Initial Environmental Examination (IEE) Checklist Report Form for Livestock / Poultry Projects

LIVESTOCK ANIMAL INDUSTRY PROJECTS

II. ENVIRONMENTAL IMPACTS AND CLIMATE CHANGE RISK MANAGEMENT PLAN


Possible Monitoring Parameters/
Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation Remarks
Impacts  Cost of preventive/mitigating as well as monitoring integrated in the construction /operation cost

LAND
 Consistency with land Current land use w/in 1km radius  See attached proof of compatibility
use (as per zoning ordinance): with land use
 Residential  Limit project activities to what is
 Commercial/ Institutional compatible to the land use

 Industrial
 Others, specify

 Agricultural/ Recreational
 Protected Areas
 Others, specify

Actual land uses w/in 1km radius:


 Residential
 Commercial/ Institutional
 Industrial
 Agricultural/ Recreational
 Protected Areas
 Others, specify

Project Name: ____________________________________________________


Page 1 of 8
Initial Environmental Examination (IEE) Checklist Report Form for Livestock / Poultry Projects

Possible Monitoring Parameters/


Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation Remarks
Impacts  Cost of preventive/mitigating as well as monitoring integrated in the construction /operation cost

 Land tenure / Identify Land tenure / compatibility  Obtain appropriate clearances/  Regularly monitor
compatibility issue issues: permits from concerned agencies presence/absence of
 CARP  Provide relocation/disturbance
complaints

 CADC/ CADT/ CALC/ CALT compensation packages


 Regular coordination with
LGU or appropriate
 ROW  Ensure participation of IPs in agencies
 Informal settlers consultations and dialogues  Others, specify
 Ecologically sensitive or  Provide adequate buffer
protected area  Others, specify
 Others, specify

 Disturbance to wildlife Existing vegetation in the area:  Comply with conditions of DENR/LGU  Annual inspection of area
due to vegetation  Forestland SLUP, Tree Cutting Permit, ROW, replanted/re-vegetated
clearing

PCA Permit  Others, specify
 Pest/disease infestation
Marshland  Limit land clearing as much as
 Grassland possible
 Mangrove  Provide temporary fencing for
 Wetland vegetation that will be retained
 Others, specify
 Employ Integrated Pest Management
System
 Promote restoration of damaged or
destroyed vegetation where possible
(e.g., tree planting)

Project Name: ____________________________________________________


Page 2 of 8
Initial Environmental Examination (IEE) Checklist Report Form for Livestock / Poultry Projects

Possible Monitoring Parameters/


Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation Remarks
Impacts  Cost of preventive/mitigating as well as monitoring integrated in the construction /operation cost

 Change in surface Slope: Considering the natural hazards and


climate projections in the area
 Regular inspection of slope  Slope/ Erosion Control
landform/ topography/  Flat (0-3%)
 Provide appropriate erosion control
protection measures in Cost:
terrain/slope erosion-prone areas
 Gently sloping to rolling (3-
 Soil Erosion 18%)
and slope protection measures
 Regular inspection for new
 Employ appropriate soil erosion eroded areas near the site
 Steep (>18%) control and slope protection
measures (e.g. contour farming,
 Others, specify
Is the project site located in an hedgerow planting, etc.)
area identified by MGB/
PAGASA/ PHIVOLCS as hazard
 Stabilization of embankment with  Others, specify
grasses or other soil cover
prone?
 Yes
 Others, specify
 No

Building of Structure and


Improper solid waste disposal
Solid Waste Management  Implement recovery re-use and  Daily inspection for
Scheme in the area: recycling of waste materials presence of garbage in the
leading to
 Impairment of visual
 SLF  Provide receptacles / bins for solid facility
aesthetics  MRF wastes  Weekly inspection of waste
 Devaluation of land  Composting  Composting of Organic Wastes accumulated
values  Regular Collection of Solid  Coordinate with the municipal / city  Regular inspection of
waste collectors landscaping and other
Wastes
beautification activities
 Implement landscaping and other
 Regular monitoring of buffer
Presence of visually significant beautification measures
landforms/landscape/structures? zones
 Provide adequate buffer

 Yes
 Compensate adjacent property
Regularly monitor
 No owners
presence/absence of
complaints from adjacent
 Others, please specify property owners
 Others, specify

Project Name: ____________________________________________________


Page 3 of 8
Initial Environmental Examination (IEE) Checklist Report Form for Livestock / Poultry Projects

Possible Monitoring Parameters/


Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation Remarks
Impacts  Cost of preventive/mitigating as well as monitoring integrated in the construction /operation cost

WATER

 Increased siltation due Specify nearest/receiving water  Set-up proper and adequate sanitary Regular (ocular) inspection of:
to project activities body: facilities  Drainage / canal systems
 Water quality  Strictly require the contractor and its  Water treatment facility (i.e.,
degradation workers to observe proper waste grease trap, septic tank,
 Others, specify
disposal and proper sanitation etc.)
 Strictly observe proper waste handling Regular monitoring of the following:
Parameter
and disposal Frequency
Distance to nearest/receiving  Provide wastewater treatment facility  pH  Annual
water body: (e.g., septic tank, oil and water  Semi-annual
 0 to less than 0.5 km separator, etc.)  Quarterly
 0.5 to 1 km  Provide biogas generator or similar  Monthly
 More than 1 km
waste treatment measures
 TSS  Annual
 Set up silt trap/settling ponds to concentratio
 Semi-annual
Classification of nearest water minimize downstream siltation n
body:  Others, specify  Quarterly
 Freshwater  Marine/ coastal  Monthly
water  BOD  Annual
 AA  SA  Semi-annual
A  SB
 Quarterly
 Monthly
B  SC
 Color  Annual
C  SD  Semi-annual
D  Quarterly
 Monthly
Project Name: ____________________________________________________
Page 4 of 8
Initial Environmental Examination (IEE) Checklist Report Form for Livestock / Poultry Projects

Possible Monitoring Parameters/


Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation Remarks
Impacts  Cost of preventive/mitigating as well as monitoring integrated in the construction /operation cost

Current Water Use:


 Fishery
 Tourist Zone / Park
 Recreational
 Industrial
 Agricultural
Distance of project area to the
nearest well used:
 0 to less than 0.5 km
 0.5 to 1 km
 More than 1 km

Use of the nearest well:


 Drinking/Domestic
 Industrial
 Agricultural
 Competition in water Size of population using receiving
surface water:
 Implement rainwater harvesting and  Regular monitoring for
use similar measures as an alternative presence/absence of
 Depletion of water  ≤ 1,000 persons source of water complaints
resources  >1,000 and ≤ 5,000  Observe water conservation  Regular coordination with
persons measures; concerned agencies
 >5,000 persons  Carefully select project site to avoid  Regular monitoring for
disruption of traditional water uses occurrences of water
shortages
Current Use of water source :  Obtain Water Permit from NWRB
 Fishery  Improve efficiency of water supply
 Others, specify
 Tourist Zone / Park and distribution system
 Recreational  Others, specify
 Industrial
 Agricultural

Available/nearest water source.


Project Name: ____________________________________________________
Page 5 of 8
Initial Environmental Examination (IEE) Checklist Report Form for Livestock / Poultry Projects

Possible Monitoring Parameters/


Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation Remarks
Impacts  Cost of preventive/mitigating as well as monitoring integrated in the construction /operation cost

 Deep well
 Water district/LGU
 Surface water
 Others, specify

 Increased occurrence Is the project site located in an


area identified by MGB/PAGASA
 Use appropriate design for project  Regular monitoring for
of flooding facilities presence/absence of
as flood prone?
  Implement appropriate drainage
complaints
Yes system  Regular coordination with
 No  Use appropriate technology (e.g.,
concerned agencies
raised hand-pumps) to protect  Regular monitoring for
drinking water from flood increased frequency of
contamination flooding
 Others, specify  Others, specify

AIR / NOISE

 Nuisance due to Distance to nearest community:  Properly operate and maintain all  Regular monitoring for
generation of  0 to less than 0.5 km emission sources (e.g. vehicles, presence/absence of
obnoxious/unpleasant  0.5 to 1 km generator, etc) complaints
odor
 More than 1 km  Strictly enforce good housekeeping
Regular (ocular) inspection of:
 Air quality degradation practices  Absence of white or black
 Nuisance due to noise Is the wind direction blowing  Control vehicle speed to lessen
smoke from vehicles,
generator, etc.
generation suspension of road dust
Project Name: ____________________________________________________
Page 6 of 8
Initial Environmental Examination (IEE) Checklist Report Form for Livestock / Poultry Projects

Possible Monitoring Parameters/


Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation Remarks
Impacts  Cost of preventive/mitigating as well as monitoring integrated in the construction /operation cost

towards the nearest community


most of the year?
 Conduct water spraying to suppress  Presence of truck cover
dust sources and minimize during deliveries
 Yes discomfort to nearby residents
 No  Use covered vehicles to deliver
materials that may generate dust
 Regular clean-up of animal houses
 Use environment-friendly deodorizer
or odor masking substances
 Use sprays with natural / microbial
disinfectants
 Provide adequate buffer and/or
planting of trees
 Others, specify

PEOPLE

 Displacement of Size of population of host  Provide relocation/disturbance  Regular monitoring for


residents including barangay: compensation packages presence/absence of
indigenous people in the  ≤ 1,000 persons  Prioritize local residents for complaints
project site and within  >1,000 and ≤ 5,000 persons employment  Regular coordination with
its vicinity
 >5,000 persons  Promptly pay local taxes and other LGU
 Enhanced employment financial obligations  Others, specify
and/or livelihood  Indigenous People Size:
opportunities
 Regular coordination with LGU

 Reduced employment
 Conduct prior consultation and
coordination to minimize disruption of
and/or livelihood
daily domestic activities and to ensure
opportunities
respect for IP rights and cultural
 Increased revenues for practices

Project Name: ____________________________________________________


Page 7 of 8
Initial Environmental Examination (IEE) Checklist Report Form for Livestock / Poultry Projects

Possible Monitoring Parameters/


Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation Remarks
Impacts  Cost of preventive/mitigating as well as monitoring integrated in the construction /operation cost

LGU Classification of host barangay:  Ensure participation of IPs in


 Disruption/Competition  Urban consultations and dialogues
in delivery of public
services (e.g.,
 Rural  Provide appropriate traffic/warning
signs, lighting, etc
education, peace and
order, etc.)
Employment/Livelihood Opportunity
Rate in the host Municipality:  Others, specify
 Enhanced delivery of  High
public services (e.g.,
education, peace and  Low
order, etc.) Description:
 Increase in traffic
volume and worsening
of traffic flow

Available services within/near the


host barangay:
 Schools (e.g., elementary,
high school, college)
 Health facilities (e.g., clinics,
hospitals, etc.)
 Peace and order (e.g., police
outpost, Brgy. Tanod, etc.)
 Recreation and sports
facilities
 Others, specify

Project Name: ____________________________________________________