INDEX OF SHEETS

A. COVER PAGE
B. GENERAL INFORMATION SHEET ---------------------------------- 1
· GENERAL NOTES N
· ABBREVATIONS
· SUMMARY OF QUANTITES
· TYPICAL DETAIL SECTION OF TARPAULIN SIGNBOARD

C. LAYOUT SHEET ----------------------------------------------------------- 2-3


· STATION LIMIT
· LOCATION MAP
· INDEX OF SHEET N
D. TYPICAL DETAILS OF ROAD PAVEMENT ------------------ 4

E3
· TYPICAL SECTION OF ROAD PAVEMENT
· TYPICAL DET. OF THERMOPLASTIC PAVEMENT MARKING

LIN
E. TYPICAL DETAILS OF ROAD PAVEMENT ------------------ 5
· TYPICAL JOINT DETAIL OF PCCP
· TYPICAL DETAIL OF CORNER PCCP
· TYPICAL DOWEL DETAIL OF PCCP LINE 1
F. TYPICAL DETAILS OF PIPE LAYING ------------------ 6 LINE 2
· PIPE LAYING DETAILS (TYPICAL)
· DETAILS FOR JOINT AND GRAVEL BASE
G. TYPICAL DRAINAGE SECTIONS SHEETS ------------------ 7
· MANHOLE GRATINGS DETAIL
· DETAILED SECTION
· MANHOLE DETAILS
· MANHOLE COVER DETAILS
· CURB AND GUTTER DETAILS
H. PLAN AND PROFILE SHEETS --------------------------------------- 8
· PLAN & PROFILE FOR LINE 1 (RIGHT LANE)
I. PLAN AND PROFILE SHEETS --------------------------------------- 9
· PLAN & PROFILE FOR LINE 2 (RIGHT LANE)
J. PLAN AND PROFILE SHEETS --------------------------------------- 10
· PLAN & PROFILE FOR LINE 3 (RIGHT LANE)
K. PLAN AND PROFILE SHEETS --------------------------------------- 11
· PLAN & PROFILE FOR LINE 1 (LEFT LANE)

L. PLAN AND PROFILE SHEETS --------------------------------------- 12


· PLAN & PROFILE FOR LINE 2 (LEFT LANE)
M. PLAN AND PROFILE SHEETS--------------------------------------- 13
L O C A T I O N M A P
· PLAN & PROFILE FOR LINE 3 (LEFT LANE) D R A W N N O T T O S C A L E
N. DETAILED CROSS SECTION --------------------------------------- 14-20
· DETAILED CROSS SECTION (BOTH LANES) BEGINNING OF PROJECT
STA. 0+157

MATCHLINE STA. 0+400


STATION LIMITS (LINE 1)
SCALE: 1:1200 MTS
I NEER ' S
Republic of the Philippines PROJECT TITLE: PREPARED BY: CHECKED BY: RECOMMENDING APPROVAL: CONCURRED: APPROVED FOR IMPLEMENTATION: SHEET NO.
NG Province of Davao del Sur
E

OF

CITY OF DIGOS CONCRETING OF ROAD SHOULDERING WITH SIDEWALK ENGR. TEMOTEO L. PUPA III ENGR. FRANCES A. SANOY
C ITY

F ICE

INCLUDING CONSTRUCTION OF DRAINAGE SYSTEM ALONG

2
DRAFTSMAN II
CEO STAFF ENGR. SALVADOR L. DUMOGHO IV ENP. OJELA MAE M. ENTERO, MBA, DBA HON. JOSEF F. CAGAS
DEL PILAR ST. (JNC. BIAK-NA-BATO ST. - BATAAN ST. - ROXAS
OFFICE OF THE CITY ENGINEER ST. - FIRST CRUMB ST.) , DIGOS CITY (K0+157 TO K0+935)
SUBMITTED BY: OIC-CITY ENGINEER CITY PLANNING AND DEVELOPMENT OFFICER CITY MAYOR

IT
City Hall Compound, Digos City ENGR. CHLOUI GLINE B. SAPLAGIO ENGR. DENNIS C. ALMACIN , SR.
S
C

Y O D I GO CEO STAFF
F LOCATION: DEL PILAR ST., BRGY ZONE III, DIGOS CITY ENGINEER I

You might also like