MARLO P. DE CHAVEZ CESAR ANTONIO P. JADER DAN LESTER T. LAGSIT FAUSTINO MARK ANTHONY S. DE LA CRUZ MA. CHYMBELIN D.

BELIN D. IBAL NESTOR I. CLEOFAS DR. ANIANO M. OGAYON, CESO V


TABLE OF CONTENTS
REPUBLIC OF THE PHILIPPINES
THIS SITE DPWH
GENERAL DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
ENGINEER / BUILDING OFFICIAL

G - 1 COVER PAGE

ARCHITECTURAL

DISTRICT / CITY / MUNICIPALITY


A - 1 PERSPECTIVE, TABLE OF CONTENTS, LOCATION MAP, SITE
DEVELOPMENT PLAN & SUMMARY OF QUANTITIES
A - 2 DPWH STANDARD PROJECT BILLBOARD
A - 3 GROUND FLOOR PLAN, TYPICAL SECOND & THIRD FLOOR PLAN, LAND USE AND ZONING
4TH FLOOR PLAN, FRONT ELEVATION & SCHEDULE OF FINISHES
A - 4 REAR ELEV., LEFT & RIGHT SIDE ELEV., CROSS SECTION AND
LONGITUDINAL SECTION
A - 5 REFLECTED CEILING PLAN & ROOF PLAN/DECK ROOF FLOOR PLAN
A - 6 SCHEDULE OF DOORS & WINDOWS, DETAIL PLAN, ELEVATION,
SECTION OF RAMP, SPOT DETAILS & DETAIL OF WINDOW
GRILL FOR W-2
A - 7 SECTION DETAIL OF EAVES, SPOT DETAIL CORNER CEILING,
CONCRETE SUN BREAKER DETAIL, PERSPECTIVE, SECTION
& SPOT DETAIL OF CEILING, PLAN & SECTION OF VENTILATION
A - 8 STAIR DETAILS
A - 9 STAIR DETAILS TO DECK ROOF, TYPICAL DETAIL OF DOOR
FRAME, SPOT DETAILS & NOSING DETAIL
A - 10 DETAIL OF FIRE ESCAPE STAIR, SPOT DETAIL AND BAY SECTION
ALONG CORRIDORS & TOILETS
A - 11 DETAIL PLAN OF TOILET & SECTION, LINE AND GRADE
DETAIL OF COUNTER SINK, URINAL SECTION & DETAIL
A - 12 BLACKBOARD DETAIL, CONNECTION SECTION DETAIL,
SECTION, SPOT DETAIL SECTION EDGE FRAMING,
CHALK DUST BOX DETAIL

L O C A T I O N M A P
STRUCTURAL

P E R S P E C T I V E V I E W S U M M AR Y O F Q U AN T I T I E S
S
S
S
-
-
-
1
2
3
GENERAL NOTES
GENERAL NOTES
FOUNDATION PLAN, 2ND - 3RD & 4TH FLOOR FRAMING PLAN ARCHITECTURAL
S - 4 SCHEDULE OF FOOTINGS & COLUMN, TYPICAL FOOTING DET.
AND DETAIL OF WALL FOOTINGS
S-5 SCHEDULE OF SLAB, SCHEDULE OF BEAMS, TYPICAL SLAB SECT.,
TYPICAL BEAM DETAILS & TYPE OF STIRRUPS
S-6 ROOF FRAMING PLAN AT TOP & BOTTOM CHORD LEVEL
S-7 TRUSS-1 ELEVATION, WELD DETAILS, SCHEDULE OF TRUSS
MEMBERS AND WELDS & TRUSS SUPPORT CONNECTION DET.
S-8 ELEV. OF END WALL FRAME & HALF TRUSS, ELEV. OF
END WALL FRAME @ GRID 6, CONCRETE SUN BREAKER
DETAIL, SC-1 DETAIL PLAN & ELEVATION, CONN. OF
PURLINS TO RB-1, DETAIL SECTION OF RB-1 & PC-1
S-9 ELEV. OF END WALL FRAME (GRID 1), DETAILS, ANCHOR BOLT
DETAIL, TRUSS DETAIL AT GUTTER END, ROOF PANEL SIDE LAP
DETAIL, J-BOLT SPACING, J-BOLT TO PURLIN & G.I.SHEET
CONNECTION DETAIL & ROOFING FIXER
S - 10 DETAIL CONN. OF CROSS BRACING AT END WALL, DET. CONN. STRUCTURAL
STAGE OF CROSS BRACING AT (GRID LINE A & C), DET. CONN. OF
CROSS BRACING AT TRUSS @ APEX, DET. OF PURLIN TO
SAG ROD CONNECTION, PURLIN CONN. DET. & PURLIN SPLICE
S - 11 STAIR FRAMING PLAN & SECTION DETAIL, RAMP DETAIL,
SECTION OF STAIR SLAB, DET. OF STAIR ON GRADE, DET. OF
WALL ON FTB & GROUND FLOOR SLAB, DETAIL OF DC-1
S - 12 STAIR FROM 4TH FLOOR TO DECK ROOF PLAN, ELEV. & DET.
S - 13 FIRE ESCAPE FRAMING PLAN, ELEVATION & DETAIL
S - 14 FIRE ESCAPE DETAILS

PLUMBING
SANITARY

THIS P-1 GENERAL NOTES & LEGEND, MISC, DETAILS TYPICAL


SEPTIC TANK DETAIL, SEPTIC TANK, DIMENSION,
UNDERGROUND WATER TANK DETAILS, UNDER GROUND
WATER TANK CAPACITY, ELEVATED WATER TANK DIMENSION,
LOCATIONS UNDER GROUND WATER TANK DIMENSION
P - 2 GROUND FLOOR, SECOND TO FOURTH FLOOR SEWER AND
DRAINAGE LAYOUT
P - 3 SECOND TO 4TH FLOOR WATERLINE LAYOUT, ROOF WATERLINE
LAYOUT AND WATERLINE ISOMETRIC VIEW
P - 4 ISOMETRIC DIAGRAM (SEWER & DRAINAGE LAYOUT), PLAN &
ELEVATION OF SCIENCE LABORATORY COUNTER

ELECTRICAL ELECTRICAL

E-1 GENERAL NOTES, LEGEND, LOAD SCHEDULE AND


ELECTRICAL RISER DIAGRAM
E-2 GROUND & SECOND FLOOR POWER & AUXILIARY LAYOUT,
AND LIGHTING LAYOUT
E-3 THIRD & FOURTH FLOOR POWER & AUXILIARY LAYOUT,
LIGHTING LAYOUT AND LOAD SCHEDULE
E-4 ROOF DECK LIGHTING LAYOUT AND
FIRE ALARM SYSTEM RISER DIAGRAM

MECHANICAL
MECHANICAL
S I T E D E V E LO P M E N T P LAN WP - 1 PARTIAL GROUND FLOOR (SHOWING LOCATION OF
CISTERN), PARTIAL ROOF PLAN, ELEVATION OF OVER
HEAD WATER TANK, ISOMETRIC DIAGRAM OF WATER
PUMPING SYSTEM, SCHEMATIC DIAGRAM OF WATER LEVEL
CONTROL, LEGEND, SCHEDULE OF EQUIPMENT

FP - 1 GROUND FLOOR, SECOND TO 4TH FLOOR FIRE PROTECTION


PLAN, PARTIAL ROOF PLAN, DRY STAND PIPE RISER DIGRAM
CONN., FIRE HOSE CABINET DETAIL, FIRE DISTINGUISHER DET.
CLASSROOM
CORRIDOR
CORRIDOR

CLASSROOM

CORRIDOR

CLASSROOM

CLASSROOM

CORRIDOR
TYPE OF STIRRUPS

TYPICAL BEAM DETAILS

TYPICAL SLAB SECTION


SPOT DETAIL

SECTION OF STAIR SLAB SECTION

DETAIL DETAIL

PLAN
RAMP DETAIL
DETAIL OF DC-1

DET. OF WALL ON FTB &


DET. OF STAIR ON GRADE GROUND FLOOR SLAB
STAIR FRAMING PLAN STAIR SECTION DETAIL
DETAIL SECTION
SPOT DETAIL
SPOT DETAIL

SPOT DETAIL

SECTION OF STAIR SLAB

ELEVATION
SPOT DETAIL

PLAN
STAIR FROM FOURTH FLOOR TO DECK ROOF
DETAIL ELEVATION DETAIL ELEVATION DETAIL
FIRE ESCAPE FRAMING PLAN
FIRE ESCAPE ELEVATION

SPOT DETAIL

SPOT D E T A I L
PLAN IN-BETWEEN LANDING
F

F
F

SHO
CO
UN
TER

F
F
CO F
UNT
ER

CO
UN
TER

F
F
F

F
F
F
2 PLAN OF SCIENCE LABORATORY COUNTER
P-4 SCALE 1:50 MTS.

SHO

CO
UNT
ER
CO
UN
TE
R

CO
UNT
ER

3 ELEVATION OF SCIENCE LABORATORY COUNTER


SCALE 1:50 MTS.
P-4
GENERAL NOTES: LOAD SCHEDULE
1. ALL ELECTRICAL WORKS SHALL COMPLY WITH THESE PLANS AND SPECIFICATIONS. THE APPLICABLE
PROVISIONS OF THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE (PEC), THE RULES AND
REGULATIONS OF THE LOCAL ENFORCING AUTHORITY AND THE REQUIREMENTS OF THE LOCAL
POWER COMPANY.

2. THE ELECTRICAL SERVICE POWER SHALL BE 1-PHASE, 3 WIRE, 230V AC, 60Hz.

3. WIRING METHOD SHALL BE AS FOLLOWS:


RIGID STEEL CONDUIT OR POLYVINYL CHLORIDE CONDUIT SCHEDULE 40 SHALL BE USED AS
SPECIFIED IN THE PLAN.

4. ALL WIRES SHALL BE COPPER AND THERMOPLASTIC INSULATED TYPE THHN UNLESS OTHERWISE
INDICATED IN THE PLAN. THE MINIMUM WIRE SIZE FOR POWER AND LIGHTING CIRCUIT

5. ALL OUTLET BOXES SHALL BE GALVANIZED GAGE NO. 16 DEEP TYPE.

6. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND APPROVED FOR THE PARTICULAR
LOCATION AND USAGE.

7. EQUIPMENT GROUNDING SYSTEM SHALL BE PROVIDED TO THE ELECTRICAL SYSTEM AS PER


PHILIPPINE ELECTRICAL CODE REQUIREMENT.

8. MOUNTING HEIGHT OF WIRING DEVICES SHALL BE AS FOLLOWS:


a. LIGHT SWITCH -1.20m ABOVE FINISH FLOOR 40AT, 2P, 240V,10kAIC
b. CONVENIENCE OUTLET -0.30m ABOVE FINISH FLOOR IN NEMA-1 ENCLOSURE

9. ALL ELECTRICAL WORKS SHALL BE DONE UNDER THE DIRECT AND IMMIDIATE SUPERVISION OF A
DULY LICENSED ELECTRICAL ENGINEER. LP-MUL 2

FOURTH FLOOR
LEVEL
LEGEND:
WL
WALL LAMP, SPANISH TYPE, 15WATTS LED (DAYLIGHT)

2x36WATTS FLUORESCENT LIGHTING FIXTURE BOX TYPE.

1x36WATTS FLUORESCENT LIGHTING FIXTURE BOX TYPE.

1-18WATTS COMPACT FLUORESCENT LAMP WITH MEDIUM BASE


KEYLESS TYPE PORCELAIN RECEPTACLE.

SINGLE CONVENIENCE OUTLET, GROUNDING AND UNIVERSAL SOCKET TYPE


WALL FAN OUTLET,MOUNTED BELOW CELING

LIGHTING FIXTURE SWITCH


S,Sa SINGLE POLE,ONE GANG SWITCH 40AT, 2P, 240V,10kAIC
IN NEMA-1 ENCLOSURE
2Sab SINGLE POLE,TWO GANG SWITCH
3Sabc SINGLE POLE,THREE GANG SWITCH
S3Wa SINGLE POLE,THREE WAY,ONE GANG SWITCH LP-MUL 1

LP LIGHTING PANEL THIRD FLOOR


LEVEL
DUPLEX CONVENIENCE OUTLET, GROUNDING AND UNIVERSAL SOCKET TYPE
16AMPS,250V

DUPLEX CONVENIENCE OUTLET, GROUNDING AND UNIVERSAL SOCKET TYPE


WP 16AMPS,250V, WEATHER PROOF TYPE

FLOOR TYPE DUPLEX CONVENIENCE OUTLET, GROUNDING AND UNIVERSAL SOCKET TYPE
16AMPS,250V

SPECIAL PURPOSE OUTLET, GROUNDING AND UNIVERSAL SOCKET TYPE


16AMPS,250V (WINDOW TYPE AIRCON OUTLET)

CIRCUIT HOMERUN F MANUAL PULL STATION

150AT, 2P, 240V,10kAIC


IN NEMA-1 ENCLOSURE
B FIRE ALARM VIBRATING BELL

LP-COM
175AT, 2P, 240V
MANUAL TRANSFER SECOND FLOOR
SWITCH, BREAKER TYPE LEVEL
IN NEMA-4X ENCLOSURE

CURRENT
TRANSFORMER
POWER IN NEMA-4X
SERVICE
ENTRANCE

KW/HR METER
175AT, 2P, 240V
IN NEMA-4X ENCLOSURE 40AT, 2P, 240V,10kAIC
MAIN CIRCUIT BREAKER IN NEMA-1 ENCLOSURE
175AT, 2P, 240V
IN NEMA-4X ENCLOSURE

LP-SCI
DP
GROUND FLOOR
LEVEL
23000 23000
4500 4500 4500 4500 5000 4500 4500 4500 4500 5000

LINE OF SUNBREAKER LINE OF SUNBREAKER

WAC 2.5

WAC 2.5 WAC 2.5 WAC 2.5


LP-COM LP-COM SHE
LP-COM LP-COM 07 LP-COM 06 LP-COM

SINK
URINAL

URINAL
HE
08 09 10 11

COUNTER SINK

COUNTER SINK
LOCKER

1.00
LP-COM LP-SCI
7000

7000
12
COMPUTER LABORATORY LP-COM SCIENCE LABORATORY 04

1.00
LANDING LANDING
LANDING 05 LANDING
9500

9500
LP-COM 10 10
LP-COM 11 9 11 9
12 8 LP-SCI STORAGE 12 8
13 DP 7 7
LP-COM 13
14 6 UP TO F.A. 05 LP-SCI
13
14 6
MTS STATION AT
04 15
16
5
4 QUEZELCO 1 3RD. FLOOR
15
16
5
4
FACP
3 3
SERVICE STO.
2 2
1
ENTRANCE 1
UP UP
UP TO F.A.
WP STATION AT WP UP WP WP UP
2ND. FLOOR TO FACP
2500

2500
CORRIDOR CORRIDOR CORRIDOR CORRIDOR DOWN TO F.A.
STATION AT
GROUND FLOOR

RAMP RAMP
UP UP

GROUND FLOOR SECOND FLOOR


COMPUTER LABORATORY SCIENCE LABORATORY
1 3
E-2 SCALE 1:100M E-2 SCALE 1:100M

23000 23000
4500 4500 4500 4500 5000 4500 4500 4500 4500 5000

LINE OF SUNBREAKER LINE OF SUNBREAKER

i i
k k
LP-COM LP-SCI LP-SCI
j j
LP-COM 03 SHE Sf

SINK
03 01

URINAL

URINAL
HE 2Sij HE
01
a b c d e f 2Sij a b c d e f
2Skl 2Skl
l l

COUNTER SINK

COUNTER SINK
LOCKER
7000

7000
o COMPUTER LABORATORY o LANDING
SCIENCE LABORATORY LP-SCI
LANDING
LANDING
02 n
9500

LANDING

9500
10 10
m 9
11 9
m 11
a b c d e f 8 8
12 a b c d e f 12
13 7 13 7
14 6 14 6
Sm 15 5 STORAGE 15 5
S3Wn 16 4
Sm STO. 16 4
3 3
2Sab Sc 2Sde Sf 2Sab Sc 2Sde Sh S3Wn
2 2
1 1
UP S3Wg S3Wg UP Sq
S3Wg S3Wg
S3Wo UP S3Wo UP
2500

2500
g g g g g CORRIDOR CORRIDOR
LP-COM CORRIDOR CORRIDOR g g g g g

02

RAMP RAMP
UP UP

GROUND FLOOR SECOND FLOOR


COMPUTER LABORATORY SCIENCE LABORATORY
2 4
E-2 SCALE 1:100M E-2 SCALE 1:100M
23000 23000
4500 4500 4500 4500 5000 4500 4500 4500 4500 5000

LINE OF SUNBREAKER LINE OF SUNBREAKER

i
k
SHE LP-MUL
SHE j
LP-MUL 03 HE

URINAL

URINAL
HE
01
a b c d e f 2Sij 2Skl
l

COUNTER SINK

COUNTER SINK
7000

7000
MULTI-PURPOSE HALL
o MULTI-PURPOSE HALL LANDING
LANDING LP-MUL LANDING
LANDING n
04
9500

9500
10 10
9
m 9
11 11
8 8
LP-MUL 12 a b c d e f 12
13 7 13 7
4TH. FLOOR 14 6 14 6
STATION AT LP-MUL 15 5
Sm
15 5
UP TO F.A. 4 S3Wn 4
05 16
3
16
3
2Sab Sc 2Sde Sf
2 2
1 1
DOWN DOWN
S3Wg S3Wg
WP WP DOWN S3Wo DOWN
2500

2500
CORRIDOR CORRIDOR DOWN TO F.A. CORRIDOR CORRIDOR
g g g g g
STATION AT LP-MUL
3RD. FLOOR 02

RAMP RAMP
UP UP
THIRD FLOOR & FOURTH FLOOR THIRD FLOOR & FOURTH FLOOR
MULTI-PURPOSE CLASSROOM MULTI-PURPOSE CLASSROOM
1 2
E-3 SCALE 1:100M E-3 SCALE 1:100M

LOAD SCHEDULE

LOAD SCHEDULE
FOURTH FLOOR
LEVEL

23000
4500 4500 4500 4500 5000

600

THIRD FLOOR
LEVEL
1500

1790

6450
WL

1150
x LANDING

ROOF DECK SECOND FLOOR


LEVEL
7000

DOWN TO

1810
LTG. CKT. AT
3RD. FLOOR y WL
2Sxy
9500

FACP

UP GROUND FLOOR
LEVEL

6425
2500
1500

2
E-4 SCALE N.T.S.

ROOF DECK
1
E-4 SCALE 1:100M