Professional Documents
Culture Documents
G - 1 COVER PAGE
ARCHITECTURAL
L O C A T I O N M A P
STRUCTURAL
P E R S P E C T I V E V I E W S U M M AR Y O F Q U AN T I T I E S
S
S
S
-
-
-
1
2
3
GENERAL NOTES
GENERAL NOTES
FOUNDATION PLAN, 2ND - 3RD & 4TH FLOOR FRAMING PLAN ARCHITECTURAL
S - 4 SCHEDULE OF FOOTINGS & COLUMN, TYPICAL FOOTING DET.
AND DETAIL OF WALL FOOTINGS
S-5 SCHEDULE OF SLAB, SCHEDULE OF BEAMS, TYPICAL SLAB SECT.,
TYPICAL BEAM DETAILS & TYPE OF STIRRUPS
S-6 ROOF FRAMING PLAN AT TOP & BOTTOM CHORD LEVEL
S-7 TRUSS-1 ELEVATION, WELD DETAILS, SCHEDULE OF TRUSS
MEMBERS AND WELDS & TRUSS SUPPORT CONNECTION DET.
S-8 ELEV. OF END WALL FRAME & HALF TRUSS, ELEV. OF
END WALL FRAME @ GRID 6, CONCRETE SUN BREAKER
DETAIL, SC-1 DETAIL PLAN & ELEVATION, CONN. OF
PURLINS TO RB-1, DETAIL SECTION OF RB-1 & PC-1
S-9 ELEV. OF END WALL FRAME (GRID 1), DETAILS, ANCHOR BOLT
DETAIL, TRUSS DETAIL AT GUTTER END, ROOF PANEL SIDE LAP
DETAIL, J-BOLT SPACING, J-BOLT TO PURLIN & G.I.SHEET
CONNECTION DETAIL & ROOFING FIXER
S - 10 DETAIL CONN. OF CROSS BRACING AT END WALL, DET. CONN. STRUCTURAL
STAGE OF CROSS BRACING AT (GRID LINE A & C), DET. CONN. OF
CROSS BRACING AT TRUSS @ APEX, DET. OF PURLIN TO
SAG ROD CONNECTION, PURLIN CONN. DET. & PURLIN SPLICE
S - 11 STAIR FRAMING PLAN & SECTION DETAIL, RAMP DETAIL,
SECTION OF STAIR SLAB, DET. OF STAIR ON GRADE, DET. OF
WALL ON FTB & GROUND FLOOR SLAB, DETAIL OF DC-1
S - 12 STAIR FROM 4TH FLOOR TO DECK ROOF PLAN, ELEV. & DET.
S - 13 FIRE ESCAPE FRAMING PLAN, ELEVATION & DETAIL
S - 14 FIRE ESCAPE DETAILS
PLUMBING
SANITARY
ELECTRICAL ELECTRICAL
MECHANICAL
MECHANICAL
S I T E D E V E LO P M E N T P LAN WP - 1 PARTIAL GROUND FLOOR (SHOWING LOCATION OF
CISTERN), PARTIAL ROOF PLAN, ELEVATION OF OVER
HEAD WATER TANK, ISOMETRIC DIAGRAM OF WATER
PUMPING SYSTEM, SCHEMATIC DIAGRAM OF WATER LEVEL
CONTROL, LEGEND, SCHEDULE OF EQUIPMENT
CLASSROOM
CORRIDOR
CLASSROOM
CLASSROOM
CORRIDOR
TYPE OF STIRRUPS
DETAIL DETAIL
PLAN
RAMP DETAIL
DETAIL OF DC-1
SPOT DETAIL
ELEVATION
SPOT DETAIL
PLAN
STAIR FROM FOURTH FLOOR TO DECK ROOF
DETAIL ELEVATION DETAIL ELEVATION DETAIL
FIRE ESCAPE FRAMING PLAN
FIRE ESCAPE ELEVATION
SPOT DETAIL
SPOT D E T A I L
PLAN IN-BETWEEN LANDING
F
F
F
SHO
CO
UN
TER
F
F
CO F
UNT
ER
CO
UN
TER
F
F
F
F
F
F
2 PLAN OF SCIENCE LABORATORY COUNTER
P-4 SCALE 1:50 MTS.
SHO
CO
UNT
ER
CO
UN
TE
R
CO
UNT
ER
2. THE ELECTRICAL SERVICE POWER SHALL BE 1-PHASE, 3 WIRE, 230V AC, 60Hz.
4. ALL WIRES SHALL BE COPPER AND THERMOPLASTIC INSULATED TYPE THHN UNLESS OTHERWISE
INDICATED IN THE PLAN. THE MINIMUM WIRE SIZE FOR POWER AND LIGHTING CIRCUIT
6. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND APPROVED FOR THE PARTICULAR
LOCATION AND USAGE.
9. ALL ELECTRICAL WORKS SHALL BE DONE UNDER THE DIRECT AND IMMIDIATE SUPERVISION OF A
DULY LICENSED ELECTRICAL ENGINEER. LP-MUL 2
FOURTH FLOOR
LEVEL
LEGEND:
WL
WALL LAMP, SPANISH TYPE, 15WATTS LED (DAYLIGHT)
FLOOR TYPE DUPLEX CONVENIENCE OUTLET, GROUNDING AND UNIVERSAL SOCKET TYPE
16AMPS,250V
LP-COM
175AT, 2P, 240V
MANUAL TRANSFER SECOND FLOOR
SWITCH, BREAKER TYPE LEVEL
IN NEMA-4X ENCLOSURE
CURRENT
TRANSFORMER
POWER IN NEMA-4X
SERVICE
ENTRANCE
KW/HR METER
175AT, 2P, 240V
IN NEMA-4X ENCLOSURE 40AT, 2P, 240V,10kAIC
MAIN CIRCUIT BREAKER IN NEMA-1 ENCLOSURE
175AT, 2P, 240V
IN NEMA-4X ENCLOSURE
LP-SCI
DP
GROUND FLOOR
LEVEL
23000 23000
4500 4500 4500 4500 5000 4500 4500 4500 4500 5000
WAC 2.5
SINK
URINAL
URINAL
HE
08 09 10 11
COUNTER SINK
COUNTER SINK
LOCKER
1.00
LP-COM LP-SCI
7000
7000
12
COMPUTER LABORATORY LP-COM SCIENCE LABORATORY 04
1.00
LANDING LANDING
LANDING 05 LANDING
9500
9500
LP-COM 10 10
LP-COM 11 9 11 9
12 8 LP-SCI STORAGE 12 8
13 DP 7 7
LP-COM 13
14 6 UP TO F.A. 05 LP-SCI
13
14 6
MTS STATION AT
04 15
16
5
4 QUEZELCO 1 3RD. FLOOR
15
16
5
4
FACP
3 3
SERVICE STO.
2 2
1
ENTRANCE 1
UP UP
UP TO F.A.
WP STATION AT WP UP WP WP UP
2ND. FLOOR TO FACP
2500
2500
CORRIDOR CORRIDOR CORRIDOR CORRIDOR DOWN TO F.A.
STATION AT
GROUND FLOOR
RAMP RAMP
UP UP
23000 23000
4500 4500 4500 4500 5000 4500 4500 4500 4500 5000
i i
k k
LP-COM LP-SCI LP-SCI
j j
LP-COM 03 SHE Sf
SINK
03 01
URINAL
URINAL
HE 2Sij HE
01
a b c d e f 2Sij a b c d e f
2Skl 2Skl
l l
COUNTER SINK
COUNTER SINK
LOCKER
7000
7000
o COMPUTER LABORATORY o LANDING
SCIENCE LABORATORY LP-SCI
LANDING
LANDING
02 n
9500
LANDING
9500
10 10
m 9
11 9
m 11
a b c d e f 8 8
12 a b c d e f 12
13 7 13 7
14 6 14 6
Sm 15 5 STORAGE 15 5
S3Wn 16 4
Sm STO. 16 4
3 3
2Sab Sc 2Sde Sf 2Sab Sc 2Sde Sh S3Wn
2 2
1 1
UP S3Wg S3Wg UP Sq
S3Wg S3Wg
S3Wo UP S3Wo UP
2500
2500
g g g g g CORRIDOR CORRIDOR
LP-COM CORRIDOR CORRIDOR g g g g g
02
RAMP RAMP
UP UP
i
k
SHE LP-MUL
SHE j
LP-MUL 03 HE
URINAL
URINAL
HE
01
a b c d e f 2Sij 2Skl
l
COUNTER SINK
COUNTER SINK
7000
7000
MULTI-PURPOSE HALL
o MULTI-PURPOSE HALL LANDING
LANDING LP-MUL LANDING
LANDING n
04
9500
9500
10 10
9
m 9
11 11
8 8
LP-MUL 12 a b c d e f 12
13 7 13 7
4TH. FLOOR 14 6 14 6
STATION AT LP-MUL 15 5
Sm
15 5
UP TO F.A. 4 S3Wn 4
05 16
3
16
3
2Sab Sc 2Sde Sf
2 2
1 1
DOWN DOWN
S3Wg S3Wg
WP WP DOWN S3Wo DOWN
2500
2500
CORRIDOR CORRIDOR DOWN TO F.A. CORRIDOR CORRIDOR
g g g g g
STATION AT LP-MUL
3RD. FLOOR 02
RAMP RAMP
UP UP
THIRD FLOOR & FOURTH FLOOR THIRD FLOOR & FOURTH FLOOR
MULTI-PURPOSE CLASSROOM MULTI-PURPOSE CLASSROOM
1 2
E-3 SCALE 1:100M E-3 SCALE 1:100M
LOAD SCHEDULE
LOAD SCHEDULE
FOURTH FLOOR
LEVEL
23000
4500 4500 4500 4500 5000
600
THIRD FLOOR
LEVEL
1500
1790
6450
WL
1150
x LANDING
DOWN TO
1810
LTG. CKT. AT
3RD. FLOOR y WL
2Sxy
9500
FACP
UP GROUND FLOOR
LEVEL
6425
2500
1500
2
E-4 SCALE N.T.S.
ROOF DECK
1
E-4 SCALE 1:100M