Professional Documents
Culture Documents
1 4 1 4 1 4
500
CEILING LINE A - 10 A - 10 A - 10
2950 2950 2950
1400 200 1350 1400 200 1350 1400 200 1350
4.5mm THK. FIBER
CEMENT CEILING BOARD
6 (PAINTED) ON METAL
A - 10 FURRING CHANNEL @
SCHEDULE 40
3200
1275
1275
LANDING LANDING
1275
LANDING (PAINT FINISH)
A - 10 (PAINT FINISH) 10 9
A - 10 A - 10
10 29
10
9 11 28 30
11
900
9
8 12 27 31
THIRD FLOOR LEVEL 8 12
38
3850
3850
3850
CORRIDOR
5
32 16 23 16 23 35
4
30 3
22 17 22 36
LANDING 29 STO. 18 37
9600
3200
28 2
21 21
27
26 B 1 B 20 19
DN B 20 38
DN
D-5
25
24 UP UP
1685
23
1500 1500 1500 1500
22 1500 1500
1100
21
900
25
18
17
11 1 DETAIL PLAN OF STAIR 2 DETAIL PLAN OF STAIR 3
16
15 A - 10
A - 10 SCALE 1:40 M. A - 10 SCALE 1:40 M. A - 10 SCALE 1:40 M.
14
1515
13
12
11 C
LANDING 10
C
3200
200
1660
(PAINT FINISH)
1709
200
135
3
2 16 19mm SQUARE BAR
900
5
700
1200
GROUND FLOOR LEVEL STORAGE 1 WELDED TO G.I PIPE
50
HANDRAIL @ 146mm
168
900
CORRIDOR
Q.C
50
50
325
300
40 (PAINT FINISH )
50
FINISH GROUND LINE 5 SECOND FLOOR LINE
TYPICAL
900
300
850
A - 10
9 THREADS @ 300 = 2575 2 x 25 x 25mm ANGULAR
BAR NOSING @ STEP
W A L L
250
TREAD
( PAINT FINISH )
A - 10 SCALE 1:20 M.
2 X 25 X 25mm ANGULAR
175
BAR NOSING @ STEP 5 SECTION DETAIL
128
ANCHOR @ R.C STAIR
SPOT DETAIL
50
10 A - 10 SCALE 1:20 M.
A - 10 SCALE 1:50 M.
A - 10 SCALE 1:20 M.
7 NOSING DETAIL
A -10 SCALE 1:50 M.
A-16 37
SCHEMA ENGINEERS AND ASSOCIATES OIC, BUILDING DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY MASINLOC, ZAMBALES