TOP OF ROOF BEAM

1 4 1 4 1 4

500
CEILING LINE A - 10 A - 10 A - 10
2950 2950 2950
1400 200 1350 1400 200 1350 1400 200 1350
4.5mm THK. FIBER
CEMENT CEILING BOARD
6 (PAINTED) ON METAL
A - 10 FURRING CHANNEL @
SCHEDULE 40
3200

400mm O.C (SEE DETAIL)


SCHEDULE 40 (PAINT FINISH)
8 SCHEDULE 40
2700

1275

1275
LANDING LANDING

1275
LANDING (PAINT FINISH)
A - 10 (PAINT FINISH) 10 9
A - 10 A - 10
10 29
10
9 11 28 30
11
900

9
8 12 27 31
THIRD FLOOR LEVEL 8 12
38

3850

3850
3850
CORRIDOR

8 THREADS @ 300 = 2400

8 THREADS @ 300 = 2400


8 THREADS @ 300 = 2400
13 32
37

9 THREADS @ 300 = 2700

9 THREADS @ 300 = 2700


7 26

9 THREADS @ 300 = 2700


7 13
36 14 33
35 14 6 25
6
34 5 15 24 34
33 15
1515

5
32 16 23 16 23 35
4

19 RISERS @ 168 = 3200


31
900

30 3
22 17 22 36
LANDING 29 STO. 18 37
9600

3200

28 2
21 21
27
26 B 1 B 20 19
DN B 20 38
DN
D-5
25
24 UP UP
1685

23
1500 1500 1500 1500
22 1500 1500

1100
21
900

20 ( AT SECOND FLOOR) ( AT THIRD FLOOR)


SECOND FLOOR LEVEL 19 CORRIDOR ( AT GROUND FLOOR)
DETAIL PLAN OF STAIR

25
18
17
11 1 DETAIL PLAN OF STAIR 2 DETAIL PLAN OF STAIR 3
16
15 A - 10
A - 10 SCALE 1:40 M. A - 10 SCALE 1:40 M. A - 10 SCALE 1:40 M.
14
1515

13
12

19 RISERS @ 168 = 3200


900

11 C
LANDING 10
C
3200

9 HANDRAIL W/ 25mm SQ.


8 SCHEDULE 40 BRACKET @ 600mm O.C
7 (PAINT FINISH) (PAINT FINISH )
6 1400 SCHEDULE 40
5

200
1660

(PAINT FINISH)
1709

200
135
3
2 16 19mm SQUARE BAR

900
5

700

1200
GROUND FLOOR LEVEL STORAGE 1 WELDED TO G.I PIPE

50
HANDRAIL @ 146mm
168

900
CORRIDOR
Q.C

50
50
325

300
40 (PAINT FINISH )
50
FINISH GROUND LINE 5 SECOND FLOOR LINE

TYPICAL
900
300

850
A - 10
9 THREADS @ 300 = 2575 2 x 25 x 25mm ANGULAR
BAR NOSING @ STEP

4 DETAIL SECTION OF STAIR SCH. 40 LANDING ANCHOR @ R.C STAIR


200
A - 10 SCALE 1:40 M. (PAINT FINISH)
ELEVATION DETAIL
50 FULLY WELDED SCALE 1:15 M
SCALE 1:25 M
SCHEDULE 40 150 150
(PAINT FINISH)
50 50 G.I PIPE
(PAINT FINISH )
19mm SQUARE BAR
WELDED
11 BALCONY RAILING DETAIL 7 50 50
TO G.I PIPE HANDRAIL
19mm SQUARE BAR ( PAINT FINISH )
@ 150mm O.C A-8 SCALE AS SHOWN A - 10
150 150 150 150

WELDED TO G.I PIPE 19mm SQUARE BAR 50


HANDRAIL @ 150mm O.C 19mm SQ. BAR WELDED TO G.I PIPE 250
ANCHORED
HANDRAIL DETAIL
100

W A L L

HANDRAIL @ 146mm O.C


6
900

TO THE WALL 300 300

250
TREAD
( PAINT FINISH )
A - 10 SCALE 1:20 M.
2 X 25 X 25mm ANGULAR
175
BAR NOSING @ STEP 5 SECTION DETAIL

128
ANCHOR @ R.C STAIR

SPOT DETAIL
50

10 A - 10 SCALE 1:20 M.

9 SPOT DETAIL A - 10 SCALE 1:50 M.


8 CRASH RAILING
12 X 12 X 2mm FLAT BAR
STRAP @ 600mm O.C

A - 10 SCALE 1:50 M.
A - 10 SCALE 1:20 M.
7 NOSING DETAIL
A -10 SCALE 1:50 M.

JOINT VENTURE OF REVIEWED AS TO


DESIGNED: CHECKED: SUBMITTED: RECOMMENDING APPROVAL APPROVED: PROJECT TITLE & LOCATION: SHEET CONTENTS:
DESIGNEDCONCEPT:
UNITED TECHNOLOGIES CONSOLIDATED PARTNERSHI P
CONSTRUCTION OF 3-STOREY
REPUBLIC OF THE PHILIPPINES
(12-CL) SCHOOL BLDG. @ A10 10
PERTCONSULT INTERNATIONAL DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
NOTE: ADOPTED FROM DPWH STANDARD PLANS COLLAT NAT'L HIGH SCHOOL STAIR DETAILS

A-16 37
SCHEMA ENGINEERS AND ASSOCIATES OIC, BUILDING DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY MASINLOC, ZAMBALES