Doc Title: MSRA for Testing of FM200 Clean Agent System – L2b Reviewed by: N. Forde
th
Doc Date: 29 Dec ‘22 Discipline: FLS Date: 30th Dec ‘22 Page: 1 of 1
Remarks:
1 of 1
MSRA Evaluation Sheet
Status Comment
A Accepted
The MSRA documentation submitted by the subcontractor should include the following
RISK ASSESSMENTS Yes No PERSONAL PROTECTIVE EQUIPMENT Yes No
COSHH Yes No EMERGENCY ARRANGEMENTS Yes No
FULL DESCRIPTION OF METHODOLOGY AND MATERIALS, WASTE REMOVAL
Yes No Yes No
SEQUENCE OF WORK HOUSEKEEPING AND STORAGE
ACCESS / EGRESS Yes No ENVIRONMENTAL Yes No
OCCUPATIONAL HEALTH Yes No LOGISTICS Yes No
WORK AT HEIGHT Yes No TECHNICAL INFORMATION Yes No
COMMUNICATION/MANAGEMENT/
PLANT / EQUIPMENT/TOOLS Yes No Yes No
TRAINING
PERMITS Yes No Yes No
Please note – referring to the MSRA Pro Forma (SAF 072) will assist in what information is needed
SAF009 (UAE) 08/20 Rev E Page 1 of 2 MSRA EVALUATION SHEET
Comments Initials
DX031-MCL-ZZ-ZZ-TC-F-
Title: MSRA for Testing of FM200 Clean Agent System - L2b Ref. No:
SPRN-0003
Project: DX3.1 Data Centre Dubai Production City Rev. No: P01
Prepared By: Dondon Tinimbang Approved By: Vivek Allen Quadros Rev. Date:
Document
Date of issue 28-Dec-2022 Dondon Tinimbang
Prepared By
As per project
Proposed start date TBA Duration of task
Requirement
Contents
Section A Register of Revisions Page 3
Section B Scope of Works to be undertaken Page 4
Section C Location of the Project Page 5
Section D Location of the Works to be Undertaken with the Project Page 6
Section E Site Access/Egress and Access to the Work Zone Page 7
Section F Emergency Contacts Details and Procedures Page 8
Section G McLaren Site Specific HSE Safety Induction Page 9
Section H Welfare facilities Page 9
Section I Personal Protective Equipment Page 10
Section J Plant/Equipment and tools to be Used Page 10
Section K Materials To be used Page 11
Section L Temporary Works Page 11
Section M Inspection and Test Regime Page 11
Section N Communication/Toolbox Talks/Training Requirements Page 11
Section O Works Permits Page 12
Section P Environmental and Waste Management Page 12
Section Q Programme for the Works Page 13
Section R Housekeeping and Storage Page 13
Section S Working at Height Page 13
Section T Occupational Health Page 13
Section U Sequence of Works/Activities Page 14
Appendices
Appendix A Risk Assessments
Appendix B Technical Information
Appendix C Inspection and Test Plans
Appendix D Third Party competency/certifications
Appendix E GC Cx Level 2b Checklist/Test report
DX031-MCL-ZZ-ZZ-TC-F-
Title: MSRA for Testing of FM200 Clean Agent System - L2b Ref. No:
SPRN-0003
Project: DX3.1 Data Centre Dubai Production City Rev. No: P01
Prepared By: Dondon Tinimbang Approved By: Vivek Allen Quadros Rev. Date:
Rev. No Date Reason for Amendment Amended By Signature Has this amendment been
(Name) briefed to the operatives
involved and have the
operatives signed the register?
P01 28-12-2022 Issued for Approval
This method statement has been prepared in conjunction with the following documents;
DX031-MCL-ZZ-ZZ-TC-F-
Title: MSRA for Testing of FM200 Clean Agent System - L2b Ref. No:
SPRN-0003
Project: DX3.1 Data Centre Dubai Production City Rev. No: P01
Prepared By: Dondon Tinimbang Approved By: Vivek Allen Quadros Rev. Date:
DX031-MCL-ZZ-ZZ-TC-F-
Title: MSRA for Testing of FM200 Clean Agent System - L2b Ref. No:
SPRN-0003
Project: DX3.1 Data Centre Dubai Production City Rev. No: P01
Prepared By: Dondon Tinimbang Approved By: Vivek Allen Quadros Rev. Date:
Existing Services
As per current information, there are no services within the site boundaries.
A full survey will be undertaken to confirm this including an underground service scan and trial
trenches hand excavated in various locations around the project to locate any services running into, or
close to the plot.
A permit to dig must be obtained from McLaren prior to any excavations commencing.
DX031-MCL-ZZ-ZZ-TC-F-
Title: MSRA for Testing of FM200 Clean Agent System - L2b Ref. No:
SPRN-0003
Project: DX3.1 Data Centre Dubai Production City Rev. No: P01
Prepared By: Dondon Tinimbang Approved By: Vivek Allen Quadros Rev. Date:
Ground Level
Level 1
DX031-MCL-ZZ-ZZ-TC-F-
Title: MSRA for Testing of FM200 Clean Agent System - L2b Ref. No:
SPRN-0003
Project: DX3.1 Data Centre Dubai Production City Rev. No: P01
Prepared By: Dondon Tinimbang Approved By: Vivek Allen Quadros Rev. Date:
DX031-MCL-ZZ-ZZ-TC-F-
Title: MSRA for Testing of FM200 Clean Agent System - L2b Ref. No:
SPRN-0003
Project: DX3.1 Data Centre Dubai Production City Rev. No: P01
Prepared By: Dondon Tinimbang Approved By: Vivek Allen Quadros Rev. Date:
In case of an Emergency/fire Alarm, all operatives, Staff and Visitors are required to report to the Assembly Point,
which is indicated on the site logistics drawing, as indicated by the symbol below. A roll call will be taken, and
registers checked to ensure that everyone is accounted for. No one will be allowed to leave the assembly point
until the Emergency Response Controller confirms that it is safe to do so.
Please refer to the attached Crisis/Emergency Plan, which is to be implemented where the need arises.
The Qualified First Aiders for the Project are listed below, and the first Aid Boxes will be available within the
First Aid Room and in the Main Office Reception.
DX031-MCL-ZZ-ZZ-TC-F-
Title: MSRA for Testing of FM200 Clean Agent System - L2b Ref. No:
SPRN-0003
Project: DX3.1 Data Centre Dubai Production City Rev. No: P01
Prepared By: Dondon Tinimbang Approved By: Vivek Allen Quadros Rev. Date:
On completion of the HSE induction, those involved in this activity will be briefed on the contents of the T & C
document by their respective Site Engineer or Supervisor. They will then be required a sign a T & C Briefing
Register (SAF019 UAE) confirming that they have been briefed and that they fully understand the T & C and what
is expected from them during the execution of the works.
Any operative who will be operating any plant or equipment will be required to produce a copy of their Dubai/
Abu Dhabi Municipality/EIAC approved competency certificate/card and proof of health to enable McLaren to
issue them with the Plant Operators Authorisation (SAF023 UAE).
DX031-MCL-ZZ-ZZ-TC-F-
Title: MSRA for Testing of FM200 Clean Agent System - L2b Ref. No:
SPRN-0003
Project: DX3.1 Data Centre Dubai Production City Rev. No: P01
Prepared By: Dondon Tinimbang Approved By: Vivek Allen Quadros Rev. Date:
*Note: All relevant competency certificates to be submitted to HSE Manager/Eng./Advisor prior to start of any
activity.
DX031-MCL-ZZ-ZZ-TC-F-
Title: MSRA for Testing of FM200 Clean Agent System - L2b Ref. No:
SPRN-0003
Project: DX3.1 Data Centre Dubai Production City Rev. No: P01
Prepared By: Dondon Tinimbang Approved By: Vivek Allen Quadros Rev. Date:
During this meeting, all those with specific responsibilities for implementation of the ITP and completing the
Work Inspection Sheets will have their roles and responsibilities briefed to them.
The QA/QC Engineer and Cx Engineer will verify that the process is fully complied with Level 2b requirements
(Yellow Tags).
Section N- Communication/Toolbox Talks/Training Requirements:
Before starting any activity, a Point of Work Risk Assessment will be carried out by the Site Engineer/ Supervisor
to ensure all risk and controls have been identified, this will be followed by a task briefing carried out in the
language of the team. All members of the team must sign the briefing sheet to confirm that they have understood
the task requirements.
During the Preparation of this MSRA the following training for the staff and operatives has been identified.
Item Description of Training Has the Training been If not, when will be
completed? (Yes/No) completed (Date)
1 3rd party training for operative of plant No, Certificates to be provided TBC
and equipment during induction.
2 First aider training Yes -
3 Power Tools Yes -
4 Banksmen/ Flagmen No, training to be provided prior TBC
to commencement of activity
5 Work at height / Scaffold No, training to be provided prior to TBC
commencement of activity
*Note: All relevant certificates will be submitted prior to works commencing or during induction. Where the
training has not been carried out, it must do so prior to the works/activities commencing.
DX031-MCL-ZZ-ZZ-TC-F-
Title: MSRA for Testing of FM200 Clean Agent System - L2b Ref. No:
SPRN-0003
Project: DX3.1 Data Centre Dubai Production City Rev. No: P01
Prepared By: Dondon Tinimbang Approved By: Vivek Allen Quadros Rev. Date:
Item Description of the Work Permit Permit Issued by Tick only applicable
1 Permit to Enter Confined Space McLaren
2 Permit for Lifting Operations. McLaren
3 Permit to Dig McLaren
4 Permit to work Hot cutting or Welding McLaren
5 Permit to Work in Ceiling Void McLaren
6 Permit for Roof Access McLaren
7 Permit to Work with scaffold McLaren √
8 Permit to Work at Height McLaren √
9 Permit to Work – Electrical above 110V McLaren √
10 Permit to Work with COSHH Items McLaren
11 Permit to Work at External Face of The Building McLaren
12 Permit for Removal of Existing Fall Protections McLaren
13 Permit for Pressure Testing McLaren √
14 Other Permit
Any other permits if required to be added
Labelled skips will be provided by McLaren, all waste must be segregated into the correct waste streams and
placed in the skips provided. It is important that waste is reduced, reused, or recycled wherever possible.
Toolbox Talks will be regularly briefed to the workforce to ensure this is understood.
1. Metal
2. Plastic
3. General
4. Concrete
5. Food waste
6. Hazardous
7. Wood Waste
Due to the nature of the works and the current site conditions, water shall be sprayed onto dirt/sand roads to
minimize dust pollution.
Where any plant is used, drip trays shall be placed underneath to catch any spilled oils or fuels. Oils and fuels will
be managed in accordance with the MSDS and the site Waste Management Plan.
All hazardous liquids must store in suitable, labelled containers with secondary containment to prevent ground
and water contamination.
Emergency spills kits must be available where any hazardous material is used.
DX031-MCL-ZZ-ZZ-TC-F-
Title: MSRA for Testing of FM200 Clean Agent System - L2b Ref. No:
SPRN-0003
Project: DX3.1 Data Centre Dubai Production City Rev. No: P01
Prepared By: Dondon Tinimbang Approved By: Vivek Allen Quadros Rev. Date:
Combustible materials will be carefully managed and monitored to reduce the risk of fire.
During the preparation of this document, the following Occupational Health issues have been reviewed and
addressed within this Method Statement.
Item Description Preventative Measures, (see also within the Risk Assessments)
1 Safety Critical Roles Anyone identified as safety critical (i.e. Operators, riggers,
scaffolders, banksmen etc.) must have a medical check-up before
starting work
2 Construction dust Roads shall be watered to minimise dust and housekeeping to be
carried out regularly.
RPE shall be provided for those at risk from hazardous dust
3 Noise Noise values will be monitored. Where required, job rotation will be
put in place and recorded. Where it is not possible to control noise,
PPE will be provided
4 Sun & Heat Drinking water and electrolyte additives will be provided.
Clothing shall cover legs and arms; gloves will be worn.
Summer Working Plans
5 Skin PPE shall be provided as required by MSDS
DX031-MCL-ZZ-ZZ-TC-F-
Title: MSRA for Testing of FM200 Clean Agent System - L2b Ref. No:
SPRN-0003
Project: DX3.1 Data Centre Dubai Production City Rev. No: P01
Prepared By: Dondon Tinimbang Approved By: Vivek Allen Quadros Rev. Date:
Prior to start the installation at site, the following pre-installation task are essential.
1. Full set of approved up to-date installation drawings, system schematics and specification detailing all
system to be commissioned.
2. Access to all areas; equipment etc. through doors, risers, etc.
3. All required work permits are in place.
4. Ensure the presence of a safety engineer during T&C process.
5. Ensure only trained/ Certified persons only shall operate the power tools and do the Testing job.
6. Necessary PPE to be worn while working in energized circuits.
7. Ensure adequate lighting is provided in the working area at night time and if inside the building area to
be well illuminated.
8. Ensure service area/work area openings are provided with barricade, tape, safety nets and warning
signage to be provided.
9. Emergency evacuation plan and procedure to be developed prior to start of testing.
10. PTW to be applied and obtained to start work on the required area.
11. Calibrated Instruments only to be used.
12. Power supply used to take temporary cable shall not have any joints.
13. No significant fire risk is associated with this activity, but general fire prevention measures will be
taken.
14. Risk mitigation measures as identified in Risk Assessments to be inspected at regular intervals for
activity duration as identified in the approved Health & Safety Manual.
15. Heat stress management to be implemented as per site situation.
16. Safety precautions to be implemented as per site situation.
1. Make sure that all Installation of system Inspected by Consultant Engineer and approved.
2. This system will Tested on site by sub-contractor in supervision of Supplier of the system.
3. The MEP Project Engineer shall check with the concerned testing and commissioning Engineer and site
Engineer the work prior to submits the Testing for Engineering approval by doing the pre-
commissioning and the Testing required.
4. WIR shall be prepared by MEP Project Engineer and will be submitted to consultant for their inspection
and approval with attendance of system manufacturer's local dealer.
5. MEP Project Engineer shall coordinate with other contractors and arrange inspection for installations to
the Consultant Engineer after confirming the installation and requirements from the system
manufacturer's local dealer.
6. MEP Project Engineer is responsible for all installation activities for getting the work inspected and
approved by Consultant Engineer.
DX031-MCL-ZZ-ZZ-TC-F-
Title: MSRA for Testing of FM200 Clean Agent System - L2b Ref. No:
SPRN-0003
Project: DX3.1 Data Centre Dubai Production City Rev. No: P01
Prepared By: Dondon Tinimbang Approved By: Vivek Allen Quadros Rev. Date:
1. The test will commence after the installation works are completed.
2. Check the installed as per the approved shop drawings.
3. Ensure level 2a inspections have been completed and any punchlist developed is available
4. Ensure that any issues of FG preventing Level 2B (yellow tag) from commencing have been rectified and
approved (or agreed to proceed).
5. Confirm FM 200-cylinder installation are completed.
6. Valid Calibration Certificates shall be available for carrying out the pressure testing activities.
7. Necessary safety permits shall be obtained from the concerned prior to start of testing activities.
8. Confirm equipment has been installed within the correct position.
9. Confirm no damage occurred between the loading bay and installation.
10. Check adequate maintenance access has been provided for valves and equipment.
11. Confirm all earthing is completed and recorded.
12. Confirm piping support are in accordance with the piping specification.
13. Check levelling and alignment of piping are correct and acceptable.
14. Confirm that the in-line piping components are mounted in the correct orientation and with regard to
flow direction.
15. Confirm that control valves are provided with sufficient pipe lengths either side of the valve to enable
operation.
16. Confirm the correct pipework flow switch has been installed according to the project specification.
17. Check all sprinkler heads are properly installed and are of the correct ratings.
18. Check all control valves are properly installed and are in accordance with design specification.
19. Confirm that all uninsulated pipework is painted in accordance with the piping specification.
20. Confirm that the electrical bonding joints are completed according to the project pipe specification
21. Confirm continuity and insulation resistance test control cable for Clean Agent system components
including, smoke Detectors, Manual Operation Button, Control Panel, Solenoid Valve and Pressure
Switches are completed.
22. Yellow tag applied to the equipment and signed, recorded accordingly.
DX031-MCL-ZZ-ZZ-TC-F-
Title: MSRA for Testing of FM200 Clean Agent System - L2b Ref. No:
SPRN-0003
Project: DX3.1 Data Centre Dubai Production City Rev. No: P01
Prepared By: Dondon Tinimbang Approved By: Vivek Allen Quadros Rev. Date:
1. Check if the piping is installed as per approved shop drawing and installation is approved.
2. All the nozzle plugs need to be closed before starting the pneumatic pressure testing.
3. Check if the air compressor is installed properly with the piping.
4. Pipes Shall be tested with air for 40 Psi for 10 mins.
5. First pressure the pipe with air for 40 psi than observe for 10 Mins.
6. During this 10 Mins if pressure drop is less than 20% of initial pressure then Pneumatic Testing is pass.
7. If the pressure drop is more than 20% of initial pressure than apply soap solution in pipes joints to
check the leakage.
8. Rectify the leak, then redo the Pressure testing until we get the desired result.
9. Puff test will be conducted after pressure testing.
1. A continuity test is a quick check to see if a circuit is open or closed. Only a closed, complete circuit (one
that is switched ON) has continuity. During a continuity test, a digital multimeter sends a small current
through the circuit to measure resistance in the circuit.
2. The purpose of this test is to ensure that all conductors are continuous throughout the
length (L, N & E) and control cable (+, -). If the test result is open the entire length joints
need to be checked and determine the phase confirmation.
3. The dead-test polarity will confirm the correct conductor (colour/ID) is confirmed through the
continuity testing.
4. The test is carried out by installing a shorting link between each pair of conductors at one
end & then by using the tester at the other end the reading is recorded.
DX031-MCL-ZZ-ZZ-TC-F-
Title: MSRA for Testing of FM200 Clean Agent System - L2b Ref. No:
SPRN-0003
Project: DX3.1 Data Centre Dubai Production City Rev. No: P01
Prepared By: Dondon Tinimbang Approved By: Vivek Allen Quadros Rev. Date:
This test is to verify that the insulation of conductors, electrical accessories & equipment is satisfactory, and
that live conductors or protective conductors are not short-circuited or show alow insulation resistance
(which would indicate defective insulation).
Tests will be carried out on Phase to Phase, Phase to Neutral, Phase to Earth and Neutral to Earth.
Before testing, checks will be made to ensure that:
An IR test, apply 500 V DC voltage for a duration of one minute on each phase, Neutral & Earth and
readings are to be taken. Reading will vary widely between site due to length of run, humidity etc. This test
should only be carried outby competent personnel.
Cleaning Method
1. Daily cleaning procedure to be followed by all operative. Toolbox Talks (TBT) shall be provided by
respective foreman at start of the job every day.
2. Ensure all works are cleaned and tidy at the end of shift, materials should be stacked secure and away
from any area where it is causing additional hazard.
Completion of Works
DX031-MCL-ZZ-ZZ-TC-F-
Title: MSRA for Testing of FM200 Clean Agent System - L2b Ref. No:
SPRN-0003
Project: DX3.1 Data Centre Dubai Production City Rev. No: P01
Prepared By: Dondon Tinimbang Approved By: Vivek Allen Quadros Rev. Date:
APPENDIX- A
RISK ASSESSMENT
DX031-MCL-ZZ-ZZ-TC-F-
Title: MSRA for Testing of FM200 Clean Agent System - L2b Ref. No:
SPRN-0003
Project: DX3.1 Data Centre Dubai Production City Rev. No: P01
Prepared By: Dondon Tinimbang Approved By: Vivek Allen Quadros Rev. Date:
1 Access & Egress to Wet floors - Slips/trips/falls Work crew • Ensure all access and egress are unobstructed PM
and from site Lack of information and Supervisor and safe for all. CM
training, Changes in floor Sub-contractor • Spillages are actioned as soon as they occur. HSE – ENGINEER
levels, Lack of supervision or Visitor & staff • Clean as you go policy adopted on site. SUPERVISOR
Unsafe work methods with • Daily visual inspection of floor and walkways by
potential to cause: supervisors and HSE team.
• Works are assessed prior to commencement.
serious injury • Changes in floor levels are marked as required.
Minor injury • Provision of information, instruction, training
Daily DSTI and supervision to work crew.
3 3 9 M • Follow Pre-task inspection. 1 3 3 L
• Equipments must not block walkways or access
/ egress.
• Display signages for the directions and
restricted area.
• All work is assessed and planned.
• Work must not obstruct walkways.
• Follow approved RAMS.
• Provision of information, instruction and
training to work crew regarding appropriate
walkways and floors.
PM
• Ensure permit system, DSTI and TBT to be
CM
followed for all required tool as per main
HSE – ENGINEER
contractor procedure.
Damage / inappropriate tool Work crew SUPERVISOR
• Ensure competent work crew to use the tool.
2 Use of Hand tools Incompetent worker may lead Supervisor 3 3 9 M 1 3 3 L
• Ensure regular inspection of any tool.
to: Sub-contractor
• Ensure regular maintenance of tools.
Striking injuries, lacerations,
fractures, broken bones • Do not allow to use in appropriate or damage
Cuts and lacerations tool.
APPENDIX-B
TECHNICAL INFORMATION
(To be Submitted)
DX031-MCL-ZZ-ZZ-TC-F-
Title: MSRA for Testing of FM200 Clean Agent System - L2b Ref. No:
SPRN-0003
Project: DX3.1 Data Centre Dubai Production City Rev. No: P01
Prepared By: Dondon Tinimbang Approved By: Vivek Allen Quadros Rev. Date:
APPENDIX-C
INSPECTION AND TEST PLANS
LEGEND
H- Hold Point. Inspection Request is required. The Consultant shall witness and sign for
acceptance the inspection checking form. Contractor shall not proceed until consultant
has completed inspection and signed inspection checking form. Further following
certification shall be submitted for review (e.g. Laboratory/ Third Party Service Company).
W- Witness Point. Inspection Request is required. The consultant shall optionally witness.
Contractor can proceed with inspection even if consultant is absent. In such cases
inspection report should be submitted for review and signature. Further following
certification shall be submitted for review (e.g. Laboratory/Third Party Service Company).
S- Surveillance. Check advice is not required. The Consultant shall spot witness during job
execution. The clarification if any shall be spot reviewed.
A- For Approval
R- Review of Certification
1) Manufacturer’s certificates to be submitted to Consultant
2) Manufacturer’s certificates check.
3) Laboratory’s certification to be submitted to Consultant
4) Laboratory’s certificates check.
5) Data sheet/Catalogues to be submitted to Consultant
6) Data sheet/Catalogues check.
7) Calibration certificates to be submitted to consultant
8) Calibration certificate
DX031-MCL-ZZ-ZZ-TC-F-
Title: MSRA for Testing of FM200 Clean Agent System - L2b Ref. No:
SPRN-0003
Project: DX3.1 Data Centre Dubai Production City Rev. No: P01
Prepared By: Dondon Tinimbang Approved By: Vivek Allen Quadros Rev. Date:
ITP
Activity Discretion Reference Documents Acceptance Criteria Inspection Record Responsibility
Code
CxA
CxM
Client
Consultant/
Main Cont./
Sub-Contractor
Level 2 approval
Approved energization plan
3.1 Pre-Function testing Approved Pre-commission N/A N/A N/A
Approved Method statement/
script.
Verifying Party
ITP
Activity Discretion Reference Documents Acceptance Criteria Inspection Record Responsibility
Code
CxA
CxM
Client
Consultant/
Main Cont./
Sub-Contractor
Functional &
5.1 N/A N/A N/A N/A N/A N/A N/A
Performance Testing
6.0 Stage 6 - Integrated systems Testing (WHITE TAG)
Integrated systems
6.1 N/A N/A N/A N/A N/A N/A N/A
Testing
Notes:
1. Responsibility and Verifying party extracted from Approved T&C Plan ‘Authority Matrix’.
METHOD STATEMENT AND RISK ASSESSMENT
APPENDIX-D
(To be Submitted)
DX031-MCL-ZZ-ZZ-TC-F-
Title: MSRA for Testing of FM200 Clean Agent System - L2b Ref. No:
SPRN-0003
Project: DX3.1 Data Centre Dubai Production City Rev. No: P01
Prepared By: Dondon Tinimbang Approved By: Vivek Allen Quadros Rev. Date:
APPENDIX-E
DX031-MCL-ZZ-ZZ-TC-F-
Title: MSRA for Testing of FM200 Clean Agent System - L2b Ref. No:
SPRN-0003
Project: DX3.1 Data Centre Dubai Production City Rev. No: P01
Prepared By: Dondon Tinimbang Approved By: Vivek Allen Quadros Rev. Date:
A: EQUIPMENT INFORMATION
C: VISUAL INSPECTION
Verify the following installation quality checks with the equipment de-energized (Power OFF); Verified
Item Description YES NO N/A Comments
1 Confirm equipment has been installed within the correct position
2 Confirm no damage occurred during tranport and installation
12 Confirm that control valves are provided with sufficient pipe lengths either side of the valve to enable operation
13 Confirm the correct pipework flow switch has been installed according to the project pipe specification.
14
Confirm continuity and insulation resistance test control cable for Clean Agent system components including,
smoke Detectors, Manual Operation Button, Control Panel, Solenoid Valve and Pressure Switches are completed.
15 Check all sprinkler heads are properly installed and are of the correct ratings
16 Check all control valves are properly installed and are in accordance with design specification
17 Confirm that all uninsulated pipework is painted in accordance with the piping specification
18 Confirm that FM200 cylinder installation are completed.
19 Confirm pipework has been pneumatically tested and that there is no evidence of leakage at joints or valves
D: TEST INSTRUMENTION
Please record the calibrated test instrumentation details below
Item Description Manufacturer Model Serial Number Calibration Due Date
1 Torque Wrench
E: TEST RECORDS
Perform the following checks and tests with the equipment de-energized (Power OFF); Verified
Item Description YES NO N/A Comments
1 Record applied torque value and bolt sizes and confirm they are correct
Bolt grade
L2.M02.15
Rev 00
©JONES ENGINEERING 2022 Page 1 of 2 2022-07-14
SITE TEST RECORD
FM200 Clean Agent System
Loop No: Loop No: Loop No: Loop No: Loop No:
(+ve) - E (-ve) - E (+ve) - E (-ve) - E (+ve) - E (-ve) - E (+ve) - E (-ve) - E (+ve) - E (-ve) - E
1
2
3
4
5
6
7
8
9
10
10
L2.M02.15
Rev 00
©JONES ENGINEERING 2022 Page 2 of 2 2022-07-14