Bhutan Detention DETAILS

Reported at L R No. / Reached at -Balaji Release at


Sr. No. Loading Point Destination Type of the Cargo Vehicle No. Type of Vehicle Loaded On Released On Unloaded On FREE DAYS DETENTION DAYS DETENTION
Loading Point Date Parking Jaigaon Parking Reached at Site Remarks

1 AIROLI BHUTAN TRANSFORMER NL01AD-4123 HYDROLIC AXLE 23-01-2023 24-01-2023 18638 24-01-2023 17-02-2023 03-03-2023 03-03-2023 25-03-2023 9 30-9 = 30X19000 570000.00
2 AIROLI BHUTAN TRANSFORMER MH46AF-3800 HYDROLIC AXLE 24-01-2023 24-01-2023 18639 24-01-2023 17-02-2023 03-03-2023 03-03-2023 27-03-2023 9 41-9 = 32X19000 608000.00
3 AIROLI BHUTAN TRANSFORMER NL01AF-5958 HYDROLIC AXLE 31-01-2023 01-02-2023 18640 01-02-2023 18-02-2023 09-03-2023 09-03-2023 26-03-2023 9 39-9 = 30X19000 570000.00
4 AIROLI BHUTAN TRANSFORMER NL01AA-0867 HYDROLIC AXLE 03-02-2023 04-02-2023 18641 04-02-2023 18-02-2023 09-03-2023 09-03-2023 26-03-2023 9 30-9 = 30X19000 570000.00
5
6
7
8
9
10
11
12
13
14
15
16
17
Total 2318000.00