END445E - Term Project 2019-2020
END445E - Term Project 2019-2020
1. Is the production system capable of satisfying the demand of the customer on time?
2. What kind of lean solution techniques or tools can be implemented to solve the
problems indicated at the first stage of your project?
3. Will you use Kanban or CONWIP? If you will use Kanban, determine the supermarket
volumes, and calculate the number of Kanbans. In addition, please show the necessary
design calculations for each of the solution technique that you propose.
4. What techniques or solutions do you suggest to improve the logistics/distribution
activities both within the manufacturing system and between the manufacturing
company & suppliers? Will you use direct shipping or milk-run between the suppliers
and your company? Why? Explain your reasons.
5. Draw the future state VSM of the production system that you have designed, based on
the solutions proposed at the previous stage. Show your logistics solutions as well.
6. Propose some solutions to decrease the setup time of the machine having the longest
setup time according to the SMED methodology.
7. To solve the quality or machine failure problems, propose some solutions.
8. What kind of Industry 4.0 or automation technologies can be implemented and to
which stages can you apply them to improve performance?
9. What is the expected improvement do you estimate after implementation of these
solutions?
10. What is the cost of implementing the solutions that you propose? Do they require
additional resources? What are these resources?