You are on page 1of 1

Section: Checklist 3.

13
Revision No: 1.0
SOPM VOL.3 Date of Issue: 1st Aug 2018
Page: 1 of 1

SOPM V3 CHECKLIST 3.13 FAMILIARISATION WITH BRIDGE EQUIPMENT

This checklist shall be used together with a training report for newly joined deck officers before
they assume responsibility for a Navigational watch.

Ship : MT. JITAI Port : BATAM Date/Time : 30 SEP 2021

Has the operation of the following equipment been studied and fully understood?
bridge and deck lighting
emergency arrangements in the event of main power failure
navigational and signal lights, including
search lights, signaling lamp, morse light
sound signaling apparatus, including
whistles, fog bell and gong system
safety equipment, including
LSA equipment including pyrotechnics, EPIRB and SART
bridge fire detection panel, general and fire alarm signaling arrangements
emergency pump, ventilation and water tight door controls
internal ship communication facilities, including
portable radios
emergency ‘ battery less’ phone system and public address system
external communication equipment, including
VHF and GMDSS equipment
alarm system on bridge
echo sunder
electronic navigational position fixing systems
gyro compass/repeaters and magnetic compass
off-course alarm and speed/distance recorder
radar including ARPA
engine and thruster controls
steering gear, including manual, auto- pilot and emergency changeover and testing arrangement
automatic track- keeping system,& VDR- if fitted
ECDIS, electronic charts and IBS functions, if fitted
location and operation of ancillary bridge equipment(e.g. binoculars, signaling flags,
metrological equipment ) ?
stowage of chart and hydrographic publications?

________________ ___________________
Name/Rank/Sign Master

You might also like