EXISTING SHEETING
TO BE REMOVED
TILL SOFFIT OF PEB
CANOPY
SS HANDLES AS PER
SELECTION
ALUMINUM CLADDING
AS/VENDOR DETAILS
OPENABLE DOOR ON
FLOOR SPRING
600
PROPOSED ALUMINUM CLADDING
AS/VENDOR DETAILS
PROPOSED ALUMINUM CLADDING
AS/VENDOR DETAILS EXISTING SHEETING
TO BE REMOVED
EXISTING SHEETING
TILL SOFFIT OF PEB
TO BE REMOVED EXISTING SHEETING
TILL SOFFIT OF PEB CANOPY(EXISTING
TO BE REMOVED
'Z' PURLINS TO BE
2400
CANOPY TILL SOFFIT OF PEB
RETAINED)
CANOPY(EXISTING
CLEAR HT.
SS HANDLES AS PER 'Z' PURLINS TO BE
5500
SELECTION RETAINED)
PROPOSED ALUMINUM CLADDING
CLEAR HT.
FOR RWP AS/VENDOR DETAILS
5500
ALUMINUM CLADDING
AS/VENDOR DETAILS PROPOSED ALUMINUM CLADDING
FOR RWP AS/VENDOR DETAILS
3000
3000
1600
PROPOSED GRANITE
SKIRTING FINISH
OPENABLE DOOR ON PROPOSED GRANITE 100MM THK.
FLOOR SPRING SKIRTING FINISH TREMIX
SLOPE
100MM THK. GROUND LVL
FLOORING
RAMP END RAMP END TREMIX ±0.00 M
800
DROP OFF PROPOSED GRANITE @-305.15M GROUND LVL
@-305.15M
-305.15 M. -305.19 M. SKIRTING FINISH
FLOORING
±0.00 M
ENTRANCE LOBBY
100
COMPACTED
EARTH(TYP)
PART ELEVATION (VIP ENT.) - OPTION 01 COMPACTED
A2 EARTH(TYP)
FOR APPROVAL
590 1175 1800 1175 4950 1175 1800 1175 590 R0 09-03-2023 AS DK -
Code Sign. Code Sign.
A3 A4 Rev. Date
Drawn by Checked by
Description
Approved
FILE NAME : GC-2370-TYB8&9-03-R1-123 - 4OF4-11-01-2023
- -
Client : TRIDENT LIMITED
Gherzi Consulting Budhni - 466445
Engineers Pvt. Ltd. Project : TYB 8&9 , SPINNING UNIT AT BUDHNI
Mumbai.
Title : TYB 8&9
TRIDENT LIMITED
Budhni - 466445 VIP ENTRANCE -
ACP CLADDING DETAILS
PART PLAN (VIP ENT.)
A1 North
A0
1:50
Scale
GC/2370
Job no.
03 TYB8&9
Stage Bldg.no. Drg.no.
R0 0
Rev. Sheet
0