Professional Documents
Culture Documents
BLY073_L2100
Site ID:
New Site:
No. Activity/Process
1 MNC
2 MCC
3 LAC
4 TAC
5 EUARFCN
6 PCI
7 Pa & Pb values for RS power
8 RSRP (Average Value)
9 SINR (Average Value)
10 Session set up success rate
Session 11 Session abnormal release rate
12 Session establishment time(ms)
13 Peak DL Thrpt
Downlink and Uplink a CQI, Downlink Peak MCS & Peak RB Allocation
Max user throughput b CQI, Uplink Peak MCS & Peak RB Allocation
14 Peak UL Thrpt
15 Intra Site
16 Inter Site
a FDD <-> TDD
Handover Success rate b.1 TDD/FDD <-> 3G
b.2 TDD/FDD <-> 2G
RRC Configuration Message Snap related to A1, A2, A3, A5, B2, B1, Blind Redirection
c which clearly states the thresholds at which events happened
Handover Delays 17 Handover delay/ Interruption time
Network attach time(ms)
Network attach success rate
Attach and Detach 19 UE Capability Information Mesaage FGI Bits
Network Detach time(ms)
Network Detach Success rate
Delays 20 Round trip time or Latency(ms)
CSFB: MO call set up time
Originate calls when device was in RRC_Idle and
CSFB: MT call setmode
RRC_connected up time
and capture the callsetup time in both scenario
CSFB 21 Terminate calls when device was in RRC_Idle and
RRC_connected mode and capture the callsetup time in both scenario
CSFB success rate
CSFB abnormal release rate , drop rate . Mention the cause code of abnormal rel
Verify that all features/functionality are working to reduce the CSFB call setup time
such as No LAU during CSFB call- right LA/TA mapping,
Deffered Measurement of non mandatory sibs, ISR ( if implemented)
Fast Return to LTE and the return priority defined in case of multiple LTE carriers i
Remarks (Comments): RSRP Coverage check till first handover or coverage dies out (whichever happens earlier). SCFT t
SP Signature:
Note :-
Overall SCFT should be completed(report submission)within 7 days from the On-Air Date meeting all the target.
Site Name: BLY073 BLY073A BLY073B BLY073C
hever happens earlier). SCFT tests needs to be performed in the planned coverage area for 3 location of the respective cell.
Bharti Signature:
Remarks
OSS Snapshot can be provided in the absense of event triggered during SCFT
OSS Snapshot can be provided in the absense of event triggered during SCFT
OSS Snapshot can be provided in the absense of event triggered during SCFT
on sample basis
UE PCI
UE RSRP
UE RSRQ
UE SINR
Physical Downlink Throughput
Physical Uplink Throughput
GOOGLE SNAP WITH NBR
Activity /Process Targets
- Volte abnormal release rate, drop rate . Mention the cause code of
< =1%
abnormal release
Verfication of all the all the LTE/VOLTE parameter values including
- LMS are as per guidelines and all features /functionalities are
implemented ( share the compliance report as an annexure of golden
parameter values and features)
KPI Value Remark
C1 C2 C3
0 0 0
Y Y Y
0 0 0
OK OK OK
VoLTE PLOTS
UE PCI
UE RSRP
UE RSRQ
UE SINR
INTRA CELL HANDOVER Sector 1
CSFB MT Sector 1
VoLTE MO Sector 1
VoLTE MT Sector 1
PDSCH PHY THROUGHPUT Sector 1
PUSCH PHY THROUGHPUT Sector 1
PING Sector 1
CSFB MO Sector 2
CSFB MT Sector 2
VoLTE MO Sector 2
VoLTE MT Sector 2
PDSCH PHY THROUGHPUT Sector 2
PUSCH PHY THROUGHPUT Sector 2
PING Sector 2
CSFB MO Sector 3
CSFB MT Sector 3
VoLTE MO Sector 3
VoLTE MT Sector 3
PDSCH PHY THROUGHPUT Sector 3
PUSCH PHY THROUGHPUT Sector 3
PING Sector 3
RRC Sector 1
Session Sector 1
SIB Sector 1
Event Sector 1 (Only message name)
Session Sector 1
SIB Sector 2
Event Sector 2 (Only message name)
Session Sector 1
SIB Sector 3
Event Sector 3 (Only message name)
25 24 330 2 2 24 330 2 2
25 24 120 2 2 24 120 2 2
25 24 250 2 1 24 250 2 1
Post
Antenna Ht + Building Ht Azimuth E Tilt M Tilt PCI Remarks
24 330 2 2 0 NO CHANGE
24 120 2 2 1 NO CHANGE
24 250 2 1 2 NO CHANGE
* Lat/long, Date & time, Site ID,ASP name stamp should be all photographs.
* All photogrphs should be latest physical status of site should have time stamp & date / lat Long
ANTEENA MODEL A
TOWER
BUILDING HEIGHT
Azimuth Cell 2 ( either of one snap)
ANTEENA MODEL B
TOWER HEIGHT
Azimuth Cell 3 ( either of one snap)
ANTEENA MODEL C
BUILDING
Log to Operator list Script
List of logs used for this report, and their mapping to each operator in the Benchmark
benchmark_entry
AIRTEL List of logs:
log_hash time modem_time operator_name log_start_
2037840751 ### AIRTEL ###
1854789932 ### AIRTEL ###
1855265128 ### AIRTEL ###
2037840751 ### AIRTEL ###
1855265128 ### AIRTEL ###
1854789932 ### AIRTEL ###
1855265128 ### AIRTEL ###
1854789932 ### AIRTEL ###
1854789932 ### AIRTEL ###
1854789932 ### AIRTEL ###
1854789932 ### AIRTEL ###
2037840751 ### AIRTEL ###
1854789932 ### AIRTEL ###
1854789932 ### AIRTEL ###
2037840751 ### AIRTEL ###
1854789932 ### AIRTEL ###
1854789932 ### AIRTEL ###
2384100800 ### AIRTEL ###
1854789932 ### AIRTEL ###
2037840751 ### AIRTEL ###
1854789932 ### AIRTEL ###
1855265128 ### AIRTEL ###
1854789932 ### AIRTEL ###
2384100800 ### AIRTEL ###
1854789932 ### AIRTEL ###
https://drive.google.com/file/d/1sN99HxS6Ejuu-5yxDlR3_7afh29knvA2/view?usp=sharing