Professional Documents
Culture Documents
Report Version: 1
Signed
(ZTE Representative) :
Signed
(ZTE Representative) :
Contents 1
1 Contents
1 CONTENTS .............................................................................................................................................. 1
2 SITE INFORMATION: ............................................................................................................................... 2
2.1 ENODEB INFORMATION: ....................................................................................................................... 2
2.1 CELL INFORMATION: ............................................................................................................................. 2
3 STATIC TEST/OSS/MOBILITY SUMMARY:................................................................................................ 3
4 STATIC TEST RESULT: .............................................................................................................................. 4
5 OSS KPI SUMMARY: ................................................................................................................................ 4
6 SITE LOCATION AND DRIVE PLOTS ......................................................................................................... 5
6.1 SITE LOCATION AND DRIVE TEST ROUTE (HO, DOWNLOAD) ........................................................................ 5
6.2 PSC PLOT & SECTOR VERIFICATION ......................................................................................................... 5
6.3 RSRP PLOT: ........................................................................................................................................ 6
6.4 RSRQ PLOT: ....................................................................................................................................... 7
6.5 SINR PLOT:......................................................................................................................................... 7
6.6 DOWNLINK THROUGHPUT PLOT: ............................................................................................................ 8
6.7 UPLINK THROUGHPUT PLOT: .................................................................................................................. 8
6.8 HANDOVER PLOT: ................................................................................................................................ 8
7 APPENDIX.............................................................................................................................................. 10
1. ALARM STATUS ................................................................................................................................ 10
1.1. OSS KPI APPENDIX ..................................................................................................................... 10
Page 1
Site Information: 2
2 Site Information:
Page 2
Static Test/OSS/Mobility Summary: 3
Page 3
Static Test Result: 4
CSFB Voice Call Pass MOC & MTC 3/3 3/3 3/3
Voice Call Setup Time (CSFB) - Avg Pass ≤ 7s 5.676s 4.982s 5.198s
VOLTE Voice Call Pass MOC & MTC 3/3 3/3 3/3
Voice Call Setup Time (VoLTE) - Avg Pass ≤ 3s 1.195s 1.174s 1.263s
SRVCC Pass SRVCC Completed (at Sector 2)
Fast Return & SRVCC test case Pass Fast Return 0.993s
Data E-RAB Drop Rate ≤1.00% 0.22% 0.43% 0.23% 0.19% 0.43% 0.25% 0.19% 0.44% 0.24%
Remark: OSS only consider 3 consecutive days within the weekdays, example Thursday, Friday and Monday
(not included public holidays)
Page 4
Site Location and Drive Plots 5
Inaccess Route:
1. 2.
3.
Page 5
Site Location and Drive Plots 6
Page 6
7
Page 7
8
Page 8
9
Page 9
Appendix 10
7 Appendix
1. Alarm Status
IPDN_Team_D_L180
0.xlsx