A Hack the existing floor screed to provide the key. 144 Sm 100 14,400
Clean to receive the ceramic floor tiles
B 300x300x8mm ceramic floor tiles 144 Sm 2000 288,000
C CEILINGS 150 Sm 300 45,000
Prepare the suspended slab soffits and sloping
soffits of stairs apply 12mm thick plaster
D DOORS 2 No 16,000 32,000
Standard steel casement door as double leaf with
50x45mm framing size 1200x2400mm high
E Clean the door frames and re-fix 45mm solid flush 12 No 1,000 12,000
doors
F Supply 100mm brass butt hinges 24 No 300 7,200
G WINDOWS 4 No 12,000 48,000
Steel casement windows size 1800x 1800mm high
H Glazing clear sheet glass 4mm to match with putty 14 Sm 1,000 15,000
i.e. replace the broken and fix to new windows
I PAINTING 20 Sm 300 6,000
Prepare and apply super gloss paint to steel general
surfaces
J Prepare and supply undercoats Steiner and 45 Sm 300 13,500
finishing coats of vanish to general surfaces of
timber doors
K Prepare and apply undercoat and finishing coats of 144 Sm 300 43,200
first quality silk vinyl paints to plastered surfaces of
beam ,and suspended soffits of slab
L Prepare the wall surfaces and apply paint as vinyl 300 Sm 300 90,000
silk
M BALUSTRATING AND RAILING 20,000
I. Rails to detail size 75 by 50 mm
II. Handrails supporters size 50 by 50mm
ELEMENTS NO 2 0
EXTERNAL FINISHES
SUMMARY PAGE
Item Description Qty Unit Rate Amount
Total summary from page 1 654,300
Total summary from above 654300
Sub Total for 1st and 2nd floor finishes 1308600
Allow Ksh 200,000 electrical works 200,000
GRAND TOTAL 2,419,300
N/B:
- 16% VAT is exclusive in the above amount
- 30% labour of above amount is = KSh. 725,790