CUADRO DE CONTROL AVANCE REVISION DOCUME

ESPECIALIDAD QUE APLICA PARA CADA SUBSISTEMA

INSTRUMENT
ITEM SUBSISTEMA MECANICA ELECTRICA ACIÓN

23 AIRE DE INSTRUMENTOS X-701 OK OK OK


40 ALUMBRADO PERIMETRAL NA OK NA
39 APANTALLAMIENTO NA OK NA
26 BOMBA P-715 A OK OK OK
27 BOMBA P-715 B OK OK OK
28 BOMBA P-715 C OK OK OK
13 BOMBA P-716 A OK OK OK
14 BOMBA P-716 B OK OK OK
15 BOMBA P-716 C OK OK OK
16 BOMBA P-716 D OK OK OK
29 CABEZAL DE DESCARGA BOMBAS P-715 OK NA OK
17 CABEZAL DE DESCARGA BOMBAS P-716 OK NA OK
30 CABEZAL DE SUCCION BOMBAS P-715 OK NA OK
18 CABEZAL DE SUCCION BOMBAS P-716 OK NA OK
1 CABEZALES-1 (CABEZAL DE PRODUCCION) OK NA OK
2 CABEZALES-2 (CABEZAL DE ALIVIOS Y TRONCALES) OK NA OK
3 CABEZALES-3 (CABEZAL DE PRUEBA No. 1) OK NA OK
4 CABEZALES-4 (CABEZAL DE PRUEBA No. 2) OK NA OK
5 CABEZALES-5 (CABEZAL DE PRUEBA No. 3) OK NA OK
31 CCM 480 V NA OK NA
41 COLECTOR AGUAS ACEITOSAS NA NA NA
37 CORRIENTE CONTINUA HASTA 125 V NA OK NA
22 DEPURADOR DE GAS -SG-706 OK NA OK
35 DISTRIBUCION DE ENERGIA DE EMERGENCIA NA OK NA
34 GENERACION DE ENERGIA DE EMERGENCIA NA OK NA
10 GUN BARREL - BOTA DE GAS OK OK OK
20 HARDWARE NA OK OK
36 ILUMINACION DE ENERGIA DE EMERGENCIA NA OK NA
43 EDIFICIOS NA NA NA
32 RED DE MT 34.5 KV NA OK NA
9 SEPARACION BIFASICA GENERAL - SE-704 OK NA OK

6 SEPARACION BIFASICA PRUEBA No. 1 - SE-701 OK NA OK

7 SEPARACION BIFASICA PRUEBA No. 2 - SE-702 OK NA OK


8 SEPARACION BIFASICA PRUEBA No. 3 - SE-703 OK NA OK
24 TANQUE TK-701 OK NA OK
25 TANQUE TK-702 OK NA OK
11 TANQUE TK-703 OK NA OK
12 TANQUE TK-704 OK NA OK
19 TEA ATMOSFERICA TH-710 OK OK OK
38 UPS 220 VAC NA OK NA

NOTAS: PENDIENTE
Se Continua con revisión en las oficinas de Masa en compañía del equipo de Bureau Veritas
NCE REVISION DOCUMENTAL DEL DOSSIER CON BUEREAU VERITAS

RA CADA SUBSISTEMA CARGADO AL MEGA POR MASA PARA REVISION DIGITAL


REVISION DE
CIVIL CARPETAS EN MECANICA ELECTRICA INSTRUMENTACIÓN CIVIL
FISICO
OK OK OK OK OK PENDIENTE
OK OK NA PENDIENTE NA PENDIENTE
NA OK NA OK NA NA
OK OK OK OK OK PENDIENTE
OK OK OK OK OK PENDIENTE
OK OK OK OK OK PENDIENTE
OK OK OK OK OK PENDIENTE
OK OK OK OK OK PENDIENTE
OK OK OK OK OK PENDIENTE
OK OK OK OK PENDIENTE PENDIENTE
OK OK OK NA OK PENDIENTE
NA OK OK NA PENDIENTE NA
NA OK OK NA OK NA
NA OK OK NA PENDIENTE NA
NA OK OK NA OK NA
NA OK OK NA OK NA
NA OK OK NA OK NA
NA OK OK NA OK NA
NA OK OK NA OK NA
OK OK NA OK NA PENDIENTE
OK OK NA NA NA PENDIENTE
NA OK NA OK NA NA
OK OK OK NA OK PENDIENTE
NA OK NA OK NA NA
OK OK NA OK NA PENDIENTE
OK OK OK OK OK PENDIENTE
NA OK NA PENDIENTE PENDIENTE NA
NA OK NA OK NA NA
OK OK NA NA NA PENDIENTE
OK OK NA OK NA PENDIENTE
NA OK OK NA PENDIENTE NA

NA OK OK NA OK NA

NA OK OK NA PENDIENTE NA
NA OK OK NA PENDIENTE NA
OK OK OK NA PENDIENTE PENDIENTE
OK OK OK NA PENDIENTE PENDIENTE
OK OK OK NA OK PENDIENTE
OK OK OK NA OK PENDIENTE
OK OK OK OK PENDIENTE
NA OK NA OK NA NA

Falta documentacion por escanear para cargar digitalmente a plataformas de revisión


CARGADO
REVSION B. VERITAS OBSERVACIONES
COMPLETO A EN SHARED POINT Y PENDIENTES
SHERED POINT ECP

OK

OK
OK
OK
OK
OK

OK

OK

OK

OK

Cap.8
8.1 faltan hojas PL-130 y PL-164 y portadas en todos
los numerales
OK OK
8.7 Falta página de indice en inspección PM y en la
carpeta OTRAS INSPECCIONES
OK OK Falta escanear y subir DOSSIER MASTER
OK