Daily Patrolling Detail at CNT Pipeline.

Area: Doha Power Station to JAHARA RESERVIOR & Date : 06/06/2021 Time : 8.00 - 1:00 pm
Manifold A to Shuwaikh power station

Observed by : D. Rajakumar
Patrolling at CNT Pipeline Doha Power Station to JAHARA RESERVIOR & Manifold A to Shuwaikh Power Station
S.No Location of Patrolling Details of Corridor (Pipeline) Status of Corridor

1 Doha Power Station to JAHARA RESERVIOR 16" HFO Pipeline OK

2 Doha Power Station to JAHARA RESERVIOR 30/42" Fuel Gas Pipeline OK

3 Doha Power Station to JAHARA RESERVIOR 2x20" HFO Pipeline OK

4 Doha Power Station to JAHARA RESERVIOR 2x40" Fuel gas pipeline OK

5 Doha Power Station to JAHARA RESERVIOR 20" New crude oil pipeline OK

6 Doha Power Station to JAHARA RESERVIOR 16" Gas oil pipeline OK

7 Doha Power Station to JAHARA RESERVIOR 12" LSFO pipeline OK

8 Doha Power Station to JAHARA RESERVIOR 10" Gas oil pipeline OK

9 Manifold A to Shuwaikh power station 18" Fuel gas pipeline OK

Sr. No. Location Observation Remark


20" crude pipeline from (Kadma to Doha power KDDB Contractor ( Contract Number 19053630) maintenance crew KOC PTW No: 1112618, 1112619
station) KM - 15+000 and 10 + 500 carrying out manual excavation for cut and replacement of 20" crude Manpower: 43 Excavation Notification -T-
1 pipeline 260074

18" Gasline (Manifold A to Shuwaikh power it is observed that the open trench which is not backfilled(1/2 meter
2 N/A
station) KM - 08 + 100 depth)

18" Gasline (Manifold A to Shuwaikh power it is observed that the collapse of the route marker board due to soil
3 station) KM - 12 + 702 erosion (1/2 meter depth) N/A

4 18" Gasline (Manifold A to Shuwaikh power Khalid al kharafi completed the pedestrian bridge N/A
station) KM - 15 + 000 conctruction(contract no - RA - 224) near crown plaza.

18" Gasline (Manifold A to Shuwaikh power it is observed that the garden and trees planted above the buired 18" Already raised mamo twice - HSE Gas
5 station) KM - 22 + 772 to 23+085 Gas pipeline corridor /777/2020 (DIMS NO 5435704)

UGCC Contractor ( Contract Number- RA - 223) crew (construction


6 18" Gasline (Manifold A to Shuwaikh power of 6.5 ring road) construction of box culvert is completed.Instructed KOC PTW No: 988493 Manpower: 04
station) KM - 12 + 850 site supervisor to clear the area and housekeeping in progress and
after completion of housekeeping planning for backfilling

Senior Engineer sign: Safety Engineer: Safety Officer Sign: