Area: Doha Power Station to JAHARA RESERVIOR & Date : 06/06/2021 Time : 8.00 - 1:00 pm
Manifold A to Shuwaikh power station
Observed by : D. Rajakumar
Patrolling at CNT Pipeline Doha Power Station to JAHARA RESERVIOR & Manifold A to Shuwaikh Power Station
S.No Location of Patrolling Details of Corridor (Pipeline) Status of Corridor
5 Doha Power Station to JAHARA RESERVIOR 20" New crude oil pipeline OK
18" Gasline (Manifold A to Shuwaikh power it is observed that the open trench which is not backfilled(1/2 meter
2 N/A
station) KM - 08 + 100 depth)
18" Gasline (Manifold A to Shuwaikh power it is observed that the collapse of the route marker board due to soil
3 station) KM - 12 + 702 erosion (1/2 meter depth) N/A
4 18" Gasline (Manifold A to Shuwaikh power Khalid al kharafi completed the pedestrian bridge N/A
station) KM - 15 + 000 conctruction(contract no - RA - 224) near crown plaza.
18" Gasline (Manifold A to Shuwaikh power it is observed that the garden and trees planted above the buired 18" Already raised mamo twice - HSE Gas
5 station) KM - 22 + 772 to 23+085 Gas pipeline corridor /777/2020 (DIMS NO 5435704)