Professional Documents
Culture Documents
★Bearing capacity of rail pile rev.8 (8m) ①6.25N (室内試験箇所のN値修正) rev.12
★Bearing capacity of rail pile rev.8 (8m) ①6.25N (室内試験箇所のN値修正) rev.12
Pile Bearing
Height Width Length Substution of Soil Bearing Bearing Ultimate Bearing Design Bearing Required
No New Chainage Cell type Rail Pile length Number/m2 Stage Bor. Name Test pile Stress Capacity (i) / 3 No. of pile No. of pile
(m) (m) (m) other Bor. Condition stress(ton) Stress(KN) Capacity (i)
(m) (ton/m2) (kN/Number) (kN/Number)
8 4.2.102 Culvert No.141 KM.162+812 1-Cell 4.400 6.920 9.920 Rail Pile 8 2.49 STAGE-1 BH-BG-141 C 8.02 550.5 5395.3 250.5 83.5 64.6 66
17 4.2.111 Culvert No.153 KM.170+859 1-Cell 4.030 5.930 9.920 Rail Pile 8 4.08 STAGE-1 BH-BG-153 C Test pile 7.71 453.5 4444.7 218.2 72.7 61.1 62
18 4.2.112 Culvert No.154 KM.171+194 3-Cell 4.530 25.670 9.920 Rail Pile 8 3.51 STAGE-1 BH-BG-154 C 8.63 2197.6 21536.5 182.2 60.7 354.5 356
19 4.2.113 Culvert No.156 KM.171+730 1-Cell 2.830 3.040 9.920 Rail Pile 8 3.78 STAGE-1 BH-BG-154 Unknown 7.61 229.5 2249.0 159.6 53.2 42.3 44
24 4.2.118 Culvert No.163 KM.177+833 1-Cell 3.950 5.930 9.920 Rail Pile 8 8.84 STAGE-1 BH-BG-163 C 7.71 453.5 4444.7 212.8 70.9 62.7 64
29 4.2.123 Culvert No.172 KM.187+690 3-Cell 3.300 20.360 9.920 Rail Pile 8 3.01 STAGE-1 BH-BG-172 C,S 6.69 1351.2 13241.6 69.2 23.1 574.4 576
31 4.2.125 Culvert No.174 KM.188+897 1-Cell 3.300 5.930 9.920 Rail Pile 8 3.88 STAGE-1 BH-BG-174 C,S,C 7.71 453.5 4444.7 391.3 130.4 34.1 36
33 4.2.127 Culvert No.176 KM.190+104 1-Cell 3.320 5.880 9.920 Rail Pile 8 3.91 STAGE-2 BH-BG-176 C,S Test pile 7.71 449.7 4407.3 108.4 36.1 122.0 124
34 4.2.128 Culvert No.177 KM.190+707 1-Cell 3.300 5.900 9.920 Rail Pile 8 3.90 STAGE-2 BH-BG-177 C Test pile 7.71 451.3 4422.3 319.2 106.4 41.6 42
36 4.2.130 Culvert No.179 KM.193+322 2-Cell 3.300 12.060 9.920 Rail Pile 8 4.01 STAGE-2 BH-BG-179 C 7.43 888.9 8711.1 123.7 41.2 211.2 212
43 4.2.137 Culvert No.190 KM.198+285 1-Cell 3.300 6.040 9.920 Rail Pile 8 3.81 STAGE-2 BH-BG-190 C 8.02 480.5 4709.2 333.6 111.2 42.3 44
44 4.2.138 Culvert No.191 KM.199+425 1-Cell 2.800 2.950 11.010 Rail Pile 8 4.43 STAGE-2 BH P2 KNK Unknown 7.61 247.2 2422.3 173.8 57.9 41.8 42
49 4.2.143 Culvert No.195 KM.206+868 1-Cell 3.560 5.880 9.920 Rail Pile 8 4.11 STAGE-2 BH-BG-195 C 7.71 449.7 4407.3 280.7 93.6 47.1 48
52 4.2.146 Culvert No.198 KM.208+879 2-Cell 6.390 11.600 9.920 Rail Pile 8 3.80 STAGE-2 BH-BG-198 C 7.02 807.8 7916.5 216.0 72.0 109.9 110
53 4.2.147 Culvert No.199 KM.210+757 2-Cell 3.600 13.050 9.920 Rail Pile 8 3.23 STAGE-2 BH-BG-199 C 7.43 961.9 9426.2 192.6 64.2 146.8 148
54 4.2.148 Culvert No.202 KM.214+244 2-Cell 4.120 12.860 9.920 Rail Pile 8 3.13 STAGE-2 BH-BG-202 C,S(L) 7.43 947.9 9289.0 129.0 43.0 216.1 218
55 4.2.149 Culvert No.205 KM.218+670 2-Cell 3.300 13.040 9.920 Rail Pile 8 3.23 STAGE-2 BH-BG-205 C 7.43 961.1 9419.0 135.2 45.1 209.0 210
58 4.2.152 Culvert No.209 KM.223+431 1-Cell 3.520 2.950 9.920 Rail Pile 8 3.90 STAGE-2 BH BG 210 Unknown 7.61 222.7 2182.5 99.1 33.0 66.1 68
59 4.2.153 Culvert No.210 KM.224+571 1-Cell 4.290 6.010 9.920 Rail Pile 8 4.03 STAGE-2 BH-BG-210 C 8.02 478.1 4685.8 83.7 27.9 167.9 168
60 4.2.154 Culvert No.213 KM.226+046 2-Cell 4.060 13.720 9.920 Rail Pile 8 3.35 STAGE-2 BH-BG-213 C,S,C Test pile 7.43 1011.2 9910.2 150.5 50.2 197.5 198
61 4.2.155 Culvert No.213A KM.226+783 3-Cell 3.300 20.200 9.920 Rail Pile 8 3.99 STAGE-2 BH-BG-213A C,S,C 6.69 1340.6 13137.6 141.6 47.2 278.3 280
62 4.2.156 Culvert No.214 KM.227+052 1-Cell 3.230 2.850 9.920 Rail Pile 8 3.36 STAGE-2 BH-BG-214 S,C 7.61 215.1 2108.5 143.8 47.9 44.0 44
63 4.2.157 Culvert No.216 KM.227+789 2-Cell 3.100 10.730 9.920 Rail Pile 8 2.32 STAGE-2 BH-BG-216 C 7.02 747.2 7322.8 153.2 51.1 143.4 144
67 4.2.161 Culvert No.220 KM.230+203 2-Cell 3.100 10.050 9.920 Rail Pile 8 3.05 STAGE-2 BH-BG-220 C,S,C 7.02 699.9 6858.7 70.2 23.4 293.3 294
68 4.2.162 Culvert No.221 KM.230+941 1-Cell 3.010 2.870 9.920 Rail Pile 8 4.21 STAGE-3 BH-P2-NCD C,S 7.61 216.7 2123.3 172.6 57.5 36.9 38
69 4.2.163 Culvert No.222 KM.232+014 3-Cell 4.920 18.510 9.920 Rail Pile 8 2.17 STAGE-3 BH-BG-222 C 6.69 1228.4 12038.4 308.9 103.0 116.9 118
72 4.2.166 Culvert No.225 KM.234+763 1-Cell 3.730 5.990 9.920 Rail Pile 8 3.52 STAGE-3 BH-BG-225 C,S 7.71 458.1 4489.7 161.2 53.7 83.6 84
76 4.2.170 Culvert No.229 KM.237+445 2-Cell 3.410 13.190 9.920 Rail Pile 8 3.19 STAGE-3 BH-BG-229 S,C 7.43 972.2 9527.3 118.0 39.3 242.3 244
81 4.2.175 Culvert No.236 KM.243+078 1-Cell 2.800 2.900 9.920 Rail Pile 8 3.30 STAGE-3 BH BG 237 Unknown 7.61 218.9 2145.5 133.1 44.4 48.4 50
82 4.2.176 Culvert No.237 KM.243+413 2-Cell 3.360 12.000 9.920 Rail Pile 8 3.83 STAGE-3 BH-BG-237 C,S,C 7.02 835.7 8189.5 122.5 40.8 200.6 202
83 4.2.177 Culvert No.238 K.243+816 1-Cell 2.800 2.800 9.920 Rail Pile 8 3.42 STAGE-3 BH BG 239 Unknown 7.61 211.4 2071.5 92.5 30.8 67.2 68
84 4.2.178 Culvert No.239 KM.244+941 2-Cell 3.650 10.990 9.920 Rail Pile 8 2.27 STAGE-3 BH-BG-239 C,S 7.02 765.3 7500.2 123.1 41.0 182.8 184
85 4.2.179 Culvert No.240 KM.244+014 1-Cell 3.300 6.850 9.920 Rail Pile 8 3.63 STAGE-3 BH-BG-240 C 8.02 545.0 5340.8 154.0 51.3 104.0 106
86 4.2.180 Culvert No.241 KM.246+416 2-Cell 3.100 10.020 9.920 Rail Pile 8 3.06 STAGE-3 BH-BG-241 S 7.02 697.8 6838.2 66.8 22.3 307.1 308
89 4.2.183 Culvert No.246 KM.248+434 3-Cell 4.500 20.320 9.920 Rail Pile 8 3.97 STAGE-3 BH-BG-246 S,C 6.69 1348.5 13215.6 239.3 79.8 165.7 166
90 4.2.184 Culvert No.247 KM.250+903 2-Cell 3.300 13.020 9.920 Rail Pile 8 4.03 STAGE-3 BH-BG-247 S 7.43 959.6 9404.5 178.2 59.4 158.3 160
92 4.2.186 Culvert No.249 KM.252+445 3-Cell 3.300 19.260 9.920 Rail Pile 8 3.38 STAGE-3 BH-BG-249 C,S,C 6.69 1278.2 12526.2 207.4 69.1 181.2 182
95 4.2.189 Culvert No.252 KM.254+323 2-Cell 3.470 13.760 9.920 Rail Pile 8 2.64 STAGE-3 BH-BG-252 C 7.43 1014.2 9939.1 214.0 71.3 139.3 140
100 4.2.194 Culvert No.258A KM.260+151 1-Cell 3.640 6.050 9.920 Rail Pile 8 4.00 STAGE-3 BH-BG-258 C 8.02 481.3 4717.0 152.4 50.8 92.8 94
101 4.2.195 Culvert No.259 KM.260+486 2-Cell 6.260 13.160 9.920 Rail Pile 8 3.20 STAGE-3 BH-BG-259 S,C 7.43 970.0 9505.7 98.1 32.7 290.8 292
102 4.2.196 Culvert No.260 KM.261+010 3-Cell 5.560 26.870 9.920 Rail Pile 8 3.21 STAGE-3 BH-BG-260 C 8.67 2311.0 22647.7 165.0 55.0 411.7 412
Quantity 41 36 5 4 6446
APPENDIX 1: CALCULATION OF BEARING CAPACITY OF RAIL PILE
2. Study for Ultimate Bearing Capacity of Rail Pile
Bridge No 141
Borehole No BH-BG-141
Boring Level 17.9905 m
EL of top of pile 14.009 m
EL of bottom of pile 6.109 m
Embeded length of pile 7.900 m
Bridge No 141
Borehole No BH-BG-141
Boring Level 17.9905 m
EL of top of pile 14.007 m
EL of bottom of pile 6.007 m
Embeded length of pile 7.900 m
Bridge No 153
Borehole No BH-BG-153
Boring Level 22.6480 m
EL of top of pile 20.162 m
EL of bottom of pile 12.162 m
Embeded length of pile 7.900 m
Bridge No 154
Borehole No BH-BG-154
Boring Level 22.9335 m
EL of top of pile 20.308 m
EL of bottom of pile 12.308 m
Embeded length of pile 7.900 m
Bridge No 156
Borehole No BH-BG-154
Boring Level 22.9335 m
EL of top of pile 21.310 m
EL of bottom of pile 13.310 m
Embeded length of pile 7.900 m
RH FW HT HB HH WT FE FM Y Ixx
kg / m cm cm4
BS 60R
rail 114.3 109.5 57.2 57.2 26.2 11.1 7.5 16.67 29.82 58.7 681
Bridge No 163
Borehole No BH-BG-163
Boring Level 25.2030 m
EL of top of pile 22.150 m
EL of bottom of pile 14.150 m
Embeded length of pile 7.900 m
Bridge No 172
Borehole No BH-BG-172
Boring Level 30.1300 m
EL of top of pile 26.690 m
EL of bottom of pile 18.690 m
Embeded length of pile 7.900 m
Bridge No 174
Borehole No BH-BG-174
Boring Level 30.0100 m
EL of top of pile 26.690 m
EL of bottom of pile 18.690 m
Embeded length of pile 7.900 m
Unit Side Resistance
Unit volume Vertical
Depth Layer volume N Soil
EL weight effective
from GL thick-ness weight value type
of water stress surface
of soil
length
Lt γs γw σ'v α Su CN N60 N160 qs Ls As= Lt*Ls Rs= qs*As
m m m kN/m3 kN/m3 kN/m 2
MPa kN/m 2
kN/m 2
m m 2
kN
26.790 0.000 0.000 0.00 0.000
Pile top 26.690 0.100 0.100 19.00 10 0.45 0.000 3 sand
25.510 1.280 1.180 19.00 10 6.21 0.006 3 sand 1.00 18.75 1.92 3 5.752 5.52 0.402 0.474 2.620
24.010 2.780 1.500 19.98 10 19.01 0.019 11 clay 1.00 68.75 1.54 11 16.978 68.75 0.402 0.603 41.456
22.510 4.280 1.500 18.21 10 32.65 0.033 23 clay 1.00 143.75 1.36 23 31.337 143.75 0.402 0.603 86.681
21.010 5.780 1.500 19.88 10 46.22 0.046 24 clay 1.00 150.00 1.25 24 29.910 150.00 0.402 0.603 90.450
19.510 7.280 1.500 19.95 10 61.09 0.061 26 clay 1.00 162.50 1.15 26 29.977 162.50 0.402 0.603 97.988
Pile tip 18.690 8.100 0.820 18.77 10 72.15 0.072 35 clay 1.00 218.75 1.10 35 38.406 218.75 0.402 0.330 72.109
18.010 8.780 0.680 18.77 10 78.72 0.079 35 clay
↑ 391.303
BH-BG-173
Calculation of bearing capacity of pile
1. Rail Pile Property
Rail pile name BS60R
Flange
Flange
Head Head thicknes
Rail Flange Head Web thicknes
Width Width s Weight
Height Width Height Thickness s
at Top at Base at
at Edge
Center
RH FW HT HB HH WT FE FM Y Ixx
kg / m cm cm4
BS 60R
rail 114.3 109.5 57.2 57.2 26.2 11.1 7.5 16.67 29.82 58.7 681
Bridge No 176
Borehole No BH-BG-176
Boring Level 29.1300 m
EL of top of pile 26.670 m
EL of bottom of pile 18.670 m
Embeded length of pile 7.900 m
Flange
Flange
Head Head thicknes
Rail Flange Head Web thicknes
Width Width s Weight
Height Width Height Thickness s
at Top at Base at
at Edge
Center
RH FW HT HB HH WT FE FM Y Ixx
kg / m cm cm4
BS 60R
rail 114.3 109.5 57.2 57.2 26.2 11.1 7.5 16.67 29.82 58.7 681
Bridge No 177
Borehole No BH-BG-177
Boring Level 28.9300 m
EL of top of pile 26.690 m
EL of bottom of pile 18.690 m
Embeded length of pile 7.900 m
Bridge No 179
Borehole No BH-BG-179
Boring Level 29.5200 m
EL of top of pile 26.690 m
EL of bottom of pile 18.690 m
Embeded length of pile 7.900 m
Bridge No 190
Borehole No BH-BG-190
Boring Level 32.1890 m
EL of top of pile 28.807 m
EL of bottom of pile 20.807 m
Embeded length of pile 7.900 m
Bridge No 191
Borehole No BH-P2-KNK
Boring Level 33.1945 m
EL of top of pile 30.478 m
EL of bottom of pile 22.478 m
Embeded length of pile 7.900 m
Flange
Flange
Head Head thicknes
Rail Flange Head Web thicknes
Width Width s Weight
Height Width Height Thickness s
at Top at Base at
at Edge
Center
RH FW HT HB HH WT FE FM Y Ixx
kg / m cm cm4
BS 60R
rail 114.3 109.5 57.2 57.2 26.2 11.1 7.5 16.67 29.82 58.7 681
Bridge No 195
Borehole No BH-BG-195
Boring Level 41.4230 m
EL of top of pile 37.378 m
EL of bottom of pile 29.378 m
Embeded length of pile 7.900 m
Flange
Flange
Head Head thicknes
Rail Flange Head Web thicknes
Width Width s Weight
Height Width Height Thickness s
at Top at Base at
at Edge
Center
RH FW HT HB HH WT FE FM Y Ixx
kg / m cm cm4
BS 60R
rail 114.3 109.5 57.2 57.2 26.2 11.1 7.5 16.67 29.82 58.7 681
Bridge No 198
Borehole No BH-BG-198
Boring Level 43.0770 m
EL of top of pile 36.490 m
EL of bottom of pile 28.490 m
Embeded length of pile 7.900 m
Bridge No 199
Borehole No BH-BG-199
Boring Level 44.9960 m
EL of top of pile 41.169 m
EL of bottom of pile 33.169 m
Embeded length of pile 7.900 m
Flange
Flange
Head Head thicknes
Rail Flange Head Web thicknes
Width Width s Weight
Height Width Height Thickness s
at Top at Base at
at Edge
Center
RH FW HT HB HH WT FE FM Y Ixx
kg / m cm cm4
BS 60R
rail 114.3 109.5 57.2 57.2 26.2 11.1 7.5 16.67 29.82 58.7 681
Bridge No 202
Borehole No BH-BG-202
Boring Level 44.6130 m
EL of top of pile 41.080 m
EL of bottom of pile 33.080 m
Embeded length of pile 7.900 m
Bridge No 205
Borehole No BH-BG-205
Boring Level 42.6115 m
EL of top of pile 40.030 m
EL of bottom of pile 32.030 m
Embeded length of pile 7.900 m
Bridge No 209
Borehole No BH-BG-210
Boring Level 41.8945 m
EL of top of pile 38.787 m
EL of bottom of pile 30.787 m
Embeded length of pile 7.900 m
Bridge No 210
Borehole No BH-BG-210
Boring Level 41.8945 m
EL of top of pile 37.390 m
EL of bottom of pile 29.390 m
Embeded length of pile 7.900 m
Bridge No 213
Borehole No BH-BG-213
Boring Level 40.6805 m
EL of top of pile 36.371 m
EL of bottom of pile 28.371 m
Embeded length of pile 7.900 m
Bridge No 213A
Borehole No BH-BG-213A
Boring Level 39.1425 m
EL of top of pile 36.811 m
EL of bottom of pile 28.811 m
Embeded length of pile 7.900 m
141.638
Calculation of bearing capacity of pile
1. Rail Pile Property
Rail pile name BS60R
Bridge No 214
Borehole No BH-BG-214
Boring Level 40.4345 m
EL of top of pile 36.789 m
EL of bottom of pile 28.789 m
Embeded length of pile 7.900 m
Bridge No 216
Borehole No BH-BG-216
Boring Level 38.8785 m
EL of top of pile 35.321 m
EL of bottom of pile 27.321 m
Embeded length of pile 7.900 m
27
2. Study for Ultimate Bearing Capacity of Rail Pile
Bridge No 220
Borehole No BH-BG-220
Boring Level 38.2565 m
EL of top of pile 34.340 m
EL of bottom of pile 26.340 m
Embeded length of pile 7.900 m
28
Calculation of bearing capacity of pile
1. Rail Pile Property
Rail pile name BS60R
Flange
Flange
Head Head thicknes
Rail Flange Head Web thicknes
Width Width s Weight
Height Width Height Thickness s
at Top at Base at
at Edge
Center
RH FW HT HB HH WT FE FM Y Ixx
kg / m cm cm4
BS 60R
rail 114.3 109.5 57.2 57.2 26.2 11.1 7.5 16.67 29.82 58.7 681
29
2. Study for Ultimate Bearing Capacity of Rail Pile
Bridge No 221
Borehole No BH-P2-NCD
Boring Level 37.8525 m
EL of top of pile 34.156 m
EL of bottom of pile 26.156 m
Embeded length of pile 7.900 m
30
Calculation of bearing capacity of pile
1. Rail Pile Property
Rail pile name BS60R
Flange
Flange
Head Head thicknes
Rail Flange Head Web thicknes
Width Width s Weight
Height Width Height Thickness s
at Top at Base at
at Edge
Center
RH FW HT HB HH WT FE FM Y Ixx
kg / m cm cm4
BS 60R
rail 114.3 109.5 57.2 57.2 26.2 11.1 7.5 16.67 29.82 58.7 681
31
2. Study for Ultimate Bearing Capacity of Rail Pile
Bridge No 222
Borehole No BH-BG-222
Boring Level 37.1840 m
EL of top of pile 33.840 m
EL of bottom of pile 25.940 m
Embeded length of pile 7.900 m
32
Calculation of bearing capacity of pile
1. Rail Pile Property
Rail pile name BS60R
33
2. Study for Ultimate Bearing Capacity of Rail Pile
Bridge No 223
Borehole No BH-BG-222
Boring Level 37.1840 m
EL of top of pile 35.610 m
EL of bottom of pile 27.610 m
Embeded length of pile 7.900 m
34
Calculation of bearing capacity of pile
1. Rail Pile Property
Rail pile name BS60R
Flange
Flange
Head Head thicknes
Rail Flange Head Web thicknes
Width Width s Weight
Height Width Height Thickness s
at Top at Base at
at Edge
Center
RH FW HT HB HH WT FE FM Y Ixx
kg / m cm cm4
BS 60R
rail 114.3 109.5 57.2 57.2 26.2 11.1 7.5 16.67 29.82 58.7 681
35
2. Study for Ultimate Bearing Capacity of Rail Pile
Bridge No 225
Borehole No BH-BG-225
Boring Level 39.3465 m
EL of top of pile 36.730 m
EL of bottom of pile 28.730 m
Embeded length of pile 7.900 m
36
Calculation of bearing capacity of pile
1. Rail Pile Property
Rail pile name BS60R
Flange
Flange
Head Head thicknes
Rail Flange Head Web thicknes
Width Width s Weight
Height Width Height Thickness s
at Top at Base at
at Edge
Center
RH FW HT HB HH WT FE FM Y Ixx
kg / m cm cm4
BS 60R
rail 114.3 109.5 57.2 57.2 26.2 11.1 7.5 16.67 29.82 58.7 681
37
2. Study for Ultimate Bearing Capacity of Rail Pile
Bridge No 229
Borehole No BH-BG-229
Boring Level 36.9915 m
EL of top of pile 34.900 m
EL of bottom of pile 26.900 m
Embeded length of pile 7.900 m
38
Calculation of bearing capacity of pile
1. Rail Pile Property
Rail pile name BS60R
Flange
Flange
Head Head thicknes
Rail Flange Head Web thicknes
Width Width s Weight
Height Width Height Thickness s
at Top at Base at
at Edge
Center
RH FW HT HB HH WT FE FM Y Ixx
kg / m cm cm4
BS 60R
rail 114.3 109.5 57.2 57.2 26.2 11.1 7.5 16.67 29.82 58.7 681
2. Study for Ultimate Bearing Capacity of Rail Pile
Bridge No 236
Borehole No BH-BG-237 * NBH-P2-KB is too far
Boring Level 39.1865 m
EL of top of pile 35.602 m
EL of bottom of pile 27.702 m
Embeded length of pile 7.900 m
43
2. Study for Ultimate Bearing Capacity of Rail Pile
Bridge No 237
Borehole No BH-BG-237
Boring Level 39.1865 m
EL of top of pile 35.676 m
EL of bottom of pile 27.676 m
Embeded length of pile 7.900 m
44
Calculation of bearing capacity of pile
1. Rail Pile Property
Rail pile name BS60R
Flange
Flange
Head Head thicknes
Rail Flange Head Web thicknes
Width Width s Weight
Height Width Height Thickness s
at Top at Base at
at Edge
Center
RH FW HT HB HH WT FE FM Y Ixx
kg / m cm cm4
BS 60R
rail 114.3 109.5 57.2 57.2 26.2 11.1 7.5 16.67 29.82 58.7 681
45
2. Study for Ultimate Bearing Capacity of Rail Pile
Bridge No 238
Borehole No BH-BG-239
Boring Level 38.1725 m
EL of top of pile 35.872 m
EL of bottom of pile 27.872 m
Embeded length of pile 7.900 m
46
Calculation of bearing capacity of pile
1. Rail Pile Property
Rail pile name BS60R
Flange
Flange
Head Head thicknes
Rail Flange Head Web thicknes
Width Width s Weight
Height Width Height Thickness s
at Top at Base at
at Edge
Center
RH FW HT HB HH WT FE FM Y Ixx
kg / m cm cm4
BS 60R
rail 114.3 109.5 57.2 57.2 26.2 11.1 7.5 16.67 29.82 58.7 681
47
2. Study for Ultimate Bearing Capacity of Rail Pile
Bridge No 239
Borehole No BH-BG-239
Boring Level 38.1725 m
EL of top of pile 34.186 m
EL of bottom of pile 26.186 m
Embeded length of pile 7.900 m
48
Calculation of bearing capacity of pile
1. Rail Pile Property
Rail pile name BS60R
Flange
Flange
Head Head thicknes
Rail Flange Head Web thicknes
Width Width s Weight
Height Width Height Thickness s
at Top at Base at
at Edge
Center
RH FW HT HB HH WT FE FM Y Ixx
kg / m cm cm4
BS 60R
rail 114.3 109.5 57.2 57.2 26.2 11.1 7.5 16.67 29.82 58.7 681
49
2. Study for Ultimate Bearing Capacity of Rail Pile
Bridge No 240
Borehole No BH-BG-240
Boring Level 38.3045 m
EL of top of pile 34.538 m
EL of bottom of pile 26.538 m
Embeded length of pile 7.900 m
50
Calculation of bearing capacity of pile
1. Rail Pile Property
Rail pile name BS60R
Flange
Flange
Head Head thicknes
Rail Flange Head Web thicknes
Width Width s Weight
Height Width Height Thickness s
at Top at Base at
at Edge
Center
RH FW HT HB HH WT FE FM Y Ixx
kg / m cm cm4
BS 60R
rail 114.3 109.5 57.2 57.2 26.2 11.1 7.5 16.67 29.82 58.7 681
51
52
2. Study for Ultimate Bearing Capacity of Rail Pile
Bridge No 241
Borehole No BH-BG-241
Boring Level 37.810 m
EL of top of pile 33.921 m
EL of bottom of pile 25.921 m
Embeded length of pile 7.900 m
53
Calculation of bearing capacity of pile
1. Rail Pile Property
Rail pile name BS60R
Flange
Flange
Head Head thicknes
Rail Flange Head Web thicknes
Width Width s Weight
Height Width Height Thickness s
at Top at Base at
at Edge
Center
RH FW HT HB HH WT FE FM Y Ixx
kg / m cm cm4
BS 60R
rail 114.3 109.5 57.2 57.2 26.2 11.1 7.5 16.67 29.82 58.7 681
54
55
2. Study for Ultimate Bearing Capacity of Rail Pile
Bridge No 246
Borehole No BH-BG-246
Boring Level 36.7100 m
EL of top of pile 32.700 m
EL of bottom of pile 24.800 m
Embeded length of pile 7.900 m
56
239.254
57
Calculation of bearing capacity of pile
1. Rail Pile Property
Rail pile name BS60R
Flange Flange
Head Head Web thickne thickne
Rail Flange Head
Width Width Thickne ss ss Weight
Height Width Height
at Top at Base ss at at
Edge Center
RH FW HT HB HH WT FE FM Y Ixx
kg / m cm cm4
BS 60R
rail 114.3 109.5 57.2 57.2 26.2 11.1 7.5 16.67 29.82 58.7 681
58
59
2. Study for Ultimate Bearing Capacity of Rail Pile
Bridge No 247
Borehole No BH-BG-247
Boring Level 37.3500 m
EL of top of pile 33.900 m
EL of bottom of pile 25.900 m
Embeded length of pile 7.900 m
60
Calculation of bearing capacity of pile Tokyu Construction Co. Ltd.
Flange
Flange
Head Head thicknes
Rail Flange Head Web thicknes
Width Width s Weight
Height Width Height Thickness s
at Top at Base at
at Edge
Center
RH FW HT HB HH WT FE FM Y Ixx
kg / m cm cm4
BS 60R
rail 114.3 109.5 57.2 57.2 26.2 11.1 7.5 16.67 29.82 58.7 681
61
62
2. Study for Ultimate Bearing Capacity of Rail Pile
Bridge No 249
Borehole No BH-BG-249
Boring Level 38.515 m
EL of top of pile 35.951 m
EL of bottom of pile 27.951 m
Embeded length of pile 7.900 m
63
Pile tip 27.951 8.100 0.059 19.11 10 80.25 0.080 15 clay 1.00 93.75 1.06 15 15.926 93.75 0.402 0.024 2.222
26.510 9.541 1.441 19.11 10 87.08 0.087 15 clay
207.427
64
Calculation of bearing capacity of pile
1. Rail Pile Property
Rail pile name BS60R
Flange
Flange
Head Head thicknes
Rail Flange Head Web thicknes
Width Width s Weight
Height Width Height Thickness s
at Top at Base at
at Edge
Center
RH FW HT HB HH WT FE FM Y Ixx
kg / m cm cm4
BS 60R
rail 114.3 109.5 57.2 57.2 26.2 11.1 7.5 16.67 29.82 58.7 681
65
66
2. Study for Ultimate Bearing Capacity of Rail Pile
Bridge No 252
Borehole No BH-BG-252
Boring Level 39.510 m
EL of top of pile 35.489 m
EL of bottom of pile 27.489 m
Embeded length of pile 7.900 m
67
Calculation of bearing capacity of pile
1. Rail Pile Property
Rail pile name BS60R
Flange Flange
Head Head Web thickne thickne
Rail Flange Head
Width Width Thickne ss ss Weight
Height Width Height
at Top at Base ss at at
Edge Center
RH FW HT HB HH WT FE FM Y Ixx
kg / m cm cm4
BS 60R
rail 114.3 109.5 57.2 57.2 26.2 11.1 7.5 16.67 29.82 58.7 681
68
69
2. Study for Ultimate Bearing Capacity of Rail Pile
Bridge No 258A
Borehole No BH-BG-258
Boring Level 41.4925 m
EL of top of pile 37.107 m
EL of bottom of pile 29.107 m
Embeded length of pile 7.900 m
70
Calculation of bearing capacity of pile
1. Rail Pile Property
Rail pile name BS60R
Flange Flange
Head Head Web thickne thickne
Rail Flange Head
Width Width Thickne ss ss Weight
Height Width Height
at Top at Base ss at at
Edge Center
RH FW HT HB HH WT FE FM Y Ixx
kg / m cm cm4
BS 60R
rail 114.3 109.5 57.2 57.2 26.2 11.1 7.5 16.67 29.82 58.7 681
71
72
2. Study for Ultimate Bearing Capacity of Rail Pile
Bridge No 259
Borehole No BH-BG-259
Boring Level 38.029 m
EL of top of pile 34.785 m
EL of bottom of pile 26.785 m
Embeded length of pile 7.900 m
73
Calculation of bearing capacity of pile
1. Rail Pile Property
Rail pile name BS60R
Flange Flange
Head Head Web thickne thickne
Rail Flange Head
Width Width Thickne ss ss Weight
Height Width Height
at Top at Base ss at at
Edge Center
RH FW HT HB HH WT FE FM Y Ixx
kg / m cm cm4
BS 60R
rail 114.3 109.5 57.2 57.2 26.2 11.1 7.5 16.67 29.82 58.7 681
74
75
2. Study for Ultimate Bearing Capacity of Rail Pile
Bridge No 260
Borehole No BH-BG-260
Boring Level 41.254 m
EL of top of pile 36.713 m
EL of bottom of pile 28.713 m
Embeded length of pile 7.900 m
76