LANDWORKS DEVELOPMENT INC.
MATERIAL CONTROL SHEET
ject Name: Construction of Bridge - Baliwag Bridge
foject Code: CE-200G-0012
scation
lent:
No.
Magallanes Cavite
OPWH
Description
[Construction of Field Office for the Engineer
‘Ordinary Plywood 1/4
‘Coco Lumber 2"x 3°x 12
CWN#2
CWNES
Corrugated G1. Sheet #26 Bf on
Project Billboard / Signboard
‘Coco Lumber 2x3" x 12"
‘Ordinary Plywood 172
‘CWIN# 2
CWN#S
Tarpaulin S38
Bored up Facilities
(C-Purins 2x 4° x6m
“Tekscrew 12mm x 65mm
GPipe 2 x 20R. 8.20
Gil Corrugated Shest ot G26
‘Swivel Clamp 2
‘Weiding rod
‘Cement(Post (Column)
‘White Sand
(Gravel 3/4
Concrete Nail #3
Concrete Nail #4
Gl. Wire #16
RS8 tamm daxem, 63s
‘Angie Bar Tx x 1/4 xem
‘Angie Bar2"x2"x 1/4 x 6m
‘Ordinary Plywood 4x8x 1/2thk
‘Coco lumber 253-12"
CWN#2
CWN#S
Cylindrical Hinges 3/4
Drill Bit Pin “12mm {mason
Concrete Epox
PCC Pavement (Unreinforced), 0.26m thick, 14 days
RSE fémmD xm
‘Asphalt Cement
Diamond Blade 14"
‘Cement
Redyoure curing Compound
Polyétnelene Sheet
C-Puriins 2x6x4m (Sm
‘Angle bar 172x112
Round Bar Témm@ x 6m
'3500psi 14D 6-3/4
Flood light 500 watts
Unleaded
[PCG Pavement (Reinforced), 0.30m Thiek 14 days:
RSB 1émmg x 9m G.40
RSB 20mmox9m 6.40
RSB 25mmBx9m G60
‘Asphalt Cement
Diamond Blade 14"
‘Cement
Redyoure Curing Compound
SST Pewareers
kgs
kgs
S
cs
0
08
cs.
kgs
kgs
ain
eoes
al.
ats)
agis)
(8)
ag(s)
Tits
roll(s)
els)
(s)
pals)
satis)
tts
Date:
oor 1/2021LANDWORKS DEVELOPMENT INC.
MATERIAL CONTROL SHEET
roject Name: Construction of Bridge - Baliwag Bridge Date: 6/0202
roject Code: CE-200G.002
Seaton; Mapalanes Cavie
lient: DPWH,
No. Description vom ‘@ty. Per Unit Total aty.
Gi Wwresie “ais) 75.00 7500
gureguts Sunbave Gouise
‘Subbase Course cu. m. 132.16 TIZTS
Lastillas cu. m. 370.00. 37000
ott aa Tae} —FpoODT
RCP 1800mm diam. pos) 30.00 30.00
BRIDGE CONSTRUCTION
Sonat Pies eet raed Tees 1a nm T68
4000 3/4 28D PCD_ cum. 85.20
Se entioea se, SS or io
RSB 36mm diameter x 9m, G-60_ pels) 200.00
RSB 20mm diameter x 7.5m, G-60_ pe(s) 476.00
te eter nae mee Ta
Gi Tie Wire # 16 kg(s) 202.38
Sorts Pes sant n Dad Votes TNS ei Fe0o
0003 280 FCO aim 3520
RSB 36mm diameter x 12m, G-60 pe(s) 288.00
Se eon sanearaoes oa =o 55600
BS6 tonmdionsereT oy, 65 a reo
Aes iomm dametersam So =O Tat 00
Siete ee ee Se5T
(CopingiBeam (Abutment A& B)
3500 psi 3/4 28D PCD. cum 47.32.
65 Sonn dia, SO met “08
65 20mm dia Sm G0 mal 3000
ReB Some dao ba a so
RSB 16mm dia x 7.5m, G-60 pe(s) 588.00
Stewie mo Tea
EXE SE Phenols Beard es 0600
Tabula eS oo EO a S60
Caraga bol & ut w waste Dee TS f 7000
Woting od 6078 a 70.00
CuLOT Whee T-Ga oa 00
SopiigBeam Pir 76
3500 psi 3/4 280 PCD cum a2 33.12
RSB 36mm dia x 12m, 60 ols) 200.00 200.00
RSB Samm diax7.5 m, 6-60 pe(s) 7125.00. 725.00
RSB 25mm dia x 12.0 m, G-60 pe(s) 60.00 60.00
RSB 16mm dia x 6m, G-60 kg(s) 925.00 ‘925.00,
Gil. Tie Wire # 16 kg(s) 432.96 132.96
yet cherie Bad ia eee] —tee0e
Tabuiar 15 oa EXO a waco e000
Carag bot & ru wi wather Peer TSR ea Hea 770.00
Welding rod 60T3 als) 40.00 40.00
Cut ot hes 1 aa ro S00 300
Shea: Blok & Rae or Roo BAND PER
3500 psi 3/4 28D PCD cum 6.05 6.05
RSB 16mm dia x 6m, G-40 pels) 585.84 585.84
RSB 12mm dia. x 6m, G-40 pols) 150.90, 150.90
ASE Tommie vom Sao a Et ae — setae
Ginemieas = as6 | 1339
wood #817 3 30 S00
Coco lumber: 2x4" x12" pes. 24.00 24.00LANDWORKS DEVELOPMENT INC.
MATERIAL CONTROL SHEET
roject Name: Construction of Bridge - Baliwag Bridge Date: os/142021
roject Code: CE-200G-0012 00
ovation, Magallanes Cavite
lent: DPWH
No. Description vom | Qty. Per Unit Total Qty.
Gite Wire #16 ig 70.31 70.31
4x8 x 3/4 Phenols board pos 4.00 4.00
Tubular 4172" 4 1/2" x 6mm thk x 6m pes 30.00 30.00
Carriage Bott & nut w/ washer 12mm x 7émm os 700.00 7100.00,
‘Welding rod 6019 ig 40.00) 40.00)
Wingwal
Rs8 16mm daxom, G60 Bes. 24.00 724.00
RSB 12mm dia x 7.5m, 6-4 pes. 364.00 384.00
3500 psi 3/4 26D ord cum 36.20 36.30
Phenolic Board 4 x 8.3/0 pss. 8.00 8.00
“Tekscrew 12mm x SOmm ps. 770.00 770.00,
G.iTie Wire # 16 ig 15.14 15.11
Concrete Nail #3 kg 70.00 10.00
Concrete Nail #4 kg 70.00 70.00
Gonerete Epo gal 8.00 8.00
[Bearing Pac
Bearing Pad Duro 60 680xG0000 Bes 75.00 76.00
Bearing Pad Duro 60 680x200x40 pes 8.00) 8.00
IRC Columns - 1.5m, Diameter
3500 9/4 28D PCD cam e788 197.92
RSB 36mm dia x 12m, 60 pels 50.00 7150.00
RSB 36mm dia xm, G60 pels) 150.00 7150.00,
RSB G6mm dia x 6m, G-60-Sarter bar pels) 72.00. 72.00
RSB 25mm dia x 9m, G-60 pois 60.00 60.00
RSB 16mm die x 9m, G-60 pels 350.00 350.00,
G.iTie Wire # 16 kg 330.54 330.54
Pile Cap
3500 3/4 28D POD am 187.82 797.92
SB somm diax 7.6m G60 pos 260.00. 260.00
SB 28mm dia x 7.6m G-60 pes. 262.00 262.00
RSB 25mm dia x 7.5m 6-60 pes 110.00. 110.00
RSS 16mm dla x7.5m 6-60 pes) 380.00 380.00
G.iTie Wire # 16 'g 300.54 390.54
4x6 x 1/2" thk plywood ord pes 20.00 20.00
2x4'x 12 coco lumber pes 50.00 50.00
Expansion Dam
Ms Plate 1.8m x 6m x 20mm thk Pes 200 2.00
‘Square bars 20mm x 20mm x 6m pes. 40.00 40.00,
Stee! Casing
[Permanent Steel Casing 1.2 diameter x 3m pes 7200 72.00
[Permanent Stool Casing 1,0 diameter x 3m pes 6.00 6.00
[Steel Casing Mold for RC Column 1.5 dlameter x 6m pes 2.00 2.00
[-BEAM ~10em x 18 om x6 meters pes. 30.00 30.00
[Restraining Bars @ Abutment A & 8
—| 888 senmdaxém, 620 Pes 77.00 77.00
1. Pipe 100mm dia shed 20 pes: 12.00 12.00
‘GI Pipe drain 100mm dia pes) 76.00 75.00
Preformed Joint Filer pes, 60.00 80.00
[Restraining Bars Fix @ Pier 18 Pier?
RSB 36mm dia x6.m, G-60 pes 77.00 77.00
‘Gil Pipe 100mm dia shed 20 os 12.00 42.00
GI Pipe drain 100mm dia pes: 75.00 75.00
Preformed Joint Filler pes 80.00 80.00
(Concrete SidewalkLANDWORKS DEVELOPMENT INC,
MATERIAL CONTROL SHEET
ject Name: Construction of Bdge -Balivag Bridge ete: ___osytvan24
ject Code: EOGONIZ
seaion’ Magallanes Cavio
lient: OPWH
‘No. Description vom Qty. Per Unit
RSB 10mm dia. x 6m, G-60 pes 485.00
S000 psa 260 rd zum 64.00
Gi Te Wie 18 mn 728.17
RR Deck Sab
Paythtore Sah aie 00
Sep 3 250 po oun 7263
RSE eM a VOM CAO mH 208.00
SB 26mm da x7 Sm, 660 pes 6800
se 26mm de xo, 680 tes 5600
5 1omm di pes 3.00
S6 Tom da = 85.0
RSB 16mm dia. pos. 622.00
SS om i oa 3200
Ase iam de 0m, G80 = ea
Fab UP tk gored od a 50009
Exe" x12 000 MBE oI 700.00
cane a 3500
Cwn# 3 kg. 35.00.
oma if 36.00
Gi Te Wier is TET
Wag rot OTS ie 160.00
Diatragm Wall
sellpe 94 2806 can wae] aa
ASS nm da vom SH a 700} 72.00
ss Zann devon eao oa Te00 7200
8 28mm da. x@m_G20 pes soa 6000
Ase Tamm da. x9.0m, 6-4 pes 7200 25200
Sitewide ia sea 8600
Bivood Fx 5x TTR 7 10.00 [10.00
Coco umber 4512 2 70.00 [10.00
canes To00 {10.00
CWNeF2, ig 10.00 10.00
Bdge TOOT
3000p 1 280 om Tee 188
785 25mm dia 6m, GBD. oe 73000-7000
58 fom die x9 630 a sac —— 6000
55 1omm die x8, G0 a 760.00 [150.00
GL TeWies ig wee] asa
Grease a 730 730
Prestressed Structural Concrete Members (25.00 meters, Type || each 8.00 8.00
RSB 32mm dia x Om, G-60 pols) 88.00 58.00
igs zanm devon 680 a et pat
RSB 20mm dlax om, 6-60 pels) 220.00 220.00
RSB 16mm dia x 9m, G-60 pels) 2,180.00 2,180.00
2500psi 3/4 28D ord Lean Concrete cu.m. 42.80 12.80
Fluidr 600g pouch (Grout Expandar pout 700.80 700.00
Ton Shik Gamer {0060p tigioes =o sxc — e400
Duct Tube Pes) 710.00 270.00
Concrete 5000psi 3/4 28D PCD. cu.m. 422.40 122.40
Grease pail(s) 4.00 4.00
Tendon im Tea 00 | spa 0
Prestessed Stucral Conarale Monae 0.00 melon, pe sesh 06 400
Stel moulds & accessais a 7.00 109
RSB 32mm dia x 9m, G-60 ‘pe(s) 37.00 3700LANDWORKS DEVELOPMENT INC.
MATERIAL CONTROL SHEET
roject Name: Consruction of Bridge -Balwag Bridge Date _oerte0z4
roject Code: CE-200G-0012
ocation: Magallanes Cavite
client: DPWH
Ne. Description vom | Qty. Per Unit Total ty.
‘Conerete S000psI S14 76D PCD. um Ti60 7.60
Grease. ‘palls) 2.00 2.00
Tendon ir. 6144.00 144.00,
‘Anchor Block unit 150.00 450.00
[DRAINAGE AND SLOPE PROTECTION STRUCTURES
|Grouted Riprap (Class A)
Boulders, cu. M, 7,963.10 7,963.10
White Sand eum. 2,388.03 2,388.93
Cement begs Dizaae2 | 21,234.92
PVC Pipe pes. 2,900.00 2,800.00
Goco Lumber 2x SIZ pes. 2,900.00 2,800.00
WES. igs. 562.20 582.20
Filter Cloth Sqm 113.76 T1376
[Stone Masonty
Escombro eum. 2ATaST DATES
White Sand um. 742.34 742.31
Cement bags 5508.00 6,598.00
PVC Pipe > pes. 7,726.00 1,726.00,
Coco Lumber 2° x 3" x 12" pes. 1,728.00 1,726.00
CWN#S gs. 348.00 346.00
Filter Cloth Sam 33.74 33.74
PVC Pipe 2” pes. 7,726.00 1,726.00
Coco Lumber 2" x 3" x 12" pes. 1,726.00 1,726.00
CWN#3 kgs. 346.00 346.00
Filter Cloth, ‘sq.m. 33.74 33.74
[Sheet Pie Steel Slope Protection
‘Sheet Piles 100mm x 400mm x 10.5mm x 12m pes. 267.00 267.00
3,500psi 3/4 28D ord cum. 36.40 86.40
16mm diameters x 6.0m RSE G-60 pecs). 420.00 120.00
22mm diameters x 6.0m RSB.G-60 —pe(s), 250.00 7250.00
G.1. Tie Wire #26 Ka(8) 36.77 36.77
Plywood 4' x 8! x 1/2" pels). 25.00 25.00
Coco lumber 2"x3"
Sheet No: Sheet Content: Project Owner: Project Title: Project Engineer: Civil Engineer As Shown A 2 Two Storey Residential With Fence BLK 5 Lot 28 Mr&Mrs Joemel A Peradilla