Stone Masonry Grouted Riprap

L = 40.00 L = 215.00
H = 6.00 H = 6.00
W = 3.42 W = 0.30
V = 482.40 V = 387.00
Unit Cost = 3,879.35 Unit Cost = 3,276.45
Item Cost = 1,871,398.44 Item Cost = 1,267,986.15

Surplus Common Excavation (completed) SUB TOTAL = 3,139,384.59


L = 162.60
H = 5.80
W = 20.00
V = 18,853.85
Unit Cost = 183.20
Total Cost = 3,454,025.32