tv 55 x 1 x 1.00 x 20 = 1100.00
= 6234.00 watt
400 : 1 = 0.00
= 28.34 Ampere
220 VA = 1 A
450 VA = 2 A
900 VA = 4 A
1300 VA = 6 A
2200 VA = 10 A
3500 VA = 16 A
4400 VA = 20 A
5500 VA = 25 A
TYPE 45
→ listrik = watt x n x - x (J) (V)
tv 55 x 2 x 1.00 x 1 = 110.00
= 1502.00 watt
= 6.83 Ampere
220 VA = 1 A
450 VA = 2 A
900 VA = 4 A
1300 VA = 6 A
2200 VA = 10 A
3500 VA = 16 A
4400 VA = 20 A
5500 VA = 25 A
BQ PERSIAPAN
BOWPLANK
→ = P x - x - x p (V)
= 311.00 m
PAGAR SENG
→ = P x - x - x p (V)
1 I 61 x 1 x 1.00 x 1 = 61.00
= 61.00 m2
BQ HALAMAN
Timbunan
→ stationing = A1 + A2 x 0.5 x p (V)
= 1723.51 m3
Pemasangan Paving
→ = a x - x - x p (V)
= 316.44 m2
pekerjaan drainase
→ dindinng = p x t x - x (J) (V)
= 120.66
= 103.42
= 4.14
BQ MESS PEGAWAI
pekerjaan tanah
→ Gali tnh = p x l x t x (J) (V)
= 92.34
= 6.16
= 80.73
p1 2.88 x 1 x 1 x -1 = -2.88
p2 1.20 x 1 x 1 x -1 = -1.20
= 62.28
pekerjaan Pancang
→ pancang = n x ttk x - x (J) (V)
3 x 4 x 1.00 x 24 = 288.00
3 x 2 x 1.00 x 12 = 72.00
= 360.00
3 x 4 x 4.00 x 24 = 1152.00
3 x 2 x 4.00 x 12 = 288.00
= 1440.00
2 x 4 x 0.80 x 24 = 153.60
2 x 2 x 0.80 x 12 = 38.40
= 192.00
1 x 4 x 1.00 x 24 = 96.00
1 x 2 x 1.00 x 12 = 24.00
= 120.00
pekerjaan beton
lt 1
→ f1 = p x l x t x (J) (V)
= 16.22
→ f2 = p x l x t x (J) (V)
1 I 1 x 1 x 0.40 x 12 = 4.80
= 4.80
→ p1 = b x h x t x (J) (V)
= 2.88
→ p2 = b x h x t x (J) (V)
= 1.20
→ S1 = b x h x p x (J) (V)
= 6.24
→ S2 = b x h x p x (J) (V)
= 15.20
→ S3 = b x h x p x (J) (V)
= 0.72
= 22.11
→ K1 = b x h x t x (J) (V)
= 8.64
→ K2 = b x h x t x (J) (V)
→ K3 = b x h x t x (J) (V)
= 3.16
→ B4 = b x h x p x (J) (V)
→ B3 = b x h x p x (J) (V)
= 1.74
= 3.01
→ B1 = b x h x p x (J) (V)
= 0.47
= 3.05
lt 2
→ B1 = b x h x p x (J) (V)
= 6.24
→ B2 = b x h x p x (J) (V)
= 15.20
→ B3 = b x h x p x (J) (V)
= 24.41
→ K1 = b x h x t x (J) (V)
= 8.64
→ K2 = b x h x t x (J) (V)
= 2.70
→ K3 = b x h x t x (J) (V)
= 1.35
→ B4 = b x h x p x (J) (V)
= 1.42
→ B3 = b x h x p x (J) (V)
= 3.01
= 6.24
→ RB2 = b x h x p x (J) (V)
= 1.18
= 10.37
→ K4 = b x h x t x (J) (V)
= 0.33
= 8.32
= 4.42
= 3.46
pekerjaan pasangan
lt 1
= 606.09
→ plesteran = p x s x - x (J) (V)
= 251.36
= 18.70
= 54.40
= 10.75
1 I x 1 x 1.00 x 1 = 0.00
1 I x 1 x 1.00 x 1 = 0.00
= 0.00
= 85.00
lt 2
= 592.71
= 1185.42
= 214.49
= 18.70
= 54.40
= 19.63
= 10.26
= 84.20
pekerjaan kusen
→ kaca mati = a x - x - x (J) (V)
1 Pj I 0.41 x 1 x 1.00 x 20 = 8.25
= 9.96
pekerjaan plafond
lt 1
= 233.19
= 314.83
lt 2
= 247.10
= 322.37
pekerjaan atap
→ rangka atap / atap = p x s x - x (J) (V)
65.83 x 2 x 1.00 x 2 = 263.32
= 334.44
= 69.12
= 105.20
pekerjaan elektrikal
→ = n x - x - x (J) (V)
tv 55 x 1 x 1.00 x 20 = 1100.00
kipas angin 60 x 1 x 1.00 x 20 = 1200.00
= 6234.00 watt
= 28.34 A
pekerjaan sanitasi
→ closed = n x - x - x (J) (V)
= 72.00
= 64.00
= 64.00
= 20.00
pekerjaan lemari
→ dinding = p x t x - x (J) (V)
= 18.00
→ kp = b x h x t x (J) (V)
= 0.72
pekerjaan Septictank
→ pasir = p x l x t x (J) (V)
= 0.64
→ lantai = p x l x t x (J) (V)
= 2.39
= 0.64
= 14.56
pekerjaan kuxen
→ pintu dan jendela lt 1 = p x b x h x (J) (V)
= 1.25
BQ TYPE 45 B
pekerjaan tanah
→ Gali tnh = p x l x t x (J) (V)
45.3 = 34.43 m3
= 1.81 m3
= 10.94 m3
= 11.78 m3
pekerjaan FONDASI
→ Batu gunung = p x l x t x (J) (V)
45.3 = 17.21 m3
pekerjaan beton
→ rabat = a x t x - x (J) (V)
= 1.54 m3
= 1.36 m3
= 4.19 m3
→ K1 = b x h x t x (J) (V)
= 0.17 m3
→ K2 = b x h x t x (J) (V)
= 1.08 m3
= 0.55 m3
= 0.34 m3
= 0.67 m3
pekerjaan pasangan
→ dinding bata lt.1 = p x t x - x (J) (V)
1 I x x x = 0.00
= 157.48 m2
= 314.96 m2
= 42.17 m2
= 2.38 m2
= 8.64 m2
= 14.00 m2
pekerjaan plafond
→ rangka / plafond = p x l x t x (J) (V)
= 66.55 m2
pekerjaan atap
→ rangka atap / atap = a x - x - x (J) (V)
24.02 x 1 x 1.00 x 1 = 24.02
= 86.82 m2
36.84 x 1 x 1 x 1 = 36.84
= 36.84 m2
= 36.40 m2
pekerjaan sanitasi
→ closed = n x - x - x (J) (V)
= 1.00 bh
= 8.00 m
= 12.00 m
= 20.00 m
pekerjaan Kusen
→ kaca = p x t x - x (J) (V)
= 0.90 m2
pekerjaan elektrikal
→ listrik = watt x n x - x (J) (V)
tv 55 x 2 x 1.00 x 1 = 110.00
= 1256.00 watt
400 : 1 = 0.00
= 5.71 A
pekerjaan teralis
→ = a x - x - x (J) (V)
= 8.65
pekerjaan kusen
→ pintu dan jendela = p x b x h x (J) (V)
= 0.51
BQ TYPE 70
pekerjaan tanah
→ Gali tnh = p x l x t x (J) (V)
65.4 = 49.70 m3
= 2.62 m3
= 17.61 m3
= 19.33 m3
pekerjaan FONDASI
→ Batu gunung = p x l x t x (J) (V)
65.4 = 24.85 m3
pekerjaan beton
→ rabat = a x t x - x (J) (V)
= 2.26 m3
→ lantai kerja = p x l x t x (J) (V)
= 5.23 m3
= 1.96 m3
= 0.29 m3
= 7.05 m3
→ K1 = b x h x t x (J) (V)
= 1.40 m3
= 0.73 m3
= 0.86 m3
= 0.92 m3
pekerjaan pasangan
→ dinding bata lt.1 = p x t x - x (J) (V)
1 I x x x = 0.00
= 415.39 m2
= 67.75 m2
= 4.14 m2
= 11.84 m2
= 1.80 m2
= 10.00 bh
pekerjaan plafond
→ rangka / plafond = p x l x t x (J) (V)
= 93.48 m2
= 115.76 m
pekerjaan atap
→ rangka atap / atap = a x - x - x (J) (V)
= 128.19 m2
3.72 x 1 x 1 x 2 = 7.44
16.05 x 1 x 1 x 1 = 16.05
3.72 x 1 x 1 x 2 = 7.44
= 30.93 m
= 45.40 m
pekerjaan sanitasi
→ closed = n x - x - x (J) (V)
= 1.00 bh
= 4.00 m
= 12.00 m
→ 3/4" = p x - x - x (J) (V)
= 16.00 m
pekerjaan Kusen
→ kaca = p x t x - x (J) (V)
= 0.90 m2
pekerjaan elektrikal
→ listrik = watt x n x - x (J) (V)
tv 55 x 2 x 1.00 x 1 = 110.00
= 1256.00 watt
400 : 1 = 0.00
= 5.71 A
pekerjaan teralis
→ = a x - x - x (J) (V)
= 8.54
pekerjaan kusen
→ pintu dan jendela = p x b x h x (J) (V)
= 0.62
CV. BLUE Print Consultant
Planning, Supervision & Engineering Consultant
Office: Jl. Yos Sudarso RT. 002 Sebengkok Tarakan
e-mail : blueprintconsultant@yahoo.com
REKAPITULASI
ESTIMATE ENGINEERING (EE)
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR BPBD PROVINSI KALIMANTAN UTARA
LOKASI : TANJUNG SELOR
TAHUN : 2015
JUMLAH BIAYA
No. URAIAN PEKERJAAN
( Rp. )
#NAME?
Konsultan Perencana,
CV. BLUE Print Consultant
MUHAMMAD RAMLI, ST
Direktur
CV. BLUE Print Consultant
Planning, Supervision & Engineering Consultant
Office: Jl. Yos Sudarso RT. 002 Sebengkok Tarakan
e-mail : blueprintconsultant@yahoo.com
REKAPITULASI
ESTIMATE ENGINEERING (EE)
PAKET KEGIATAN : USULAN PEMBANGUNAN RUMAH DINAS
LOKASI : TARAKAN
TAHUN : 2020
JUMLAH BIAYA
No. URAIAN PEKERJAAN
( Rp. )
I PEKERJAAN PERSIAPAN Rp. 94,204,470.09
II PEKERJAAN HALAMAN Rp. 622,251,392.65
III RUMAH DINAS TYPE 45 A (8 UNIT) Rp. 2,727,165,369.82
IV PEKERJAAN PAGAR Rp. 285,473,575.83
Tiga Milyar Sembilan Ratus Empat Puluh Tujuh Juta Tujuh Ratus Lima Puluh Tujuh Ribu Rupiah
A PEKERJAAN PERSIAPAN
1 Pemasangan Bowplank 134.00 m 94,823.14 12,706,300.09
2 Plank Nama Proyek 1.00 ls 500,000.00 500,000.00
3 Dokumentasi 1.00 ls 3,000,000.00 3,000,000.00
4 K3 1.00 ls 77,998,170.00 77,998,170.00
Total A 94,204,470.09
B PEKERJAAN HALAMAN
1 Urugan Tanah 563.00 m3 158,505.54 89,238,616.21
2 Pemasangan Paving 559.52 m2 270,336.77 151,258,828.15
3 Pembuatan Saluran Drainase
- Pemasangan dinding 1/2 bata, 965.27 m2 280,752.49 271,002,517.53
- Plesteran dinding saluran, 827.38 m2 86,563.43 71,620,506.53
- Cor rabat lantai saluran 33.10 m3 1,182,380.33 39,130,924.24
Total B 622,251,392.65
I PEKERJAAN TANAH
1 Galian Tanah 268.64 m3 100,943.84 27,117,148.73
2 Urugan Pasir Dibawah Fondasi, T = 10 Cm 14.57 m3 158,505.54 2,309,742.66
3 Urugan pasir Dibawah Lantai 94.42 m3 158,505.54 14,965,458.59
4 Urugan Tanah Kembali 105.47 m3 73,432.68 7,744,797.37
Sub Total I 52,137,147.35
II PEKERJAAN FONDASI
1 Fondasi Batu Gunung 132.85 m3 1,440,493.16 191,366,635.65
Sub Total II 191,366,635.65
IV PEKERJAAN ATAP
1 Pasangan Rangka Atap Baja Ringan 693.29 m2 269,598.41 186,909,773.83
2 Pasangan Atap Multy Colour 693.29 m2 154,921.66 107,405,578.12
3 Pasangan Bubungan Atap Multy Colour 273.90 m 128,339.74 35,152,766.91
4 Pasangan Listplank kayu 291.20 m 81,968.38 23,869,191.53
Sub Total IV 353,337,310.39
V PEKERJAAN PASANGAN
1 Pasangan Dinding 1/2 Bata, Camp. 1:4 1,238.88 m2 280,752.49 347,818,644.81
2 Plesteran Dinding , Camp. 1:4 2,477.76 m2 86,563.43 214,483,410.51
3 Pemasangan Lantai Keramik 60x60 340.10 m2 489,849.62 166,599,032.19
4 Pemasangan Lantai WC Keramik 20x20 19.04 m2 285,369.43 5,433,433.94
5 Pemasangan Dinding WC Keramik 20x25 69.12 m2 322,532.92 22,293,475.53
6 Pemasangan Kisi Holow 7.78 m2 650,000.00 5,054,400.00
7 Pemasangan Lubang Angin Kayu 120.00 bh 150,000.00 18,000,000.00
Sub Total V 779,682,396.99
VI PEKERJAAN KUSEN
1 Pemasangan Kusen Pintu dan Jendela Kayu Kelas II 3.92 m3 8,095,101.85 31,706,894.93
2 Pemasangan daun pintu panel kayu kelas II 40.00 bh 1,900,000.00 76,000,000.00
3 Pemasangan daun jendela kayu kelas II + kaca polos t = 5 mm 80.00 bh 600,000.00 48,000,000.00
4 Pemasangan kaca polos t = 5 mm 7.20 bh 254,535.46 1,832,655.31
5 Pemasangan Bovent (Bv) 8.00 bh 150,000.00 1,200,000.00
6 Pemasangan Teralis besi jendela 43.20 m2 350,000.00 15,120,000.00
Sub Total VI 173,859,550.23
HARGA SATUAN JUMLAH
No. URAIAN PEKERJAAN VOLUME SATUAN
( Rp.) ( Rp.)
IX PEKERJAAN PENGECATAN
1 Pengecatan Dinding dan Struktur Expose 2,477.76 m2 49,001.89 121,414,931.14
2 Pengecatan Plafond 542.90 m2 49,001.89 26,603,088.67
3 Pengecatan List Plafond 75.42 m2 49,001.89 3,695,918.80
4 Pengecatan Listplank kayu 87.36 m2 48,624.69 4,247,853.01
Sub Total IX 155,961,791.62
X PEKERJAAN SANITASI
1 Pemasangan Kloset Duduk 8.00 unit 2,715,206.12 21,721,648.96
2 Pemasangan Bak Cuci Piring 1 Lubang 8.00 bh 278,421.38 2,227,371.06
3 Pemasangan Pipa Air Bersih PVC 3/4" 160.00 m 25,275.27 4,044,043.52
4 Pemasangan Pipa Air Kotor PVC 3" 96.00 m 88,430.38 8,489,316.00
5 Pemasangan Pipa Air Kotor PVC 4" 64.00 m 122,743.50 7,855,584.00
6 Pemasangan Floor Drain 8.00 bh 85,021.63 680,173.02
7 Kran Air 16.00 bh 121,738.05 1,947,808.82
8 Pemasangan shower 8.00 bh 256,371.63 2,050,973.02
9 Pemasangan Septic Tank Dan Peresapan
Cor Beton Bertulang Lantai
- Cor Beton K-225 1.20 m3 1,249,836.78 1,499,804.14
- Pembesian polos 82.58 kg 25,327.50 2,091,646.26
Cor Beton Bertulang Dinding
- Cor Beton K-225 5.52 m3 1,249,836.78 6,899,099.05
- Pembesian polos 379.89 kg 25,327.50 9,621,572.80
- Begesting 13.80 m2 434,054.50 5,989,952.10
Cor Beton Bertulang Dak Penutup
- Cor Beton K-225 1.20 m3 1,249,836.78 1,499,804.14
- Pembesian polos 82.58 kg 25,327.50 2,091,646.26
- Begesting 12.00 m2 434,054.50 5,208,654.00
Urugan pasir Dibawah Lantai 1.20 m3 158,505.54 190,206.64
Pasangan dinding bata 52.00 m2 280,752.49 14,599,129.48
Plesteran dinding 104.00 m2 86,563.43 9,002,596.98
Sub Total X 107,711,030.25
HARGA SATUAN JUMLAH
No. URAIAN PEKERJAAN VOLUME SATUAN
( Rp.) ( Rp.)
Total C 2,727,165,369.82
D PEKERJAAN PAGAR
Total D 285,473,575.83
DAFTAR ISI ANALISA
CLICK HERE A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
CLICK HERE A.4.1.1.4. Membuat 1 m³ lantai kerja beton mutu f 'c = 7,4 Mpa ( K - 100 ), Slump ( 3 - 6 ) cm, w/c = 0.87
CLICK HERE A.4.1.1.5. Membuat 1 m³ beton mutu f 'c = 14,5 Mpa ( K - 175 ), Slump ( 12 ± 2 ) cm, w/c = 0.66
CLICK HERE A.4.1.1.6. Membuat 1 m³ beton mutu f 'c = 16,9 Mpa ( K - 200 ), Slump ( 12 ± 2 ) cm, w/c = 0.61
CLICK HERE A.4.1.1.7. Membuat 1 m³ beton mutu f 'c = 19,3 Mpa ( K - 225 ), Slump ( 12 ± 2 ) cm, w/c = 0.58
CLICK HERE A.4.1.1.8. Membuat 1 m³ beton mutu f 'c = 21,7 Mpa ( K - 250 ), Slump ( 12 ± 2 ) cm, w/c = 0.56
CLICK HERE A.4.1.1.9. Membuat 1 m³ beton mutu f 'c = 24,0 Mpa ( K - 275 ), Slump ( 12 ± 2 ) cm, w/c = 0.53
CLICK HERE A.4.1.1.10. Membuat 1 m³ beton mutu f 'c = 26,4 Mpa ( K - 300 ), Slump ( 12 ± 2 ) cm, w/c = 0.52
CLICK HERE A.4.1.1.11. Membuat 1 m³ beton mutu f 'c = 28,8 Mpa ( K - 325 ), Slump ( 12 ± 2 ) cm, w/c = 0.49
CLICK HERE A.4.1.1.12. Membuat 1 m³ beton mutu f 'c = 31,2 Mpa ( K - 350 ), Slump ( 12 ± 2 ) cm, w/c = 0.48
CLICK HERE A.4.1.1.17. Pembesian 10 Kg dengan besi ulir
CLICK HERE A.4.1.1.17. Pembesian 10 Kg dengan besi Polos
CLICK HERE A.4.1.1.18. Pemasangan 10 Kg kabel presstressed polos / strands
CLICK HERE A.4.1.1.19. Pemasangan 10 Kg jaring kawat baja ( wiremesh )
CLICK HERE A.4.1.1.20. Pemasangan 1 m² bekisting untuk pondasi
CLICK HERE A.4.1.1.21. Pemasangan 1 m² bekisting untuk sloof
CLICK HERE A.4.1.1.22. Pemasangan 1 m² bekisting untuk kolom
CLICK HERE A.4.1.1.23. Pemasangan 1 m² bekisting untuk balok
CLICK HERE A.4.1.1.24. Pemasangan 1 m² bekisting untuk lantai
CLICK HERE A.4.1.1.25. Pemasangan 1 m² bekisting untuk dinding
CLICK HERE A.4.1.1.26. Pemasangan 1 m² bekisting untuk tangga
CLICK HERE A.4.1.1.27. Pemasangan 1 m² jembatan untuk pengecoran beton
CLICK HERE A.4.1.1.28. Membuat 1 m³ pondasi beton bertulang ( 150 Kg besi + Bekisting )
CLICK HERE A.4.1.1.29. Membuat 1 m³ sloof beton bertulang ( 200 Kg besi + Bekisting )
CLICK HERE A.4.1.1.30. Membuat 1 m³ kolom beton bertulang ( 300 Kg besi + Bekisting )
CLICK HERE A.4.1.1.31. Membuat 1 m³ Balok beton bertulang ( 200 Kg besi + Bekisting )
CLICK HERE A.4.1.1.32. Membuat 1 m³ kolom beton bertulang ( 150 Kg besi + Bekisting )
CLICK HERE A.4.1.1.33. Membuat 1 m³ dinding beton bertulang ( 150 Kg besi + Bekisting )
CLICK HERE A.4.1.1.34. Membuat 1 m³ dinding beton bertulang ( 200 Kg besi + Bekisting )
CLICK HERE A.4.1.1.35. Membuat 1 m' kolom praktis beton bertulang ( 11 x 11 ) cm
CLICK HERE A.4.1.1.36. Membuat 1 m' ring balok beton bertulang ( 10 x 15 ) cm
22,050.68
157,926.28
1,836,716.45
184,782.00
94,823.14
917,715.95
Err:509
100,943.84
123,894.16
147,212.68
134,346.31
203,728.71
162,430.66
44,231.19
73,432.68
73,432.68
158,505.54
Err:509
1,522,630.19
1,440,493.16
1,445,679.20
1,343,552.65
1,288,722.60
834,894.10
3,863,800.94
1,351,029.33
1,427,513.69
1,494,590.52
1,545,848.60
1,642,815.95
1,699,676.65
1,746,737.85
1,694,878.62
1,815,086.04
1,828,337.77
1,953,960.63
1,971,323.73
23,092.51
21,764.26
Err:509
241,170.85
255,672.35
467,486.26
477,860.41
634,009.36
501,546.61
443,379.61
141,465.78
6,131,102.50
7,516,725.38
12,217,604.30
9,460,152.76
8,791,078.06
8,374,890.50
8,878,308.13
147,815.83
158,745.63
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
174,632.87
345,491.07
281,216.92
280,752.49
143,546.73
130,932.42
Err:509
106,141.95
94,862.29
89,880.15
86,563.43
84,566.80
83,016.49
82,128.57
81,240.66
126,923.29
100,639.80
115,786.12
113,195.97
111,056.86
69,682.12
40,834.07
84,200.41
52,158.60
Err:509
265,381.73
285,369.43
356,179.17
Err:509
415,729.08
322,532.92
Err:509
Err:509
291,102.72
59,622.04
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
128,339.74
2,475,000.00
225,000.00
8,095,101.85
#REF!
#REF!
#REF!
#REF!
#REF!
702,117.72
6,556,938.90
8,276,707.55
8,250,921.73
134,347.31
132,701.61
81,968.38
81,260.44
182,995.50
Err:509
Err:509
284,957.87
44,633.16
55,231.99
254,535.46
Err:509
Err:509
Err:509
Err:509
48,624.69
68,574.02
49,001.89
39,987.71
41,317.23
2,715,206.12
Err:509
Err:509
2,640,310.28
Err:509
278,421.38
85,021.63
Err:509
Err:509
Err:509
Err:509
121,738.05
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
23,399.77
25,275.27
Err:509
53,428.41
LOKASI : TARAKAN
TAHUN : 2020
II BAHAN
0.15 x 0.2 m
P R O C E S S I N G
Pembesian
Tulangan Pokok
Wtul. Pokok = - kg
Tulangan Sengkang
Begesting
Luasan begesting
Sisi Samping = 6.67 m2 x 2 sisi = 13.33 m2
Jadi utk Vol 1 m3 beton diperlukan luasan begesting L total = 18.33 m2 / per 1 m3 beton
KOLOM 15 x 15 cm
0.15 x 0.15 m
P R O C E S S I N G
Pembesian
Tulangan Pokok
Tulangan Sengkang
Begesting
Luasan begesting
= 13.33 m2 x 2 sisi = 26.67 m2
= = - m2
Jadi utk Vol 1 m3 beton diperlukan luasan begesting L total = 26.67 m2 / per 1 m3 beton
SLOOF 15 x 30 cm
0.15 x 0.3 m
P R O C E S S I N G
Pembesian
Tulangan Pokok
Wtul. Pokok = - kg
Tulangan Sengkang
Begesting
Luasan begesting
Samping = 6.67 m2 x 2 sisi = 13.33 m2
Bawah = = - m2
L total = 13.33 m2
Jadi utk Vol 1 m3 beton diperlukan luasan begesting = 13.33 m2
BQ PAGAR
pekerjaan tanah
→ Gali tnh = p x l x t x (J) (V)
= 24.44
pekerjaan FONDASI
→ Batu gunung = p x l x t x (J) (V)
143.58 = 27.97
= 4.66
→ K1 = b x h x t x (J) (V)
= 1.92
= 3.11
pekerjaan pasangan
→ dinding bata lt.1 = p x t x - x (J) (V)
= 194.08
→ plesteran = p x s x t x (J) (V)
= 388.16
= 65.84
BQ TYPE 45 A
pekerjaan tanah
→ Gali tnh = p x l x t x (J) (V)
43.7 = 33.58
= 1.82
= 11.80
= 13.18
pekerjaan FONDASI
→ Batu gunung = p x l x t x (J) (V)
43.7 = 16.61
pekerjaan beton
→ cor rabat = a x t x - x (J) (V)
= 1.77
→ lantai kerja = p x l x t x (J) (V)
= 3.50
= 1.45
= 0.29
= 4.04
→ K1 = b x h x t x (J) (V)
= 1.24
= 0.55
= 0.39
→ kanopi = p x l x t x (J) (V)
= 0.34
= 0.68
pekerjaan pasangan
→ dinding bata lt.1 = p x t x - x (J) (V)
1 I x x x = 0.00
= 154.86
= 309.72
= 42.51
= 2.38
= 8.64
= 15.00
pekerjaan plafond
→ rangka / plafond = p x l x t x (J) (V)
= 67.86
= 94.28
pekerjaan atap
→ rangka atap / atap = a x - x - x (J) (V)
= 86.66
14.48 x 1 x 1 x 1 = 14.48
12.04 x 1 x 1 x 1 = 12.04
4.72 x 1 x 1 x 1 = 4.72
3.00 x 1 x 1 x 1 = 3.00
= 34.24
= 36.40
pekerjaan sanitasi
→ closed = n x - x - x (J) (V)
= 1.00
= 8.00
→ 3" = p x - x - x (J) (V)
= 12.00
= 20.00
pekerjaan Kusen
→ kaca = p x t x - x (J) (V)
= 0.90
pekerjaan elektrikal
→ listrik = watt x n x - x (J) (V)
tv 55 x 2 x 1.00 x 1 = 110.00
= 1256.00 watt
400 : 1 = 0.00
= 5.71 A
pekerjaan teralis
→ = a x - x - x (J) (V)
= 5.40
pekerjaan Septictank
→ pasir = p x l x t x (J) (V)
= 0.15
→ lantai = p x l x t x (J) (V)
= 0.15
= 0.69
= 0.15
= 6.50
pekerjaan kusen
→ pintu dan jendela = p x b x h x (J) (V)
= 0.49
CV. BLUE Print Consultant
Planning, Supervision & Engineering Consultant
Office: Jl. Yos Sudarso RT. 002 Sebengkok Tarakan
e-mail : blueprintconsultant@yahoo.com
REKAPITULASI
ESTIMATE ENGINEERING (EE)
PAKET KEGIATAN : PENGEMBANGAN RTH SAMPING TAMAN BERTUAH
LOKASI : TARAKAN
TAHUN : 2020
JUMLAH BIAYA
No. URAIAN PEKERJAAN
( Rp. )
I PEKERJAAN PERSIAPAN Rp. 3,597,195.00
II PEKERJAAN AREA TAMAN Rp. 641,848,723.41
Tujuh Ratus Sembilaan Juta Sembilan Ratus Sembilan Puluh Ribu Rupiah
I PEKERJAAN PERSIAPAN
1 Plank Nama Proyek 1.00 ls 500,000.00 500,000.00
2 Dokumentasi 1.00 ls 750,000.00 750,000.00
3 K3 1.00 ls 2,347,195.00 2,347,195.00
Total I 3,597,195.00
71
A.2.3.1.11 Pengurugan 1 m³ dengan pasir urug
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.300 111,780.00 33,534.00
2 Mandor L.04 OH 0.010 160,090.00 1,600.90
Jumlah Tenaga Kerja 35,134.90
B Bahan
1 Pasir Urug m³ 1.200 85,600.00 102,720.00
Jumlah Harga Bahan 102,720.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 137,854.90
E Overhead + Profit ( Contoh 15% ) 15% x D 20,678.24
F Harga Satuan Pekerjaan ( D + E ) 158,533.14
72
A.3.2.1.2 Pemasangan 1 m' Kanstin uk. 15/20 30x50
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.500 111,780.00 55,890.00
2 Tukang Batu L.02 OH 0.050 135,070.00 6,753.50
3 Kepala Tukang L.03 OH 0.010 140,740.00 1,407.40
4 Mandor L.04 OH 0.001 160,090.00 160.09
Jumlah Tenaga Kerja 64,210.99
B Bahan
1 Semen (PC) zak 0.360 75,000.00 27,000.00
2 Pasir Pasang m2 0.001 187,900.00 187.90
3 Kanstin uk. 15/20 30x50 bh 2.000 41,800.00 83,600.00
Jumlah Harga Bahan 110,787.90
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 174,998.89
E Overhead + Profit ( Contoh 15% ) 15% x D 26,249.83
F Harga Satuan Pekerjaan ( D + E ) 201,248.72
73
A.4.1.1. HARGA SATUAN PEKERJAAN BETON
A.4.1.1.5. Membuat 1 m³ beton mutu f 'c = 14,5 Mpa ( K - 175 ), Slump ( 12 ± 2 ) cm, w/c = 0.66
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.650 111,780.00 184,437.00
2 Tukang Batu L.02 OH 0.275 135,070.00 37,144.25
3 Kepala Tukang L.03 OH 0.028 140,740.00 3,940.72
4 Mandor L.04 OH 0.083 160,090.00 13,287.47
Jumlah Tenaga Kerja 238,809.44
B Bahan
1 Semen Portland Kg 326.000 1,500.00 489,000.00
2 Pasir Beton Kg 760.000 117.44 89,252.50
3 Kerikil ( Maks 30mm ) Kg 1,029.000 424.89 437,210.67
4 Air Liter 215.000 53.00 11,395.00
Jumlah Harga Bahan 1,026,858.17
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 1,265,667.61
E Overhead + Profit ( Contoh 15% ) 15% x D 189,850.14
F Harga Satuan Pekerjaan ( D + E ) 1,455,517.75
A.4.1.1.7. Membuat 1 m³ beton mutu f 'c = 19,3 Mpa ( K - 225 ), Slump ( 12 ± 2 ) cm, w/c = 0.58
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.650 111,780.00 184,437.00
2 Tukang Batu L.02 OH 0.275 135,070.00 37,144.25
3 Kepala Tukang L.03 OH 0.028 140,740.00 3,940.72
4 Mandor L.04 OH 0.083 160,090.00 13,287.47
Jumlah Tenaga Kerja 238,809.44
B Bahan
1 Semen Portland Kg 371.000 1,500.00 556,500.00
2 Pasir Beton Kg 698.000 117.44 81,971.38
3 Kerikil ( Maks 30mm ) Kg 1,047.000 424.89 444,858.67
4 Air Liter 215.000 53.00 11,395.00
Jumlah Harga Bahan 1,094,725.04
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 1,333,534.48
E Overhead + Profit ( Contoh 15% ) 15% x D 200,030.17
F Harga Satuan Pekerjaan ( D + E ) 1,533,564.65
74
A.4.1.1.17. Pembesian 10 Kg dengan besi polos
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.070 111,780.00 7,824.60
2 Tukang Besi L.02 OH 0.070 135,070.00 9,454.90
3 Kepala Tukang L.03 OH 0.007 140,740.00 985.18
4 Mandor L.04 OH 0.004 160,090.00 640.36
Jumlah Tenaga Kerja 18,905.04
B Bahan
1 Besi Beton Polos Kg 10.500 15,900.00 166,950.00
2 Kawat Beton Kg 0.150 22,700.00 3,405.00
Jumlah Harga Bahan 170,355.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 189,260.04
E Overhead + Profit ( Contoh 15% ) 15% x D 28,389.01
F Harga Satuan Pekerjaan ( D + E ) 217,649.05
Harga Satuan Pekerjaan /1 kg besi F/10 21,764.90
75
A.4.4.1. HARGA SATUAN PEKERJAAN PASANGAN DINDING
A.4.4.1.3. Pemasangan 1 m² dinding bata merah ( 9 x 9 x 18 ) cm tebal 1 batu campuran 1 SP : 4 PP
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.500 111,780.00 55,890.00
2 Tukang Batu L.02 OH 0.200 135,070.00 27,014.00
3 Kepala Tukang L.03 OH 0.020 140,740.00 2,814.80
4 Mandor L.04 OH 0.025 160,090.00 4,002.25
Jumlah Tenaga Kerja 89,721.05
B Bahan
1 Bata Merah m2 55.000 900.00 49,500.00
2 Semen Portland Kg 20.861 1,500.00 31,291.07
3 Pasir Pasang m³ 0.073 187,900.00 13,730.12
Jumlah Harga Bahan 94,521.19
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 184,242.24
E Overhead + Profit ( Contoh 15% ) 15% x D 27,636.34
F Harga Satuan Pekerjaan ( D + E ) 211,878.58
76
CV. BLUE Print Consultant
Planning, Supervision & Engineering Consultant
Office: Jl. Yos Sudarso RT. 002 Sebengkok Tarakan
e-mail : blueprintconsultant@yahoo.com
LOKASI : TARAKAN
TAHUN : 2020
II BAHAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PENGEMBANGAN RTH SAMPING TAMAN BERTUAH
PROP / KAB / KODYA : Kalimanta Utara / Kota Tarakan
JENIS PEKERJAAN Penyelenggaraan Sistem Manajemen Keselamatan Konstruksi (SMKK)
SATUAN PEMBAYARAN : Ls
REKAPITULASI
ESTIMATE ENGINEERING (EE)
PAKET KEGIATAN : PEMBUATAN TAMAN JUATA KERIKIL
LOKASI : TARAKAN
TAHUN : 2020
JUMLAH BIAYA
No. URAIAN PEKERJAAN
( Rp. )
I PEKERJAAN PERSIAPAN Rp. 3,087,195.00
II PEKERJAAN AREA TAMAN Rp. 169,640,917.59
I PEKERJAAN PERSIAPAN
1 Plank Nama Proyek 1.00 ls 500,000.00 500,000.00
2 Dokumentasi 1.00 ls 750,000.00 750,000.00
3 K3 1.00 ls 1,837,195.00 1,837,195.00
Total I 3,087,195.00
Total II 169,640,917.59
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
A.2.3.1.1 Penggalian 1 m³ tanah biasa sedalam 1 m
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.750 111,780.00 83,835.00
2 Mandor L.04 OH 0.025 160,090.00 4,002.25
Jumlah Tenaga Kerja 87,837.25
B Bahan
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 87,837.25
E Overhead + Profit ( Contoh 15% ) 15% x D 13,175.59
F Harga Satuan Pekerjaan ( D + E ) 101,012.84
82
A.2.3.1.11 Pengurugan 1 m³ dengan pasir urug
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.300 111,780.00 33,534.00
2 Mandor L.04 OH 0.010 160,090.00 1,600.90
Jumlah Tenaga Kerja 35,134.90
B Bahan
1 Pasir Urug m³ 1.200 85,600.00 102,720.00
Jumlah Harga Bahan 102,720.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 137,854.90
E Overhead + Profit ( Contoh 15% ) 15% x D 20,678.24
F Harga Satuan Pekerjaan ( D + E ) 158,533.14
83
A.3.2.1.2 Pemasangan 1 m' Kanstin uk. 15/20 30x50
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.500 111,780.00 55,890.00
2 Tukang Batu L.02 OH 0.050 135,070.00 6,753.50
3 Kepala Tukang L.03 OH 0.010 140,740.00 1,407.40
4 Mandor L.04 OH 0.001 160,090.00 160.09
Jumlah Tenaga Kerja 64,210.99
B Bahan
1 Semen (PC) zak 0.360 75,000.00 27,000.00
2 Pasir Pasang m2 0.001 187,900.00 187.90
3 Kanstin uk. 15/20 30x50 bh 2.000 51,666.67 103,333.33
Jumlah Harga Bahan 130,521.23
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 194,732.22
E Overhead + Profit ( Contoh 15% ) 15% x D 29,209.83
F Harga Satuan Pekerjaan ( D + E ) 223,942.06
84
A.4.1.1.7. Membuat 1 m³ beton mutu f 'c = 19,3 Mpa ( K - 225 ), Slump ( 12 ± 2 ) cm, w/c = 0.58
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.650 111,780.00 184,437.00
2 Tukang Batu L.02 OH 0.275 135,070.00 37,144.25
3 Kepala Tukang L.03 OH 0.028 140,740.00 3,940.72
4 Mandor L.04 OH 0.083 160,090.00 13,287.47
Jumlah Tenaga Kerja 238,809.44
B Bahan
1 Semen Portland Kg 371.000 1,500.00 556,500.00
2 Pasir Beton Kg 698.000 117.44 81,971.38
3 Kerikil ( Maks 30mm ) Kg 1,047.000 424.89 444,858.67
4 Air Liter 215.000 53.00 11,395.00
Jumlah Harga Bahan 1,094,725.04
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 1,333,534.48
E Overhead + Profit ( Contoh 15% ) 15% x D 200,030.17
F Harga Satuan Pekerjaan ( D + E ) 1,533,564.65
85
A.4.1.1.21. Pemasangan 1 m² bekisting untuk sloof
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.520 111,780.00 58,125.60
2 Tukang Kayu L.02 OH 0.260 135,070.00 35,118.20
3 Kepala Tukang L.03 OH 0.026 140,740.00 3,659.24
4 Mandor L.04 OH 0.026 160,090.00 4,162.34
Jumlah Tenaga Kerja 101,065.38
B Bahan
1 Kayu Kelas III m³ 0.045 2,522,000.00 113,490.00
2 Paku 5 - 10 cm Kg 0.300 22,400.00 6,720.00
3 Minyak Bekisting Liter 0.100 10,900.00 1,090.00
Jumlah Harga Bahan 121,300.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 222,365.38
E Overhead + Profit ( Contoh 15% ) 15% x D 33,354.81
F Harga Satuan Pekerjaan ( D + E ) 255,720.19
86
A.4.4.1. HARGA SATUAN PEKERJAAN PASANGAN DINDING
A.4.4.1.3. Pemasangan 1 m² dinding bata merah ( 9 x 9 x 18 ) cm tebal 1 batu campuran 1 SP : 4 PP
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.500 111,780.00 55,890.00
2 Tukang Batu L.02 OH 0.200 135,070.00 27,014.00
3 Kepala Tukang L.03 OH 0.020 140,740.00 2,814.80
4 Mandor L.04 OH 0.025 160,090.00 4,002.25
Jumlah Tenaga Kerja 89,721.05
B Bahan
1 Bata Merah m2 110.000 900.00 99,000.00
2 Semen Portland Kg 20.861 1,500.00 31,291.07
3 Pasir Pasang m³ 0.073 187,900.00 13,730.12
Jumlah Harga Bahan 144,021.19
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 233,742.24
E Overhead + Profit ( Contoh 15% ) 15% x D 35,061.34
F Harga Satuan Pekerjaan ( D + E ) 268,803.58
87
A.4.4.2. HARGA SATUAN PEKERJAAN PLESTERAN
A.4.4.2.4. Pemasangan 1 m² plesteran 1 SP : 4 PP tebal 15 mm
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.300 111,780.00 33,534.00
2 Tukang Batu L.02 OH 0.150 135,070.00 20,260.50
3 Kepala Tukang L.03 OH 0.015 140,740.00 2,111.10
4 Mandor L.04 OH 0.015 160,090.00 2,401.35
Jumlah Tenaga Kerja 58,306.95
B Bahan
1 Semen Portland Kg 6.240 1,500.00 9,360.00
2 Pasir Pasang m³ 0.024 187,900.00 4,509.60
Jumlah Harga Bahan 13,869.60
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 72,176.55
E Overhead + Profit ( Contoh 15% ) 15% x D 10,826.48
F Harga Satuan Pekerjaan ( D + E ) 83,003.03
88
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP
A.4.5.2.40. Pemasangan 1 m² atap metalroof
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.200 111,780.00 22,356.00
2 Tukang Kayu L.02 OH 0.100 135,070.00 13,507.00
3 Kepala Tukang L.03 OH 0.0100 140,740.00 1,407.40
4 Mandor L.04 OH 0.001 160,090.00 160.09
Jumlah Tenaga Kerja 37,430.49
B Bahan
1 Genteng Metal Lembar 1.020 91,000.00 92,820.00
2 Paku Biasa 2" - 5" Kg 0.200 22,400.00 4,480.00
Jumlah Harga Bahan 97,300.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 134,730.49
E Overhead + Profit ( Contoh 15% ) 15% x D 20,209.57
F Harga Satuan Pekerjaan ( D + E ) 154,940.06
89
A.4.6.1. HARGA SATUAN PEKERJAAN KAYU
A.4.6.1.13. Pemasangan 1 m³ konstruksi kuda-kuda konvensional, kayu kelas I, II dan III
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 4.000 111,780.00 447,120.00
2 Tukang Kayu L.02 OH 12.000 135,070.00 1,620,840.00
3 Kepala Tukang L.03 OH 1.2000 140,740.00 168,888.00
4 Mandor L.04 OH 0.200 160,090.00 32,018.00
Jumlah Tenaga Kerja 2,268,866.00
B Bahan
1 Balok Kayu m³ 1.1000 3,007,000.00 3,307,700.00
2 Besi Strip Tebal 5 mm Kg 15.000 -
3 Paku 12 cm Kg 5.600 22,400.00 125,440.00
Jumlah Harga Bahan 3,433,140.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 5,702,006.00
E Overhead + Profit ( Contoh 15% ) 15% x D 855,300.90
F Harga Satuan Pekerjaan ( D + E ) 6,557,306.90
A.4.6.1.19. Pemasangan 1 m² rangka langit-langit ( 50 x 100 ) cm, kayu kelas II atau III
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.150 111,780.00 16,767.00
2 Tukang Kayu L.02 OH 0.300 135,070.00 40,521.00
3 Kepala Tukang L.03 OH 0.0300 140,740.00 4,222.20
4 Mandor L.04 OH 0.075 160,090.00 12,006.75
Jumlah Tenaga Kerja 73,516.95
B Bahan
1 Kaso-kaso 5 x 7 cm m³ 0.0154 3,007,000.00 46,307.80
2 Paku 7 cm - 10 cm Kg 0.200 22,400.00 4,480.00
Jumlah Harga Bahan 50,787.80
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 124,304.75
E Overhead + Profit ( Contoh 15% ) 15% x D 18,645.71
F Harga Satuan Pekerjaan ( D + E ) 142,950.46
90
A.4.6.1.22. Pemasangan 1 m¹ listplank ukuran ( 3 x 30 ) cm, kayu kelas I atau kelas II
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.100 111,780.00 11,178.00
2 Tukang Kayu L.02 OH 0.200 135,070.00 27,014.00
3 Kepala Tukang L.03 OH 0.0200 140,740.00 2,814.80
4 Mandor L.04 OH 0.005 160,090.00 800.45
Jumlah Tenaga Kerja 41,807.25
B Bahan
1 Papan Kayu m³ 0.0110 3,007,000.00 33,077.00
2 Paku 5 cm dan 7 cm Kg 0.050 22,400.00 1,120.00
Jumlah Harga Bahan 34,197.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 76,004.25
E Overhead + Profit ( Contoh 15% ) 15% x D 11,400.64
F Harga Satuan Pekerjaan ( D + E ) 87,404.89
91
CV. BLUE Print Consultant
Planning, Supervision & Engineering Consultant
Office: Jl. Yos Sudarso RT. 002 Sebengkok Tarakan
e-mail : blueprintconsultant@yahoo.com
LOKASI : TARAKAN
TAHUN : 2020
II BAHAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PEMBUATAN TAMAN JUATA KERIKIL
PROP / KAB / KODYA : Kalimanta Utara / Kota Tarakan
JENIS PEKERJAAN Penyelenggaraan Sistem Manajemen Keselamatan Konstruksi (SMKK)
SATUAN PEMBAYARAN : Ls
###
REKAPITULASI
ESTIMATE ENGINEERING (EE)
PAKET KEGIATAN : PEMBUATAN TAMAN KELURAHAN JUATA PERMAI
LOKASI : TARAKAN
TAHUN : 2020
JUMLAH BIAYA
No. URAIAN PEKERJAAN
( Rp. )
I PEKERJAAN PERSIAPAN Rp. 3,051,385.00 ###
II PEKERJAAN AREA TAMAN Rp. 137,122,104.38 ###
Seratus Lima Puluh Empat Juta Seratus Sembilan Puluh Ribu Rupiah
I PEKERJAAN PERSIAPAN
1 Plank Nama Proyek 1.00 ls 500,000.00 500,000.00
2 Dokumentasi 1.00 ls 750,000.00 750,000.00
3 K3 1.00 ls 1,801,385.00 1,801,385.00
Total I 3,051,385.00
96
A.2.3.1.11 Pengurugan 1 m³ dengan tanah urug
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.300 110,000.00 33,000.00
2 Mandor L.04 OH 0.010 155,000.00 1,550.00
Jumlah Tenaga Kerja 34,550.00
B Bahan
1 Tanah Urug m³ 1.200 85,600.00 102,720.00
Jumlah Harga Bahan 102,720.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 137,270.00
E Overhead + Profit ( Contoh 15% ) 15% x D 20,590.50
F Harga Satuan Pekerjaan ( D + E ) 157,860.50
A Tenaga
1 Pekerja L.01 OH 0.300 110,000.00 33,000.00
2 Mandor L.04 OH 0.010 155,000.00 1,550.00
Jumlah Tenaga Kerja 34,550.00
B Bahan
1 Pasir Urug m³ 1.200 120,000.00 144,000.00
Jumlah Harga Bahan 144,000.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 178,550.00
E Overhead + Profit ( Contoh 15% ) 15% x D 26,782.50
F Harga Satuan Pekerjaan ( D + E ) 205,332.50
97
F Harga Satuan Pekerjaan ( D + E ) 251,016.25
98
A.3.2.1.2 Pemasangan 1 m' Kanstin uk. 15/20 30x50
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.500 110,000.00 55,000.00
2 Tukang Batu L.02 OH 0.050 134,000.00 6,700.00
3 Kepala Tukang L.03 OH 0.010 140,000.00 1,400.00
4 Mandor L.04 OH 0.001 155,000.00 155.00
Jumlah Tenaga Kerja 63,255.00
B Bahan
1 Semen (PC) zak 0.360 65,000.00 23,400.00
2 Pasir Pasang m2 0.001 160,000.00 160.00
3 Kanstin uk. 15/20 30x50 bh 2.000 51,666.67 103,333.33
Jumlah Harga Bahan 126,893.33
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 190,148.33
E Overhead + Profit ( Contoh 15% ) 15% x D 28,522.25
F Harga Satuan Pekerjaan ( D + E ) 218,670.58
99
A.4.1.1. HARGA SATUAN PEKERJAAN BETON
A.4.1.1.5. Membuat 1 m³ beton mutu f 'c = 14,5 Mpa ( K - 175 ), Slump ( 12 ± 2 ) cm, w/c = 0.66
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.650 110,000.00 181,500.00
2 Tukang Batu L.02 OH 0.275 134,000.00 36,850.00
3 Kepala Tukang L.03 OH 0.028 140,000.00 3,920.00
4 Mandor L.04 OH 0.083 155,000.00 12,865.00
Jumlah Tenaga Kerja 235,135.00
B Bahan
1 Semen Portland Kg 326.000 1,300.00 423,800.00
2 Pasir Beton Kg 760.000 100.00 76,000.00
3 Kerikil ( Maks 30mm ) Kg 1,029.000 418.52 430,655.56
4 Air Liter 215.000 53.00 11,395.00
Jumlah Harga Bahan 941,850.56
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 1,176,985.56
E Overhead + Profit ( Contoh 15% ) 15% x D 176,547.83
F Harga Satuan Pekerjaan ( D + E ) 1,353,533.39
A.4.1.1.7. Membuat 1 m³ beton mutu f 'c = 19,3 Mpa ( K - 225 ), Slump ( 12 ± 2 ) cm, w/c = 0.58
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.650 110,000.00 181,500.00
2 Tukang Batu L.02 OH 0.275 134,000.00 36,850.00
3 Kepala Tukang L.03 OH 0.028 140,000.00 3,920.00
4 Mandor L.04 OH 0.083 155,000.00 12,865.00
Jumlah Tenaga Kerja 235,135.00
B Bahan
1 Semen Portland Kg 371.000 1,300.00 482,300.00
2 Pasir Beton Kg 698.000 100.00 69,800.00
3 Kerikil ( Maks 30mm ) Kg 1,047.000 418.52 438,188.89
4 Air Liter 215.000 53.00 11,395.00
Jumlah Harga Bahan 1,001,683.89
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 1,236,818.89
E Overhead + Profit ( Contoh 15% ) 15% x D 185,522.83
F Harga Satuan Pekerjaan ( D + E ) 1,422,341.72
100
A.4.1.1.17. Pembesian 10 Kg dengan besi polos
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.070 110,000.00 7,700.00
2 Tukang Besi L.02 OH 0.070 134,000.00 9,380.00
3 Kepala Tukang L.03 OH 0.007 140,000.00 980.00
4 Mandor L.04 OH 0.004 155,000.00 620.00
Jumlah Tenaga Kerja 18,680.00
B Bahan
1 Besi Beton Polos Kg 10.500 15,900.00 166,950.00
2 Kawat Beton Kg 0.150 22,700.00 3,405.00
Jumlah Harga Bahan 170,355.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 189,035.00
E Overhead + Profit ( Contoh 15% ) 15% x D 28,355.25
F Harga Satuan Pekerjaan ( D + E ) 217,390.25
Harga Satuan Pekerjaan /1 kg besi F/10 21,739.03
101
A.4.2.1. HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM
A.4.2.1.21. Pemasangan 1 m² rangka besi holow 1 x 50 x 50 x 2 mm,
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.350 110,000.00 38,500.00
2 Tukang Besi L.02 OH 0.350 134,000.00 46,900.00
3 Kepala Tukang L.03 OH 0.0350 140,000.00 4,900.00
4 Mandor L.04 OH 0.0180 155,000.00 2,790.00
Jumlah Tenaga Kerja 93,090.00
B Bahan
1 Rangka Metal Hollow 50.50.2
m¹ 4.000 51,666.67 206,666.67
mm
2 Assesoris ( Perkuatan, Las dll 100% x
Ls 51,666.67 51,666.67
) Rangka
Jumlah Harga Bahan 258,333.33
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 351,423.33
E Overhead + Profit ( Contoh 15% ) 15% x D 52,713.50
F Harga Satuan Pekerjaan ( D + E ) 404,136.83
102
A.4.4.1.3. Pemasangan 1 m² dinding bata merah ( 9 x 9 x 18 ) cm tebal 1 batu campuran 1 SP : 4 PP
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.500 110,000.00 55,000.00
2 Tukang Batu L.02 OH 0.200 134,000.00 26,800.00
3 Kepala Tukang L.03 OH 0.020 140,000.00 2,800.00
4 Mandor L.04 OH 0.025 155,000.00 3,875.00
Jumlah Tenaga Kerja 88,475.00
B Bahan
1 Bata Merah m2 55.000 120,000.00 6,600,000.00
2 Semen Portland Kg 20.861 1,300.00 27,118.93
3 Pasir Pasang m³ 0.073 160,000.00 11,691.43
Jumlah Harga Bahan 6,638,810.36
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 6,727,285.36
E Overhead + Profit ( Contoh 15% ) 15% x D 1,009,092.80
F Harga Satuan Pekerjaan ( D + E ) 7,736,378.16
103
HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN
A.4.4.3.
DINDING
A.4.4.3.35. Pemasangan 1 m² lantai keramik ukuran 40c m x 40 cm
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.700 110,000.00 77,000.00
2 Tukang Batu L.02 OH 0.350 134,000.00 46,900.00
3 Kepala Tukang L.03 OH 0.035 140,000.00 4,900.00
4 Mandor L.04 OH 0.035 155,000.00 5,425.00
Jumlah Tenaga Kerja 134,225.00
B Bahan
1 Ubin Keramik Bh 6.875 73,000.00 501,875.00
2 Semen Portland Kg 10.000 1,300.00 13,000.00
3 Pasir Pasang m³ 0.045 160,000.00 7,200.00
4 Semen Warna Kg 1.500 2,100.00 3,150.00
Jumlah Harga Bahan 525,225.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 659,450.00
E Overhead + Profit ( Contoh 10% ) 10% x D 65,945.00
F Harga Satuan Pekerjaan ( D + E ) 725,395.00
104
A.4.5.2.41. Pemasangan 1 m¹ nok atap Metal roof
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.250 110,000.00 27,500.00
2 Tukang Kayu L.02 OH 0.150 134,000.00 20,100.00
3 Kepala Tukang L.03 OH 0.0150 140,000.00 2,100.00
4 Mandor L.04 OH 0.013 155,000.00 2,015.00
Jumlah Tenaga Kerja 51,715.00
B Bahan
1 Nok Buah 1.100 43,000.00 47,300.00
2 Paku Hak Panjang 15 cm Kg 0.040 22,400.00 896.00
Jumlah Harga Bahan 48,196.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 99,911.00
E Overhead + Profit ( Contoh 15% ) 15% x D 14,986.65
F Harga Satuan Pekerjaan ( D + E ) 114,897.65
105
A.4.6.1.19. Pemasangan 1 m² rangka langit-langit ( 50 x 100 ) cm, kayu kelas II atau III
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.150 110,000.00 16,500.00
2 Tukang Kayu L.02 OH 0.300 134,000.00 40,200.00
3 Kepala Tukang L.03 OH 0.0300 140,000.00 4,200.00
4 Mandor L.04 OH 0.075 155,000.00 11,625.00
Jumlah Tenaga Kerja 72,525.00
B Bahan
1 Kaso-kaso 5 x 7 cm m³ 0.0154 3,007,000.00 46,307.80
2 Paku 7 cm - 10 cm Kg 0.200 22,400.00 4,480.00
Jumlah Harga Bahan 50,787.80
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 123,312.80
E Overhead + Profit ( Contoh 15% ) 15% x D 18,496.92
F Harga Satuan Pekerjaan ( D + E ) 141,809.72
106
B Bahan
1 Cat Menie Kg 0.200 31,000.00 6,200.00
2 Plamir Kg 0.150 -
3 Cat Dasar Kg 0.170 51,800.00 8,806.00
4 Cat Penutup Kg 0.260 51,800.00 13,468.00
5 Kuas Buah 0.010 18,000.00 180.00
6 Pengencer Kg 0.030 25,800.00 774.00
7 Ampelas Lembar 0.200 5,000.00 1,000.00
Jumlah Harga Bahan 30,428.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 40,639.00
E Overhead + Profit ( Contoh 15% ) 15% x D 6,095.85
F Harga Satuan Pekerjaan ( D + E ) 46,734.85
A.4.7.1.10. Pengecataan 1 m² tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.020 110,000.00 2,200.00
2 Tukang Cat L.02 OH 0.063 134,000.00 8,442.00
3 Kepala Tukang L.03 OH 0.0063 140,000.00 882.00
4 Mandor L.04 OH 0.003 155,000.00 465.00
Jumlah Tenaga Kerja 11,989.00
B Bahan
1 Plamir Kg 0.100 8,800.00 880.00
2 Cat Dasar Kg 0.100 83,000.00 8,300.00
3 Cat Penutup Kg 0.260 83,000.00 21,580.00
Jumlah Harga Bahan 30,760.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 42,749.00
E Overhead + Profit ( Contoh 15% ) 15% x D 6,412.35
F Harga Satuan Pekerjaan ( D + E ) 49,161.35
107
CV. BLUE Print Consultant
Planning, Supervision & Engineering Consultant
Office: Jl. Yos Sudarso RT. 002 Sebengkok Tarakan
e-mail : blueprintconsultant@yahoo.com
LOKASI : TARAKAN
TAHUN : 2020
II BAHAN
1 Agregat Kasar/batu pecah M3 Rp. 565,000 418.52 Kg
2 Semen (50kg) Zak Rp. 65,000 1,300.00 / kg setara tonasa
3 Semen Warna Kg Rp. 2,100 / kg
4 Besi beton polos Kg Rp. 15,900
5 Kawat Ikat / Kg Rp. 22,700
6 Plywood 4 mm / Lbr Rp. 83,000
7 Keramik 40x40 / Kotak Rp. 73,000
8 Paku Biasa / Kg Rp. 22,400
9 Tear Oil / Kg Rp. 35,300
10 Minyak Begesting Ltr Rp. 10,900
11 Batu Gunung / M3 Rp. 447,900 308.90 /kg
12 Pasir Pasangan / M3 Rp. 160,000 100.00 /kg
13 Tanah Urug / M3 Rp. 85,600
14 Pasir Urug / M3 Rp. 120,000
15 Paving Blok ( t = 8 cm ) / Bh Rp. 3,000
16 Air Bersih Ltr Rp. 53
17 Kayu Perancah / M3 Rp. 2,522,000
18 Kayu Meranti / M3 Rp. 2,522,000
19 Kayu Kapur / Bengkirai / Lembasung / M3 Rp. 3,007,000
20 Hollow 50x50x2 /m Rp. 51,667
21 Atap Multi Roof / Lbr Rp. 91,000
22 Nok Multi Roof /m Rp. 43,000
23 BRC 120x240 / Lbr Rp. 750,000
24 Tiang BRC Galvanis / Btg Rp. 200,000
25 Pohon Palem Ekor Tupai / Pokok Rp. 525,000
26 Rumput Gajah Mini / M2 Rp. 61,500
27 Pohon Pucuk Merah / Pokok Rp. 112,200
28 Cat Menie / Kg Rp. 31,000
29 Plamir / Kg Rp. 8,800
30 Cat Minyak / Kg Rp. 51,800
31 Cat Air / Kg Rp. 83,000
32 Kuas / Bh Rp. 18,000
33 Pengencer / Kg Rp. 25,800
34 Ampelas / Lbr Rp. 5,000
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PEMBUATAN TAMAN KELURAHAN KP.4
PROP / KAB / KODYA : Kalimanta Utara / Kota Tarakan
JENIS PEKERJAAN Penyelenggaraan Sistem Manajemen Keselamatan Konstruksi (SMKK)
SATUAN PEMBAYARAN : Ls
REKAPITULASI
ESTIMATE ENGINEERING (EE)
PAKET KEGIATAN : PEMBUATAN TAMAN KELURAHAN KARANG ANYAR
LOKASI : TARAKAN
TAHUN : 2020
JUMLAH BIAYA
No. URAIAN PEKERJAAN
( Rp. )
I PEKERJAAN PERSIAPAN Rp. 6,087,195.00
II PEKERJAAN AREA TAMAN Rp. 166,640,609.95
I PEKERJAAN PERSIAPAN
1 Plank Nama Proyek 1.00 ls 500,000.00 500,000.00
2 Dokumentasi 1.00 ls 750,000.00 750,000.00
3 K3 1.00 ls 1,837,195.00 1,837,195.00
4 Pembongkaran Lantai Beton 1.00 ls 3,000,000.00 3,000,000.00
Total I 6,087,195.00
112
A.2.3.1.11 Pengurugan 1 m³ dengan tanah urug
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.300 110,000.00 33,000.00
2 Mandor L.04 OH 0.010 155,000.00 1,550.00
Jumlah Tenaga Kerja 34,550.00
B Bahan
1 Tanah Urug m³ 1.200 85,600.00 102,720.00
Jumlah Harga Bahan 102,720.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 137,270.00
E Overhead + Profit ( Contoh 15% ) 15% x D 20,590.50
F Harga Satuan Pekerjaan ( D + E ) 157,860.50
A Tenaga
1 Pekerja L.01 OH 0.300 110,000.00 33,000.00
2 Mandor L.04 OH 0.010 155,000.00 1,550.00
Jumlah Tenaga Kerja 34,550.00
B Bahan
1 Pasir Urug m³ 1.200 120,000.00 144,000.00
Jumlah Harga Bahan 144,000.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 178,550.00
E Overhead + Profit ( Contoh 15% ) 15% x D 26,782.50
F Harga Satuan Pekerjaan ( D + E ) 205,332.50
113
F Harga Satuan Pekerjaan ( D + E ) 251,016.25
114
A.3.2.1.2 Pemasangan 1 m' Kanstin uk. 15/20 30x50
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.500 110,000.00 55,000.00
2 Tukang Batu L.02 OH 0.050 134,000.00 6,700.00
3 Kepala Tukang L.03 OH 0.010 140,000.00 1,400.00
4 Mandor L.04 OH 0.001 155,000.00 155.00
Jumlah Tenaga Kerja 63,255.00
B Bahan
1 Semen (PC) zak 0.360 65,000.00 23,400.00
2 Pasir Pasang m2 0.001 160,000.00 160.00
3 Kanstin uk. 15/20 30x50 bh 2.000 51,666.67 103,333.33
Jumlah Harga Bahan 126,893.33
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 190,148.33
E Overhead + Profit ( Contoh 15% ) 15% x D 28,522.25
F Harga Satuan Pekerjaan ( D + E ) 218,670.58
115
A.4.1.1.7. Membuat 1 m³ beton mutu f 'c = 19,3 Mpa ( K - 225 ), Slump ( 12 ± 2 ) cm, w/c = 0.58
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.650 110,000.00 181,500.00
2 Tukang Batu L.02 OH 0.275 134,000.00 36,850.00
3 Kepala Tukang L.03 OH 0.028 140,000.00 3,920.00
4 Mandor L.04 OH 0.083 155,000.00 12,865.00
Jumlah Tenaga Kerja 235,135.00
B Bahan
1 Semen Portland Kg 371.000 1,300.00 482,300.00
2 Pasir Beton Kg 698.000 100.00 69,800.00
3 Kerikil ( Maks 30mm ) Kg 1,047.000 418.52 438,188.89
4 Air Liter 215.000 53.00 11,395.00
Jumlah Harga Bahan 1,001,683.89
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 1,236,818.89
E Overhead + Profit ( Contoh 15% ) 15% x D 185,522.83
F Harga Satuan Pekerjaan ( D + E ) 1,422,341.72
116
A.4.1.1.21. Pemasangan 1 m² bekisting untuk sloof
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.520 110,000.00 57,200.00
2 Tukang Kayu L.02 OH 0.260 134,000.00 34,840.00
3 Kepala Tukang L.03 OH 0.026 140,000.00 3,640.00
4 Mandor L.04 OH 0.026 155,000.00 4,030.00
Jumlah Tenaga Kerja 99,710.00
B Bahan
1 Kayu Kelas III m³ 0.045 2,522,000.00 113,490.00
2 Paku 5 - 10 cm Kg 0.300 22,400.00 6,720.00
3 Minyak Bekisting Liter 0.100 10,900.00 1,090.00
Jumlah Harga Bahan 121,300.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 221,010.00
E Overhead + Profit ( Contoh 15% ) 15% x D 33,151.50
F Harga Satuan Pekerjaan ( D + E ) 254,161.50
117
A.4.4.1. HARGA SATUAN PEKERJAAN PASANGAN DINDING
A.4.4.1.3. Pemasangan 1 m² dinding bata merah ( 9 x 9 x 18 ) cm tebal 1 batu campuran 1 SP : 4 PP
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.500 110,000.00 55,000.00
2 Tukang Batu L.02 OH 0.200 134,000.00 26,800.00
3 Kepala Tukang L.03 OH 0.020 140,000.00 2,800.00
4 Mandor L.04 OH 0.025 155,000.00 3,875.00
Jumlah Tenaga Kerja 88,475.00
B Bahan
1 Bata Merah m2 110.000 120,000.00 13,200,000.00
2 Semen Portland Kg 20.861 1,300.00 27,118.93
3 Pasir Pasang m³ 0.073 160,000.00 11,691.43
Jumlah Harga Bahan 13,238,810.36
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 13,327,285.36
E Overhead + Profit ( Contoh 15% ) 15% x D 1,999,092.80
F Harga Satuan Pekerjaan ( D + E ) 15,326,378.16
118
A.4.4.2. HARGA SATUAN PEKERJAAN PLESTERAN
A.4.4.2.4. Pemasangan 1 m² plesteran 1 SP : 4 PP tebal 15 mm
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.300 110,000.00 33,000.00
2 Tukang Batu L.02 OH 0.150 134,000.00 20,100.00
3 Kepala Tukang L.03 OH 0.015 140,000.00 2,100.00
4 Mandor L.04 OH 0.015 155,000.00 2,325.00
Jumlah Tenaga Kerja 57,525.00
B Bahan
1 Semen Portland Kg 6.240 1,300.00 8,112.00
2 Pasir Pasang m³ 0.024 160,000.00 3,840.00
Jumlah Harga Bahan 11,952.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 69,477.00
E Overhead + Profit ( Contoh 15% ) 15% x D 10,421.55
F Harga Satuan Pekerjaan ( D + E ) 79,898.55
119
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP
A.4.5.2.40. Pemasangan 1 m² atap metalroof
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.200 110,000.00 22,000.00
2 Tukang Kayu L.02 OH 0.100 134,000.00 13,400.00
3 Kepala Tukang L.03 OH 0.0100 140,000.00 1,400.00
4 Mandor L.04 OH 0.001 155,000.00 155.00
Jumlah Tenaga Kerja 36,955.00
B Bahan
1 Genteng Metal Lembar 1.020 91,000.00 92,820.00
2 Paku Biasa 2" - 5" Kg 0.200 22,400.00 4,480.00
Jumlah Harga Bahan 97,300.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 134,255.00
E Overhead + Profit ( Contoh 15% ) 15% x D 20,138.25
F Harga Satuan Pekerjaan ( D + E ) 154,393.25
120
A.4.6.1. HARGA SATUAN PEKERJAAN KAYU
A.4.6.1.13. Pemasangan 1 m³ konstruksi kuda-kuda konvensional, kayu kelas I, II dan III
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 4.000 110,000.00 440,000.00
2 Tukang Kayu L.02 OH 12.000 134,000.00 1,608,000.00
3 Kepala Tukang L.03 OH 1.2000 140,000.00 168,000.00
4 Mandor L.04 OH 0.200 155,000.00 31,000.00
Jumlah Tenaga Kerja 2,247,000.00
B Bahan
1 Balok Kayu m³ 1.1000 3,007,000.00 3,307,700.00
2 Besi Strip Tebal 5 mm Kg 15.000 -
3 Paku 12 cm Kg 5.600 22,400.00 125,440.00
Jumlah Harga Bahan 3,433,140.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 5,680,140.00
E Overhead + Profit ( Contoh 15% ) 15% x D 852,021.00
F Harga Satuan Pekerjaan ( D + E ) 6,532,161.00
121
1 Pekerja L.01 OH 0.070 110,000.00 7,700.00
2 Tukang Cat L.02 OH 0.009 134,000.00 1,206.00
3 Kepala Tukang L.03 OH 0.006 140,000.00 840.00
4 Mandor L.04 OH 0.003 155,000.00 465.00
Jumlah Tenaga Kerja 10,211.00
B Bahan
1 Cat Menie Kg 0.200 31,000.00 6,200.00
2 Plamir Kg 0.150 -
3 Cat Dasar Kg 0.170 51,800.00 8,806.00
4 Cat Penutup Kg 0.260 51,800.00 13,468.00
5 Kuas Buah 0.010 18,000.00 180.00
6 Pengencer Kg 0.030 25,800.00 774.00
7 Ampelas Lembar 0.200 5,000.00 1,000.00
Jumlah Harga Bahan 30,428.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 40,639.00
E Overhead + Profit ( Contoh 15% ) 15% x D 6,095.85
F Harga Satuan Pekerjaan ( D + E ) 46,734.85
A.4.7.1.10. Pengecataan 1 m² tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.020 110,000.00 2,200.00
2 Tukang Cat L.02 OH 0.063 134,000.00 8,442.00
3 Kepala Tukang L.03 OH 0.0063 140,000.00 882.00
4 Mandor L.04 OH 0.003 155,000.00 465.00
Jumlah Tenaga Kerja 11,989.00
B Bahan
1 Plamir Kg 0.100 8,800.00 880.00
2 Cat Dasar Kg 0.100 83,000.00 8,300.00
3 Cat Penutup Kg 0.260 83,000.00 21,580.00
Jumlah Harga Bahan 30,760.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 42,749.00
E Overhead + Profit ( Contoh 15% ) 15% x D 6,412.35
F Harga Satuan Pekerjaan ( D + E ) 49,161.35
122
CV. BLUE Print Consultant
Planning, Supervision & Engineering Consultant
Office: Jl. Yos Sudarso RT. 002 Sebengkok Tarakan
e-mail : blueprintconsultant@yahoo.com
LOKASI : TARAKAN
TAHUN : 2020
II BAHAN
1 Agregat Kasar/batu pecah M3 Rp. 565,000 418.52 Kg
2 Semen (50kg) Zak Rp. 65,000 1,300.00 / kg setara tonasa
3 Semen Warna Kg Rp. 2,100 / kg
4 Besi beton polos Kg Rp. 15,900
5 Kawat Ikat / Kg Rp. 22,700
6 Plywood 4 mm / Lbr Rp. 83,000
7 Keramik 40x40 / Kotak Rp. 73,000
8 Paku Biasa / Kg Rp. 22,400
9 Tear Oil / Kg Rp. 35,300
10 Minyak Begesting Ltr Rp. 10,900
11 Batu Pecah / M3 Rp. 565,000 389.66 /kg
12 Pasir Pasangan / M3 Rp. 160,000 100.00 /kg
13 Tanah Urug / M3 Rp. 85,600
14 Pasir Urug / M3 Rp. 120,000
15 Paving Blok ( t = 8 cm ) / Bh Rp. 3,000
16 Air Bersih Ltr Rp. 53
17 Kayu Perancah / M3 Rp. 2,522,000
18 Kayu Meranti / M3 Rp. 2,522,000
19 Kayu Kapur / Bengkirai / Lembasung / M3 Rp. 3,007,000
20 Hollow 50x50x2 /m Rp. 51,667
21 Atap Multi Roof / Lbr Rp. 91,000
22 Nok Multi Roof /m Rp. 43,000
23 BRC 120x240 / Lbr Rp. 750,000
24 Tiang BRC Galvanis / Btg Rp. 200,000
25 Pohon Palem Ekor Tupai / Pokok Rp. 525,000
26 Rumput Gajah Mini / M2 Rp. 61,500
27 Pohon Pucuk Merah / Pokok Rp. 112,200
28 Cat Menie / Kg Rp. 31,000
29 Plamir / Kg Rp. 8,800
30 Cat Minyak / Kg Rp. 51,800
31 Cat Air / Kg Rp. 83,000
32 Kuas / Bh Rp. 18,000
33 Pengencer / Kg Rp. 25,800
34 Ampelas / Lbr Rp. 5,000
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PEMBUATAN TAMAN DEPAN 613
PROP / KAB / KODYA : Kalimanta Utara / Kota Tarakan
JENIS PEKERJAAN Penyelenggaraan Sistem Manajemen Keselamatan Konstruksi (SMKK)
SATUAN PEMBAYARAN : Ls
REKAPITULASI
ESTIMATE ENGINEERING (EE)
PAKET KEGIATAN : TAMAN BELAKANG BRI
LOKASI : TARAKAN
TAHUN : 2020
JUMLAH BIAYA
No. URAIAN PEKERJAAN
( Rp. )
I PEKERJAAN PERSIAPAN Rp. 3,087,195.00
II PEKERJAAN BETON Rp. 1,053,399,430.19
III PEKERJAAN PASANGAN Rp. 102,657,158.52
IV PEKERJAAN ATAP Rp. 23,416,209.27
V PEKERJAAN KUSEN Rp. 12,289,382.47
VI PEKERJAAN PENGANTUNG & PENGUNCI Rp. 2,314,987.83
VII PEKERJAAN PLAFOND Rp. 17,164,947.96
VIII PEKERJAAN PENGECATAN Rp. 19,040,106.28
IX PEKERJAAN SANITASI Rp. 2,310,295.61
X PEKERJAAN MEKANIKAL ELECTRIKAL Rp. 2,645,206.00
XI PEKERJAAN PAGAR & TAMAN Rp. 30,141,178.10
Satu Milyar Tiga Ratus Delapan Puluh Delapan Juta Lima Puluh Tiga Ribu Rupiah
I PEKERJAAN PERSIAPAN
1 Plank Nama Proyek 1.00 ls 500,000.00 500,000.00
2 Dokumentasi 1.00 ls 750,000.00 750,000.00
3 K3 1.00 ls 1,837,195.00 1,837,195.00
Total I 3,087,195.00
II PEKERJAAN BETON
1 Pancang Beton 10/10, 400 820.00 Btg 404,400.00 331,608,000.00
2 Cor Beton Bertulang Foot Plat
- Cor Beton K-225 20.99 M3 1,780,721.06 37,380,896.42
- Pembesian 4,775.68 Kg 22,360.00 106,784,198.52
- Bekisting 104.96 M2 261,412.69 27,437,875.63
3 Cor Beton Bertulang Kolom K1
- Cor Beton K-225 4.61 M3 1,780,721.06 8,213,575.87
- Pembesian 2,425.89 Kg 22,360.00 54,242,852.49
- Bekisting 142.68 M2 261,412.69 37,298,362.18
4 Cor Beton Bertulang Balok B1
- Cor Beton K-225 3.68 M3 1,780,721.06 6,544,149.88
- Pembesian 834.48 Kg 22,360.00 18,658,971.70
- Bekisting 63.70 M2 261,412.69 16,651,988.16
5 Cor Beton Bertulang Kolom K2
- Cor Beton K-225 0.74 M3 1,780,721.06 1,324,856.47
- Pembesian 206.18 Kg 22,360.00 4,610,095.09
- Bekisting 12.32 M2 261,412.69 3,220,604.30
6 Cor Beton Bertulang Ring Balk
- Cor Beton K-225 0.90 M3 1,780,721.06 1,607,991.11
- Pembesian 208.19 Kg 22,360.00 4,655,038.69
- Bekisting 24.08 M2 261,412.69 6,294,817.50
7 Cor Beton Bertulang Plat Lantai T:12 cm
- Cor Beton K-225 61.70 M3 1,780,721.06 109,877,612.08
- Pembesian 6,376.08 Kg 22,360.00 142,569,140.42
- Bekisting 514.20 M2 261,412.69 134,418,403.66
Total II 1,053,399,430.19
IV PEKERJAAN ATAP
1 Rangka Atap kayu 5/10 1.28 M3 6,696,456.90 8,590,214.91
2 Pas Atap Seng Gelombang 117.00 M2 85,984.10 10,060,139.35
3 Pemasangan Bubungan 13.50 M' 40,594.56 548,026.60
4 Pasangan Listplank Kayu 2x20 47.50 M 88,796.39 4,217,828.41
Total IV 23,416,209.27
V PEKERJAAN KUSEN
1 Pemasangan Kusen Pintu (PJ1) 2.00 Bh 1,100,000.00 2,200,000.00
2 Pemasangan Kusen Pintu (P1) 1.00 Bh 450,000.00 450,000.00
3 Pemasangan Kusen (J2) 2.00 Bh 700,000.00 1,400,000.00
4 Pemasangan Daun Pintu (P1) 3.00 Bh 1,500,000.00 4,500,000.00
5 Pemasangan Daun Jendela (J2) 8.00 Bh 400,000.00 3,200,000.00
6 Kaca Polos t=3mm 3.06 m2 176,268.78 539,382.47
Total V 12,289,382.47
IX PEKERJAAN SANITASI
1 Pemasangan Kloset Jongkok 1.00 Bh 717,150.81 717,150.81
2 Pemasangan Kran Air 1.00 Bh 105,570.98 105,570.98
3 Pemasangan Pipa air Bersih PVC 3/4" 20.00 M 25,278.44 505,568.80
4 pemasangan Pipa Air Kotor 4" 8.00 M 122,750.63 982,005.02
Total IX 2,310,295.61
129
A.2.3.1.11 Pengurugan 1 m³ dengan pasir urug
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.300 111,780.00 33,534.00
2 Mandor L.04 OH 0.010 160,090.00 1,600.90
Jumlah Tenaga Kerja 35,134.90
B Bahan
1 Pasir Urug m³ 1.200 195,600.00 234,720.00
Jumlah Harga Bahan 234,720.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 269,854.90
E Overhead + Profit ( Contoh 15% ) 15% x D 40,478.24
F Harga Satuan Pekerjaan ( D + E ) 310,333.14
130
A.3.2.1.2 Pemasangan 1 m' Kanstin uk. 15/20 30x50
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.500 111,780.00 55,890.00
2 Tukang Batu L.02 OH 0.050 135,070.00 6,753.50
3 Kepala Tukang L.03 OH 0.010 140,740.00 1,407.40
4 Mandor L.04 OH 0.001 160,090.00 160.09
Jumlah Tenaga Kerja 64,210.99
B Bahan
1 Semen (PC) zak 0.360 86,000.00 30,960.00
2 Pasir Pasang m2 0.001 297,900.00 297.90
3 Kanstin uk. 15/20 30x50 bh 2.000 51,666.67 103,333.33
Jumlah Harga Bahan 134,591.23
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 198,802.22
E Overhead + Profit ( Contoh 15% ) 15% x D 29,820.33
F Harga Satuan Pekerjaan ( D + E ) 228,622.56
131
A.4.1.1.7. Membuat 1 m³ beton mutu f 'c = 19,3 Mpa ( K - 225 ), Slump ( 12 ± 2 ) cm, w/c = 0.58
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.650 111,780.00 184,437.00
2 Tukang Batu L.02 OH 0.275 135,070.00 37,144.25
3 Kepala Tukang L.03 OH 0.028 140,740.00 3,940.72
4 Mandor L.04 OH 0.083 160,090.00 13,287.47
Jumlah Tenaga Kerja 238,809.44
B Bahan
1 Semen Portland Kg 371.000 1,720.00 638,120.00
2 Pasir Beton Kg 698.000 186.19 129,958.88
3 Kerikil ( Maks 30mm ) Kg 1,047.000 506.37 530,169.78
4 Air Liter 215.000 53.00 11,395.00
Jumlah Harga Bahan 1,309,643.65
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 1,548,453.09
E Overhead + Profit ( Contoh 15% ) 15% x D 232,267.96
F Harga Satuan Pekerjaan ( D + E ) 1,780,721.06
132
A.4.1.1.21. Pemasangan 1 m² bekisting untuk sloof
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.520 111,780.00 58,125.60
2 Tukang Kayu L.02 OH 0.260 135,070.00 35,118.20
3 Kepala Tukang L.03 OH 0.026 140,740.00 3,659.24
4 Mandor L.04 OH 0.026 160,090.00 4,162.34
Jumlah Tenaga Kerja 101,065.38
B Bahan
1 Kayu Kelas III m³ 0.045 2,632,000.00 118,440.00
2 Paku 5 - 10 cm Kg 0.300 22,400.00 6,720.00
3 Minyak Bekisting Liter 0.100 10,900.00 1,090.00
Jumlah Harga Bahan 126,250.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 227,315.38
E Overhead + Profit ( Contoh 15% ) 15% x D 34,097.31
F Harga Satuan Pekerjaan ( D + E ) 261,412.69
133
A.4.4.1. HARGA SATUAN PEKERJAAN PASANGAN DINDING
A.4.4.1.3. Pemasangan 1 m² dinding bata merah ( 9 x 9 x 18 ) cm tebal 1 batu campuran 1 SP : 4 PP
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.500 111,780.00 55,890.00
2 Tukang Batu L.02 OH 0.200 135,070.00 27,014.00
3 Kepala Tukang L.03 OH 0.020 140,740.00 2,814.80
4 Mandor L.04 OH 0.025 160,090.00 4,002.25
Jumlah Tenaga Kerja 89,721.05
B Bahan
1 Bata Merah m2 110.000 900.00 99,000.00
2 Semen Portland Kg 20.861 1,720.00 35,880.43
3 Pasir Pasang m³ 0.073 297,900.00 21,767.98
Jumlah Harga Bahan 156,648.41
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 246,369.46
E Overhead + Profit ( Contoh 15% ) 15% x D 36,955.42
F Harga Satuan Pekerjaan ( D + E ) 283,324.88
134
A.4.4.2. HARGA SATUAN PEKERJAAN PLESTERAN
A.4.4.2.4. Pemasangan 1 m² plesteran 1 SP : 4 PP tebal 15 mm
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.300 111,780.00 33,534.00
2 Tukang Batu L.02 OH 0.150 135,070.00 20,260.50
3 Kepala Tukang L.03 OH 0.015 140,740.00 2,111.10
4 Mandor L.04 OH 0.015 160,090.00 2,401.35
Jumlah Tenaga Kerja 58,306.95
B Bahan
1 Semen Portland Kg 6.240 1,720.00 10,732.80
2 Pasir Pasang m³ 0.024 297,900.00 7,149.60
Jumlah Harga Bahan 17,882.40
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 76,189.35
E Overhead + Profit ( Contoh 15% ) 15% x D 11,428.40
F Harga Satuan Pekerjaan ( D + E ) 87,617.75
135
A.4.4.3.36. Pemasangan 1 m² lantai keramik ukuran 20 cm x 20 cm
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.700 111,780.00 78,246.00
2 Tukang Batu L.02 OH 0.350 135,070.00 47,274.50
3 Kepala Tukang L.03 OH 0.035 140,740.00 4,925.90
4 Mandor L.04 OH 0.035 160,090.00 5,603.15
Jumlah Tenaga Kerja 136,049.55
B Bahan
1 Ubin Keramik Bh 26.500 -
2 Semen Portland Kg 10.400 1,720.00 17,888.00
3 Pasir Pasang m³ 0.045 297,900.00 13,405.50
4 Semen Warna Kg 1.620 13,100.00 21,222.00
Jumlah Harga Bahan 52,515.50
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 188,565.05
E Overhead + Profit ( Contoh 15% ) 15% x D 28,284.76
F Harga Satuan Pekerjaan ( D + E ) 216,849.81
136
A.4.5.1.9. Pemasangan 1 m¹ list langit-langit gypsum
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.050 111,780.00 5,589.00
2 Tukang Kayu L.02 OH 0.050 135,070.00 6,753.50
3 Kepala Tukang L.03 OH 0.005 140,740.00 703.70
4 Mandor L.04 OH 0.003 160,090.00 480.27
Jumlah Tenaga Kerja 13,526.47
B Bahan
1 List Gypsum m 1.050 31,100.00 32,655.00
2 Tepung gypsum Kg 0.150 6,600.00 990.00
Jumlah Harga Bahan 33,645.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 47,171.47
E Overhead + Profit ( Contoh 15% ) 15% x D 7,075.72
F Harga Satuan Pekerjaan ( D + E ) 54,247.19
137
A.4.5.2.39. Pemasangan 1 m¹ nok atap seng
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.150 111,780.00 16,767.00
2 Tukang Kayu L.02 OH 0.070 135,070.00 9,454.90
3 Kepala Tukang L.03 OH 0.0070 140,740.00 985.18
4 Mandor L.04 OH 0.006 160,090.00 960.54
Jumlah Tenaga Kerja 28,167.62
B Bahan
1 Seng Plat 3" x 6" BJLS 28 Lembar 0.300 19,600.00 5,880.00
2 Paku Seng Kg 0.040 31,300.00 1,252.00
Jumlah Harga Bahan 7,132.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 35,299.62
E Overhead + Profit ( Contoh 15% ) 15% x D 5,294.94
F Harga Satuan Pekerjaan ( D + E ) 40,594.56
138
A.4.6.1.20. Pemasangan 1 m² rangka langit-langit ( 60 x 60 ) cm, kayu kelas II atau III
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.200 111,780.00 22,356.00
2 Tukang Kayu L.02 OH 0.300 135,070.00 40,521.00
3 Kepala Tukang L.03 OH 0.0300 140,740.00 4,222.20
4 Mandor L.04 OH 0.010 160,090.00 1,600.90
Jumlah Tenaga Kerja 68,700.10
B Bahan
1 Kaso-kaso m³ 0.0163 2,632,000.00 42,901.60
2 Paku 7 cm - 10 cm Kg 0.250 22,400.00 5,600.00
Jumlah Harga Bahan 48,501.60
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 117,201.70
E Overhead + Profit ( Contoh 15% ) 15% x D 17,580.26
F Harga Satuan Pekerjaan ( D + E ) 134,781.96
139
A.4.6.2. HARGA SATUAN PEKERJAAN KUNCI DAN KACA
A.4.6.2.2. Pemasangan 1 buah kunci tanam
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.010 111,780.00 1,117.80
2 Tukang Kayu L.02 OH 0.500 135,070.00 67,535.00
3 Kepala Tukang L.03 OH 0.0500 140,740.00 7,037.00
4 Mandor L.04 OH 0.005 160,090.00 800.45
Jumlah Tenaga Kerja 76,490.25
B Bahan
1 Kunci Tanam Biasa Buah 1.000 121,900.00 121,900.00
Jumlah Harga Bahan 121,900.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 198,390.25
E Overhead + Profit ( Contoh 15% ) 15% x D 29,758.54
F Harga Satuan Pekerjaan ( D + E ) 228,148.79
140
A.4.6.2.5. Pemasangan 1 buah engsel pintu
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.015 111,780.00 1,676.70
2 Tukang Kayu L.02 OH 0.150 135,070.00 20,260.50
3 Kepala Tukang L.03 OH 0.0150 140,740.00 2,111.10
4 Mandor L.04 OH 0.0008 160,090.00 128.07
Jumlah Tenaga Kerja 24,176.37
B Bahan
1 Engsel Pintu Buah 1.000 22,700.00 22,700.00
Jumlah Harga Bahan 22,700.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 46,876.37
E Overhead + Profit ( Contoh 15% ) 15% x D 7,031.46
F Harga Satuan Pekerjaan ( D + E ) 53,907.83
141
A.4.6.2.9. Pemasangan 1 buah kait angin
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.015 111,780.00 1,676.70
2 Tukang Kayu L.02 OH 0.150 135,070.00 20,260.50
3 Kepala Tukang L.03 OH 0.0150 140,740.00 2,111.10
4 Mandor L.04 OH 0.0080 160,090.00 1,280.72
Jumlah Tenaga Kerja 25,329.02
B Bahan
1 Kait Angin Buah 1.000 11,300.00 11,300.00
Jumlah Harga Bahan 11,300.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 36,629.02
E Overhead + Profit ( Contoh 15% ) 15% x D 5,494.35
F Harga Satuan Pekerjaan ( D + E ) 42,123.37
142
A.4.6.2.16. Pemasangan 1 m² kaca tebal 3 mm
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.015 111,780.00 1,676.70
2 Tukang Kayu L.02 OH 0.150 135,070.00 20,260.50
3 Kepala Tukang L.03 OH 0.0015 140,740.00 211.11
4 Mandor L.04 OH 0.0008 160,090.00 128.07
Jumlah Tenaga Kerja 21,937.20
B Bahan
1 Kaca Tebal 3 mm m² 1.100 119,400.00 131,340.00
2 Sealant Kg 0.050 31,100.00 1,555.00
Jumlah Harga Bahan 131,340.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 153,277.20
E Overhead + Profit ( Contoh 15% ) 15% x D 22,991.58
F Harga Satuan Pekerjaan ( D + E ) 176,268.78
143
A.4.7.1.10. Pengecataan 1 m² tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.020 111,780.00 2,235.60
2 Tukang Cat L.02 OH 0.063 135,070.00 8,509.41
3 Kepala Tukang L.03 OH 0.0063 140,740.00 886.66
4 Mandor L.04 OH 0.003 160,090.00 480.27
Jumlah Tenaga Kerja 12,111.94
B Bahan
1 Plamir Kg 0.100 8,800.00 880.00
2 Cat Dasar Kg 0.100 51,800.00 5,180.00
3 Cat Penutup Kg 0.260 51,800.00 13,468.00
Jumlah Harga Bahan 19,528.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 31,639.94
E Overhead + Profit ( Contoh 15% ) 15% x D 4,745.99
F Harga Satuan Pekerjaan ( D + E ) 36,385.93
144
A.5.1.1.19. Pemasangan 1 buah kran air ؽ" atau ؾ"
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.010 111,780.00 1,117.80
2 Tukang Batu L.02 OH 0.400 135,070.00 54,028.00
3 Kepala Tukang L.03 OH 0.040 140,740.00 5,629.60
4 Mandor L.04 OH 0.005 160,090.00 800.45
Jumlah Tenaga Kerja 61,575.85
B Bahan
1 Kran Air ؽ" atau ؾ m¹ 1.000 30,100.00 30,100.00
2 Sealtape Buah 0.025 5,000.00 125.00
Jumlah Harga Bahan 30,225.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 91,800.85
E Overhead + Profit ( Contoh 15% ) 15% x D 13,770.13
F Harga Satuan Pekerjaan ( D + E ) 105,570.98
145
A.5.1.1.32. Pemasangan 1 m¹ PVC type AW Ø4"
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.081 111,780.00 9,054.18
2 Tukang Batu L.02 OH 0.135 135,070.00 18,234.45
3 Kepala Tukang L.03 OH 0.0135 140,740.00 1,899.99
4 Mandor L.04 OH 0.004 160,090.00 640.36
Jumlah Tenaga Kerja 29,828.98
B Bahan
1 Pipa PVC Ø4" m¹ 1.200 52,750.00 63,300.00
2 Perlengkapan % 35.000 18,462.50 18,462.50
Jumlah Harga Bahan 81,762.50
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 111,591.48
E Overhead + Profit ( Contoh 10% ) 10% x D 11,159.15
F Harga Satuan Pekerjaan ( D + E ) 122,750.63
146
CV. BLUE Print Consultant
Planning, Supervision & Engineering Consultant
Office: Jl. Yos Sudarso RT. 002 Sebengkok Tarakan
e-mail : blueprintconsultant@yahoo.com
LOKASI : TARAKAN
TAHUN : 2020
II BAHAN
1 Agregat Kasar/batu pecah M3 Rp. 683,600 506.37 Kg + Ongkos Angkut
2 Semen (50kg) Zak Rp. 86,000 1,720.00 / kg + Ongkos Angkut
3 Semen Warna Kg Rp. 13,100 / kg + Ongkos Angkut
4 Besi beton polos Kg Rp. 16,393 + Ongkos Angkut
5 Kawat Ikat / Kg Rp. 22,700
6 Plywood 4 mm / Lbr Rp. 85,200 + Ongkos Angkut
7 Keramik 40x40 / Kotak Rp. 12,633 75,800.00 + Ongkos Angkut
8 Keramik 20x20 / Kotak Rp. 3,032 75,800.00 + Ongkos Angkut
9 Paku Biasa / Kg Rp. 22,400
10 Paku Seng / Kg Rp. 31,300
11 Paku Sekrup / Kg Rp. 40,000
12 Tear Oil / Kg Rp. 35,300
13 Minyak Begesting Ltr Rp. 10,900
14 Batu Pecah / M3 Rp. 683,600 471.45 /kg + Ongkos Angkut
15 Pasir Pasangan / M3 Rp. 297,900 186.19 /kg + Ongkos Angkut
16 Tanah Urug / Pasir urug / M3 Rp. 195,600 + Ongkos Angkut
17 Batu Bata / Bh Rp. 900 + Ongkos Angkut
18 Paving Blok ( t = 8 cm ) / Bh Rp. 3,000
19 Air Bersih Ltr Rp. 53
20 Kayu Perancah / M3 Rp. 2,742,000 + Ongkos Angkut
21 Kayu Meranti / M3 Rp. 2,632,000 + Ongkos Angkut
22 Kayu Kapur / Bengkirai / Lembasung / M3 Rp. 3,117,000 + Ongkos Angkut
23 Hollow 50x50x2 /m Rp. 51,667
24 Seng Plat 3" x 6" BJLS 28 /m Rp. 19,600
25 Seng Gelombang 3" x 6" / Lbr Rp. 72,600
26 BRC 175x240 / Lbr Rp. 675,000
27 Pohon Palem Ekor Tupai / Pokok Rp. 525,000
28 Rumput Gajah Mini / M2 Rp. 77,100
29 Pohon Pucuk Merah / Pokok Rp. 178,000
30 Kran Air / Bh Rp. 30,100
31 Pipa PVC 3/4" /M Rp. 6,250 25,000.00
32 Pipa PVC 4" /M Rp. 52,750 211,000.00
33 Kloset Jongkok / Bh Rp. 249,200
34 Plamir / Kg Rp. 8,800
35 Cat Air / Kg Rp. 51,800
36 Cat Minyak / Kg Rp. 56,000
37 Menie / Kg Rp. 28,000
38 Kuas / Bh Rp. 18,200
39 Ampelas / Lembar Rp. 5,600
40 Thiner / Ltr Rp. 25,800
41 Kaca 3mm / M2 Rp. 119,400
42 Sealent / Tube Rp. 31,100
43 Heandle / Bh Rp. 20,000
44 Grendle / Bh Rp. 22,700
45 Kait Angin / Bh Rp. 11,300
46 Engsel 4" / Bh Rp. 22,700
47 Engsel 3" / Bh Rp. 22,700
48 Kunci Tanam / Bh Rp. 121,900
49 Gypsum Board / Lbr Rp. 32,700 + Ongkos Angkut
50 List Gypsum /M Rp. 31,100 + Ongkos Angkut
51 Tepung Gypsum / Kg Rp. 6,600 + Ongkos Angkut
52 Pancang Beton 10/10 400 / Btg Rp. 404,400 + Ongkos Angkut
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : TAMAN BELAKANG BRI
PROP / KAB / KODYA : Kalimanta Utara / Kota Tarakan
JENIS PEKERJAAN Penyelenggaraan Sistem Manajemen Keselamatan Konstruksi (SMKK)
SATUAN PEMBAYARAN : Ls
REKAPITULASI
ESTIMATE ENGINEERING (EE)
PAKET KEGIATAN : TAMAN BELAKANG BRI
LOKASI : TARAKAN
TAHUN : 2020
JUMLAH BIAYA
No. URAIAN PEKERJAAN
( Rp. )
I PEKERJAAN PERSIAPAN Rp. 3,087,195.00
II PEKERJAAN BETON Rp. 167,156,544.06
III PEKERJAAN PAGAR & TAMAN Rp. 11,575,000.00
I PEKERJAAN PERSIAPAN
1 Plank Nama Proyek 1.00 ls 500,000.00 500,000.00
2 Dokumentasi 1.00 ls 750,000.00 750,000.00
3 K3 1.00 ls 1,837,195.00 1,837,195.00
Total I 3,087,195.00
II PEKERJAAN BETON
1 Pancang Beton 10/10, 400 125.00 Btg 404,400.00 50,550,000.00
2 Cor Beton Bertulang Foot Plat
- Cor Beton K-225 3.20 M3 1,780,721.06 5,698,307.38
- Pembesian 728.00 Kg 22,360.00 16,278,079.04
- Bekisting 16.00 M2 261,412.69 4,182,602.99
3 Cor Beton Bertulang Kolom K1
- Cor Beton K-225 0.70 M3 1,780,721.06 1,252,069.49
- Pembesian 369.80 Kg 22,360.00 8,268,727.51
- Bekisting 18.45 M2 261,412.69 4,823,201.32
4 Cor Beton Bertulang Balok B1
- Cor Beton K-225 3.68 M3 1,780,721.06 6,544,149.88
- Pembesian 834.48 Kg 22,360.00 18,658,971.70
- Bekisting 31.85 M2 261,412.69 8,325,994.08
5 Cor Beton Bertulang Plat Lantai T:12 cm
- Cor Beton K-225 7.68 M3 1,780,721.06 13,675,937.72
- Pembesian 793.60 Kg 22,360.00 17,744,894.96
- Bekisting 42.67 M2 261,412.69 11,153,607.98
Total II 167,156,544.06
A.4.1.1.7. Membuat 1 m³ beton mutu f 'c = 19,3 Mpa ( K - 225 ), Slump ( 12 ± 2 ) cm, w/c = 0.58
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.650 111,780.00 184,437.00
2 Tukang Batu L.02 OH 0.275 135,070.00 37,144.25
3 Kepala Tukang L.03 OH 0.028 140,740.00 3,940.72
4 Mandor L.04 OH 0.083 160,090.00 13,287.47
Jumlah Tenaga Kerja 238,809.44
B Bahan
1 Semen Portland Kg 371.000 1,720.00 638,120.00
2 Pasir Beton Kg 698.000 186.19 129,958.88
3 Kerikil ( Maks 30mm ) Kg 1,047.000 506.37 530,169.78
4 Air Liter 215.000 53.00 11,395.00
Jumlah Harga Bahan 1,309,643.65
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 1,548,453.09
E Overhead + Profit ( Contoh 15% ) 15% x D 232,267.96
F Harga Satuan Pekerjaan ( D + E ) 1,780,721.06
152
A.4.1.1.17. Pembesian 10 Kg dengan besi polos
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.070 111,780.00 7,824.60
2 Tukang Besi L.02 OH 0.070 135,070.00 9,454.90
3 Kepala Tukang L.03 OH 0.007 140,740.00 985.18
4 Mandor L.04 OH 0.004 160,090.00 640.36
Jumlah Tenaga Kerja 18,905.04
B Bahan
1 Besi Beton Polos Kg 10.500 16,392.83 172,124.73
2 Kawat Beton Kg 0.150 22,700.00 3,405.00
Jumlah Harga Bahan 175,529.73
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 194,434.77
E Overhead + Profit ( Contoh 15% ) 15% x D 29,165.22
F Harga Satuan Pekerjaan ( D + E ) 223,599.99
Harga Satuan Pekerjaan /1 kg besi F/10 22,360.00
153
CV. BLUE Print Consultant
Planning, Supervision & Engineering Consultant
Office: Jl. Yos Sudarso RT. 002 Sebengkok Tarakan
e-mail : blueprintconsultant@yahoo.com
LOKASI : TARAKAN
TAHUN : 2020
II BAHAN
1 Agregat Kasar/batu pecah M3 Rp. 683,600 506.37 Kg + Ongkos Angkut
2 Semen (50kg) Zak Rp. 86,000 1,720.00 / kg + Ongkos Angkut
3 Semen Warna Kg Rp. 13,100 / kg + Ongkos Angkut
4 Besi beton polos Kg Rp. 16,393 + Ongkos Angkut
5 Kawat Ikat / Kg Rp. 22,700
6 Plywood 4 mm / Lbr Rp. 85,200 + Ongkos Angkut
7 Keramik 40x40 / Kotak Rp. 12,633 75,800.00 + Ongkos Angkut
8 Keramik 20x20 / Kotak Rp. 3,032 75,800.00 + Ongkos Angkut
9 Paku Biasa / Kg Rp. 22,400
10 Paku Seng / Kg Rp. 31,300
11 Paku Sekrup / Kg Rp. 40,000
12 Tear Oil / Kg Rp. 35,300
13 Minyak Begesting Ltr Rp. 10,900
14 Batu Pecah / M3 Rp. 683,600 471.45 /kg + Ongkos Angkut
15 Pasir Pasangan / M3 Rp. 297,900 186.19 /kg + Ongkos Angkut
16 Tanah Urug / Pasir urug / M3 Rp. 195,600 + Ongkos Angkut
17 Batu Bata / Bh Rp. 900 + Ongkos Angkut
18 Paving Blok ( t = 8 cm ) / Bh Rp. 3,000
19 Air Bersih Ltr Rp. 53
20 Kayu Perancah / M3 Rp. 2,742,000 + Ongkos Angkut
21 Kayu Meranti / M3 Rp. 2,632,000 + Ongkos Angkut
22 Kayu Kapur / Bengkirai / Lembasung / M3 Rp. 3,117,000 + Ongkos Angkut
23 Hollow 50x50x2 /m Rp. 51,667
24 Seng Plat 3" x 6" BJLS 28 /m Rp. 19,600
25 Seng Gelombang 3" x 6" / Lbr Rp. 72,600
26 BRC 175x240 / Lbr Rp. 675,000
27 Pohon Palem Ekor Tupai / Pokok Rp. 525,000
28 Rumput Gajah Mini / M2 Rp. 77,100
29 Pohon Pucuk Merah / Pokok Rp. 178,000
30 Kran Air / Bh Rp. 30,100
31 Pipa PVC 3/4" /M Rp. 6,250 25,000.00
32 Pipa PVC 4" /M Rp. 52,750 211,000.00
33 Kloset Jongkok / Bh Rp. 249,200
34 Plamir / Kg Rp. 8,800
35 Cat Air / Kg Rp. 51,800
36 Cat Minyak / Kg Rp. 56,000
37 Menie / Kg Rp. 28,000
38 Kuas / Bh Rp. 18,200
39 Ampelas / Lembar Rp. 5,600
40 Thiner / Ltr Rp. 25,800
41 Kaca 3mm / M2 Rp. 119,400
42 Sealent / Tube Rp. 31,100
43 Heandle / Bh Rp. 20,000
44 Grendle / Bh Rp. 22,700
45 Kait Angin / Bh Rp. 11,300
46 Engsel 4" / Bh Rp. 22,700
47 Engsel 3" / Bh Rp. 22,700
48 Kunci Tanam / Bh Rp. 121,900
49 Gypsum Board / Lbr Rp. 32,700 + Ongkos Angkut
50 List Gypsum /M Rp. 31,100 + Ongkos Angkut
51 Tepung Gypsum / Kg Rp. 6,600 + Ongkos Angkut
52 Pancang Beton 10/10 400 / Btg Rp. 404,400 + Ongkos Angkut
53 BRC 175x240 / Lbr Rp. 675,000
54 Tiang BRC Galvanis / Btg Rp. 200,000
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : TAMAN BELAKANG BRI
PROP / KAB / KODYA : Kalimanta Utara / Kota Tarakan
JENIS PEKERJAAN Penyelenggaraan Sistem Manajemen Keselamatan Konstruksi (SMKK)
SATUAN PEMBAYARAN : Ls
###
REKAPITULASI
ESTIMATE ENGINEERING (EE)
PAKET KEGIATAN : PEMBUATAN TAMAN KELURAHAN PAMUSIAN
LOKASI : TARAKAN
TAHUN : 2020
JUMLAH BIAYA
No. URAIAN PEKERJAAN
( Rp. )
I PEKERJAAN PERSIAPAN Rp. 3,087,195.00 ###
II PEKERJAAN AREA TAMAN Rp. 178,730,996.60 ###
I PEKERJAAN PERSIAPAN
1 Plank Nama Proyek 1.00 ls 500,000.00 500,000.00
2 Dokumentasi 1.00 ls 750,000.00 750,000.00
3 K3 1.00 ls 1,837,195.00 1,837,195.00
Total I 3,087,195.00
Total II 178,730,996.60
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
A.2.3.1.1 Penggalian 1 m³ tanah biasa sedalam 1 m
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.750 110,000.00 82,500.00
2 Mandor L.04 OH 0.025 155,000.00 3,875.00
Jumlah Tenaga Kerja 86,375.00
B Bahan
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 86,375.00
E Overhead + Profit ( Contoh 15% ) 15% x D 12,956.25
F Harga Satuan Pekerjaan ( D + E ) 99,331.25
160
A.2.3.1.11 Pengurugan 1 m³ dengan tanah urug
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.300 110,000.00 33,000.00
2 Mandor L.04 OH 0.010 155,000.00 1,550.00
Jumlah Tenaga Kerja 34,550.00
B Bahan
1 Tanah Urug m³ 1.200 85,600.00 102,720.00
Jumlah Harga Bahan 102,720.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 137,270.00
E Overhead + Profit ( Contoh 15% ) 15% x D 20,590.50
F Harga Satuan Pekerjaan ( D + E ) 157,860.50
A Tenaga
1 Pekerja L.01 OH 0.300 110,000.00 33,000.00
2 Mandor L.04 OH 0.010 155,000.00 1,550.00
Jumlah Tenaga Kerja 34,550.00
B Bahan
1 Pasir Urug m³ 1.200 120,000.00 144,000.00
Jumlah Harga Bahan 144,000.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 178,550.00
E Overhead + Profit ( Contoh 15% ) 15% x D 26,782.50
F Harga Satuan Pekerjaan ( D + E ) 205,332.50
161
F Harga Satuan Pekerjaan ( D + E ) 251,016.25
162
A.3.2.1.2 Pemasangan 1 m' Kanstin uk. 15/20 30x50
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.500 110,000.00 55,000.00
2 Tukang Batu L.02 OH 0.050 134,000.00 6,700.00
3 Kepala Tukang L.03 OH 0.010 140,000.00 1,400.00
4 Mandor L.04 OH 0.001 155,000.00 155.00
Jumlah Tenaga Kerja 63,255.00
B Bahan
1 Semen (PC) zak 0.360 65,000.00 23,400.00
2 Pasir Pasang m2 0.001 160,000.00 160.00
3 Kanstin uk. 15/20 30x50 bh 2.000 51,666.67 103,333.33
Jumlah Harga Bahan 126,893.33
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 190,148.33
E Overhead + Profit ( Contoh 15% ) 15% x D 28,522.25
F Harga Satuan Pekerjaan ( D + E ) 218,670.58
163
A.4.1.1.7. Membuat 1 m³ beton mutu f 'c = 19,3 Mpa ( K - 225 ), Slump ( 12 ± 2 ) cm, w/c = 0.58
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.650 110,000.00 181,500.00
2 Tukang Batu L.02 OH 0.275 134,000.00 36,850.00
3 Kepala Tukang L.03 OH 0.028 140,000.00 3,920.00
4 Mandor L.04 OH 0.083 155,000.00 12,865.00
Jumlah Tenaga Kerja 235,135.00
B Bahan
1 Semen Portland Kg 371.000 1,300.00 482,300.00
2 Pasir Beton Kg 698.000 100.00 69,800.00
3 Kerikil ( Maks 30mm ) Kg 1,047.000 418.52 438,188.89
4 Air Liter 215.000 53.00 11,395.00
Jumlah Harga Bahan 1,001,683.89
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 1,236,818.89
E Overhead + Profit ( Contoh 15% ) 15% x D 185,522.83
F Harga Satuan Pekerjaan ( D + E ) 1,422,341.72
164
A.4.1.1.21. Pemasangan 1 m² bekisting untuk sloof
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.520 110,000.00 57,200.00
2 Tukang Kayu L.02 OH 0.260 134,000.00 34,840.00
3 Kepala Tukang L.03 OH 0.026 140,000.00 3,640.00
4 Mandor L.04 OH 0.026 155,000.00 4,030.00
Jumlah Tenaga Kerja 99,710.00
B Bahan
1 Kayu Kelas III m³ 0.045 2,522,000.00 113,490.00
2 Paku 5 - 10 cm Kg 0.300 22,400.00 6,720.00
3 Minyak Bekisting Liter 0.100 10,900.00 1,090.00
Jumlah Harga Bahan 121,300.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 221,010.00
E Overhead + Profit ( Contoh 15% ) 15% x D 33,151.50
F Harga Satuan Pekerjaan ( D + E ) 254,161.50
165
A.4.4.1. HARGA SATUAN PEKERJAAN PASANGAN DINDING
A.4.4.1.3. Pemasangan 1 m² dinding bata merah ( 9 x 9 x 18 ) cm tebal 1 batu campuran 1 SP : 4 PP
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.500 110,000.00 55,000.00
2 Tukang Batu L.02 OH 0.200 134,000.00 26,800.00
3 Kepala Tukang L.03 OH 0.020 140,000.00 2,800.00
4 Mandor L.04 OH 0.025 155,000.00 3,875.00
Jumlah Tenaga Kerja 88,475.00
B Bahan
1 Bata Merah m2 110.000 120,000.00 13,200,000.00
2 Semen Portland Kg 20.861 1,300.00 27,118.93
3 Pasir Pasang m³ 0.073 160,000.00 11,691.43
Jumlah Harga Bahan 13,238,810.36
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 13,327,285.36
E Overhead + Profit ( Contoh 15% ) 15% x D 1,999,092.80
F Harga Satuan Pekerjaan ( D + E ) 15,326,378.16
166
A.4.4.2. HARGA SATUAN PEKERJAAN PLESTERAN
A.4.4.2.4. Pemasangan 1 m² plesteran 1 SP : 4 PP tebal 15 mm
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.300 110,000.00 33,000.00
2 Tukang Batu L.02 OH 0.150 134,000.00 20,100.00
3 Kepala Tukang L.03 OH 0.015 140,000.00 2,100.00
4 Mandor L.04 OH 0.015 155,000.00 2,325.00
Jumlah Tenaga Kerja 57,525.00
B Bahan
1 Semen Portland Kg 6.240 1,300.00 8,112.00
2 Pasir Pasang m³ 0.024 160,000.00 3,840.00
Jumlah Harga Bahan 11,952.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 69,477.00
E Overhead + Profit ( Contoh 15% ) 15% x D 10,421.55
F Harga Satuan Pekerjaan ( D + E ) 79,898.55
167
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP
A.4.5.2.40. Pemasangan 1 m² atap metalroof
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.200 110,000.00 22,000.00
2 Tukang Kayu L.02 OH 0.100 134,000.00 13,400.00
3 Kepala Tukang L.03 OH 0.0100 140,000.00 1,400.00
4 Mandor L.04 OH 0.001 155,000.00 155.00
Jumlah Tenaga Kerja 36,955.00
B Bahan
1 Genteng Metal Lembar 1.020 91,000.00 92,820.00
2 Paku Biasa 2" - 5" Kg 0.200 22,400.00 4,480.00
Jumlah Harga Bahan 97,300.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 134,255.00
E Overhead + Profit ( Contoh 15% ) 15% x D 20,138.25
F Harga Satuan Pekerjaan ( D + E ) 154,393.25
168
A.4.6.1. HARGA SATUAN PEKERJAAN KAYU
A.4.6.1.13. Pemasangan 1 m³ konstruksi kuda-kuda konvensional, kayu kelas I, II dan III
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 4.000 110,000.00 440,000.00
2 Tukang Kayu L.02 OH 12.000 134,000.00 1,608,000.00
3 Kepala Tukang L.03 OH 1.2000 140,000.00 168,000.00
4 Mandor L.04 OH 0.200 155,000.00 31,000.00
Jumlah Tenaga Kerja 2,247,000.00
B Bahan
1 Balok Kayu m³ 1.1000 3,007,000.00 3,307,700.00
2 Besi Strip Tebal 5 mm Kg 15.000 -
3 Paku 12 cm Kg 5.600 22,400.00 125,440.00
Jumlah Harga Bahan 3,433,140.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 5,680,140.00
E Overhead + Profit ( Contoh 15% ) 15% x D 852,021.00
F Harga Satuan Pekerjaan ( D + E ) 6,532,161.00
A.4.6.1.19. Pemasangan 1 m² rangka langit-langit ( 50 x 100 ) cm, kayu kelas II atau III
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.150 110,000.00 16,500.00
2 Tukang Kayu L.02 OH 0.300 134,000.00 40,200.00
3 Kepala Tukang L.03 OH 0.0300 140,000.00 4,200.00
4 Mandor L.04 OH 0.075 155,000.00 11,625.00
Jumlah Tenaga Kerja 72,525.00
B Bahan
1 Kaso-kaso 5 x 7 cm m³ 0.0154 3,007,000.00 46,307.80
2 Paku 7 cm - 10 cm Kg 0.200 22,400.00 4,480.00
Jumlah Harga Bahan 50,787.80
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 123,312.80
E Overhead + Profit ( Contoh 15% ) 15% x D 18,496.92
F Harga Satuan Pekerjaan ( D + E ) 141,809.72
169
A.4.6.1.22. Pemasangan 1 m¹ listplank ukuran ( 3 x 30 ) cm, kayu kelas I atau kelas II
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.100 110,000.00 11,000.00
2 Tukang Kayu L.02 OH 0.200 134,000.00 26,800.00
3 Kepala Tukang L.03 OH 0.0200 140,000.00 2,800.00
4 Mandor L.04 OH 0.005 155,000.00 775.00
Jumlah Tenaga Kerja 41,375.00
B Bahan
1 Papan Kayu m³ 0.0110 3,007,000.00 33,077.00
2 Paku 5 cm dan 7 cm Kg 0.050 22,400.00 1,120.00
Jumlah Harga Bahan 34,197.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 75,572.00
E Overhead + Profit ( Contoh 15% ) 15% x D 11,335.80
F Harga Satuan Pekerjaan ( D + E ) 86,907.80
A.4.7.1.10. Pengecataan 1 m² tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
170
1 Pekerja L.01 OH 0.020 110,000.00 2,200.00
2 Tukang Cat L.02 OH 0.063 134,000.00 8,442.00
3 Kepala Tukang L.03 OH 0.0063 140,000.00 882.00
4 Mandor L.04 OH 0.003 155,000.00 465.00
Jumlah Tenaga Kerja 11,989.00
B Bahan
1 Plamir Kg 0.100 8,800.00 880.00
2 Cat Dasar Kg 0.100 83,000.00 8,300.00
3 Cat Penutup Kg 0.260 83,000.00 21,580.00
Jumlah Harga Bahan 30,760.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 42,749.00
E Overhead + Profit ( Contoh 15% ) 15% x D 6,412.35
F Harga Satuan Pekerjaan ( D + E ) 49,161.35
171
CV. BLUE Print Consultant
Planning, Supervision & Engineering Consultant
Office: Jl. Yos Sudarso RT. 002 Sebengkok Tarakan
e-mail : blueprintconsultant@yahoo.com
LOKASI : TARAKAN
TAHUN : 2020
II BAHAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET : PEMBUATAN TAMAN JUATA KERIKIL
PROP / KAB / KODYA : Kalimanta Utara / Kota Tarakan
JENIS PEKERJAAN Penyelenggaraan Sistem Manajemen Keselamatan Konstruksi (SMKK)
SATUAN PEMBAYARAN : Ls
175
A.2.3.1.11 Pengurugan 1 m³ dengan pasir urug
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.300 #REF! #REF!
2 Mandor L.04 OH 0.010 #REF! #REF!
Jumlah Tenaga Kerja #REF!
B Bahan
1 Pasir Urug m³ 1.200 #REF! #REF!
Jumlah Harga Bahan #REF!
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) #REF!
E Overhead + Profit ( Contoh 15% ) 15% x D #REF!
F Harga Satuan Pekerjaan ( D + E ) #REF!
176
A.3.2.1.2 Pemasangan 1 m' Kanstin uk. 15/20 30x50
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.500 #REF! #REF!
2 Tukang Batu L.02 OH 0.050 #REF! #REF!
3 Kepala Tukang L.03 OH 0.010 #REF! #REF!
4 Mandor L.04 OH 0.001 #REF! #REF!
Jumlah Tenaga Kerja #REF!
B Bahan
1 Semen (PC) zak 0.360 100,000.00 36,000.00
2 Pasir Pasang m2 0.001 #REF! #REF!
3 Kanstin uk. 15/20 30x50 bh 2.000 #REF! #REF!
Jumlah Harga Bahan #REF!
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) #REF!
E Overhead + Profit ( Contoh 15% ) 15% x D #REF!
F Harga Satuan Pekerjaan ( D + E ) #REF!
177
A.4.1.1.7. Membuat 1 m³ beton mutu f 'c = 19,3 Mpa ( K - 225 ), Slump ( 12 ± 2 ) cm, w/c = 0.58
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.650 #REF! #REF!
2 Tukang Batu L.02 OH 0.275 #REF! #REF!
3 Kepala Tukang L.03 OH 0.028 #REF! #REF!
4 Mandor L.04 OH 0.083 #REF! #REF!
Jumlah Tenaga Kerja #REF!
B Bahan
1 Semen Portland Kg 371.000 #REF! #REF!
2 Pasir Beton Kg 698.000 #REF! #REF!
3 Kerikil ( Maks 30mm ) Kg 1,047.000 #REF! #REF!
4 Air Liter 215.000 #REF! #REF!
Jumlah Harga Bahan #REF!
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) #REF!
E Overhead + Profit ( Contoh 15% ) 15% x D #REF!
F Harga Satuan Pekerjaan ( D + E ) #REF!
178
A.4.1.1.21. Pemasangan 1 m² bekisting untuk sloof
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.520 #REF! #REF!
2 Tukang Kayu L.02 OH 0.260 #REF! #REF!
3 Kepala Tukang L.03 OH 0.026 #REF! #REF!
4 Mandor L.04 OH 0.026 #REF! #REF!
Jumlah Tenaga Kerja #REF!
B Bahan
1 Kayu Kelas III m³ 0.045 #REF! #REF!
2 Paku 5 - 10 cm Kg 0.300 #REF! #REF!
3 Minyak Bekisting Liter 0.100 #REF! #REF!
Jumlah Harga Bahan #REF!
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) #REF!
E Overhead + Profit ( Contoh 15% ) 15% x D #REF!
F Harga Satuan Pekerjaan ( D + E ) #REF!
179
A.4.4.1. HARGA SATUAN PEKERJAAN PASANGAN DINDING
A.4.4.1.3. Pemasangan 1 m² dinding bata merah ( 9 x 9 x 18 ) cm tebal 1 batu campuran 1 SP : 4 PP
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.500 #REF! #REF!
2 Tukang Batu L.02 OH 0.200 #REF! #REF!
3 Kepala Tukang L.03 OH 0.020 #REF! #REF!
4 Mandor L.04 OH 0.025 #REF! #REF!
Jumlah Tenaga Kerja #REF!
B Bahan
1 Bata Merah m2 110.000 #REF! #REF!
2 Semen Portland Kg 20.861 #REF! #REF!
3 Pasir Pasang m³ 0.073 #REF! #REF!
Jumlah Harga Bahan #REF!
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) #REF!
E Overhead + Profit ( Contoh 15% ) 15% x D #REF!
F Harga Satuan Pekerjaan ( D + E ) #REF!
180
A.4.4.2. HARGA SATUAN PEKERJAAN PLESTERAN
A.4.4.2.4. Pemasangan 1 m² plesteran 1 SP : 4 PP tebal 15 mm
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.300 #REF! #REF!
2 Tukang Batu L.02 OH 0.150 #REF! #REF!
3 Kepala Tukang L.03 OH 0.015 #REF! #REF!
4 Mandor L.04 OH 0.015 #REF! #REF!
Jumlah Tenaga Kerja #REF!
B Bahan
1 Semen Portland Kg 6.240 #REF! #REF!
2 Pasir Pasang m³ 0.024 #REF! #REF!
Jumlah Harga Bahan #REF!
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) #REF!
E Overhead + Profit ( Contoh 15% ) 15% x D #REF!
F Harga Satuan Pekerjaan ( D + E ) #REF!
181
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.700 #REF! #REF!
2 Tukang Batu L.02 OH 0.350 #REF! #REF!
3 Kepala Tukang L.03 OH 0.035 #REF! #REF!
4 Mandor L.04 OH 0.035 #REF! #REF!
Jumlah Tenaga Kerja #REF!
B Bahan
1 Ubin Keramik Bh 26.500 -
2 Semen Portland Kg 10.400 #REF! #REF!
3 Pasir Pasang m³ 0.045 #REF! #REF!
4 Semen Warna Kg 1.620 #REF! #REF!
Jumlah Harga Bahan #REF!
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) #REF!
E Overhead + Profit ( Contoh 15% ) 15% x D #REF!
F Harga Satuan Pekerjaan ( D + E ) #REF!
182
Jumlah Tenaga Kerja #REF!
B Bahan
1 List Gypsum m 1.050 #REF! #REF!
2 Tepung gypsum Kg 0.150 #REF! #REF!
Jumlah Harga Bahan #REF!
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) #REF!
E Overhead + Profit ( Contoh 15% ) 15% x D #REF!
F Harga Satuan Pekerjaan ( D + E ) #REF!
183
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP
A.4.5.2.38. Pemasangan 1 m² atap seng gelombang
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.120 #REF! #REF!
2 Tukang Kayu L.02 OH 0.060 #REF! #REF!
3 Kepala Tukang L.03 OH 0.0060 #REF! #REF!
4 Mandor L.04 OH 0.006 #REF! #REF!
Jumlah Tenaga Kerja #REF!
B Bahan
1 Seng Gelombang 3" x 6" Lembar 0.700 #REF! #REF!
2 Paku Seng Kg 0.020 #REF! #REF!
Jumlah Harga Bahan #REF!
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) #REF!
E Overhead + Profit ( Contoh 15% ) 15% x D #REF!
F Harga Satuan Pekerjaan ( D + E ) #REF!
184
A.4.6.1. HARGA SATUAN PEKERJAAN KAYU
A.4.6.1.13. Pemasangan 1 m³ konstruksi kuda-kuda konvensional, kayu kelas I, II dan III
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 4.000 #REF! #REF!
2 Tukang Kayu L.02 OH 12.000 #REF! #REF!
3 Kepala Tukang L.03 OH 1.2000 #REF! #REF!
4 Mandor L.04 OH 0.200 #REF! #REF!
Jumlah Tenaga Kerja #REF!
B Bahan
1 Balok Kayu m³ 1.1000 #REF! #REF!
2 Besi Strip Tebal 5 mm Kg 15.000 -
3 Paku 12 cm Kg 5.600 #REF! #REF!
Jumlah Harga Bahan #REF!
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) #REF!
E Overhead + Profit ( Contoh 15% ) 15% x D #REF!
F Harga Satuan Pekerjaan ( D + E ) #REF!
185
4 Mandor L.04 OH 0.005 #REF! #REF!
Jumlah Tenaga Kerja #REF!
B Bahan
1 Papan Kayu m³ 0.0110 #REF! #REF!
2 Paku 5 cm dan 7 cm Kg 0.050 #REF! #REF!
Jumlah Harga Bahan #REF!
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) #REF!
E Overhead + Profit ( Contoh 15% ) 15% x D #REF!
F Harga Satuan Pekerjaan ( D + E ) #REF!
186
A.4.6.2.5. Pemasangan 1 buah engsel pintu
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.015 #REF! #REF!
2 Tukang Kayu L.02 OH 0.150 #REF! #REF!
3 Kepala Tukang L.03 OH 0.0150 #REF! #REF!
4 Mandor L.04 OH 0.0008 #REF! #REF!
Jumlah Tenaga Kerja #REF!
B Bahan
1 Engsel Pintu Buah 1.000 #REF! #REF!
Jumlah Harga Bahan #REF!
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) #REF!
E Overhead + Profit ( Contoh 15% ) 15% x D #REF!
F Harga Satuan Pekerjaan ( D + E ) #REF!
187
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) #REF!
E Overhead + Profit ( Contoh 15% ) 15% x D #REF!
F Harga Satuan Pekerjaan ( D + E ) #REF!
188
1 Pekerja L.01 OH 0.070 #REF! #REF!
2 Tukang Cat L.02 OH 0.009 #REF! #REF!
3 Kepala Tukang L.03 OH 0.006 #REF! #REF!
4 Mandor L.04 OH 0.003 #REF! #REF!
Jumlah Tenaga Kerja #REF!
B Bahan
1 Cat Menie Kg 0.200 #REF! #REF!
2 Plamir Kg 0.150 #REF! #REF!
3 Cat Dasar Kg 0.170 #REF! #REF!
4 Cat Penutup Kg 0.260 #REF! #REF!
5 Kuas Buah 0.010 #REF! #REF!
6 Pengencer Kg 0.030 #REF! #REF!
7 Ampelas Lembar 0.200 #REF! #REF!
Jumlah Harga Bahan #REF!
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) #REF!
E Overhead + Profit ( Contoh 15% ) 15% x D #REF!
F Harga Satuan Pekerjaan ( D + E ) #REF!
A.4.7.1.10. Pengecataan 1 m² tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.020 #REF! #REF!
2 Tukang Cat L.02 OH 0.063 #REF! #REF!
3 Kepala Tukang L.03 OH 0.0063 #REF! #REF!
4 Mandor L.04 OH 0.003 #REF! #REF!
Jumlah Tenaga Kerja #REF!
B Bahan
1 Plamir Kg 0.100 #REF! #REF!
2 Cat Dasar Kg 0.100 #REF! #REF!
3 Cat Penutup Kg 0.260 #REF! #REF!
Jumlah Harga Bahan #REF!
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) #REF!
E Overhead + Profit ( Contoh 15% ) 15% x D #REF!
F Harga Satuan Pekerjaan ( D + E ) #REF!
189
4 Mandor L.04 OH 0.160 #REF! #REF!
Jumlah Tenaga Kerja #REF!
B Bahan
1 Closet Jongkok Unit 1.000 #REF! #REF!
2 Semen Portland Kg 6.000 #REF! #REF!
3 Pasir Pasang m³ 0.010 #REF! #REF!
Jumlah Harga Bahan #REF!
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) #REF!
E Overhead + Profit ( Contoh 15% ) 15% x D #REF!
F Harga Satuan Pekerjaan ( D + E ) #REF!
190
A.5.1.1.32. Pemasangan 1 m¹ PVC type AW Ø4"
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.081 #REF! #REF!
2 Tukang Batu L.02 OH 0.135 #REF! #REF!
3 Kepala Tukang L.03 OH 0.0135 #REF! #REF!
4 Mandor L.04 OH 0.004 #REF! #REF!
Jumlah Tenaga Kerja #REF!
B Bahan
1 Pipa PVC Ø4" m¹ 1.200 #REF! #REF!
2 Perlengkapan % 35.000 #REF! #REF!
Jumlah Harga Bahan #REF!
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) #REF!
E Overhead + Profit ( Contoh 10% ) 10% x D #REF!
F Harga Satuan Pekerjaan ( D + E ) #REF!
191
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
A.2.2.1.9 Pembersihan 1 m² lapangan dan perataan
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.100 111,700.00 11,170.00
2 Mandor L.04 OH 0.050 160,090.00 8,004.50
Jumlah Tenaga Kerja 19,174.50
B Bahan
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 19,174.50
E Overhead + Profit ( Contoh 15% ) 15% x D 2,876.18
F Harga Satuan Pekerjaan ( D + E ) 22,050.68
A.2.2.1.9 1 M2 Pagar Sementara dari seng gelombang tinggi 2 M
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.200 111,700.00 22,340.00
2 Tukang OH 0.400 135,070.00 54,028.00
3 Kepala tukang OH 0.020 140,740.00 2,814.80
2 Mandor L.04 OH 0.020 160,090.00 3,201.80
Jumlah Tenaga Kerja 82,384.60
B Bahan
Dolken dia 10 cm Batang - 35,000.00 -
Kayu Balok 5/7 Kelas III m³ 0.072 2,522,000.00 181,584.00
Semen Kg - 2,000.00 -
Seng Gelombang Lbr 1.200 -
Pasir beton M3 - 187,900.00 -
Koral Beton M3 - 573,600.00 -
Meni besi Liter - 33,600.00 -
Paku Biasa Kg 0.020 159,900.00 3,198.00
Jumlah Harga Bahan 184,782.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 267,166.60
E Overhead + Profit ( Contoh 15% ) 15% x D 40,074.99
F Harga Satuan Pekerjaan ( D + E ) 307,241.59
192
A.2.2.1.9 1 M' Pengukuran dan pemasangan bowplank
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.100 111,700.00 11,170.00
2 Tukang OH 0.100 135,070.00 13,507.00
3 Kepala tukang OH 0.010 140,740.00 1,407.40
2 Mandor L.04 OH 0.050 160,090.00 8,004.50
Jumlah Tenaga Kerja 34,088.90
B Bahan
Kayu papan kelas III m³ 0.007 2,522,000.00 17,654.00
Kayu Balok 5/7 Kelas III m³ 0.012 2,522,000.00 30,264.00
Paku Biasa Kg 0.020 22,400.00 448.00
Jumlah Harga Bahan 48,366.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 82,454.90
E Overhead + Profit ( Contoh 15% ) 15% x D 12,368.24
F Harga Satuan Pekerjaan ( D + E ) 94,823.14
193
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 1,597,144.74
E Overhead + Profit ( Contoh 15% ) 15% x D 239,571.71
F Harga Satuan Pekerjaan ( D + E ) 1,836,716.45
194
1 Panel Beton Pracetak Lbr 0.969 - -
2 Kolom Beton Pracetak Btg 0.525 - -
3 Semen PC Kg 45.000 - -
4 Pasir Beton m³ 0.074 - -
5 Koral m³ 0.146 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
195
E Overhead + Profit ( Contoh 15% ) 15% x D 13,166.59
F Harga Satuan Pekerjaan ( D + E ) 100,943.84
196
A.2.3.1.2 Penggalian 1 m³ tanah biasa sedalam 2 m
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.900 111,700.00 100,530.00
2 Mandor L.04 OH 0.045 160,090.00 7,204.05
Jumlah Tenaga Kerja 107,734.05
B Bahan
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 107,734.05
E Overhead + Profit ( Contoh 15% ) 15% x D 16,160.11
F Harga Satuan Pekerjaan ( D + E ) 123,894.16
197
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.500 111,700.00 167,550.00
2 Mandor L.04 OH 0.060 160,090.00 9,605.40
Jumlah Tenaga Kerja 177,155.40
B Bahan
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 177,155.40
E Overhead + Profit ( Contoh 15% ) 15% x D 26,573.31
F Harga Satuan Pekerjaan ( D + E ) 203,728.71
A Tenaga
1 Pekerja L.01 OH 0.330 111,700.00 36,861.00
2 Mandor L.04 OH 0.010 160,090.00 1,600.90
Jumlah Tenaga Kerja 38,461.90
B Bahan
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 38,461.90
E Overhead + Profit ( Contoh 15% ) 15% x D 5,769.29
F Harga Satuan Pekerjaan ( D + E ) 44,231.19
198
A Tenaga
1 Pekerja L.01 OH 0.500 111,700.00 55,850.00
2 Mandor L.04 OH 0.050 160,090.00 8,004.50
Jumlah Tenaga Kerja 63,854.50
B Bahan
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 63,854.50
E Overhead + Profit ( Contoh 15% ) 15% x D 9,578.18
F Harga Satuan Pekerjaan ( D + E ) 73,432.68
A Tenaga
1 Pekerja L.01 OH 0.300 111,700.00 33,510.00
2 Mandor L.04 OH 0.010 160,090.00 1,600.90
Jumlah Tenaga Kerja 35,110.90
B Bahan
1 Pasir Urug m³ 1.200 85,600.00 102,720.00
Jumlah Harga Bahan 102,720.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 137,830.90
E Overhead + Profit ( Contoh 15% ) 15% x D 20,674.64
F Harga Satuan Pekerjaan ( D + E ) 158,505.54
199
A.2.3.1.14 Pengurugan 1 m³ sirtu padat
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.250 111,700.00 27,925.00
2 Mandor L.04 OH 0.025 160,090.00 4,002.25
Jumlah Tenaga Kerja 31,927.25
B Bahan
1 Sirrtu m³ 1.200 Err:509 Err:509
Jumlah Harga Bahan Err:509
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) Err:509
E Overhead + Profit ( Contoh 15% ) 15% x D Err:509
F Harga Satuan Pekerjaan ( D + E ) Err:509
200
B Bahan
1 Batu Belah m³ 1.200 447,900.00 537,480.00
2 Semen Portland Kg 202.000 2,000.00 404,000.00
3 Pasir Pasang m³ 0.485 187,900.00 91,131.50
Jumlah Harga Bahan 1,032,611.50
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 1,324,026.25
E Overhead + Profit ( Contoh 15% ) 15% x D 198,603.94
F Harga Satuan Pekerjaan ( D + E ) 1,522,630.19
201
F Harga Satuan Pekerjaan ( D + E ) 1,445,679.20
A Tenaga
1 Pekerja L.01 OH 1.500 111,700.00 167,550.00
2 Tukang Batu L.02 OH 0.750 135,070.00 101,302.50
3 Kepala Tukang L.03 OH 0.075 140,740.00 10,555.50
4 Mandor L.04 OH 0.075 160,090.00 12,006.75
Jumlah Tenaga Kerja 291,414.75
B Bahan
1 Batu Belah m³ 1.200 447,900.00 537,480.00
2 Semen Portland Kg 91.000 2,000.00 182,000.00
3 Pasir Pasang m³ 0.584 187,900.00 109,733.60
Jumlah Harga Bahan 829,213.60
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 1,120,628.35
E Overhead + Profit ( Contoh 15% ) 15% x D 168,094.25
F Harga Satuan Pekerjaan ( D + E ) 1,288,722.60
202
3 Kepala Tukang L.03 OH 0.075 - -
4 Mandor L.04 OH 0.075 - -
Jumlah Tenaga Kerja -
B Bahan
1 Batu Belah m³ 1.200 - -
1 Kapur m³ 0.170 - -
2 Semen Portland Kg 0.170 - -
3 Pasir Pasang m³ 0.340 - -
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
203
3 Pasir Pasang m³ 0.523 - -
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A Tenaga
1 Pekerja L.01 OH 0.780 111,700.00 87,126.00
2 Tukang Batu L.02 OH 0.390 135,070.00 52,677.30
3 Kepala Tukang L.03 OH 0.039 140,740.00 5,488.86
4 Mandor L.04 OH 0.039 160,090.00 6,243.51
Jumlah Tenaga Kerja 151,535.67
B Bahan
1 Batu Belah m³ 1.200 447,900.00 537,480.00
2 Pasir Urug m³ 0.432 85,600.00 36,979.20
Jumlah Harga Bahan 574,459.20
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 725,994.87
E Overhead + Profit ( Contoh 15% ) 15% x D 108,899.23
F Harga Satuan Pekerjaan ( D + E ) 834,894.10
A.3.2.1.10 Pemasangan 1 m³ pondasi siklop, 60% beton campuran 1 SP : 2 PB : 3 Kr dan 40% batu belah
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 3.400 111,700.00 379,780.00
2 Tukang Batu L.02 OH 0.850 135,070.00 114,809.50
3 Kepala Tukang L.03 OH 0.085 140,740.00 11,962.90
4 Mandor L.04 OH 0.170 160,090.00 27,215.30
Jumlah Tenaga Kerja 533,767.70
B Bahan
1 Batu Belah m³ 0.480 447,900.00 214,992.00
2 Semen Portland Kg 194.000 2,000.00 388,000.00
3 Pasir Beton m³ 0.312 187,900.00 58,624.80
4 Kerikil m³ 0.468 256,800.00 120,182.40
5 Besi Beton Kg 126.000 15,900.00 2,003,400.00
6 Kawat Beton Kg 1.800 22,700.00 40,860.00
Jumlah Harga Bahan 2,826,059.20
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 3,359,826.90
E Overhead + Profit ( Contoh 15% ) 15% x D 503,974.04
F Harga Satuan Pekerjaan ( D + E ) 3,863,800.94
204
A.3.2.1.11 Pemasangan 1 m³ pondasi, sumuran, diameter 100 cm
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 2.400 111,700.00 268,080.00
2 Tukang Batu L.02 OH 0.800 135,070.00 108,056.00
3 Kepala Tukang L.03 OH 0.080 140,740.00 11,259.20
4 Mandor L.04 OH 0.119 160,090.00 19,050.71
Jumlah Tenaga Kerja 406,445.91
B Bahan
1 Batu Belah m³ 0.450 447,900.00 201,555.00
2 Semen Portland Kg 194.000 2,000.00 388,000.00
3 Pasir Beton m³ 0.312 187,900.00 58,624.80
4 Kerikil m³ 0.468 256,800.00 120,182.40
Jumlah Harga Bahan 768,362.20
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 1,174,808.11
E Overhead + Profit ( Contoh 15% ) 15% x D 176,221.22
F Harga Satuan Pekerjaan ( D + E ) 1,351,029.33
205
A.4.1.1. HARGA SATUAN PEKERJAAN BETON
A.4.1.1.1. Membuat 1 m³ beton mutu f 'c = 7,4 Mpa ( K - 100 ), Slump (12 ± 2 ) cm, w/c = 0.87
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.650 111,700.00 184,305.00
2 Tukang Batu L.02 OH 0.275 135,070.00 37,144.25
3 Kepala Tukang L.03 OH 0.028 140,740.00 3,940.72
4 Mandor L.04 OH 0.083 160,090.00 13,287.47
Jumlah Tenaga Kerja 238,677.44
B Bahan
1 Semen Portland Kg 247.000 2,000.00 494,000.00
2 Pasir Beton Kg 869.000 117.44 102,053.19
3 Kerikil ( Maks 30mm ) Kg 999.000 395.59 395,190.62
4 Air Liter 215.000 53.00 11,395.00
Jumlah Harga Bahan 1,002,638.81
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 1,241,316.25
E Overhead + Profit ( Contoh 15% ) 15% x D 186,197.44
F Harga Satuan Pekerjaan ( D + E ) 1,427,513.69
A.4.1.1.2. Membuat 1 m³ beton mutu f 'c = 9,8 Mpa ( K - 125 ), Slump (12 ± 2 ) cm, w/c = 0.78
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.650 111,700.00 184,305.00
2 Tukang Batu L.02 OH 0.275 135,070.00 37,144.25
3 Kepala Tukang L.03 OH 0.028 140,740.00 3,940.72
4 Mandor L.04 OH 0.083 160,090.00 13,287.47
Jumlah Tenaga Kerja 238,677.44
B Bahan
1 Semen Portland Kg 276.000 2,000.00 552,000.00
2 Pasir Beton Kg 828.000 117.44 97,238.25
3 Kerikil ( Maks 30mm ) Kg 1,012.000 395.59 400,333.24
4 Air Liter 215.000 53.00 11,395.00
Jumlah Harga Bahan 1,060,966.49
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 1,299,643.93
E Overhead + Profit ( Contoh 15% ) 15% x D 194,946.59
F Harga Satuan Pekerjaan ( D + E ) 1,494,590.52
A.4.1.1.3. Membuat 1 m³ beton mutu f 'c = 12,2 Mpa ( K - 150 ), Slump (12 ± 2 ) cm, w/c = 0.72
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
206
A Tenaga
1 Pekerja L.01 OH 1.650 111,700.00 184,305.00
2 Tukang Batu L.02 OH 0.275 135,070.00 37,144.25
3 Kepala Tukang L.03 OH 0.028 140,740.00 3,940.72
4 Mandor L.04 OH 0.083 160,090.00 13,287.47
Jumlah Tenaga Kerja 238,677.44
B Bahan
1 Semen Portland Kg 299.000 2,000.00 598,000.00
2 Pasir Beton Kg 799.000 117.44 93,832.56
3 Kerikil ( Maks 30mm ) Kg 1,017.000 395.59 402,311.17
4 Air Liter 215.000 53.00 11,395.00
Jumlah Harga Bahan 1,105,538.73
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 1,344,216.17
E Overhead + Profit ( Contoh 15% ) 15% x D 201,632.43
F Harga Satuan Pekerjaan ( D + E ) 1,545,848.60
CATATAN :
Bobot isi pasir = 1.400 Kg/m³, bobot isi kerikil = 1.350 Kg/m³, buckling factor pasir = 20%
A.4.1.1.4. Membuat 1 m³ lantai kerja beton mutu f 'c = 7,4 Mpa ( K - 100 ), Slump ( 3 - 6 ) cm, w/c = 0.87
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.650 111,700.00 184,305.00
2 Tukang Batu L.02 OH 0.275 135,070.00 37,144.25
3 Kepala Tukang L.03 OH 0.028 140,740.00 3,940.72
4 Mandor L.04 OH 0.083 160,090.00 13,287.47
Jumlah Tenaga Kerja 238,677.44
B Bahan
1 Semen Portland Kg 299.000 2,000.00 598,000.00
2 Pasir Beton Kg 799.000 117.44 93,832.56
3 Kerikil ( Maks 30mm ) Kg 1,017.000 395.59 402,311.17
4 Air Liter 215.000 53.00 11,395.00
Jumlah Harga Bahan 1,105,538.73
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 1,344,216.17
E Overhead + Profit ( Contoh 15% ) 15% x D 201,632.43
F Harga Satuan Pekerjaan ( D + E ) 1,545,848.60
A.4.1.1.5. Membuat 1 m³ beton mutu f 'c = 14,5 Mpa ( K - 175 ), Slump ( 12 ± 2 ) cm, w/c = 0.66
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.650 111,700.00 184,305.00
2 Tukang Batu L.02 OH 0.275 135,070.00 37,144.25
207
3 Kepala Tukang L.03 OH 0.028 140,740.00 3,940.72
4 Mandor L.04 OH 0.083 160,090.00 13,287.47
Jumlah Tenaga Kerja 238,677.44
B Bahan
1 Semen Portland Kg 326.000 2,000.00 652,000.00
2 Pasir Beton Kg 760.000 117.44 89,252.50
3 Kerikil ( Maks 30mm ) Kg 1,029.000 424.89 437,210.67
4 Air Liter 215.000 53.00 11,395.00
Jumlah Harga Bahan 1,189,858.17
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 1,428,535.61
E Overhead + Profit ( Contoh 15% ) 15% x D 214,280.34
F Harga Satuan Pekerjaan ( D + E ) 1,642,815.95
A.4.1.1.6. Membuat 1 m³ beton mutu f 'c = 16,9 Mpa ( K - 200 ), Slump ( 12 ± 2 ) cm, w/c = 0.61
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.650 111,700.00 184,305.00
2 Tukang Batu L.02 OH 0.275 135,070.00 37,144.25
3 Kepala Tukang L.03 OH 0.028 140,740.00 3,940.72
4 Mandor L.04 OH 0.083 160,090.00 13,287.47
Jumlah Tenaga Kerja 238,677.44
B Bahan
1 Semen Portland Kg 352.000 2,000.00 704,000.00
2 Pasir Beton Kg 731.000 117.44 85,846.81
3 Kerikil ( Maks 30mm ) Kg 1,031.000 424.89 438,060.44
4 Air Liter 215.000 53.00 11,395.00
Jumlah Harga Bahan 1,239,302.26
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 1,477,979.70
E Overhead + Profit ( Contoh 15% ) 15% x D 221,696.95
F Harga Satuan Pekerjaan ( D + E ) 1,699,676.65
A.4.1.1.7. Membuat 1 m³ beton mutu f 'c = 19,3 Mpa ( K - 225 ), Slump ( 12 ± 2 ) cm, w/c = 0.58
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.650 111,700.00 184,305.00
2 Tukang Batu L.02 OH 0.275 135,070.00 37,144.25
3 Kepala Tukang L.03 OH 0.028 140,740.00 3,940.72
4 Mandor L.04 OH 0.083 160,090.00 13,287.47
Jumlah Tenaga Kerja 238,677.44
B Bahan
1 Semen Portland Kg 371.000 2,000.00 742,000.00
2 Pasir Beton Kg 698.000 117.44 81,971.38
3 Kerikil ( Maks 30mm ) Kg 1,047.000 424.89 444,858.67
208
4 Air Liter 215.000 53.00 11,395.00
Jumlah Harga Bahan 1,280,225.04
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 1,518,902.48
E Overhead + Profit ( Contoh 15% ) 15% x D 227,835.37
F Harga Satuan Pekerjaan ( D + E ) 1,746,737.85
A.4.1.1.8. Membuat 1 m³ beton mutu f 'c = 21,7 Mpa ( K - 250 ), Slump ( 12 ± 2 ) cm, w/c = 0.56
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.650 111,700.00 184,305.00
2 Tukang Batu L.02 OH 0.275 135,070.00 37,144.25
3 Kepala Tukang L.03 OH 0.028 140,740.00 3,940.72
4 Mandor L.04 OH 0.083 160,090.00 13,287.47
Jumlah Tenaga Kerja 238,677.44
B Bahan
1 Semen Portland Kg 384.000 2,000.00 768,000.00
2 Pasir Beton Kg 692.000 117.44 81,266.75
3 Kerikil ( Maks 30mm ) Kg 1,039.000 424.89 441,459.56
4 Air Liter 215.000 53.00 11,395.00
Jumlah Harga Bahan 1,302,121.31
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 1,540,798.75
E Overhead + Profit ( Contoh 10% ) 10% x D 154,079.87
F Harga Satuan Pekerjaan ( D + E ) 1,694,878.62
A.4.1.1.9. Membuat 1 m³ beton mutu f 'c = 24,0 Mpa ( K - 275 ), Slump ( 12 ± 2 ) cm, w/c = 0.53
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.650 111,700.00 184,305.00
2 Tukang Batu L.02 OH 0.275 135,070.00 37,144.25
3 Kepala Tukang L.03 OH 0.028 140,740.00 3,940.72
4 Mandor L.04 OH 0.083 160,090.00 13,287.47
Jumlah Tenaga Kerja 238,677.44
B Bahan
1 Semen Portland Kg 406.000 2,000.00 812,000.00
2 Pasir Beton Kg 684.000 117.44 80,327.25
3 Kerikil ( Maks 30mm ) Kg 1,026.000 424.89 435,936.00
4 Air Liter 215.000 53.00 11,395.00
Jumlah Harga Bahan 1,339,658.25
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 1,578,335.69
E Overhead + Profit ( Contoh 15% ) 15% x D 236,750.35
F Harga Satuan Pekerjaan ( D + E ) 1,815,086.04
209
A.4.1.1.10. Membuat 1 m³ beton mutu f 'c = 26,4 Mpa ( K - 300 ), Slump ( 12 ± 2 ) cm, w/c = 0.52
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.650 111,700.00 184,305.00
2 Tukang Batu L.02 OH 0.275 135,070.00 37,144.25
3 Kepala Tukang L.03 OH 0.028 140,740.00 3,940.72
4 Mandor L.04 OH 0.083 160,090.00 13,287.47
Jumlah Tenaga Kerja 238,677.44
B Bahan
1 Semen Portland Kg 413.000 2,000.00 826,000.00
2 Pasir Beton Kg 681.000 117.44 79,974.94
3 Kerikil ( Maks 30mm ) Kg 1,021.000 424.89 433,811.56
4 Air Liter 215.000 53.00 11,395.00
Jumlah Harga Bahan 1,351,181.49
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 1,589,858.93
E Overhead + Profit ( Contoh 15% ) 15% x D 238,478.84
F Harga Satuan Pekerjaan ( D + E ) 1,828,337.77
A.4.1.1.11. Membuat 1 m³ beton mutu f 'c = 28,8 Mpa ( K - 325 ), Slump ( 12 ± 2 ) cm, w/c = 0.49
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 2.100 111,700.00 234,570.00
2 Tukang Batu L.02 OH 0.350 135,070.00 47,274.50
3 Kepala Tukang L.03 OH 0.035 140,740.00 4,925.90
4 Mandor L.04 OH 0.105 160,090.00 16,809.45
Jumlah Tenaga Kerja 303,579.85
B Bahan
1 Semen Portland Kg 439.000 2,000.00 878,000.00
2 Pasir Beton Kg 670.000 117.44 78,683.13
3 Kerikil ( Maks 30mm ) Kg 1,006.000 424.89 427,438.22
4 Air Liter 215.000 53.00 11,395.00
Jumlah Harga Bahan 1,395,516.35
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 1,699,096.20
E Overhead + Profit ( Contoh 15% ) 15% x D 254,864.43
F Harga Satuan Pekerjaan ( D + E ) 1,953,960.63
A.4.1.1.12. Membuat 1 m³ beton mutu f 'c = 31,2 Mpa ( K - 350 ), Slump ( 12 ± 2 ) cm, w/c = 0.48
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 2.100 111,700.00 234,570.00
210
2 Tukang Batu L.02 OH 0.350 135,070.00 47,274.50
3 Kepala Tukang L.03 OH 0.035 140,740.00 4,925.90
4 Mandor L.04 OH 0.105 160,090.00 16,809.45
Jumlah Tenaga Kerja 303,579.85
B Bahan
1 Semen Portland Kg 448.000 2,000.00 896,000.00
2 Pasir Beton Kg 667.000 117.44 78,330.81
3 Kerikil ( Maks 30mm ) Kg 1,000.000 424.89 424,888.89
4 Air Liter 215.000 53.00 11,395.00
Jumlah Harga Bahan 1,410,614.70
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 1,714,194.55
E Overhead + Profit ( Contoh 15% ) 15% x D 257,129.18
F Harga Satuan Pekerjaan ( D + E ) 1,971,323.73
211
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
212
A.4.1.1.17. Pembesian 10 Kg dengan besi ulir
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.070 111,700.00 7,819.00
2 Tukang Besi L.02 OH 0.070 135,070.00 9,454.90
3 Kepala Tukang L.03 OH 0.007 140,740.00 985.18
4 Mandor L.04 OH 0.004 160,090.00 640.36
Jumlah Tenaga Kerja 18,899.44
B Bahan
1 Besi Beton Ulir Kg 10.500 17,000.00 178,500.00
2 Kawat Beton Kg 0.150 22,700.00 3,405.00
Jumlah Harga Bahan 181,905.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 200,804.44
E Overhead + Profit ( Contoh 15% ) 15% x D 30,120.67
F Harga Satuan Pekerjaan ( D + E ) 230,925.11
Harga Satuan Pekerjaan /1 kg besi F/10 23,092.51
213
3 Kepala Tukang L.03 OH 0.005 - -
4 Mandor L.04 OH 0.003 - -
Jumlah Tenaga Kerja -
B Bahan
1 Besi Beton ( Polos / Ulir ) Kg 10.500 - -
2 Kawat Beton Kg 0.100 - -
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
214
A.4.1.1.20. Pemasangan 1 m² bekisting untuk pondasi
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.520 111,700.00 58,084.00
2 Tukang Kayu L.02 OH 0.260 135,070.00 35,118.20
3 Kepala Tukang L.03 OH 0.026 140,740.00 3,659.24
4 Mandor L.04 OH 0.026 160,090.00 4,162.34
Jumlah Tenaga Kerja 101,023.78
B Bahan
1 Kayu Kelas III m³ 0.040 2,522,000.00 100,880.00
2 Paku 5 - 10 cm Kg 0.300 22,400.00 6,720.00
3 Minyak Bekisting Liter 0.100 10,900.00 1,090.00
Jumlah Harga Bahan 108,690.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 209,713.78
E Overhead + Profit ( Contoh 15% ) 15% x D 31,457.07
F Harga Satuan Pekerjaan ( D + E ) 241,170.85
215
A.4.1.1.22. Pemasangan 1 m² bekisting untuk kolom
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.660 111,700.00 73,722.00
2 Tukang Kayu L.02 OH 0.330 135,070.00 44,573.10
3 Kepala Tukang L.03 OH 0.033 140,740.00 4,644.42
4 Mandor L.04 OH 0.003 160,090.00 480.27
Jumlah Tenaga Kerja 123,419.79
B Bahan
1 Kayu Kelas III m³ 0.040 2,522,000.00 100,880.00
2 Paku 5 - 12 cm Kg 0.400 22,400.00 8,960.00
3 Minyak Bekisting Liter 0.200 10,900.00 2,180.00
4 Balok Kayu Kelas II m³ 0.015 3,007,000.00 45,105.00
5 Plywood Tebal 9 mm Lembar 0.350 159,900.00 55,965.00
6 Dolken Kayu Ø 8 - 10 cm -
Batang 2.000 35,000.00 70,000.00
Panjang 4 m
Jumlah Harga Bahan 283,090.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 406,509.79
E Overhead + Profit ( Contoh 15% ) 15% x D 60,976.47
F Harga Satuan Pekerjaan ( D + E ) 467,486.26
216
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.660 111,700.00 73,722.00
2 Tukang Kayu L.02 OH 0.330 135,070.00 44,573.10
3 Kepala Tukang L.03 OH 0.033 140,740.00 4,644.42
4 Mandor L.04 OH 0.033 160,090.00 5,282.97
Jumlah Tenaga Kerja 128,222.49
B Bahan
1 Kayu Kelas III m³ 0.040 2,522,000.00 100,880.00
2 Paku 5 - 12 cm Kg 0.400 22,400.00 8,960.00
3 Minyak Bekisting Liter 0.200 10,900.00 2,180.00
4 Balok Kayu Kelas II m³ 0.015 3,007,000.00 45,105.00
5 Plywood Tebal 9 mm Lembar 0.350 159,900.00 55,965.00
6 Dolken Kayu Galam Ø 8 - 10
Batang 6.000 35,000.00 210,000.00
cm - Panjang 4 m
Jumlah Harga Bahan 423,090.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 551,312.49
E Overhead + Profit ( Contoh 15% ) 15% x D 82,696.87
F Harga Satuan Pekerjaan ( D + E ) 634,009.36
217
A.4.1.1.25. Pemasangan 1 m² bekisting untuk dinding
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.660 111,700.00 73,722.00
2 Tukang Kayu L.02 OH 0.330 135,070.00 44,573.10
3 Kepala Tukang L.03 OH 0.033 140,740.00 4,644.42
4 Mandor L.04 OH 0.033 160,090.00 5,282.97
Jumlah Tenaga Kerja 128,222.49
B Bahan
1 Kayu Kelas III m³ 0.030 2,522,000.00 75,660.00
2 Paku 5 - 12 cm Kg 0.400 22,400.00 8,960.00
3 Minyak Bekisting Liter 0.200 10,900.00 2,180.00
4 Balok Kayu Kelas II m³ 0.020 3,007,000.00 60,140.00
5 Plywood Tebal 9 mm Lembar 0.350 159,900.00 55,965.00
6 Dolken Kayu Ø 8 - 10 cm -
Batang 3.000 35,000.00 105,000.00
Panjang 4 m
7 Panjang Jarak Bekisting /
Buah 4.000 - -
Spacer
Jumlah Harga Bahan 307,905.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 436,127.49
E Overhead + Profit ( Contoh 15% ) 15% x D 65,419.12
F Harga Satuan Pekerjaan ( D + E ) 501,546.61
218
A.4.1.1.27. Pemasangan 1 m² jembatan untuk pengecoran beton
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.150 111,700.00 16,755.00
2 Tukang Kayu L.02 OH 0.050 135,070.00 6,753.50
3 Kepala Tukang L.03 OH 0.005 140,740.00 703.70
4 Mandor L.04 OH 0.008 160,090.00 1,280.72
Jumlah Tenaga Kerja 25,492.92
B Bahan
1 Kayu Kelas III ( Papan ) m³ 0.026 2,522,000.00 66,580.80
2 Paku 5 - 12 cm Kg 0.600 22,400.00 13,440.00
3 Dolken Kayu Ø 8 - 10 cm -
Batang 0.500 35,000.00 17,500.00
Panjang 4 m
Jumlah Harga Bahan 97,520.80
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 123,013.72
E Overhead + Profit ( Contoh 15% ) 15% x D 18,452.06
F Harga Satuan Pekerjaan ( D + E ) 141,465.78
219
A.4.1.1.29. Membuat 1 m³ sloof beton bertulang ( 200 Kg besi + Bekisting )
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 5.650 111,700.00 631,105.00
2 Tukang Batu L.02 OH 0.275 135,070.00 37,144.25
3 Tukang Kayu L.02 OH 1.560 135,070.00 210,709.20
4 Tukang Besi L.02 OH 1.400 135,070.00 189,098.00
5 Kepala Tukang L.03 OH 0.323 140,740.00 45,459.02
6 Mandor L.04 OH 0.283 160,090.00 45,305.47
Jumlah Tenaga Kerja 1,158,820.94
B Bahan
1 Kayu Kelas III m³ 0.270 2,522,000.00 680,940.00
2 Paku 5 - 12 cm Kg 2.000 22,400.00 44,800.00
3 Minyak Bekisting Liter 0.600 10,900.00 6,540.00
4 Besi Beton Polos Kg 210.000 15,900.00 3,339,000.00
5 Kawat Beton Kg 3.000 22,700.00 68,100.00
6 Semen Portland Kg 336.000 2,000.00 672,000.00
7 Pasir Beton m³ 0.540 187,900.00 101,466.00
8 Kerikil m³ 0.810 573,600.00 464,616.00
Jumlah Harga Bahan 5,377,462.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 6,536,282.94
E Overhead + Profit ( Contoh 15% ) 15% x D 980,442.44
F Harga Satuan Pekerjaan ( D + E ) 7,516,725.38
220
11 Dolken Kayu Ø (8 - 10) cm, 35,000.00 700,000.00
Batang 20.000
Panjang 4m
Jumlah Harga Bahan 9,179,632.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 10,624,003.74
E Overhead + Profit ( Contoh 15% ) 15% x D 1,593,600.56
F Harga Satuan Pekerjaan ( D + E ) 12,217,604.30
221
6 Mandor L.04 OH 0.265 160,090.00 42,423.85
Jumlah Tenaga Kerja 1,026,288.70
B Bahan
1 Kayu Kelas III m³ 0.320 2,522,000.00 807,040.00
2 Paku 5 - 12 cm Kg 3.200 22,400.00 71,680.00
3 Minyak Bekisting Liter 1.600 10,900.00 17,440.00
4 Besi Beton Polos Kg 157.500 15,900.00 2,504,250.00
5 Kawat Beton Kg 2.250 22,700.00 51,075.00
6 Semen Portland Kg 336.000 2,000.00 672,000.00
7 Pasir Beton m³ 0.540 187,900.00 101,466.00
8 Kerikil m³ 0.810 573,600.00 464,616.00
9 Kayu Kelas II ( Balok ) m³ 0.120 3,007,000.00 360,840.00
10 Plywood 9 mm Lembar 2.800 159,900.00 447,720.00
11 Dolken Kayu Ø (8 - 10) cm, 35,000.00 1,120,000.00
Batang 32.000
Panjang 4m - -
Jumlah Harga Bahan 6,618,127.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 7,644,415.70
E Overhead + Profit ( Contoh 15% ) 15% x D 1,146,662.36
F Harga Satuan Pekerjaan ( D + E ) 8,791,078.06
222
F Harga Satuan Pekerjaan ( D + E ) 8,374,890.50
223
5 Kawat Beton Kg 0.450 22,700.00 10,215.00
6 Semen Portland Kg 4.000 2,000.00 8,000.00
7 Pasir Beton m³ 0.006 187,900.00 1,127.40
8 Kerikil m³ 0.009 573,600.00 5,162.40
Jumlah Harga Bahan 77,472.80
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 128,535.50
E Overhead + Profit ( Contoh 15% ) 15% x D 19,280.33
F Harga Satuan Pekerjaan ( D + E ) 147,815.83
224
Jumlah Tenaga Kerja 19,118.05
B Bahan
1 Semen Portland Kg 26.080 2,000.00 52,160.00
2 Pasir Beton Kg 60.800 187,900.00 11,424,320.00
3 Kerikil ( Maks 30mm ) Kg 82.320 573,600.00 47,218,752.00
4 Air Liter 17.200 53.00 911.60
Jumlah Harga Bahan 58,696,143.60
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 58,715,261.65
E Overhead + Profit ( Contoh 15% ) 15% x D 8,807,289.25
F Harga Satuan Pekerjaan ( D + E ) 67,522,550.90
A.4.1.2.2. Pembuatan 1 m² lahan produksi tebal 10 cm beton f'c 14,5 Mpa ( K - 175 ) slump ( 12 ± 2 ) cm
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.165 111,700.00 18,430.50
2 Tukang Batu L.02 OH 0.028 135,070.00 3,781.96
3 Kepala Tukang L.03 OH 0.003 140,740.00 422.22
4 Mandor L.04 OH 0.008 160,090.00 1,280.72
Jumlah Tenaga Kerja 23,915.40
B Bahan
1 Semen Portland Kg 32.600 2,000.00 65,200.00
2 Pasir Beton Kg 76.000 187,900.00 14,280,400.00
3 Kerikil ( Maks 30mm ) Kg 102.900 573,600.00 59,023,440.00
4 Air Liter 21.500 53.00 1,139.50
Jumlah Harga Bahan 73,370,179.50
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 73,394,094.90
E Overhead + Profit ( Contoh 15% ) 15% x D 11,009,114.24
F Harga Satuan Pekerjaan ( D + E ) 84,403,209.14
A.4.1.2.3. Pembuatan 1 m² lahan produksi tebal 12 cm beton f'c 14,5 Mpa ( K - 175 ) slump ( 12 ± 2 ) cm
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.198 111,700.00 22,116.60
2 Tukang Batu L.02 OH 0.033 135,070.00 4,457.31
3 Kepala Tukang L.03 OH 0.003 140,740.00 422.22
4 Mandor L.04 OH 0.010 160,090.00 1,600.90
Jumlah Tenaga Kerja 28,597.03
B Bahan
1 Semen Portland Kg 32.120 2,000.00 64,240.00
2 Pasir Beton Kg 91.200 187,900.00 17,136,480.00
3 Kerikil ( Maks 30mm ) Kg 123.480 573,600.00 70,828,128.00
4 Air Liter 25.800 53.00 1,367.40
Jumlah Harga Bahan 88,030,215.40
225
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 88,058,812.43
E Overhead + Profit ( Contoh 15% ) 15% x D 13,208,821.86
F Harga Satuan Pekerjaan ( D + E ) 101,267,634.29
A.4.1.2.4. Pembuatan 1 m² lahan produksi tebal 15 cm beton f'c 14,5 Mpa ( K - 175 ) slump ( 12 ± 2 ) cm
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.248 111,700.00 27,701.60
2 Tukang Batu L.02 OH 0.041 135,070.00 5,537.87
3 Kepala Tukang L.03 OH 0.004 140,740.00 562.96
4 Mandor L.04 OH 0.013 160,090.00 2,081.17
Jumlah Tenaga Kerja 35,883.60
B Bahan
1 Semen Portland Kg 48.900 2,000.00 97,800.00
2 Pasir Beton Kg 114.000 187,900.00 21,420,600.00
3 Kerikil ( Maks 30mm ) Kg 154.350 573,600.00 88,535,160.00
4 Air Liter 32.250 53.00 1,709.25
Jumlah Harga Bahan 110,055,269.25
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 110,091,152.85
E Overhead + Profit ( Contoh 15% ) 15% x D 16,513,672.93
F Harga Satuan Pekerjaan ( D + E ) 126,604,825.78
226
F Harga Satuan Pekerjaan ( D + E ) -
A.4.1.2.8. Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
227
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.053 - -
2 TukangKayu L.02 OH 0.018 - -
4 Mandor L.04 OH 0.005 - -
Jumlah Tenaga Kerja -
B Bahan
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.089 - -
2 TukangKayu L.02 OH 0.030 - -
4 Mandor L.04 OH 0.005 - -
Jumlah Tenaga Kerja -
B Bahan
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen kolom beton pracetak
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.071 - -
2 TukangKayu L.02 OH 0.024 - -
4 Mandor L.04 OH 0.005 - -
Jumlah Tenaga Kerja -
B Bahan
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
228
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.064 - -
2 Tukang Batu L.02 OH 0.244 - -
3 Tukang Vibrator L.02 OH 0.128 - -
4 Kepala Tukang L.03 OH 0.034 - -
5 Mandor L.04 OH 0.073 - -
Jumlah Tenaga Kerja -
B Bahan
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
229
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
230
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.083 - -
2 Tukang Batu L.02 OH 0.083 - -
3 Operator Crane L.02 OH 0.166 - -
4 Tukang Erection L.02 OH 0.083 - -
5 Pembantu operator crane L.02 OH 0.083 - -
6 Kepala Tukang L.03 OH 0.083 - -
7 Mandor L.04 OH 0.083 - -
Jumlah Tenaga Kerja -
B Bahan
1 Solar Liter 8.277 - -
Jumlah Harga Bahan -
C Peralatan
1 Sewa Crane UH 0.083 - -
2 Sewa Pipe Support UH 2.200 - -
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
231
Jumlah Tenaga Kerja -
B Bahan
1 Solar Liter 1.897 - -
Jumlah Harga Bahan -
C Peralatan
1 Sewa Crane UH 0.019 - -
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
232
F Harga Satuan Pekerjaan ( D + E ) Err:509
A.4.2.1.4. Pembuatan 1 m² pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.050 - -
2 Tukang Las Biasa L.02 OH 1.050 - -
3 Kepala Tukang L.03 OH 0.105 - -
4 Mandor L.04 OH 0.052 - -
233
Jumlah Tenaga Kerja -
B Bahan
1 Besi Siku L 30.30.3 Kg 15.000 - -
2 Besi Plat Baja Kg 32.800 - -
3 Kawat Las KG 0.050 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
234
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
235
Jumlah Tenaga Kerja 128,891.56
B Bahan
1 Sunscreen Alluminium m² 1.000 Err:509 Err:509
Jumlah Harga Bahan Err:509
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) Err:509
E Overhead + Profit ( Contoh 15% ) 15% x D Err:509
F Harga Satuan Pekerjaan ( D + E ) Err:509
236
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.085 111,700.00 9,494.50
2 Tukang Khusus Alluinium L.02 OH 0.085 135,070.00 11,480.95
3 Kepala Tukang L.03 OH 0.0085 140,740.00 1,196.29
4 Mandor L.04 OH 0.0042 160,090.00 672.38
Jumlah Tenaga Kerja 22,844.12
B Bahan
1 Profil Alluminium m 4.400 Err:509 Err:509
2 Alluminium Strip m 14.600 Err:509 Err:509
Jumlah Harga Bahan Err:509
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) Err:509
E Overhead + Profit ( Contoh 15% ) 15% x D Err:509
F Harga Satuan Pekerjaan ( D + E ) Err:509
237
1 venetions blinds dan vertical
m 4.400 Err:509 Err:509
blinds(Tirai)
Jumlah Harga Bahan Err:509
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) Err:509
E Overhead + Profit ( Contoh 15% ) 15% x D Err:509
F Harga Satuan Pekerjaan ( D + E ) Err:509
238
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.200 - -
2 Tukang L.02 OH 0.200 - -
3 Kepala Tukang L.03 OH 0.0200 - -
4 Mandor L.04 OH 0.0010 - -
Jumlah Tenaga Kerja -
B Bahan
1 Jendela Naco ( Rangka +
m² 1.100 - -
Kaca 5 mm )
2 Paku Skrup 1 cm - 2.5 cm Buah 10.000
3 Besi Strip m 7.000
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A.4.2.1.19. Pemasangan 1 m¹ talang ½ lingkaran Ø15 cm, seng plat bjls 30 lebar 45 cm
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.150 111,700.00 16,755.00
2 Tukang L.02 OH 0.300 135,070.00 40,521.00
3 Kepala Tukang L.03 OH 0.0300 140,740.00 4,222.20
4 Mandor L.04 OH 0.0080 160,090.00 1,280.72
239
Jumlah Tenaga Kerja 62,778.92
B Bahan
1 Seng Plat m³ 1.050 Err:509 Err:509
2 Paku 1 cm - 2,5 cm Kg 0.010 22,400.00 224.00
3 Besi Strip Kg 0.500 Err:509 Err:509
Jumlah Harga Bahan Err:509
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) Err:509
E Overhead + Profit ( Contoh 15% ) 15% x D Err:509
F Harga Satuan Pekerjaan ( D + E ) Err:509
A.4.2.1.20. Pemasangan 1 m² rangka besi holow 1 x 40 x 40 x 2 mm, modul 60 x 120 cm, dinding partisi
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.250 111,700.00 27,925.00
2 Tukang Besi L.02 OH 0.250 135,070.00 33,767.50
3 Kepala Tukang L.03 OH 0.0250 140,740.00 3,518.50
4 Mandor L.04 OH 0.0130 160,090.00 2,081.17
Jumlah Tenaga Kerja 67,292.17
B Bahan
1 Rangka Metal Hollow 40.40.2
m¹ 1.050 41,250.00 43,312.50
mm
2 Assesoris ( Perkuatan, Las dll 100% x
Ls 41,250.00 41,250.00
) Rangka
Jumlah Harga Bahan 84,562.50
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 151,854.67
E Overhead + Profit ( Contoh 15% ) 15% x D 22,778.20
F Harga Satuan Pekerjaan ( D + E ) 174,632.87
240
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 300,427.02
E Overhead + Profit ( Contoh 15% ) 15% x D 45,064.05
F Harga Satuan Pekerjaan ( D + E ) 345,491.07
A.4.2.1.21. Pemasangan 1 m2 kuda-kuda baja ringan + reng untuk atap genteng metal
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.200 111,700.00 22,340.00
2 Tukang Besi L.02 OH 0.450 135,070.00 60,781.50
3 Kepala Tukang L.03 OH 0.0100 140,740.00 1,407.40
4 Mandor L.04 OH 0.0500 160,090.00 8,004.50
Jumlah Tenaga Kerja 92,533.40
B Bahan
1 C-75. 0,8 m2 1.488 18,333.33 27,280.00
2 C-75. 0,6 m2 2.232 18,333.33 40,920.00
3 Baut bh 28.000 575.00 16,100.00
4 Dynabolt bh 1.600 4,000.00 6,400.00
5 Reng m' 3.600 12,500.00 45,000.00
6 Talang jurai m' 0.124 50,000.00 6,200.00
Jumlah Harga Bahan 141,900.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 234,433.40
E Overhead + Profit ( Contoh 15% ) 15% x D 35,165.01
F Harga Satuan Pekerjaan ( D + E ) 269,598.41
241
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
242
2 Tukang Batu L.02 OH 0.200 - -
3 Kepala Tukang L.03 OH 0.020 - -
4 Mandor L.04 OH 0.030 - -
Jumlah Tenaga Kerja -
B Bahan
1 Bata Merah m³ 140.000 - -
2 Semen Portland Kg 26.550 - -
3 Pasir Pasang m³ 0.093 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
243
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
244
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.300 - -
2 Tukang Batu L.02 OH 0.100 - -
3 Kepala Tukang L.03 OH 0.010 - -
4 Mandor L.04 OH 0.015 - -
Jumlah Tenaga Kerja -
B Bahan
1 Bata Merah m³ 70.000 - -
2 Semen Portland Kg 18.950 - -
3 Pasir Pasang m³ 0.0380 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
245
1 Bata Merah m³ 70.000 - -
2 Semen Portland Kg 14.370 - -
3 Pasir Pasang m³ 0.0400 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
246
A.4.4.1.10. Pemasangan 1 m² dinding bata merah ( 5 x 11 x 22 ) cm tebal ½ batu campuran 1 SP : 5 PP
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.300 - -
2 Tukang Batu L.02 OH 0.100 - -
3 Kepala Tukang L.03 OH 0.010 - -
4 Mandor L.04 OH 0.015 - -
Jumlah Tenaga Kerja -
B Bahan
1 Bata Merah m³ 70.000 - -
2 Semen Portland Kg 9.680 - -
3 Pasir Pasang m³ 0.0450 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
247
Jumlah Tenaga Kerja -
B Bahan
1 Bata Merah m³ 70.000 - -
2 Semen Portland Kg 6.500 - -
3 Pasir Pasang m³ 0.0500 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
248
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
249
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.300 111,700.00 33,510.00
2 Tukang Batu L.02 OH 0.150 135,070.00 20,260.50
3 Kepala Tukang L.03 OH 0.015 140,740.00 2,111.10
4 Mandor L.04 OH 0.015 160,090.00 2,401.35
Jumlah Tenaga Kerja 58,282.95
B Bahan
1 Semen Portland Kg 15.504 2,000.00 31,008.00
2 Pasir Pasang m³ 0.016 187,900.00 3,006.40
Jumlah Harga Bahan 34,014.40
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 92,297.35
E Overhead + Profit ( Contoh 15% ) 15% x D 13,844.60
F Harga Satuan Pekerjaan ( D + E ) 106,141.95
`
A.4.4.2.2. Pemasangan 1 m² plesteran 1 SP : 2 PP tebal 15 mm
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.300 111,700.00 33,510.00
2 Tukang Batu L.02 OH 0.150 135,070.00 20,260.50
3 Kepala Tukang L.03 OH 0.015 140,740.00 2,111.10
4 Mandor L.04 OH 0.015 160,090.00 2,401.35
Jumlah Tenaga Kerja 58,282.95
B Bahan
1 Semen Portland Kg 10.224 2,000.00 20,448.00
2 Pasir Pasang m³ 0.020 187,900.00 3,758.00
Jumlah Harga Bahan 24,206.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 82,488.95
E Overhead + Profit ( Contoh 15% ) 15% x D 12,373.34
F Harga Satuan Pekerjaan ( D + E ) 94,862.29
250
Jumlah Harga Bahan 19,873.70
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 78,156.65
E Overhead + Profit ( Contoh 15% ) 15% x D 11,723.50
F Harga Satuan Pekerjaan ( D + E ) 89,880.15
251
A Tenaga
1 Pekerja L.01 OH 0.300 111,700.00 33,510.00
2 Tukang Batu L.02 OH 0.150 135,070.00 20,260.50
3 Kepala Tukang L.03 OH 0.015 140,740.00 2,111.10
4 Mandor L.04 OH 0.015 160,090.00 2,401.35
Jumlah Tenaga Kerja 58,282.95
B Bahan
1 Semen Portland Kg 4.416 2,000.00 8,832.00
2 Pasir Pasang m³ 0.027 187,900.00 5,073.30
Jumlah Harga Bahan 13,905.30
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 72,188.25
E Overhead + Profit ( Contoh 15% ) 15% x D 10,828.24
F Harga Satuan Pekerjaan ( D + E ) 83,016.49
252
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 70,644.05
E Overhead + Profit ( Contoh 15% ) 15% x D 10,596.61
F Harga Satuan Pekerjaan ( D + E ) 81,240.66
253
A Tenaga
1 Pekerja L.01 OH 0.400 111,700.00 44,680.00
2 Tukang Batu L.02 OH 0.200 135,070.00 27,014.00
3 Kepala Tukang L.03 OH 0.020 140,740.00 2,814.80
4 Mandor L.04 OH 0.022 160,090.00 3,521.98
Jumlah Tenaga Kerja 78,030.78
B Bahan
1 Semen Portland Kg 13.632 2,000.00 27,264.00
2 Pasir Pasang m³ 0.027 187,900.00 5,073.30
Jumlah Harga Bahan 32,337.30
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 110,368.08
E Overhead + Profit ( Contoh 15% ) 15% x D 16,555.21
F Harga Satuan Pekerjaan ( D + E ) 126,923.29
254
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 100,683.58
E Overhead + Profit ( Contoh 15% ) 15% x D 15,102.54
F Harga Satuan Pekerjaan ( D + E ) 115,786.12
255
2 Tukang Batu L.02 OH 0.100 135,070.00 13,507.00
3 Kepala Tukang L.03 OH 0.010 140,740.00 1,407.40
4 Mandor L.04 OH 0.015 160,090.00 2,401.35
Jumlah Tenaga Kerja 50,825.75
B Bahan
1 Semen Portland Kg 4.320 2,000.00 8,640.00
2 Pasir Pasang m³ 0.006 187,900.00 1,127.40
Jumlah Harga Bahan 9,767.40
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 60,593.15
E Overhead + Profit ( Contoh 15% ) 15% x D 9,088.97
F Harga Satuan Pekerjaan ( D + E ) 69,682.12
256
F Harga Satuan Pekerjaan ( D + E ) 84,200.41
257
1 Pekerja L.01 OH 0.250 - -
2 Tukang Batu L.02 OH 0.125 - -
3 Kepala Tukang L.03 OH 0.013 - -
4 Mandor L.04 OH 0.013 - -
Jumlah Tenaga Kerja -
B Bahan
1 Ubin abu-abu Bh 11.870 - -
2 Semen Portland Kg 10.000 - -
3 Pasir Pasang m³ 0.045 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
258
4 Pasir Pasang m³ 0.045 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
259
A.4.4.3.7. Pemasangan 1 m² lantai ubin PC warna ukuran 20 cm x 20 cm
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.270 - -
2 Tukang Batu L.02 OH 0.135 - -
3 Kepala Tukang L.03 OH 0.014 - -
4 Mandor L.04 OH 0.014 - -
Jumlah Tenaga Kerja -
B Bahan
1 Ubin Warna Bh 26.500 - -
2 Semen Portland Kg 10.400 - -
3 Semen Warna Kg 1.620 - -
4 Pasir Pasang m³ 0.045 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
260
2 Tukang Batu L.02 OH 0.350 - -
3 Kepala Tukang L.03 OH 0.035 - -
4 Mandor L.04 OH 0.035 - -
Jumlah Tenaga Kerja -
B Bahan
1 Ubin Keramik Bh 106.000 - -
2 Semen Portland Kg 8.190 - -
3 Pasir Pasang m³ 0.045 - -
4 Semen Warna Kg 3.200 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
261
3 Pasir Pasang m³ 0.045 Err:509 Err:509
4 Semen Warna Kg 1.500 2,294.00 3,441.00
Jumlah Harga Bahan Err:509
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) Err:509
E Overhead + Profit ( Contoh 15% ) 15% x D Err:509
F Harga Satuan Pekerjaan ( D + E ) Err:509
262
F Harga Satuan Pekerjaan ( D + E ) 489,849.62
263
1 Pekerja L.01 OH 0.700 - -
2 Tukang Batu L.02 OH 0.350 - -
3 Kepala Tukang L.03 OH 0.035 - -
4 Mandor L.04 OH 0.035 - -
Jumlah Tenaga Kerja -
B Bahan
1 Ubin Keramik Bh 11.870 - -
2 Semen Portland Kg 14.150 - -
3 Pasir Pasang m³ 0.039 - -
4 Semen Warna Kg 2.000 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
264
2 Lem Kg 0.350 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
265
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.700 - -
2 Tukang Batu L.02 OH 0.350 - -
3 Kepala Tukang L.03 OH 0.035 - -
4 Mandor L.04 OH 0.035 - -
Jumlah Tenaga Kerja -
B Bahan
1 Parquet m² 1.050 - -
2 Lem Kg 0.600 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
266
2 Semen Portland Kg 9.300 - -
3 Pasir Pasang m³ 0.018 - -
4 Semen Warna Kg 2.750 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
267
E Overhead + Profit ( Contoh 15% ) 15% x D 54,225.53
F Harga Satuan Pekerjaan ( D + E ) 415,729.08
268
A.4.4.3.54. Pemasangan 1 m² dinding keramik 20 cm x 20 cm
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.900 111,700.00 100,530.00
2 Tukang Batu L.02 OH 0.450 135,070.00 60,781.50
3 Kepala Tukang L.03 OH 0.045 140,740.00 6,333.30
4 Mandor L.04 OH 0.045 160,090.00 7,204.05
Jumlah Tenaga Kerja 174,848.85
B Bahan
1 Keramik Bh 26.500 2,988.00 79,182.00
2 Semen Portland Kg 9.300 2,000.00 18,600.00
3 Pasir Pasang m³ 0.018 187,900.00 3,382.20
4 Semen Warna Kg 1.940 2,294.00 4,450.36
Jumlah Harga Bahan 105,614.56
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 280,463.41
E Overhead + Profit ( Contoh 15% ) 15% x D 42,069.51
F Harga Satuan Pekerjaan ( D + E ) 322,532.92
269
2 Tukang Batu L.02 OH 0.500 - -
3 Kepala Tukang L.03 OH 0.050 - -
4 Mandor L.04 OH 0.050 - -
Jumlah Tenaga Kerja -
B Bahan
1 Bata Pelapis Bh 63.000 - -
2 Semen Portland Kg 12.440 - -
3 Pasir Pasang m³ 0.025 - -
4 Semen Warna Kg 0.050 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
270
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) Err:509
E Overhead + Profit ( Contoh 15% ) 15% x D Err:509
F Harga Satuan Pekerjaan ( D + E ) Err:509
271
1 Pekerja L.01 OH 0.350 111,700.00 39,095.00
2 Tukang Batu L.02 OH 0.175 135,070.00 23,637.25
3 Kepala Tukang L.03 OH 0.017 140,740.00 2,392.58
4 Mandor L.04 OH 0.002 160,090.00 320.18
Jumlah Tenaga Kerja 65,445.01
B Bahan
1 HPL Lbr 0.367 Err:509 Err:509
2 Lem Kg 0.250 Err:509 Err:509
Jumlah Harga Bahan Err:509
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) Err:509
E Overhead + Profit ( Contoh 15% ) 15% x D Err:509
F Harga Satuan Pekerjaan ( D + E ) Err:509
272
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
273
1 Pekerja L.01 OH 0.120 - -
2 Tukang Kayu L.02 OH 0.120 - -
3 Kepala Tukang L.03 OH 0.012 - -
4 Mandor L.04 OH 0.006 - -
Jumlah Tenaga Kerja -
B Bahan
1 Akustik Lembar 12.000 - -
2 Paku Tripleks Kg 0.050 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
274
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A.4.5.1.5. Pemasangan 1 m² langit-langit tripleks ukuran ( 120 x 240 ) cm, tebal 3 mm, 4 mm & 6 mm
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.100 111,700.00 11,170.00
2 Tukang Kayu L.02 OH 0.100 135,070.00 13,507.00
3 Kepala Tukang L.03 OH 0.010 140,740.00 1,407.40
4 Mandor L.04 OH 0.005 160,090.00 800.45
Jumlah Tenaga Kerja 26,884.85
B Bahan
1 Tripleks Lembar 0.375 Err:509 Err:509
2 Paku Tripleks Kg 0.030 22,400.00 672.00
Jumlah Harga Bahan Err:509
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) Err:509
E Overhead + Profit ( Contoh 15% ) 15% x D Err:509
F Harga Satuan Pekerjaan ( D + E ) Err:509
A.4.5.1.7. Pemasangan 1 m² langit-langit gypsum board ukuran ( 120 x 240 x 9 ) mm, tebal 9 mm
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.100 111,700.00 11,170.00
2 Tukang Kayu L.02 OH 0.050 135,070.00 6,753.50
275
3 Kepala Tukang L.03 OH 0.005 140,740.00 703.70
4 Mandor L.04 OH 0.005 160,090.00 800.45
Jumlah Tenaga Kerja 19,427.65
B Bahan
1 Gypsum Board Lembar 0.364 80,900.00 29,447.60
2 Paku Skrup Kg 0.110 27,000.00 2,970.00
Jumlah Harga Bahan 32,417.60
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 51,845.25
E Overhead + Profit ( Contoh 15% ) 15% x D 7,776.79
F Harga Satuan Pekerjaan ( D + E ) 59,622.04
A.4.5.1.7. Pemasangan 1 m² langit-langit Semen Asbes board ukuran ( 120 x 240 x 4 ) mm, tebal 4 mm
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.100 111,700.00 11,170.00
2 Tukang Kayu L.02 OH 0.050 135,070.00 6,753.50
3 Kepala Tukang L.03 OH 0.005 140,740.00 703.70
4 Mandor L.04 OH 0.005 160,090.00 800.45
Jumlah Tenaga Kerja 19,427.65
B Bahan
1 Semen Asbes Lembar 0.364 Err:509 Err:509
2 Paku Skrup Kg 0.110 27,000.00 2,970.00
Jumlah Harga Bahan Err:509
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) Err:509
E Overhead + Profit ( Contoh 15% ) 15% x D Err:509
F Harga Satuan Pekerjaan ( D + E ) Err:509
276
E Overhead + Profit ( Contoh 15% ) 15% x D Err:509
F Harga Satuan Pekerjaan ( D + E ) Err:509
A.4.5.1.8. Pemasangan 1 m² langit-langit akustik ukuran ( 60 x 120 ) cm, berikut rangka alluminium
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.500 - -
2 Tukang Besi L.02 OH 0.500 - -
3 Kepala Tukang L.03 OH 0.050 - -
4 Mandor L.04 OH 0.025 - -
Jumlah Tenaga Kerja -
B Bahan
1 Profil Alluminium "T" m 3.600 - -
2 Kawat Ø4 mm Kg 0.150 - -
3 Ramset Buah 1.050 - -
4 Akustik 60 x 120 Lembar 1.500 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
277
A.4.5.1.9. Pemasangan 1 m¹ list langit-langit gypsum
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.050 111,700.00 5,585.00
2 Tukang Kayu L.02 OH 0.050 135,070.00 6,753.50
3 Kepala Tukang L.03 OH 0.005 140,740.00 703.70
4 Mandor L.04 OH 0.003 160,090.00 480.27
Jumlah Tenaga Kerja 13,522.47
B Bahan
1 List Gypsum m 1.050 31,100.00 32,655.00
2 Tepung gypsum Kg 0.150 6,600.00 990.00
Jumlah Harga Bahan 33,645.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 47,167.47
E Overhead + Profit ( Contoh 15% ) 15% x D 7,075.12
F Harga Satuan Pekerjaan ( D + E ) 54,242.59
278
1 Pekerja L.01 OH 0.150 - -
2 Tukang Kayu L.02 OH 0.075 - -
3 Kepala Tukang L.03 OH 0.0080 - -
4 Mandor L.04 OH 0.008 - -
Jumlah Tenaga Kerja -
B Bahan
1 Genteng Kodok Bh 25.000 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
279
F Harga Satuan Pekerjaan ( D + E ) -
280
3 Kepala Tukang L.03 OH 0.0080 - -
4 Mandor L.04 OH 0.008 - -
Jumlah Tenaga Kerja -
B Bahan
1 Asbes Gel 92 x 250 Lembar 0.500 - -
2 Paku Pancing 6 x 23 Kg 0.120 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
281
F Harga Satuan Pekerjaan ( D + E ) -
282
Jumlah Tenaga Kerja -
B Bahan
1 Asbes Gel 105 x 270 Lembar 0.420 - -
2 Paku Pancing 6 x 23 Kg 0.120 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
283
A.4.5.2.16. Pemasangan 1 m² atap asbes gelombang 1,05 m x 1,50 m x 4 mm
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.140 - -
2 Tukang Kayu L.02 OH 0.070 - -
3 Kepala Tukang L.03 OH 0.0070 - -
4 Mandor L.04 OH 0.007 - -
Jumlah Tenaga Kerja -
B Bahan
1 Asbes Gel 105 x 150 Lembar 0.800 - -
2 Paku Pancing 6 x 23 Kg 0.120 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
284
B Bahan
1 Asbes Gel 108 x 270 Lembar 0.380 - -
2 Paku Pancing 6 x 23 Kg 0.120 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
285
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.140 - -
2 Tukang Kayu L.02 OH 0.070 - -
3 Kepala Tukang L.03 OH 0.0070 - -
4 Mandor L.04 OH 0.007 - -
Jumlah Tenaga Kerja -
B Bahan
1 Asbes Gel 108 x 180 Lembar 0.570 - -
2 Paku Pancing 6 x 23 Kg 0.120 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
286
2 Paku Seng Kg 0.040 31,300.00 1,252.00
Jumlah Harga Bahan Err:509
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) Err:509
E Overhead + Profit ( Contoh 15% ) 15% x D Err:509
F Harga Satuan Pekerjaan ( D + E ) Err:509
287
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.120 111,700.00 13,404.00
2 Tukang Kayu L.02 OH 0.060 135,070.00 8,104.20
3 Kepala Tukang L.03 OH 0.0060 140,740.00 844.44
4 Mandor L.04 OH 0.006 160,090.00 960.54
Jumlah Tenaga Kerja 23,313.18
B Bahan
1 Zincalum gelombang 4 mm Lembar 0.700 Err:509 Err:509
2 Paku Hak Panjang 15 cm Kg 0.020 Err:509 Err:509
Jumlah Harga Bahan Err:509
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) Err:509
E Overhead + Profit ( Contoh 15% ) 15% x D Err:509
F Harga Satuan Pekerjaan ( D + E ) Err:509
288
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) Err:509
E Overhead + Profit ( Contoh 15% ) 15% x D Err:509
F Harga Satuan Pekerjaan ( D + E ) Err:509
289
A.4.5.2.41. Pemasangan 1 m¹ nok atap Metal roof
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.250 111,700.00 27,925.00
2 Tukang Kayu L.02 OH 0.150 135,070.00 20,260.50
3 Kepala Tukang L.03 OH 0.0150 140,740.00 2,111.10
4 Mandor L.04 OH 0.013 160,090.00 2,081.17
Jumlah Tenaga Kerja 52,377.77
B Bahan
1 Nok Buah 1.100 52,700.00 57,970.00
2 Paku Hak Panjang 15 cm Kg 0.040 31,300.00 1,252.00
Jumlah Harga Bahan 59,222.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 111,599.77
E Overhead + Profit ( Contoh 15% ) 15% x D 16,739.97
F Harga Satuan Pekerjaan ( D + E ) 128,339.74
A.4.6.1.2. Pembuatan dan pemasangan 1 m³ kusen pintu dan kusen jendela, kayu kelas II & III
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 6.000 111,700.00 670,200.00
2 Tukang Kayu L.02 OH 18.000 135,070.00 2,431,260.00
290
3 Kepala Tukang L.03 OH 1.8000 140,740.00 253,332.00
4 Mandor L.04 OH 0.300 160,090.00 48,027.00
Jumlah Tenaga Kerja 3,402,819.00
B Bahan
1 Balok Kayu m³ 1.200 3,007,000.00 3,608,400.00
2 Paku 10 cm Kg 1.250 22,400.00 28,000.00
Jumlah Harga Bahan 3,636,400.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 7,039,219.00
E Overhead + Profit ( Contoh 15% ) 15% x D 1,055,882.85
F Harga Satuan Pekerjaan ( D + E ) 8,095,101.85
A.4.6.1.3. Pembuatan dan pemasangan 1 m² kusen pintu klamp standar, kayu kelas II
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.350 - -
2 Tukang Kayu L.02 OH 1.050 - -
3 Kepala Tukang L.03 OH 0.1050 - -
4 Mandor L.04 OH 0.018 - -
Jumlah Tenaga Kerja -
B Bahan
1 Papan Kayu m³ 0.040 - -
2 Paku 5 - 7 cm Kg 0.050 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A.4.6.1.4. Pembuatan dan pemasangan 1 m² kusen pintu klamp sederhana, kayu kelas III
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
291
A Tenaga
1 Pekerja L.01 OH 0.350 - -
2 Tukang Kayu L.02 OH 1.050 - -
3 Kepala Tukang L.03 OH 0.1050 - -
4 Mandor L.04 OH 0.018 - -
Jumlah Tenaga Kerja -
B Bahan
1 Papan Kayu m³ 0.040 - -
2 Paku 5 - 7 cm Kg 0.050 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A.4.6.1.5. Pembuatan dan pemasangan 1 m² daun pintu panel, kayu kelas I atau II
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.000 111,700.00 111,700.00
2 Tukang Kayu L.02 OH 3.000 135,070.00 405,210.00
3 Kepala Tukang L.03 OH 0.3000 140,740.00 42,222.00
4 Mandor L.04 OH 0.050 160,090.00 8,004.50
Jumlah Tenaga Kerja 567,136.50
B Bahan
1 Papan Kayu m³ 0.040 3,007,000.00 120,280.00
2 Lem Kayu Kg 0.500 #REF! #REF!
Jumlah Harga Bahan #REF!
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) #REF!
E Overhead + Profit ( Contoh 15% ) 10% x D #REF!
F Harga Satuan Pekerjaan ( D + E ) #REF!
A.4.6.1.6. Pembuatan dan pemasangan 1 m² pintu dan jendela kaca, kayu kelas I atau II
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.800 111,700.00 89,360.00
2 Tukang Kayu L.02 OH 2.400 135,070.00 324,168.00
3 Kepala Tukang L.03 OH 0.2400 140,740.00 33,777.60
4 Mandor L.04 OH 0.040 160,090.00 6,403.60
Jumlah Tenaga Kerja 453,709.20
B Bahan
1 Papan Kayu m³ 0.024 3,007,000.00 72,168.00
2 Lem Kayu Kg 0.300 #REF! #REF!
Jumlah Harga Bahan #REF!
C Peralatan
292
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) #REF!
E Overhead + Profit ( Contoh 15% ) 15% x D #REF!
F Harga Satuan Pekerjaan ( D + E ) #REF!
A.4.6.1.7. Pembuatan dan pemasangan 1 m² pintu dan jendela jalusi, kayu kelas I atau II
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.000 111,700.00 111,700.00
2 Tukang Kayu L.02 OH 3.000 135,070.00 405,210.00
3 Kepala Tukang L.03 OH 0.3000 140,740.00 42,222.00
4 Mandor L.04 OH 0.050 160,090.00 8,004.50
Jumlah Tenaga Kerja 567,136.50
B Bahan
1 Papan Kayu m³ 0.064 3,007,000.00 192,448.00
2 Lem Kayu Kg 0.500 #REF! #REF!
Jumlah Harga Bahan #REF!
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) #REF!
E Overhead + Profit ( Contoh 15% ) 15% x D #REF!
F Harga Satuan Pekerjaan ( D + E ) #REF!
A.4.6.1.8. Pembuatan 1 m² daun pintu plywood rangkap, rangka kayu kelas II tertutup ( lebar sampai 90 cm )
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.700 111,700.00 78,190.00
2 Tukang Kayu L.02 OH 2.100 135,070.00 283,647.00
3 Kepala Tukang L.03 OH 0.2100 140,740.00 29,555.40
4 Mandor L.04 OH 0.035 160,090.00 5,603.15
Jumlah Tenaga Kerja 396,995.55
B Bahan
1 Papan Kayu m³ 0.025 3,007,000.00 75,175.00
2 Paku 1 cm - 2,5 cm Kg 0.030 22,400.00 672.00
3 Lem Kayu Kg 0.500 #REF! #REF!
4 Plywood tebal 4 mm ukuran
Lembar 0.035 83,000.00 2,905.00
( 90 x 220 ) cm
Jumlah Harga Bahan #REF!
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) #REF!
E Overhead + Profit ( Contoh 15% ) 15% x D #REF!
F Harga Satuan Pekerjaan ( D + E ) #REF!
A.4.6.1.9. Pembuatan 1 m² pintu plywood rangkap, rangka expose kayu kelas I atau II
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
293
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.800 111,700.00 89,360.00
2 Tukang Kayu L.02 OH 2.400 135,070.00 324,168.00
3 Kepala Tukang L.03 OH 0.2400 140,740.00 33,777.60
4 Mandor L.04 OH 0.040 160,090.00 6,403.60
Jumlah Tenaga Kerja 453,709.20
B Bahan
1 Papan Kayu m³ 0.0256 3,007,000.00 76,979.20
2 Paku 1 cm - 2,5 cm Kg 0.030 22,400.00 672.00
3 Lem Kayu Kg 0.500 #REF! #REF!
4 Plywood tebal 4 mm ukuran
Lembar 1.000 83,000.00 83,000.00
( 90 x 220 ) cm
Jumlah Harga Bahan #REF!
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) #REF!
E Overhead + Profit ( Contoh 15% ) 15% x D #REF!
F Harga Satuan Pekerjaan ( D + E ) #REF!
294
1 Papan Kayu m³ 0.0250 - -
2 Paku 1 cm - 2,5 cm Kg 0.030 - -
3 Lem Kayu Kg 0.300 - -
4 Teakwood tebal 4 mm ukuran
Lembar 1.000 - -
( 90 x 220 ) cm
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A.4.6.1.12. Pemasangan 1 m² teakwood rangkap lapis formika, rangka expose kayu kelas II
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.850 - -
2 Tukang Kayu L.02 OH 2.550 - -
3 Kepala Tukang L.03 OH 0.2550 - -
4 Mandor L.04 OH 0.043 - -
Jumlah Tenaga Kerja -
B Bahan
1 Papan Kayu m³ 0.0250 - -
2 Paku 1 cm - 2,5 cm Kg 0.030 - -
3 Lem Kayu Kg 0.800 - -
4 Teakwood tebal 4 mm ukuran
Lembar 1.000 - -
( 90 x 220 ) cm
5 Formika Lembar 0.500 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
295
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 5,701,686.00
E Overhead + Profit ( Contoh 15% ) 15% x D 855,252.90
F Harga Satuan Pekerjaan ( D + E ) 6,556,938.90
296
A Tenaga
1 Pekerja L.01 OH 0.100 - -
2 Tukang Kayu L.02 OH 0.100 - -
3 Kepala Tukang L.03 OH 0.0100 - -
4 Mandor L.04 OH 0.005 - -
Jumlah Tenaga Kerja -
B Bahan
1 Kaso-kaso 5 x 7 cm m³ 0.0140 - -
2 Reng ( 3 x 4 ) cm m³ 0.057 - -
3 Paku 5 dan 10 cm Kg 0.250 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A.4.6.1.19. Pemasangan 1 m² rangka langit-langit ( 50 x 100 ) cm, kayu kelas II atau III
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.150 111,700.00 16,755.00
2 Tukang Kayu L.02 OH 0.300 135,070.00 40,521.00
3 Kepala Tukang L.03 OH 0.0300 140,740.00 4,222.20
4 Mandor L.04 OH 0.075 160,090.00 12,006.75
Jumlah Tenaga Kerja 73,504.95
B Bahan
1 Kaso-kaso 5 x 7 cm m³ 0.0154 2,522,000.00 38,838.80
2 Paku 7 cm - 10 cm Kg 0.200 22,400.00 4,480.00
Jumlah Harga Bahan 43,318.80
297
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 116,823.75
E Overhead + Profit ( Contoh 15% ) 15% x D 17,523.56
F Harga Satuan Pekerjaan ( D + E ) 134,347.31
298
1 Pekerja L.01 OH 0.100 111,700.00 11,170.00
2 Tukang Kayu L.02 OH 0.200 135,070.00 27,014.00
3 Kepala Tukang L.03 OH 0.0200 140,740.00 2,814.80
4 Mandor L.04 OH 0.005 160,090.00 800.45
Jumlah Tenaga Kerja 41,799.25
B Bahan
1 Papan Kayu m³ 0.0110 2,522,000.00 27,742.00
2 Paku 5 cm dan 7 cm Kg 0.050 22,400.00 1,120.00
Jumlah Harga Bahan 28,862.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 70,661.25
E Overhead + Profit ( Contoh 15% ) 15% x D 10,599.19
F Harga Satuan Pekerjaan ( D + E ) 81,260.44
A.4.6.1.23. Pemasangan 1 m² rangka dinding pemisah ( 60 x 120 ) cm, kayu kelas II atau III
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.150 111,700.00 16,755.00
2 Tukang Kayu L.02 OH 0.450 135,070.00 60,781.50
3 Kepala Tukang L.03 OH 0.0450 140,740.00 6,333.30
4 Mandor L.04 OH 0.008 160,090.00 1,280.72
Jumlah Tenaga Kerja 85,150.52
B Bahan
1 Balok Kayu m³ 0.0280 2,522,000.00 70,616.00
2 Paku 5 cm dan 7 cm Kg 0.150 22,400.00 3,360.00
Jumlah Harga Bahan 73,976.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 159,126.52
E Overhead + Profit ( Contoh 15% ) 15% x D 23,868.98
F Harga Satuan Pekerjaan ( D + E ) 182,995.50
299
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) Err:509
E Overhead + Profit ( Contoh 15% ) 15% x D Err:509
F Harga Satuan Pekerjaan ( D + E ) Err:509
300
A.4.6.2. HARGA SATUAN PEKERJAAN KUNCI DAN KACA
A.4.6.2.1. Pemasangan 1 buah kunci tanam antik
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.060 - -
2 Tukang Kayu L.02 OH 0.600 - -
3 Kepala Tukang L.03 OH 0.0600 - -
4 Mandor L.04 OH 0.003 - -
Jumlah Tenaga Kerja -
B Bahan
1 Kunci Tanam Antik Buah 1.000 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
301
B Bahan
1 Kunci Tanam KM Buah 1.000 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
302
A.4.6.2.2. Pemasangan 1 pasang handle pintu
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.010 111,700.00 1,117.00
2 Tukang Kayu L.02 OH 0.500 135,070.00 67,535.00
3 Kepala Tukang L.03 OH 0.0500 140,740.00 7,037.00
4 Mandor L.04 OH 0.005 160,090.00 800.45
Jumlah Tenaga Kerja 76,489.45
B Bahan
1 Handle pintu Buah 1.000 20,000.00 20,000.00
Jumlah Harga Bahan 20,000.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 96,489.45
E Overhead + Profit ( Contoh 15% ) 15% x D 14,473.42
F Harga Satuan Pekerjaan ( D + E ) 110,962.87
303
A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.010 111,700.00 1,117.00
2 Tukang Kayu L.02 OH 0.100 135,070.00 13,507.00
3 Kepala Tukang L.03 OH 0.0100 140,740.00 1,407.40
4 Mandor L.04 OH 0.0005 160,090.00 80.05
Jumlah Tenaga Kerja 16,111.45
B Bahan
1 Engsel Kupu-kupu Buah 1.000 22,700.00 22,700.00
Jumlah Harga Bahan 22,700.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 38,811.45
E Overhead + Profit ( Contoh 15% ) 15% x D 5,821.72
F Harga Satuan Pekerjaan ( D + E ) 44,633.16
304
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
305
A.4.6.2.9. Pemasangan 1 buah handle / grendle
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.015 111,700.00 1,675.50
2 Tukang Kayu L.02 OH 0.150 135,070.00 20,260.50
3 Kepala Tukang L.03 OH 0.0150 140,740.00 2,111.10
4 Mandor L.04 OH 0.0080 160,090.00 1,280.72
Jumlah Tenaga Kerja 25,327.82
B Bahan
1 handle Buah 1.000 22,700.00 22,700.00
Jumlah Harga Bahan 22,700.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 48,027.82
E Overhead + Profit ( Contoh 15% ) 15% x D 7,204.17
F Harga Satuan Pekerjaan ( D + E ) 55,231.99
306
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
307
3 Kepala Tukang L.03 OH 0.0250 - -
4 Mandor L.04 OH 0.0013 - -
Jumlah Tenaga Kerja -
B Bahan
1 Rel Pintu Sorong Buah 1.000 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
308
A.4.6.2.17. Pemasangan 1 m² kaca tebal 5 mm
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.015 111,700.00 1,675.50
2 Tukang Kayu L.02 OH 0.150 135,070.00 20,260.50
3 Kepala Tukang L.03 OH 0.0015 140,740.00 211.11
4 Mandor L.04 OH 0.0008 160,090.00 128.07
Jumlah Tenaga Kerja 22,275.18
B Bahan
1 Kaca Tebal 5 mm m² 1.100 179,600.00 197,560.00
2 Sealant Kg 0.050 30,000.00 1,500.00
Jumlah Harga Bahan 199,060.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 221,335.18
E Overhead + Profit ( Contoh 15% ) 15% x D 33,200.28
F Harga Satuan Pekerjaan ( D + E ) 254,535.46
309
1 Kaca Buram Tebal 12 mm m² 1.100 - -
2 Sealant Kg 0.070 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
310
A Tenaga
1 Pekerja L.01 OH 0.015 - -
2 Tukang Kayu L.02 OH 0.150 - -
3 Kepala Tukang L.03 OH 0.0150 - -
4 Mandor L.04 OH 0.0080 - -
Jumlah Tenaga Kerja -
B Bahan
1 kaca wireglassed tebal 5 mm m² 1.100 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
311
A.4.7.1. HARGA SATUAN PEKERJAAN PENGECATAN
A.4.7.1.1. 1 m² pengikisan / pengerokan permukaan cat lama
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.150 111,700.00 16,755.00
2 Mandor L.04 OH 0.003 160,090.00 480.27
Jumlah Tenaga Kerja 17,235.27
B Bahan
1 Soda Api Kg 0.050 Err:509 Err:509
Jumlah Harga Bahan Err:509
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) Err:509
E Overhead + Profit ( Contoh 15% ) 15% x D Err:509
F Harga Satuan Pekerjaan ( D + E ) Err:509
312
E Overhead + Profit ( Contoh 15% ) 15% x D Err:509
F Harga Satuan Pekerjaan ( D + E ) Err:509
A.4.7.1.4. 1 m² pengecatan bidang kayu baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.070 111,700.00 7,819.00
2 Tukang Cat L.02 OH 0.009 135,070.00 1,215.63
3 Kepala Tukang L.03 OH 0.006 140,740.00 844.44
4 Mandor L.04 OH 0.003 160,090.00 480.27
Jumlah Tenaga Kerja 10,359.34
B Bahan
1 Cat Menie Kg 0.200 33,600.00 6,720.00
2 Plamir Kg 0.150 6,200.00 930.00
3 Cat Dasar Kg 0.170 51,800.00 8,806.00
4 Cat Penutup Kg 0.260 51,800.00 13,468.00
5 Kuas Buah 0.010 10,500.00 105.00
6 Pengencer Kg 0.030 25,800.00 774.00
7 Ampelas Lembar 0.200 5,600.00 1,120.00
Jumlah Harga Bahan 31,923.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 42,282.34
E Overhead + Profit ( Contoh 15% ) 15% x D 6,342.35
F Harga Satuan Pekerjaan ( D + E ) 48,624.69
A.4.7.1.5. 1 m² pengecatan bidang kayu baru ( 1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup )
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.070 111,700.00 7,819.00
2 Tukang Cat L.02 OH 0.105 135,070.00 14,182.35
3 Kepala Tukang L.03 OH 0.004 140,740.00 562.96
4 Mandor L.04 OH 0.003 160,090.00 480.27
Jumlah Tenaga Kerja 23,044.58
B Bahan
1 Cat Menie Kg 0.200 33,600.00 6,720.00
2 Plamir Kg 0.150 6,200.00 930.00
3 Cat Dasar Kg 0.170 51,800.00 8,806.00
4 Cat Penutup Kg 0.350 51,800.00 18,130.00
5 Kuas Buah 0.010 10,500.00 105.00
6 Pengencer Kg 0.030 25,800.00 774.00
7 Ampelas Lembar 0.200 5,600.00 1,120.00
Jumlah Harga Bahan 36,585.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 59,629.58
E Overhead + Profit ( Contoh 15% ) 15% x D 8,944.44
313
F Harga Satuan Pekerjaan ( D + E ) 68,574.02
A.4.7.1.10. Pengecataan 1 m² tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.020 111,700.00 2,234.00
2 Tukang Cat L.02 OH 0.063 135,070.00 8,509.41
3 Kepala Tukang L.03 OH 0.0063 140,740.00 886.66
4 Mandor L.04 OH 0.003 160,090.00 480.27
314
Jumlah Tenaga Kerja 12,110.34
B Bahan
1 Plamir Kg 0.100 6,200.00 620.00
2 Cat Dasar Kg 0.100 83,000.00 8,300.00
3 Cat Penutup Kg 0.260 83,000.00 21,580.00
Jumlah Harga Bahan 30,500.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 42,610.34
E Overhead + Profit ( Contoh 15% ) 15% x D 6,391.55
F Harga Satuan Pekerjaan ( D + E ) 49,001.89
A.4.7.1.11. Pengecataan 1 m² tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup )
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.028 111,700.00 3,127.60
2 Tukang Cat L.02 OH 0.042 135,070.00 5,672.94
3 Kepala Tukang L.03 OH 0.0042 140,740.00 591.11
4 Mandor L.04 OH 0.003 160,090.00 480.27
Jumlah Tenaga Kerja 9,871.92
B Bahan
1 Cat Dasar Kg 0.120 83,000.00 9,960.00
2 Cat Penutup Kg 0.180 83,000.00 14,940.00
Jumlah Harga Bahan 24,900.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 34,771.92
E Overhead + Profit ( Contoh 15% ) 15% x D 5,215.79
F Harga Satuan Pekerjaan ( D + E ) 39,987.71
315
F Harga Satuan Pekerjaan ( D + E ) -
316
4 Mandor L.04 OH 0.0025 160,090.00 400.23
Jumlah Tenaga Kerja 32,463.03
B Bahan
1 Menie Besi m 0.100 33,600.00 3,360.00
2 Kuas Buah 0.010 10,500.00 105.00
Jumlah Harga Bahan 3,465.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 35,928.03
E Overhead + Profit ( Contoh 15% ) 15% x D 5,389.20
F Harga Satuan Pekerjaan ( D + E ) 41,317.23
317
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A.4.7.1.19. Pengecatan 1 m² permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.060 - -
2 Tukang Cat L.02 OH 0.060 - -
3 Kepala Tukang L.03 OH 0.012 - -
4 Mandor L.04 OH 0.0030 - -
Jumlah Tenaga Kerja -
B Bahan
1 Cat Kg 0.300 - -
2 Kuas Buah 0.010 - -
3 Pengencer Liter 0.010 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A.4.7.1.21. Pengecatan 1 m² permukaan baja galvanis secara semprot sistem 3 lapis cat
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
318
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.400 - -
2 Tukang Cat L.02 OH 0.700 - -
3 Kepala Tukang L.03 OH 0.070 - -
4 Mandor L.04 OH 0.0200 - -
Jumlah Tenaga Kerja -
B Bahan
1 Cat Dasar Kg 0.300 - -
2 Pengencer Liter 0.010 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
319
Jumlah Tenaga Kerja 361,030.40
B Bahan
1 Closet Jongkok Unit 1.000 Err:509 Err:509
2 Semen Portland Kg 6.000 2,000.00 12,000.00
3 Pasir Pasang m³ 0.010 Err:509 Err:509
Jumlah Harga Bahan Err:509
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) Err:509
E Overhead + Profit ( Contoh 15% ) 15% x D Err:509
F Harga Satuan Pekerjaan ( D + E ) Err:509
320
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) Err:509
E Overhead + Profit ( Contoh 15% ) 15% x D Err:509
F Harga Satuan Pekerjaan ( D + E ) Err:509
321
A.5.1.1.6. Pemasangan 1 buah bathcuip porselen
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.075 - -
2 Tukang Batu L.02 OH 0.750 - -
3 Kepala Tukang L.03 OH 0.075 - -
4 Mandor L.04 OH 0.003 - -
Jumlah Tenaga Kerja -
B Bahan
1 Bathcuip Unit 1.200 - -
2 Perlengkapan % 20.000 0.20 0.20
Jumlah Harga Bahan 0.20
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 0.20
E Overhead + Profit ( Contoh 15% ) 15% x D 0.03
F Harga Satuan Pekerjaan ( D + E ) 0.23
322
1 Bata Merah m³ 150.000 900.00 135,000.00
2 Semen Portland Kg 120.000 2,000.00 240,000.00
3 Pasir Pasang m³ 0.300 Err:509 Err:509
4 Porselen 11 x 11 Buah 360.000 1,400.00 504,000.00
5 Semen Warna Kg 6.000 2,294.00 13,764.00
Jumlah Harga Bahan Err:509
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) Err:509
E Overhead + Profit ( Contoh 15% ) 15% x D Err:509
F Harga Satuan Pekerjaan ( D + E ) Err:509
323
A.5.1.1.11. Pemasangan 1 buah bak beton vol 1 m³
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 3.500 - -
2 Tukang Batu L.02 OH 4.500 - -
3 Kepala Tukang L.03 OH 0.050 - -
4 Mandor L.04 OH 0.018 - -
Jumlah Tenaga Kerja -
B Bahan
1 Beton 1 : 2 : 3 m³ 0.900 - -
2 Baja Tulangan Kg 180.000 - -
3 Kayu Eksisting m² 8.000 - -
4 Ubin Porselen Buah 500.000 - -
5 Perlengkapan % 10.000 0.10 0.10
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
324
4 Mandor L.04 OH 0.025 - -
Jumlah Tenaga Kerja -
B Bahan
1 Bak Cuci Piring Unit 1.000 - -
2 Waterdrain Buah 1.000 - -
3 Semen Portland Kg 20.000 - -
4 Pasir Pasang m³ 0.050 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
325
A.5.1.1.15. Pemasangan 1 buah bak kontrol pasangan bata 30 x 30 tinggi 35 cm
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 2.160 111,700.00 241,272.00
2 Tukang Batu L.02 OH 0.720 135,070.00 97,250.40
3 Kepala Tukang L.03 OH 0.072 140,740.00 10,133.28
4 Mandor L.04 OH 0.011 160,090.00 1,760.99
Jumlah Tenaga Kerja 350,416.67
B Bahan
1 Bata Merah Buah 40.000 900.00 36,000.00
2 Semen Portland Kg 44.000 2,000.00 88,000.00
3 Pasir Pasang m³ 0.070 Err:509 Err:509
4 Pasir Beton m³ 0.060 Err:509 Err:509
5 Kerikil m³ 0.070 573,600.00 40,152.00
6 Baja Tulangan Kg 1.600 15,900.00 25,440.00
Jumlah Harga Bahan Err:509
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) Err:509
E Overhead + Profit ( Contoh 15% ) 15% x D Err:509
F Harga Satuan Pekerjaan ( D + E ) Err:509
326
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 3.200 111,700.00 357,440.00
2 Tukang Batu L.02 OH 1.150 135,070.00 155,330.50
3 Kepala Tukang L.03 OH 0.011 140,740.00 1,548.14
4 Mandor L.04 OH 0.016 160,090.00 2,561.44
Jumlah Tenaga Kerja 516,880.08
B Bahan
1 Bata Merah Buah 123.000 900.00 110,700.00
2 Semen Portland Kg 114.000 2,000.00 228,000.00
3 Pasir Pasang m³ 0.184 Err:509 Err:509
4 Pasir Beton m³ 0.120 Err:509 Err:509
5 Kerikil m³ 0.033 573,600.00 18,928.80
6 Baja Tulangan Kg 4.850 15,900.00 77,115.00
Jumlah Harga Bahan Err:509
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) Err:509
E Overhead + Profit ( Contoh 15% ) 15% x D Err:509
F Harga Satuan Pekerjaan ( D + E ) Err:509
327
B Bahan
1 shower Unit 1.000 206,100.00 206,100.00
Jumlah Harga Bahan 206,100.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 222,931.85
E Overhead + Profit ( Contoh 15% ) 15% x D 33,439.78
F Harga Satuan Pekerjaan ( D + E ) 256,371.63
328
A.5.1.1.20. Pemasangan 1 m¹ pipa galvanis ؾ"
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.054 111,700.00 6,031.80
2 Tukang Batu L.02 OH 0.090 135,070.00 12,156.30
3 Kepala Tukang L.03 OH 0.009 140,740.00 1,266.66
4 Mandor L.04 OH 0.027 160,090.00 4,322.43
Jumlah Tenaga Kerja 23,777.19
B Bahan
1 Pipa Galvanis ؾ" m¹ 1.200 Err:509 Err:509
2 Perlengkapan % 35.000 Err:509 Err:509
Jumlah Harga Bahan Err:509
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) Err:509
E Overhead + Profit ( Contoh 15% ) 15% x D Err:509
F Harga Satuan Pekerjaan ( D + E ) Err:509
329
1 Pipa Galvanis Ø1½" m¹ 1.200 Err:509 Err:509
2 Perlengkapan % 35.000 Err:509 Err:509
Jumlah Harga Bahan Err:509
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) Err:509
E Overhead + Profit ( Contoh 15% ) 10% x D Err:509
F Harga Satuan Pekerjaan ( D + E ) Err:509
330
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.135 111,700.00 15,079.50
2 Tukang Batu L.02 OH 0.225 135,070.00 30,390.75
3 Kepala Tukang L.03 OH 0.023 140,740.00 3,237.02
4 Mandor L.04 OH 0.007 160,090.00 1,120.63
Jumlah Tenaga Kerja 49,827.90
B Bahan
1 Pipa Galvanis Ø4" m¹ 1.200 Err:509 Err:509
2 Perlengkapan % 35.000 Err:509 Err:509
Jumlah Harga Bahan Err:509
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) Err:509
E Overhead + Profit ( Contoh 15% ) 15% x D Err:509
F Harga Satuan Pekerjaan ( D + E ) Err:509
331
A.5.1.1.26. Pemasangan 1 m¹ PVC type AW ؾ"
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.036 111,700.00 4,021.20
2 Tukang Batu L.02 OH 0.060 135,070.00 8,104.20
3 Kepala Tukang L.03 OH 0.006 140,740.00 844.44
4 Mandor L.04 OH 0.002 160,090.00 320.18
Jumlah Tenaga Kerja 13,290.02
B Bahan
1 Pipa PVC ؾ" m¹ 1.200 6,250.00 7,500.00
2 Perlengkapan % 35.000 2,187.50 2,187.50
Jumlah Harga Bahan 9,687.50
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 22,977.52
E Overhead + Profit ( Contoh 10% ) 10% x D 2,297.75
F Harga Satuan Pekerjaan ( D + E ) 25,275.27
332
1 Pipa PVC Ø1½" m¹ 1.200 - -
2 Perlengkapan % 35.000 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
333
A.5.1.1.30. Pemasangan 1 m¹ PVC type AW Ø2½"
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.081 - -
2 Tukang Batu L.02 OH 0.135 - -
3 Kepala Tukang L.03 OH 0.0135 - -
4 Mandor L.04 OH 0.004 - -
Jumlah Tenaga Kerja -
B Bahan
1 Pipa PVC Ø2½" m¹ 1.200 - -
2 Perlengkapan % 35.000 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A Tenaga
1 Pekerja L.01 OH 0.081 111,700.00 9,047.70
2 Tukang Batu L.02 OH 0.135 135,070.00 18,234.45
3 Kepala Tukang L.03 OH 0.0135 140,740.00 1,899.99
4 Mandor L.04 OH 0.004 160,090.00 640.36
Jumlah Tenaga Kerja 29,822.50
B Bahan
1 Pipa PVC Ø3" m¹ 1.200 32,625.00 39,150.00
2 Perlengkapan % 35.000 11,418.75 11,418.75
Jumlah Harga Bahan 50,568.75
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 80,391.25
E Overhead + Profit ( Contoh 10% ) 10% x D 8,039.13
F Harga Satuan Pekerjaan ( D + E ) 88,430.38
334
1 Pipa PVC Ø4" m¹ 1.200 52,750.00 63,300.00
2 Perlengkapan % 35.000 18,462.50 18,462.50
Jumlah Harga Bahan 81,762.50
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 111,585.00
E Overhead + Profit ( Contoh 10% ) 10% x D 11,158.50
F Harga Satuan Pekerjaan ( D + E ) 122,743.50
335
A.5.1.1.32. Pemasangan 1 m¹ PVC type AW Ø6"
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.081 111,700.00 9,047.70
2 Tukang Batu L.02 OH 0.135 135,070.00 18,234.45
3 Kepala Tukang L.03 OH 0.0135 140,740.00 1,899.99
4 Mandor L.04 OH 0.004 160,090.00 640.36
Jumlah Tenaga Kerja 29,822.50
B Bahan
1 Pipa PVC Ø6" m¹ 1.200 138,750.00 166,500.00
2 Perlengkapan % 35.000 48,562.50 48,562.50
Jumlah Harga Bahan 215,062.50
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 244,885.00
E Overhead + Profit ( Contoh 10% ) 10% x D 24,488.50
F Harga Satuan Pekerjaan ( D + E ) 269,373.50
336
Jumlah Tenaga Kerja -
B Bahan
1 Pipa Tanah Ø15cm Buah 1.600 - -
2 Semen Portland Kg 0.680 - -
3 Pasir Pasang m³ 0.013 - -
4 Pasir Urug m³ 0.011 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
337
5 Pasir Urug m³ 0.069 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
338
A.5.1.1.1. Pemotongan 1 Buah Tiang Beton
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.125 111,700.00 13,962.50
2 Mandor L.04 OH 0.030 160,090.00 4,802.70
Jumlah Tenaga Kerja 18,765.20
B Bahan
1 Alat bantu 1.000 20,000.00 20,000.00
Jumlah Harga Bahan 20,000.00
C Peralatan
1 - -
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) 38,765.20
E Overhead + Profit ( Contoh 10% ) 10% x D 3,876.52
F Harga Satuan Pekerjaan ( D + E ) 42,641.72
339
PT. BUMI KALTARA KONSULTAN
Perencanaan, Pengawasan, Pengukuran, dan Manajemen Konstruksi
Alamat : JL. P. Diponegoro RT. 22 RW.08 kel. Sebengkok Tarakan – Kalimantan Utara
email : pt.bumikaltara@yahoo.com
HARGA
JUMLAH
No. URAIAN PEKERJAAN SATUAN
( Rp ) ( Rp )
1 2 3 4
I PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan 1 m bouwplank
a. Tenaga Kerja
0.100 oh Pekerja 82,500.00 8,250.00
0.100 oh Tukang 88,000.00 8,800.00
0.010 oh Kepala tukang 88,000.00 880.00
0.005 oh Mandor 99,000.00 495.00
Jumlah Harga Tenaga Kerja 18,425.00
b. Bahan
0.012 m3 kayu 5/7 3,600,000.00 43,200.00
0.020 kg Paku biasa 2" - 3" 24,200.00 484.00
0.007 m3 Kayu papan 3/20 3,600,000.00 25,200.00
Jumlah Harga Bahan 68,884.00
c. Peralatan
- - - -
Jumlah Harga Peralatan -
d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c) 87,309.00
e. Overhead + Profit (15% x d) 13,096.35
f. Harga Satuan Pekerjaan (d+e) 100,405.35
II PEKERJAAN TANAH
1 Penggalian 1 m3 tanah biasa sedalam 1 m
a. Tenaga Kerja
0.750 oh Pekerja 82,500.00 61,875.00
0.025 oh Mandor 99,000.00 2,475.00
Jumlah Harga Tenaga Kerja 64,350.00
b. Bahan
- - - -
Jumlah Harga Bahan -
c. Peralatan
- - - -
Jumlah Harga Peralatan -
d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c) 64,350.00
e. Overhead + Profit (15% x d) 9,652.50
f. Harga Satuan Pekerjaan (d+e) 74,002.50
IV PEKERJAAN BETON
1 Pembesian 1 kg dengan besi polos
a. Tenaga Kerja
0.700 oh Pekerja 82,500.00 57,750.00
0.700 oh Tukang 88,000.00 61,600.00
0.070 oh Kepala tukang 88,000.00 6,160.00
0.070 oh Mandor 99,000.00 6,930.00
Jumlah Harga Tenaga Kerja 132,440.00
HARGA
JUMLAH
No. URAIAN PEKERJAAN SATUAN
( Rp ) ( Rp )
b. Bahan
105.00 kg Besi beton (polos) 17,600.00 1,848,000.00
1.50 kg Kawat ikat 22,000.00 33,000.00
Jumlah Harga Bahan 1,881,000.00
c. Peralatan
- - - -
Jumlah Harga Peralatan -
d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c)/100 20,134.40
e. Overhead + Profit (15% x d) 3,020.16
f. Harga Satuan Pekerjaan (d+e) 23,154.56
V PEKERJAAN DINDING
1 Pemasangan 1 m2 dinding bata merah ukuran (8 x 8 x 17.5) cm tebal 1/2 bata, campuran spesi 1 PC : 4 PP
a. Tenaga Kerja
0.300 oh Pekerja 82,500.00 24,750.00
0.100 oh Tukang 88,000.00 8,800.00
0.010 oh Kepala tukang 88,000.00 880.00
0.015 oh Mandor 99,000.00 1,485.00
Jumlah Harga Tenaga Kerja 35,915.00
b. Bahan
52.000 Buah Bata merah 1,600.00 83,200.00
11.500 kg Portland Cement 1,760.00 20,240.00
0.043 m3 Pasir Pasang 121,000.00 5,203.00
Jumlah Harga Bahan 108,643.00
c. Peralatan
- - - -
Jumlah Harga Peralatan -
d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c) 144,558.00
e. Overhead + Profit (15% x d) 21,683.70
f. Harga Satuan Pekerjaan (d+e) 166,241.70
VI PEKERJAAN PLESTERAN
1 Memasang 1 m2 plesteran 1 SP : 4 PP, tebal 15 mm
a. Tenaga Kerja
0.300 oh Pekerja 82,500.00 24,750.00
0.150 oh Tukang 88,000.00 13,200.00
HARGA
JUMLAH
No. URAIAN PEKERJAAN SATUAN
( Rp ) ( Rp )
0.015 oh Kepala tukang 88,000.00 1,320.00
0.015 oh Mandor 99,000.00 1,485.00
Jumlah Harga Tenaga Kerja 40,755.00
b. Bahan
6.240 kg Portland Cement 1,760.00 10,982.40
0.024 m3 Pasir Pasang 121,000.00 2,904.00
Jumlah Harga Bahan 13,886.40
c. Peralatan
- - - -
Jumlah Harga Peralatan -
d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c) 54,641.40
e. Overhead + Profit (15% x d) 8,196.21
f. Harga Satuan Pekerjaan (d+e) 62,837.61
X PEKERJAAN KAYU
1 Pemasangan 1 m2 rangka langit-langit (60x60) cm, kayu kelas II atau III
a. Tenaga Kerja
0.200 oh Pekerja 82,500.00 16,500.00
0.300 oh Tukang 88,000.00 26,400.00
0.030 oh Kepala tukang 88,000.00 2,640.00
0.075 oh Mandor 99,000.00 7,425.00
Jumlah Harga Tenaga Kerja 52,965.00
b. Bahan
0.016 m3 Kaso-kaso (5 x 7) cm 3,600,000.00 58,680.00
0.250 kg Paku 7 cm – 10 cm 24,200.00 6,050.00
Jumlah Harga Bahan 64,730.00
c. Peralatan
- - - -
Jumlah Harga Peralatan -
d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c) 117,695.00
e. Overhead + Profit (15% x d) 17,654.25
f. Harga Satuan Pekerjaan (d+e) 135,349.25
4 Pemasangan 1 m lisplank ukuran (3 x 20) cm, kayu kelas kelas I atau kelas II
a. Tenaga Kerja
0.100 oh Pekerja 82,500.00 8,250.00
0.200 oh Tukang 88,000.00 17,600.00
0.020 oh Kepala tukang 88,000.00 1,760.00
0.005 oh Mandor 99,000.00 495.00
Jumlah Harga Tenaga Kerja 28,105.00
b. Bahan
0.011 m3 Papan kayu 4,800,000.00 51,840.00
0.100 kg Paku 5 cm dan 7 cm 24,200.00 2,420.00
Jumlah Harga Bahan 54,260.00
c. Peralatan
- - - -
Jumlah Harga Peralatan -
d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c) 82,365.00
e. Overhead + Profit (15% x d) 12,354.75
f. Harga Satuan Pekerjaan (d+e) 94,719.75
HARGA
JUMLAH
No. URAIAN PEKERJAAN SATUAN
( Rp ) ( Rp )
XI PEKERJAAN LANGIT-LANGIT
1 Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3mm, 4 mm, dan 6 mm
a. Tenaga Kerja
0.100 oh Pekerja 82,500.00 8,250.00
0.100 oh Tukang 88,000.00 8,800.00
0.010 oh Kepala tukang 88,000.00 880.00
0.005 oh Mandor 99,000.00 495.00
Jumlah Harga Tenaga Kerja 18,425.00
b. Bahan
0.375 lbr Tripleks 80,000.00 30,000.00
0.030 kg Paku 24,200.00 726.00
Jumlah Harga Bahan 30,726.00
c. Peralatan
- - - -
Jumlah Harga Peralatan -
d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c) 49,151.00
e. Overhead + Profit (15% x d) 7,372.65
f. Harga Satuan Pekerjaan (d+e) 56,523.65
2 Pengecatan 1 m2 Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup
a. Tenaga Kerja
0.070 oh Pekerja 82,500.00 5,775.00
0.009 oh Tukang 88,000.00 792.00
0.006 oh Kepala tukang 88,000.00 528.00
0.003 oh Mandor 99,000.00 297.00
Jumlah Harga Tenaga Kerja 7,392.00
b. Bahan
0.200 kg Cat menie 59,000.00 11,800.00
0.150 kg Plamir 55,000.00 8,250.00
0.170 kg Cat dasar 59,000.00 10,030.00
0.260 kg Cat penutup 59,000.00 15,340.00
0.010 bh Kuas 30,000.00 300.00
HARGA
JUMLAH
No. URAIAN PEKERJAAN SATUAN
( Rp ) ( Rp )
0.030 kg Minyak cat 29,000.00 870.00
0.200 lbr Ampelas 13,000.00 2,600.00
Jumlah Harga Bahan 49,190.00
c. Peralatan
- - - -
Jumlah Harga Peralatan -
d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c) 56,582.00
e. Overhead + Profit (15% x d) 8,487.30
f. Harga Satuan Pekerjaan (d+e) 65,069.30
2 Pemasangan 1 m2 kuda-kuda dan rangka atap baja ringan (zincalume) bersertifikasi iso
a. Tenaga Kerja
0.500 oh Pekerja 82,500.00 41,250.00
0.025 oh Tukang 88,000.00 2,200.00
0.250 oh Kepala tukang 88,000.00 22,000.00
0.025 oh Mandor 99,000.00 2,475.00
Jumlah Harga Tenaga Kerja 67,925.00
b. Bahan
1.000 m2 Kuda-kuda Zincalume 72,000.00 72,000.00
1.000 m2 Reng Zincalume 107,000.00 107,000.00
1.000 ls Asesories 30,000.00 30,000.00
Jumlah Harga Bahan 209,000.00
c. Peralatan
- - - -
Jumlah Harga Peralatan -
d. Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (a+b+c) 276,925.00
e. Overhead + Profit (15% x d) 41,538.75
f. Harga Satuan Pekerjaan (d+e) 318,463.75
II SATUAN BAHAN
1 Semen ( 50 ) Rp. 88,000.00 / Zak
2 Semen Warna ( 50 ) Rp. 125,400.00 / Zak
3 Pasir Pasangan Rp. 121,000.00 / M3
4 Pasir urug Rp. 117,000.00 / M3
5 Tanah Urug Rp. 117,000.00 / M3
6 Besi Beton Polos Rp. 17,600.00 / Kg
7 Besi Beton Ulir Rp. 22,000.00 / Kg
8 Batu Pecah / Agregat Kasar Rp. 580,000.00 / Kg
9 Batu Bata Merah Rp. 1,600.00 / Bh
10 Kawat Ikat Rp. 22,000.00 / Kg
11 Kayu Meranti Rp. 3,600,000.00 / M3
12 Kayu Kapur/ Bengkirai/ Lembasung Rp. 4,800,000.00 / M3
13 Paku Biasa Rp. 24,200.00 / Kg
14 Paku Sekrup Rp. 27,000.00 / Kg
15 Plywood Tebal 9 mm Rp. 120,000.00 / Lbr
16 Plywood Tebal 6 mm Rp. 96,000.00 / Lbr
17 Plywood Tebal 4 mm Rp. 80,000.00 / Lbr
18 List Kayu Profil Rp. 30,000.00 / btg
19 Kaca Polos Tebal 5 mm Rp. 151,000.00 / M2
20 Kaca temperd Tebal 12 mm Rp. 550,000.00 / M2
21 Kaca Ryben 5 mm Rp. 149,000.00 / M2
22 Keramik 40x40 EX-Roman Rp. 145,000.00 / M2
23 Keramik 30x30 EX-Roman Rp. 6,930.00 / Bh
No Uraian Bahan Harga Satuan (Rp) Satuan
1 2 3 4
24 Keramik 20x20 Rp. 106,000.00 / M2
25 Keramik 20x25 Rp. 106,000.00 / M2
26 Dempul / plamir Rp. 55,000.00 / Kg
27 Amplas Rp. 13,000.00 / Lbr
28 Cat Air Rp. 26,000.00 / Kg
29 Cat Kilap Rp. 59,000.00 / Kg
30 Minyak Begesting Rp. 9,000.00 / Ltr
31 Minyak Cat A Rp. 29,000.00 / Kg
32 Meni Rp. 59,000.00 / Kg
33 Sealent Rp. 41,000.00 / Tube
34 Kunci Tanam Rp. 176,000.00 / Bh
35 Hak Angin Rp. 22,000.00 / Bh
36 Grendel Rp. 27,500.00 / Bh
37 Handle Rp. 27,500.00 / Bh
38 Engsel Kupu-Kupu 4" Rp. 66,000.00 / Psg
39 Engsel Kupu-Kupu 3" Rp. 49,500.00 / Psg
40 Dolken kayu galam, Ö (8 - 10) cm, panjang 4 m Rp. 60,000.00 / Btg
41 Besi baja C- 75. 0,8 Rp. 72,000.00 / Btg
42 Besi baja C- 75. 0,6 Rp. 72,000.00 / Btg
42 Reng Zincalume Rp. 107,000.00 / M2
43 Baja ringan (Zincalume) Rp. 60,000.00 / M
44 Seng Gelombang BJLS 30 Rp. 110,000.00 / Lbr
45 Seng Plat BJLS 30 Rp. 106,000.00 / Lbr
46 Multy colour Rp. 77,000.00 / Lbr
47 Nok multy colour Rp. 59,000.00 / Lbr
39 Kran Air Rp. 27,500.00 / Bh
40 Closed Jongkok Rp. 313,000.00 / Bh
41 Pipa PVC 1/2" Rp. 41,800.00 / Btg
42 Pipa PVC 2" Rp. 115,500.00 / Btg
43 Pipa PVC 3" Rp. 139,000.00 / Btg
44 Pipa PVC 4" Rp. 217,000.00 / Btg
45 Floor Drain Rp. 54,000.00 / Bh
46 Saklar Ganda Rp. 42,000.00 / Bh
47 Saklar Tunggal Rp. 31,000.00 / Bh
48 Stop Kontak Rp. 42,000.00 / Bh
49 Baut (screw driver) Rp. 23,000.00 / Kg
49 Kusen Aluminium Rp. 159,000.00 / M
49 Atap Spandek Rp. 90,000.00 / M2
50 Tiang Pancang 20x20x400 Rp. 1,500,000.00 / Btg
51 Hollow 4/4 Rp. 223,000.00 / Btg
No Uraian Bahan Harga Satuan (Rp) Satuan
1 2 3 4
52 Hollow 2/4 Rp. 169,000.00 / Btg
53 Kuas Rp. 30,000.00 / Bh
54 Baja WF Rp. 24,000.00 / Kg
55 Kawat las Rp. 37,125.00 / Kg
56 Mesin las Rp. 30,000.00 / Jam
ENGINEERING ESTIMATE (EE)
KEGIATAN : PEMBANGUNANFASILITAS UMUM DAN SOSIAL
PAKET KEGIATAN : MCK DAN PROFIL RT 06 MAMBURUNGAN TIMUR
LOKASI : KOTA TARAKAN
TAHUN ANGGARAN : 2011
1 x 10 x 0.1 m
P R O C E S S I N G
Pembesian
Sumbu-X
Sumbu-Y
Wtul.bagian atas = - kg
Wtul.TOTAL = 68.82 kg
Begesting
Luasan begesting =
Samping = = - m2
Bawah = 10 m2 = 10.00 m2
L total = 10.00 m2
1 x 6.6667 x 0.15 m
P R O C E S S I N G
Pembesian
Sumbu-X
Sumbu-Y
D10 ------> 0.62 kg/m' L= 6.67 m x 6.00 bh = 40.00 m -----------> Wtul.sumbu Y = 24.80 kg
Wtul.bagian atas = - kg
Wtul.TOTAL = 46.50 kg
Begesting
Luasan begesting =
Samping = = - m2
Bawah = 7 m2 = 6.67 m2
L total = 6.67 m2
0.15 x 0.15 m
P R O C E S S I N G
Pembesian
Tulangan Pokok
Tulangan Sengkang
Begesting
Luasan begesting
= 13.33 m2 x 2 sisi = 26.67 m2
= = - m2
Jadi utk Vol 1 m3 beton diperlukan luasan begesting L total = 26.67 m2 / per 1 m3 beton
PLAT LANTAI 100 x 1000 x 10 cm
1 x 10 x 0.1 m
P R O C E S S I N G
Pembesian
Sumbu-X
Sumbu-Y
Wtul.bagian atas = - kg
Wtul.TOTAL = 35.76 kg
SLOOF 15 x 20 cm
0.15 x 0.2 m
P R O C E S S I N G
Pembesian
Tulangan Pokok
Wtul. Pokok = - kg
Tulangan Sengkang
Begesting
Luasan begesting
Samping = 6.67 m2 x 2 sisi = 13.33 m2
Bawah = = - m2
L total = 13.33 m2
Jadi utk Vol 1 m3 beton diperlukan luasan begesting = 13.33 m2
x y t
POER PLAT 70 x 70 x 20 cm
P R O C E S S I N G
Pembesian
Panjang Total
D12 ------> 0.887 kg/m' Arah- X L= 1.26 m x 5 bh = 6.30 m
12.60 m'
Arah- Y L= 1.26 m x 5 bh = 6.30 m
Begesting
Luasan begesting
Samping Arah- X = 0.14 m2 x 2 sisi = 0.28 m2
Jadi utk Vol 1 m3 beton diperlukan luasan begesting LTotal = 5.71 m2/m3
KOLOM 10 x 15 cm
0.1 x 0.15 m
P R O C E S S I N G
Pembesian
Tulangan Pokok
Tulangan Sengkang
Begesting
Luasan begesting
= 16.67 m2 x 2 sisi = 33.33 m2
= = - m2
Jadi utk Vol 1 m3 beton diperlukan luasan begesting L total = 33.33 m2 / per 1 m3 beton
Balok 10 x 15 cm
0.1 x 0.15 m
P R O C E S S I N G
Pembesian
Tulangan Pokok
Wtul. Pokok = - kg
Tulangan Sengkang
Begesting
Luasan begesting
Sisi Samping = 10.00 m2 x 2 sisi = 20.00 m2
Jadi utk Vol 1 m3 beton diperlukan luasan begesting L total = 26.67 m2 / per 1 m3 beton
DAK ATAP 100 x 1000 x 10 cm
1 x 10 x 0.1 m
P R O C E S S I N G
Pembesian
Sumbu-X
Sumbu-Y
Wtul.bagian atas = - kg
Wtul.TOTAL = 43.62 kg
Begesting
Luasan begesting =
Samping = = - m2
Bawah = 10 m2 = 10.00 m2
L total = 10.00 m2
0.1 x 0.15 m
P R O C E S S I N G
Pembesian
Tulangan Pokok
Wtul. Pokok = - kg
Tulangan Sengkang
Begesting
Luasan begesting
Sisi Samping = 10.00 m2 x 2 sisi = 20.00 m2
Jadi utk Vol 1 m3 beton diperlukan luasan begesting L total = 26.67 m2 / per 1 m3 beton
x y t
P R O C E S S I N G
Pembesian
Panjang Total
D16 ------> 1.58 kg/m' Arah- X L= 2.86 m x 8 bh = 22.88 m
45.76 m'
Arah- Y L= 2.86 m x 8 bh = 22.88 m
Begesting
Luasan begesting
Samping Arah- X = 0.52 m2 x 2 sisi = 1.04 m2
Jadi utk Vol 1 m3 beton diperlukan luasan begesting LTotal = 3.08 m2/m3
x y t
1 x 1 x 0.4 m
P R O C E S S I N G
Pembesian Ulir
Panjang Total
D16 ------> 1.58 kg/m' Arah- X L= 2.26 m x 6 bh = 13.56 m
27.12 m'
Arah- Y L= 2.26 m x 6 bh = 13.56 m
Begesting
Luasan begesting
Samping Arah- X = 0.4 m2 x 2 sisi = 0.80 m2
Jadi utk Vol 1 m3 beton diperlukan luasan begesting LTotal = 4.00 m2/m3
KOLOM 25 x 40 cm
0.25 x 0.4 m
P R O C E S S I N G
Pembesian
Tulangan Pokok
Tulangan Sengkang
Begesting
Luasan begesting
= 5.79 m2 x 2 sisi = 11.57 m2
= = - m2
Jadi utk Vol 1 m3 beton diperlukan luasan begesting L total = 11.57 m2 / per 1 m3 beton
KOLOM 25 x 25 cm
0.25 x 0.25 m
P R O C E S S I N G
Pembesian
Tulangan Pokok
Tulangan Sengkang
Begesting
Luasan begesting
= 8.00 m2 x 2 sisi = 16.00 m2
= = - m2
Jadi utk Vol 1 m3 beton diperlukan luasan begesting L total = 16.00 m2 / per 1 m3 beton
SLOOF 25 x 40 cm
0.25 x 0.4 m
P R O C E S S I N G
Pembesian
Tulangan Pokok
Begesting
Luasan begesting
Samping = 4.00 m2 x 2 sisi = 8.00 m2
Bawah = = - m2
L total = 8.00 m2
0.25 x 0.4 m
P R O C E S S I N G
Pembesian
Tulangan Pokok
Begesting
Luasan begesting
Samping = 4.00 m2 x 2 sisi = 8.00 m2
Bawah = = - m2
L total = 8.00 m2
0.15 x 0.2 m
P R O C E S S I N G
Pembesian
Tulangan Pokok
Wtul. Pokok = - kg
Tulangan Sengkang
Begesting
Luasan begesting
Samping = 6.67 m2 x 2 sisi = 13.33 m2
Bawah = = - m2
L total = 13.33 m2
1 x 10 x 0.1 m
P R O C E S S I N G
Pembesian
Sumbu-X
Sumbu-Y
Wtul.bagian atas = - kg
Wtul.TOTAL = 43.62 kg
KOLOM 10 x 15 cm
0.1 x 0.15 m
P R O C E S S I N G
Pembesian
Tulangan Pokok
Wtul. Pokok = - kg
Tulangan Sengkang
Begesting
Luasan begesting
= 16.67 m2 x 2 sisi = 33.33 m2
= = - m2
Jadi utk Vol 1 m3 beton diperlukan luasan begesting L total = 33.33 m2 / per 1 m3 beton
RINGBALK 10 x 20 cm
0.1 x 0.2 m
P R O C E S S I N G
Pembesian
Tulangan Pokok
Wtul. Pokok = - kg
Tulangan Sengkang
Begesting
Luasan begesting
Sisi Samping = 10.00 m2 x 2 sisi = 20.00 m2
0.15 x 0.25 m
P R O C E S S I N G
Pembesian
Tulangan Pokok
Wtul. Pokok = - kg
Tulangan Sengkang
Begesting
Luasan begesting
Sisi Samping = 6.67 m2 x 2 sisi = 13.33 m2
0.25 x 0.4 m
P R O C E S S I N G
Pembesian
Tulangan Pokok
Tulangan Sengkang
Begesting
Luasan begesting
Sisi Samping = 4.00 m2 x 2 sisi = 8.00 m2
1 x 12.5 x 0.08 m
P R O C E S S I N G
Pembesian
Sumbu-X
Sumbu-Y
Wtul.bagian atas = kg
Wtul.TOTAL = 44.61 kg
Begesting
Luasan begesting =
Samping = = - m2
L total = 12.50 m2
1 x 8.3333 x 0.12 m
P R O C E S S I N G
Pembesian
Sumbu-X
Sumbu-Y
D10 ------> 0.62 kg/m' L= 8.33 m x 6.00 bh = 50.00 m -----------> Wtul.sumbu Y = 31.00 kg
Wtul.TOTAL = ### kg
Begesting
Luasan begesting =
Samping = = - m2
L total = 8.33 m2
0.25 x 0.4 m
P R O C E S S I N G
Pembesian
Tulangan Pokok
Tulangan Sengkang
Begesting
Luasan begesting
Sisi Samping = 4.00 m2 x 2 sisi = 8.00 m2
1 x 8.3333 x 0.12 m
P R O C E S S I N G
Pembesian
Sumbu-X
Sumbu-Y
D10 ------> 0.62 kg/m' L= 8.33 m x 5.00 bh = 41.67 m -----------> Wtul.sumbu Y = 25.83 kg
Wtul.TOTAL = 95.07 kg
Begesting
Luasan begesting =
Samping = = - m2
L total = 8.33 m2
0.25 x 0.4 m
P R O C E S S I N G
Pembesian
Tulangan Pokok
Tulangan Sengkang
Begesting
Luasan begesting
Sisi Samping = 4.00 m2 x 2 sisi = 8.00 m2
0.25 x 0.4 m
P R O C E S S I N G
Pembesian
Tulangan Pokok
Tulangan Sengkang
Begesting
Luasan begesting
Sisi Samping = 4.00 m2 x 2 sisi = 8.00 m2
0.1 x 0.2 m
P R O C E S S I N G
Pembesian
Tulangan Pokok
Wtul. Pokok = - kg
Tulangan Sengkang
Begesting
Luasan begesting
Sisi Samping = 10.00 m2 x 2 sisi = 20.00 m2
0.2 x 0.4 m
P R O C E S S I N G
Pembesian
Tulangan Pokok
Tulangan Sengkang
Begesting
Luasan begesting
Sisi Samping = 5.00 m2 x 2 sisi = 10.00 m2
Jadi utk Vol 1 m3 beton diperlukan luasan begesting L total = 12.50 m2 / per 1 m3 beton
KOLOM 25 x 25 cm
0.25 x 0.25 m
P R O C E S S I N G
Pembesian
Tulangan Pokok
Tulangan Sengkang
Begesting
Luasan begesting
= 8.00 m2 x 2 sisi = 16.00 m2
= = - m2
Jadi utk Vol 1 m3 beton diperlukan luasan begesting L total = 16.00 m2 / per 1 m3 beton
luifel 100 x 1000 x 10 cm
1 x 10 x 0.1 m
P R O C E S S I N G
Pembesian
Sumbu-X
Sumbu-Y
Wtul.bagian atas = kg
Wtul.TOTAL = 35.76 kg
Begesting
Luasan begesting =
Samping = = - m2
Bawah = 10 m2 = 10.00 m2
L total = 10.00 m2
1 x 6.6667 x 0.15 m
P R O C E S S I N G
Pembesian
Sumbu-X
Sumbu-Y
D10 ------> 0.62 kg/m' L= 6.67 m x 6.00 bh = 40.00 m -----------> Wtul.sumbu Y = 24.80 kg
Wtul.TOTAL = 93.00 kg
Begesting
Luasan begesting =
Samping = = - m2
L total = 6.67 m2
P R O C E S S I N G
Pembesian Polos
D8 ------> 0.393 kg/m' L= 0.84 m x 11 bh = 9.24 m 3.63
Begesting
Luasan begesting
Arah- X = 0.6213 m2 x 1 sisi = 0.86 m2
Jadi utk Vol 1 m3 beton diperlukan luasan begesting LTotal = 9.29 m2/m3