This contingency plan outlines potential problems that could affect the film production "The Final Meta Project" and measures to control them. It identifies issues like equipment availability, audio and visual quality, sickness on shooting dates, lack of extra help, and not having enough time to do post-production work. The plan proposes solutions such as booking equipment and recording hardware in advance, experimenting with lighting, taking health precautions, using more static shots, and carefully managing time for filming and rotoscoping.
This contingency plan outlines potential problems that could affect the film production "The Final Meta Project" and measures to control them. It identifies issues like equipment availability, audio and visual quality, sickness on shooting dates, lack of extra help, and not having enough time to do post-production work. The plan proposes solutions such as booking equipment and recording hardware in advance, experimenting with lighting, taking health precautions, using more static shots, and carefully managing time for filming and rotoscoping.
This contingency plan outlines potential problems that could affect the film production "The Final Meta Project" and measures to control them. It identifies issues like equipment availability, audio and visual quality, sickness on shooting dates, lack of extra help, and not having enough time to do post-production work. The plan proposes solutions such as booking equipment and recording hardware in advance, experimenting with lighting, taking health precautions, using more static shots, and carefully managing time for filming and rotoscoping.
Name of Production: The Final Meta Project Producers Name: Tom Evans Contact Number: 07737 127127
Location / Potential problem Effect on Control Measure Existing measures
scene production Equipment not Unable to film Book equipment in advance Ability to book equipment Full available project and know what to film. through college website project Messy audio Decrease in quality Book recording hardware placement of camera in Full project of the overall project such as microphones relation to sound being produced Bad visuals Decrease in quality Experiment with lighting Ability to change colour/ Full project (lighting) of visual aspects of before beginning to film. tone of lighting during the the production production/ filming. Sickness on dates Unable to shoot Regular precautious N/A Full project of shooting while project is booked No extra people to Difficulty with some Make use of more N/A Full project help camera movements interesting static shots and cinematography Not enough time to More simple designs Time manage when to film N/A Full project rotoscope for demon and when to rotoscope