DOCUMENT NO :

OPF-M-LST-2004
LINE LIST SHEET : 5 OF 10

Project Title :

OO-OX Field Development

Author's Org:
A ISSUED FOR REVIEW 1-Jun-22 MN MRP TG/ARK
PT. Depriwangga Engineering
REV DESCRIPTION DATE BY CHK'D APP'D COMP'D

P&ID Operating Condition Design Condition Test Pressure


Routing Piping Specification
(From-to) Fluid Grade Stress Analysis
Line Number Radiographic
No. Line Number Description Fluid State Density Press Temp Press. Temp. (Stress Calculation Service Design Code Remarks
Status Hydrotest Pneumatic test Testing
(lb/ft3) Analysis) Number
(psig) (psig)
o o
No. REV FROM TO Rating Sch. No. psig F psig F

Wet Gas from Slug Catcher OPF-BANG-P-PID-6002 /


1 PG-011-B-3" (BANG-V-010) to Fuel Gas NewLine
Existing OPF-BANG-P-PID-6013 1A Slug Catcher (BANG-V-010) Fuel Gas System 300# std Gas 0.25 45.00 67.78 740 100 1125 - A N/A 100% Process Gas ASME B31.3 NON CRITICAL
Scrubber Sheet 1 of 2

OPF-BANG-P-PID-6002 /
Outlet Gas OOA Slug Catcher N/A
2 PG-620-B-10" New OPF-BANG-P-PID-6202 1A OOA Slug Catcher (BANG-V-202) PG-026-B-10" 300# std Gas 1.04 218.00 77.00 655 300 1125 - B OPF-M-CAL-2001 100% Process Gas ASME B31.3 CRITICAL
(BANG-V-202) Sheet 2 of 2

OPF-BANG-P-PID-6002 /
3 PG-026-B-10" Inlet TEG Package NewLine
Existing 1A Slug Catcher (BANG-V-010) TEG Contactor 300# std Gas 1.02 218.00 78.25 655 300 1125 - A N/A 100% Process Gas ASME B31.3 NON CRITICAL
OPF-BANG-P-PID-6204

Outlet Gas TEG Package


4 PG-038-B-10" Existing
NewLine OPF-BANG-P-PID-6004 1A TEG Package PG-042-B-10" 300# std Gas 0.99 218.00 83.12 655 300 1125 - A N/A 100% Process Gas ASME B31.3 NON CRITICAL
(BANG-PK-160)

Outlet Gas TEG Package


5 PG-042-B-10" Existing
NewLine OPF-BANG-P-PID-6004 1A PG-038-B-10" Sales Gas Coalescer 300# std Gas 0.74 160.00 78.08 655 300 1125 - A N/A 100% Process Gas ASME B31.3 NON CRITICAL
(BANG-PK-160) After Valve

Outlet Gas TEG Package


6 PG-066-B-3" (BANG-PK-160) to Fuel Gas Existing
NewLine OPF-BANG-P-PID-6004 1A PG-042-B-12" Fuel Gas Scrubber 300# std Gas 0.74 160.00 78.08 740 100 1125 - A N/A 100% Process Gas ASME B31.3 NON CRITICAL
Scrubber

Outlet Fuel Gas Scrubber to OPF-BANG-P-PID-6013


7 GF-215-A-3" Existing
NewLine 1A Fuel Gas Scrubber Fuel Gas Coalescer 150# std Gas 0.34 45.00 71.41 285 100 450 - A N/A 100% Fuel Gas ASME B31.3 NON CRITICAL
Fuel Gas Coalescer Sheet 1 of 2

Inlet Fuel Gas Scrubber OPF-BANG-P-PID-6013


8 GF-211-A-3" NewLine
Existing 1A PG-066-B-3" Fuel Gas Scrubber 150# std Gas 0.34 45.00 71.41 285 100 450 - A N/A 100% Fuel Gas ASME B31.3 NON CRITICAL
(BANG-V-070) Sheet 1 of 2

Outlet Gas Crude Oil


OPF-BANG-P-PID-6203
9 PG-035-A-3" Separator New 1A Crude Oil Separator PG-629-A-3" 150# std Gas 0.38 45.00 72.86 285 100 450 - A N/A 100% Process Gas ASME B31.3 NON CRITICAL
Sheet 1 of 3
(BANG-V-217)
OPF-BANG-P-PID-6203
Outlet Gas Crude Oil
Sheet 1 of 3 / OPF-
10 PG-629-A-3" Separator New 1A PG-035-A-3" Fuel Gas System 150# std Gas 0.38 45.00 72.86 285 100 450 - A N/A 100% Process Gas ASME B31.3 NON CRITICAL
BANG-P-PID-6013 Sheet
(BANG-V-217) After Valve 1 of 2

Purge Gas Header to Flare OPF-BANG-P-PID-6013 GF-606-A-2"


11 GF-700-A-3" New 1A GF-222-A-3"-IH-1" 150# std Gas 0.32 45.00 96.50 285 100 450 - A N/A 100% Fuel Gas ASME B31.3 NON CRITICAL
Header Sheet 2 of 2 GF-607-A-2"

OPF-BANG-P-PID-6013
12 GF-606-A-2" Purge Gas to HP Flare Header New 1A GF-700-A-3" HP Flare Header 150# std Gas 0.32 45.00 96.50 285 100 450 - A N/A 100% Fuel Gas ASME B31.3 NON CRITICAL
Sheet 2 of 2

OPF-BANG-P-PID-6013
13 GF-607-A-2" Purge Gas to LP Flare Header New 1A GF-700-A-3" LP Flare Header 150# std Gas 0.32 45.00 96.50 285 100 450 - A N/A 100% Fuel Gas ASME B31.3 NON CRITICAL
Sheet 2 of 2

Outlet Liquid GGA Slug


14 PL-005-B-12" New Line
Existing OPF-BANG-P-PID-6002 1A Slug Catcher (BANG-V-010) PL-006-A-4" 300# std Liquid 40.88 218.00 86.00 635 400 450 - A N/A 100% Process Liquid ASME B31.3 NON CRITICAL
Catcher (BANG-V-010)

Outlet Liquid GGA Slug


15 PL-006-A-4" Catcher (BANG-V-010) to Existing
New Line OPF-BANG-P-PID-6002 1A PL-005-B-12" Condensate Separator 150# std Liquid 40.88 218.00 72.86 260 200 450 - A N/A 100% Process Liquid ASME B31.3 NON CRITICAL
Condensate Separator
OPF-BANG-P-PID-6003
HC Liquid to Crude Oil Sheet 1 of 2 / OPF-
16 PL-643-A-4" Existing
New Line 1A Slug Catcher (BANG-V-010) Crude Oil Separator 150# std Liquid 40.88 218.00 86.00 260 200 450 - A N/A 100% Process Liquid ASME B31.3 NON CRITICAL
Separator from Slug Catcher BANG-P-PID-6203 Sheet
1 of 3
OPF-BANG-P-PID-6003
Produced Water From
Sheet 1 of 2 / OPF-
17 OW-131-A-3" Condensate Separator to Existing
New Line 1A OW-026-A-3' Water Degasser 150# std Liquid 40.88 218.00 86.00 285 100 450 - A N/A 100% Oily Water ASME B31.3 NON CRITICAL
BANG-P-PID-6010 Sheet
Water Degasser 1 of 2
OPF-BANG-P-PID-6003
Outlet Condensate Separator Sheet 1 of 2 / OPF-
18 OW-026-A-3" New Line
Existing 1A Condensate Separator OW-131-A-3" 150# std Liquid 40.88 218.00 86.00 285 100 450 - A N/A 100% Oily Water ASME B31.3 NON CRITICAL
(BANG-V-040) BANG-P-PID-6010 Sheet
1 of 2
OPF-BANG-P-PID-6003
HC Liquid from Condensate
Sheet 2 of 2 / OPF-
19 PL-648-A-2" Separator to Crude Oil Flash Existing
New Line 1A Condensate Separator Crude Oil Flash Vessel 150# std Liquid 40.88 218.00 86.00 285 100 450 - A N/A 100% Process Liquid ASME B31.3 NON CRITICAL
BANG-P-PID-6203 Sheet
Vessel 3 of 3

Outlet Condensate Storage


OPF-BANG-P-PID-6009 Condensate Storage Tank (BANG- B
20 PL-103-A-8" Tank (BANG-T-050A/B to Existing
New Line 1A PL-105-A-8" 150# std Liquid 48.51 0.50 109.01 230 300 450 - A N/A 100% Process Liquid ASME B31.3 NON CRITICAL
CRITICAL
Sheet 1 of 4 T-050A)
Condensate Transfer Pump
Header Outlet Condensate
PL-104-A-8"
Storage Tank (BANG-T- OPF-BANG-P-PID-6009
21 PL-105-A-8" Existing
New Line 1A PL-103-A-8" PL-039-A-8" 150# std Liquid 48.51 0.50 109.01 230 300 450 - A
B N/A 100% Process Liquid ASME B31.3 NON CRITICAL
CRITICAL
050A/B) to Condensate Sheet 1 of 4
PL-039A-A-8"
Transfer Pump (BANG-P-
DOCUMENT NO :

OPF-M-LST-2004
LINE LIST SHEET : 6 OF 10

Project Title :

OO-OX Field Development

Author's Org:
A ISSUED FOR REVIEW 1-Jun-22 MN MRP TG/ARK
PT. Depriwangga Engineering
REV DESCRIPTION DATE BY CHK'D APP'D COMP'D

P&ID Operating Condition Design Condition Test Pressure


Routing Piping Specification
(From-to) Fluid Grade Stress Analysis
Line Number Radiographic
No. Line Number Description Fluid State Density Press Temp Press. Temp. (Stress Calculation Service Design Code Remarks
Status Hydrotest Pneumatic test Testing
(lb/ft3) Analysis) Number
(psig) (psig)
o o
No. REV FROM TO Rating Sch. No. psig F psig F

Suction Condensate Transfer OPF-BANG-P-PID-6009


22 PL-104-A-8" Existing
New Line 1A PL-105-A-8" PL-106-A-6" 150# std Liquid 48.51 0.50 103.98 230 300 450 - BA N/A 100% Process Liquid ASME B31.3 CRITICAL
NON CRITICAL
Pump (BANG-P-053A) Sheet 1 of 4

Suction Condensate Transfer OPF-BANG-P-PID-6009 BA


23 PL-039-A-8" Existing
New Line 1A PL-105-A-8" PL-040=A=6" 150# std Liquid 48.51 0.50 109.01 230 300 450 - N/A 100% Process Liquid ASME B31.3 NON CRITICAL
CRITICAL
Pump (BANG-P-053B) Sheet 1 of 4

Discharge Condensate
OPF-BANG-P-PID-6009
24 PL-106-A-6" Transfer Pump (BANG-P- Existing
New Line 1A PL-104-A-8" PL-107-A-6" 150# std Liquid 48.53 55.00 109.23 260 200 450 - A N/A 100% Process Liquid ASME B31.3 NON CRITICAL
Sheet 1 of 4
053A)

Discharge Condensate
OPF-BANG-P-PID-6009
25 PL-040-A-6" Transfer Pump (BANG-P- New Line
Existing 1A PL-039A-A-8" PL-107-A-6" 150# std Liquid 48.53 55.00 109.23 260 200 450 - A N/A 100% Process Liquid ASME B31.3 NON CRITICAL
Sheet 1 of 4
053B)

PL-106-A-6"
From Condensate Transfer OPF-BANG-P-PID-6009
26 PL-107-A-6" Existing
New Line 1A PL-040-A-6" PL-108-A-6" 150# std Liquid 48.53 55.00 109.23 260 200 450 - A N/A 100% Process Liquid ASME B31.3 NON CRITICAL
Pump (BANG-P-053A/B) Sheet 1 of 4
PL-040A-A-6"

From Condensate Transfer


OPF-BANG-P-PID-6009
27 PL-108-A-6" Pump (BANG-P-053A/B) to New Line
Existing 1A PL-107-A-6" Condensate Exportline 150# std Liquid 48.53 55.00 109.23 260 200 450 - A N/A 100% Process Liquid ASME B31.3 NON CRITICAL
Sheet 1 of 4
Condensate Exportline

Inlet Condensate Storage OPF-BANG-P-PID-6009


28 PL-024-A-4" Existing
New Line 1A PL-154-A-4" Condensate Storage Tank 150# std Liquid 48.49 30.00 109.32 260 200 450 - A N/A 100% Process Liquid ASME B31.3 NON CRITICAL
Tank (BANG-T-050A) Sheet 1 of 4

From Condensate Transfer OPF-BANG-P-PID-6009


Pump (BANG-P-053A/B) to Sheet 1 of 4 / OPF-
29 PL-510-A-4" Existing
New Line 1A PL-024-A-4" Condensate Storage Tank 150# std Liquid 48.53 55.00 109.23 260 200 450 - A N/A 100% Process Liquid ASME B31.3 NON CRITICAL
Condensate Storage Tank BANG-P-PID-6009 Sheet
(BANG-T-050B) 3 of 4
From Condensate Storage OPF-BANG-P-PID-6009
Tank (BANG-T-050B) to Sheet 1 of 4 / OPF- B
30 PL-511-A-8" New Line
Existing 1A Condensate Storage Tank-B PL-105-A-8" 150# std Liquid 48.51 0.50 109.01 230 300 450 - A N/A 100% Process Liquid ASME B31.3 NON CRITICAL
CRTICAL
Condensate Transfer Pump BANG-P-PID-6009 Sheet
(BANG-P-053A/B) 3 of 4
Outlet Stabilization Package OPF-BANG-P-PID-6009
FEED Pump (BANG-P- Sheet 1 of 4 / OPF-
31 PL-711-A-4" Existing
New Line 1A Crude Oil Stabilization Package PL-024-A-4" 150# std Liquid 48.49 30.00 109.32 260 200 450 - A N/A 100% Process Liquid ASME B31.3 NON CRITICAL
241A/B) to Condensate BANG-P-PID-6203 Sheet
Storage Tank 3 of 3

From Condensate Transfer


OPF-BANG-P-PID-6009
32 PL-109-A-6" Pump (BANG-P-053A/B) to Existing
New Line 1A PL-108-A-6" PL-395-A-6" 150# std Liquid 48.53 55.00 109.23 260 200 450 - A N/A 100% Process Liquid ASME B31.3 NON CRITICAL
Sheet 2 of 4
Condensate Exportline
From Condensate Transfer
Pump (BANG-P-053A/B) After OPF-BANG-P-PID-6009
33 PL-395-A-6" Existing
New Line 1A PL-109-A-6" Condensate Tank - 1 150# std Liquid 48.53 55.00 109.23 260 200 450 - A N/A 100% Process Liquid ASME B31.3 NON CRITICAL
Check Valve to Condensate Sheet 2 of 4
Exportline
Produced Water From Crude OPF-BANG-P-PID-6010
Oil Stabilization Unit to Sheet 1 of 2 / OPF-
34 OW-719-A-2" New 1A Crude Oil Stabilization Unit OW-800-A-3" 150# std Liquid 50.07 30.00 109.32 285 100 450 - A N/A 100% Oily Water ASME B31.3 NON CRITICAL
Temporary Produced Water BANG-P-PID-6203 Sheet
Pond 2 of 3
Outlet Liquid Crude Oil OPF-BANG-P-PID-6010
Separator Sheet 1 of 2 / OPF-
35 OW-702-A-3" New 1A Crude Oil Separator OW-800-A-3" 150# std Liquid 49.22 0.50 72.98 285 100 450 - A N/A 100% Oily Water ASME B31.3 NON CRITICAL
(BANG-V-217) After Valve to BANG-P-PID-6203 Sheet
Water Degasser 1 of 3

Header Outlet Produced


OPF-BANG-P-PID-6010
36 OW-133-A-4" Water Transfer Pump (BANG- New Line
Existing 1A OW-606-A-4" Temporary Produced Water Pond 150# std Liquid 49.23 30.00 73.01 260 200 450 - A N/A 100% Oily Water ASME B31.3 NON CRITICAL
Sheet 1 of 2
P-255A/B/C)

Outlet Produced Water OW-603-A-3"


OPF-BANG-P-PID-6010
37 OW-606-A-4" Transfer Pump (BANG-P- New Line
Existing 1A OW-604-A-3" OW-133-A-4" 150# std Liquid 49.23 30.00 73.01 260 200 450 - A N/A 100% Oily Water ASME B31.3 NON CRITICAL
Sheet 1 of 2
255A/B/C) OW-605-A-3"

Outlet Liquid Water Degasser OPF-BANG-P-PID-6010


38 OW-132-A-6" New Line
Existing 1A Water Degasser OW-034-A-6" 150# std Liquid 49.22 0.50 72.98 260 200 450 - A N/A 100% Oily Water ASME B31.3 NON CRITICAL
(BANG-V-200) Sheet 1 of 2

Outlet Liquid Water Degasser


OW-600-A-4"
(BANG-V-200) to Produced OPF-BANG-P-PID-6010
39 OW-034-A-6" New Line
Existing 1A OW-132-A-6" OW-601-A-4" 150# std Liquid 49.22 0.50 72.98 260 200 450 - A N/A 100% Oily Water ASME B31.3 NON CRITICAL
Water Transfer Pump (BANG- Sheet 1 of 2
OW-602-A-4"
P-225A/B/C)
Suction Produced Water
OPF-BANG-P-PID-6010
40 OW-600-A-4" Transfer Pump (BANG-P- New Line
Existing 1A OW-034-A-6" OW-603-A-3" 150# std Liquid 49.22 0.50 72.98 260 200 450 - A N/A 100% Oily Water ASME B31.3 NON CRITICAL
Sheet 1 of 2
255A)
PT. PHE ONWJ Condensate Storage Tank (BANG-T-050 A/B) Foundation

Time Rate of Settlement


cv = 0.0090 m2/day
Hdr = 22 m
2
t = T Hdr / c v
sc (t) t
Uav g T
(m) (mm) (day) (year)
9% 0.007 0.0168 16.8 365 1.0
21% 0.034 0.0376 37.6 1825 5.0
29% 0.068 0.0532 53.2 3650 10.0
36% 0.102 0.0652 65.2 5475 15.0
42% 0.135 0.0752 75.2 7300 20.0
46% 0.169 0.0841 84.1 9125 25.0
51% 0.203 0.0922 92.2 10950 30.0
55% 0.237 0.0995 99.5 12775 35.0
59% 0.271 0.1064 106.4 14600 40.0
62% 0.305 0.1119 111.9 16425 45.0
65% 0.339 0.1175 117.5 18250 50.0

Legend Description Unit Value


t Time life design Year 25
Spile Elastic shorthening of pile materials mm 2.9
Scp Consolidation settlement of soils mm 84.1
Total Settlement
St mm 87.0
st = spile + scp

8.4 Reinforcement Design

A. Footing Flexural Reinforcement Design


Reinforcement is designed / b = 1.000 m
The effect of horizontal load to the foundation is an increase of pile reaction as calculated. The
maximum pile reaction due to vertical and horizontal loads:

OPF-C-CAL-0012 Page 24
26 of 37