LIST MATERIAL

Pekerjaan ME Tol Cipali Rest Area KM86 A dan B

Nama Barang UNIT REST AREA A REST AREA B TOTAL A/B

pvc pipe Rucika 2" AW batang 16 16 32


pvc pipe Rucika 1"AW batang 1 1 2
Gate valve 1'' Kuningan no 4 4 8
double Naple1" no 4 4 8
Gate valve 1 .1/4 pvc no 4 4 8
check Valve1" Kuningan no 4 4 8

selang flexible 1" pvc roll 5 5 10


selang flexible 1.1/4" pvc roll 5 5 10

tee stuck 4" x 1.1/2 pvc no 4 4 8

socket 1/2" besi no 8 8 16


vlock ring 1/2" x 5/8" kuningan no 8 8 16
Preshure switch no 4 4 8
phershure water meter no 4 4 8
pvc pipe rucika 4" AW batang 2 2 4
Elbow 4" rucika no 4 4 8
Elbow 1.1/2" rucika no 4 4 8
dop pvc 4" no 1 1 2
lem pipa no 4 4 8
Gate valve 2" ONDA 4 4 8
Gate valve 2.1/2" ONDA 3 3 6
SDL luar/shock drat luar 1.1/4" 8 8 16
SDL luar/shock drat luar 2" 4 4 8
Elbow 2" 16 16 32
Volk shok 4 x3 1 1 2
Volk shok 1.1/2 x 1.1/4 4 4 8
pipe rucika 1.1/2 " pvc 1 1 2
selotip besar 10 10 20
HEADER ( Pabrikasi ) 2.5" 1 1 2
Stop Kontak Roll 50 meter 1 1 2
Cable Listrik sambungan 20 meter 1 1 2
Harga satuan Total harga Adan B

Rp 112,000 Rp 3,584,000
Rp 45,000 Rp 90,000
Rp 185,000 Rp 1,480,000
Rp 12,500 Rp 100,000
Rp 293,000 Rp 2,344,000
Rp 92,500 Rp 740,000

Rp 250,000 Rp 2,500,000
Rp 475,000 Rp 4,750,000

Rp 52,500 Rp 420,000

Rp 5,500 Rp 88,000
Rp 17,500 Rp 280,000
Rp 575,000 Rp 4,600,000
Rp 210,000 Rp 1,680,000
Rp 357,500 Rp 1,430,000
Rp 38,500 Rp 308,000
Rp 8,500 Rp 68,000
Rp 55,000 Rp 110,000
Rp 45,000 Rp 360,000
Rp 575,000 Rp 4,600,000
Rp 1,100,000 Rp 6,600,000
Rp 11,500 Rp 184,000
Rp 16,000 Rp 128,000
Rp 8,500 Rp 272,000
Rp 30,000 Rp 60,000
Rp 11,000 Rp 88,000
Rp 90,000 Rp 180,000
Rp 7,500 Rp 150,000
Rp 3,000,000 Rp 6,000,000
Rp 215,000 Rp 430,000
Rp 85,000 Rp 170,000
Rp 43,794,000