You are on page 1of 4

Rp 350,000 Rp 95,000

Rp 140,000 Rp 25,000
Rp 120,000 Rp 25,000
Rp 55,000 Rp 25,000
Rp 400,000 Rp 95,000
Rp 55,000 Rp 25,000
Rp 400,000 Rp 95,000

Rp 155,000 Rp 100,000
Rp 120,000
Rp 60,000 Rp 60,000
Rp 32,000 Rp 10,000
Box Panel 30x40x 18 cm Bh 1.00 Rp 630,000
MCCB 16 A. 3. P Bh 1.00 Rp 662,800
MCB 6 A Bh 9.00 Rp 97,800
Amper Meter Bh 1.00 Rp 166,000
CT200/5.A Bh 3.00 Rp 160,000
Volt Meter Digital Bh 3.00 Rp 166,000
Herz Meter Bh 1.00 Rp 166,000
Selektor Swict 3p Lot 1.00 Rp 182,200
BAR Nol Lot 1.00 Rp 308,000
BAR Gronding Bh 1.00 Rp 308,000
Pilot Lamp Bh 3.00 Rp 42,000
SCHUN Kable 25 mm2 Bh 11.00 Rp 26,480 Rp 500,000
NYAF 0,75 mm2., 1,5 mm2 Lot 1.00 Rp 62,000
SCHUN Kable 10mm2 Bh 11.00 Rp 25,800
Vinil Y War Lot 1.00 Rp 188,000
Spirall Bks 1.00 Rp 96,000
Kable Duckting uk 23x23 mm2 Lot 1.00 Rp 244,000
Double tape Lot 1.00 Rp 80,000
SCHUN Kable Y Lot 1.00 Rp 400,000
Isolasi Rol 5.00 Rp 9,600
Fuse Black Bh 3.00 Rp 86,000
Rel MCB Btg 3.00 Rp 156,000
Sisir CT Btg 1.00 Rp 400,000
Kabel Fider
Kabel NYY 4 x 4 mm2 (SDP - PP g M 35.00 Rp 80,000 Rp 20,000
Kabel BC 6 mm2( Grounding Elekt M 13.00 Rp 40,000 Rp 20,000
REHABILITASI RUANG LABORATORIUM BIOLOGI SMKN 1 NGABANG
PEKERJAAN PENDAHULUAN
Pembersihan Lokasi Lsm 1.00
Papan Nama Proyek Lsm 1.00
Penerapan SMKK terdiri dari Lsm 1.00
Rp 630,000 500000
Rp 662,800 0
Rp 880,200 0
Rp 166,000 0
Rp 480,000 0
Rp 498,000 0
Rp 166,000 0
Rp 182,200 0
Rp 308,000 0
Rp 308,000 0
Rp 126,000 0
Rp 291,280 0
Rp 62,000 0
Rp 283,800 0
Rp 188,000 0
Rp 96,000 0
Rp 244,000 0
Rp 80,000 0
Rp 400,000 0
Rp 48,000 0
Rp 258,000 0
Rp 468,000 0
Rp 400,000 0
Rp 7,226,280 Rp 500,000
Rp 96,000 700000
Rp 48,000 260000
###
###
###
###
###
###
###
###
###
###
###
### ###
###
###
###
###
###
###
###
###
###
###
###

### ###
### ###