Professional Documents
Culture Documents
13,269,100
Ongkos Produksi
Tk Kayu 14 OH 175,000 2,450,000
Pemb. Tk Kayu 14 OH 125,000 1,750,000
Tk. Tusir 5 OH 165,000 825,000
RINCIAN Material dan Upah
5,025,000
Ongkos Setting
Tk Kayu 3 OH 175,000 525,000
Pemb. Tk Kayu 3 OH 145,000 435,000
Tk. Tusir 3 OH 165,000 495,000
1,455,000
Ongkir Angkutan
Pickup 1 lot 350,000 350,000
Deliveri 1 lot 150,000 150,000
500,000