Roll No. 24513 B. Tech 7th Sem. (Civil Engg.) Examination — December, 2014 ESTIMATING & COSTING Paper : CE-405-F Time : Three Hours ] [ Maximum Marks : 100 Before answering the questions, candidates should ensure that they have been supplied the correct and.complete question paper. No complaint in this regard, will be entertained after examination. Note: 1. (a) (b) Students have to attempt 5 questions in: total, selecting at least one question from each Section. All questions carry equal marks. SECTION-A Work out internal plaster for a room-of size 6.3 m x 5.1 m (inside dimension) having floor height up to ceiling 3.3 m. schedule of opening is an. mentioned below : 12 D1 ‘1imx21m W1 1.8mx 1.2m VI 0.4m x-0.7m State different type Approximate Estimate. Illustrate any one example. 8 24513- 3,500 -(P-3)(Q-8)(14) : P.T.O. 2. (a) Mention the desired accuracy in taking measurements of : Length, Area, Volume & Weight. : 10 (b) What do you understand by — standard measurement book ? 10 SECTION -B - 3. Estimate the quantity of (a) Earth work Excavation, (b) Footing concrete, (c) Masonry in footing, (d) D.P.C and (e)Brick work in super structure for the building from the given plan and section having following size : Wall thickness = 230mm; head room height = 3.0m; footing concrete = 1 m x 0.3m; I footing = 0.7 x 0.3m; II footing = 0.5 x 0.3m; Basement = 0.4 x 0.4m; flooring concrete = 150mm; floor finish CM 1 : 3 = 25mm; DPC = 20mm; roof slab = 125mm; weathering course L.C = 75mm; Assume the base of footing is 1.1 m below GL. 20 3m x 3m 6m x 3m 3m x 3m 3m x 3m 6m x 3m. 4. (a) Explain the general specification of a first class building. 10 (b) Explain the labour required for different works. 10 24513- 3,500 -(P-3)(Q-8)(14) (2) (b) ~(b) (b) (b) SECTION -C Prepare rate analysis for . brick ‘work in superstructure in CM 1: 6, for 10.0 cum. 12 State the factors affecting Rate Analysis. 8 Prepare Rate Analysis for 25 cu.m. RCC M20 slab. 10 Differentiate between ‘Analysis of rates' and ‘Schedule of rates'. 10 SECTION -D Differentiate between mortgage value and scrap value. 10 Describe different types of penalties imposed on a- contract and why such penalties are imposed. 10 Explain in detail about the four methods of calculating depreciation. 10 Describe briefly the procedure of opening tenders and acceptance of tenders. 10 24513- 3,500 -(P-3)(Q-8)(14) (3)

You might also like