Time Cycle P1 P2 P1 P2 3 Relay Used

0 6 4.5 1st Relay on / 2nd & 3rd Relay off.


0.07 1 4.5 6 1st Relay off / 2nd Relay on & 3rd Relay off.
0.14 6 4.5 3rd Relay on / 1st & 2nd Relay off.
0.21 2 4.5 6 3rd Relay off / 2nd Relay on & 1st Relay off.
0.28 6 4.5 1st Relay - P1
0.35 3 4.5 6 3rd Relay - P2
0.42 6 4.5 2nd Relay is relief valve
0.49 4 4.5 6 Cycale Time 15 second
0.56 6 4.5 Time 0 P1 Pressur in 6kg/cm2 and
1.03 5 4.5 6 P2 monitoring Pressure out approx 4.5Kg/cm2
1.1 6 4.5 Time 0.07 P2 Pressur in 6kg/cm2
1.17 6 4.5 6 P1 monitoring Pressure out approx 4.5Kg/cm2
1.24 6 4.5
1.31 7 4.5 6
1.38 6 4.5
1.45 8 4.5 6
1.52 6 4.5
1.59 9 4.5 6
2.06 6 4.5 Report 100 cycle each &
2.13 10 4.5 6 Afterward at every 10 cycle each side.
Continu 10000 cycle