Table 1: C&S and M&E scope of works for EIA report submission

Scope of Works

Information for EIA Consultant Study

Professional Engineer (PE) endorsed Project Site Grading Plan (Before, Site
1.
Preparation and During earthworks activities).
Project Implementation Schedule Plan which includes site preparation until
2.
project completion.
Professional Engineer (PE) endorsed layout drawings for all buildings (plan
view, side view and front view). The drawing includes:
3.
a. Machineries/plant/tanks (example: thermal treatment plant)
b. perimeter drains and sump.
Layout drawings for temporary siting of workers camp during construction
4.
period (if applicable).
Professional Engineer (PE) endorsed piping drawing with flow (water
5.
treatment plant).

6. Sewage - Population Equivalent (PE) calculation.

Full Erosion and Sediment Control Plan (ESCP) Report includes manual
7. design calculation and drawings and endorsed by Department of Irrigation
and Drainage (JPS).
Estimate start date, completion date and stabilization scheduled for each
8. major land-disturbing activities or construction activities phase, stages and
sequences.
Proposed access and roads flow drawing during construction and operation
9.
indicating the entrance and exit points.

10. Individual site layout of each facility.

Project Site Schedule Plan which includes Site Preparation until project
11.
completion.

Information Required (Construction Phase)

12. Phasing plan of project site.

13. Description of the construction activity.

Construction schedule for each major land disturbance complete with the
14. timeline or chart for the installations of Land Disturbance Pollution Prevention
and Mitigation Measures (LD-P2M2).
Typical method statement for site clearing, cut and fill, excavation of
15. foundation, drilling of borehole, in-stream work and construction of
temporary/permanent stream/river crossing and diversion (if any).

16. List of existing drainage identified on-site (Drainage System Plan).

17. Earthworks cut and fill volume.

Information Required (Construction Phase)


Guarantee letter from technology provider stated that the facility is designed
18. and installed compliance with specifications as per the Environmental Impact
Assessment (EIA) study document.
Separate contaminated and uncontaminated surface runoff systems
19.
(drawing).

20. Engineering drawings with PE endorsement.

21. Landfill gas venting/control systems.

22. Construction development phase.