1. Option Home -> CIAG -> Return option is used to transfer site to site material
True
False
My Answer:False
2. Anti static Wrist should be use once working inside the PowerCube for Cards and Cable
connection
True
False
My Answer:True
3. DC low Voltage Alarms need to be test in ATP and its tested by plugging out the PSU
modules.
True
False
My Answer:False
True
False
My Answer:False
5. After BTS/DBS installation is completed : Check whether the DC output voltage of the DCDU
ranges from 57.6 V to 38.4 V.
True
False
My Answer:True
True
False
My Answer:False
7. Site Engineer should login with the NOC before enter the site.
True
False
My Answer:False
8. Huawei TXN Engineer don’t need to log in with NOC when site Engineer is already log in
True
False
My Answer:False
9. RTN IDU should not be dismantled until Huawei Engineer give confirmation.
True
False
My Answer:True
10. Transmission Cable (E1 / Ethernet) should be directly connected between IDU & BBU
True
False
My Answer:False
11. Customers often provide plane coordinates in the East-West direction. Plane coordinates can
be accurately converted into latitude-longitude coordinates without the aid of other information.
True
False
My Answer:False
12. During SFP optical modules installatio in UBBP in the BBU, and route the optical fibers into
the cabinet from the left front at the bottom of the cabinet, and connect the optical fibers to the
optical modules. Then, use binding straps to bind the optical fibers at the optical fiber branch and
secure the optical fibers to the subrack.
True
False
My Answer:True
13. All types of tools use in Power installation should be insulated and check be Huawei FE.
True
False
My Answer:True
True
False
My Answer:False
15. Shift all sites traffic at same time accordingly MUX plan
True
False
My Answer:True
16. The labels of communication cables, feeder cables and jumper should be stuck and tied
according to specifications. The labels should be arranged in an orderly way with same direction.
True
False
My Answer:True
True
False
My Answer:False
18. When installed on a tower, only one RRU can be installed in standard mode or reverse mode,
and two RRUs can be installed on a pole in back-to-back mode. RRUs cannot be installed on the
side, and the brackets for more than two RRUs cannot be combined.
True
False
My Answer:False
19. After fixing the new Power cabinet first need to connect the AC cable.
True
False
My Answer:False
True
False
My Answer:False
Single Choice
21. Link configuration on the new IF boards should be according to
D.No link configuration need for IDU swap since ODU used are the same.
My Answer:A
22. To avoid the risk of having the ODU become faulty, you should
B.Switch off the ODU power from the IF board before removing the IF cable
My Answer:B
A.One Click
B.Mannaul
C.Auto
D.All of above
My Answer:A
C.32Amps LLVD
D.32Amps BLVD
My Answer:A
A.BLVD
B.LLVD
My Answer:B
26. When we set multimeter mode to diode like symbol, it verifies the device‘s
A.V
B.A
C.Continuity
D.Power
My Answer:C
A.LLVD
B.BLVD
D.BBU
My Answer:B
28. The loss between the active (main) interface and standby interface is ( ).
A.the same
C.stochastic
My Answer:D
A.Hammer
B.Thimble Presser
C.Cable Cutter
D.Pliers
My Answer:B
30. IN ICC 500 Cabinet, Transmission equipment is always laid out from
A.Bottom Up
B.Top Down
C.Middle
D.Both A & B
My Answer:A
D.Revert back activities should be take care during cold SWAP only
My Answer:C
A.Amplification only
B.decode
D.Modulation
My Answer:C
A.Log off
B.Remain log in
C.stand by
My Answer:B
34. Using WDT : For a new site what IP is used to login the UMPT, before commissioning
A.192.168.0.1
B.192.168.0.75
C.192.168.0.49
My Answer:C
B.128QAM
C.16QAM
D.ASK
My Answer:B
Multiple Choice
36. In SMU03A, which of the following ports are available just underneath LCD display ?
A.FE
B.RS485/RS232
C.COM1
D.COM2
My Answer:A,B,C,D
A.129.9.0.10
B.129.9.70.35
C.172.9.10.35
D.202.9.0.12
My Answer:A,B
My Answer:A,B
A.UE
B.NodeB
C.RNC
D.CS&PS
My Answer:A,B,C,D
A.LLVD
B.BLVD
C.DC breakers
D.AC Breakers
My Answer:A,C
A.AT Tower
My Answer:A,B
A.ODU mute
B.Co-channel interference
My Answer:A,B,C
A.RRU3936
B.WRFUa
C.RRU3832
D.RRU3838
My Answer:A,C,D
A.BU
B.RFU
C.IDU
D.Flexi Waveguide
E.Antenna
My Answer:A,B,C
45. Which of the following conditions must be met in order to use tools on site ?
A.Insulation
B.Taping
C.Any surface
D.All of these
My Answer:A,B