Professional Documents
Culture Documents
0
1/1
SLO
PE
PE
SLO
1/10
5 4 3 2 1 Client :
S.G
S.G
S.G
S.G
S.G
S.G
Ministry of Housing, Utilities
S.G
S.G
1162
5.91
3
4.83
9
& Urban Development
X=8 059.140 1162
82 X=8 1.88
8
Y=6 8206 3.76
6 3
Y=6 1162 2.69
S.G
S.G
S.G
6 X=8 064.636 1162
SLOPE 1/10
6.98
S.G
X=8 4
1162 82 7.38
X=8 056.393 Y=6 8206
Y=6
2
1/1
E
OP
S.G
82
SL
Y=6
SLOPE 1/10
DRAINAGE PIT DRAINAGE PIT 920 1475 1475 1475 1475 1475
1475 1475 1475 1475 1475
S.G
680
3865 2400
S.G
0
750750
8.80
1000
1163
1686 900
0
2.64 3 X=8 4.82
0 B082 B083 B084 B085 B086
1166 8 1.20 8200 B087 B088 B089 B090
X=8 2.31 1166 1 Y=6 B091 B092 6
7 8 8.48
7 8193 X=8 8.00 7.52
3
2.15
5.85 9.89
S.G
Y=6 DRAINAGE PIT
1172 1171 1171 8193 1162 1162 8
X=8 8 X=8 760.520 X=8 764.715 Y=6 X=8 055.019 9 X=8 8.75
2.79 6.44
3722
76 8206
8174 81 Y=6
81 4 Y=6
82 1162 25.3 .229 Y=6
Y=6 Y=6 3.58 6 B1
09 X=8 057.767 X=8116 .515 4.30
3
1623
1166 8.41 1162
750 2350
7 X=8 929.523 1163 Y=6
82 8206
0 =81 66.010
6.79 4651475 1475 460 DRAINAGE PIPE X=8 003.396 08 Y=6 X=8 063.262 X DRAINAGE PIT
750
920
81 1
Y=6 81
B005 B006 B007 B008 B009 B010 B 1163
X=8 006.244 2.2%
750750
750750
Y=6 7 147
7.64 06
1163 B1
5
82
X=8 000.548 Y=6
147
2350
B110 B111 B112 4651475 460 05
82 B1
5
Authority
7
B001 B002 B003 B004 5.38 680 1475 1475 1475 1475 1475 920 Y=6 14
1172
75
X=8 4.19
6
8.95
7 1.70
1 1
50
8174 1166 8.03
7
147
6.32 Y=6 0.36
8 1171 X=8 936.613 1163
07
7
1172 9.42 X=8 7 56
X=8 741.400 1172 3.31 3.11
2 X=8 001.972
X=8 759.122=81171
75
8176 81
80
Y=6
81
Y=6
81 X
8176
1.91
9 Y=6 1166
X=8 930.920 Y=6 Y=6
82 1.5%
DRAINAGE PIT Y=6 Y=6
81
1%
D 0.25% D
1.6%
2.5%
RETAIL 01
0.25%
0.25%
RETAIL 01
323.80 Sub -Consultant :
RETAIL 02
0.25%
ELEVATOR LOBBY
MECH. GAS PIPE
SHAFT SHAFT
RETAIL 02
ELEVATOR
RETAIL
SERVICE
Contractor :
ELEC. CLOSET
STAIR- 6A
324.20
A01 LG 166 -
BALL ROOM
0.3%
DOWN
0.3%
Key Plan :
+324.20 +324.20
F.F.L. F.F.L.
1%
NORTH
0.6%
323.80 323.80
ELEVATOR LOBBY
0.3%
MECH.SHAFT
RETAIL
3
1.03
1166
X=8 680.240
750750
ELEVATOR
MECH.SHAFT
PARKING
RETAIL
ELEVATOR
81
SERVICE
RETAIL
Y=6
920 1475 1475 1475 1475 1475 680
B011 B012 B013 B014 B015 B016
MECH.SHAFT
5
9.63
116 5
X=8 679.770
81
316.50
Y=6
0.3%
ELEVATOR LOBBY
6
8.23
1165
X=8 679.300
RETAIL
0
5.44 0.3%
CLOSET
TELECOM
81 1165
CLOSET
Y=6
MECH.
X=8 0
8.36 0.6%
S.G
6.83
8 8167
Y=6
STAIR- 5A
1165
X=8 678.830
Y=6
81
0.5 % 0.35 % NOTE:
323.90 (T.O.C)
323.90 (T.O.C)
4.04
2
0.3% 0.3% 01-THIS
0.3%DRAWING SHALL BE READ IN CONJUNCTION
1165
X=8 677.890
324.65
PLUMBING
SHAFT
SHAFT
ELEC.
ELEC.
81 Ø
Y=6
SHAFT
10
C
0
A01UG 77 -
ELEVATOR
ELEVATOR
PARKING
PARKING
0.3%
CLOSET
FM200
ESCAPE CORRIDOR
A01UG 75 -
PRESSURIZATION
0.3%
02-DEFORMED HIGH TENSILE STEEL
MECH.SHAFT SERVICES
MECH.SHAFT
A01UG 73 10
MECH.SHAFT
STAIRS
FIRE ELEVATOR LOBBY
REINFORCEMENT BARS B500DWR HAVING A
A01UG 79 -
A01MUG12 -
0.3% 0.3% 0.3%
VIP SHUTTLE
A01MUG03 02
TELE.(FM-FTR)
BMS CLOSET
SERVICE CORRIDOR
A01UG 70 -
OB/VIP SHUTTLE LOBBY
A-01 MINIMUM YIELD STRENGTH OF 500 MPa SHALL BE
A01UG 81 -
SERVICE CORRIDOR
USED AND CONFORMING TO EGYPTIAN CODES OF
A01UG 71 -
VIP SHUTTLE
ELEVATOR
MECH.SHAFT
FIRE
PRACTICE AND PROJECT SPECS.
SHAFT
ELEC.
OFFICE Z02
OFFICE Z02
OFFICE Z02
OFFICE Z01
OFFICE Z01
OFFICE Z01
SHAFT
MECH.
MV ELEC.
SHAFT
0.4% 0.8% 0.45% 0.75% 0.5%
A-01
324.65
324.65
324.65
DIMENSIONS & COORDINATES SHOULD BE READ OR
COMPUTED.
OFFICE Z02
OFFICE Z02
OFFICE Z02
OFFICE Z01
OFFICE Z01
OFFICE Z01
SHAFT
MECH.
SHAFT
MECH.
SERVICE CORRIDOR A01UG 18 01
A01UG 82 -
STORAGE
MECH.SHAFT
TELE.(SP-FTR)
SERVICE CORRIDOR
ELEVATOR
OFFICE Z03
A01UG 93 -
FIRE
ELEVATORS LOBBY
OFFICES SERVICE
DIMENSIONS ARE GIVEN IN MILLIMETERS AND
A01UG 74 10
A01UG 90 -
ELEC. ROOM
TELE.
STAIRS
TELE.
OFFICE Z03
OFFICE Z03
A01MUG15
ELEVATOR
SERVICE
OFFICE
LEVELS IN METERS.
TELE.
0.3% 0.3% 0.3%
-
MECH.SHAFT
MECH.SHAFT
JANITOR CLOSET
PRESSURIZATION
A01UG 89 -
OFFICE Z03
OFFICE Z03
0.3%
ESCAPE CORRIDOR
0.5 %
A01UG 85 -
ELEVATOR
ELEVATOR
05-CONCRETE GRADE
PARKING
PARKING
PLUMBING
SHAFT
1161
2.60
0
Element Concrete Grade
324.65
X=8 663.954
B017 B018 B019 B020 B021 B022 B023 B024 B025 B026 B027
81
Y=6 0.3% 0.3% 0.3%
9.80
2
Foundation C35
324.65
00
1475
116 0
323.90
323.90
1.2
1161 X=8 3.02
0
X=8 663.490 8166
Y=6
81 Y=6
STAIR- 5B
1475
6 Blinding C15
ELEVATOR LOBBY
7.00
CLOSET
TELECOM
1475
1160
8.40
5
X=8
1160
2.07
7 0.3%
X=8 662.546 8166
Y=6
323.80 0.6%
1475
81
Y=6
RETAIL
0
323.80
1475
4.21
S.G
8
5.60 1160 0.3%
1160 X=8 661.139
X=8 661.609
ELEVATOR
SERVICE
MECH.SHAFT
RETAIL
81
316.50
Y=6
MECH.SHAFT
81
ELEVATOR
1475
PARKING
Y=6
RETAIL
STORAGE
1
2.81
1475
1160
RETAIL
3
X=8 660.669 1.41
116 0 9
81 X=8 0.19
MECH.SHAFT
Y=6
ELEVATOR LOBBY
8166
06-CONCRETE COVER
1475
Y=6
5
0.01
116 0
1475
X=8 659.731
81
Y=6
Element Concrete Cover
1475
7
8.61
1159
X=8 659.259
Y=6
81
Reference Table:
+324.20
F.F.L. Type No. Ref. No. Date
1 E18066-0105D-FD-18-F03-EY-5-SS-001-1 13/06/2019
FRESH AIR
PLENUM
MECH SHAFT
5 DWG-CSCEC-18-F01-LS-HR-0001-03 16/03/2020
ELEVATOR LOBBY
A01 UG 050 -
UP 6 DWG-CSCEC-18-F01-LS-HR-0003-01 16/03/2020
B
0.3%
B-01 B 7
8
DWG-CSCEC-18-F01-LS-HR-0004-01
DWG-CSCEC-01-A01-AR-AR-0536-00
29/04/2020
07/02/2022
RESTAURANT
ELEVATOR
PUBLIC
0.3%
A01 UG 051 -
STAIR- 8A
9 SHD-CSCEC-18-F03-ST-SC-02-RF-01-0004-0000-01 15/06/2020
324.500
DOWN
10 DWG-CSCEC-11-G00-ST-SC-1258-00 17/12/2022
11 DWG-CSCEC-11-G00-ST-SC-1260-00 17/12/2022
STAIR- 6B
ELEC. CLOSET
12 DWG-CSCEC-11-G00-ST-SC-0280-02 29/01/2023
OBSERVATION DECK
A-01
A01 UG 024 -
A01 UG 023 -
STAIR- 9A
13 DWG-CSCEC-08-G00-ST-SC-1417-01 14/02/2023
324.20
S.G
14 ASB-CSCEC-08-G00-ST-SC-0026-00 22/02/2023
+324.20
15 ASB-CSCEC-08-G00-ST-SC-0025-00 22/02/2023
ELEVATOR
SHAFT SHAFT
ELEVATOR LOBBY
SERVICE
RETAIL
0.25% 16 DWG-CSCEC-08-G00-ST-SC-0264-07 07/02/2023
1.5%
+324.10
T.O.S. B-01 17 DWG-CSCEC-06-C05-AR-AR-0242-02 23/11/2021
323.80
RETAIL 05
2% 2% 1 MAT-CSCEC-18-EL-LC-0031-04 17/04/2022
+324.10
Documents
T.O.S.
Ø100
0
Ø10
RETAIL 06
3.3% 0.25%
0.25%
0.25%
8
2.34
0.09
5 X=8
1145
8186
8.35
1
9.00
1
Coordination Table :
1151 2.30
6 Y=6 1141
2350
X=8 2
9.06 9.15
5 1145 X=8 6.51
7
8168 1150 X=8 865.402 50 8196
Y=6 X=8 1.85
9 81 B041 750 7 Y=6
S.G
B047
6
750
1.03 Y=6 7.82
3
1151 B039
680 1
X=8 686.267 1141
920 1475 1475 1475 1475 1475 680 X=8 965.629 DRAINAGE PIT
200 1150 150
81 3 4651
81
B046
Y=6 1.54 Y=6
475
475
1145 2.32
7 7 Architecture
X=8 859.533 4651475460 0.83
1475
460 1145 1142
Y=6
81 X=8 866.876 X=8 1
1475
2.76
B045
81 8194
750 2350
Y=6 Y=6 7
B031 B032 B033 B034 B035 B036 0.36
5 1.06
6 1.30
7
1142 Structure C.
920
8.68 1145 1142 X=8 944.159
0.56
5 1150 B037 B038 X=8 0.92
9 X=8 941.363 81
X=8 693.257 4651475 1475 460 Y=6 6.64
6
1151 8186 Y=6
81
1 X=8 687.665 Y=6
81 Y=6 1141 1
8.69 X=8 4.74 Structure S.
750
81 5
1150 Y=6 9.62 8196
X=8 674.997 8 1150 1 DRAINAGE PIT Y=6
81 X = 0.46
50 Y=6 8169 B042 B043 B044
2350
Y=6
7
750
Electrical
SLOPE 1/10
0
B03
2
1/1
PE
SLO
9
7.70
680
1150
9
X=8 673.896
SLOPE 1/10
Plumbing
B02
S.G
147
81
Y=6
5
8
B02
147
S.G
HVAC
59
20
DRAINAGE PIT
S.G
S.G
S.G
S.G
Other
S.G
7
6.72
1150
S.G
X=8 672.796
81
Y=6
Revision Table :
S.G
S.G
S.G
S.G
S.G
S.G
S.G
01 Approved 18 FEB 2023 WGJ
00 Approved 20 NOV 2022 WGJ
1/10
SLOPE 1/12
PE
1/10
SLO
PE
SLO
Drawing Title :
SLOPE 1/12
0
1/1
SLO
PE
PE
SLO
1/1
0
INF-F01
AUTOMATIC RISING BOLLARD
FOUNDATION LAYOUT (PART 1)
S.G
S.G
S.G
S.G
S.G
S.G
S.G
SLOPE
1/10
S.G
SL
O PE
1/1
S.G
S.G
S.G
S.G
S.G
S.G
SLOPE
1/10
1.4% 2%
1.2% SHD CSCEC 18 F01 ST SC 01 EX 05 0001 0000 01
0.3% 0.3% 0.5% 0.3%
Packa. Build. Sub Elemt. Floor Part Sheet Sequnc. Rev.
5 4 3 2 324.15 1
Type Contractor No. Type
Discp.
Discp. Type Level No. No. No. No.