You are on page 1of 1

SLOPE 1/12

0
1/1

SLO
PE

PE
SLO

1/10
5 4 3 2 1 Client :

S.G

S.G

S.G

S.G

S.G
S.G
Ministry of Housing, Utilities

S.G
S.G
1162
5.91
3
4.83
9
& Urban Development
X=8 059.140 1162
82 X=8 1.88
8
Y=6 8206 3.76
6 3
Y=6 1162 2.69

S.G

S.G
S.G
6 X=8 064.636 1162
SLOPE 1/10

6.98

S.G
X=8 4
1162 82 7.38
X=8 056.393 Y=6 8206
Y=6
2
1/1
E
OP

S.G
82
SL

Y=6

SLOPE 1/10
DRAINAGE PIT DRAINAGE PIT 920 1475 1475 1475 1475 1475
1475 1475 1475 1475 1475
S.G

680
3865 2400

S.G
0

750750
8.80

1000
1163

1686 900
0
2.64 3 X=8 4.82
0 B082 B083 B084 B085 B086
1166 8 1.20 8200 B087 B088 B089 B090
X=8 2.31 1166 1 Y=6 B091 B092 6
7 8 8.48
7 8193 X=8 8.00 7.52
3
2.15
5.85 9.89

S.G
Y=6 DRAINAGE PIT
1172 1171 1171 8193 1162 1162 8
X=8 8 X=8 760.520 X=8 764.715 Y=6 X=8 055.019 9 X=8 8.75
2.79 6.44

3722
76 8206
8174 81 Y=6
81 4 Y=6
82 1162 25.3 .229 Y=6
Y=6 Y=6 3.58 6 B1
09 X=8 057.767 X=8116 .515 4.30
3
1623
1166 8.41 1162

750 2350
7 X=8 929.523 1163 Y=6
82 8206
0 =81 66.010
6.79 4651475 1475 460 DRAINAGE PIPE X=8 003.396 08 Y=6 X=8 063.262 X DRAINAGE PIT

New Urban Communities


8 820
117 2 920 1475 1475 1475 680 0.83 81 B113 B114 B1 82 Y=6
X=8 740.002 1172 Y=6 82 4 Y=6
X=8 757.724 Y=6 07 9.18

750
920
81 1
Y=6 81
B005 B006 B007 B008 B009 B010 B 1163
X=8 006.244 2.2%

750750

750750
Y=6 7 147
7.64 06
1163 B1
5
82
X=8 000.548 Y=6
147

2350
B110 B111 B112 4651475 460 05
82 B1
5

Authority
7
B001 B002 B003 B004 5.38 680 1475 1475 1475 1475 1475 920 Y=6 14
1172
75
X=8 4.19
6
8.95
7 1.70
1 1

50
8174 1166 8.03
7
147
6.32 Y=6 0.36
8 1171 X=8 936.613 1163

07
7
1172 9.42 X=8 7 56
X=8 741.400 1172 3.31 3.11
2 X=8 001.972
X=8 759.122=81171

75
8176 81
80
Y=6
81
Y=6
81 X
8176
1.91
9 Y=6 1166
X=8 930.920 Y=6 Y=6
82 1.5%
DRAINAGE PIT Y=6 Y=6
81

1%

0.15% Main Consultant :

D 0.25% D
1.6%
2.5%

RETAIL 01
0.25%
0.25%

RETAIL 01
323.80 Sub -Consultant :

RAMP-01 Refer to DWG-CSCEC-01-A01-AR-AR-0062-00


Ø100
Ø100
2% 2%

RETAIL 02
0.25%

ELEVATOR LOBBY
MECH. GAS PIPE
SHAFT SHAFT

RETAIL 02
ELEVATOR

RETAIL
SERVICE
Contractor :

ELEC. CLOSET
STAIR- 6A
324.20

A01 LG 166 -
BALL ROOM
0.3%

316.50 Project Name :

DOWN
0.3%

C-10 C-10 Central Business District


A-01 Of the
New Administrative Capital
CBD EAST - PHASE 1

Key Plan :
+324.20 +324.20
F.F.L. F.F.L.
1%
NORTH
0.6%

323.80 323.80

ELEVATOR LOBBY
0.3%

MECH.SHAFT

RETAIL
3
1.03
1166
X=8 680.240
750750

ELEVATOR
MECH.SHAFT

PARKING
RETAIL

ELEVATOR
81

SERVICE
RETAIL
Y=6
920 1475 1475 1475 1475 1475 680
B011 B012 B013 B014 B015 B016

MECH.SHAFT
5
9.63
116 5
X=8 679.770
81

316.50
Y=6
0.3%

ELEVATOR LOBBY
6
8.23
1165
X=8 679.300

RETAIL
0
5.44 0.3%

CLOSET
TELECOM
81 1165

CLOSET
Y=6

MECH.
X=8 0
8.36 0.6%
S.G

6.83
8 8167
Y=6

STAIR- 5A
1165
X=8 678.830
Y=6
81
0.5 % 0.35 % NOTE:

323.90 (T.O.C)

323.90 (T.O.C)
4.04
2
0.3% 0.3% 01-THIS
0.3%DRAWING SHALL BE READ IN CONJUNCTION
1165
X=8 677.890

C WITH PROJECT SPECIFICATIONS AND OTHER

324.65

PLUMBING

SHAFT

SHAFT
ELEC.

ELEC.
81 Ø
Y=6

SHAFT
10

C
0

FIRE COMMAND CENTER


RELATED DRAWINGS.

A01UG 77 -

ELEVATOR

ELEVATOR
PARKING

PARKING
0.3%

CLOSET
FM200

ESCAPE CORRIDOR
A01UG 75 -

PRESSURIZATION
0.3%
02-DEFORMED HIGH TENSILE STEEL

MECH.SHAFT SERVICES

MECH.SHAFT
A01UG 73 10
MECH.SHAFT

STAIRS
FIRE ELEVATOR LOBBY
REINFORCEMENT BARS B500DWR HAVING A
A01UG 79 -

A01MUG12 -
0.3% 0.3% 0.3%

VIP SHUTTLE

A01MUG03 02
TELE.(FM-FTR)
BMS CLOSET
SERVICE CORRIDOR

A01UG 70 -
OB/VIP SHUTTLE LOBBY
A-01 MINIMUM YIELD STRENGTH OF 500 MPa SHALL BE
A01UG 81 -

SERVICE CORRIDOR
USED AND CONFORMING TO EGYPTIAN CODES OF

A01UG 71 -
VIP SHUTTLE

ELEVATOR

MECH.SHAFT
FIRE
PRACTICE AND PROJECT SPECS.
SHAFT
ELEC.

OFFICE Z02

OFFICE Z02

OFFICE Z02

OFFICE Z01

OFFICE Z01
OFFICE Z01
SHAFT
MECH.

03-DO NOT SCALE FROM DRAWINGS, ALL

MV ELEC.
SHAFT
0.4% 0.8% 0.45% 0.75% 0.5%
A-01
324.65

324.65

324.65
DIMENSIONS & COORDINATES SHOULD BE READ OR
COMPUTED.
OFFICE Z02

OFFICE Z02

OFFICE Z02

OFFICE Z01

OFFICE Z01

OFFICE Z01
SHAFT
MECH.

SHAFT
MECH.
SERVICE CORRIDOR A01UG 18 01
A01UG 82 -

STORAGE
MECH.SHAFT

TELE.(SP-FTR)

SERVICE CORRIDOR
ELEVATOR

OFFICE Z03

04-UNLESS OTHERWISE NOTED ON THE DRAWINGS,


OFFICE Z03

A01UG 93 -
FIRE

ELEVATORS LOBBY
OFFICES SERVICE
DIMENSIONS ARE GIVEN IN MILLIMETERS AND
A01UG 74 10

A01UG 90 -
ELEC. ROOM

TELE.
STAIRS

FIRE ELEVATOR LOBBY

TELE.
OFFICE Z03
OFFICE Z03
A01MUG15

ELEVATOR
SERVICE
OFFICE

LEVELS IN METERS.

TELE.
0.3% 0.3% 0.3%
-
MECH.SHAFT

MECH.SHAFT
JANITOR CLOSET
PRESSURIZATION

A01UG 89 -
OFFICE Z03

OFFICE Z03

0.3%
ESCAPE CORRIDOR

0.5 %
A01UG 85 -

ELEVATOR

ELEVATOR

05-CONCRETE GRADE
PARKING

PARKING

PLUMBING
SHAFT

1161
2.60
0
Element Concrete Grade
324.65

X=8 663.954
B017 B018 B019 B020 B021 B022 B023 B024 B025 B026 B027

81
Y=6 0.3% 0.3% 0.3%
9.80
2
Foundation C35
324.65
00
1475

116 0

323.90

323.90
1.2
1161 X=8 3.02
0
X=8 663.490 8166
Y=6
81 Y=6

STAIR- 5B
1475

6 Blinding C15

ELEVATOR LOBBY
7.00

CLOSET
TELECOM
1475

1160
8.40
5
X=8
1160
2.07
7 0.3%
X=8 662.546 8166
Y=6

323.80 0.6%
1475

81
Y=6

RETAIL
0

323.80
1475

4.21
S.G

8
5.60 1160 0.3%
1160 X=8 661.139
X=8 661.609

ELEVATOR
SERVICE
MECH.SHAFT

RETAIL
81

316.50
Y=6

MECH.SHAFT
81

ELEVATOR
1475

PARKING
Y=6

RETAIL

STORAGE
1
2.81
1475

1160

RETAIL
3
X=8 660.669 1.41
116 0 9
81 X=8 0.19

MECH.SHAFT
Y=6

ELEVATOR LOBBY
8166
06-CONCRETE COVER
1475

Y=6
5
0.01
116 0
1475

X=8 659.731
81
Y=6
Element Concrete Cover
1475

7
8.61
1159
X=8 659.259
Y=6
81

1% +324.10 Foundation 50mm


0.6% T.O.S.

Reference Table:
+324.20
F.F.L. Type No. Ref. No. Date
1 E18066-0105D-FD-18-F03-EY-5-SS-001-1 13/06/2019
FRESH AIR
PLENUM
MECH SHAFT

Drawings 2 E18066-0105D-FD-18-F01-ES-1-OP-001-3 22/03/2020


3 E18066-0105D-FD-18-F00-SC-0-GN-001-2 21/10/2019
4 E18066-0105D-FD-18-F00-SC-0-GN-002-1 21/10/2019
OB SERVICE
ELEVATOR

5 DWG-CSCEC-18-F01-LS-HR-0001-03 16/03/2020
ELEVATOR LOBBY
A01 UG 050 -

UP 6 DWG-CSCEC-18-F01-LS-HR-0003-01 16/03/2020
B
0.3%
B-01 B 7
8
DWG-CSCEC-18-F01-LS-HR-0004-01
DWG-CSCEC-01-A01-AR-AR-0536-00
29/04/2020
07/02/2022
RESTAURANT
ELEVATOR
PUBLIC

0.3%
A01 UG 051 -
STAIR- 8A

9 SHD-CSCEC-18-F03-ST-SC-02-RF-01-0004-0000-01 15/06/2020
324.500

DOWN
10 DWG-CSCEC-11-G00-ST-SC-1258-00 17/12/2022
11 DWG-CSCEC-11-G00-ST-SC-1260-00 17/12/2022

STAIR- 6B

ELEC. CLOSET
12 DWG-CSCEC-11-G00-ST-SC-0280-02 29/01/2023
OBSERVATION DECK

A-01
A01 UG 024 -

A01 UG 023 -
STAIR- 9A

13 DWG-CSCEC-08-G00-ST-SC-1417-01 14/02/2023

324.20
S.G

14 ASB-CSCEC-08-G00-ST-SC-0026-00 22/02/2023
+324.20
15 ASB-CSCEC-08-G00-ST-SC-0025-00 22/02/2023

GAS PIPE MECH.


F.F.L.

ELEVATOR

SHAFT SHAFT

ELEVATOR LOBBY
SERVICE
RETAIL
0.25% 16 DWG-CSCEC-08-G00-ST-SC-0264-07 07/02/2023

1.5%
+324.10
T.O.S. B-01 17 DWG-CSCEC-06-C05-AR-AR-0242-02 23/11/2021

323.80

RETAIL 05
2% 2% 1 MAT-CSCEC-18-EL-LC-0031-04 17/04/2022
+324.10
Documents
T.O.S.
Ø100

0
Ø10

RETAIL 06
3.3% 0.25%
0.25%
0.25%

8
2.34

0.09
5 X=8
1145
8186
8.35
1
9.00
1
Coordination Table :
1151 2.30
6 Y=6 1141

2350
X=8 2
9.06 9.15
5 1145 X=8 6.51
7
8168 1150 X=8 865.402 50 8196
Y=6 X=8 1.85
9 81 B041 750 7 Y=6
S.G

8169 Y=6 B040 Discipline Signature Date

B047
6

750
1.03 Y=6 7.82
3
1151 B039

680 1
X=8 686.267 1141
920 1475 1475 1475 1475 1475 680 X=8 965.629 DRAINAGE PIT
200 1150 150

81 3 4651
81

B046
Y=6 1.54 Y=6

475
475
1145 2.32
7 7 Architecture
X=8 859.533 4651475460 0.83
1475
460 1145 1142
Y=6
81 X=8 866.876 X=8 1

1475
2.76

B045
81 8194

750 2350
Y=6 Y=6 7
B031 B032 B033 B034 B035 B036 0.36
5 1.06
6 1.30
7
1142 Structure C.

920
8.68 1145 1142 X=8 944.159
0.56
5 1150 B037 B038 X=8 0.92
9 X=8 941.363 81
X=8 693.257 4651475 1475 460 Y=6 6.64
6
1151 8186 Y=6
81
1 X=8 687.665 Y=6
81 Y=6 1141 1
8.69 X=8 4.74 Structure S.

750
81 5
1150 Y=6 9.62 8196
X=8 674.997 8 1150 1 DRAINAGE PIT Y=6
81 X = 0.46
50 Y=6 8169 B042 B043 B044

2350
Y=6
7
750
Electrical
SLOPE 1/10

0
B03
2
1/1
PE
SLO

9
7.70
680

1150
9

X=8 673.896
SLOPE 1/10

Plumbing
B02

S.G
147

81
Y=6
5
8
B02

147

S.G
HVAC
59
20

DRAINAGE PIT
S.G

S.G

S.G

S.G
Other
S.G

7
6.72
1150
S.G

X=8 672.796
81
Y=6

Revision Table :

S.G

S.G
S.G

S.G

S.G

S.G

S.G
01 Approved 18 FEB 2023 WGJ
00 Approved 20 NOV 2022 WGJ
1/10
SLOPE 1/12

PE
1/10

SLO
PE
SLO

A A No. Description Date App.

Drawing Title :
SLOPE 1/12
0
1/1

SLO
PE

PE
SLO

1/1
0

INF-F01
AUTOMATIC RISING BOLLARD
FOUNDATION LAYOUT (PART 1)
S.G

S.G

S.G

S.G

S.G

S.G
S.G

SLOPE
1/10

S.G

SL
O PE
1/1
S.G

S.G

S.G

S.G
S.G

Designed Checked Approved

S.G
SLOPE
1/10

AHMED ABDELWAHAB DUAN XINGCHAO WU GUANGJUN

0.3% 0.3% 0.4% 0.3% 0.3%


Drawn Date Scale

AHMED ABDELWAHAB 18 FEB 2023 AS SHOWN

1.4% 2%
1.2% SHD CSCEC 18 F01 ST SC 01 EX 05 0001 0000 01
0.3% 0.3% 0.5% 0.3%
Packa. Build. Sub Elemt. Floor Part Sheet Sequnc. Rev.
5 4 3 2 324.15 1
Type Contractor No. Type
Discp.
Discp. Type Level No. No. No. No.

323.80 D-02 D-02323.80 D-03 D-03

You might also like