Professional Documents
Culture Documents
700
500
3300
2800
2800
THIRD FFL THIRD FFL
EL. ± 7125MM EL. ± 7125MM
600
600
SECOND FCL SECOND FCL
EL. ± 6525MM EL. ± 6525MM
11125
11125
3400
3400
2800
2800
SECOND FFL SECOND FFL
EL. ± 3725MM EL. ± 3725MM
600
600
GROUND FCL GROUND FCL
EL. ± 3125MM EL. ± 3125MM
3600
3600
3000
3000
GROUND FFL GROUND FFL
125
125
EL. ± 125MM EL. ± 125MM
NATURAL GRADE LINE NATURAL GRADE LINE
EL. ± 0.00MM EL. ± 0.00MM
01 REAR ELEVATION
A-05 SCALE: 1:100M 02 LEFT SIDE ELEVATION
A-05 SCALE: 1:100M
CIVIL ENGINEER: PROJECT OWNER: PROJECT TITLE: DESIGNED BY:
SHEET CONTENTS: SHEET
DRAWN BY:
ENGR. MYCO M. MINDORO MOLINO RESIDENCE HJFT A-05
BAN MIKKO MOLINO CHECKED BY:
AS SHOWN
05 27
PRC NO.: DATE: VALIDITY: PROJECT LOCATION:
DATE:
PTR NO.: PLACE: TIN:
BRGY. SAWANG, ROMBLON, ROMBLON DRAWING