GIRDER

5000 6000 6000 6000 6000 6000 5000 SHONSHO NALLAH


RL =101.00

3000
3000

3000

3000

3000

3000
RL = 85.00
15°

°51
ABUTMENT - 2
ABUTMENT - 1
GL A
GL
15°

°51
15°

°51
A'

EARTH FILLING

> Earthfilling Specification:-

Minimum CBR Should be 8% FOOTING(1200X1200 X300)


Minimum Filling thickness is 500mm
Minimum Filling Compaction is 97% Project No. CE (P) SWK-03 /2020-21
> Footing Specification:- Client -
Footing cover =50mm BORDER ROADS ORGANISATION
Reinforcement bar 10mmØ@150mm c/c in both direction
Fe=500 and Grade of concrete M25. SEEMA SADAK BHAWAN
RING ROAD, DELHI CANTT
NEW DELHI-110010
1200

DRAWING NAME - Details Of Cribs For 3 m Height

PROJECT :
Design and Construction of 3Nos Major Permanent Bridges of span
1200

40mtr over Shonsho Nallah at km 27.900(Part I), 35 mtr over Mayung


Nallah at km 33.250 (Part II) AND 50 MTR Over Mokaha Nallah AT KM
84.575 (Part III) with Steel Super Structure through type on road
Plan
Tuensang-Mon-Naginimora under 100 RCC/15 BRTF under project
Sewak in Nagaland State.Tender No. CE(P)SWK-03/2020-21(Second
call).
Prepared By :
GEO TECHNO CONSULTING SOLUTIONS
300

Address : House No. -116 , Near Reliance Market ,


Jaya Nagar Tiniali , Tripura Road ,Guwahati , Pin- 781022
1200 10mmØ@150mm c/c
Section AA'
Designed By : Phanindra Nath Page No : 1