Training objectives:
You know how to read and handle parameters
Content Page
Electronic box and Control board...................................................................................................... 3
Local bus adapter, installation locations and slot assignments.......................................................... 4
Control board and I/O-interfaces....................................................................................................... 5
Data storage.................................................................................................................................... 6
Parameterization via PMU (ParaMeterizing Unit).............................................................................. 7
Communication CUVC PG/PC.................................................................................................. 8
Settings for the serial interface on the PG/PC................................................................................... 9
Properties of Serial Interfaces.......................................................................................................... 10
Access to change parameters / Selection of function macros........................................................... 11
Saving Data / Upload, Download...................................................................................................... 12
Operating status display / Power section definitions.......................................................................... 13
Adjustment of converter current and converter supply voltage.......................................................... 14
Load class and load cycles............................................................................................................... 15
Motor data....................................................................................................................................... 16
Speed feedback via encoder or EMF................................................................................................ 17
Field control / Field weakening......................................................................................................... 18
Current and torque limits / Ramp function generator......................................................................... 19
Optimization routines....................................................................................................................... 20
Electronic box:
Terminals for
programmable digital
Display and
keypad (PMU)
USS-serial interface
(for commissioning)
1 3 2
location number Æ
sequence of installation
Data storage
Booting FW
P53
P Δ P P Δ P
0009 r000 P462 i 001 10.00 20.00 P462
example: setting a ramp time of 20 s for dataset 1 (initial condition: ready to switch on)
SIMOREG DC-Master
upload, download
P051=6 *
Download
Upload
P051=7 *
Motor data
Optimization routines
during optimization
runs the drive will
accelearate up to
maximum speed