Before submitting call for Inspection of solar roof top connection to Testing Division, following points is to be
complied by O&M subdivision or Division
AE/DyEE/Add.EE/EE Consumer/Representative
O&M,____________
_________________
Single Line Diagram
Solar Panel
Make:-
Sr. No.:-
Solar Panel Volt.:-
O/p Capacity:-
Imax:-
DC (MCB) ISOLATOR,
Capacity:
Inverter
Inverter Make:
Rating:
AC (MCB) ISOLATOR
Capacity:
Generator Meter
Owner: MSEDCL/Consumer
Make:
Meter CT ratio: Connected CT ratio:
Meter PT ratio: Connected PT ratio:
MF:
Towards load
Connected load:
Sanctioned load:
Net Meter
Owner: MSEDCL/Consumer
Make:
Meter CT ratio: Connected CT ratio:
Meter PT ratio: Connected PT ratio:
MF:
Towards Grid
Name of DTC: DTC Code:
DTC Capacity: Name of feeder
Consumer/Representative AE/DyEE/Add.EE/EE
O&M, ____________