GENERADOR
CONTRATO: S/C
OBRA: PERIODO: 07 DE JULIO AL 15 DE JULIO 3
FECHA: jueves, 14 julio, 2022
CROQUIS DE LOCALIZACION
GRAND SALON. FLOOR RELEVELING BASED ON SEMI-POLISHED CONCRETE,ARMED WITH 6x6/10- 10 ELECTRO-WELDED MESH, UP TO 7 CMS OF
7 AGGREGATE, MIXED CONCRETE f'c 250 kg/cm2, INCLUDES WASHING WHIT ACID, A COAT OF POLIMOR, CARRYING OF MATERIAL, CLEANING, MINOR
TOOL AND EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION.
0.80
KITCHEN BAR
Croquis: 15
Tramo: A
0.97
0.80
DINNING ROOM
ENTRY HALL
GRAND SALON
Croquis: 07
Tramo: A
3.15
3.15
3.15
EUGENIO ALVAREZ LOPEZ ING. ARQ. EDER PÉREZ PONCE ARQ. EDGAR PEÑA
ING. VICTOR AVILES ARQ. JESUS AMADOR ARQ. HECTOR REVELES
CONTRATISTA RESIDENTE DE OBRA GONZÁLEZ
ESTIMACIONES
NOMBRE DEL DOCUMENTO
GENERADOR
CONTRATO: S/C
OBRA: PERIODO: 07 DE JULIO AL 15 DE JULIO 3
FECHA: jueves, 14 julio, 2022
CROQUIS DE LOCALIZACION
DINNING. FLOOR RELEVELING BASED ON SEMI-POLISHED CONCRETE,ARMED WITH 6x6/10-10 ELECTRO-WELDED MESH, UP TO 7 CMS OF AGGREGATE,
19 MIXED CONCRETE f'c 250 kg/cm2, INCLUDES WASHING WHIT ACID, A COAT OF POLIMOR, CARRYING OF MATERIAL, CLEANING, MINOR TOOL AND
EVERYTHING NECESSARY FOR ITS CORRECT EXECUTION.
0.97
Croquis: 19
Tramo: A
DINNING ROOM
2.64