Introduction
PSP
202 -0004
This section is a guide to be used for first installation of the engine and generator, or when a
replacement of any of the equipment has been made. Too often the equipment is damaged or destroyed

10: 3/04/2 AE6C


before it ever has a chance to be used because of incorrect wiring, lead shorts, wrong polarity or a
mechanical problem.

1
SEN 4:14+ 3
The information that follows contains a basic, step by step checklist to be followed. Before any supply
power is applied, all wiring and settings should be verified to be correct. Then the system is energized

© 2 R643 03:00
and the components are checked out to see if they function correctly. Finally the engine is started, and
the complete system is checked and adjusted dynamically.

023 0
The correct use of these initial checks will eliminate most of the early failures that can occur.

Cat
PSP-0004AE6C
erp
2023/04/23
illa
10:14:08+03:00
SENR64300003 r In
© 2023 Caterpillar Inc. c.

https://sis2.cat.com/#/print-preview/service/%257B%2522title%2522%253A%2522Initial%2520Checks%2520And%2520Adjustments%2520At%2520I… 1/1

You might also like