Table 1.1- Initial and final mass of material used in g (±0.
01g) over a period of 7 days
Material Initial Mass 'g' (±0.01) Final Mass 'g' (±0.01)
1 Concrete 9.02 7.04 Control for concrete 8.10 8.10 2 Sea shell 6.86 4.71 Control for sea shell 5.52 5.52 3 Egg shell 6.57 5.97 Control for egg shell 5.50 5.50 4 Marble 8.69 7.08 Control for marble 8.64 8.64 over a period of 7 days