Table 1.1- Initial and final mass of material used in g (±0.

01g) over a period of 7 days

Material Initial Mass 'g' (±0.01) Final Mass 'g' (±0.01)


1 Concrete 9.02 7.04
Control for concrete 8.10 8.10
2 Sea shell 6.86 4.71
Control for sea shell 5.52 5.52
3 Egg shell 6.57 5.97
Control for egg shell 5.50 5.50
4 Marble 8.69 7.08
Control for marble 8.64 8.64
over a period of 7 days

Change in Mass 'g' (±0.01) % Change in mass


1.98 21.95
0.00 0.00
2.15 31.34
0.00 0.00
0.60 9.13
0.00 0.00
1.61 18.53
0.00 0.00