5. Assume that spoilage loss is charged to all production during August.

What would be
the unit cost of the good coats produced on Job 501?
Harper Co.'s Job 501 for the manufacture of 2,200 coats, which was completed during
August at theunit costs presented below. Final inspection of Job 501 disclosed 200
spoiled coats which were sold to a jobber for P3,000.
Direct materials P10
Direct labor P9
Factory overhead (includes an allowance of P0.50 for spoiled work) P28
Assume that spoilage loss is charged to all production during August. What
would be the unit cost of the good coats produced on Job 501?