Pre-contract procedure
Design CONSTRUCTION
The general approach on The project is handed over
the design, layout & to the contractor for
construction method is construction.
determined.
Inception &
Feasibility
This is a stage where a Traditional Construction Project Stages
client expresses his
intention to build building
SWAT Analysis
Analysis on strength,
Organization
weaknesses, opportunity and
thread of the project
EIA
$$
Funding
Client provide administrative Environmental Impact Cost estimate and funding in
organisation Assessment place
Consultants SIA
Client appoints consultants i.e Social Impact Assessment
architect, quantity surveyor,
planner
ROI Result
Return of Investment Suggestion & advice client
based on result
Design
The general approach on
Traditional Construction Project Stages
the design, layout &
construction method is
determined.
Architecture
cost
Civil &
structure
cost
M&E cost
PRODUCTION OF
INFORMATION
Supervision of Works
The consultant’s duties are to
monitor the construction work,
evaluate the work and prepare
payment certificate to the contractor
Project #3 Project #4
Lorem ipsum dolor sit amet, Lorem ipsum dolor sit amet,
consectetur adipiscing elit. consectetur adipiscing elit.
Integer pulvinar nulla ut.
ON-SITE OPERATION Integer pulvinar nulla ut.
It is the contractor’s duty to
execute the work on site until
project completion
HANDOVER &
MAINTENANCE Traditional Construction Project Stages
The project is completed
and handover to the client
for occupation and use
Completion of all Fulfillment of all authority Handover of all relevant Defect Liability Period
necessary testing and requirements and the ‘as-built’ records, (DLP)
commissioning obtaining of all necessary documentation,
certificates, eg Certificate undertakings, warranties, Rectification of patent and
Practical completion of the of Fitness, etc etc. latent defects for which
works under the contract contractor is contractually
Final account responsible
final
completion CF maintenance
documentation
Involvement of the Quantity Surveyor in pre- contract procedure
Design Completion
Preparing cost plan according to Completing final account
element
Comparative cost study
Prepare BQ Feedback
Cost check
Account analysis
Work record analysis
Tendering
Prepare tender document
Prepare tender report