Plan 52 Dual Seals Plan 53A Plan 53B Plan 53C Plan 54
Plan 62 Quench Seals Plan 65 Good Piping Practices Single Seals Dual Seals
high point vent
What What What Plan 23 shown Plan 53A shown
seal External quench seal
External drain on Minimize line losses Minimize flow
end view
on atmospheric end view
atmospheric side restrictions in piping
side Use large diameter tubing system
for proper orientation
Drain - see end view
Why
Why Detection of
Only upward sloping lines Why
Horizontal Horizontal
Vertical Equipment Equipment
Vertical
Prevent solids seal failure Use long radius bends Optimum flow rates Equipment Equipment
buildup for best piping 1.5 - 2 ft.
Where Minimize component losses plan performance (0.45 - 0.6 m)
1.5 - 2 ft.
(0.45 - 0.6 m)
Where Remote locations, Optimize for thermosyphon
Hot hydrocarbon, critical services Where
caustic Check rotation direction Closed loop auxiliary
systems with internal
Test for leaks flow induction, good low point drain low point drain
practice everywhere 3 ft. (0.9 m) max 4 ft. (1.2 m) max