SOAL : Diketahui struktur portal beton dengan konfigurasi seperti gambar di bawah ini :
K7 K14
B5

B3
K6 K3
B4

B2
K5 K2

B1
K1
No Type Elemen Dimensi Diameter As Gambar Potongan
Penampang tulangan Penampang dan
Detail Penulangan
1. Balok B1 30/50 Cm D12 As’ = 335,100/0/400,57
As = 0/259,04/0
2. Balok B2 30/50 cm D16 As’ = 474,57/0/439,69
As = 0/330/0
3. Balok B3 30/50 cm D12 As’ = 361,3/0/395,51
As = 0/90,3/0
4 Balok B4 30/50 cm D16 As’ = 240,16/0/474,57
As = 0/442,35/0
5 Balok B5 30/50 cm D16 As’ = 465,04/0/245,98
As = 0/83,5/0
6. Kolom tepi K1 50/50 cm D25 As = 2500
7. Kolom tepi K4 50/50 cm D25 As = 2500
8. Kolom tepi K7 50/50 cm D25 As = 2500
9. Kolom tengah 50 cm D16 As = 1256,64
K2
10. Kolom tengh 50 cm D16 As = 1256,64
K3
11. Kolom tngh K5 50 cm D16 As = 1256,64
12. Kolom tengh 50 cm D16 As = 1256,64
K6
TYPE BALOK TUMPUAN LAPANGAN TUMPUAN

300 300 300

4D12 4D12 4D12

500

500

500
B1

4D12 4D12 4D12

300 300 300

3D16 3D16 3D16


500

500

500
B2

3D16 3D16 3D16

300 300 300

4D12 4D12 4D12


500

500

500

B3

4D12 4D12 4D12


4D12 4D12 4D12

300 300 300

B4
3D16 3D16

500

500
3D16

500

3D16 3D16 3D16

300
300 300

3D16

500
B5 3D16 3D16
500

500

3D16
3D16 3D16
TYPE GAMBAR DETAIL

Kolom Tepi K1 6D25

500
Kolom Tepi K4
Kolom Tepi K7

500

Kolom Tengah K2 R25


0

Kolom Tengah K3
Kolom Tengah K5
Kolom Tengah K6
8D16