International Journal of Informatics Information System and Computer Engineering 3(1) (2022) 47-60

47 | International Journal of Informatics Information System and Computer Engineering 3(1) (2022) 19-44

International Journal of Informatics,


Information System and Computer
Engineering

Development of Pec Based Electrical Load Schedule


Software
Ralph G. Alvaro, Eric Kenneth B. Cabrera, Raineir Ryan G. Gutierrez * , Joshua D. Punzalan, Louie G. Serrano,
Alma L. Tangcuangco

Department of Electrical Engineering, Don Honorio Ventura State University, Philippines

E-mail: * raineirryangutierrez@gmail.com

ABSTRACTS ARTICLE INFO


This paper presents the development of PEC-based electrical Article History:
Submitted/Received 01 Dec 2021
load schedule software for residential electrical services First Revised 01 Mar 2022
design. All the sources that will be used for the computation Accepted 09 Apr 2022
First Available Online 14 Mar 2022
and data will be based on PEC. The testing of the project will Publication Date 01 Jun 2022
be carried out in accordance with PEC as well as other ___________________
approved codes. Calculating tools to help you understand Keywords:
the process of accurately sizing a commercial electrical panel Diagram,
based on proposed loads. To emphasize, accurate load sizing Electrical,
Single-phase,
is best performed by an electrical engineer, which is
Software,
reviewed by the building department in your jurisdiction. Power system
The software was developed using Visual Basic (VB. net)
programming language. Vb.net, or Visual Basic, is a
development of the BASIC programming language. It is
intended to be used in conjunction with an Integrated
Development Environment (IDE). Prior to the development
of IDEs, programming languages like BASIC relied
significantly on the DOS command-line. A load schedule for
different operating scenarios will show when peak
consumption occurs and provide an opportunity to find out
if all the high loads must operate at this time. It serves as a
valuable calculation tool for electrical engineers, students,
and technicians by providing a faster, easier, and more
accurate means of carrying out some basic calculations, such
as determination of the size of wire; conduit sizes; circuit
breaker ratings; the main feeder size of wires; main circuit
breaker ratings; voltage drop; and riser diagram using
Philippine Electrical Code Tables. The results of these
calculations help the designer to make vital decisions such as
cable sizing and nominal ratings of protective devices
required by each circuit and by the entire installation, in line
with appropriate standards and regulations.

DOI: https://doi.org/10.34010/injiiscom.v3i1.7555
p-ISSN 2810-0670 e-ISSN 2775-5584
Ralph et al. Development of Pec Based Electrical Load Schedule Software | 48

1. INTRODUCTION estimation for electrical engineers and


The electrical load schedule computation master electricians in the project that has
is a summary of the data that helps been professionally prepared and printed
electrical installers to know the The Electrical load schedule software
equipment ratings and their contribution combines a graphical user interface and
to the overall power consumption in an the intelligence of software electrical load
installation. The data in the electrical load schedule for (Bungalow/family home,
schedules is usually backed by offices, and administration building). To
calculations which are based on standard easily design, calculate and analyse low
electrical codes (PEC) Philippine and medium voltage panel load
Electrical Code. Some of the Electrical schedules and distribution of panel
engineers compute their electrical load boards.
schedule manually and there are a
portion who use Microsoft Excel and The Electrical Load Schedule Software is
create a sheet for their computation. done by using a program that will
Nowadays with the help of a fast phase calculate electrical loads to be used in an
advancement of technology many electrical calculation. This program will
develop software with the means of be using Visual Basic (VB.net), there are
improving their efficiency and accuracy. many programs language readily
There are books to read where we can available in the market like C++, C#, Java,
learn and understand the Electrical load and others. Since the group’s knowledge
Schedule, also known as PEC or in programming is limited, Visual Basic
Philippine Electrical Code, which is done (VB.net) is another option (Morrison &
by an Electrical Engineer. To have a Cornell, 2008). It is easier to use and you
precise and acceptable result, the purpose can develop something fairly fast. VB
of this study is to create software that may also be used for web and application
electrical engineers may use to identify development, similar to java but with a
everything they need to do and put different approach.
everything in place. Application of The Philippine Electrical Code (PEC) is
electrical products and equipment for used nationally as the basis for
additional installation or replacement is safeguarding people, buildings, and
suggested to be consulted with a licensed contents from hazards that may arise
electrical practitioner before installation from the use of electricity. This code
for safety. Failure to do so may result in contains provisions that are necessary for
fire, serious injury, or death. safety and thus is used as a basis for the
The Electrical Load Schedule Software legal enforcement in the installation of
will aid Professional Electrical Engineer electrical system design and PEC
and Electrical Engineering in analysing calculations are based on a 120-230 V ac
load schedules. This program can source and an operating frequency of
compute the size of wire, conduit sizes, 60Hz and the wiring sizes exist from each
circuit breaker rating, the main feeder other’s table.
size of wires, main circuit breaker ratings, This study aims to develop software for
voltage drop and riser diagram using electrical engineers. The Electrical load
Philippine Electrical Code Tables. The schedule software combines a graphical
software can be used for calculation and

DOI: https://doi.org/10.34010/injiiscom.v3i1.7555
p-ISSN 2810-0670 e-ISSN 2775-5584
49 | International Journal of Informatics Information System and Computer Engineering 3(1) (2022) 47-60

user interface and the data intellect of sizes of cables, and nominal appraisals of
PEC to lighten, calculate, design, and defensive gadgets required by each
analyse electrical load schedules and circuit and by the whole establishment in
distributions of panel boards. The line with fitting measures and directions.
Philippine Electrical Code (PEC) is the The software is called Calculation for
basis of making sure the electrical service Home Electrical Services.
is sized properly and computed correctly.
Residential electrical services design
● To provide these calculating tools as
calculator software. The software was
a guide to assist you to understand
created using the Java programming
the process of accurately sizing a
language and serves as a useful design
residential unit electrical panel based
tool for electrical engineers, students, and
on proposed loads.
technicians by making basic calculations
● To enlighten the results of the
such as determining the number of
calculations are based upon the
lighting fixtures required in a room, the
accuracy of the information that users
design current and power required per
provide.
final sub-circuit, the total connected load,
● To emphasise the accurate load sizing
voltage drop across chosen cables, and
is best performed by an electrical
load balancing across the three axes
engineer which is reviewed by the
faster, easier, and more accurate. The
building department in your
results of these calculations assist the
jurisdiction.
designer in making critical decisions such
According to Olatmiwa 2012, the
as the types of luminaires, cable
software was found to be reasonably
diameters, and notional protective device
effective and efficient in carrying out the
ratings required by each circuit and by
required electrical design calculations at
the total system in accordance with
computer speed and accuracy. The
acceptable standards.
software serves as a valuable design tool
for electrical engineers, students, and The few calculators software that provide
technicians by providing a faster, easier, residential design calculations utilise an
and more accurate means of carrying out approach that presume the home's load
some basic calculations. The calculator need is based on its area. This study, on
software was created utilizing the Java the other hand, proposes a model that
programming dialect and it serves as an allows the designer to deal with precise
important planning device for electrical loads predicted or needed by the
engineers, students, and professionals by customer while taking into account
giving a speedier, less demanding, and unusual load characteristics such as
more precise means of carrying out a few power factor. This program estimates
essential calculations, such as; assurance apparent power, which is the amount of
of the number of lighting installations power required from the supply to the
required in a room; the plan current and end user, while also accounting for
control required per last sub-circuit; the variations in real load utilisation. The
whole associated load; voltage drop over designer may enter all quantitative
chosen cables; and load adjusting over design elements utilised in the
the three stages of a three-phase provided computations (diversity factor, utility
building. The results of these calculations factor, maintenance factor, and power
offer assistance to the architect in forming factor), improving design flexibility
crucial choices such as sorts of lights, (Parmar et al., 2012).

DOI: https://doi.org/10.34010/injiiscom.v3i1.7555
p-ISSN 2810-0670 e-ISSN 2775-5584
Ralph et al. Development of Pec Based Electrical Load Schedule Software | 50

Calculating electrical loads needs to be the goal is to keep the total of these fines
improved to improve the accuracy of the as low as possible (Hait & Artigues, 2011)
data that affect the technical and
According to Khuntia & Van der Meijden,
economic indicators of the overall
(2018), For utilities and planners, long-
corporate complex. (Khomiakov &
term electrical load forecasting is critical.
Ustinov, 2019). To reduce the inaccuracy
The use of a multiplicative error model
in predicting electrical loads to acceptable
(MEM) to anticipate long-term demand is
levels in engineering calculations, the
proposed in this work. The advantages of
effect of energy-saving measures made
taking volatility into account is
on each electric receiver independently,
demonstrated by out-of-sample forecast
particularly from the frequency converter
outcomes and directional accuracy
installation, must be considered. The
during the Great Recession.
experiments undertaken confirm the
necessity to alter the coefficients used in For the distribution system planning
the calculations using the existing problem, a novel technique based on the
method. seeker optimization algorithm (SOA) is
given. SOA entails the simultaneous
The analysis of the electrical load
installation of automatic reclosers (RAs)
schedule takes far too long. There are
to prevent brief failures. It may be
steps to take, preparations to make, and
utilized effectively to optimize the design
requirements to meet. C.A. Cole claims
of an advanced power distribution
that while there are many various ways
system (Kumar & Samantaray, 2014)
to construct an electrical design, there is
only one item that cannot be changed According to Karabulut et al. (2008), Load
(Khomiakov & Ustinov, 2019). The management is a capacity that load
requirements of the code must be distribution centers and electric
observed. companies demand. Long-term load
forecasting provides direction for
According to Polydorides & Lionheart,
installation maintenance and
(2002), Microsoft's VB.NET is a
construction planning. Power companies
programming language that runs on
have been more interested in new
the.NET framework. Visual basic may be
forecasting approaches for more
readily developed by any programmer
trustworthy and accurate estimates.
that is familiar with vb.net. The Common
Short-term, mid-term, and long-term
Language runtime environment for
load forecasting assessments are
Microsoft's Visual Studio program is
available.
used by VB.NET (Polydorides &
Lionheart, 2002). What VB developers can achieve with
Visual Basic.NET is limitless, and books
The cost of a schedule is determined by
for Visual Basic.NET must be created
the total energy consumption of the
from the bottom up. VB developers are
equipment, which is calculated on a
continuously seeking for publications
regular basis. Every 15 minutes, the
that are clear and effective in
power provider and the plant owner
communicating these new issues
agree a target usage. Any deviation from
(Barnaby, 2002).
the contractual usage is punished, and

DOI: https://doi.org/10.34010/injiiscom.v3i1.7555
p-ISSN 2810-0670 e-ISSN 2775-5584
51 | International Journal of Informatics Information System and Computer Engineering 3(1) (2022) 47-60

1.1 Power load calculator power factor, transformer, underground


cover, lighting design, motors, voltage
This software will help you calculate the
drop, and more are all done in accordance
load on a circuit to see if it is excessive.
with current National Electrical Code
You may also determine the size of circuit
regulations. The reports are thorough,
breaker required for the load. This is
succinct, and well-written (NEC Design
especially useful during pre-production
Software, 2014).
since it allows you to quickly assess
whether or not you'll require an external 2. METHOD
generator and how many you'll require. The Research Methodologies used for the
Calculating the minimum required load study are described with specific
for your power supply is a objectives to achieve the design
straightforward task. By glancing up a conditions of the project. The projects
few ratings from the datasheet, you can start with the definition and function of
immediately apply the proper load size the components based on the Philippine
(Power Load Calculator, 2007-2022). Electrical Code (PEC) (PEC, 2017). All the
1.2 Design master electrical sources that will be used for the
computation and data will be based on
It enables the user to design quality Philippine Electrical Code. Then, testing
schedules with different electrical of the project will be done (Fig. 1).
characteristics that are simple to manage
and read. It enhances electrical The program language used was VB.net.
calculations with new features. This The Vb.net or Visual Basic is a
application's design is simple and development of the BASIC programming
straightforward. It responds quickly language that is intended to be used in
when doing its role. The main part of conjunction with an Integrated
designing electrical services is the user- Development Environment (IDE).
friendly interface. Design master Programming languages like BASIC
electrical is a full electrical drawing and relied significantly on the DOS
model solution that works directly in command-line prior to the development
AutoCAD, requiring no other software of IDEs. Programmers had to write their
(Design Master Software, 2001-2022). code by hand and use DOS to convert it
into executable files, which was a time-
1.3 Wiresizecalculator.net consuming procedure with a lot of chance
The wire size calculator makes estimating for error. An IDE, on the other hand,
the size of wires and cables for pump streamlines the process by offering a
applications very simple and quick. This single interface that makes coding easier
site has a number of complex calculators and allows for one-click compilation into
to help you size wire securely and an executable file. We think Visual Basic
accurately. It has calculators, tables, and is a very approachable programming
tools to help you size wire and conduit language for beginners who want to write
correctly (WireSizeCalculator.net, 2021). basic applications because of its
simplicity. Visual Basic is a Microsoft-
1.4 NECDESIGN.COM developed programming language that is
NEC Calculator is a set of calculators that primarily used to create method
will correctly, efficiently, and consistently programs in the Windows system. In the
handle all of your basic electrical design mathematical modelling of the software,
jobs. Wire size, conduit fill, fault current, all the data of the electrical design were
DOI: https://doi.org/10.34010/injiiscom.v3i1.7555
p-ISSN 2810-0670 e-ISSN 2775-5584
Ralph et al. Development of Pec Based Electrical Load Schedule Software | 52

based on Philippine Electrical Code (Conduit). All of this will be included in


(PEC). This includes all the necessary the mathematical modelling of the
computation in the load schedule, software.
voltage drop and the riser diagram of the
The following procedures were
software such as ground wire of the main
employed in the development of P.E.C.
circuit breaker, size of wire, ground wire
based electrical load schedule software as
for the size of the wire, horsepower (Air
shown in Fig. 1.
Conditioning unit), ampere ratings for
the circuit breakers, and ampere rating

Fig. 1. Program Development

DOI: https://doi.org/10.34010/injiiscom.v3i1.7555
p-ISSN 2810-0670 e-ISSN 2775-5584
53 | International Journal of Informatics Information System and Computer Engineering 3(1) (2022) 47-60

2.1. Methods of Program Development 2.1.5. Voltage Drop


2.1.1. Program Application It will automatically show you the
voltage drop. If volts drop, amps drop
This program application you will
choose or select of what type of load too. That is why when you find a
voltage drop in a connection or cable,
schedule you will create. There are two
option calculations, the single phase and you know the connection or cable is
the three phase. restricted.

2.1.2. Input Data 2.1.6. Display Results

The user will select the type of Loads and The program displays the computed
input all the required data in creating a results in the load schedule table and the
load schedule table. The data entry riser diagram in its dedicated platform.
operator may be required to verify or edit The load schedule table shows the sizes of
data as it is entered. There will be a wires, conduit size, and circuit breaker
dropdown option when you insert your rating of each load and also the main
quantities. feeder sizes of wires and main circuit
breaker ratings and Voltage drop. While
2.1.3. Construction of Load Schedule
the riser diagram only displayed the
Table
circuit breaker number and grounding
Loads that are inputted by the user are electrode. The process will handle the
now then put in the load schedule. It recommended inputs and it will be
includes a circuit number, types of shown downwards while you put the
loads, rating rated current, circuit necessary details in your computation
breaker ratings, sizes of wires, conduit such as the proper wire size and number
sizes, voltage drop and riser diagram of circuits to be used, types of loads,
This will help designers to properly size rating rated current, circuit breaker
the power backup generators or other ratings, size of wires and conduits to be
alternative power sources. used in the project.
2.1.4. Perform Computation 2.1.7. Save
The program performs two different If the user is finished with the design, the
types of computation: load schedule and user can choose to save it or discard it. If
riser diagram. For the load schedule the user chose to save the file, the
table, the program computes the rated program produces a text file for the riser
current and gives the sizes of wire, diagram with load schedule computation.
conduit size, voltage drop, circuit The software can provide printed output
breaker ratings for each load. The load when you finish the design.
schedule table, computes the overall
2.2. Software Formulas
current and gives the main feeder sizes
of the wires, conduit size, and circuit In the Single-Phase System this is the
breaker rating. For the design of the riser simplest. The kVA may be calculated
diagram, the program only computes easily using the kW and power factor.
the circuit number of the breaker and the The current is calculated by dividing the
size of the wire grounding electrode. kVA by the voltage. While in the Three
Phase System the voltage is the major
DOI: https://doi.org/10.34010/injiiscom.v3i1.7555
p-ISSN 2810-0670 e-ISSN 2775-5584
Ralph et al. Development of Pec Based Electrical Load Schedule Software | 54

difference between a three phase and a Motor Load


single-phase system. In a three-phase
The overcurrent device protecting the
system we have the line-to-line voltage
individual motor branch circuit must be
(VLL) and the phase voltage (VLN).
able to carry the motor starting current. It
2.2.1. Conductor sizing must have a time delay to allow the motor
Branch Circuit (Lighting and Appliance to start and come up to speed.
Load) For single phase (all types no code
QTY. X 100 (if lighting) = WATTS (as per letter)
PEC standard) Icb = 250% IfL – Inverse time breaker
QTY. X 180 (if con. outlet) = WATTS (as Icb = 700% IfL – Instantaneous trip
per PEC standard) breaker
TV, Refrigerator, Water pump and Range Iss = 300% IfL – Non time delay fuse
etc. as per owner choice of wattage
Iss = 175% IfL – Dual Element
(VA)
For other types of motor with code
VA/V = A (AMPERES)
letters. (PEC, 2017)
WATTS /VOLTS = AMP. LOAD
Feeder Circuit (Lighting and Appliance
2.2.2. Motor Load loads)
The current on the branch circuit feeding Single or Three phase loads
a single motor is taken as 125% the full
The rating of overcurrent protection shall
load rated current of the motor.
be capable of carrying the computed line
Ic = IfL x 1.25 current. It should be the nearest higher
The current on the branch circuit feeding commercially available overcurrent
two or more is taken as not less than 125% protection should not be higher than the
of the full load current rating of the capacity of the feeder conductor
highest rated motor in the group plus the protected. Minimum ampacity of the
sum of the full load current rating of the conductor required (Ic), Full load current
remainder of the motors in the group. of the motor (ifL).= Full load current of
the highest rated motor (IfLhrm).
2.2.3. Overcurrent Protection Rating
Ic = 1.25% IfL hrm + ifL
Branch Circuit (Lighting and Appliance
loads) The rating of the overcurrent Single Phase System
protection should be capable of carrying Service Entrance Conductors (size of wire)
the computed line current. It should be
The service entrance is where the wires
the nearest higher commercially available
connected to the load side of the meter
overcurrent protection/circuit breaker.
enter the house or building. The service
The ampere trip of the overcurrent
entrance in a home is typically called to
protection should not be higher than the
as a breaker or power supply.
ampacity of the conductor that is being
protected. IF = (IFL x D.F) + 25% (HML)

DOI: https://doi.org/10.34010/injiiscom.v3i1.7555
p-ISSN 2810-0670 e-ISSN 2775-5584
55 | International Journal of Informatics Information System and Computer Engineering 3(1) (2022) 47-60

Service Equipment (size of breaker) current flowing through the conductor


multiplied by the total resistance of the
This required equipment, which
conductor. In other words, Vd = I x R. A
typically consists of circuit breakers,
simple formula was derived from Ohm's
switches, and fuses, as well as their
law to calculate the voltage drop across a
equipment, is connected to the load end
conductor. This formula can help you
of service conductors that serve a
determine voltage drop across a circuit, as
structure and serves as the main control
well as the size wire gauge you will need
and cut off of the supply.
for your circuit based on the maximum
IMCB = (IFL x D.F) + 150% (HML) desired voltage drop. The Philippine
(size of breaker) (Section 4.30.2.4 PEC Electrical Code states that the voltage
2017, pg. 349,350) drop of a feeder circuit must not exceed
Three Phase System 5%, and the voltage drop of a branch
circuit must not exceed 3%.
Delta Connected System
The voltage drop formula illustrates
A delta connection is a three-phase
whether the power given by the voltage
system connection in which three
source is condensed as electric current
elements in series form a triangle, with
runs through the parts of the electrical
the supply being input and output at
circuit that do not supply the voltage.
the three junctions. Minimum
Furthermore, voltage drops between the
ampacity of the feeder conductor (IF),
source's internal resistances and
Summation of line currents (IL),
connections are undesirable since supply
Current of the highest rated motor in
energy is wasted. Furthermore, voltage
the group/panel (ihrm), Summation of
drop across active circuit parts and loads
3phase line current (∈I3∅), Summation
is preferable since provided power
of the single-phase line current
performs a competent task.
(∈I3∅H). The service entrance (size of
wire) and service equipment (size of Voltage Drop Formula
breaker) equation is shown respectively General Formula
as follows:
VD = ILoad Zwire
Service Entrance (size of wire)
Where:
𝐼𝐹
= [∈ 𝐼3∅ + √3
∈ 𝐼1∅𝐻 + .25 𝐼ℎ𝑟𝑚 ][𝐷𝑒𝑚𝑎𝑛𝑑 𝐹𝑎𝑐𝑡𝑜𝑟 ] 𝑍 = √𝑅 2 + 𝑋 2
Single- Phase Circuits
Service Equipment (size of breaker)
𝐿 1
𝐼𝑐𝑏 𝑉𝐷 = 2𝐼𝑍 ( )( )
305 𝑁
= [∈ 𝐼3∅ + √3
Three- Phase Circuits
∈ 𝐼1∅𝐻 + 1 .5 𝐼ℎ𝑟𝑚 ][𝐷𝑒𝑚𝑎𝑛𝑑 𝐹𝑎𝑐𝑡𝑜𝑟 ]
𝐿 1
Voltage drop is calculated using the most 𝑉𝐷 = 𝐼 √3 𝑍 ( )( )
305 𝑁
universal of all electrical laws: Ohm's
Law. This states that the voltage potential Where:
across the conductor is equal to the Z is the wire impedance, Ω
DOI: https://doi.org/10.34010/injiiscom.v3i1.7555
p-ISSN 2810-0670 e-ISSN 2775-5584
Ralph et al. Development of Pec Based Electrical Load Schedule Software | 56

L is the total Length of wire, m used in certain conditions, this


characteristic demonstrates the extent to
N is the number of sets
which a product or system provides
Conductors for feeders, as sized to functions that meet stated and implied
prevent a voltage drop exceeding 3 expectations of the Electrical Load
percent at the farthest outlet of power, Schedule software while also adhering to
heating, and lighting loads, or the Philippine Electrical Code's standards.
combination of such loads, and where the Later, the requirements of the Electrical
maximum total voltage drop on both load schedule software and the PEC
standards guided the creation of the
feeders and branch circuits to the farthest
template and layouts. This feature
outlet does not exceed 5 percent, will
indicates performance in relation to the
provide reasonable efficiency of quantity of resources consumed under
operation. 2.15.1.2 Minimum Rating and specified conditions. Then the
Size (Feeders), 2.10.2.2 Minimum compatibility, the extent to which a
Ampacity and Size (Branch Circuit) PEC. product, system, or component may share
2.3. Research tool information with other products, systems,
or components while sharing the same
Evaluation form. An instrument is used to software environment. For usability, the
assess the operational feasibility of the degrees to which a product or system may
system. The following criteria were be utilised by specific users to accomplish
provided in order to evaluate the specific goals with effectiveness,
developed application. During the efficiency, and satisfaction in a specific
evaluation of the developed system, the context of usage. Then reliability, the
researchers distributed questionnaires degree to which a system, product, or
and feedback forms through an online component fulfils defined functions
under given conditions during a specific
form to the respondents of the system and
time period. Security is the degree to
they were evaluated by a licensed
which a product or system safeguards
electrical practitioner. The developed
information and data so that people or
application was evaluated by the target other goods or systems have the proper
users. In addition, computed means are level of data access for their kinds and
interpreted in the five-point Likert Scale, degrees of permission. The degree of
which uses a rating scale ranging from efficacy and efficiency with which a
not at all satisfied (1) to very satisfied (5) product or system may be adjusted to
and the conversion of the qualified enhance, rectify, or adapt to changes in the
weighted mean into a descriptive rating. environment and needs is represented by
the maintainability characteristic. Finally,
The researchers used the product quality
portability describes the ability with
model defined in ISO/IEC 25010 for the which a system, product, or component
study. The researcher went through eight may be transferred from one software or
primary phases in order to execute this other operational or consumption
model: functional suitability, performance
environment to another
efficiency, compatibility, usability,
reliability, security, maintainability and
portability. Functional suitability is when

DOI: https://doi.org/10.34010/injiiscom.v3i1.7555
p-ISSN 2810-0670 e-ISSN 2775-5584
57 | International Journal of Informatics Information System and Computer Engineering 3(1) (2022) 47-60

3. RESULTS AND DISCUSSION a list of all the scheduled loads in the


installation.
This chapter presents the major findings
of the study. We get the electrical characteristics for
each load in a single phase, such as wire
3.1. Software Homepage
size, conduit size, circuit breaker ratings,
Fig. 2 shows the electrical load main feeder wire size, main circuit
scheduling program. The software's logo breaker ratings, voltage drop, and riser
will be shown on the welcome page. diagram. In all three phases, the
As for the image shown you can also see procedure is the same, but the
the username and password wherein the computations are different. When
user will put its own username and everything is finished, the riser diagram
password then click the login button to will be shown (Fig. 3).
continue if not the user can just click the 3.3. Load Description
exit button, then the software will
An outlet is a place on the wire system
continue to exit.
that supplies power to electrical
equipment. A lighting outlet is one
3.2. Calculation Option Page designed for electrical use. On household
The single-phase and three-phase general-purpose branch circuits, there is
calculations are the two possibilities for no limit to the number of light or
computation on this menu. The table will receptacle outlets.
now be displayed, where you may make

Fig. 2. Welcome page of the program

Fig. 3. Calculation Option Page

DOI: https://doi.org/10.34010/injiiscom.v3i1.7555
p-ISSN 2810-0670 e-ISSN 2775-5584
Ralph et al. Development of Pec Based Electrical Load Schedule Software | 58

On the software, the following lights will Outlet, Range, Duplex Convenience
be visible; Halogen Lamp, LED Dual Outlet, Spare, and SPO (Fig. 4).
Floodlight, Fluorescent Lamp,
3.4. Respondents of the Evaluation
Incandescent Lamp, Mercury Lamp, LED
Emergency Light, HPS Lamp, LED Lamp, Table 1 presents the respondents of the
Spot Light, LED Linear Lamp, Compact study. The following are the results taken
Fluorescent, LED High Bay Lamp, from the evaluation of 7 Registered
Incandescent Lamp, LED Outdoor Light, Electrical Engineers (REE) and 1
Pin Light, and Smart Bulbs. This is due to Professional Electrical Engineer. Product
their high-power consumption or other quality defined in ISO/IEC 25010 with
fundamental properties such as high results of the evaluators.
initial current and frequency of use.
Table 2 shows the Overall result of the
Appliances are typically seen as a single
ISO/IEC 25010. From the data that the
piece of equipment used to perform
researchers collected and after analysing
household tasks in the home. The
and reviewing the respondents’ answers,
following appliances will be shown in
it shows that from 8 respondents who
our program; Exhaust Fan, Hand Dryer,
participated in answering the survey
Freezer, Fan Coil Unit, Ceiling Fan,
questions, 35.89% answered more than
Television, Heater Machine, LED TV,
satisfied to use the PEC based Electrical
Water Heater, Washing Machine, Water
load schedule software for their design
Pump, Air conditioner unit, Dryer, and
and to be further enhanced. Moreover,
Refrigerator.
34.68% are satisfied and agree to use the
A convenience outlet is a type of outlet software. Meanwhile, 18.55% answered
that is mounted on a room's wall and is that they are fine with whether the
used to power electrical appliances. The system will be built or not. Furthermore,
electricity from the incoming source is 10.48% answered that they were very
connected to the line side of an outlet. satisfied and wanted the software to be
Power exits the device and continues further enhanced to give more pleasing
down the load side of the circuit. The satisfaction to the user. And last 0.40%
predicted load for a single 230-volt outlet. who are not at all satisfied.
Here is the following; Convenience

Fig. 4. Load Description

DOI: https://doi.org/10.34010/injiiscom.v3i1.7555
p-ISSN 2810-0670 e-ISSN 2775-5584
59 | International Journal of Informatics Information System and Computer Engineering 3(1) (2022) 47-60

Table 1. Respondents of the Study


Respondents Frequency Percentage
Professional Electrical 1 12.5%
Engineer (PEE)
Registered Electrical 7 87.5%
Engineer (REE)
Total 8 100%

Table 2. Overall result of the ISO/IEC 25010


Respondents

Mean

Mode
Standard Response

Medi
INDICATORS

an
1 2 3 4 5 deviation description

Functional
0 5 10 8 1 3.21 3 3 0.83 Satisfied
suitability
Performance
0 6 10 5 3 3.21 3 3 0.98
Efficiency Satisfied
Compatibility 0 3 6 7 0 3.25 3 4 0.77
Satisfied
Usability 0 10 13 19 6 3.44 4 4 0.97 Satisfied
More Than
Reliability 0 6 9 11 6 3.53 4 4 1.02
Satisfied
Security 0 7 14 16 3 3.36 3 4 0.87 Satisfied
Maintainability 1 7 14 14 4 3.33 3 3.4 0.97 Satisfied
Portability 0 2 10 9 3 3.38 3 3 0.82 Satisfied

total 1 46 86 89 26 3.32 3 3 0.93 Satisfied


1 2 3 4 5
INDICATORS Respondents Standard Response
Medi

Mod
Mea

an
n

1 2 3 4 5 deviation description
1 46 86 89 26 3.38 3 4 0.92 Satisfied

4. CONCLUSION computation of the electrical load


schedule, as illustration, is direct to
The program was found to be relatively
convert to AutoCAD. We would want
effective and efficient when it came to
doing the needed electrical design to use our software to build it, but we
calculations at computer speed and wouldn't have enough time. Since the
accuracy. The program is a helpful group was mainly focused on
design tool for electrical engineers since bungalows or family homes, offices,
it allows them to perform certain and administrative buildings, this
subject suggests that it contains more
fundamental calculations faster, easier,
industrial structures where suitable
and more accurately for home electrical
demand variables for various
design work. We should refer the
industrial buildings must be
program to AutoCAD. The
addressed.

DOI: https://doi.org/10.34010/injiiscom.v3i1.7555
p-ISSN 2810-0670 e-ISSN 2775-5584
Ralph et al. Development of Pec Based Electrical Load Schedule Software | 60

REFERENCES
Barnaby, T. (2002). Distributed. NET Programming in VB. NET. Apress.
Hait, A., & Artigues, C. (2011). On electrical load tracking scheduling for a steel
plant. Computers & Chemical Engineering, 35(12), 3044-3047.
Karabulut, K., Alkan, A., & Yilmaz, A. S. (2008). Long term energy consumption
forecasting using genetic programming. Mathematical and Computational
Applications, 13(2), 71-80.
Khomiakov, K. A., & Ustinov, D. A. (2019, October). Improving the accuracy of
calculations of electrical loads for industrial enterprises. In Journal of Physics:
Conference Series (Vol. 1333, No. 6, p. 062009). IOP Publishing
Khuntia, S. R., Rueda, J. L., & Van der Meijden, M. A. (2018). Long-term electricity
load forecasting considering volatility using multiplicative error
model. energies, 11(12), 3308.
Kumar, D., & Samantaray, S. R. (2014). Design of an advanced electric power
distribution systems using seeker optimization algorithm. International Journal
of Electrical Power & Energy Systems, 63, 196-217.
Morrison, J., & Cornell, G. (2008). Programming VB. NET: a guide for experienced
programmers. A press
Olatomiwa, L., & Alabi, A. C. (2012). Design and Development of Calculator Software
for Residential Electrical Services Design.
Parmar, R., Mangrola, M. H., Parmar, B. H., & Joshi, V. G. (2012). A software to
calculate crystalline size by Debey-Scherrer Formula using VB .NET. Multi-
Disciplinary Edu Global Quest, 1(1).
Polydorides, N., & Lionheart, W. R. (2002). A Matlab toolkit for three-dimensional
electrical impedance tomography: a contribution to the Electrical Impedance
and Diffuse Optical Reconstruction Software project. Measurement science and
technology, 13(12), 1871.

DOI: https://doi.org/10.34010/injiiscom.v3i1.7555
p-ISSN 2810-0670 e-ISSN 2775-5584

You might also like