DEPARTMENT OF AGRICULTURE
REGIONAL FIELD OFFICE III
City of San Fernando, Pampanga
PROGRAM OF WORKS
Project Title: 3 PHASE ELECTRICAL SUPPLY FOR LIQUID NITROGEN AT MEAT LAB
Category: INSTALLATION
Brgy/Mun/Province: REGULATORY COMPOUND - DA RFO3, SAN FERNANDO, PAMPANGA
Total Project Cost: Php 152,904.41
Project Duration: 5 c.d.
Implementn. Mode: By Contract
Project Description: Heavy Equipment Needed Light Equipment Needed Technical Personnel:
Owned Leased Description Owned Leased Description Description
1 Registered Electrical Engineer
1 Electrician
2 Skilled Labor
Item No. Scope of Work % Weight Quantity Unit Unit Cost Total
Prepared by:
INSTALLATION OF 3 PHASE
ELECTRICAL SUPPLY FOR
1101
LIQUID NITROGEN MACHINE 1.00 lot 116,498.60 17,474.79 11,649.86 25.00% 29,124.65 7,281.16 36,405.81 152,904.41 152,904.41
AT MEATLAB
Total 1.00 - 116,498.60 17,474.79 11,649.86 29,124.65 7,281.16 36,405.81 152,904.41 152904.41
Total 1,496.00 10,743.60 - 10,743.60 104,259.00 116,498.60 17,474.79 11,649.86 7,281.16 152,904.41
OCM 15%
What to USE?
Profit 10%
ITEM No.: 1101 UNIT: lot
k. Miscelaneous -
Electric Cooperative Fee 1 lot 50,000.00 50,000.00
Accessories 1 lot 5,000.00 5,000.00
C. Materials:
Embankment materials 138.30 cu.m. 384.40 53,162.52
Materials Total 53,162.52
Equipment Requirement
Quantites Equipment Activity
Type of Equipment No. of unit
Required cu.m./day Duration (days)
Concrete Mixer 1 23.30 24.00 1
Bar Cutter 4 3,404.10 500.00 7
19 days
F SPL2
A
5 days 1 day 1 day
B
2 days 2 days
C
2 days 2 days
D
101(1) 101(1) 101(1) 102(1) 102(2) 103(1) 103(2)
5 days
101(1)
Name of project: Concreting of CLIARC Farm to Market Road with Solar Street lights
Location: Paraiso Tarlac City, Tarlac
BACK UP COMPUTATION
ITEM 200 INSTALLATION OF 3 PHASE ELECTRICAL SUPPLY FOR LIQUID NITROGEN MACHINE
Item 311 (1) PORTLAND CEMENT CONCRETE PAVEMENT (UNREINFORCED), 0.20m THICK
Area = Length x Width
Area = 1.80 x 4.00
Area = 7.20
square meters
Guradrail (0.2mx0.3mx0.50m)
Volume = Length x Area x sides
Volume = 67 x 0.06 x 2
Volume = 8.04 cu.m.
CONCRETE
POST
Volume = Length x Width x Height
Volume = 0.20 x 0.20 x 1.20
FOOTING
Volume = Length x Width x Thickness
Volume = 0.50 x 0.50 x 0.20
Volume = 0.050 cu.m.
Subtotal Footing
= Post Volume +
Volume
Subtotal Volume
= 0.048 + 0.050
Volume
Subtotal
= 0.098 cu.m.
Volume
Subtotal
Total Volume = x # of Posts
Volume
Total Volume = 0.098 x 2.00
Total Volume = 0.196 cu.m.
PERT-CPM
ITEM NO. DURATION Determining the Number of Calendar Days of the Project:
101 INSTALLATION OF 3 PHASE ELECTRICAL SUPPLY FOR LIQU 5 days
Err:509 Err:509 #REF! day
Err:509 Err:509 4 day Critical Parth: A-C-D-E-F-G-H-I-J-K
Err:509 Err:509 7 days No. of Days of the CP: 150 days
Err:509 Err:509 3 days Unworkable Days Considered: 30 days
Err:509 Err:509 21 days 180 days
Err:509 Err:509 27 days
Err:509 Err:509 25 days
Err:509 Err:509 21 days
Err:509 Err:509 14 days
Err:509 Err:509 25 days
Err:509 Err:509 30 days
Err:509 Err:509 12 day
Err:509 Err:509 45 day
Err:509 Err:509 8 day
Err:509 Err:509 30 day
Err:509 Err:509 21 day
Err:509 Err:509 6 day
0 Dec-99 6 day
Err:509 Err:509 3 day
C 30.0 days
Err:509
A 3.0 days 5.0 days 4.0 days 7.0 days 3.0 days 21.0 days 25.0 days I 21.0 days 3.0 days K
CPM 0/0
A
3/3
D E E H H I
Spl 1 101(1) 104(1) 900 900a 311 ### 624 Spl 1
Activity Duration
Item Number
* Fileld Office should be utilized in the commencemnet of the activities, it is expected finished on the first day implementation
Name of project: 3 PHASE ELECTRICAL SUPPLY FOR LIQUID NITROGEN AT MEAT LAB
Location: REGULATORY COMPOUND - DA RFO3, SAN FERNANDO, PAMPANGA
I. Bar Chart
Month1 Month2 Month3
Item No. Scope of Work Activity Duration (days)
W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12
Err:509 Err:509 5.00 2
#REF! #REF! #REF! 1
Err:509 Err:509 4.00 1
Err:509 Err:509 7.00 5 7 7 6
Err:509 Err:509 3.00 1 2
Err:509 Err:509 21.00 5 3
900a REINFORCED CONCRETE WITHOUT FORMS 3.00 3
704 MASONRY WORKS 21.00 4 6 6 2
Err:509 Err:509 21.00 5 2
Err:509 Err:509 14.00 2
Err:509 Err:509 25.00 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
Err:509 Err:509 30.00 5 3 2
Err:509 Err:509 12.00 12
II. Equipment Schedulle
No. of Unit Month1 Month2 Month2
Item No. Type of Equipment Required
Required W1 W2 W3 W4 W5 W6 W7 W8 W5 W6 W7 W8
#REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
Err:509 #REF! #REF!
#REF! #REF!
#REF! #REF!
Err:509 #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Concrete Mixer 1
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Bar Cutter 4
900a Concrete Mixer 1
Err:509 Err:509
704 Bagger Mixer 1
#REF! #REF! #REF!
Total No of Equipment Required Per Week 0 0 0 0 0 0 0 0 0 0 0 0
#REF! 0 0
#REF! 0 0 0 0 0 0
#REF! 0 0 0 0 0 0 0
#REF! 0 0 0 0 0 0 0
#REF! 0 0 0 0 0 0 0 0 0
#REF! 0 0 0 0 0 0
Concrete Mixer 0 0 0 0 0
Err:509 0 0 0 0 0
Err:509 0 0 0 0 0
Err:509 0 0 0 0 0
Err:509 0 0 0 0 0
Err:509 0 0 0 0 0
Err:509 0 0 0 0 0
Bar Cutter 0 0 0 0 0
#REF! 0 0
Materials Engineer 1 1 1 1 1 1 1 1 1 1 1 1 1
#REF! #REF! 1
#REF! #REF! 2
#REF! #REF! 1
#REF! #REF! 1 1
#REF! #REF! 1 1
#REF! #REF! 1 1
#REF! #REF! 1 1 1 1 1
#REF! #REF! 1 1 1 1 1
#REF! #REF! 1 1 1 1 1
#REF! #REF! 1 1 1 1 1
1101 Electrician 1 1 1
Err:509 Err:509 1 1
Err:509 Err:509 1 1
Skilled Laborer 2 1 1
900.00 Foreman 1 1 1 1 1
Err:509 Err:509 4 4 4 4
Err:509 Err:509 1 1 1 1
Err:509 Err:509 1 1 1 1
Err:509 Err:509 1 1 1 1
Mason 4 4 4 4 4
#REF! #REF! 1 1 1 1
#REF! #REF! 1 1 1 1
Materials Engineer 1 1 1 1 1 1 1 1 1 1 1 1 1
#REF! 2 2 1 1 3 2 2 3 2 2
#REF! 1
#REF! 2
#REF! 1 1 1 1 1
#REF! 1 2 1 1 2 2
#REF! 1 2 1 1 2 2
#REF! 1 2 1 1 3 1 3 1
#REF! 1 1 1 1 1
Err:509 4 4 4 4
Err:509 1 1 1 1
Mason 4 4 4 4
#REF! 1 1 1 1
#REF! 1 1 1 1
B. Unskilled Laborer Requirement
Month1 Month2 Month2
Item No. Unskilled Laborer Required No.
W1 W2 W3 W4 W5 W6 W7 W8 W5 W6 W7 W8
#REF! #REF! #REF! 1
#REF! #REF! 2
#REF! #REF! 1
#REF! #REF! 1 1
#REF! #REF! 1 1
#REF! #REF! 1 1 1 1 1
#REF! #REF! 1 1 1 1 1
#REF! #REF! 1 1 1 1 1
Err:509 Err:509 1 1
Err:509 Err:509 1 1
900.00 Laborers 12 12 12 12 12
#REF! #REF! 1 1 1
#REF! #REF! 1 1 1
#REF! #REF! 1 1 1
#REF! #REF! 1 1 1
0 - 0.00
Err:509
Err:509 Err:509
TOTAL Err:509
Accumulated Weekly
Accomplishment (%)
Accomplishment ( Peso)
Equipment Schedule
Plate Compactor
Genset
Backhoe
Bagger Mixer
Bar Bender
Bar Cutter
Scaffolding
Pay Loader
Chainsaw
Dump Truck
Manpower Schedule
Project Engineer
Foreman/Leadman
Payloader Operator
Payloader helper
Dumptruck Driver
Dumptruck Helper
Plate Compactor Operator
Backhoe Operator
Steel Man
Carpenter
Welder
Assistant Welder
Mason
Mason Helper
Plumber
Electrician
Electrician Helper
Painter
Assistant Painter
Laborer
Total
LEGEND
A
LF ES
ACTIVITY FLOW/ COMPUTATION NODE
Critical Path
Dummy
Early Start ES
Late Finish LF
1200.00%
1000.00%
ACCUMULATED WEEKLY
ACCOMPLISHMENT
800.00%
600.00%
400.00%
200.00%
0.00%
0
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 Err:509
Err:509
1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1
1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 12 12 12 12 12 12 12 12 12 12
6 6 6 6 6 6 6 6 6 6 6 6 6 6 20 20 20 20 20 20 20 20 20 20
INDIVIDUAL REMOVAL OF TREES & CONC. STUCTURES
7 0
A B C
0/0 7/7 14 / 14
7 0 7 0
REINFORCING STEEL
Prepared By: Checked and Reviewed by:
1000.00%
800.00%
600.00%
400.00%
200.00%
0.00%
0 20 40 60 80
2ND MONTH
4TH WEEK 1ST WEEK 2ND WEEK 3RD WEEK 4TH WEEK
4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
.
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12
20 20 20 20 20 20 20 20 20 20 20 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18
49 14
XCAVATION & BACKFILLING CONCRETE WORKS
D
35 / 35
21 0 28 0
REINFORCING STEEL
21 0
`
G
63 / 35
`
28 0
and Reviewed by: Recommending Approval:
3ND MONTH
1ST WEEK 2ND WEEK 3RD WEEK 4th WEEK 1ST WEEK
1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3
Err:509 Err:509
Err:509
Err:509 Err:509
Err:509
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 15 15 15 15 15 15 15 15 15 15
23 23 23 23 23 23 23 30 30 30 30 30 30 30 30 30 30 30 30 30 30 33 33 33 33 33 33 33 35 35 35
EMBANKMENT
E
77 / 63 28 14
FILLING MATERIALS ( WAREHOUSE FILL )
I
` 91 / 63
J
` 84 / 63
`
`
MASONRY WORKS
F
63 / 63
42 0
METAL STRUCTURE ( T
`
K
` 77 / 63
OFFICE QURTER
G
63 / 35
35 28
Approved by:
140 160
4th MONTH
1ST WEEK 2ND WEEK 3RD WEEK 4TH WEEK IST WEEK
4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3
Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 4 4 4 4 4 4 4 4 4 4
1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 4 4 4 4 4 4 4 4 4 4
2 2 2 2 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
15 15 15 15 15 15 15 15 15 15 15 9 9 9 9 9 9 9 8 8 8 8 8 8 8 8 8 8
35 35 35 35 35 35 35 35 35 35 35 29 29 29 29 29 29 29 25 25 25 25 25 25 25 29 29 29
DRAINAGE CANAL
28 21
ELCTRICAL WORKS
21 21
METAL STRUCTURE ( TRUSS FABRICATION ) DOOR ,WINDOW AND EXHAUST FAN (INSTAL
28 14 14 14
PAINTING WORKS
o
98 / 70 35 28
p
105 / 105
CORTA, CESO III
5th MONTH
IST WEEK IST WEEK IST WEEK IST WEEK
4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7
100.00%
Err:509
Err:509
Err:509 Err:509 Err:509
Err:509
Err:509 Err:509
Err:509
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
4 4 4 4
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
4 4 4 4
4 4 4 4 4 4 4 4 4 4 4
4 4 4 4 4 4 4 4 4 4 4
8 8 8 8 4 4 4 4 4 4 4 4 4 4 4 4 4 4 2 2 2 2 2 2 2
29 29 29 29 17 17 17 17 17 17 17 9 9 9 9 9 9 9 6 6 6 6 6 6 6
Q
140 / 119 `
DEMOBILIZATION
Y ( ROOF FRAMING,ROOFING, PLUMBING)
U V
133 / 133 140 / 140
28 0 7 0
S
133 / 119 `
SCAFFOLDING
28 0
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.0000%
Err:509
2014 ACEL RATES
(Minimum Operation = 8 hrs. per day)
Original POW Estimated Test Min. No. of Sample Test Total Test Amount of
Item No. Description Unit REMARKS
Quantity Direct Cost (P) Required Test Req'd. Requirements Required Test
(1) (2) (3) (4) (5) (6) (7) (8) (9) (11) (12)
= (4)/(8) x (7) = (9) x (10)
PART B - EARTHWORKS
#REF! #REF! ha. #REF! #REF! IR Dec-99 None Dec-99 - Inspection Report for clearing and grubbing of whole area
#REF! #REF! #REF! #REF! #REF! IR Dec-99 None Dec-99 - Inspection Report for Individual Removal of Trees for the whole area
#REF! #REF! #REF! #REF! #REF! IR Dec-99 None Dec-99 - Inspection Report for Individual Removal of Trees for the whole area
#REF! #REF! #REF! #REF! #REF! IR Dec-99 None Dec-99 - Inspection Report for Individual Removal of Trees for the whole area
#REF! #REF! #REF! #REF! #REF! IR Dec-99 None Dec-99 - Inspection Report for Individual Removal of Trees for the whole area
#REF! #REF! #REF! #REF! #REF! IR Dec-99 None Dec-99 - Inspection Report for the removal of existing concrete for 247 x 4
#REF! #REF! #REF! #REF! #REF! IR Dec-99 None Dec-99 - Inspection Report for the removal of existing concrete for 247 x 4
#REF! #REF! cu.m. #REF! #REF! IR Dec-99 for the whole area Dec-99 -
Certificate of Waste (62% of excavated materials)
P Dec-99 for every Feb-04 cu m. -
#REF! #REF! #REF! #REF! #REF! G Dec-99 0 -
P Dec-99 for every Feb-04 cu m. 0 - Certificate of Waste
C Dec-99 0 -
#REF! #REF! cu.m. #REF! #REF! G Dec-99 #REF! #REF! 10% of excavated materials used as backfill
#REF! P Dec-99 for every Feb-04 cu m. #REF! #REF!
1 GT, 1 PT &1 Compaction Test for every 1500 cu.m.
C Dec-99 #REF! #REF!
FDT Jan-00 for every May-01 sq.m. #REF! #REF! 3 FDT Test per set
#REF! #REF! sq.m. #REF! #REF! G Dec-99 #REF! #REF!
P Dec-99 for every Feb-04 cu m. #REF! #REF! subgrade thickness of 150 mm
C Dec-99 #REF! #REF!
FDT Jan-00 for every May-01 sq.m. #REF! #REF! 3 FDT Test per set
PART C - SUBBASE & BASE COURSE
1101 INSTALLATION OF 3 PHASE ELECTRICAL SUPPLY FOR LIQUID cu.m. 1.00 116,498.60 G Dec-99 0 - 1 Grading Test for every 300 cu.m.
for every Oct-00 cu m.
5.00 P Dec-99 0 - 1 Plasticity Test for every 300 cu.m.
C Dec-99 0 -
for every Feb-04 cu m. 1 Compaction Test for every 1500 cu.m.
Q1 Dec-99 0
CBR Dec-99 for every Nov-06 cum 0 - 1 - CBR for every 2500 cu.m.
FDT Jan-00 for every May-01 sq.m. 0 - 3-FDT @ every 200mm/layer of subbase coarse
PART D - SURFACE COURSE
The number of tests indicated here in were based on the minimum test requirements from one source. In the event that the materials were taken from various sources, each material should be tested separately a number
of test should be on the same basis as the minimum requirements.
Submitted by: Reviewed By:
ENRICO T. YUZON
PROJECT MANAGER (CONTRACTOR) PPMIU ENGINEER
cc: PSO/NPCO
LEGEND
IR - Inspection Report Q1 - Quality Test (Grading, Plasticity and Abrasion)
PEC - Project Engineer Certificate Q2 - Quality Test (Grading, Plasticity, Abrasion, Stripping and Bulk Specific Gravity)
G - Grading Q3 - Quality Test (Grading, Elutriation (Wash), Bulk Specific Gravity, Absorption, Mortar Strength, Soundness, Organic Impurities,
P - Plasticity Test Unit Weight, % Clay Lumps and Shale)
C - Laboratory Compaction Test Q4 - Quality Test (Grading Elutriation (Wash), Bulk Specific Gravity, Absorption and Mortar Strength)
FDT - Field Density Test Q5 - Quality Test (Grading, Bulk Specific Gravity, Absorption, Abrasion, Soundness and Unit Weight)
CBR - California Bearing Ratio Q6 - Quality Test (Grading, Bulk Specific Gravity, Absorption and Abrasion)
F - Fractured Face Q7 - Quality Test (Bending, Tension and Chemical Analysis) for Steel Bar
E - Extraction Qw - Physical Test for Water
R - Retained Stability Index Qp - Quality Test for Paint
Sty - Stability Ql - Quality Test for Hydrated Lime
Ft - Flexural Strength Test for Concrete Beam Sample Qs - Quality Test for Asphalt (Bituminous) Materials
Ct - Compressive Strength Test on Concrete Cylinder Sample Qc - Quality Test for Cement (Chemical or Physical)
St - Slump Test Qm - Quality Test for other Materials (Bearing Pad, Premolded Filler, Joint Filler, etc.)
Ta - Thickness Determination (Core Drilling and Compression Test) for Asphalt MC - Mill Test Certificate
Tc - Thickness Determination (Core Drilling and Compression Test) for PCC Pavement
Prices of Construction Materials
Output
Item Description Equipment Unit
Min. Max
100 Clearing and Grubbing Bulldozer 3200 4000 sq.m./day
Excavation Bulldozer 640 cu.m./day
102
Compaction Road Roller 240 320 cu.m./day
Embankment Payloader 240 320 cu.m./day
104 Compaction Road Roller 240 320 cu.m./day
Quarrying Bulldozer 560 cu.m./day
Sub-grade Preparation Grader 2400 sq.m./day
105
Compaction Road Roller 2400 sq.m./day
Agg. Sub-Base Course Grader 400 cu.m./day
200/201 Road Roller 240 320 cu.m./day
Water Truck 8000 8000 sq.m./day