You are on page 1of 4

13.

50

1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50

BENCH 1
2.00

1.25
BENCH 2
1.50
6.00 2.00 1.25

BENCH 3
1.25

N.G.L.
2.00
BENCH 4

2.00 0.50 1.50 2.00

FLOOR PLAN FRONT ELEVATION


NOT TO SCALE NOT TO SCALE

RE ARE HE E RE OMMEN ING A RO E SHEET NO.


A RO AL
INSTALLATION OF 74.25
SQ.M. GREENHOUSE ENGR. A . A I
ENGR. MAR A RIAN S.
O AM O ENGR. ESHIAH A. MER A O ENGR. LA IMIR T. UNO
REGIONAL H FO AL ERSON
RIS ULO G. AUTISTA R.
1
TE HNI AL STAFF H ENGINEER II E SS RAE E III RAE REGIONAL E E UTI E IRE TOR
HIGH ALUE RO S ENGR. ELMER F. TU IG R. E UAR O L. LA U R.
HIEF RAE RT O E
E ELO MENT ROGRAM 4
1.25

0.40
1.25
1.05

1.25 1.05
N.G.L. N.G.L.

1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50


13.50

SIDE ELEVATION
NOT TO SCALE

TRUSS 1

TRUSS 1

TRUSS 1

TRUSS 1

TRUSS 1

TRUSS 1

TRUSS 1

TRUSS 1

TRUSS 1

TRUSS 2

TRUSS 2
0.45
0.25m x 0.25m x 1m
Concrete Foundation 1 1/2" Dia. G.I. Pipe
w/ 10mm Diam. RSB Schedule 40 (Post)
5 ties Spaced O.C.
0.45

0.25

welded on G.I. pipe


N.G.L.

0.50

0.25
0.10
0.10

FLOOR PLAN
NOT TO SCALE

FOUNDATION PLAN
NOT TO SCALE

PREPARED BY: CHECKED BY: RECOMMENDING APPROVED: SHEET NO.


APPROVAL:
INSTALLATION OF .
S .M. GREENHOUSE ENGR. AB P. DAVID
ENGR. MARK ADRIAN S.
OCAMPO ENGR. JESHIAH A. MERCADO ENGR. VLADIMIR T. PUNO
REGIONAL HVCDP FOCAL PERSON
CRISPULO G. BAUTISTA JR.
2
TECHNICAL STAFF, HVCDP ENGINEER II, EPDSS/RAED Engineer III, RAED ENGR. ELMER F. TUBIG REGIONAL EXECUTIVE DIRECTOR
HIGH VALUE CROPS DR. EDUARDO L. LAPUZ, JR.
DEVELOPMENT PROGRAM CHIEF, RAED RTD for Operations and Extension
4
10.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.25

0.90

1.50 1.50 1.50 1.50

TRUSS 1 DETAILS BENCH DETAILS (TOP VIEW)


NOT TO SCALE NOT TO SCALE

10.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

0.20

0.55 0.80

N.G.L.
0.15 0.10

0.40 BENCH DETAILS (SIDE VIEW)


NOT TO SCALE

0.75 0.75
0.90

0.50
TRUSS 2 DETAILS 0.90
NOT TO SCALE 0.25

BENCH DETAILS (SIDE VIEW)


NOT TO SCALE

RE ARE HE E RE OMMEN ING A RO E SHEET NO.


A RO AL
INSTALLATION OF 74.25
SQ.M. GREENHOUSE ENGR. A . A I
ENGR. MAR A RIAN S.
O AM O ENGR. ESHIAH A. MER A O ENGR. LA IMIR T. UNO
REGIONAL H FO AL ERSON
RIS ULO G. AUTISTA R.
3
TE HNI AL STAFF H ENGINEER II E SS RAE E III RAE ENGR. ELMER F. TU IG REGIONAL E E UTI E IRE TOR
HIGH ALUE RO S R. E UAR O L. LA U R.
E ELO MENT ROGRAM HIEF RAE RT O E
4
13.50

1.00 0.50

0.60

0.60

13.50
1.40

2
AUTOMATED MISTING SYSTEM
NOT TO SCALE

0.297
1
REPUBLIC OF THE PHILIPPINES
DA-RFO DEPARTMENT OF AGRICULTURE HVCDP
III
LOGO REGIONAL FIELD OFFICE III LOGO
CITY OF SAN FERNANDO, PAMPANGA

PROJECT TITLE:

PROJECT FUND:
RECIPIENT:
PROJECT LOCATION: LEGEND:
SECTOR: HIGH VALUE CROPS DEVELOPMENT
PROGRAM

0.42

CRISPULO G. BAUTISTA JR.


REGIONAL EXECUTIVE DIRECTOR

H.E. FERDINAND R. MARCOS JR.


PRESIDENT, REPUBLIC OF THE PHILIPPINES
ELECTRICAL LAYOUT
NOT TO SCALE

PERMANENT MARKER DETAILS


NOT TO SCALE

PREPARED BY: CHECKED BY: RECOMMENDING APPROVED: SHEET NO.


APPROVAL:
INSTALLATION OF .
S .M. GREENHOUSE ENGR. AB P. DAVID
ENGR. MARK ADRIAN S.
OCAMPO ENGR. JESHIAH A. MERCADO ENGR. VLADIMIR T. PUNO
REGIONAL HVCDP FOCAL PERSON
CRISPULO G. BAUTISTA JR.
4
TECHNICAL STAFF, HVCDP ENGINEER II, EPDSS/RAED Engineer III, RAED ENGR. ELMER F. TUBIG REGIONAL EXECUTIVE DIRECTOR
HIGH VALUE CROPS DR. EDUARDO L. LAPUZ, JR.
CHIEF, RAED RTD for Operations and Extension
DEVELOPMENT PROGRAM 4