Professional Documents
Culture Documents
BLOCK 21 Proposed Road (FOR CONS) - Model
BLOCK 21 Proposed Road (FOR CONS) - Model
17
1
A=1
155.00
A=6
145.00
A=6
13.00
5
A=6
125.00
A=6
11.00 101.92
Curb & Gutter A=6
105.00
A=6
5
A=1
9 .00
Sidewalk 85.00
1
A=6
8
5
235.23
25.00
PCCP CA=6
7 .00
5
A=6
K 21 0
253.00
A=6
A=7
A=6
55.00
A=6
A=6
65.00
BL O 175.00
195.00
A=6
A=6
5 .0
296.39
A=6
3
A=6
5.0
0
45.00 24
A=6
A=6
155.00
0
5.0
35.00 A=6 45.00
A=6 252.00 A=6
A=6
135.00
25.00
9 20 0
A=6
K1
A=6
1 0.00
A=6
115.00 A=6
5.0
185.00 55.00
1757
98.47
A=6
A= 7 95.00
C A=6 A=6
A=6 165.00
BLO
A=6
55.00
7
A=6
5.0
0
B L O 12 0
145.00
A=6
A=6
135.00
15 6
A=6
6.2 65.00
A=6
35.00 =65
.0
115.00
A=6
10 0
A
1758
A=6
98.50
1 7.47 A=6
5.0
95.00 A=6 7 .00
CK
85.00
ND DS 0
5
A=6
A=6 16 9 A=6
2
A=6 75.00
1759
1.8
65.00
98.50
A=6
A K
145.00
KS ROUN
A=6
A=6 5 .00
4 .00 A=6 85.00
R
PA YG
A=6
5
3 .00
A=6
5
C 125.00 A=6
BLO
27.47
1760
A=6
98.55
M.
10 0
22
5
A= 6 A=6
1 9.86 5.0
6S
A=6
5 A=6
INq.m
1761
97.86
65.00
30 R M 4 .00
A=6
=2
52.73 10.00
A TE 32 s
3 25.88 A=6
5
A=8
A=6
5
AR
E PUVAREA
= A=6
2 A=6
35.00
1
C
A=1
K
1 4.55
1
48.89
11 0
A=6
5.0
BL O A=8
25.75
A=7
12 0
A=6
5.0
135.00
A=6
ADE
PROMEN 142.74
A=9