An API audit was conducted from 25-27 April 2023. While no issues were found with engineering documents, the auditor suggested 5 improvements to daily processes. These included completing design packages earlier to allow more review time, providing training on API specification 6A, updating the contract review format, validating the design of C-22 casing hangers, and developing guidance for C-29 casing hanger validation. An action plan was created with target dates for addressing each point.
An API audit was conducted from 25-27 April 2023. While no issues were found with engineering documents, the auditor suggested 5 improvements to daily processes. These included completing design packages earlier to allow more review time, providing training on API specification 6A, updating the contract review format, validating the design of C-22 casing hangers, and developing guidance for C-29 casing hanger validation. An action plan was created with target dates for addressing each point.
An API audit was conducted from 25-27 April 2023. While no issues were found with engineering documents, the auditor suggested 5 improvements to daily processes. These included completing design packages earlier to allow more review time, providing training on API specification 6A, updating the contract review format, validating the design of C-22 casing hangers, and developing guidance for C-29 casing hanger validation. An action plan was created with target dates for addressing each point.
API Audit 25 Apr 2023 to 27 Apr 2023, Auditor Suggested Improvement points:
Sl. No. Process Observation Points
No issues / concern on engineering documents were raised during
the API audit. But the below improvements in daily activity will get better the design package. 1 Engineering 1. Design packages are not completed against the Actual New product development activities and its review minutes. Design packages were completed and ready for audit on the bottle neck period to API audit. 2. personals were knows the specification no with slight understanding of API requirements. A detailed training of specifications against API spec 6A is require for all personals. 3. Engineering suggested on NOV 2022 to change the Contract review format for API 6A design criteria, however the CR format has not been modified as of yet. 4. We have a concern on design validation of C-22 casing hanger for the combination of Pressure test along with rated load capacity. 5. We are receiving the enquiry for C-29 casing hangers, but we requires a guidance for the design validation of C-29 casing hanger Group 4 Category and retention feature requirements. ment points: Action taken Responsibility Target Status