PO N° 2393-2-00001
MILTON ROY No. 23000870-QT22047264-NDS
NOISE DATA SHEET
GE-001
GE-002
NMR SA 7902-601.7
DOCUMENT STATUS
□1 Approved
□4 Information Only
REVIEW DATE: . . .
STAMP :
First Issue
GENERAL INFORMATION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Project Designation: Northern Area Gas Producing Inquiry/Purchase Order No.:
Location: Saudi Aramco Manufacturer: MILTON ROY EUROPE
PRP21-23F2FNZ (Head 1)
Equipment Type: Model No.:
DOSING PUMPS and MOTORS PRP21-23FRFNZ (Head 2)
Equipment Serial No.: 202301300306/307/308/309 TAG : GE-001 / GE-002
02-Feb-2023
DATE
PURCHASER'S REQUIREMENTS
REV. NO.
This form shall be completed for each piece of equipment (or integrated unit) that is likely to generate noise in excess of 85
00
dBA at a distance of one meter. If the noise level is greater than 90 dBA, the cost of special design and/or acoustic
treatment should be supplied. Measurements are to be made in accordance with ANSI S1.13 and at full design load,
unless otherwise indicated. For rotating electric machinery, use points defined in IEEE Standard 85.
BY/DATE
OTHER
OPERATIONS/DATE
Also measure at: 50% load 120% load Other load 100%
REVIEW FOR KEY DRAWINGS
REQUIRED (SAUDI ARAMCO)
We confirm that the NOISE LEVEL will be less than 85dBA measure 1m from the pump
20 - 75 63 90 NA NA
(DESIGN AGENCY)
75 - 150 125 83 NA NA
NOISE DATA SHEET DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
DAT
G 1 00
SAUDI ARABIA