You are on page 1of 4

CURRICULUM VITAE

JAFARALI.A

Email id: Career Objective:


jafardot08@gmail.com
To work in a creative and challenging environment where I could
constantly enrich my skills and successfully deliver solutions for the
Contact No.:
Organization’s growth and Myself.
+966 595530768

Present Address: Career Profile:


Jubail Dynamic professional with 7+ years of experience in the field of Electrical
Kingdom of Saudi Arabia and Instrument , Automation ( PCS , SAS ) in Oil & GAS, Substation Field.

Academic Records:
Permanent Address:
847.DTK Nagar,  B.E in Electrical & Electronics Engineering, in Annamalai University, with
Chidambaram, an aggregate of 79%, 2009 Passout
 HSC in Ramaswamy Chettiar Town Higher Secondary School,
Cuddalore District, Chidambaram (State Board) with 76%, 2005 Passout
 SSLCin Ramaswamy Chettiar Town Higher Secondary School,
Tamil Nadu– 608102. Chidambaram (State Board) with 90%, 2003 Passout

Personal Details: Additional Course:


Father’s Name: Mr.Abdul
 45 days training on PLC,SCADA,FIELD INSTRUMENTS, FIELD
Raheem DRIVES on Prolific Automation Ltd, Chennai
Date of Birth: 01/Apr/1987.
Professional Experience 1:
Age: 30.
Company : GULF STEEL WORKS, KSA
Sex: Male. Duration : OCT 2015 – Till Present
Marital Status: Married. Designation : E & I ENGINEER

Nationality: Indian. Major Project Handled:


Languages Known: English,
Tamil, Hindi  Gas Modular Skid
 Oil Modular Skid.
Passport No: H3055709
 Chemical Injection Skid.

Responsibilities:
 Familiar with Saudi ARAMCO standards (SAES, SAMSS).
 Preparation of project Scope of work by reviewing the client project
specifications.
 Understanding the scope of Electrical, Instrumentation, Automation and
Communication.
 Preparation of Preliminary RFQ documents for Instruments, Panels, JB’s.
 Preparation of Material Take Off List (MTO) in ERP system and releasing
to Procurement.
 Reviewing of Technical Offer for Instruments, Starter control Panel,
Electrical panel, RTU and ESD based on Project requirement.
 Participation in Technical Meetings with sub Vendors and Clients/Consultants.
 Review & Approval of Vendor's Drawings & Documents for Instruments, starter Control Panel, UPS, RTU and
ESD system.
 Interaction with Project, Proposal, Procurement & Construction team.
 Giving Technical Instructions to CAD Operators.
 Preparation of Hook-ups Diagram & extracting Bill of Material (BOM).
 Preparation of Cable Block Diagram, Cable schedule, Cable sizing & selection and Junction Box details.
 Preparation of Wiring diagram and Instrument Loop diagram.
 Preparation of Cable Tray routing diagram.
 Preparing Non-Material Requisition (NMR 601, 602 & 603) documents for client approval.

Professional Experience 2:
Company : Prudent Saudi Arabia Limited, KSA
Duration : Nov 2012 – Aug 2015
Designation : Project Engineer - Automation

Major Project Handled:

 VFD System for Chemical Injection Skid for Onshore oil wells , Saudi Aramco , Manifa –KSA.
 PLC and Scada System for MPT Chemical Plant for Basic Chemical Industries, Dammam –KSA.
 PLC and Scada System for Sales Gas Pipeline in Independent Power plant for Saudi Aramco and Saudi
Electricity Board, Qyrayyah-KSA.
 Leak Detection System for Qyrayyah Independent Power plant for Saudi Aramco and Saudi Electricity Board,
Qyrayyah-KSA.
 Up-Gradation of PLC Annunciator System in Sharq – SABIC, Juabil –KSA.
 PLC and Scada System for 2EG Annunciator System in Sharq – SABIC, Juabil –KSA.
 Leak Detection System for Sadara Petrochemicals – Jubail-KSA.
 Power Monitoring system for King Abdulla Sports City , Jeddah, Saudi Aramco – L&T

Responsibilities:
 Project Planning, Design, development and execution of assigned projects as per the customer requirement.
 Providing technical reports and documentation within guidelines and in compliance with internal and
customer procedures and regulations.
 Deft in handling selection, Installation, of the Siemens & AB PLC as per the requirement and compliance
to Standards.
 KICK of Meeting, Project Initiation & Handing over from Sales team.
 BOM, Technical Data sheets documents Submission & getting approvals from client to start procuring
materials.
 IO list, Functional Design Specification, & getting approvals from Clients to Start Engineering works.
 Engineering Works involves- Hardware design of PLC system, Panel, Power calculation, Heat rise
calculation. Etc.,.
 Coordinates with Panel team & Draftsman in the same time of Engineering works to get the Panel GA, IO
wiring, Cable scheduling documents and gets approval from client to start panel construction.
 After Pre-FAT Testing FAT Procedure shall be submitting to client for approval & Schedule for FAT as
per the project planning/ clients availability.
 After Successful FAT, system will be certified by client for dispatching the Panel to site. SAT will be
planned by Client.
 Co-ordination with commissioning team to finish the project with in time.
Professional Experience 3:
Company :NISSI ENGINEERING SOLUTION, Tamil Nadu.
Duration :April 2011 – Sept 2012
Designation :Project Engineer – Substation Automation.

Major Project Handled:


 Erection, Testing and Commissioning DATA CONCENTRATOR (AK 1703 ACP) for GMR ENERGY
LTD, Gas Power Plant (400KV Switchyard) for M/S SIEMENS Ltd.
 Erection , Testing and Commissioning of SIEMENS RTU (TM 1703 ACP,AK 1703 ACP) for
MAHARASTRA STATE ELECTRICITY TRANSMISSION CORPORATION LIMITED (VASHI
ZONE) for M/S SIEMENS Ltd
 Testing and Commissioning of SIEMENS DC (TM 1703 ACP,AK 1703 ACP) for MANGALORE
REFINERY AND PETROCHEMICALS LIMITED (ONGC) for M/S SIEMENS Ltd

Responsibilities:
 Preparation of I/O Lists and Cable Schedules.
 Configuration of Siemens DATA CONCENTRATOR.
 Integration of IEDs i.e. Relay (SIEMENS) through IEC 61850 protocol
 Supervision for adaptation works.
 Erection ,Testing and Commissioning of DC AK 1703
 Supervision for adaptation works.
 Programming of SCADA with Sicam 230
 Integration of IEDs i.e. Relay (SIEMENS) through IEC 61850 protocol.
 Conducting of FAT & SAT along with the client
 Interfacing of DCS by MODBUS protocol
 Testing and Commissioning of RTU and Scada.

Professional Experience 4:
Company : HUBERT ENVIRO CARE SYSTEMS (P) LTD, Tamil Nadu
Duration : JAN 2010 – MAR 2011
Designation : Electrical Engineer-Projects

Major Project Handled:

 17 MLD STP Plant at Kumbakonam for Tamilnadu Municipal Corporation,


 50 KLD STP at Thoppur & Hosur for BPCL, Chennai.
 200 KLD STP, ETP, EVAPORATOR for Apollo tyres, Chennai.
 24 KLD ETP and STP plant For Shriram EPC, Chennai.
Responsibilities:
 Projects management process.
 Conducting site visit to collect the required design inputs
 Making of BOQ as per Site Requirement.
 Designing of PLC (Siemens, AB, Omron) based Electrical panel as per the client Requirement.

 Getting of quotations from vendors and order finalization for integration of the control panel.
 Checking of plc programming and checking of inter panel wiring as per the approved drawings.
 Testing of PLC logic Operation and Electrical Panel as per the requirement.
 Erection of PLC Based Electrical panel Board and other electrical equipment.
 Erection of Motors and Blowers ranges up to 125HP.
 Cable laying and termination supervision.
 Commissioning of Electrical Panel.

Technical Expertise:
 Operating Systems : Windows XP & VISTA
 Software’s Used : ACAD , TOOLBOX-II, DIGSI(SIEMENS),SICAM 230(HMI), RS-LOGIX 500
 Selection Tools : Rockwell Integrated Architecture Builder, TIA portal.
 Protocols : Modbus , IEC61850.

Strengths:

 Ability to blend into & lead a team.

 Positive Attitude, Commitment to work, Sincerity & Punctuality.

 Desire for innovation & Continuous learning.

 Having result & quality orientation.

Declaration:

I hereby assure that the above-furnished details are true to the best of my knowledge and
belief. I also assure that I will be truthful and dutiful to the job assigned to me.

Yours Sincerely,
Jafar ali.a

You might also like