You are on page 1of 630

ONGOLE MUNICIPAL CORPORATION

E-PROCUREMENT TENDER NOTICES


S. Tender
No Notice No. Name of the work Est cost

Construction of C.C Road From Mandava Gangadar House to Ramesh


406 /
1 2015-16 House,Nalamothu Rambabu House to Mandava Koteswra Rao House Devudumitta 8.95 AE-1
To Cherala Road & Devudumitta To Park in Division No:1
Providing Strength of Walking Track & Providing Quarry Rubbish Road From
407 /
2015-16 Raccha banda to Upputuri Subbaiah House at BC Colony & Construction of Culvert 8.90
2 AE-1
at ZP High School Near Masjid in Throvagunta in Division No:1
408 / Construction of C.C Road from Cheerala Road to west Side of Park at Throvagunta
3 2015-16 5.10 AE-1
in Division No:1
409 / Construction of C.C Road from Thota kura Chinna Venkata Rao House to Katta
4 2015-16 8.80 AE-1
Ramakotaiah House at Throvagunta in Division No:1
410 / Construction of C.C Road from Boddu Ray Ending Road to Masthan Chettu at
5 2015-16
Throvagunta in Division No:1 (Reserved for L.C.C.S) 7.55 AE-1

Construction of C.C Drain from Ramuluvari Temple to challa Srinivasa Rao House
411 /
6 2015-16 (Mini Bye pass) & Construcion of C.C Road From Batthula Srinivasa Rao House to 5.65 AE-1
Main Road (Gopal Nagar Extension 2 nd Cross Road) in Division No:5
412 / Construction of C.C Drain from Kuttuboyana Lakshmi narayana House (Left Side) to
7 2015-16
Gaddikayalu Cross Road in Division No:5 6.47 AE-1

413 / Construction of C.C Drain from Kuttuboyana Lakshmi narayana House (Right Side)
8 2015-16 6.47 AE-1
to Gaddikayalu Cross Road in Division No:5
414 / Construction of C.C Drain from Gollapudi Hari House to Yarla gadda Bapuji Rao
9 2015-16 9.65 AE-1
House (Gaddikayalu first Cross Road) in Division No:5
415 / Construction of C.C Drain from Koduri Venkatadri House to Reddy Kirana Shop
10 2015-16 3.30 AE-1
Gopal Nagar 1st line Left side Drain in Division No:5 (Reserved for L.C.C.S)
416 / Construction of C.C Drain from Batthula Krishna House to Gaddikayalu in Division
11 2015-16
No: 5 5.80 AE-1

417 / Construction of C.C Drains & C.C Road From Ktari Subbamma Hosue to Reddy
12 2015-16 6.45 AE-1
Kirana Shop in Division No:5
418 / Construction of C.C Drain from Gopal Nagar Extension Gaddikayalu Cross Road to
13 2015-16 6.47 AE-1
Pothuraju Canal in Division No:5
419 / Construction of Internal C.C Drains from Subrahmanyeswara Swami Temple to
14
2015-16 Kuttuboyina Srinu House (Gopal Nagar 1st Line) in Division No:6 7.40 AE-1

420 / Construction of C.C Road & C.C Drain from Bhajana Koteswramma House (Gopal
15 2015-16 3.42 AE-1
Nagar 4rd Cross Road) to Kareti House Division No:6 (Reserved for L.C.C.S)

421 / Construction of C.C Drains from Annangi Aruna House to Yendeti Swami House
16 2015-16
(Gopal Nagar 1st Line) 2nd Cross Road in Division No:6 2.65 AE-1

422 / Construction of Internal C.C Drains from Mini Byepass to Church Line (Gopal Nagar
17 2015-16 9.95 AE-1
1st Line) in Division No:6

423 / Construction of C.C Road & C.C Drain from Pigili Krishna House to House (Gopal
18
2015-16 Nagar 3rd Cross Road) to Appanaboyina Hussainamma House Division No:6 4.65 AE-1
424 / Construction of C.C Road & C.C Drain from Shaik Hussain House (Gopal Nagar 4th
19 2015-16 5.90 AE-1
Line Cross Road) to Uppalapati Ramulu House Division No:6
425 / Construction of C.C Drains from Adusumalli Yalamanda House to Radha Krishna
20 2015-16 3.82 AE-1
Murthy House in Division No:6 (Reserved for L.C.C.S)
426 / Construction of C.C Drains from Subrhmanyeswara Swami Temple to Krishnuni
21 2015-16 9.99 AE-1
Temple House in Division No:6

427 /
Construction of C.C Drain& from Annavarappadu 3rd line Balabrammachari house
2015-16 to Railway track and 3rd 2nd middle Mestri Mastan to bank ramaiah house and 6.70
22 AE-2
annam Koteswararao house to Gaddi pati veeraiah house in Division No.15

428 / Providing C.C Drain&Culvert From N.Agrharam road east side Chandra house to 8.95 AE-2
23 2015-16
Hosanna Mandiram Road of Rajukula Colony in Division No.16
429 / Providing C.C. Road From Komataneni Ramesh House to Gonugunta Sesha Rao
24
2015-16 House at Cheruvukommupalem in Division No.18 5.50 AE-3

Providing C.C. Road From Vetarnary Hospital to Krishna Mandiram at


430 /
25 2015-16 Cheruvukommupalem (Opp. Panchayat Office) in Division No.18 (Reserved for 7.65 AE-3
L.C.C.S)
431 / Providing C.C. Road From Kalluri Narasimha Rao House to Pendyala Venkata Rao
26 2015-16
(C.C. Road Conection) at Cheruvukommupalem in Division No.18 9.98 AE-3

432 / Providing C.C. Road From Katari Narasimharao House to Pendyala Surendra at
27 2015-16 9.98 AE-3
Cheruvukommupalem in Division No.18
433 / Providing C.C. Road From Pendyala Surendra House to Venkayya Swami Temple at
28
2015-16 Cheruvukommupalem in Division No.18 9.65 AE-3

434 / Construction of CC Drain in N.G.O Colony 1st Crooss Road (Old Prathiba College
29
2015-16 Road) in Division No.47 8.30 AE-7

435 / Raising of CC Road to Venkateswara Nagar 3rd Cross Road from 0-150 mts in
30
2015-16 Division No.47 (Reserved for L.C.C.S) 9.70 AE-7

436 / Raising of CC Road to Venkateswara Nagar 3rd Cross Road from 150-200 mts in
31
2015-16 Division No.47 3.30 AE-7

437 / Construction of CC Drain from Kurnool road to Venkateswara nagar in Division


32 2015-16 5.20 AE-7
No.47
438 /
33 2015-16 Raising of CC Road from Kurnool Road to Venkateswara Nagar in Division No.47 10.00 AE-7

439 /
34 2015-16 Construction of CC Drain in Venkateswara nagar 3rd Cross Road in Division No.47 7.50 AE-7

440 / Construction of CC Drains and RCC Slab Culvert at Saraswathi Sisu Mandir road in
35 2015-16 5.00 AE-7
Division No.47 (Reserved for L.C.C.S)
441 / Construction of CC Drains on South Side of Chandraiah Nagar Comity Hall to 60"
36 2015-16
Feet Road in Division No.48 9.10 AE-7

442 /
2015-16 Construction of CC Drains in Achari Veedhi in Division No.48 3.00 AE-7
37

443 / Construction of CC Drains in Chandraiah Nagar 7th lane from East to west in
38 2015-16 3.20 AE-7
Division No.48
444 /
39 2015-16 Construction of CC Road from Dibbla road to towards RTC colony in Division No.48 4.80 AE-7
445 / Raising of CC Road From Kurnool Road to Dibbalaroad ELSR in Division No.48
40 2015-16 8.00 AE-7
(Reserved for L.C.C.S)
446 /
41 2015-16 Raising of CC Road From Dibbalaroad ELSR to Aswini Hospital in Division No.48 8.80 AE-7

447 /
42 2015-16 Construction of CC Drain from Kurnool Road to Aswini Hospital in Division No.48 6.90 AE-7

448 /
2015-16 Construction of CC Drains at Opp to the Amrutha Hospital in Division No.48 1.90 AE-7
43

449 /
44 2015-16 Construction of CC Road in Innavari Veedi in Division No.48 4.70 AE-7

450 /
Construction of C.C Drains in Jayaprakash Colony main road and C.C Drains and
2015-16 Quarry Rubbish Roads from Prasad house to Durgamma house and from T.Srinu 7.40
45 AE-7
house to Ch.Obulamma house in Division No.50
451 / Providing Quarry Rubbish Road and C.C Drain from G.Yedukondalu house to
46 2015-16 7.20 AE-7
Ch.Vijayamma house in Maruthi Nagar in Division No.44
TOTAL 309.75
Download Start Time : 22.01.2016 5.00 P.M
Download End Time : 05.02.2016 5.00 P.M
Receipt of Bids End Time : 05.02.2016 5.15 P.M
Price Bid Opening Time : 05.02.2016 5.30 P.M
452 / Providing 12.5 Hp Vertical Open Well Submersible Motor to Fixing New Filter Bed
1
2015-16 (14.30) in Public Health Office in Ongole Municipal Corporation 3.15 AE-5

453 / Supply and fixing of 10 HP open well Submersible motors in 60kl Clear Water Sump
2 2015-16 6.30 AE-2
at koppolu of 10th Division in Ongole Municipal Corporation
Repairs and Rectification of R.R. Tank Pump Unit-II and New Filter Bed 5 HP Up
454 /
3 2015-16 Wash Motor and Water Tankers Pumping 5 HP Motor in Ongole Municipal 2.65 AE-5
Corporation (2nd call)

Engaging of 110 Hydraulic Chain Mounted Machine, Excavator and Tractors for
455 /
4 2015-16 lifting of Garbage and capping at Guttikondavaripalem in Sy.No.105/3,4,5,7 & 8 of 10.00 AE-7
Koppolu (Guttikondavaripalem) in Ongole Municipal Corporation
456 / Construction of C.C Drain from Houseing Board to Mamidi Palem (Via) Bank Colony
5
2015-16 1 to 4 Lines in Division No:19 7.50 AE-2

457 / Supply and delivery of Pyrosene Oile E is 6014-1978, Pyretherum 2 % extract an PIP
6
2015-16 Insect Bait to Ongole Municipal Corporation 9.18 AE-7

458 / Supply and Delivery of Visiontek GL 11 POS Machine to Ongole Municipal


7 2015-16 0.99 AE-7
Corporation
459 / Providing CC Road and CC Drain from Mangamur Road to Sivaprasad Colony
8 2015-16
Existing CC Raoad Division No.33 10.00

460 / Providing Computer Systems at Town Planig Section and Engineering section in
9 2015-16 9.99
Ongole Municipal Corporation
461 / Laying of Quarry Rubbish Road and RCC Slab Culvert in Sramika Nagar from Sriram
10 2015-16
Colony 2nd lane to Ganapatrhi Nagar Main Road Division No:50 2.74 AE-7

462 / Laying of 150mm and 100mm dia A.C.pipe line in Sri ram colony 2nd line in
11 2015-16 9.35 AE-7
Division.No.43
463 /
2015-16 Construction of CC Drains in Virat Nagar 1 to 5th lines in Div No: 43 10.00
12
464 /
2015-16 Providing Skeyting in Ura Cheruvu N in Division No :24 8.93
13

TOTAL 90.78
Download Start Time : 23.01.2016 5.00 P.M
Download End Time : 06.02.2016 5.00 P.M
Receipt of Bids End Time : 06.02.2016 5.15 P.M
Price Bid Opening Time : 06.02.2016 5.30 P.M

465 / Maintenance of Water Supply - Transportation and Supply of Water in various


1 2015-16 10.00 AE-6
places in Ongole Municipal Corporation from 06.02.2016 to 31.03.2016

466 / Manufacture, Supply and Delivery of IM-II Hand Pump Spare Parts to Ongole
2 2015-16
Municipal Corporation 7.30 AE-6

467 / Drilling of Deep Bore Well and Fixing of IM-II Pumpsets at various places in Ongole
3 2015-16 9.99 AE-6
Municipal Corporation
468 / Providing Honda make Brush Cutter (UMK 435T), Lown Mover (HRJ 216) in Gadhi
4 2015-16 1.50 AE-5
Park Ongole Municipal Corporation
TOTAL 28.79 4.32
Download Start Time : 30.01.2016 5.00 P.M
Download End Time : 08.02.2016 5.00 P.M
Receipt of Bids End Time : 08.02.2016 5.15 P.M
Price Bid Opening Time : 08.02.2016 5.30 P.M
469 /
2015-16 Providing Iron Gates in Various places in Ura cheruvu in Division No:24 9.50 AE-4
1

470 / Construction of C.C Drain South Side Beside of Hindu Burial Ground to Karavadi
2 2015-16
Donka Road in Division No:7 10.00

471 /
2015-16 Levelling site of Burial Ground in Christian Palem in Division No.34 9.98
3

472 / Construction of Compound Wall at Christian Burial Ground near S.S Tank-I in
4 2015-16 9.98
Kothjaamidi Palem in Division No.32 (Reserved for L.C.C.S)
473 / Laying of 150 mm Dia A.C Pipe Line From Kotha Colony Main Road to 4th Cross
5 2015-16
Road East Side at Pelluru in Division No.17 3.35 AE-5

Supply of Labour for Watch and Ward and Petrolling along NSP canal from
474 /
2015-16 Ramatheertham Reservoir to SS Tanks and additional Pumping arrangement to SS 9.80
6 AE-5
Tank-2 in MARCH, 2016 in Ongole Municipal Corporation
475 / Construction of Balance C.C Drain at Gaddalagunta (Burial Ground Back Side) in
7 2015-16 1.25 AE-5
Division No:32
476 / Rennovation of Ongole Municipal Corporation Office Building in Ongole Municipal
8 2015-16 5.60 AE-5
Corporation (Reserved for L.C.C.S)
477 / Devlopment of Municipal Office Park in Ongole Municipal Corporation (Reserved
9 2015-16 4.78 AE-5
for L.C.C.S)
478 / Providing R.C.C Culverts at Power Office opp South Bye pass (100 feet Road) and
10 2015-16
Thirupathi Marbles in Division No.34 5.60 AE-5

479 / Partition and flooring to toilets in R.D.O Office Campus in Ongole Municipal
11 2015-16 3.50 AE-5
Corporation
480 / Providing Push Back Chairs and Deep Bore well with Motar to Bala Bhavan in R.D.O
12 2015-16 9.80 AE-5
Office Campus in Ongole Municipal Corporation
481 / Flooring to out side area of Bala Bhavan in R.D.O Office Campus in Ongole
13 2015-16 9.50 AE-5
Municipal Corporation
482 / Providing Split Air Conditioners at Bala Bhavan in R.D.O Office Campus in Ongole
14 2015-16 9.86 AE-5
Municipal Corporation
483 /
2015-16 Repairs to Sri Giri Temple Steps in Division No.27 1.70 AE-4
15
TOTAL 104.20
Download Start Time : 30.01.2016 5.00 P.M
Download End Time : 15.02.2016 5.00 P.M
Receipt of Bids End Time : 15.02.2016 5.15 P.M
Price Bid Opening Time : 15.02.2016 5.30 P.M
484 / Construction of Foot Path along North side of Kurnool Road from 60' feet road to
1 2015-16 9.75 AE-7
near Ramya Residency in Ongole Municipal Corporation

485 / Construction of Foot Path along North side of Kurnool Road from Near Ramya
2 2015-16 9.75 AE-7
Residency to Near Nancharamma Medical Shop in Ongole Municipal Corporation

486 / Widening of C.C Road from Kurapati Complex to 60' feet Road at North side
3 2015-16 Kurnool Road in Division No.48 4.00 AE-7

487 / Widening of C.C Road from Ramana Rao Hospital to Dibbala Road at North Side of
4 2015-16 Kurnool Road in Division No.48 8.00 AE-7

488 / Laying of 250 mm A.C.pipe line from Dibbala Road to Venkata ramana Nursing
5 2015-16 4.75 AE-7
home in Division No.48
489 / Repairs to Dumper Placer (Vehicle No: AP 27 W 8172) in Ongole Municipal
6 2015-16 2.75 AE-7
Corporation

490 / Cost, supply and fixing of Name boards for Swatch Ongole Programme and Green,
7 2015-16 Amber and Red Zones and at Various Places to Ongole Municipal Corporation 9.60 AE-7

Engaging of Driver (Heavy Vehicle Licence holder) and having experince on


491 /
8 2015-16 Operation of Heavy vehicles and helper to Dumper placer on Out sourcing basis in 6.51 AE-7
Ongole Municipal Corporation (Reserved for L.C.C.S)
492 / Providing Galvalume sheet to open site at Guttikondavaripalem in Ongole
9 2015-16 Municipal Corporation 9.25 AE-7

493 / Drilling of Deep Bore Well and Fixing of IM-II Pumpsets at various places in Ongole
10 2015-16 7.55 AE-7
Municipal Corporation
494 / Supply and delivery of MS Containers (Garbage Bins) (IIIrd Phase) to Ongole
11 2015-16 9.70 AE-7
Municipal Corporation
495 / Completion of incomplete Components for Skill Upgradation Training Centre in
12 2015-16 10.00 AE-6
Nehru Nagar in Ongole Municipal Corporation
496 / Widening of C.C Road From Anjaneya Jewvalary to M.S.R Statue in Kurnool road
13 2015-16 south side in Ongole Municipal Corporation 2.50 AE-4

497 / Widening of C.C Road From Sagar Agencies to Anjaneya Jewellers in Kurnool road
14 2015-16 9.50 AE-4
south side in Ongole Municipal Corporation
498 / Widening of C.C Road From Gupthas Gold House to Sagar Agencies in Kurnool road
15 2015-16 9.50 AE-4
south side in Ongole Municipal Corporation
499 / Supply, delivery and fixing of Name boards, Sign boards, Direction Boards and in
16 2015-16 9.90 AE-2
Various palces in A.E-2 Section in Ongole Municipal Corporation.
500 / Painting and Repairs to Building of Water Supply Scheme at 3.15 Filtration Plant
17 2015-16 10.00 AE-5
Compound in Ongole Municipal Corporation
501 / Construction CC Drain from vegitable market To yamini Eye hospital road in
18 2015-16 5.50 AE-4
Division No.24
502 / Construction of Foot Path from Karoor Vysya Bank to M.S.R Statue in Kurnool Road
19 2015-16 7.45 AE-4
in Division No.24
503 / Construction of Foot Path along Padmavathi Silks to Karoor Vysya Bank in Kurnool
20 2015-16 Road in Division No.24 9.75 AE-4

504 / Construction of Foot Path along Market Road to Thripura Complex in Kurnool Road
21 2015-16 9.75 AE-4
in Division No.24
505 / Supply and fixing of 10 HP open well Submersible motors in 60kl Clear Water Sump
22 2015-16 6.30 AE-2
at koppolu of 10th Division in Ongole Municipal Corporation (2nd call)
506 / Providing 200 mm dia A.C Pipe Line from Rajeev Nagar at Milk Factory west side to
23 2015-16 9.50 AE-6
Milk Factory east side along Kurnool Road in Division No.40
507 / Drilling of Deep Bore Well and Fixing of IM-II Pumpsets at various places in Ongole
24 2015-16 9.99 AE-6
Municipal Corporation (2nd call)
191.25
Download Start Time : 17.02.2016 5.00 P.M
Download End Time : 02.03.2016 5.00 P.M
Receipt of Bids End Time : 02.03.2016 5.15 P.M
Price Bid Opening Time : 02.03.2016 5.30 P.M
509 / Construction of C.C Road & Culvert from Panchayathi Office to Dasu Anja Rao
1
2015-16 House in Mukthinuthalapadu in Division No:2 9.60 AE-1

510 / Construction of C.C Road from Poleramma Temple to B.C Colony in 9.47 AE-1
2
2015-16 Mukthinuthalapadu in Division No:2
511 / Providing Quarry Rubbish Road From Mukthinuthalapadu (Ongole Road) to
3 2015-16 5.00 AE-1
Appayakunta in Division No:2

512 / Construction of C.C Road & Culvert from Bodapati Venkateswrlu Barene to Near
4 2015-16 9.99 AE-1
Veeragandham Venkateswrlu Kostalu in Mukthinuthalapadu in Division No:2

513 / Providing C.C Road From Sudanagunta Ramaiah Site to NH5 in Mukthinuthalapadu
5
2015-16 in Divisions:2 (Reserved for L.C.C.S) 9.75 AE-1

514 / Providing C.C Road From Bodapati Abbaiah (Tobaco Gowdens) to Sudanagunta
6
2015-16 Ramaiah Site in Mukthinuthalapadu in Division No:2 9.75 AE-1

515 / Construction of C.C Drain from A.Ranga Rao House to Gottam Srininivasa Rao
7 2015-16 3.20 AE-1
House in Military Colony in Division No: 3
516 / Construction of C.C Drain from Military Colony Mian Road to Sankaram House in
8 2015-16
Military Colony in Division No: 3 9.95 AE-1

517 / Construction of C.C Drain from Sankaram House to Chavali Sravanthi House in
9 2015-16 5.50 AE-1
Military Colony in Division No: 3
518 / Construction of C.C Drain from Gorremuchu Pravathi House to Durgaiah House in
10 2015-16 5.65 AE-1
Balaram Colony in Division No: 3 (Reserved for L.C.C.S)
519 /
2015-16 Construction of C.C Internal Drain at Military Colony in Division No:3 9.99 AE-1
11

520 / Construction of C.C Culvert at Dasaradipalli Road Near Balineni Bharath Nagar in
12 2015-16 1.72 AE-1
Division No:3
521 / Construction of C.C Drains & Culverts from Daniyelu Church to Ketha Nursing
13 2015-16 7.00 AE-1
Home in Division No:3
Construction of C.C Drains From Ravella Raghavendra House to Sudhi House in
522 /
2015-16 Balaram Colony & NTR Colony 4th Line Starting to Incompletion of Drain in Division 5.00
14 AE-1
No:3
523 / Construction of C.C Drain from Shaik Rehman House to Rain bow Stickers in
15 2015-16 5.30 AE-1
Division No: 4 (Reserved for L.C.C.S)
524 / Construction of C.C Drain &Culvert from Basha Tailor Shop to Kayyum House in
16 2015-16 2.30 AE-1
Division No: 4
525 /
2015-16 Construction of C.C Internal Drains (Lorry la Kunta) in Division No:4 8.95 AE-1
17

526 / Construction of C.C Drain From Opp.Ameer House to Community Hall in Division
18 2015-16 1.00 AE-1
No: 4
527 / Construction of C.C Road from Basheer tailor Shop to Shaju Gari House Islam Peta
19 2015-16 5.90 AE-1
-II in Division No:4
528 / Providing C.C Drian from Model School to Burial Ground in Prakasam Colony in
20 2015-16
Division No:4 (Reserved for L.C.C.S) 6.60 AE-1

529 / Providing C.C Drian from Guntur Road to Model School in Prakasam Colony in
21 2015-16 6.60 AE-1
Division No:4
530 / Laying of C.C Road in thurpu Christian FromNear Sharath House (Church Line) to
22 2015-16 9.99 AE-1
Nannapaneni Venkata Rao House in Division No:8
531 / Construction of C.C Drain from Chennupati Hari Babu House to I.Polaiah House at
23
2015-16 Kakathiya Nagar in Division No:8 4.64 AE-1

532 / Construction of C.C Drain From Dinala bavi to Kakateeya Nagar Main Road (at
24
2015-16 Culvert) (both sides) in Division No:8 8.40 AE-1

Laying C.C Road at Amrutha Minaral water Road (k.V Subbaiah House) to
533 /
25 2015-16 KaravadiDonka Road Near Venkateswaraswami Temple in Division No.8 (Reserved 5.05 AE-1
for L.C.C.S)
534 / Construction of C.C Drain From Bheemaneni Venkateswarlu Nilayam to
26 2015-16 9.15 AE-1
Opp.Christain Burrial Ground Gate at Karavadi Donka Road in Division No:8
535 / Construction of C.C Drain From Christain Burrial Ground Gate to Pothu Raju Canal
27 2015-16 3.85 AE-1
in Division No:8
536 / Providing C.C Road & Quarry Rubbish Road From Gangadi Radhakrishna house to
28
2015-16 Kummari Anjaiah house of Koppolu in Division No.9 2.55 AE-2

537 / Formation of Quarry Rubbish Road from Manne Ramanamma house Nadipinene
29
2015-16 Bhaskar house of Koppolu in Division No.9 3.25 AE-2

538 / Providing c.c road from Yalagala Kotaiah house to Pusapati Chiranjivee house of
30
2015-16 Koppolu in Division No.9 (Reserved for L.C.C.S) 4.80 AE-2

539 / Formation of Quarry Rubbish Road at Bramhana Street&Journalist colony in


31 2015-16 10.00 AE-2
Division No.9
540 / Construction of C.C Drain from Pallapolu Krishna reddy house to palem entrance
32 2015-16
road Through Bodduri at Guthikondavari palem in Division No.9 10.00 AE-2

541 / Formation of Quarry Rubbish road from south side Well to north side In let channel
33 2015-16
in Gutthikondavari palem in Division No.9 4.60 AE-2

542 / Formation of Quarry Rubbish Road from Indra colony & Jayapraksh colony in
34 2015-16 7.50 AE-2
Division No.9
Construction of C.C Drain & Culverts from Dhunna Subbarao house to North side
543 /
2015-16 Last Cross road at 4th line of Rajiv Gruha kalpa in Division No.9 (Reserved for 3.65
35 AE-2
L.C.C.S)
544 / Providing C.C Road&Drain from S.k.Himam Saheb house to Ambethkar colony
36 2015-16
Community hall in Division No.10 9.30 AE-2

545 / Providing of CC Road &C.C Drain at Upputuri Venkateswrlu house to Eadara


37 2015-16 6.00 AE-2
Ramdevi house of Koppolu in Division No.10
546 / Construction of C.C Drains from Katragadda Viswanadham house to Sundharaiah
38 2015-16 3.65 AE-2
School of Koppolu in Division No.10
547 / Providing Quary Rubbish road of Brudhavanam Venchers opp of Indramma Gruhalu
39 2015-16
in Division No.10 7.25 AE-2

548 / Construction of CC Drain &Culvert of ok road to Brudhavanam Venchers oppof


40 2015-16 10.00 AE-2
Indramma Gruhalu in Division No.10 (Reserved for L.C.C.S)
549 / Construction of C.C Drain & Raising of Road from Chakire Maruthi kumar house to
41 2015-16 3.40 AE-2
Words Junction of Anadharao Road in Division No.12
550 / Construction of C.C Drain & Raising of Road from Antha mallikarjuna house to
42 2015-16
wards back side of Saradha balakutir to Anadharao road in Division No.12 9.25 AE-2

551 / Construction of C.C Drain From Sathya Nivas house to Ajantha Silk Carcana in
43 2015-16
Division No.12 4.75 AE-2

552 / Construction of Culvert of C.C Road at south side of sivalayam to sankarasetty


44 2015-16 3.95 AE-2
varaprasad house in Division No.12
553 / Construction of Repairs C.C Drain From Pakeerupalem punuri ramesh house to
45
2015-16 Mashumsha Street in Division No.12 (Reserved for L.C.C.S) 0.95 AE-2

Construction of C.C Drain from Raghavendra swami temple to 2nd line of


554 /
46 2015-16 Annavarapadu through syam sundhar nilayam & Kotilingam house to 10.00 AE-2
K.Ramanamurthi house of South side of Venkaiah Swami Temple in Division No.15

Construction of C.C Drain from Annavarapadu 2nd line Extension to Kunapa reddy
555 /
47 2015-16 Chenchaiah house & Extentision Ramnagar 3rd lineat to Ramnagar 5th line in 10.00 AE-2
Division No.15

556 / Formation of Quarry Rubbish Road from Jayarao house to Agraharam Railway gate
48
2015-16 Road (Raghavendra Swami Temple Back side)of Santha Peta in Division No.15 0.95 AE-2

557 / Providing C.C Road From Ramnagar 1st Cross road of 1st line to 5th line in Division
49 2015-16 7.90 AE-2
No.15
Construction of C.C Drains from 3rd&4th line Cross Road of Annaparedy Musalaiah
558 / house to Easari gadda yallama house&Annavarapadu main Road 3rd line to
2015-16 Park&Ramnagar 1st line to 2nd line Cross Road at Annavarapadu in Division No.15 6.00
50 AE-2
(Reserved for L.C.C.S)
559 / Construction CC drain Ramnagar 4th line From Ramya nivas to Railway track in
51 2015-16 7.50 AE-2
Division No.15
560 / Construction CC Road Ramnagar 9th line From ELSR to Guttha Venkata Subbiah
52 2015-16 7.40 AE-2
Gudown in Division No.15
561 / Construction of C.C Drain&Culvert from Ramnagar 8 th line South side Roshan
53
2015-16 Plaza to Tanguturi Gopala Krishna house in Division No.15 9.76 AE-2
562 / Construction of C.C Drain&Culvert from Ramnagar 8 th line North side Bazag
54 2015-16 9.45 AE-2
Showroom to (opp) Tanguturi Gopala Krishna house in Division No.15
563 / Construction of C.C Drain&Culvert from Ramnagar 8 th line Middle Cross Road
55 2015-16 3.72 AE-2
Vikram School to 7th Line in Division No.15 (Reserved for L.C.C.S)
564 / Construction of CC Culvert Balaji nagar first main road 3 cross road. Opp BC Colony
56 2015-16 1.20 AE-2
at pothurajupalem in Division No.16
565 / Providing Quarry Rubbish Road&Culvert from NH-5 to Pelluru at OMC Bore Wells in
57 2015-16
Division No.17 9.99 AE-3

566 / Construction of C.C Drain from Sanneboyina Subbarayudu house to Ramuluvari


58 2015-16 3.82 AE-3
Temple in Division No.17
567 / Providing C.C Road From S.k Basha house to Sivalayam Temple at Pelluru in
59 2015-16 8.70 AE-3
Division No.17
568 / Providing C.C Road From Dhuduluri Subbarao house to Chirala Subba Rao
60
2015-16 house(Rapurivari Bazar) at Pelluru in Division No.17 (Reserved for L.C.C.S) 5.40 AE-3

569 / Formation of Quarry Rubbish Road from N.H-5 to G.K Apartments at Pelluru (Bit-1)
61
2015-16 in Division No.17 9.65 AE-3

570 / Formation of Quarry Rubbish Road from N.H-5 to G.K Apartment at Pelluru (Bit-2)
62
2015-16 in Division No.17 7.25 AE-3

571 /
63 2015-16 Construction of C.C Drain opp Pelluru Cheruvu at Pelluru in Division No.17 7.20 AE-3

572 / Formation of Quarry Rubbish Road from Govt. School to Ramalayam Temple at
64 2015-16
Pelluru in Division No.17 3.85 AE-3

573 / Providing CC Road Peddireddy.Hanuma Reddy House to PeddiReddy 7.40 AE-3


65 2015-16
Venkateswarlu House in Division No.18 (Reserved for L.C.C.S)
574 / Construction of C.C Drain & Culvert from Bhagya Nagar 4th line to Housing Board
66 2015-16 9.99 AE-3
Park in Division No: 19
575 / Construction of C.C Drain & Culvert from Housing Board Park to 5th Cross Road in
67 2015-16
Division No: 19 4.95 AE-3

576 / Construction of C.C Drain at Housing Board colony Polytechnic College Road (390-
68 2015-16 5.25 AE-3
480) in Division No:19
577 / Providing C.C Road From Thummakudi Appa Rao house to Shaik.Anjimunnisha
69 2015-16 5.80 AE-3
house at Daravari Thota (Mara Bavi Road) in Division No:20
578 / Construction of C.C Culverts at Daravarithota 4th line Hotel Surover Cross Road in
70 2015-16 0.99 AE-3
Division No:20 (Reserved for L.C.C.S)
579 / Providing C.C Road From Muthakani Subba Rao house to Kunchala Anjaiah house at
71 2015-16
Daravari Thota 4th line in Division No:20 4.85 AE-3

580 / Construction of C.C Drain from Maruthi Apartment to Daravari thota Masid at
72 2015-16 6.10 AE-3
Division No:20
581 / Providing C.C Road at Bhagya Nagar 2nd line Park Est and West Sides of Division
73 2015-16 5.30 AE-3
No:20
582 /
2015-16 Providing of C.C Road Bhagya Nagar 2nd Line 0.00 m to 180.00 m in Division No:20 10.00 AE-3
74

583 / Providing of C.C Road Bhagya Nagar 2nd Line Ch.181.00 m to 285.00 m in Division
75
2015-16 No:20 (Reserved for L.C.C.S) 5.70 AE-3

584 / Construction of C.C Drain&Culvert from Bhagya Nagar 2nd line 6thCross Road in
76
2015-16 Division No:20 7.90 AE-3
585 / Construction of C.C. Drain & Culvert from Bhagya Nagar 2nd Line 5th Cross Road in
77 2015-16 6.40 AE-3
Division No: 20
586 / Providing of C.C. Drain & Culvert Bhagya Nagar 2nd Line North Side Road in Division
78 2015-16 9.35 AE-3
No: 20
587 / Providing of C.C. Drain from Bhagya Nagar 2nd Line A.Venkateswarlu House to
79 2015-16 1.55 AE-3
Bhagyanagar 3rd Line Existing CC Road in Division No: 20
588 / Providing C.C Road From Malapati Brahmaiah house to Bandaru Srinu house at
80 2015-16
Bhagya Nagar 2nd line of Division No:20 (Reserved for L.C.C.S) 2.05 AE-3

589 / Providing C.C. Road from Kodali Yedukondalu House to Kondaiah House at
81 2015-16 0.67 AE-3
Bhagyanagar 2nd Line (Old Rama krishna School Back side) in Division No: 20
590 / Construction of C.C. Drain & Culvert from Kummari Kotaiah House to Devudu
82 2015-16 8.35 AE-3
Cheruvu Junction (Bit-1) in Division No: 21
591 / Construction of C.C Drain & Culvert from Kummari Kotaiah House to Devudu
83 2015-16 4.95 AE-3
Cheruvu Junction (Bit-2) in Division No:21
592 / Construction of C.C. Road & Drain from Ambethkar Bhavan to N.T.R. Colony Last
84
2015-16 Road in Division No: 21 3.10 AE-3

593 / Construction of C.C. Drain & Culvert from Maruthi Apartment opp. Road at
85
2015-16 Dharavari Thota in Division No:21 (Reserved for L.C.C.S) 1.75 AE-3

594 / Providing C.C. Road & Pipe Line from Ambethkar Bhavan Main Road to 2nd Line
86
2015-16 Last in Division No: 21 5.30 AE-3

595 / Construction of C.C. Road & Drain from Rentapalla David House to J.S. Rajashekar
87 2015-16 8.86 AE-3
House at N.G.O. Home Balaji Nagar in Division No: 21
596 / Construction of CC Drain & Culvert from C.S.R. Sarma College to Ambethkar Bhavan
88 2015-16
Road in Division No: 21 4.30 AE-3

597 /
2015-16 Providing C.C Road From C.R.P Quarters Park All Round in Division No:21 7.85 AE-3
89

598 /
2015-16 Providing C.C Road at Santhi Nagar in Division No:21 (Reserved for L.C.C.S) 1.15 AE-3
90

599 / Construction of C.C.Drain P.V Subba Rao House to Medhra Valla Vari Veedi in
91 2015-16 2.38 AE-4
Division No.22
600 / Construction of Road C.C.Drain from opp Dr.Rajeswar Rao Hospatal in Division
92 2015-16 4.30 AE-4
No.22
601 / Providing CC.Road & C.C.Drain from Mariyam Janaki House Mamidi Setty Subbarao
93 2015-16 3.55 AE-4
House in Kuttuboina Vari Palem in Division No.22
602 / Providing CC.Patch & C.C.Drain at Venugopala Swamy Temple Street in Division
94 2015-16
No.22 10.00 AE-4

603 / Construction of C.C.Drain & Road opp Ramalayam at Ganuga Palem in Division
95 2015-16 3.93 AE-4
No.23 (Reserved for L.C.C.S)
604 / Construction of C.C.Drain & Road Patches Ganuga Palem Hindustan Hotal to
96 2015-16 7.00 AE-4
Pathivari Street in Division No.23
605 / Construction of Damaged Culvers & C.C.Drain Kota Veedi & Mangala Palem in
97
2015-16 Division No.23 6.40 AE-4

606 /
98 2015-16 Construction of Internal C.C.Drain at Kota Veedi in Division No.23 4.70 AE-4

607 / Construction of C.C. Side Drain At Old Market Back Side Muneer Chiken Cenre to
99
2015-16 Anjali Dresses in Division No.23 2.43 AE-4
Providing CC.Road from SK.Meeravali House to SK.Akthar House and SK.Hussain
608 /
2015-16 House to 0.9 MGD Filter Bed In Sanjeev Nagar 3rd Line in Division No.27 (Reserved 3.38
100 AE-4
for L.C.C.S)
609 /
2015-16 Winding C.C Road & Construction of C.C Drain opp N.S.P.Banglow in Division No.27 4.40 AE-4
101

610 /
2015-16 Construction of C.C.Drain from Andhra Bank to Sivalayam in Division No.27 5.60 AE-4
102

611 /
2015-16 Construction of C.C.Drain C.C.Culverts at zakaraya Hospatal Road in Division No.27 4.60 AE-4
103

612 / Providing CC.Road from Hill Tower E.L.S.R to M.Nageswar Rao House (SRI GIRI
104
2015-16 South Side) in Division No.27 9.50 AE-4

613 / Providing C.C Road in V.I.P Road 34 Cross Road in Post Office Line in Division No:34
105
2015-16 (Reserved for L.C.C.S) 6.35 AE-5

Construction of Damaged C.C Drain from South Bye Pass to towards V.I.P Road 1
614 /
2015-16 to7 Cross Road's & Approches (Sri sai School of Nursing 8-231 to 36-071-110, 6.70 AE-5
106
Annapurna Nilayam, 8-153, Axis Bank A.T.M Road) in Division No.35
615 / Providing C.C Road and C.C Drain , Nirmala School Road,Sri Venkata Naga Dhurga
107
2015-16 Nilayam.and C.C.Patch's at Division No.35 9.95 AE-5

Construction of Damaged C.C Road (Padarthi Nivas D.No.8-385), C.C Approches, C.C
616 /
2015-16 Patch Works & C.C Culverts (Various Places), C.C Drain & Pipe Line Patch Work in 7.25
108 AE-5
Division No.35
617 / Providing C.C. Road & Culvert from Nirmal Nagar Park Road (Beside Kakumani
109
2015-16 Rangaiah House) to End of the Road in Division No.36 1.15 AE-5

Raising of CC Drain (Road Side) Wall & Desiltation from Pallu Subbaiah House to
618 /
2015-16 Challa & R.K. Lake view Apartment Near Ayyappa Swamy Temple Main Gate (Ranga 2.40
110 AE-5
Raidu Cheruvu Back Side) Kalanikethan in Division No.36 (Reserved for L.C.C.S)

619 / Providing CC.Drain from Pundari Kakshaiah House to Sankar Fast Food in
111
2015-16 M.M.Road at Ayappa Swamy Temple Street in Division No.36 1.57 AE-5

620 / Construction of C.C Drain & Damaged C.C.Drain from Chidithoti Jeevan Nilayam to
112
2015-16 Anjaiah Road in Nirmal Nagar Park Road in Division No.36 1.50 AE-5

621 / Construction of C.C Road, CC Drain & R.C.C. Culverts from Sundarnagar 2nd Line
113
2015-16 Extention to end of the Road (Near Narayana Public School) in Division No.36 7.45 AE-5

Providing CC Road and CC Drain from NH-5 to Madala Srinivasarao House in


622 /
2015-16 Sundaranagar 2nd Line (Opp.Ratnakar Granites) and from NH-5 to Peddi 6.95
114 AE-5
Bhaskararao House in Bhavani Street(Opp. Padma Towers) in Division No.36
Construction of CC Drain and Quarry Rubbiah Road in State Bank Colony Last Cross
623 /
2015-16 Road From SK.Abdul Rahiman (H) to Rachamalla Ramulamma (H) in Division No.45 3.70 AE-7
115
(Reserved for L.C.C.S)
624 / Construction of CC Drains in Kurnool Road from ST Xaviers School back wall to Sasi
116
2015-16 Sekhar Nilayam in Division No.45 3.40 AE-7

117
625 / Construction of CC Drains in Sri Nagar Colony 3rd Lane (East Side) From 9.30 AE-7
2015-16 Cheramkuri Narasimha (H) to towards North Side in Division No.45
626 / Construction of CC Drains in Sri Nagar Colony 3rd Lane (West Side) From
118
2015-16 Cheramkuri Narasimha (H) to towards North Side in Division No.45 9.60 AE-7
627 / Construction of CC Drains in Nh-5 from Sanikommu Ramireddy Nilayam to Sriram
119
2015-16 Prabakar in Division No.45 5.00 AE-7

628 / Construction of CC Drains Ratna Towers to Machikallapati Prasad in Division No.45


120
2015-16 (Reserved for L.C.C.S) 5.30 AE-7

629 / Laying of Quarry Rubbish Roads in NH-5 From Poleramma Temple to SK.Meera
121
2015-16 mohamudin South Side in Division No.45 4.20 AE-7

630 / Construction of CC Drains in NH-5 From Poleramma Temple to SK.Meera


122
2015-16 mohamudin South Side in Division No.45 7.90 AE-7

631 / Construction of CC Drains in NH-5 from Lakshmi Nilayam to Chavali Bikshapathi in


123
2015-16 Division No.45 7.10 AE-7

632 / Laying of Quarry Rubbish Roads from (A) (D.No. 33-51-561) to CH.Obulamma (H)
124
2015-16 (B) P.Srinivasarao (H) to D.Vijayamma (H) in Division No.50 2.00 AE-7

633 / Construction of CC Drains in Ch.Rambabu (H) to SK.Nazorvali (H) at Venkateswara


125
2015-16 Colony in Division No.50 (Reserved for L.C.C.S) 5.70 AE-7

634 / Construction of CC Drains in Juvidha Maseedu to Jallipalli Anjaneyulu (H) at Nehru


126
2015-16 Nagar 3rd lane in Division No.50 6.60 AE-7

635 / Construction of CC Drains in Kanaparthi Venkateswarulu (H) to SK.Phajula (H) at


127
2015-16 Nehru Nagar 1st lane in Division No.50 6.00 AE-7

636 / Construction of CC Drains in Ketha Malakondaiah (H) to Petrol Bunk at Nehru Nagar
128
2015-16 4th lane and 7th lane Balance in Division No.50 5.40 AE-7

637 / Construction of CC Road in Rajaka Bazar in Venkateswara Colony from


129
2015-16 K.Chiranjeevi (H) to K.Anjaneyulu (H) in Division No.50 6.80 AE-7

638 / Construction of CC Road in Venkateswara Colony from SK.Meeravalli (H) to


130
2015-16 Lillamma (H) in Division No.50 (Reserved for L.C.C.S) 4.90 AE-7

639 / Construction of CC Drains in Somiseeti Srinivasulu (H) to Sumathi (H) at


131
2015-16 Venkateswara Colony in Division No.50 7.00 AE-7

640 / Construction of CC Drainsfrom T.Koteswara Rao (H) to V.Subbaiah (H) & DR.
132
2015-16 Anjaneyulu (H) to V.Nirosh (H) at Venkateswara Colony in Division No.50 9.30 AE-7

641 / Laying of Quarry Rubbish Roads in Venkateswara Colony Internal Roads in Division
133
2015-16 No.50 9.10 AE-7

Laying of Quarry Rubbish Roads in Venkateswara Colony south side for first road
642 /
2015-16 2nd cross road and 4th cross road (Ch.Subbarao house to Sk.Nasarvali house) in 1.55
134 AE-7
Division No.50
Construction of C.C Road and C.C Drain in Matam Bazar from Ayinabathina
643 /
2015-16 Ramanaiah Municipal High School to Gorantla Rambabu house in Division No.49 3.70 AE-7
135
(Reserved for L.C.C.S)
644 / Construction of C.C Drains from Bothula Anjaneyulu house to Jettiveni
136
2015-16 Venkateswarlu house in Sathyanarayana Puram in Division No.49 9.00 AE-7

645 /
2015-16 Raising of C.C Road and Drains in Chowtapalem Bazar in Division No.49 9.20 AE-7
137

646 / Construction of C.C Drains from Rama Kotaiah house to Podala Kotaiah house in
138
2015-16 Indira Nagar in Sathyanarayana Puram in Division No.49 5.50 AE-7

647 / Construction of C.C Drains in Balakrishnapuram from Polugupati Venkata Rao


139
2015-16 house to Yadhala Venkateswarlu house in Division No.49 5.20 AE-7

648 / Construction of C.C Drain on east side of Saroj Mayuri Road in Division No.49
140
2015-16 (Reserved for L.C.C.S) 5.10 AE-7
649 /
2015-16 Raising of C.C Road in Saroj Mayuri Road in Division No.49 6.10 AE-7
141

650 / Construction of C.C Drains from Zetti Tirupathaiah house to Kondepi Omkara Achari
142
2015-16 house near Vijetha Hospital in Sathyanarayana Puram in Division No.49 9.90 AE-7

651 / Construction of C.C Drains from Vaka Nagireddy house upto Pothuraju kaluva in
143
2015-16 Indira Nagar 3rd line in Sathyanarayana Puram in Division No.49 8.50 AE-7

652 /
2015-16 Construction of Internal C.C Drains in Balakrishna Puram in Division No.49 7.50 AE-7
144

653 / Construction of C.C Drain from Pendyala rama krishna house to Gopal nagar 4th
145
2015-16 line extension cross roads in Division No.7 (Reserved for L.C.C.S) 6.80 AE-1

654 / Construction of C.C Road from Kamma Palem 3rd line extension cross roads in
146
2015-16 Division No.7 9.99 AE-1

655 / Construction of C.C Drain from Kodanda Rama Swamy Temple to K.N.S Electronics
147
2015-16 (opp. Jaya lakshmi theatre road) and Dharavari Veedhi in Division No.7 6.00 AE-1

656 /
2015-16 Construction of C.C Drain at Kamma palem 1st line in Division No.7 4.65 AE-1
148

657 /
2015-16 Constsruction of C.C Drain from Srinu Bunk to Karavadi Donka road in Division No.7 10.00 AE-1
149

Construction of C.C Drain from Nama Venkateswarlu house to Nuthalapati


658 /
2015-16 Koteswara rao house (Bollineni vari palem 3rd road 3rd cross road) to Karavadi 6.00
150 AE-1
Donka Road in Division No.7 (Reserved for L.C.C.S)
659 / Construction of C.C Drain in Enugu Chettu Road in Miriyala Palem centare in
151
2015-16 Division No.22 10.00 AE-4

660 /
2015-16 Construction of C.C Drain from ELSR to Zakaraiah Hospital road in Division No.27 4.30 AE-4
152

661 /
2015-16 Construction of C.C Road and C.C Drain in Kesava swamy pet in Division No.27 6.00 AE-4
153

662 / Construction of C.C Road and 100 mm dia A.C Pipe Line in Bheemarajuvari Veedhi
154
2015-16 1st lin in Division No.25 4.70 AE-4

663 /
2015-16 Construction of C.C Drain in Balajirao pet in Division No.25 (Reserved for L.C.C.S) 10.00 AE-4
155

664 /
2015-16 Construction of C.C Drains in Virat Nagar 1st and 2nd cross roads in Division No.43 10.00 AE-7
156

665 /
2015-16 Construction of C.C Drains in Sundaraiah Bhavan road (west side) in Division NO.46 7.60 AE-7
157

666 / Providing C.C Drain from D.No.6-251 to via B.B Towers, Abhinaya Towers towards
158
2015-16 existing culvert in Lawyerpet extension line in Division No.34 4.85 AE-5

667 / Construction of C.C Drain from Hill Towers (ELSR) to Reddy Apartments in Division
159
2015-16 No.31 2.35 AE-5

Construction of C.C Drain from Maruthi Nagar 1st line to towards N.H 5 upto
668 /
2015-16 existing Culvert on north side of Peerla Manyam in Division No.45 (Reserved for 7.60 AE-7
160
L.C.C.S)
669 / Construction of C.C Road from Fire Prasad house to Vysya Hostel in Seetharama
161
2015-16 puram in Division No.31 9.90 AE-5
670 / Construction of C.C Road from Mudhurthi Raghava rao house to Ramalayam
162
2015-16 Temple steps in Seetharamapuram in Division No.31 9.98 AE-5

671 /
2015-16 Construction of C.C Drain in Andhra Kesari Nagar main Road in Division No.43 8.40 AE-7
163

672 / Construction of C.C Roads in Andhra Kesari Nagar 1st and 2nd cross roads in
164
2015-16 Division No.43 2.60 AE-7

673 / Construction of C.C Drain and Quarry Rubbish Road in Harihara Nagar 3rd line
165
2015-16 (Anjaiah Master) in Division No.33 9.95 AE-5

674 / Construction of C.C Drain, C.C Culverts and Quarry Rubbish Road from Sai Srinivasa
2015-16 Towers to Maruthi Rao Apartment in Rajeev Nagar extension area in Division No.34 7.80
166 AE-5

675 / Construction of C.C Road to Harihara Nagar 1st line from Ranga Rao (Doctor) house
167
2015-16 to Chenchurami reddy house in Division No.33 9.80 AE-5

676 / Repairing of C.C Drian from 40 Feet Road to Hindu Burial Ground along Dasaraju
168
2015-16 palle Road & Construction of C.C Culvert at Pothuraju Kaluva in Division No:7 8.75 AE-1

677 /
2015-16 Construction of C.C Patches and B.T Patches in Various Places in Division No:7 6.88 AE-1
169

678 / Construction of C.C Drain South Side Beside of Hindu Burial Ground to Karavadi
170
2015-16 Donka Road in Division No:7 (2nd call) 10.00 AE-1

679 / Construction of C.C Drain and Culvert at K.Subbarayudu H.No.8-51 (near M.P Y.V
171
2015-16 Subba Reddy gari house) in Lawyerpet in Division No.34 0.85 AE-5
TOTAL 1062.49
Download Start Time : 03.03.2016 5.00 P.M
Download End Time : 17.03.2016 5.00 P.M
Receipt of Bids End Time : 17.03.2016 5.15 P.M
Price Bid Opening Time : 17.03.2016 5.30 P.M
680 /
2015-16 Supply and delivery of Stainless Steel Push Carts to Ongole Municipal Corporation 9.80 AE-7
1

681 / Supply and delivery of 80 Liters with LID (HDPE material - virgin quality) Un-
2
2015-16 Breakable Plastic Bins to Ongole Municipal Corporation 7.30 AE-7

682 / Supply, delivery and fixing of Name boards, Sign boards, Direction boards in various
3
2015-16 places in A.E-4 section in Ongole Municipal Corporation 9.60 AE-4

683 / Supply, delivery and fixing of Name boards, Sign boards, Direction boards in various
4 2015-16 9.90 AE-5
places in A.E-3 & A.E-5 section in Ongole Municipal Corporation
684 / Supply, delivery and fixing of Name boards, Sign boards, Direction boards in various
5 2015-16
places in A.E-6 section in Ongole Municipal Corporation 10.00 AE-6

685 / Providing figurative/non-figurative/geometrical/ patterns Art Work on walls Out


6 2015-16 2.70 AE-5
side of Office compund Wall in Ongole Municipal Corporation
686 / Laying of 200 mm dia A.C Pipe Line from Mangamoor Donka to Sundar Nagar in
7 2015-16 9.99 AE-5
Division No.36
687 / Laying of 150 mm dia A.C Pipe Line for improvement of Distribution System in V.I.P
8 2015-16
Road area in Division No.34 & 28 9.99 AE-5

Providing Air Valves to Pumping Gravity Main from Gaddalagunta to Dibbala road
688 /
2015-16 ELSR and Hill Tower ULBR to Kothapatnam Bus Stand ELSRs in Ongole Municipal 9.99
9 AE-5
Corporation
689 / Providing 200 mm dia A.C Pipe Line from Milk Factory east side to Ambedkar
10 2015-16 9.50 AE-6
Statue in Arunodaya Colony in Division No.40
690 / Repairs and Rectification of Leakages in A.E-5 section in Ongole Municipal
11 2015-16 2.00 AE-5
Corporation
691 / Maintenance of Water Supply - Supply and Delivery of Bleaching Powder to Ongole
12 2015-16 1.55 AE-5
Municipal Corporation
692 / Maintenance of Water Supply - Supply and Delivery of Ferric Alum to Ongole
13 2015-16
Municipal Corporation 1.50 AE-5

693 / Laying of 100 mm dia A.C Pipe Line from Yedluri Hari Babu house to Kommuri
14 2015-16 0.985 AE-5
Marthamma house in Division No.17
694 / Maintenance of Water Supply - Transportation and Supply of Water in various
15 2015-16 10.00 AE-6
places in Ongole Municipal Corporation from 01.04.2016 to 15.05.2016
695 / Providing C.C Disposal drain from Sri Sai Surya Heights Apartment to B.R
16 2015-16 10.00 AE-6
Apartment opposite Ongole Public School in Mangamur road in Division No.37
696 / Repairs and Providing 7.5H.P Submersible Motor including all accssories for Drawal
17 2015-16 7.40 AE-4
of Water from Kodandam Bhavi in Division No.22
697 / Construction of C.C Drain East side of Rambabu Hosptal from Lashmaiah house to
18 2015-16
Railway station Road of division No.13 (2nd call) 1.50 AE-2

698 / Providing MS Fabrication Equipment and Articles in Gandhi Park in Ongole


19 2015-16 2.50 AE-5
Municipal Corpoaration
Supply and Erection of Air Blower to 0.9 MGD (Guest House) Filtration Plant & SS
699 /
20 2015-16 Tank-2 16 MLD Air Blower Servicing,165 KVA Transformer Repair at R.R Tank & 5.65 AE-5
New Filter Bed in Ongole Municipal Corporation
700 / Providing 3 HP Motor and 5 HP Motors Fixing to Open Wells Various Places in AE-3
21
2015-16 & AE-5 Sections in Ongole Municipal Corporation 3.40 AE-5

Repairs and Rectification of Motors and Starters and Butterfly Sluice valves Repairs
701 /
22 2015-16 in water works of S.S. Tank-2 Bridge Clarifier Wheel, Hill Tower and R.R. Tank in 2.40 AE-5
Ongole Municipal Corporation
Providing of 12 mtrs High Mast lighting with LED Fittings at SWAMY
702 /
23
2015-16 VEVAKANANDHA STATUE at KOTHA PATAM BUS STAND CENTER in Ongole 3.30 AE-5
Municipality, Ongole.
703 / Drilling of deep bore well and fixing of IM-II Pumpsets at various places in Ongole
24 2015-16
Municipal Corporation 9.99 AE-6

704 / Construction of Damaged Compound wall at Viswas Nagar Burial Ground in


25 2015-16 6.90 AE-5
Division No.31
705 / Repairs to Dumper Placer (Vehicle No: AP 27 W 8172) in Ongole Municipal
26 2015-16 2.75 AE-7
Corporation (2nd call)
706 / Supply and Delivery of Visiontek GL 11 POS Machine to Ongole Municipal
27
2015-16 Corporation (2nd call) 0.99 AE-7

707 /
28 2015-16 Development of Devedu Cheruvu Park in Ongole Municipal Corporation 9.99 AE-5
TOTAL 171.58
Download Start Time : 14.03.2016 5.00 P.M
Download End Time : 28.03.2016 5.00 P.M
Receipt of Bids End Time : 28.03.2016 5.15 P.M
Price Bid Opening Time : 28.03.2016 5.30 P.M
708 /
1 2015-16 Providing 40 HP Motors Re pumping to SS-2 in Ongole Municipal Corporation 9.99 AE-5

709 / Providing 750 KVA Transformer (Stand bye) at SS Tank-2 in Ongole Muncipal
2 2015-16
Corporation 9.99 AE-5
TOTAL 19.98
Download Start Time : 30.03.2016 5.00 P.M
Download End Time : 04.04.2016 5.00 P.M
Receipt of Bids End Time : 04.04.2016 5.15 P.M
Price Bid Opening Time : 04.04.2016 5.30 P.M
1/
1 2016-17 Construction of C.C Internal Drain at Military Colony in Division No:3 (2nd call) 9.99

2/ Construction of C.C Culvert at Dasaradipalli Road Near Balineni Bharath Nagar in


2 2016-17 1.72
Division No:3 (2nd call)
3/
3 2016-17
Construction of C.C Drain from Shaik Rehman House to Rain bow Stickers in 5.30
Division No: 4 (2nd call)
4/ Construction of C.C Drain &Culvert from Basha Tailor Shop to Kayyum House in
4
2016-17 Division No: 4 (2nd call) 2.30

5/
2016-17 Construction of C.C Internal Drains (Lorry la Kunta) in Division No:4 (2nd call) 8.95
5

6/ Construction of C.C Drain From Opp.Ameer House to Community Hall in Division


6
2016-17 No: 4 (2nd call) 1.00

7/
7 2016-17
Providing C.C Drian from Model School to Burial Ground in Prakasam Colony in 6.60
Division No:4 (2nd call)

8/ Construction of C.C Drain & Raising of Road from Antha mallikarjuna house to
wards back side of Saradha balakutir to Anadharao road in Division No.12 (2nd call) 9.25
8 2016-17

9/ Construction of C.C Drain From Sathya Nivas house to Ajantha Silk Carcana in
9
2016-17 Division No.12 (2nd call) 4.75

10 / Construction of Repairs C.C Drain From Pakeerupalem punuri ramesh house to


10
2016-17 Mashumsha Street in Division No.12 (2nd call) 0.95

Construction of C.C Drains from 3rd&4th line Cross Road of Annaparedy Musalaiah
11 / house to Easari gadda yallama house & Annavarapadu main Road 3rd line to
11 2016-17 6.00
Park&Ramnagar 1st line to 2nd line Cross Road at Annavarapadu in Division No.15
(2nd call)
12 / Construction of C.C Drain&Culvert from Ramnagar 8 th line Middle Cross Road
12 2016-17
Vikram School to 7th Line in Division No.15 (2nd call) 3.72

13 / Construction of CC Culvert Balaji nagar first main road 3 cross road. Opp BC Colony
13 2016-17 1.20
at pothurajupalem in Division No.16 (2nd call)
14 / Construction of C.C Drain & Culvert from Bhagya Nagar 4th line to Housing Board
14 2016-17
Park in Division No: 19 (2nd call) 9.99

15 / Construction of C.C Culverts at Daravarithota 4th line Hotel Surover Cross Road in
15 2016-17 0.99
Division No:20 (2nd call)
16 / Providing of C.C. Drain from Bhagya Nagar 2nd Line A.Venkateswarlu House to
16 2016-17 1.55
Bhagyanagar 3rd Line Existing CC Road in Division No: 20 (2nd call)
Providing C.C. Road from Kodali Yedukondalu House to Kondaiah House at
17 /
2016-17 Bhagyanagar 2nd Line (Old Rama krishna School Back side) in Division No: 20 (2nd 0.67
17
call)
18 / Construction of C.C. Drain & Culvert from Maruthi Apartment opp. Road at
18 2016-17
Dharavari Thota in Division No:21 (2nd call) 1.75

19 / Construction of CC Drain & Culvert from C.S.R. Sarma College to Ambethkar Bhavan
19 2016-17 4.30
Road in Division No: 21 (2nd call)
20 /
2016-17 Providing C.C Road at Santhi Nagar in Division No:21 (2nd call) 1.15
20

21 / Construction of C.C.Drain P.V Subba Rao House to Medhra Valla Vari Veedi in
21 2016-17 2.38
Division No.22 (2nd call)
22 / Providing CC.Patch & C.C.Drain at Venugopala Swamy Temple Street in Division
22 2016-17 10.00
No.22 (2nd call)
23 / Construction of C.C.Drain & Road opp Ramalayam at Ganuga Palem in Division
23 2016-17 3.93
No.23 (2nd call)
24 / Construction of Damaged Culvers & C.C.Drain Kota Veedi & Mangala Palem in
24 2016-17
Division No.23 (2nd call) 6.40

25 / Construction of C.C.Drain from Andhra Bank to Sivalayam in Division No.27 (2nd


25 2016-17 5.60
call)
26 / Construction of C.C.Drain C.C.Culverts at zakaraya Hospatal Road in Division No.27
26 2016-17 4.60
(2nd call)

Construction of Damaged C.C Drain from South Bye Pass to towards V.I.P Road 1
27 /
27 2016-17 to7 Cross Road's & Approches (Sri sai School of Nursing 8-231 to 36-071-110, 6.70
Annapurna Nilayam, 8-153, Axis Bank A.T.M Road) in Division No.35 (2nd call)

28 / Providing C.C. Road & Culvert from Nirmal Nagar Park Road (Beside Kakumani
28
2016-17 Rangaiah House) to End of the Road in Division No.36 (2nd call) 1.15

Raising of CC Drain (Road Side) Wall & Desiltation from Pallu Subbaiah House to
29 /
29 2016-17 Challa & R.K. Lake view Apartment Near Ayyappa Swamy Temple Main Gate (Ranga 2.40
Raidu Cheruvu Back Side) Kalanikethan in Division No.36 (2nd call)

30 / Providing CC.Drain from Pundari Kakshaiah House to Sankar Fast Food in


30 2016-17
M.M.Road at Ayappa Swamy Temple Street in Division No.36 (2nd call) 1.57

31 / Construction of C.C Drain & Damaged C.C.Drain from Chidithoti Jeevan Nilayam to
31 2016-17 1.50
Anjaiah Road in Nirmal Nagar Park Road in Division No.36 (2nd call)

Construction of C.C Road, CC Drain & R.C.C. Culverts from Sundarnagar 2nd Line
32 /
32 2016-17 Extention to end of the Road (Near Narayana Public School) in Division No.36 (2nd 7.45
call)
33 / Construction of CC Drains in Kurnool Road from ST Xaviers School back wall to Sasi
33 2016-17 3.40
Sekhar Nilayam in Division No.45 (2nd call)
34 / Construction of CC Drains Ratna Towers to Machikallapati Prasad in Division No.45
34
2016-17 (2nd call) 5.30

35 / Construction of CC Drains in Ch.Rambabu (H) to SK.Nazorvali (H) at Venkateswara


35
2016-17 Colony in Division No.50 (2nd call) 5.70
36 / Construction of CC Drains in Juvidha Maseedu to Jallipalli Anjaneyulu (H) at Nehru
36 2016-17 6.60
Nagar 3rd lane in Division No.50 (2nd call)
37 / Construction of C.C Drain on east side of Saroj Mayuri Road in Division No.49 (2nd
37 2016-17 5.10
call)
38 /
38 2016-17 Construction of Internal C.C Drains in Balakrishna Puram in Division No.49 (2nd call) 7.50

39 / Construction of C.C Drain from Pendyala rama krishna house to Gopal nagar 4th
39 2016-17
line extension cross roads in Division No.7 (2nd call) 6.80

40 / Construction of C.C Drain from Kodanda Rama Swamy Temple to K.N.S Electronics
40
2016-17 (opp. Jaya lakshmi theatre road) and Dharavari Veedhi in Division No.7 (2nd call) 6.00

41 /
41 2016-17 Construction of C.C Drain at Kamma palem 1st line in Division No.7 (2nd call) 4.65

42 / Construction of C.C Drains in Sundaraiah Bhavan road (west side) in Division NO.46
42 2016-17 7.60
(2nd call)

43 / Providing C.C Drain from D.No.6-251 to via B.B Towers, Abhinaya Towers towards
43
2016-17 existing culvert in Lawyerpet extension line in Division No.34 (2nd call) 4.85

44 / Construction of C.C Drain from Maruthi Nagar 1st line to towards N.H 5 upto
44 2016-17
existing Culvert on north side of Peerla Manyam in Division No.45 (2nd call) 7.60

Repairing of C.C Drian from 40 Feet Road to Hindu Burial Ground along Dasaraju
45 /
2016-17 palle Road & Construction of C.C Culvert at Pothuraju Kaluva in Division No:7 (2nd 8.75
45
call)
46 / Construction of C.C Patches and B.T Patches in Various Places in Division No:7 (2nd
46 2016-17
call) 6.88

47 / Construction of C.C Drain South Side Beside of Hindu Burial Ground to Karavadi
47 2016-17 10.00
Donka Road in Division No:7 (3rd call)
48 / Drilling of deep bore well and fixing of IM-II Pumpsets at various places in Ongole
48 2016-17 9.99
Municipal Corporation (2nd call)
TOTAL 242.53
Download Start Time : 02.04.2016 5.00 P.M
Download End Time : 11.04.2016 5.00 P.M
Receipt of Bids End Time : 11.04.2016 5.15 P.M
Price Bid Opening Time : 11.04.2016 5.30 P.M
Supply of Outsourcing workers for maintenance of Street Lighting and Water
49 /
2016-17 Supply Pump houses for the year 2016-17 in Ongole Municipal Corporation 40.70
1
(Reserved for L.C.C.S)
Supply of Outsourcing workers for maintenance of Water Supply Distribution Lines
50 /
2016-17 and Borewells for the Year 2016-17 in Ongole Municipal Corporation (Reserved for 97.60
2
L.C.C.S)
Supply of Outsourcing workers for maintenance of Municipal Parks and Watch &
51 /
3 2016-17 ward Municipal Office premises for the year 2016-17 in Ongole Municipal 18.00
Corporation (Reserved for L.C.C.S)
Supply of Outsourcing workers to assist Municipal Assistant Engineers for
52 /
4 2016-17 developmental works for the year 2016-17 in Ongole Municipal Corporation 52.10
(Reserved for L.C.C.S)
Engaging Computer Data Entry Operators through outsourcing agencies on
53 /
2016-17 contract basis for the Year 2016-17 in Ongole Municipal Corporation (Reserved for 26.10
5
L.C.C.S)
54 / Supply of Outsourcing workers for Drivers for the year 2016-17 in Ongole
6 2016-17
Municipal Corporation (Reserved for L.C.C.S) 8.15
TOTAL 242.65
Download Start Time : 04.04.2016 5.00 P.M
Download End Time : 18.04.2016 5.00 P.M
Receipt of Bids End Time : 18.04.2016 5.15 P.M
Price Bid Opening Time : 18.04.2016 5.30 P.M
55 / Providing Plaster of Paris Ceiling at Balabavan Green Rooms in Ongole Municipal
1 2016-17
Corporation 0.86 AE-5

56 /
2 2016-17 Filling for Tank at Mukthinuthalapadu (Current Motor &Oil Motor) in Division No:2 0.999 AE-1

57 / Construction of C.C Culverts from Mini Bye pass Road at Gopal nagar 5th line in
3 2016-17 0.89 AE-1
Division No:7
58 / Construction of C.C Culverts from Mini Bye pass Road at Gopal nagar 6th line in
4
2016-17 Division No:7 0.925 AE-1

59 / Laying of 200 mm dia A.C Pipe Line from Raghavendra swami temple to Agrharam
5
2016-17 gate in Division No.13 2.35 AE-2
TOTAL 6.024
Download Start Time : 06.04.2016 5.00 P.M
Download End Time : 13.04.2016 5.00 P.M
Receipt of Bids End Time : 13.04.2016 5.15 P.M
Price Bid Opening Time : 13.04.2016 5.30 P.M
60 / Providing Sound System and Stage Lighting to Balabavan in Ongole Municipal
1 2016-17
Corporation 9.45 AE-5

61 /
2016-17 Providing Wall Panelling to Balabavan in Ongole Municipal Corporation 9.20 AE-5
2

62 / Providing Ceilling under Deck Insulaltion with Tinsheets or Asbestos to Dias of


3 2016-17 9.50 AE-5
Balabavan in Ongole Municipal Corporation
63 / Providing Ceilling under Deck Insulaltion with Tinsheets or Asbestos to Hall of
4 2016-17
Balabavan in Ongole Municipal Corporation 4.80 AE-5

64 / Laying of A.C Pipe Line From Along 40" Road Gopal Nagar 5th Line to Karavdidonka
5 2016-17 8.17 AE-1
Road at Kalikamma Temple in Division No:7
65 / Drilling of Deep Bore Well and Fixing of IM-II Pumpsets at various places of 9th to
6 2016-17 7.55 AE-2
16th Divisions in Ongole Municipal Corporation
TOTAL 48.67
Download Start Time : 07.04.2016 5.00 P.M
Download End Time : 21.04.2016 5.00 P.M
Receipt of Bids End Time : 21.04.2016 5.15 P.M
Price Bid Opening Time : 21.04.2016 5.30 P.M
Ongole Municipal Corporation - 13th Finance Commission Grant 2014-15 -
66 /
1 2016-17 Providing C.C Strom Water Drain from opp of Rajamatha Towers Road to Sai Baba 37.00 AE-2
Temple of 14th Division in Ongole Municipal Corporation
Desiltation of Drains Subbarami reddy statue to throughBack side Rambabu
67 / hospital to Agharam Railway gate of 13th Division, Annavarapadu road sai baba
2016-17 temple up to agraharam railway gate in 14th Division, Anad rao ccs police station 6.70
2 AE-2
to rail way track
68 / Desiltation of Drain at Div No.17 to 21 in AE-3 Section in Ongole Municipal
3 2016-17 7.00 AE-3
Corporation
69 / Desiltation of Drains at Various Places in AE-4 Area in Ongole Municipal
4 2016-17
Corporation 6.00 AE-4

70 / Desiltation of Drains at Division no - 28 to 36 in AE-V section in Ongole Municipal


5 2016-17 8.00 AE-5
Corporation
71 / Desiltation of Drains at Guntur road,40"feet road,60"feet road and at Ganapathi
6 2016-17 7.09 AE-7
Nagar in A.E-7 section in Ongole Municipal Corporation
72 / Providing Chain Link Mesh Fencing under Kurnool Road Fly Over Junction north
7
2016-17 side in Ongole Municipal Corporation 10.00 AE-7

73 / Providing Chain Link Mesh Fencing under Kurnool Road Fly Over Junction south
8
2016-17 side in Ongole Municipal Corporation 10.00 AE-7

74 / Providing Central Lighting to Bandlamitta Centre Main Road in Ongole Municipal


9
2016-17 Corporation 9.99 AE-5

75 / Laying of 100 mm AC Pipe line in C.R.P Quarters End Kummaripalem (Ganjisetty


10
2016-17 Kotaiah) Interconction of Division No.30 6.20 AE-5

76 / Laying of 150 mm dia A.C Pipe line on south side side of Kurnool Road from
11 2016-17 8.65 AE-4
Magunta Subbaramireddy Statue to Sundaraiah Bhavan in Division No.24
77 / Laying of 200 mm Dia AC Pipe Line from RR Tank to Vinayaka Swamy Temple In
12 2016-17
Division No:24 10.00 AE-4

78 / Laying of 150 mm Dia AC Pipe Line fromVinayaka Swamy Temple to Addanki Bus
13 2016-17 10.00 AE-4
Stand In Division No:24
79 / Manufacturing, supplying and fixing of Office Cubical Work Stations at J.T.O Room
14 2016-17
& Town planning Cell in Ongole Municipal Corporation main building 9.55 AE-5
TOTAL 146.18
Download Start Time : 12.04.2016 5.00 P.M
Download End Time : 26.04.2016 5.00 P.M
Receipt of Bids End Time : 26.04.2016 5.15 P.M
Price Bid Opening Time : 26.04.2016 5.30 P.M
80 / Supply of Car on Hire Basis to Municipal Commissiner for the Year 2016-17 in
1 2016-17 2.68 AE-7
Ongole Municipal Corporation
81 / Supply of Car on Hire Basis to Assistant Commissiner for the Year 2016-17 in
2
2016-17 Ongole Municipal Corporation 2.68 AE-7

82 / Providing A.C Pipe Line from NTR Colony 4th line starting (Old age home) to
3
2016-17 Bharath Colony (At Culvert) in Division no 3 10.00 AE-1

83 / Supply of Car on Hire Basis to Municipal Engineer for the Year 2016-17 in Ongole
4
2016-17 Municipal Corporation 2.68 AE-7

84 / Supply of Car on Hire Basis to Assistant City Planer for the Year 2016-17 in Ongole
5 2016-17 2.68 AE-7
Municipal Corporation
85 / Rectification of varoius leakages at Various places in 37 to 42 Divisions in Ongole
6 2016-17
Municipal Corporation 4.35 AE-6
86 / Rectification of leaks at various places of Div.no.43 to 50 in Ongole Municipal
7 2016-17 2.15 AE-7
Corporation
87 / Providing A.C Pipe Line from Ramu House (At Culvert) to Masjid in Bharath Colony
8 2016-17 4.20
in Division no 3
88 /
9 2016-17 Desiltation of Drain in A.E - 1 in Divisions 1 to 8 in Ongole Municipal Corporation 4.00 AE-1

89 /
10 2016-17 Desiltation of Drains in division no 37 to 42 in Ongole Municipal Corporation 3.00 AE-6

90 / Desiltation of Drain at Maruthi Nagar,Anjaiah Road North Side,Pandariripuram at


11
2016-17 Kurnool Road Flyover in Ongole Municipal Corporation 2.30 AE-7

91 / Construction of Balance CC Drain From Ganghar Hardwares to MSR Statue Cross


12 2016-17 1.00 AE-4
Road in kurnool road south side Division No:24
92 / Construction of Balance CC Drain From Anjaneya Jewalary to Ganghar Hardwares in
13 2016-17 1.00 AE-4
kurnool road south side in Division No:24
93 / Construction of Balance CC Drain in Kurnool Road South side from Sangeetha
14 2016-17
mobiles to Sagar Agenicies Division No:24 1.00 AE-4

94 / Construction of Balance CC Drain & providing Manholes in front of MSR Statue


15 2016-17
Kurnool Road Division No:24 0.95 AE-4

95 / Construction of culverts and approches& pipe line repairs in Kurnool Road( MSR
16 2016-17 0.58 AE-4
STATUE) Division No:24
96 / Filling for Tank at Vengamukkala palem (Current Motor &Oil Motor) in Division
17
2016-17 No:18 0.99 AE-5

97 / Repairs and Rectification of Vengamukkalapalem R.O Plant Filter Midia Change at


18
2016-17 Division No.18 0.995 AE-5

Fixing of 315 KVR Stand bye Transformer on Hire Basic fROM APSEB Including cost
98 / of H.T Cable kit 240 Sqm Alluminiaum Cable and fixing of 630 Amps change our
switch with Nessaery Acceries in SS Tank-2 Excluding hire charges in Ongole 1.15
19 2016-17 AE-5
Municipal Corporation

Additional Pumping for filling of SS Tank-2 Providing Old 25 H.P Motors fixing with
99 / base Plate with Required section pipes, Delivery pipes in and 75 H.P Motors
20 2016-17 3.50 AE-5
Barings and Pump Repairs at Clear water Pump House at SS Tank-2 in Ongole
Municipal Corporation
100 / Filling of S.S tank-2 at Yarajarla Road with additional motors(Current Motor &Oil
21 2016-17 0.99 AE-5
Motor) in Ongole Municipal Corporation
101 /
22 2016-17 Providing Galvanised Sheet Shed at SS Tank-2 in Ongole Municipal Corporation 3.50 AE-5

Painting with Synthetic Enamel Paint to Sri Dr.B.R Ambedkar, Sri Damodaram
102 /
2016-17 Sanjeevaiah, Sri Gurram Jashuva and Sri Prakasam Panthulu Status in various 1.50
23 AE-2
places in Ongole Municipal Corporation
TOTAL 57.875
Download Start Time : 12.04.2016 5.00 P.M
Download End Time : 19.04.2016 5.00 P.M
Receipt of Bids End Time : 19.04.2016 5.15 P.M
Price Bid Opening Time : 19.04.2016 5.30 P.M
103 / Construction of CC Drain at Revenue Colony in Div No:43 in Ongole Municipal
1
2016-17 Corporation Under 13th Finance Commission Grant for year 2014-15 15.00

104 / Laying of 150 mm and 100 mm dia A.C.Class-15 Distrubution pipe line in Ganapathi
2 2016-17
Nagar in Division.No.43 of Ongole Municipal Corporation 20.00

106 / Laying of 150 mm dia A.C Pipe Line from Bhagya Nagar 4th line Arch to Velugu
3 2016-17 9.99 AE-5
Office in Division No.19
107 / Providing Quarry Rubbish Road in Peerlamanyam Main Road in Kurnool road in
4 2016-17 5.50 AE-6
Division No.39
108 / Providing Quarry Rubbish road in Internal Roads in south side of main road in
5 2016-17
Peerlamanyam (Kurnool road) in Division No.39 6.00 AE-6

109 / Providing Quarry Rubbish Road in Internal Roads in north side of main road in
6 2016-17 5.40 AE-6
Peerlamanyam (Kurnool road) in Division No.39
110 / Providing C.C Drain in North side in Main road in Peerlamanyam (Kurnool road) in
7 2016-17 10.00 AE-6
Division No.39
111 / Providing C.C Drain in south side in Main road (Reach-I) (From 3rd line to 14th line)
8 2016-17
in Peerlamanyam (Kurnool road) in Division No.39 10.00 AE-6

112 / Providing C.C.Drains from Karri Srinivasrao house in Manikanta Nagar to Ambedkar
9 2016-17
statue in Arunoday Colony in Division No.39 10.00 AE-6

113 / Providing Quarry Rubbish Road from Mangamur road to Datta Peetham in Division
10 2016-17 10.00 AE-6
No.40
114 / Providing 150 mm dia A.C Pipe Line from Bunda Road to Becan Gardens in Division
11
2016-17 No.13 3.60 AE-2

115 / Providing C.C Patches in various places in A.E-1 Section in Ongole Municipal
12
2016-17 Corporation 5.78 AE-1

116 / Providing C.C Patches in various places in A.E - 3 & A.E - 5 Section in Ongole
13
2016-17 Municipal Corporation 9.90 AE-5

Engaging of Man Mazdoor,Cutting of CC Road and Hiring of Pumpsets for Bailout


117 /
14 2016-17 Water for Maintance of Water supply in A.E-3 & A.E-5 section in Ongole Municipal 6.40 AE-5
Corporation
118 / Construction of C.C Drain From Subba ramireddy Statue line to Eseva culvert back
15 2016-17 8.00 AE-4
side in Division No:24
119 / Construction of C.C Drain from Fish Market to Subb Rami Reddy statue line in
16
2016-17 Division No.24 6.61 AE-4

120 / Construction of C.C Drian in Hindhu Burial Ground to Kurnool road in Division
17
2016-17 No.24 5.19 AE-4
TOTAL 147.37
Download Start Time : 22.04.2016 5.00 P.M
Download End Time : 06.05.2016 5.00 P.M
Receipt of Bids End Time : 06.05.2016 5.15 P.M
Price Bid Opening Time : 06.05.2016 5.30 P.M
121 / Providing C.C.Drain in South side in Main road (Reach-II) (From Kotha donka to 3rd
1 2016-17
line) in Peerlamanyam (Kurnool road) in Division No.39 3.00 AE-6

122 / Levelling of Site at S.S Tank-II Water works (Compound wall area) in Mamidi Palem
2 2016-17 3.00 AE-5
in Division No. 32
123 / Supply of Car on Hire Basis to Examiner for the Year 2016-17 in Ongole Municipal
3 2016-17 2.68 AE-7
Corporation
125 / Providing B.T Patches in various places from 11 to 15th Divisions in A.E 2 Section
4 2016-17 5.00 AE-2
in Ongole Municipal Corporation
126 / Providing B.T Patches in various places from22 to 27th Divisions in A.E-4 Section
5 2016-17 2.95 AE-4
in Ongole Municipal Corporation
127 / Laying of B.T Patches in varoius places of A.E - 3 & A.E - 5 Section in Ongole
6 2016-17
Municipal Corporation 3.00 AE-5

128 / Construction of C.C Drain From Muttun Market at Vegitable Market in Division No:
7 2016-17 2.05 AE-4
24
129 / Construction of Compound wall of Open place at Marati palem of Bundar road in
8 2016-17 3.50 AE-2
Division No.12
130 / Construction of Compound wall of Narayanarao School and CC Drain &Culvert
9
2016-17 From Kirana shop to Asha supply shop Road in Division No.12 3.00 AE-2

131 / Providing C.C Road and Dismantling of Statue Coloum at Removed Vivekananda
10 2016-17 1.30 AE-2
Statue place at Kothapatnam Bus stand centre in Division No.12

132 / Repairs to Wells (Bheema rajula vari veedhi, side side tyaga raju mandiram and
11 2016-17
Kanyaka Parameswari Street) in Division No:25 (Reserved for L.C.C.S) 0.95 AE-4

133 / Repairs to Well Enuguchettu Vemurikota School and New filter bed in Division
12 2016-17 0.98 AE-4
No:22 (Reserved for L.C.C.S)
134 /
13 2016-17 Repairs to Well at Mangali Palem in Division No:24 (Reserved for L.C.C.S) 0.79 AE-4

135 / Fixing of MS Grills (Open Well) at Vijayanagar Colony in Division No.31 (Reserved
14
2016-17 for L.C.C.S) 0.52 AE-5

136 / Costruction of Damaged Open Wells at Vijayanagar Colony in Division No.31


15
2016-17 (Reserved for L.C.C.S) 0.93 AE-5

Supply of Labour for Watch and Ward and Petrolling along Irrigation canal from
137 /
16 2016-17 gundlakamma Project to Yedugundlapadu Raw Water Sump House in 0.999 AE-1
MARCH ,2016 (Reserved for L.C.C.S)
138 / Providing Plaster of Paris Ceiling at Balabavan Green Rooms in Ongole Municipal
17 2016-17 0.86 AE-5
Corporation (2nd call)
139 / Construction of Compound Wall for Bandila Doddi and Ram Nagar High School in
18
2016-17 Division No.15 3.50 AE-2

140 / Providing C.C Road Patches at various places in A.E-II section in Ongole Municipal
19
2016-17 Corporation 2.50 AE-2
TOTAL 41.509
Download Start Time : 22.04.2016 5.00 P.M
Download End Time : 29.04.2016 5.00 P.M
Receipt of Bids End Time : 29.04.2016 5.15 P.M
Price Bid Opening Time : 29.04.2016 5.30 P.M
141 / Construction of C.C Drain &Culvert from Basha Tailor Shop to Kayyum House in
1 2016-17 2.30
Division No: 4 (3rd call)
142 /
2016-17 Construction of C.C Internal Drains (Lorry la Kunta) in Division No:4 (3rd call) 8.95
2
143 / Construction of C.C Drain From Opp.Ameer House to Community Hall in Division
3 2016-17 1.00
No: 4 (3rd call)
144 / Construction of C.C Drain From Sathya Nivas house to Ajantha Silk Carcana in
4 2016-17 4.75
Division No.12 (3rd call)
145 / Construction of Repairs C.C Drain From Pakeerupalem punuri ramesh house to
5 2016-17 0.95
Mashumsha Street in Division No.12 (3rd call)
146 / Construction of C.C Culverts at Daravarithota 4th line Hotel Surover Cross Road in
6 2016-17
Division No:20 (3rd call) 0.99

Providing C.C. Road from Kodali Yedukondalu House to Kondaiah House at


147 /
2016-17 Bhagyanagar 2nd Line (Old Rama krishna School Back side) in Division No: 20 (3rd 0.67
7
call)
148 / Construction of C.C. Drain & Culvert from Maruthi Apartment opp. Road at
8 2016-17 1.75
Dharavari Thota in Division No:21 (3rd call)
149 / Construction of Damaged Culvers & C.C.Drain Kota Veedi & Mangala Palem in
9 2016-17 6.40
Division No.23 (2nd call)
150 / Construction of CC Drains in Kurnool Road from ST Xaviers School back wall to Sasi
10 2016-17
Sekhar Nilayam in Division No.45 (3rd call) 3.40

151 / Construction of C.C Drain from Pendyala rama krishna house to Gopal nagar 4th
11 2016-17
line extension cross roads in Division No.7 (3rd call) 6.80

152 / Construction of C.C Drain from Kodanda Rama Swamy Temple to K.N.S Electronics
12
2016-17 (opp. Jaya lakshmi theatre road) and Dharavari Veedhi in Division No.7 (3rd call) 6.00

153 /
13 2016-17 Construction of C.C Drain at Kamma palem 1st line in Division No.7 (3rd call) 4.65

154 / Providing C.C Drain from D.No.6-251 to via B.B Towers, Abhinaya Towers towards
14
2016-17 existing culvert in Lawyerpet extension line in Division No.34 (3rd call) 4.85

155 / Construction of C.C Patches and B.T Patches in Various Places in Division No:7 (3rd
15 2016-17 6.88
call)
156 / Drilling of deep bore well and fixing of IM-II Pumpsets at various places in Ongole
16 2016-17
Municipal Corporation (3rd call) 9.99

157 / Drilling of Deep Bore Well and Fixing of IM-II Pumpsets at various places of 9th to
17 2016-17 7.55 AE-2
16th Divisions in Ongole Municipal Corporation (2nd call)
158 / Desiltation of Drain in A.E - 1 in Divisions 1 to 8 in Ongole Municipal Corporation
18 2016-17 4.00 AE-1
(2nd call)
159 / Desiltation of Drains in division no 37 to 42 in Ongole Municipal Corporation (2nd
19 2016-17
call) 3.00 AE-6

160 / Desiltation of Drain at Maruthi Nagar,Anjaiah Road North Side,Pandariripuram at


20
2016-17 Kurnool Road Flyover in Ongole Municipal Corporation (2nd call) 2.30 AE-7

161 / Laying of Quarry Rubbish Raods from P.Narayanamma house to Sk.Yeshobu house
21 2016-17 0.56 AE-7
in Nehru Nagar extension in Division No.50
162 / Construction of Man Hole Pit and Pre-cast Slabs Fixing on Existing Drain at the
22 2016-17 0.70 AE-6
House of S.N Padu M.L.A in Division No:38
163 /
2016-17 Supply and delivery of Dog Cannels to Ongole Municipal Corporation 2.00 AE-7
23
164 / Providing B.T Patches in various places in A.E-7 Section in Ongole Municipal
24 2016-17 1.30 AE-7
Corporation
165 / Construction of CC Drains and Quarry Rubbish Road from Kasi Reddy (H) to Ramesh
25 2016-17 4.40 AE-7
(H) in maruthi Nagar in Division No.44
166 / Supply and Delivery of Children Play Equirement Items Fixing at Gandhi Park in AE-
26 2016-17 2.50
Ongole Municipal Corporation 5
TOTAL 98.64
Download Start Time : 28.04.2016 5.00 P.M
Download End Time : 05.05.2016 5.00 P.M
Receipt of Bids End Time : 05.05.2016 5.15 P.M
Price Bid Opening Time : 05.05.2016 5.30 P.M
S.C.S.P Grant 2013-14 - Construction of C.C Drain From Kotapuri Prabhakar House
167 / AE-
1 2016-17 to Mudigonda Vagu(SC Colony)Throvagunta in Division No:1 in Ongole Municipal 10.00 1
Corporation (2nd call)
168 / Construction of C.C Road & C.C Drain from Bhajana Koteswramma House (Gopal
2 2016-17 3.42 AE-1
Nagar 4rd Cross Road) to Kareti House Division No:6 (2nd call)
169 / Raising of CC Road From Kurnool Road to Dibbalaroad ELSR in Division No.48 (2nd
3
2016-17 call) 8.00 AE-7

170 / Construction of C.C Drain from Koduri Venkatadri House to Reddy Kirana Shop
4
2016-17 Gopal Nagar 1st line Left side Drain in Division No:5 (2nd call) 3.30 AE-1

171 / Raising of CC Road to Venkateswara Nagar 3rd Cross Road from 0-150 mts in
5
2016-17 Division No.47 (2nd call) 9.70 AE-7

172 / Construction of First Floor and Repairs to N.T.R Kala Pranganam in Pernamitta in
6
2016-17 Ongole Municipal Corporation (2nd call) 10.00 AE-
6

Construction of C.C Road From Mandava Gangadar House to Ramesh


173 /
7 2016-17 House,Nalamothu Rambabu House to Mandava Koteswra Rao House Devudumitta 8.95 AE-1
To Cherala Road & Devudumitta To Park in Division No:1 (2nd call)

174 / Providing C.C. Road From Katari Narasimharao House to Pendyala Surendra at
8 2016-17 9.98 AE-3
Cheruvukommupalem in Division No.18 (2nd call)

Providing Strength of Walking Track & Providing Quarry Rubbish Road From
175 /
2016-17 Raccha banda to Upputuri Subbaiah House at BC Colony & Construction of Culvert 8.90
9 AE-1
at ZP High School Near Masjid in Throvagunta in Division No:1 (2nd call)

176 / Providing C.C. Road From Pendyala Surendra House to Venkayya Swami Temple at
10 2016-17 9.65 AE-3
Cheruvukommupalem in Division No.18 (2nd call)

177 / Providing C.C. Road From Kalluri Narasimha Rao House to Pendyala Venkata Rao
11
2016-17 (C.C. Road Conection) at Cheruvukommupalem in Division No.18 (2nd call) 9.98 AE-3

178 / Providing C.C. Road From Komataneni Ramesh House to Gonugunta Sesha Rao
12 2016-17 5.50 AE-3
House at Cheruvukommupalem in Division No.18 (2nd call)
179 / Providing C.C. Road From Vetarnary Hospital to Krishna Mandiram at
13 2016-17
Cheruvukommupalem (Opp. Panchayat Office) in Division No.18 (2nd call) 7.65 AE-3

180 / Construction of C.C Drains from Adusumalli Yalamanda House to Radha Krishna
14 2016-17 3.82 AE-1
Murthy House in Division No:6 (2nd call)
181 / Construction of C.C Road from Boddu Ray Ending Road to Masthan Chettu at
15 2016-17 7.55 AE-1
Throvagunta in Division No:1 (2nd call)
182 / Construction of CC Drains and RCC Slab Culvert at Saraswathi Sisu Mandir road in
16 2016-17 5.00 AE-7
Division No.47 (2nd call)
183 / Providing Chain Link Mesh Fencing at Kurnool Road Fly Over north side 2nd bit in
17 2016-17 10.00 AE-7
Ongole Municipal Corporation
184 / Providing Chain Link Mesh Fencing at Kurnool Road Fly Over south side 2nd bit in
18 2016-17
Ongole Municipal Corporation 10.00 AE-7

185 / Providing Chain Link Mesh Fencing on east side of Guntur Raod from Pothuraju
19 2016-17 10.00 AE-7
Canal Bridge to towards north Bye-Pass in Division No.50
186 / Providing Chain Link Mesh Fencing on west side of Guntur Road from Pothuraju
20 2016-17 10.00 AE-7
Canal Bridge to towards north Bye-Pass Road in Division No.50
187 /
2016-17 Supply and delivery of C.I Valves and C.I Materials to Ongole Municipal Corporation 10.00
21 AE-7

Construction of C.C Drains from Uma Manovikasa Kendram to G.Subba reddy


188 /
22 2016-17 house and Revenue Colony main road culvert to Kasi reddy house in Maruthi Nagar 7.90 AE-7
in Division No.44
189 / Providing 100 mm dia A.C Pipe Line from Kurnool road to Virat Nagar in Division
23 2016-17
No.43 6.25 AE-7

190 / Construction of C.C Drain from Kurnool Road to Sri Sai Ram Nilayam (Ravi
24 2016-17 9.20 AE-7
Anjaneyulu vari veedhi) in Division No.46
191 / Construction of C.C Drain from Sundaraiah Bhavan Main road east side in Division
25
2016-17 No.46 10.00 AE-7

192 / Construction of C.C Drain from Lambadi Donka Main Road east side in Division
26
2016-17 No.46 6.90 AE-7

Construction of C.C Drain from Lambadi Donka west side and C.C Drain and C.C
193 /
27 2016-17 Road in Brundavan Nagar 2nd line (P.Ravi Nilayam to Sk.Meeravali house) in 7.20 AE-7
Division No.46
194 / Construction of C.C Drain from Municipal Reserved site (Brundavan Nagar) to R.T.C
28 2016-17 9.40 AE-7
Bus Stand Road in Division No.46
195 / Construction of Balance C.C Drain From Arya Bhavan Hotel to RTC Middle gate in
29 2016-17 7.30 AE-1
kurnool road south side in Division No:24
TOTAL 235.55
Download Start Time : 29.04.2016 5.00 P.M
Download End Time : 13.05.2016 5.00 P.M
Receipt of Bids End Time : 13.05.2016 5.15 P.M
Price Bid Opening Time : 13.05.2016 5.30 P.M
196 / Maintenance of Water Supply - Transportation and Supply of Water in various
1 2016-17
places in Ongole Municipal Corporation from 15.05.2016 to 31.06.2016 10.00 AE-6

197 / Rectification of varoius leakages at Various places in 37 to 42 Divisions in Ongole


2 2016-17 4.35 AE-6
Municipal Corporation
Repair and Rectfication of Morters and Starters to SS Tank-1&2 75 Hp Clear Water
198 /
2016-17 & 35 Hp M.F KIRLOSKAR Punp&Water Supply Genaral Maintence in Ongole 4.80
3 AE-5
Municipal Corporation
199 / Construction of Balance C.C Drain at Harihara Nagar 1st line East Side Division
4 2016-17 0.66 AE-5
No:33
200 / Providing 900 mm dia R.C.C Pipe Culvert Main Cross Roads in Pelluru in Division
5 2016-17 0.60 AE-5
No.17
Supply, Delivery and Fixing of Np3 Cement pipes For Culverts and Speed Brakers at
201 /
2016-17 Various places in 1 to 8 Divisions in Ongole Municipal Corporation (Reserved for 0.999
6 AE-1
L.C.C.S)
202 / Supply and Delivery of Material for Maintenance of Post Hole Digger and 12 "
7 2016-17 0.94 AE-2
Augar in Ongole Municipal Corporation (Reserved for L.C.C.S)
TOTAL 22.35
Download Start Time : 05.05.2016 5.00 P.M
Download End Time : 12.05.2016 5.00 P.M
Receipt of Bids End Time : 12.05.2016 5.15 P.M
Price Bid Opening Time : 12.05.2016 5.30 P.M
203 / Maintenance of Water Supply - Transportation and Supply of Water in various
1 2016-17 10.00 AE-6
places in Ongole Municipal Corporation
204 / Supply, Delivery and Fixing of Video Display Screen in Gandhi Park in Ongole
2
2016-17 Municipal Corporation 9.99 AE-5

205 / Renovation of Kerb Walls and Interloking System at Gandhi Park in Ongole
3
2016-17 Municipal Corporation 9.99 AE-5

206 / Construction of Compound Wall to Segregation Shed at New Filter Bed in Ongole
4
2016-17 Municipal Corporation 8.60 AE-7

207 / Construction A.C Shed for Sterlised (Stray Dogs) at Veterinary Hospital in Ongole
5
2016-17 Municipal Corporation 1.50 AE-7
TOTAL 40.08
Download Start Time : 24.05.2016 5.00 P.M
Download End Time : 01.06.2016 5.00 P.M
Receipt of Bids End Time : 01.06.2016 5.15 P.M
Price Bid Opening Time : 01.06.2016 5.30 P.M

208 / S.C.S.P Grant 2015-16 - Construction of C.C Road & C.C Drain (3 Works) in Thurpu
1
2016-17 Christain palem Sc Area in Division No:8 in Ongole Municipal Corporation 12.25 AE-1

209 / S.C.S.P Grant 2015-16 - Construction of C.C Road & CC Drain in Thurpu Christian
2 2016-17 21.70 AE-1
Palem SC Colny in Division No:8 in Ongole Municipal Corporation
210 / S.C.S.P Grant 2015-16 - Construction of C.C Roads to 6 streets in Throvagunta SC
3 2016-17
Area in Division No:1 in Ongole Municipal Corporation 27.55 AE-1

211 / S.C.S.P Grant 2015-16 - Construction of C.C Roads & CC Drains to 11 streeets in
4
2016-17 Mukthinuthala Padu SC Colony in Division No:2 in Ongole Municipal Corporation 30.85 AE-1

S.C.S.P Grant 2015-16 - Construction of C.C Roads to 6 streets and C.C Drain to 1
212 /
5 2016-17 street in Gudimellapadu (Sc Colony) in Division No:2 in Ongole Municipal 35.60 AE-1
Corporation
213 / S.C.S.P Grant 2015-16 - Construction of C.C Drains to 8 streets in Throvagunta (SC
6
2016-17 Colony) in Division No:1 in Ongole Municipal Corporation 39.25 AE-1

214 / S.C.S.P Grant 2015-16 - Construction of C.C Roads & Drains (10 Works) in
7
2016-17 Throvagunta Sc Area in Division No:1 in Ongole Municipal Corporation 47.60 AE-1
215 / S.C.S.P Grant 2015-16 - Construction of C.C Roads & Drains ( 10 Works) in Sc Area
8 2016-17 42.99 AE-1
in Division No:2 in Ongole Municipal Corporation
S.C.S.P Grant 2015-16 - Construction of CC Roads&Drains and providing water pipe
216 /
2016-17 line in Arava colony sc area in Division No.16(4 works)in ongole Municipal 24.35
9 AE-2
Corporation

217 / S.C.S.P Grant 2015-16 - Construction of CC Drainas &Roads &providing water pipe
10 2016-17 37.25 AE-2
linein koppolu Sc Area in Div No. 10(12 works)in Ongole Municipal Corporation

S.C.S.P Grant 2015-16 - construction CC Roads &CC Drains in pulivenkatareddy


218 /
11 2016-17 colony sc area in Div No.9(4 works) and C.C Roads and Drains in Cloughpet S.C area 41.40 AE-2
Ongole Municipal Corporation

219 / S.C.S.P Grant 2015-16 - Construction of CC Roads&Drains and providing water pipe
2016-17 line in NTR colony sc area in Division No.9(7 works)in ongole Municipal Corporation 43.50
12 AE-2

220 / S.C.S.P Grant 2015-16 - Construction CC Roads&Drains providing water pipe line
13 2016-17 48.50 AE-2
SC Area in Division No.9 (7works) in Ongole Municipal Corporation
221 / S.C.S.P Grant 2015-16 - Construction of C.C Drains in Mamidipalem Sc Area in
14 2016-17 30.00 AE-5
Division No:18 & 31 in Ongole Municipal Corporation
S.C.S.P Grant 2015-16 - Construction of C.C Roads & Drains From Existing CC Road
222 / to Mangamuru Road to Existing CC Road in Vadduvanikunta in Sanjai Gandhi
2016-17 Colony Sc Area&Pragathi Colony S.C Are in Division No:17 & 33 in Ongole Municipal 31.00
15 AE-5
Corporation
223 / S.C.S.P Grant 2015-16 - Construction of C.C Roads & C.C Drains in Division No:17 &
16 2016-17 34.97 AE-5
18 in Ongole Municipal Corporation
224 / S.C.S.P Grant 2015-16 - Providing C.C Road & Drain in Pelluru S.C Area in Division
17
2016-17 No:17 in Ongole Municipal Corporation 37.00 AE-5

225 / S.C.S.P Grant 2015-16 - Construction of C.C Roads & Drains in Sanjeev Gandhi
18
2016-17 Colony Sc area in Division No.30 in Ongole Municipal Corporation 41.85 AE-5

226 / S.C.S.P Grant 2015-16 - Construction of C.C Drains in Pragathi Colony S.C Area in
19
2016-17 Division No:17 in Ongole Municipal Corporation 49.75 AE-5

227 / S.C.S.P Grant 2015-16 - Construction of C.C Roads & C.C Drains in 50.00 AE-5
20 2016-17
Cheruvukommupalem S.C Area in Division No:18 in Ongole Municipal Corporation

228 / S.C.S.P Grant 2015-16 - Construction of CC Roads and CC Drains in Throvagunta (SC
21 2016-17 49.85 AE-7
Colony) in Division No.50 in Ongole Municipal Corporation
229 / Construction of C.C Pavement in Police Quarters from Chainage 0-200 Mts. In
22
2016-17 Division No.45 in Ongole Municipal Corporation 9.00 AE-7
TOTAL 786.21
Download Start Time : 27.05.2016 5.00 P.M
Download End Time : 10.06.2016 5.00 P.M
Receipt of Bids End Time : 10.06.2016 5.15 P.M
Price Bid Opening Time : 10.06.2016 5.30 P.M
230 / Laying of Quarry Rubbish Roads in 1st and 2nd Cross Roads on West Side Road of
1 2016-17
Maruthi Nagar 2nd Lane in Division No:44 0.98 AE-7

231 /
2 2016-17 Construction of C.C Drian in Hindu Burial Ground to Kurnool road in Division No.24 5.25 AE-4
232 / Repairs to Reading Room and Deep Bore well with Motar in Cheruvukommupalem
3 2016-17 4.20 AE-5
in Division No.18
233 / Construction of Compound wall at Hindu Burial Ground (East to North) in
4 2016-17 8.50 AE-5
Cheruvukommupalem in Division No.18
234 / Construction of Compound wall at Hindu Burial Ground (West to South) in
5 2016-17 7.90 AE-5
Cheruvukommupalem in Division No.18
235 / Construction of Compound wall at Muslim Burial Ground in Cheruvukommupalem
6 2016-17
in Division No.18 9.99 AE-5

236 / Construction of Compound wall at Viswa Brahmana Burial Ground (Kamsali) in


7 2016-17 9.99 AE-5
Cheruvukommupalem in Division No.18
237 / Providing Quarry Rubbish Road and C.C Drain from Chintala Subbarao House to
8 2016-17 5.35 AE-5
Setharamapuram Main Road Existing C.C. Road in Division No.30

238 / Providing C.C Drain, Culvert and Patch work from B.Koteswar rao House to Uma
9
2016-17 Nilayam House (near Shekar House) in Gaddala Gunta in Division No.30 5.92 AE-5

Providing C.C Drain from Midasala Raju House to Dola Karuna House (near
239 /
2016-17 Chennakasava Swamy Temple) near to 3 Statue Centre in Gaddala Gunta in 5.20
10 AE-5
Division No.30
240 / Providing C.C Drain and Culvert to Kakumani Bujji Babu House Road in Gaddala
11 2016-17
Gunta in Division No.30 5.05 AE-5

Construction of C.C.Drain from Hill Tower Water Tank to Narsapuram Subbarao


241 /
2016-17 House to near Hill tower, Dhani Pudi Kotaiah House to Pokuri Madhavi House in 9.75
12 AE-5
Division No.30
242 / Providing of C.C Drain and Culverts in Housing Board 5th Cross Road (Polytechnic
13 2016-17
Road) North Side in Division No:19 4.66 AE-5

243 / Providing of C.C Drain and Culvert from M.I.G 19 to M.I.G.I 386 at Housing Board
14 2016-17 8.15 AE-5
6th Cross Road (Polytechnic Road) Both Side in Division No:19
244 / Construction of Compound wall and Arrange Childrens Play Equipments to
15 2016-17 9.40 AE-5
Housing Board Colony Park opp Sia Sudhakar Opartment in Division No.19
245 / Providing of C.C Drain and Culvert in Housing Board 5th Cross Road (Polytechnic
16 2016-17
Road) South Side in Division No:19 7.00 AE-5

246 / Providing of C.C Drain and Culverts in Housing Board 6th Cross Road (Polytechnic
17 2016-17 3.85 AE-5
Road) Both Side in Division No:19
247 / Providing Pipe Line C.C Patches at Various Places in Division No.17 to 21, 30 & 31 in
18 2016-17 10.00 AE-5
Ongole Municipal Corporation
248 / Construction of Pipe Culvert from Housing Bord Colony (Polytechnic College) to
19 2016-17
NH-5 of Division No:19 0.90 AE-5

249 /
2016-17 Costruction of C.C Drain at Housing Board colony in Division No:19 8.70 AE-5
20

250 /
21 2016-17 roviding C.C Road from (Ch 0.00-Ch.197) in Vijaya Nagar Colony in Division No: 31 9.96 AE-5

251 /
2016-17 Providing C.C Road from (Ch.197-Ch.330) in Vijaya Nagar Colony in Division No: 31 7.30 AE-5
22

252 / Construction of C.C Drain and Culverts from (Ch.0.00 to Ch.285) in Vijayanagara
23
2016-17 Colony Main Road South Side in Division No:31 9.50 AE-5
253 / Construction of C.C Drain and Culverts from (Ch.285 to Ch.335) in Vijayanagara
24 2016-17 1.90 AE-5
Colony Main Road South Side in Division No:31
254 / Providing C.C Road from Ankamma Thalli Temple to C.R.P Quarters Road (Ch.0 to
25 2016-17 7.65 AE-5
Ch.150) in Vijaya Nagar Colony in Division No.31
255 / Providing C.C Roads from Ankamma Thalli Temple to C.R.P Quarters Road (Ch.150
26 2016-17 8.45 AE-5
to ch.315) in Vijaya Nagar Colony in Division No.31
256 / Construction of C.C Drains to Vijaya Nagar Colony Cross Roads (Bit-1) in Division
27 2016-17
No:31 7.65 AE-5

257 / Construction of C.C Drains to Vijaya Nagar Colony Cross Roads (Bit-2) in Division
28 2016-17 7.65 AE-5
No:31
258 / Construction of C.C Drains to Vijaya Nagar Colony Cross Roads (Bit-3) in Division
29 2016-17 7.65 AE-5
No:31
259 / Providing C.C Road from Viswas Nagar to Bhagya Nagar 4th line (Via) Sri Krishna
30
2016-17 Temple in Division No:31 6.90 AE-5

260 / Construction of C.C Drain and Culvert from Viswas Nagar to Bhagya Nagar 4th line
31
2016-17 (Via) Sri Krishna Temple in Division No:31 5.85 AE-5

261 / Construction of C.C Road and C.C Culvert from Lakka Raju Kameswar rao House
32 2016-17
(Door No:8-1-37) Back to Janapati House Via Jammichettu Street in Division No:28 2.07 AE-5

262 / Providing 80 mm Dia G.I Pipe and 50 mm Dia G.I Pipe Distribution Network to
33 2016-17 5.30 AE-5
Rajapangal Streets 5th line to 10th line Cross Roads in Division No.29
263 /
34 2016-17 Providing C.C Road and Drain at Hill Tower area in Division No.29 8.50 AE-5

264 / Repairs and Rectification of C.C Patches and C.C Aproches in Rajapanagal Road in
35
2016-17 Division No:29 3.80 AE-5

265 / Construction of C.C Road and C.C Drain in Rajapanagal Road 4th to 14th Cross
36
2016-17 Roads in Division No:29 8.05 AE-5

266 / Construction of C.C Drain at Konijeti Bus Stand Well, Galagala Srinivasulu House to
37 2016-17 4.60 AE-5
Vinayaka Temple and C.C Aproches at Rajapanagal Road in Division No:29

267 /
Providing Quarry Rubbish Road at Gas Ankababu Road North Direction Main Road
2016-17 & Cross Roads (Sri Dhata Sai House, Hanuman Nilayam) Gaddala Gunta Poleramma 4.10
38 AE-5
Temple back side in Division No:32
268 / Providing C.C Road at J.Venkatrao House Road (near Public Toilets) in Gaddala
39 2016-17 3.52 AE-5
Gunta in Division No.32
Construction of C.C Road and C.C Drain from Quality Residency opposite Road to
269 /
2016-17 Sri Venkateswara Pharma Distributions ((bit-I), Electrical ADE, Builder Raghu) in 8.10
40 AE-5
Division No.32
Construction of C.C Road and C.C Drain from Quality Residency opposite Road to
270 /
2016-17 Sri Venkateswara Pharma Distributions ((Bit-II) Electrical ADE (Builder Raghu)) in 8.10
41 AE-5
Division No.32

271 / Providing C.C Road and Culverts in Ramalayam Street at Chittem Venkateswarlu
42 2016-17 2.25 AE-5
House and Thotakura Rangaiah House in Gaddala Gunta area in Division No:32

272 / Providing R.C.C Culverts and C.C Patches in various places in Gaddala Gunta area in
43
2016-17 Division No.32 10.00 AE-5
273 /
2016-17 Construction of Compound wall at Poleramma Temple in Division No.32 2.40 AE-5
44

274 / Construction of C.C Drain both sides from M.P.Malyadri gari House to existing C.C
45 2016-17 5.95 AE-5
Drain in Z.P Colony main Road in Division No:33
Providing C.C Drain, Culverts and Qurry Rubbish Road (3 Cross Roads) (Venkata
275 /
2016-17 Gopala Krishna House, MalliKarjuna Nilayam & D.No.35-066-085) in Z.P Colony in 5.60
46 AE-5
Division No.33
276 / Providing C.C Road from Kotha Donka Road to R.Anjaneyulu House in Division
47 2016-17
No.33 7.10 AE-5

277 / Providing C.C Drain to Z.P Colony 3rd Line, Nagi Reddy House Line and Sherma Gari
48 2016-17 7.30 AE-5
Line in Division No.33
278 / Providing C.C Drain, Culverts and Quarrey Rubbish Road in Z.P Colony (Sub Station
49 2016-17 7.05 AE-5
Back Side) in Division No.33
279 / Construction of C.C Drain and Quarry Rubbish Road from M.M.Donka to Kotha
50 2016-17 6.15 AE-5
Donka Road (via Cal Gas Road) in Division No:33
280 / Providing C.C Drain from P.RamaKrishna House to Kotha Donka Road Bulet Show
51 2016-17
Room House in Division No.33 4.20 AE-5

281 / Construction of C.C Drain and Quarry Rubbish Road from Siva Prasad Colony (R.T.C-
52 2016-17 4.37 AE-5
2) Mangamuru Main Road in Division No:33
282 / Desiltation of existing Drains from Mangamuru Road South Side, NH-5 West Side
53 2016-17 3.95 AE-5
(Kotha Donka) in Division No.33
283 / Providing C.C Drain to Sivaprasad Colonby 1st, 2nd, 3rd lines (D.Krishna Mohan
54
2016-17 House) and C.C Patch Work in Siva Prasad Colony in Division No:33 7.68 AE-5

284 / Construction of C.C Road from Mangamuru Road to dead end of the Road in
55
2016-17 Vaddivanikunta 2nd line (East towards West) in Division No.33 2.66 AE-5

285 / Construction of C.C Road from Mangamuru Road to Dead End of the Road in
56
2016-17 Vaddivanikunta 7th line (East towards West) in Division No.33 2.95 AE-5

286 / Raising of north side C.C Drain Wall from NH-5 Road to Z.P Colony Main Road in
57
2016-17 Kotha Donka Road in Division No:33 3.00 AE-5

287 / Construction of C.C Drain from Shaik Mgbul house to B.Santha Rao house&Raju
58 2016-17 9.30 AE-1
Haouse to Doctor Subbarao house in Division No:5
Construction of C.C Drains from Tirupalu Naidu house to Ramadevi house&Kavuri
288 /
59 2016-17 Ramanaiah house to Shaik Mastan house Gopal Nagar Extension 4th line in Division 9.95 AE-1
No:5
Construction of C.C Drain Ramakotiah house to Aavula Kotiah house &
289 /
60 2016-17 YalamandaReddy house to Aavula Nancharamma house in gopal nagar Extension 5.30 AE-1
4th line cross roads in Division No:5
290 /
2016-17 Construction of Internal C.C Drains in Mahendra Nagar in Division No:5 9.65 AE-1
61

Construction of C.C Drain Gopal nagar 4th line koppuRavuri koteswara rao House
291 /
2016-17 to Bogginenni koteswara Rao House (Kamma palemRamalayamTemple) in Division 5.54
62 AE-1
No:7
292 / Construction of C.C Drain From 40feet road to at transform kamma palem 2nd line
63 2016-17 8.86 AE-1
in Division No:7
293 / Construction of C.C Drain Nagaramma Temple to Maha Lakshmi Temple in Division
64 2016-17
No:7 4.31 AE-1
294 / Construction of raising C.C Roads and C.C Drains Devudu arugu and Devudu arugu
65 2016-17 8.20 AE-1
to N.T.R in Division No:7

295 / Construction of C.C Drain from Eedhara Srinivasa Rao House to Sripathi Rajeswari
66
2016-17 site& Bharani prasad House to South Side main road in Division No:8 5.10 AE-1

296 / Construction of C.C Drain from Bollinenni Chandra Rao site to Criset public School
67 2016-17 9.64 AE-1
in Division No:8
297 / Construction of C.C Drain from Channa Reddy Koteswara Rao House to Bottla
68 2016-17 8.83 AE-1
Rama Devi House in Division No:8
298 / Construction of C.C Drain and Culvert from Natubabu rao park to Municipal school
69 2016-17
of Santhapeta of division No.14 9.40 AE-2

299 / Construction of C.C Drains of Ramakurivari Veedhi from Trunk road to Santha peta
70 2016-17 9.80 AE-2
road of division No.14
300 /
2016-17 Construction of C.C Drains at Santhapeta of division No.14 5.90 AE-2
71

301 / Providing C.C Road from Madhan mohan house to Koteswaramma house at south
72
2016-17 side 1 st line of Anjaneyaswami temple road of Santha peta in Division No.14 5.60 AE-2

302 / Construction of C.C Drains at Anjaneyaswami temple street and 3 cross lines of
73 2016-17
Santha peta in Division No.14 10.00 AE-2

303 / Construction of C.C Drain from Trunk road to Santhapeta main road(Kamasastri
74 2016-17 10.00 AE-2
street) in Division No.14
304 / Construction of C.C Drains at chavala vari veedhi and ramakumari vari veedhi 1st
75 2016-17 4.80 AE-2
cross road in Division No.14
305 / Construction CC Drain of Muslim Burial Ground Besides Pedda Masjid in Division
76 2016-17
No.12 3.00 AE-2

306 / Construction of Compound wall of Muslim Burial Ground of Survey No.564


77 2016-17
Besides Pedda Masjid in Division No.12 10.00 AE-2

307 / Construction of C.C Drain&Culvert from Annavarapadu 2nd line to 4th line besides
78 2016-17 7.50 AE-2
railway track in Division No.15

308 /
Providing C.C Road and Drain From Annapareddy yallamma(H) to vurata
2016-17 venkateswasrlu house And marripudi venkateswarlu house to vinayaka temple at 10.00
79 AE-2
Annavarapadu cross Road in Division No.15
309 / Providing C.C Drain From pulipati Mahesh house to Checken babu house and Josph
80 2016-17 5.00 AE-2
house to Agrahram road of Arava colony in Division No.16

310 / Providing C.C Drain From Kathi Ankiah house to Obaiah house and Bellem konda
81
2016-17 venkateswarlu house to Kalavathi house of Balaji nagar in Division No.16 2.25 AE-2

311 / Providing C.C Drains at opp.of Subbalakshmi shop of Agrahram road in Division
82 2016-17
No.16 2.00 AE-2

312 / Providing C.C Road From Ungarala Ragamma house to Medikonda Savithramma
83 2016-17 6.00 AE-2
house of 2nd cross road of Pothurajupalem in Division No.16

313 / Providing Quary Rubbish Roads Arava colony and Ungarala Ragamma house to
84
2016-17 Agrahram road of Balaji nagar 1st&2nd,3rd Cross Road in Division No.16 2.30 AE-2
314 / Providing C.C Drain&Quary Rubbish Road From Arava colony 1st&2nd,3rd Cross
85 2016-17 8.85 AE-2
Road in Division No.16
315 / Formation of Quarry Rubbish Road Guttha Venkata subbiah Gudown to Railway
86 2016-17 2.15 AE-2
Track at Ram nagar 8th line in Division No.15
316 / Construction of C.C Drains at Sundaraiah school road Area and Koduru Ramaiah
87 2016-17 10.00 AE-2
house to Katragadda srinivasarao house in Division No.10
317 / Providing C.C Drain&Culvert From Naatu Baburao park Junction to Sivalayam and
88 2016-17
Aghram Railway gate in Division No.14 9.80 AE-2

318 / Construction of C.C Drain from Thiruveedhi venktaranthnam house of Ok Road to


89
2016-17 Guthi kondavari Palem Road of 9th Division in Ongole Municipal Corporation 7.30 AE-2

319 / Providing CC road from Sujatha nagar 11th line to Kalluri Butchaiah house in
90 2016-17 7.30 AE-6
Soniyagandhi nagar 3rd cross road in Division nos.37
Providing CC Drains both sides from Sujatha nagar main road to Soniyagandhi
320 /
2016-17 nagar 3rd cross road and Sujatha nagar 11th line to Kalluri Butchaiah house in 7.10
91 AE-6
Soniyagandhi nagar 3rd cross road in Division nos.37
321 /
92 2016-17 Providing C.C.Road in Sujatha nagar 5TH Line line (Reach-I) in Division No.37 10.00 AE-6

322 / Providing C.C.Road and drains in Sujatha nagar 5TH Line line (REACH-II) in Division
93 2016-17
No.37 8.90 AE-6

323 /
2016-17 Providing C.C.Drains in both sides Sujatha nagar 5th line in Division No.37 10.00 AE-6
94

324 / Providing C.C.Road to 2nd line of Revenue colony from North to South (Reach -I )
95 2016-17 10.00 AE-6
in Division No.37
325 / Providing C.C.Road to 2nd line of Revenue colony from North to South (Reach-II )
96 2016-17
in Division No.37 6.90 AE-6

326 / Providing C.C.Road from Existing CC road to Bhasyam school in 3rd line of Sivaji
97 2016-17
nagar in Division No.37 10.00 AE-6

327 / Providing C.C Road and C.C Drains both sides in Soniya Gandhi Nagar 3rd Line in
98 2016-17 10.00 AE-6
Division No.37
328 / Providing CC road and C.C.Drains both sides in Soniyagandhi nagar 5th Line in
99 2016-17 8.50 AE-6
Division No.37
Providing C.C.Road from Machavarapu Mallikharjuna house to Bethamsetty
329 /
2016-17 Donthulaiah house 6th line to 1st line in Gandhinagar and Quarry Rubbish road 10.00
100 AE-6
from BR Gardens ooposite OPS to Sambaiah house in Division No.37
Providing C.C.Road from Miller Ramanareddy house to Elchuri Prasad house in 5th
330 /
2016-17 line and Sk.Mastan house to SK.Peerusaheb house from 6th line to 3rd line in 9.80
101 AE-6
Gandhi Nagar in Division No.37
331 / Providing C.C.Road and CC drains from Eginuri Srinivasarao house to NS canal in
102
2016-17 5th line of Military colony in Division No.37 8.50 AE-6

332 / Providing C.C.Road and CC drains from Thalamanchi Peda Lakshmaiah house to
103
2016-17 Mannepalli Ramaiah house in 7th line of Military colony in Division No.37 9.30 AE-6
Providing C.C.Road and CC drains both sides from Rachapudi Krishnamurthy
333 / house to S.Pullaiah house Sujatha nagar 2nd line to sambasiva nagar and from
2016-17 Gonasapudi Kondaiah house to Edara Subbarao house in Sambasiv nagar 1st line in 9.15
104 AE-6
Division No.37
334 /
2016-17 Providing C.C.Drains both sides in Soniyagandhi nagar 2nd line in Division No.37 3.75 AE-6
105

335 / Providing C.C Road and C.C Drain from Sri Srinivasa Villa West Apartment to
106
2016-17 Mangamur Road opposite to Ongole Public School in Division No.37 10.00 AE-6

336 / Providing C.C Drains in east side from Sujatha Nagar main road to Alla Srikanth
107
2016-17 Reddy Apartment in Soniyagandhi Nagar 1st Line in Division No.37 10.00 AE-6

337 / Providing Quarry Rubbish Road from Sujatha Nagar main road to Dheeraj
108
2016-17 Apartment in Sujathanagar 11 th line in Division No.37 8.70 AE6

338 / Providing C.C Road in Samatha Nagar 1st line east side in Samatha nagar main road
109
2016-17 in Division No.37 10.00 AE6

339 /
2016-17 Construction of C.C Drian in Vadde Palem in Division No.24 10.00 AE-4
110

340 /
2016-17 Construction of C.C Drian in Mangali Palem in Division No.24 8.00 AE-4
111

341 / Construction of C.C Drain From Muttun Market at Vegitable Market in Division No:
112
2016-17 24 (2nd call) 2.05 AE-4
TOTAL 774.23
Download Start Time : 30.05.2016 5.00 P.M
Download End Time : 14.06.2016 5.00 P.M
Receipt of Bids End Time : 14.06.2016 5.15 P.M
Price Bid Opening Time : 14.06.2016 5.30 P.M
342 / Procurement of 4 seated (2+2) Mobile toilet for putting Near Mother & Child
1 2016-17 4.85
Hospital in Ongole Municipal Corporation
343 / Procurement of 4 seated (2+2) Mobile toilet for putting at Pothuraju Canal North
2 2016-17
side in Ongole Municipal Corporation 4.85

344 /
3 2016-17 Construction C.C Pavement in Police Quarters from 200-275 mts in Division No.45 3.40 AE-7

345 / Procurement of 4 seated (2+2) Mobile toilet for putting at Godugu Sanjeeva
4 2016-17 4.85
veedhi in Ongole Municipal Corporation
346 / Procurement of 4 seated (2+2) Mobile toilet for putting at Pernametta Milk dairy
5
2016-17 in Ongole Municipal Corporation 4.85

347 / Procurement of 4 seated (2+2) Mobile toilet for putting Mangamur Road in Ongole
6
2016-17 Municipal Corporation 4.85

348 / Providing Garden Lighting System, Under Ground Cables, Panel Board, G.I Poles in
7 2016-17
Annavarappadu Park in Division No.15 3.70 AE-2

349 / Providing and Fixing at Ceiling Fans and Wiring at D.R.R Mpl. High School and P.V.R
8
2016-17 High School in Ongole Muncipal Corporation 0.95 AE-2

350 / Providing Quarry Rubbish Road from Z.P Colony 1st Cross Road to 3rd Cross Road
9 2016-17 2.70 AE-5
(via Bapatla M.P's House) in Division No.33
351 / Supply and delivery of Vaporized Liquid Chlorine Gas Cylinder (100 Kgs) for the
10 2016-17 2.50 AE-5
maintenance of Water Supply system in Ongole Municipal Corporation
352 / Desiltation of Open Wells at Various Places in A.E-3 and A.E-5 Section in Ongole
11 2016-17 0.98 AE-5
Municipal Corporation (Reserved for L.C.C.S)
353 / Repair of Toilets in Municipal Office in Ongole Municipal Corporation (Reserved for
12 2016-17 2.10 AE-5
L.C.C.S)
Repairs to Wells at Mahalaxmamma Temple, Tangella Kasim Vari Veedhi, Abburi
354 /
13 2016-17 vari street and Ramula vari temple in Kamma Palem in Division No.7 (Reserved for 2.20 AE-1
L.C.C.S)
355 / Repairs to Wells in SC and ST areas in Throvagunta in Division No.1 (Reserved for
14
2016-17 L.C.C.S) 1.70 AE-1

356 / Providing Deep Bore Well and Fixing 5 HP Submersible Motor at Vengamukkala
15
2016-17 palem in Ongole Municipal Corporation (Reserved for L.C.C.S) 3.25 AE-5

357 / Construction of RCC Slab Culvert and CC Pavement at Chunduri Petrol Bunk
16 2016-17
(Guntur Road Junction) in ongole Municipal Corporation 1.55 AE-7
TOTAL 49.28
Download Start Time : 09.06.2016 5.00 P.M
Download End Time : 16.06.2016 5.00 P.M
Receipt of Bids End Time : 16.06.2016 5.15 P.M
Price Bid Opening Time : 16.06.2016 5.30 P.M
358 / Manufacture, Supply and Delivery of S.S Dust Bins (Garbage Bins) to Ongole
1 2016-17 10.00
Municipal Corporation
359 / Procurement of 6seated (3+3) Mobile toilet for putting at Old Vegetable market
2 2016-17
area in Ongole Municipal Corporation 5.35

360 / Construction of 5 seated Community toilet near Kothapatnam Bus Stand in Ongole
3 2016-17 7.00
Municipal Corporation
361 / Construction of 5 seated Community toilet near Lorry Owners Asossiation Site in
4 2016-17 7.00
Ongole Municipal Corporation
362 / Construction of 5 seated Community toilet at Jayaprakash Colony in Ongole
5 2016-17
Municipal Corporation 7.00

363 / Construction of 5 seated Community toilet at Pernamitta Christian Palem in


6 2016-17 7.00
Ongole Municipal Corporation
364 / Construction of 5 seated Community toilet at Anjaiah Road in Ongole Municipal
7 2016-17 7.00
Corporation
Providing Chain link mesh fencing for Green Belt , from vidyuth building to
365 /
2016-17 Ramnagar 1th line and Ramnagar 2th line to Ramnager 3rd line in Ongole 9.80
8 AE-2
municipal Corporation
366 / Providing Chain link mesh fencing for Green Belt , from Ramnager 3rd line to
9 2016-17
ramnager 5th line in Ongole municipal Corporation 9.80 AE-2

367 / Providing Chain Link Mesh Fencing for Green Belt from Ramnagar 5th line
10 2016-17 9.80 AE-2
Ramnagar 6th line in Ongole municipal Corporation
368 / Providing Chain link mesh fencing at Kurnool road fly over South side 3rd Bit in
11 2016-17 10.00 AE-7
Ongole municipal Corporation
369 / Providing Chain link mesh fencing at Kurnool road fly over North side 3rd Bit in
12 2016-17 10.00 AE-7
Ongole municipal Corporation
370 /
2016-17 Supply of Plants to Divisions 1 to 50 in Ongole Municipal Corporation 10.00 AE-2
13
371 / Providing C.C Drains from Samatha Nagar Main Road to D.Gopala Rao House in
14 2016-17 7.95 AE-6
Samatha Nagar 8th line in Division No.37
372 / Supply and delivery of C.I.D/F Pipes and C.I materials to A.E-2 Section in Ongole
15 2016-17 10.00 AE-2
Municipal Corporation
373 / Supply and delivery of SFRC Man Hole Covers with Angular Frames in 1 to 50
16 2016-17 10.00 AE-2
Divisions to Ongole Municipal Corporation
Repair and Rectification of 75 Hp Clear Water Pump Damaged Section Pipe
374 / Removing and Refixing off C.ID/F Pipes and 40 Hp (Raw Water Pump House) Pumps
2016-17 Repairs in SS Tank -2 & New Filter bed 11 Kv Transformer Yard in Ongole Muncipal 7.65
17 AE-5
Corporation
375 / Construction of C.C Drains and Culvert from New Ton Jhon House to Panditi Raja
18 2016-17 9.99 AE-5
Ratnam House at Mamidipalem in Division No:31
376 / Construction of C.C Drains and Culvert from Panditi Raja Ratnam House to Krishna
19
2016-17 Mandhiram at Mamidipalem in Division No:31 9.99 AE-5
TOTAL 165.33
Download Start Time : 09.06.2016 5.00 P.M
Download End Time : 23.06.2016 5.00 P.M
Receipt of Bids End Time : 23.06.2016 5.15 P.M
Price Bid Opening Time : 23.06.2016 5.30 P.M

377 / Maintenance of Water Supply - Transportation and Supply of Water in various


1 2016-17 10.00 AE-6
places in Ongole Municipal Corporation from 01.07.2016 to 15.08.2016

TOTAL 10.00
Download Start Time : 20.06.2016 5.00 P.M
Download End Time : 27.06.2016 5.00 P.M
Receipt of Bids End Time : 27.06.2016 5.15 P.M
Price Bid Opening Time : 27.06.2016 5.30 P.M
378 / Providing C.C Patches in various places in A.E-1 Section in Ongole Municipal
1 2016-17 5.78 AE-1
Corporation (2nd call)
379 / Providing C.C Patches in various places in A.E - 3 & A.E - 5 Section in Ongole
2 2016-17 9.90 AE-5
Municipal Corporation (2nd call)
380 / Providing C.C Road Patches at various places in A.E-II section in Ongole Municipal
3 2016-17
Corporation (2nd call) 2.50 AE-2

381 / Construction of C.C Patches and B.T Patches in Various Places in Division No:7 (4th
4 2016-17
call) 6.88 AE-1

382 / Procurement of 4 seated (2+2) Mobile toilet for putting Near Mother & Child
5 2016-17 4.85
Hospital in Ongole Municipal Corporation (2nd call)
383 / Procurement of 4 seated (2+2) Mobile toilet for putting at Pothuraju Canal North
6 2016-17 4.85
side in Ongole Municipal Corporation (2nd call)
384 / Procurement of 4 seated (2+2) Mobile toilet for putting at Godugu Sanjeeva
7
2016-17 veedhi in Ongole Municipal Corporation (2nd call) 4.85

385 / Procurement of 4 seated (2+2) Mobile toilet for putting Mangamur Road in Ongole
8
2016-17 Municipal Corporation (2nd call) 4.85

386 / Drilling of deep bore well and fixing of IM-II Pumpsets at various places in Ongole
9
2016-17 Municipal Corporation (4th call) 9.99 AE-6
Supply of Labour for Watch and Ward and Petrolling along Irrigation canal from
387 /
2016-17 gundlakamma Project to Yedugundlapadu Raw Water Sump House in 0.999 AE-1
10
MARCH ,2016 (Reserved for L.C.C.S) (2nd call)
388 / Providing Plaster of Paris Ceiling at Balabavan Green Rooms in Ongole Municipal
11 2016-17
Corporation (3rd call) 0.86 AE-5

389 / Laying of 150 mm and 100 mm dia A.C.Class-15 Distrubution pipe line in Ganapathi
12
2016-17 Nagar in Division.No.43 of Ongole Municipal Corporation (2nd call) 20.00

390 / Providing C.C.Drain in South side in Main road (Reach-II) (From Kotha donka to 3rd
13 2016-17 3.00 AE-6
line) in Peerlamanyam (Kurnool road) in Division No.39 (2nd call)

391 / S.C.S.P Grant 2014-15 - Construction of C.C Drain and Culvert from Edipogu Kotaiah
14
2016-17 House to Patra Vinod House Thurpu Christian Palem in Division No.8 (3rd call) 1.38 AE-1

392 / Construction of CC Drains in Iyannavari Veedi from Padarthi Rosaiah Nilayam to


15 2016-17 8.50 AE-7
Edhara Nageswara Rao in Division No:49 (2nc call)
393 / Construction of C.C Drain &Culvert from Basha Tailor Shop to Kayyum House in
16 2016-17
Division No: 4 (4th call) 2.30

394 /
2016-17 Construction of C.C Internal Drains (Lorry la Kunta) in Division No:4 (4th call) 8.95
17

395 / Construction of C.C Drain From Opp.Ameer House to Community Hall in Division
18 2016-17
No: 4 (4th call) 1.00

396 / Construction of C.C Drain From Sathya Nivas house to Ajantha Silk Carcana in
19 2016-17 4.75
Division No.12 (4th call)
397 / Construction of Repairs C.C Drain From Pakeerupalem punuri ramesh house to
20 2016-17 0.95
Mashumsha Street in Division No.12 (4th call)
398 / Construction of C.C Culverts at Daravarithota 4th line Hotel Surover Cross Road in
21 2016-17 0.99 AE-5
Division No:20 (4th call)
399 / Construction of C.C. Drain & Culvert from Maruthi Apartment opp. Road at
22 2016-17
Dharavari Thota in Division No:21 (4th call) 1.75 AE-5

400 / Construction of Damaged Culvers & C.C.Drain Kota Veedi & Mangala Palem in
23 2016-17 6.40
Division No.23 (3rd call)
401 / Construction of C.C Drain from Pendyala rama krishna house to Gopal nagar 4th
24 2016-17 6.80
line extension cross roads in Division No.7 (4th call)

402 / Construction of C.C Drain from Kodanda Rama Swamy Temple to K.N.S Electronics
25
2016-17 (opp. Jaya lakshmi theatre road) and Dharavari Veedhi in Division No.7 (4th call) 6.00

403 /
26 2016-17 Construction of C.C Drain at Kamma palem 1st line in Division No.7 (4th call) 4.65

404 / Providing C.C Drain from D.No.6-251 to via B.B Towers, Abhinaya Towers towards
27 2016-17
existing culvert in Lawyerpet extension line in Division No.34 (4th call) 4.85

406 / Drilling of Deep Bore Well and Fixing of IM-II Pumpsets at various places of 9th to
28 2016-17 7.55
16th Divisions in Ongole Municipal Corporation (3rd call)
407 / Construction of C.C Drian in Hindu Burial Ground to Kurnool road in Division No.24
29 2016-17 5.25 AE-4
(2nd call)

408 / Providing C.C Drain, Culvert and Patch work from B.Koteswar rao House to Uma
30 2016-17 5.92 AE-5
Nilayam House (near Shekar House) in Gaddala Gunta in Division No.30 (2nd call)
Providing C.C Drain from Midasala Raju House to Dola Karuna House (near
409 /
2016-17 Chennakasava Swamy Temple) near to 3 Statue Centre in Gaddala Gunta in 5.20
31 AE-5
Division No.30 (2nd call)
410 / Providing C.C Drain and Culvert to Kakumani Bujji Babu House Road in Gaddala
32 2016-17
Gunta in Division No.30 (2nd call) 5.05 AE-5

Construction of C.C.Drain from Hill Tower Water Tank to Narsapuram Subbarao


411 /
33 2016-17 House to near Hill tower, Dhani Pudi Kotaiah House to Pokuri Madhavi House in 9.75 AE-5
Division No.30 (2nd call)
412 / Providing Pipe Line C.C Patches at Various Places in Division No.17 to 21, 30 & 31 in
34
2016-17 Ongole Municipal Corporation (2nd call) 10.00 AE-5

413 / Construction of Pipe Culvert from Housing Bord Colony (Polytechnic College) to
35
2016-17 NH-5 of Division No:19 (2nd call) 0.90 AE-5

414 / Construction of C.C Drain and Culverts from (Ch.0.00 to Ch.285) in Vijayanagara
36 2016-17 9.50 AE-5
Colony Main Road South Side in Division No:31 (2nd call)
415 / Construction of C.C Drain and Culverts from (Ch.285 to Ch.335) in Vijayanagara
37 2016-17
Colony Main Road South Side in Division No:31 (2nd call) 1.90 AE-5

416 / Construction of C.C Drains to Vijaya Nagar Colony Cross Roads (Bit-1) in Division
38 2016-17 7.65 AE-5
No:31 (2nd call)
417 / Construction of C.C Drain and Culvert from Viswas Nagar to Bhagya Nagar 4th line
39 2016-17
(Via) Sri Krishna Temple in Division No:31 (2nd call) 5.85 AE-5

418 / Providing 80 mm Dia G.I Pipe and 50 mm Dia G.I Pipe Distribution Network to
40
2016-17 Rajapangal Streets 5th line to 10th line Cross Roads in Division No.29 (2nd call) 5.30 AE-5

419 /
2016-17 Providing C.C Road and Drain at Hill Tower area in Division No.29 (2nd call) 8.50 AE-5
41

420 / Repairs and Rectification of C.C Patches and C.C Aproches in Rajapanagal Road in
42 2016-17 3.80 AE-5
Division No:29 (2nd call)
421 / Construction of C.C Road and C.C Drain in Rajapanagal Road 4th to 14th Cross
43 2016-17
Roads in Division No:29 (2nd call) 8.05 AE-5

422 / Construction of C.C Drain at Konijeti Bus Stand Well, Galagala Srinivasulu House to
2016-17 Vinayaka Temple and C.C Aproches at Rajapanagal Road in Division No:29 (2nd call) 4.60
44 AE-5

423 / Providing C.C Drain to Z.P Colony 3rd Line, Nagi Reddy House Line and Sherma Gari
45 2016-17
Line in Division No.33 (2nd call) 7.30 AE-5

424 / Construction of C.C Drain from Shaik Mgbul house to B.Santha Rao house&Raju
46 2016-17
Haouse to Doctor Subbarao house in Division No:5 (2nd call) 9.30 AE-1

Construction of C.C Drains from Tirupalu Naidu house to Ramadevi house&Kavuri


425 /
47 2016-17 Ramanaiah house to Shaik Mastan house Gopal Nagar Extension 4th line in Division 9.95 AE-1
No:5 (2nd call)
Construction of C.C Drain Ramakotiah house to Aavula Kotiah house &
426 /
48 2016-17 YalamandaReddy house to Aavula Nancharamma house in gopal nagar Extension 5.30 AE-1
4th line cross roads in Division No:5 (2nd call)
427 /
49 2016-17 Construction of Internal C.C Drains in Mahendra Nagar in Division No:5 (2nd call) 9.65 AE-1
Construction of C.C Drain Gopal nagar 4th line koppuRavuri koteswara rao House
428 /
2016-17 to Bogginenni koteswara Rao House (Kamma palemRamalayamTemple) in Division 5.54
50 AE-1
No:7 (2nd call)
429 / Construction of C.C Drain From 40feet road to at transform kamma palem 2nd line
51 2016-17
in Division No:7 (2nd call) 8.86 AE-1

430 / Construction of C.C Drain Nagaramma Temple to Maha Lakshmi Temple in Division
52 2016-17 4.31 AE-1
No:7 (2nd call)
431 / Construction of raising C.C Roads and C.C Drains Devudu arugu and Devudu arugu
53 2016-17 8.20 AE-1
to N.T.R in Division No:7 (2nd call)

432 / Construction of C.C Drain from Eedhara Srinivasa Rao House to Sripathi Rajeswari
54
2016-17 site& Bharani prasad House to South Side main road in Division No:8 (2nd call) 5.10 AE-1

433 / Construction of C.C Drain from Bollinenni Chandra Rao site to Criset public School
55 2016-17 9.64 AE-1
in Division No:8 (2nd call)
434 / Construction of C.C Drain from Channa Reddy Koteswara Rao House to Bottla
56 2016-17
Rama Devi House in Division No:8 (2nd call) 8.83 AE-1

435 / Construction of C.C Drain and Culvert from Natubabu rao park to Municipal school
57 2016-17 9.40 AE-2
of Santhapeta of division No.14 (2nd call)
436 / Construction of C.C Drain from Trunk road to Santhapeta main road(Kamasastri
58 2016-17
street) in Division No.14 (2nd call) 10.00 AE-2

437 / Construction of C.C Drains at chavala vari veedhi and ramakumari vari veedhi 1st
59 2016-17 4.80 AE-2
cross road in Division No.14 (2nd call)
438 / Construction CC Drain of Muslim Burial Ground Besides Pedda Masjid in Division
60 2016-17 3.00 AE-2
No.12 (2nd call)
439 / Construction of Compound wall of Muslim Burial Ground of Survey No.564 10.00 AE-2
61 2016-17
Besides Pedda Masjid in Division No.12 (2nd call)

440 / Providing C.C Drain From Kathi Ankiah house to Obaiah house and Bellem konda
2016-17 venkateswarlu house to Kalavathi house of Balaji nagar in Division No.16 (2nd call) 2.25
62 AE-2

441 / Construction of C.C Drains at Sundaraiah school road Area and Koduru Ramaiah
63
2016-17 house to Katragadda srinivasarao house in Division No.10 (2nd call) 10.00 AE-2

Providing CC Drains both sides from Sujatha nagar main road to Soniyagandhi
442 /
2016-17 nagar 3rd cross road and Sujatha nagar 11th line to Kalluri Butchaiah house in 7.10
64 AE-6
Soniyagandhi nagar 3rd cross road in Division nos.37 (2nd call)
443 /
65 2016-17 Construction of C.C Drian in Vadde Palem in Division No.24 (2nd call) 10.00 AE-4
444 /
66 2016-17 Construction of C.C Drian in Mangali Palem in Division No.24 (2nd call) 8.00 AE-4

445 / Construction of C.C Drain From Muttun Market at Vegitable Market in Division No:
67
2016-17 24 (3rd call) 2.05 AE-4

446 / Formation of Quarry Rubbish Road from N.S.P Canal to Karumudi HariBabu house AE-
68 2016-17 6.25 2
of Guthikondavari Palem at 9th Division in Ongole Municipal Corporation (2nd call)

TOTAL 418.18
Download Start Time : 28.06.2016 5.00 P.M
Download End Time : 12.07.2016 5.00 P.M
Receipt of Bids End Time : 12.07.2016 5.15 P.M
Price Bid Opening Time : 12.07.2016 5.30 P.M
447 / Laying of B.T Patches in various places in A.E-1 Section in Ongole Municipal
1 2016-17 2.90 AE-1
Corporation
448 / Fabrication, Supply and Errection of Water Level Indicators fixing at various ELSR's
2
2016-17 and Sumps in Ongole Municipal Corporation 3.31 AE-5

449 / Providing 5 Tons Capacity Dubble Gadder Gantry Arrangements at Yedukondala


3 2016-17 4.60 AE-1
padu Raw water Pumping Station in Ongole Municipal Corporation

450 / Construction of Water Harvesting Structures at Various Places in A.E -3 & A.E-5
4 2016-17
Sections in Ongole Municipal Corporation 3.25 AE-5

451 / Removal of Road High Berms and Site Levelling and Kutch Drains to providing J.C.B
2016-17 on hire basis in A.E-1 Section in Division No.1 to 8 in Ongole Municipal Corporation 0.925
5 AE-1

452 / Providing Plaster of Paries Ceiling at Computer Room in Main Office in Ongole
6 2016-17 0.90 AE-5
Municipal Corporation office in Ongole Municipal Corporation
453 / Supply and Delivery of Home Needs to Night Shelter Opp. New Vegetable Market
7 2016-17 0.75 AE-4
in Division No.24
454 / Desiltation and Damaged Open Wells at Bhagya Nagar and Vijayanagar Colony in
8 2016-17
Division No.20 and 31 (Reserved for L.C.C.S) 1.99 AE-5

455 /
9 2016-17 Repairs to open well in Guthikondavari palem in Division No.9 1.78 AE-2

456 /
10 2016-17 Repairs to Chivukula Vari Veedhi well in Division No.12 1.00 AE-2
457 /
11 2016-17 Repairs to Pakeeru Palem Well in Division No.12 1.50 AE-2

458 / Repairs to Marathi Palem Well and Phikula Vari Veedhi Well in Division Nos.12 &
12
2016-17 13 0.95 AE-2

459 /
2016-17 Repairs to Kabadi Palem Well and Annavarappadu Well in Division Nos.13 & 15 0.88 AE-2
13

460 /
14 2016-17 Repairs to Masjid Well and Rani Well in Division No.14 0.60 AE-2

461 /
2016-17 Repairs to Bathula Vari Kunta Well in Division No.16 0.92 AE-2
15

TOTAL 26.26
Download Start Time : 30.06.2016 5.00 P.M
Download End Time : 07.07.2016 5.00 P.M
Receipt of Bids End Time : 07.07.2016 5.15 P.M
Price Bid Opening Time : 07.07.2016 5.30 P.M
462 / Procurement of 4 seated (2+2) Mobile toilet for putting at Pothuraju Canal South
1 2016-17 4.85
side in Ongole Municipal Corporation
463 / Procurement of 6seated (3+3) Mobile toilet for putting at Kurnool Road flyover in
2 2016-17 5.35
Ongole Municipal Corporation
464 / Supply and Delivery of Desktop Computer Systems to Revenue Section in Ongole
3 2016-17
Municipal Corporation 9.99 AE-5
465 / Supply and Delivery of Desktop Computer Systems to Sanitation Section and
4 2016-17 9.99 AE-5
Engineering section in Ongole Municipal Corporation

Engaging of 110 Hydrualic Chain Mounted Machine, Excavator and Tractors for
466 /
5 2016-17 Lifting of Garbage and earth at Guttikondavaripalem in Survey No.105/3,4,5,7 and 10.00 AE-7
8 of Koppolu(Guttikondavaripalem) in Ongole Municipal Corporation

467 / Maintanace of Air Valves for Water Supply Pumping Main in Ongole Municipal
6 2016-17 9.98 AE-1
Corporation
468 / Supply and Delivery of R..C.C Collars (BIS 458/2003) for Errection and Protection of
7 2016-17
Plants in A.E-2 Section in Ongole Municipal Corporation 10.00 AE-2

469 / Providing Chain Link Mesh Fencing for Green Belt Ramnagar 6th line and Ramnagar
8 2016-17
7th line in Ongole municipal Corporation 8.95 AE-2

470 / Providing Chain link mesh fencing for Green Belt from Ramnager 7th line to
9 2016-17 9.80 AE-2
ramnager 8th line in Ongole municipal Corporation
471 / Laying of Water Supply Pipe Line at Kamma Palem 1st line and Gopal Nagar 6th line
10 2016-17 9.05 AE-1
in Division No.7
Laying of Water Supply Pipe Line from Auxillium School back side road Starting to
472 /
11 2016-17 Burial ground Compound Wall and store Bazar to Gaddam Srinivas House in 7.35 AE-1
Division No.5 and 7
Laying of Water Supply Pipe Line from Dinala Bavi opposite road to N.Venkatrao
473 /
2016-17 House (at culvert) and from N.T.R Statue to Bollineni Anjaneyulu House 9.95
12 AE-1
(Dasaradpalli road right side) in Division No.8

Laying of Water Supply Pipe Line from Bollinenivari Palem 3rd line in 1st cross road
474 / to Mini Bypass road and From N.T.R Statue (Left side tifin hotel along Dasaratha
2016-17 palli Road) to Gopal nagar 4th line extension 4th Cross Road extension in Division 9.80
13 AE-1
No.7
475 / Laying of Water Supply Pipe Line at Guntur road from Komza Motor Ltd to
14 2016-17 2.90 AE-1
Bismillah industries Near Papa Rice Mill in Division No.3
476 / Laying of 150 mm Dia A.C Pipe line from Viswas Nagar to Bhagya Nagar 4th line
15
2016-17 (via) Srikrishna Temple in Division No.31 9.90 AE-5

477 / Providing Quarry Rubbish Road and A.C Pipe Line in Krishna Nagar 2nd Line north
16 2016-17 3.60 AE-6
side of Venkateswara swamy temple in Samatha nagar Division No.38
478 / Formation of Quarry Rubbish Road from Ram Nagar 11th line to 14 th lines and
17 2016-17 9.25 AE-2
cross road in Ramnagar in Division No.15
479 / Supply and delivery of 34 TR Central Air Conditional Unit for Bala Bhavan in Ongole
18 2016-17
Municipal Corporation. 7.95

480 / Providing Ducting Arrangements for providing Central Air Conditional in Bala
19 2016-17 6.50
Bhavan in Ongole Municipal Corporation.
481 / Providing Theater Screen and Drama background motorized curtains in Bala 8.70
20 2016-17
Bhavan in Ongole Municipal Corporation.
482 / Providing Ceiling mounted projector to Bala Bhavan in Ongole Municipal
21 2016-17
Corporation. 8.60

483 / Providing Galvanized Iron Sheet roofing and Scientific Roof Heat Insulation for Bala
22 2016-17
Bhavan in Ongole Municipal Corporation 8.65
484 / Enhancing of existing Video display LED Screen from 10 feet x 6 feet to 10 feet x 12
23 2016-17 9.55
feet in Gandhi Park in Ongole Municipal Corporation
TOTAL 190.66
Download Start Time : 30.06.2016 5.00 P.M
Download End Time : 14.07.2016 5.00 P.M
Receipt of Bids End Time : 14.07.2016 5.15 P.M
Price Bid Opening Time : 14.07.2016 5.30 P.M
Ongole Municipal Corporation - A.P.Urban Greening & Beautification Corporation
485 /
1 2016-17 Limited - Estimate for development of landscape Works for Chennakesava Swamy 50.00
Layout Park (1.68 Acres) at Ongole, Prakasam District.,
TOTAL 50.00
Download Start Time : 22.07.2016 5.00 P.M
Download End Time : 05.08.2016 5.00 P.M
Receipt of Bids End Time : 05.08.2016 5.15 P.M
Price Bid Opening Time : 02.08.2016 5.30 P.M
486 /
1 2016-17 Supply of Fruits and Foliage Plants in Ongole Municipal Corporation 10.00 AE-2

487 /
2 2016-17 Supply of Conocorpus Plants to Divisions 1 to 50 in Ongole Municipal Corporation 10.00 AE-2

488 / Maintenance of Water Supply - Transportation and Supply of Water in various


3 2016-17 10.00 AE-6
places in Ongole Municipal Corporation from 09.08.2016 to 16.09.2016
489 / Construction of Water Harvesting Structures at Various Places in A.E -7 Section in
4
2016-17 Ongole Municipal Corporation 4.20 AE-7

490 / Supply, Delivery and Fixing of Railing in Papa Colany Bridge and Construction of C.C
5
2016-17 Patches in various places in Division No.3 3.04 AE-1

491 /
6 2016-17 Providing R.C.C Slabs on the drain at Pattivari Veedhi in Division No.23 8.75 AE-4
TOTAL 45.99
Download Start Time : 25.07.2016 5.00 P.M
Download End Time : 01.08.2016 5.00 P.M
Receipt of Bids End Time : 01.08.2016 5.15 P.M
Price Bid Opening Time : 01.08.2016 5.30 P.M
492 / Providing C.C Patches in various places from 9 th to 16th Divisions in A.E-2 Section
1 2016-17 9.95 AE-2
in Ongole Municipal Corporation
493 / Manufacture, Supply and Delivery of IM-II Hand Pump Spare Parts to Ongole
2 2016-17 10.00 AE-6
Municipal Corporation
494 / Laying of B.T patches in various places in 37 to 42 Divisions in Ongole Municipal
3 2016-17
Corporation 2.85 AE-6

495 /
2016-17 Repairs to P.V.R Girls High School in Division No.28 9.99 AE-5
4

496 /
5 2016-17 Providing Painting at P.V.R Girls High School in Division No.28 4.90 AE-5

497 /
2016-17 Repairs and Painting to Common Toilets in Thurpu Christian Palem in Division No.8 1.80 AE-4
6

498 / Repairs and Painting to Common Toilets (Srigiri Ghat Road up Side and Srigiri down
7
2016-17 side) in Division No.27 2.10 AE-4
Providing Thermoplastic Road Marking and Supply and Fixing of Raised Pavement
499 /
2016-17 Markers (Road Studs) with Twin Moulded Shanks from south bye pass road to 10.00
8 AE-2
mastan darga centre in ongole Municipal Corporation
500 / Supply and Delivery of Conservency Articles and Supply of Labour for Tree
9 2016-17
Plantation in Ongole Municipal Corporation 10.00 AE-2

501 / Lifting and Clearing of site from Bandlamitta and uracheruvu area in Ongole
10 2016-17 9.50 AE-4
Municipal Corporation
502 / Repairs to Wells Tyaga raju mandiram north side and pichamma well and bheema
11 2016-17 1.60 AE-4
rajula vari veedhi 2nd line in Ongole Municipal Corporation
503 /
12 2016-17 Providing Brick Masanory and Plastering At Sri Giri steps side walls Division No.27 0.43 AE-4

504 / Providing A.C Sheet Roofing Sheds (South and North sides) at New Vegitable
13 2016-17 5.00 AE-4
market in Division No.24
505 / Providing Pre-Cast Dividers in the middle of the road at various places in the town
14 2016-17 9.99 AE-4
in Ongole Municipal Corporation
Supply, Delivery and Fixing of Water testing Monitoring Laboratory for testing of
506 / Turbidity, PH, T.D.S, Acidity, Alkalinity, Quality of Alum, Dosage of Alum, in 14
2016-17 M.L.D Water Treatment Plants at S.S Tank I & New filtter Bed (p.h) in Ongole 0.49
15 AE-5
Municipal Corporation
507 / Manufacturing, Supplying and Fixing of Cubical Work Stations at S.S Tanks and
16 2016-17 7.15 AE-5
Filtration Plants in Ongole Municipal Corporation
508 / Maintanance of Water Supply - Repairs of Leaks in 1 to 8 Divisions in Ongole
17
2016-17 Municipal Corporation 3.45 AE-1

509 /
18 2016-17 Providing Walking Track at Housing board Park in Division No.19 7.20 AE-5

510 / Providing Pathway and 1.5 HP Submersible Motor in Bhagyanagar 2 line Park in
19
2016-17 Division No.20 6.90 AE-5

511 / Providing M.S Fabrication Equipment and Articles in Bhagyanagar 2 line Park in
20 2016-17 1.15 AE-5
Division No.20
MPLADS - Providing Water Supply Pipe Line and Side Drain from Gadiyam
512 /
21 2016-17 Venkataramireddy house to Bypass Road in Housing Board Colony in Division 5.00 AE-5
No.19
513 / Laying of 200 mm and 150 mm dia A.C Pipe Line from Sujatha Nagar 6th Line to
22 2016-17 10.00 AE-6
Samatha Nagar Main Road in Division No.37
514 / Laying of 150 mm dia A.C Pipe Line in Sambasiva Nagar and Gandhi Nagar in
23
2016-17 Division No.37 10.00 AE-6

Providing A.C Pipe Lines from Gundabatthina Murali house to Brahmam gari
515 /
24 2016-17 temple and from Mahesh Medicals at GP Office to Syamasetty Venkatrao house 10.00 AE-6
(including Jandachettu Veedhi) in Uttaram Bazar in Pernamitta in Division No.41

Extension of 150 mm dia A.C Trunk Lines from Open well to 1st line towards east in
516 /
25 2016-17 Santhi Nagar Main Road and Sundaraiah Colony Main Road in Pernamitta in 10.00 AE-6
Division No.42
517 / Improvements to Water Supply to tail end points of Sujatha Nagar in Division
26 2016-17 5.60 AE-6
No.37
518 / Construction of Compound wall at Housing Bord Park opp. M.I.G 54 in Division
27 2016-17 3.28 AE-5
No.19
519 / Construction of Compound Wall at R.R Tank All Round in Ongole Municipal
28 2016-17 9.70 AE-5
Corporation
520 / Construction of Compound wall and Gate from Hindu Burial Ground to Sreenivasa
29 2016-17 9.99 AE-1
Theatre Road (near Power office) in Division No.5
521 /
30 2016-17 Providing C.C Drain at Gaddala Gunta (Near Ramalayam Temple) Division No.32 1.50 AE-5

Construction of C.C Drain and Culvert from Bhagya Nagar 4th line (via Kendriya
522 /
2016-17 Vidyalayam North Side) to Polytechnic College Road in Housing Bord Colony in 2.40
31 AE-5
Division No.19
523 / Construction of C.C Drain from Kendriya Vidyalayam to Polytechnic College Main
32 2016-17 3.00 AE-5
Road at Housing Bord Colony in Division No:19
524 / Construction of C.C Drain & Culverts From pogula Gurumurthy House to Davayadil
33 2016-17 4.16 AE-1
Masjid at Bilal Nagar 3rd Line in Division No:3
525 / Construction of CC Drains from Appati Church (at transform) to Culvert(at Ramu
34 2016-17
house) and Culvert to Pothuraju Canal in Division No.3 7.70 AE-1

526 / Construction of C.C Drain and Culverts from Kaila Ramulu House to Main Road in
35 2016-17
Bilal Nagar 4th line in Division No.3 5.62 AE-1

527 / Construction of C.C Drain and Culverts From Pogula Gurumurthy house to
36 2016-17 5.35 AE-1
Davayadil in Bilal Nagar 3rd Line in Division No.3
528 / Construction of C.C. Drain from Krishnalayam to Udyanavanam in Ayyappaswamy
37 2016-17 2.40 AE-5
Kalyanamandapam Road in Division No.36
529 / Construction of Balance C.C Drain and Culvert at Housing Board Colony
38
2016-17 (Polytechnic College Road last edege) in Division No.19 1.35 AE-5

530 / Construction of C.C. Drain and Quarry Rubbish Road at north side of Devudu
39
2016-17 Cheruvu Park in Division No.30 5.40 AE-5

531 / Providing C.C Drains from Male Krishnareddy house to Palle swarnasri house in
40
2016-17 Pardhasaradhi nagar(Asramam) in Pernamitta in Division No.38 10.00 AE-6

532 / Construction of C.C Drain from B.Ramadevi house to Pothuraju Kaluva right side
41
2016-17 (old Karavadi donka road) in Division No.8 9.92 AE-1

533 / Construction of C.C Drain from P.Ramakrishna rao house (Hindu barial ground
42 2016-17 9.04 AE-1
back side) to Poturagu Kalava in Division No.7
534 / Construction of C.C Drain from Sweet Shop to Pothuraju Canal (hindu burial
43
2016-17 ground back) opp. Old Age Home in Division no.5 7.41 AE-1

535 / Construction of C.C Drain from Sivalayam Temple to Gunji Addemma house in
44
2016-17 Mukthinuthalapadu in Division No.2 6.85 AE-1

536 / Construction of C.C Drain from Madala Shirisha house (at boring) to Pothuraju
45
2016-17 Kalava (old karvadi donkka) in Division No.8 9.89 AE-1

537 / Construction of R.C.C Slab Culvert at Revenue Colony 1st Cross Road in Division
46
2016-17 No.44 0.42 AE-7

538 / Providing Pipe Culvert across Main Road near Samathanagar 2nd line in Division
47 2016-17 0.46 AE-6
No.37
539 / Construction of C.C Drain and C.C Road from Opp. Dasari Peraiah House in Ekalavya
48 2016-17
Nagar in Division No.24 1.61 AE-4
540 / Providing C.C Road and C.C Drain from existing C.C Road to Golden Tree Apartment
2016-17 in Samatha nagar 3rd line (west side of Samatha nagar main road) in Division No.39 7.25
49 AE-6

541 / Providing C.C road from Male Krishnareddy house to Palle swarnasri house in
50 2016-17
Pardhasaradhi nagar (Asramam) (reach-I) in Pernamitta in Division no.38 10.00 AE-6

542 / Providing C.C road from Male Krishnareddy house to Palle swarnasri house in
51 2016-17 3.75 AE-6
Pardhasaradhi nagar(Asramam) (reach-II) in Pernamitta in Division no.38
543 /
2016-17 Providing C.C.Road in Srivalli Nagar in Division No. 38 10.00 AE-6
52

544 / Construction of C.C Road from Killa Venkaiah House to Ramisetty Sreenivasa Rao
53
2016-17 House at Throvagunta in Division No:1 7.92 AE-1

545 / Providing C.C.Road (D.No:36-71-858) Beside Quality Residency at Rajeev Nagar


54 2016-17 2.20 AE-5
extension Division No.32
546 / Providing C.C Road from Sathya Residency opp at Rajeev Nagar extension in
55 2016-17 9.99 AE-5
Division No.32
547 / Providing C.C Road from Trunk Road to Vinayaka Temple in Bhagya Nagar 4th line
56 2016-17
at Division No.19 9.98 AE-5

548 / Construction of C.C Road from Ura Cheruvu to S.Seshayya Koshtam in


57 2016-17
Mukthinuthalapadu in Division No.2 2.70 AE-1

549 / Providing C.C Road ffrom Mangamoor Road to Ankammathalli Apartment in


58 2016-17 10.00 AE-6
Revenue Colony Main Road in Division No.37

550 /
Providing C.C Road from Ankammathalli Apartment to existing C.C Road at
2016-17 Kancharla Venkataramaiah house (D.No.34-62-1054) in Revenue Colony 1st Line in 9.20
59 AE-6
Division No.37
551 / Providing C.C Road At Narayana E-Techno School near court center in Division
60 2016-17 3.70 AE-4
No.25
Providing Quarry Rubbish Road and Dust to all Damageded Main Road and for Pot
552 /
2016-17 Holes, Wheel Track damaged in various places in A.E-5 section in Ongole Municipal 2.00
61 AE-5
Corporation
553 / Levelling of Site at Hindu Burial Ground (at Srineevasa Theatre Road) (near Power
62 2016-17
office) in Division No.5 8.25 AE-1

554 / Providing Quarry Rubbish Road from Samatha nagar main road to Krishna nagar
63 2016-17 3.90 AE-6
main road via Challa Subbarao house in Krishna nagar in Division no.38
555 / Formation of Quarry Rubbish Road at Vijaya Nagar Colony C.R.P Quarters down
64 2016-17 9.99 AE-5
(North and South Sides) of Division No.31
556 / Formation of Quarry Rubbish Road from O.M.C Bore Wells to 10.00 AE-5
65 2016-17
Cheruvukommupalem Main Road in Pelluru in Division No.17
557 /
2016-17 Formation of Quarry Rubbish Road to Ram Nagar 11th line in Division No.17 6.00 AE-5
66

558 / Providing Quarry Rubbish Road from Cheruvukommu Palem Main Road to E.L.S.R
67 2016-17
in Division No.18 1.71 AE-5

559 / Providing Quarry Rubbish Road From Mannem Vekateswarlu House to Bodapati
68 2016-17 0.582 AE-1
Hanumanthu Rao House in Mukthinuthalapadu in Division No:2
560 /
69 2016-17 Laying of Shoulders with Gravel in Chowtapalem in Division No.49 0.53 AE-7
561 / Supply, Delivery and Fixing of Electrical Items and Fans in P.V.R Boys High School in
70 2016-17 0.60 AE-4
Ongole Municipal Corporation
562 / Procurement of 6seated (3+3) Mobile toilet for putting at Old Vegetable market
71 2016-17 5.35
area in Ongole Municipal Corporation (2nd call)
563 / Construction of 5 seated Community toilet near Kothapatnam Bus Stand in Ongole
72 2016-17 7.00
Municipal Corporation (2nd call)
564 / Construction of 5 seated Community toilet near Lorry Owners Asossiation Site in
73 2016-17
Ongole Municipal Corporation (2nd call) 7.00

565 / Construction of 5 seated Community toilet at Jayaprakash Colony in Ongole


74 2016-17 7.00
Municipal Corporation (2nd call)
566 / Construction of 5 seated Community toilet at Pernamitta Christian Palem in 7.00
75 2016-17
Ongole Municipal Corporation (2nd call)
567 / Construction of 5 seated Community toilet at Anjaiah Road in Ongole Municipal
76
2016-17 Corporation (2nd call) 7.00

568 / Providing C.C Drains from Samatha Nagar Main Road to D.Gopala Rao House in
77
2016-17 Samatha Nagar 8th line in Division No.37 (2nd call) 7.95 AE-6

Removal of Road High Berms and Site Levelling and Kutch Drains to providing J.C.B
569 /
78 2016-17 on hire basis in A.E-1 Section in Division No.1 to 8 in Ongole Municipal Corporation 0.925 AE-1
(2nd call)
570 / Providing C.C Patches in various places in A.E-1 Section in Ongole Municipal
79 2016-17 5.78 AE-1
Corporation (3rd call)
571 / Construction of C.C Drain from Shaik Mgbul house to B.Santha Rao house&Raju
80
2016-17 Haouse to Doctor Subbarao house in Division No:5 (3rd call) 9.30 AE-1

Construction of C.C Drains from Tirupalu Naidu house to Ramadevi house&Kavuri


572 /
81 2016-17 Ramanaiah house to Shaik Mastan house Gopal Nagar Extension 4th line in Division 9.95 AE-1
No:5 (3rd call)
Construction of C.C Drain Ramakotiah house to Aavula Kotiah house &
573 /
2016-17 YalamandaReddy house to Aavula Nancharamma house in gopal nagar Extension 5.30
82 AE-1
4th line cross roads in Division No:5 (3rd call)
574 /
83 2016-17 Construction of Internal C.C Drains in Mahendra Nagar in Division No:5 (3rd call) 9.65 AE-1

575 / S.C.S.P Grant 2014-15 - Construction of C.C Drain and Culvert from Edipogu Kotaiah
84
2016-17 House to Patra Vinod House Thurpu Christian Palem in Division No.8 (4th call) 1.38 AE-1

576 / Construction of C.C Drain &Culvert from Basha Tailor Shop to Kayyum House in
85 2016-17
Division No: 4 (5th call) 2.30 AE-1

577 /
2016-17 Construction of C.C Internal Drains (Lorry la Kunta) in Division No:4 (5th call) 8.95 AE-1
86

578 / Construction of C.C Drain From Opp.Ameer House to Community Hall in Division
87 2016-17
No: 4 (5th call) 1.00 AE-1

579 / Construction of C.C Drain from Pendyala rama krishna house to Gopal nagar 4th
88 2016-17 6.80 AE-1
line extension cross roads in Division No.7 (5th call)

580 / Construction of C.C Drain from Kodanda Rama Swamy Temple to K.N.S Electronics
89
2016-17 (opp. Jaya lakshmi theatre road) and Dharavari Veedhi in Division No.7 (5th call) 6.00 AE-1
581 /
90 2016-17 Construction of C.C Drain at Kamma palem 1st line in Division No.7 (5th call) 4.65 AE-1

582 / Construction of C.C Patches and B.T Patches in Various Places in Division No:7 (5th
91 2016-17 6.88 AE-1
call)
TOTAL 539.917
Download Start Time : 28.07.2016 5.00 P.M
Download End Time : 11.08.2016 5.00 P.M
Receipt of Bids End Time : 11.08.2016 5.15 P.M
Price Bid Opening Time : 11.08.2016 5.30 P.M
Supply of Labour for Watch and Ward and Petrolling along NSP canal from
583 /
1 2016-17 Ramatheertham Reservoir to SS Tanks and additional Pumping arrangement to SS 8.00 AE-5
Tank-2 in Ongole Municipal Corporation
584 / Providing C.C Road besides Railway Track at the end of Annavarapadu 2nd line in
2 2016-17 3.80 AE-2
Division No.15
TOTAL 11.80
Download Start Time : 29.07.2016 5.00 P.M
Download End Time : 05.08.2016 5.00 P.M
Receipt of Bids End Time : 05.08.2016 5.15 P.M
Price Bid Opening Time : 02.08.2016 5.30 P.M
585 / Providing C.C.Road from Park East Gate to existing C.C Road in Sambasiva nagar
1 2016-17
Main Road in Chennakesavaswamy Layout in Division No.37 10.00 AE-6

586 / Providing 16 Mts. Galvanised High Mast Lighting System at Gandhi Park in Ongole
2 2016-17 9.50 AE-5
Municipal Corporation
Providing Thermoplastic Road Marking and Supply and Fixing of Raised Pavement
587 / Markers (Road Studs) with Twin Moulded Shanks from Mastan Darga Centre to
2016-17 Church Centre via kothapatnam bus stand and subbarama reddy statue in ongole 7.55
3 AE-2
Municipal Corporation
588 / Supply of Chairs to 9th and 10th Divisions Corporation Building of koppolu in
4 2016-17 1.08 AE-2
Ongole Municipal Corporation
589 / Providing R.C.C Benches in A.E-5 Section in Ongole Municipal Corporation
5 2016-17 1.00 AE-5
(Reserved for L.C.C.S)
Removal of Road High Berms, Site Leveling and Kutcha Drains to Prove J.C.B,
590 /
2016-17 Tractor, Dozzor, 110 Chain Mounted Machine in Engaged on Hire basis in A.E-5 2.60
6 AE-5
Section in Ongole Municipal Corporation
591 / Construction of balance work for Stray Dogs Shed at Veterinary Hospital in Ongole
7 2016-17
Municipal Corporation 5.05 AE-7

592 / Supply and Delivery of Material for Maintence of Post Hole Digger and 12" Augar
8 2016-17 0.95 AE-2
in Ongole Municipal Corporation
593 / Supply and Delivery of Conservency Articles and Supply of Labour for Tree
9 2016-17 1.40 AE-1
plantation in 1 to 8 Divisions in Ongole Municipal Corporation
594 / Engaging the Labour to Tractor and Digger for maintenance of Tree Plantation in
10 2016-17 9.80 AE-2
Ongole Municipal Corporation
595 /
2016-17 Providing Kerb Wall in Annavarappadu Park in Division No.15 0.52 AE-2
11
596 / Panting to South, West, North sides Compond Wall and Grills of the Park area in
12
2016-17 Chennakesavaswamy temple layout in Revenue colony in Division No.37 1.50 AE-6

597 / S.C.S.P 2015-16 - Laying of A.C Pipe Line From E.L.S.R to S.C Colony in
13 2016-17
Vengamukkalapalem in Division No.18 9.99 AE-5

598 / Improvement of Water Supply in Chandraiah Nagar and Sri nagar 1st line in ongole
14 2016-17 0.62 AE-7
Municipal Corporation
599 / Laying of 100 mm dia A.C Pipe Line from Upputuri Venkateswarlu house to Edara
15 2016-17 1.50 AE-2
Ramadevi house in Division No.10
600 / Laying of 100 mm Dia A.C Pipe Line from Sarma College Main Road to Sanjiv Gandhi
16 2016-17
Colony (via Vinayaka Swami Temple) in Division No.30 3.20 AE-5

Laying of 150 mm Dia A.C Pipe Line from Gandhi Park back side Road from M.M
601 /
2016-17 Donka Kalanikethan Shopping Mall to Sankar Narayana Kalyana Mandapam in 9.99
17 AE-5
Division No.35
602 / S.C.S.P 2015-16 - Laying of A.C Pipe Line to SC Colony from Church to North Side
18 2016-17
Road, South Side Road and Opp. Road in Throvagunta in Division No.1 5.00 AE-1

603 / Supply and Delivery of Tractor Engine with 4000 ltrs Capacity water tanker with
19 2016-17 8.00 AE-7
trailer to Ongole Municipal Corporation
604 / Construction of C.C Drain and Culvert from Annavarapadu Main road from 3rd line
20 2016-17
to Ram nagar 2nd line in Division No.15 5.20 AE-2

605 / Construction of C.C Drain at P.V Subba Rao House in Madara valla veedhi in
21 2016-17 2.38 AE-4
Division No.22
606 /
22 2016-17 Construction C.C Drain from Dwakra Bazar to Eunugu Chettu Road in Division N.22 3.20 AE-4

607 / Construction of C.C Drain from Bellamkonda Venkateswarlu house to Kalavathi


23 2016-17 0.80 AE-2
house in Balaji Nagar in Division No.16
608 / Construction of C.C Drain from Sivalayam south and north sides to poleramma
24 2016-17
Temaple in Division No.25 5.55 AE-4

609 / Extenstion of Culverts at K.R Tiffin center and Poleramma Temple and PVR Girls
25 2016-17 4.85 AE-4
High School in Division No.25
610 / S.C.S.P 2015-16 - Construction of C.C Drain from Dharmavarapu Nagaraju House to
26 2016-17 5.00 AE-1
K.Jayaprakash House in Neelaya Palem SC Colony in Division No.6

Construction of C.C Drains from Banka Haribabu house to Marati palem well,
611 /
27 2016-17 Miriyala palem main road to nanduri umamaheswa rao house and Chivukula vari 7.90 AE-2
veedhi of Miriyala palem Rekha Studio to Bundhar Road in Division No.12

612 / Providing C.C Drain, C.C Culvert and C.C Patches at Chavalavari veedhi and
28
2016-17 Ramakuri vari veedhi to Kamasastri veedhi 1 st cross road in Division No.14 6.15 AE-2

613 / Construction of C.C Drain and C.C Road From Opp Dr.Rajeswara Rao Hospital in
29
2016-17 Division No.22 4.30 AE-4

614 / Providing C.C Road and C.C Drain From Mariyam Janiki House to Mamidi sestty
30 2016-17 3.55 AE-4
Subba Rao House in Kuttuboyina vari Palem in Division No.22
615 / Providing C.C Road & Drain From Yerajarla Paddiah house to Railway Station road
31 2016-17
(opp Railway Quarters) in Division No.14 10.00 AE-2

616 / Construction of C.C Road and C.C Drain from Sathya Residency to end of the road
32 2016-17 1.15 AE-5
(Hari Hara Nagar 1st Line) in Division No.33
Laying of 100 mm dia A.C Pipe Line at Sai Baba Temple Road in Division No.44 and
617 / 150 mm dia A.C Pipe Line from N.G.O Colony Main road to Kurnool Road Fly Over
2016-17 on North side and Interconnections at Chandraiah nagar and Venkateswara nagar 9.80
33 AE-7
last in ongole unicipal Corporation
618 / Providing C.C Road From Bhagya Nagar 4th line (2nd Cross Road) to Kokkirala
34 2016-17 8.55 AE-5
Sanjeev Kumara house at Bhagya Nagar in Division No:19
619 / Construction of C.C Road from Viswas Nagar Church to Burial Ground in Division
35 2016-17
No:31 3.35 AE-5

620 / Providing C.C Road From Menda Rangarao house to Pandipatla Mohan house in
36 2016-17 4.20 AE-5
Mamidipalem in Division No.19
621 /
37 2016-17 Providing Internal C.C Roads in Ekalavya Nagar in Division No:24 4.90 AE-4

622 / Providing Quarry Rubbish Roads from O.K Road to Bejavada venkateswarlu house
38 2016-17 9.65 AE-2
and Various places in Indiramma Gruhalu and Rajiv gruhakalpa in Division No.9

623 / Providing C.C Road from Bundar road Ajantha karkana to Gorrepati complex and
39
2016-17 Narayanarao school opp. Aluri tea stall to gopi lite house in Division No.12 5.20 AE-2

624 /
40 2016-17 Formation of Quarry Rubbish Road from Bank Colony 4th line of Division No.19 1.70 AE-5

625 / Filling with Quarry Rubbish at Mutton Market and Dry Fish Market in Division
41 2016-17 0.99 AE-4
No.24
626 / Providing Quarry Rubbish of panchayath office to rachabanda Road at koppolu in
42 2016-17 0.95 AE-2
Division No.10

627 / Construction of Quarry Rubbish Road from Axillium School Back side 1st line and
43
2016-17 2nd line from Bramaiah house to Cristian Burrial Ground Road in Division No.5 1.32 AE-1

628 / Providing Quarry Rubbish Roads to 1, 2, 3 Lines of Indiramma Gruhalu in Division


44 2016-17
No.9 9.95 AE-2

629 / Providing Quarry Rubbish Roads to 4th, 8th and 9th lines in Indiramma Gruhalu in
45 2016-17 10.00 AE-2
Division No.9
630 / Providing Quarry Rubbish Roads to 5th, 6th and 7th lines of Indiramma Gruhalu in
46 2016-17 9.85 AE-2
Division No.9
631 / Providing Quarry Rubbish Roads to Devudu cheruvu veedhi abd Koppolu in Division
47 2016-17 6.80 AE-2
No.9
Providing Quarry Rubbish Roads from Gangadi hanumantha rao house to
632 / Singamaneni hanuamantharao house , O.K Road to Gangadi Rangiah house, O.K
2016-17 Road to kuppala hanumantha rao house and O.K Road to Bejavada venkateswarlu 1.75
48 AE-2
house in Koppolu in Division No.9

Repairs and Rectification of motors and Starters repairs to Pelluru and


Cheruvukommu Plalem mini Pumping Station and SS-II Raw Water 40 HP motor
633 / Bed blocks repairs and R.R tank 3 HP dol Starter and New filtert bed 40 HP Kirloskar
2016-17 motor rewinding and 10HP Sludge Pump repair and 5HP Sub mersible motor 3.00
49 AE-5
rewinding (Water tanker Filling) and 5 HP Vaccum Priming Motor in Ongole
Municipal Corporation
634 /
2016-17 Providing Walking Track at R.R Tank Bond in Ongole Municipal Corporation. 4.10 AE-5
50

Supply and delivery erection of chlorinator ranging from 0 to 5 kg per hour


635 /
2016-17 associated and instrumentation for Pre Chlorination at S.S Tank-II in Ongole 1.60
51 AE-5
Municipal Corporation.

Supply,delivery and erection of Chlorinatior ranging from 0 to 2 kg Per hour


636 /
2016-17 associated and instrumentation at Cheruvukommu palem, Vengamukkalapalem, 2.85
52 AE-5
Koppolu, Mukthinuthalapadu and Pelluru in Ongole Municipal Corporation

637 /
53 2016-17 Renovation of Gandhi Park Tree Plantation & lawn in Ongole Municipal Corporation 9.90 AE-5

638 / Providing damaged WBM Road towards NH-5 to Kotta mamidi palem in Div no 18
54 2016-17 9.99 AE-5
in Ongole Municipal Corporation.
639 / Laying of 150mm Dia AC Pipe Line NH-5 Servo Oil to R.C.C Manufacturing Industry
55 2016-17 4.95 AE-5
End in Division No-36 in Ongole Municipal Corporation.
640 / Construction of C.C Drain and Culvert at Gaddalagunta School back Side in Division
56 2016-17
No.30 3.30 AE-5

Ongole Municipal Corporation - A.P.Urban Greening & Beautification Corporation


641 /
57 2016-17 Limited - Estimate for development of landscape Works for Chennakesava Swamy 50.00
Layout Park (1.68 Acres) at Ongole, Prakasam District., (2nd call)

642 / Construction of Water Harvesting Structures at Various Places in A.E -7 Section in


58
2016-17 Ongole Municipal Corporation (2nd call) 4.20 AE-7

643 / Providing Plaster of Paries Ceiling at Computer Room in Main Office in Ongole
59 2016-17 0.90 AE-5
Municipal Corporation office in Ongole Municipal Corporation (2nd call)

644 / Providing C.C Patches in various places in A.E - 3 & A.E - 5 Section in Ongole
60 2016-17
Municipal Corporation (3rd call) 9.90 AE-5

Providing C.C Drain from Midasala Raju House to Dola Karuna House (near
645 /
2016-17 Chennakasava Swamy Temple) near to 3 Statue Centre in Gaddala Gunta in 5.20
61 AE-5
Division No.30 (3rd call)
646 / Providing C.C Drain and Culvert to Kakumani Bujji Babu House Road in Gaddala
62 2016-17 5.05 AE-5
Gunta in Division No.30 (3rd call)
Construction of C.C.Drain from Hill Tower Water Tank to Narsapuram Subbarao
647 /
2016-17 House to near Hill tower, Dhani Pudi Kotaiah House to Pokuri Madhavi House in 9.75
63 AE-5
Division No.30 (3rd call)
648 / Providing 12 Mtrs Galvanized High Mast Lighting System at Sri Sai Baba Temple in
64 2016-17 5.50 AE-2
Santhapeta in Ongole Municipal Corporation
649 / Construction of C.C Drain and Culvert from Viswas Nagar to Bhagya Nagar 4th line
65 2016-17
(Via) Sri Krishna Temple in Division No:31 (3rd call) 5.85 AE-5

650 / Repairs and Rectification of C.C Patches and C.C Aproches in Rajapanagal Road in
66 2016-17 3.80 AE-5
Division No:29 (3rd call)

651 / Construction of C.C Drain at Konijeti Bus Stand Well, Galagala Srinivasulu House to
2016-17 Vinayaka Temple and C.C Aproches at Rajapanagal Road in Division No:29 (3rd call) 4.60
67 AE-5
652 / Construction CC Drain of Muslim Burial Ground Besides Pedda Masjid in Division
68 2016-17 3.00 AE-2
No.12 (3rd call)
653 / Providing Garden Lighting System, Under Ground Cables, Panel Board, G.I Poles at
69 2016-17 6.80 AE-2
Natu Babu Rao Park in Ongole Municipal Corporation
654 /
2016-17 Construction of C.C Drian in Mangali Palem in Division No.24 (3rd call) 8.00 AE-4
70

655 / Providing Plaster of Paris Ceiling at Balabavan Green Rooms in Ongole Municipal
71 2016-17
Corporation (4th call) 0.86 AE-5

656 / Construction of Damaged Culvers & C.C.Drain Kota Veedi & Mangala Palem in
72 2016-17 6.40 AE-4
Division No.23 (4th call)
657 / Construction of C.C Drain From Sathya Nivas house to Ajantha Silk Carcana in
73 2016-17 4.75 AE-2
Division No.12 (5th call)
658 / Construction of Repairs C.C Drain From Pakeerupalem punuri ramesh house to
74
2016-17 Mashumsha Street in Division No.12 (5th call) 0.95 AE-2

659 / Providing C.C Drain from D.No.6-251 to via B.B Towers, Abhinaya Towers towards
75 2016-17 4.85 AE-5
existing culvert in Lawyerpet extension line in Division No.34 (5th call)

Providing Interconnection at Dibbala Road opposite Raju Complex and Repairs to


660 /
2016-17 300 mm dia A.C Pipe Line near Sujatha Nagar E.L.S.R in Ongole Municipal 0.62
76 AE-7
Corporation
661 / Supply of Outsourcing Workers for Driver and Helpers to Town Planning Section in
77 2016-17 9.80 AE-7
Ongole Municipal Corporation
662 /
2016-17 Providing Non Skid Tiles in Badlamitta area in Division No.24 10.00 AE-4
78

664 /
79 2016-17 Providing Walking Track At DRRM High School in Ongole Municipal Corporation 10.00 AE-4

665 /
2016-17 Providing Walking Track At PVR BOYS High School in Division No.24 10.00 AE-4
80

666 /
81 2016-17 Removal of Debris at Uracheruvu area in Division No.24 7.18 AE-4

667 / Construction of compound wall at P.V.R Boys Municipal High School in Division
82
2016-17 No.24 10.00 AE-4

668 /
83 2016-17 Supply of Fruit Bearings Plants to Ongole Municipal Corporation 10.00 AE-2

669 /
84 2016-17 Supply of Fruit and Foliage Plants to Ongole Municipal Corporation 5.00 AE-2

670 /
85 2016-17 Supply of Plants to Divisions 1 to 25 in Ongole Municipal Corporation 10.00 AE-2

671 /
2016-17 Supply of Plants to Divisions 26 to 50 in Ongole Municipal Corporation 10.00 AE-2
86

672 / Construction C.C Drain from Vegetable Market to Yamini Eye Hospital road in
87 2016-17 8.82 AE-4
Division No.24
Providing Quarry Rubbish Road from O.K Road opp. N.T.R Colony 1st line to Sri
673 /
2016-17 Vinayaka Enclave and Vennapusa Venkata Reddy side of Karthikeya Nagar in 6.60
88 AE-2
Division No.10
674 /
89 2016-17 Providing of jungle Clearence at SS Tank-1 in Ongole Municipal Corporation 8.60 AE-5
TOTAL 534.91
Download Start Time : 11.08.2016 5.00 P.M
Download End Time : 25.08.2016 5.00 P.M
Receipt of Bids End Time : 25.08.2016 5.15 P.M
Price Bid Opening Time : 25.08.2016 5.30 P.M
Providing House Service connections where ever network, Reservoirs & Source is
675 / available with 5 years O & M Cost and details of House Holds without Water Supply
1 2016-17 288.00
House Service Connections under AMRUT Scheme for Ongole Municipal
Corporation UNDER AMRUT SCHEME

Provindig C.C Drain from Vadde Palem in Uracheruvu upto culvert near Addanki
676 /
2 2016-17 Bus Stand Reservoir in Division No.24 in Ongole Municipal Corporation under 13th 50.00
Finance Commission Grant
Construction of C.C Drain from Bhagya Nagar 4th line Archi to Velugu Office Road
677 /
2016-17 (North Side) in Division No:19 in Ongole Municipal Corporation under 13th Finance 24.00
3
Commission Grant
678 / Providing Distribution Pipe lines in Cheruvukommu Palem in Division No.18 in
4 2016-17 20.00
Ongole Municipal Corporation under 13th Finance Commission Grant
679 / Providing Distribution Pipe Line in Housing Board Colony in Division No.19 in
5 2016-17 20.00
Ongole Municipal Corporation under 13th Finance Commission Grant
680 / Providing Distribution Pipe Line in Rajeev Nagar in Division No.32 in Ongole
6 2016-17
Municipal Corporation under13th Finance Commission Grant 20.00

681 / Providing Distribution Pipe Line in Balaji Nagar at 16th Division in Ongole
7 2016-17
Municipal Corporation under 13th Finance Commission Grant 20.00
TOTAL 442.00
Download Start Time : 18.08.2016 5.00 P.M
Download End Time : 01.09.2016 5.00 P.M
Receipt of Bids End Time : 01.09.2016 5.15 P.M
Price Bid Opening Time : 01.09.2016 5.30 P.M
682 / Supply and Delivery of Tractor Engine with 4000 ltrs Capacity water tanker with
1
2016-17 trailer to Ongole Municipal Corporation (2nd call) 8.00 AE-7

683 /
2016-17 Filling for Tank at Gudimellapadu (Current Motor and Oil Motor) in Division No.2 1.40 AE-1
2

684 / Cleaning and Filling for Tank at Mukthinuthalapadu (Current Motor and Oil Motor)
3
2016-17 in Division No.2 1.50 AE-1

685 / Procurement of 6seated (3+3) Mobile toilet for putting at Old Vegetable market
4 2016-17 5.35 AE-1
area in Ongole Municipal Corporation (3rd call)
686 / Supply and Delivery of Conservency Articles and Supply of Labour for Tree
5 2016-17
Plantation in Ongole Municipal Corporation (2nd call) 10.00 AE-2

687 / Engaging the Labour to Tractor and Digger for maintenance of Tree Plantation in
6 2016-17 9.80 AE-2
Ongole Municipal Corporation (2nd call)
TOTAL 36.05
Download Start Time : 31.08.2016 5.00 P.M
Download End Time : 07.09.2016 5.00 P.M
Receipt of Bids End Time : 07.09.2016 5.15 P.M
Price Bid Opening Time : 07.09.2016 5.30 P.M
688 / S.C.S.P Grant 2015-16 - Construction of C.C Drain from Durga Refrigirations to
1
2016-17 D.No.4-6-399 in Lambadi Donka in Division No.46 4.00 AE-7

689 / S.C.S.P Grant 2015-16 - Construction of Disposal C.C Drain in Throvagunta S.C
2 2016-17 4.00 AE-7
Colony in Division No.50
690 / S.C.S.P Grant 2015-16 - Construction C.C Road and C.C Drain in Aravapalem and
3 2016-17
Dandupalem in Division No.23 10.00 AE-4

Providing Thermoplastic Road Marking and Supply and Fixing of Raised Pavement
691 / Markers (Road Studs) with Twin Moulded Shanks from kurnool Road flyover to
2016-17 Magunta Subbaramireddy Statue on North Side of Kurnool Road in Ongole 6.38
4 AE-7
Municipal Corporation Limits

692 / Maintenance of Water Supply for Inter Connections (along Karavadi Donka Road)
5 2016-17 1.10 AE-1
after Mini Bye pass Road in division No.7

693 / Repairs to Wells at Kammapalem and Hindu Burial Ground and OHSR Trovagunta in
6
2016-17 Division No.1 and 7 in Ongole Municipal Corporation (Reserved for L.C.C.S) 4.15 AE-1

694 / Construction of C.C Drain from Kammmapalem 3rd Line to Karavadi Donka Road
7
2016-17 (40' Mini Bye Pass Road) west side in Division No.7 8.25 AE-1

695 / Construction of C.C Road and C.C Drain from Srinivasa Rao House to Singamaneni
8 2016-17
Thirupathaiah House in Karavadi Donka Road 5th Line in Division No.7 4.60 AE-1

696 / Construction of C.C Road from Sudhakar House to Railway Track and T.Brahmaiah
9
2016-17 House to Rail lway Track 1st and 2nd lines in Indurthy Nagar in Division No.8 10.00 AE-1

Laying of A.C Pipe Line from Vijetha School to Railway Track (near Katragadda
697 /
2016-17 Venkateswarlu house) and Chennupati Hari Babu house in Kakathiya Nagar in 3.35
10 AE-1
Division No.8
698 / Construction of C.C Drain from D.No.20-19-49 to Sarada House in Rajakala Bazar
11 2016-17 10.00 AE-1
(Tangilla Kasim street) in Division No.7
699 / Construction of C.C Drain from Mini Byepass Road (Boring) to Kammapalem main
12 2016-17 6.00 AE-1
Road Inkammaplem 3rd Line in Division No.7
Construction of C.C Drain and Quarry Rubbish Road from Chennareddy Ranga Rao
700 /
13 2016-17 House opp. Road and Nagisetty Bharani prasad house in Kakatiya Nagar Extension 5.50 AE-1
in Division No.8
701 / Construction of C.C Drains,Culverts and C.C Patch from D.No.21-3-387 to 21-30-607
14 2016-17 6.60 AE-1
in Kammapalem 4th line in Division No.7
702 /
15 2016-17 Desiltation of Drain at Pelluru at Division No.17 6.65 AE-5

703 / Engaging the Labour for Geo-Tagging of Plants at various places in Ongole
16 2016-17 9.80 AE-2
Municipal Corporation (Reserved for L.C.C.S)
704 / Providing C.C Road in 2nd Cross road in Chennakesavaswamy Layout in Division
17 2016-17 10.00 AE-6
No.37
705 / Providing C.C Road in 3rd Cross road (infront of Park) in Chennakesavaswamy
18 2016-17
Layout in Division No.37 10.00 AE-6

706 / Providing C.C Road Balance Lengths in Main Road, 2nd Cross Road and 3rd Cross
19 2016-17 10.00 AE-6
Roads in Chennakesavaswamy Layout in Division No.37
707 /
2016-17 Providing Electrification to Bala Bhavan in Ongole Municipal Corporation 10.00 AE-6
19

TOTAL 140.38
Download Start Time : 01.09.2016 5.00 P.M
Download End Time : 15.09.2016 5.00 P.M
Receipt of Bids End Time : 15.09.2016 5.15 P.M
Price Bid Opening Time : 15.09.2016 5.30 P.M
708 / Maintenance of Water Supply - Transportation and Supply of Water in various
1
2016-17 places in Ongole Municipal Corporation from 24.09.2016 to 08.11.2016 10.00 AE-6

TOTAL 10.00
Download Start Time : 15.09.2016 5.00 P.M
Download End Time : 22.09.2016 5.00 P.M
Receipt of Bids End Time : 22.09.2016 5.15 P.M
Price Bid Opening Time : 22.09.2016 5.30 P.M
709 / Completion of incomplete Components for Skill Upgradation Training Centre in
1
2016-17 Nehru Nagar of Ongole Municipal Corporation 10.00 AE-6

710 / Maintenance of Water Supply - Procurement of Chlorine Gas to Ongole Municipal


2
2016-17 Corporation 9.85 AE-5

Providing C.C. culvert at Sai visveswara Recidency and Quarry rubbish road from
711 /
3 2016-17 Sai visveswara Recidency to Ghali Phani kumar house in Mangamur road in 6.40 AE-6
Division No.39
712 / Providing CC road and Drain west side of road from Akshra apartment to Sai Balaji
4
2016-17 Enclave in Mangamur road in Division No.39 7.60 AE-6

713 / Supply and Delivery of Conservency Articles and Supply of Labour for Tree
5
2016-17 Plantation in Ongole Municipal Corporation (3rd call) 10.00 AE-2

714 / Engaging the Labour to Tractor and Digger for maintenance of Tree Plantation in
6
2016-17 Ongole Municipal Corporation (3rd call) 9.80 AE-2
TOTAL 53.65
Download Start Time : 30.09.2016 5.00 P.M
Download End Time : 14.10.2016 5.00 P.M
Receipt of Bids End Time : 14.10.2016 5.15 P.M
Price Bid Opening Time : 14.10.2016 5.30 P.M
715 / Repairs and Restoration of Damaged Earthen Bund Portation at North West Corner
1 2016-17 3.85 AE-5
of SS Tank-2 in Ongole Municipal Corporation
716 / Providing C.C Patch and C.C Drain in Kamma Palem 3rd Line and Main Road in
2 2016-17 3.50 AE-1
Division No.7
717 / Maintenance of Water Supply - Procuremetn of Ferric Alum and Bleaching Powder
3 2016-17
to Ongole Municipal Corporation 3.00 AE-5

718 / Providing Voice Broadcast with Digital Feedback Service in Ongole Municipal
4 2016-17
Corporation 1.62 AE-5

Supply, Delivery and Fixing of Water testing Monitoring Laboratory for testing of
719 / Turbidity, PH, T.D.S, Acidity, Alkalinity, Quality of Alum, Dosage of Alum, in 14
5 2016-17 0.49 AE-5
M.L.D Water Treatment Plants at S.S Tank I & New filtter Bed (P.H) in Ongole
Municipal Corporation (2nd call)
720 / Supply and Delivery of Conservency Articles and Supply of Labour for Tree
6
2016-17 plantation in 1 to 8 Divisions in Ongole Municipal Corporation (2nd call) 1.40 AE-1
TOTAL 13.86
Download Start Time : 30.09.2016 5.00 P.M
Download End Time : 07.10.2016 5.00 P.M
Receipt of Bids End Time : 07.10.2016 5.15 P.M
Price Bid Opening Time : 07.10.2016 5.30 P.M

721 / 13th Finance Commission Grant 2014-15 - Providing Distribution Pipe Line in Arava
1
2016-17 Colony, Pothuraju colony in Division No.16 in ongole Municipal Corporation 20.00

S.C.S.P Grant under Plan 2015-16 - Providing C.C Drains and Quarry Rubbish Road
722 /
2016-17 in Ramalingareddy Nagar in Pernamitta in Division No.40 in Ongole Municipal 50.00
2
Corporation
723 / S.C.S.P Grant under Plan 2015-16 - Construction of C.C Drains in Arunodaya Colony
3 2016-17 20.00
in Pernamitta in Division No.39 in Ongole Municipal Corporation
724 / S.C.S.P Grant under Plan 2015-16 - Providing C.C Road in Santhinagar in Pernamitta
4 2016-17
in Division No.42 in Ongole Municipal Corporation 18.00

725 / S.T.S.P Grant under Plan 2015-16 - Providing C.C Road and C.C Drains in S.T Yanadi
5
2016-17 Colny near Military Colony in Division No.37 in Ongole Municipal Corporation 40.00

726 / T.S.P Grant Work under Plan 2015-16 - Construction of Drains in Balaji Nagar S.T
6 2016-17
Colony in Division 16 in Ongole Municipal Corporation 30.00
TOTAL 178.00
Download Start Time : 03.10.2016 5.00 P.M
Download End Time : 17.10.2016 5.00 P.M
Receipt of Bids End Time : 17.10.2016 5.15 P.M
Price Bid Opening Time : 17.10.2016 5.30 P.M
727 / Providing Lighting Arrangements on hire basis to Deepavali Crockery Shops at P.V.R
1 2016-17
Boys High School Ground in Ongole Municipal Corporation 1.00 AE-5

TOTAL 1.00
Download Start Time : 24.10.2016 5.00 P.M
Download End Time : 27.10.2016 5.00 P.M
Receipt of Bids End Time : 27.10.2016 5.15 P.M
Price Bid Opening Time : 27.10.2016 5.30 P.M
728 / Supply and Delivery of Conservancy Articles to Ongole municipal Corporation
1 2016-17
(Reserved for L.C.C.S) 4.69 AE-7

729 /
2 2016-17 Supply and Delivery of Bleaching Powder to Ongole Municipal Corporation 0.55 AE-7

733 / Maintenance of Water Supply - Transportation and Supply of Water in various


3
2016-17 places in Ongole Municipal Corporation from 8.11.2016 to 23.12.2016 10.00 AE-6

744 / Repairs to LIPI T6100 Line Printer of Revenue Section in Ongole Municipal
4 2016-17
Corporation 0.60

746 / Eletrification to Municipal Building at 14 MLD Water Works Compound in Ongole


5 2016-17 4.80 AE-5
Municipal Corporation
747 / Supply of Laboratory Equipment to various Municipal Schools in 31 to 50 Divisions
6 2016-17 0.87 AE-2
in Ongole Municipal Corporation
748 / Supply of Laboratory Equipment to various Municipal Schools in 1 to 30 Divisions
7 2016-17 0.90 AE-2
in Ongole Municipal Corporation
Supply and Delivery kirloskar make 8 hp @2200 RPM Single Cylinder Water Cooled
751 /
2016-17 Handle Start AV1 XL N4 model Disel Engine 100x100 mm Pump Set with to Ongole 1.38
8 AE-7
municipal Corporation
765 / Manufacturing, Supplying and Fixing of Cubical Work Stations at S.S Tanks and
9 2016-17 7.15 AE-5
Filtration Plants in Ongole Municipal Corporation (2nd call)
766 / Providing Voice Broadcast with Digital Feedback Service in Ongole Municipal
10 2016-17 1.62 AE-5
Corporation (2nd call)
TOTAL 32.560
Download Start Time : 26.10.2016 5.00 P.M
Download End Time : 09.11.2016 5.00 P.M
Receipt of Bids End Time : 09.11.2016 5.15 P.M
Price Bid Opening Time : 09.11.2016 5.30 P.M
767 / Formation of Quarry Spell Roads in S.T Yanadi Colony in Kurnool Road in Division
1 2016-17 3.00 AE-6
No.39
768 / Providing Quarry Spell Road from Mallela Rama Rao house to Garigula Gangayya
2
2016-17 house in Throvagunta B.C Colony in Division No.1 2.45 AE-1

769 / Repairs to Deputy Executive Engineer-I's Office Room in Ongole Municipal


3
2016-17 Corporation 0.999

770 / Construction A.C Shed-2 for Sterlised (Stray Dogs) at vetnary hospital in Ongole
4
2016-17 Municipal Corporation 3.30 AE-7
TOTAL 9.749
Download Start Time : 04.11.2016 5.00 P.M
Download End Time : 12.11.2016 5.00 P.M
Receipt of Bids End Time : 12.11.2016 5.15 P.M
Price Bid Opening Time : 12.11.2016 5.30 P.M

771 / Formation of Quarry Spell Road from 1st Main Road to 3rd Main Road at Internal
1
2016-17 Cross Roads in Kesavaraju Kunta in Division No.2 (Reserved for L.C.C.S) 9.55 AE-1

772 / Formation of Quarry Spell Road to 3rd Main Road Internal Cross Roads and 4th
2 2016-17
Main Road in Kesavaraju Kunta in Division No.2 9.30 AE-1

773 /
3 2016-17 Formation of Quarry Spell Road at Bharat Colony 11 Cross Roads in Division No.3 7.50 AE-1

Construction of C.C Road from Kunchala Marthayya house to Kunchala Venkata Rao
774 /
4 2016-17 house (i.e., Chirala Road) in Throvagunta B.C Colony in Division No.1 (Reserved for 8.45 AE-1
L.C.C.S)
775 / Construction of C.C Road from Patnam Swarna House to Dhaniyelu Kotaiah house
5
2016-17 (i.e., Chirala Road) in Throvagunta B.C Colony in Division No.1 8.95 AE-1

Construction of C.C Road from Bandaru Srinu house to Bandaru Veeraswami house
776 /
6 2016-17 and Thamisetty Venkaiah house to Thanniru Prasad in Throvagunta B.C Colony in 9.65 AE-1
Division No.1
777 /
2016-17 Construction of C.C Road to Harihara Nagar 3rd Line in Division No.33 9.60 AE-5
7

778 / Laying of 100 mm and 150 mm dia A.C Pipe Line in Nagendra Colony in Division
8 2016-17 9.95 AE-7
No.45
779 /
9 2016-17 Laying of 100 mm and 150 mm dia A.C Pipe Line in N.G.O Colony in Division No.45 9.95 AE-7

780 /
2016-17 Laying of Quarry Spell Road to Nethaji Nagar Main Road in Division No.50 9.30 AE-7
10
TOTAL 92.20
Download Start Time : 05.11.2016 5.00 P.M
Download End Time : 19.11.2016 5.00 P.M
Receipt of Bids End Time : 19.11.2016 5.15 P.M
Price Bid Opening Time : 19.11.2016 5.30 P.M
781 / Supply and delivery of Megafog 100 CC Vehicle Mounted Heavy Fogging Machine
1 2016-17 4.43
to Ongole Municipal Corporation
TOTAL 4.43
Download Start Time : 11.11.2016 5.00 P.M
Download End Time : 19.11.2016 5.00 P.M
Receipt of Bids End Time : 19.11.2016 5.15 P.M
Price Bid Opening Time : 19.11.2016 5.30 P.M
782 / Laying of A.C Pipe Line from north to south of Chinna Malleswara Colony starting to
1
2016-17 4th Main Road in Kesavaraju Kunta in Division No.2 8.65 AE-1

S.C.S.P 2015-16 - Construction of C.C Drain from Dharmavarapu Nagaraju House to


783 /
2 2016-17 K.Jayaprakash House in Neelaya Palem SC Colony in Division No.6 (2nd call) 4.55 AE-1
(Reserved for L.C.C.S)

784 / S.C.S.P Grant 2014-15 - Construction of C.C Drain and Culvert from Edipogu Kotaiah
3 2016-17 1.25 AE-1
House to Patra Vinod House Thurpu Christian Palem in Division No.8 (5th call)

785 / Construction of C.C Drains from Annavarapadu 4th Line Main Road to Railway track
4 2016-17
in 15th division in Ongole Municipal Corporation (2nd call) 5.65 AE-2

786 / Providing Bore Well, Sump and Raising to Compound Wall to Edhga at Konijedu Bus
5
2016-17 Stand in Ongole Municipal Corporation 7.85 AE-5

787 /
6 2016-17 Laying of Platform in Edhga at Konijedu Bus Stand in Ongole Municipal Corporation 9.15 AE-5

Construction of C.C Drain and Culvert from Bhagya Nagar 4th line (via Kendriya
788 /
2016-17 Vidyalayam North Side) to Polytechnic College Road in Housing Bord Colony in 2.25
7 AE-5
Division No.19 (2nd call)

789 / Construction of C.C Drain from Kendriya Vidyalayam to Polytechnic College Main
8 2016-17
Road at Housing Bord Colony in Division No.19 (2nd call) (Reserved for L.C.C.S) 2.80 AE-5

790 / Repairs to LIPI T6100 Line Printer of Revenue Section in Ongole Municipal
9
2016-17 Corporation (2nd call) 0.60
791 / Supply of Laboratory Equipment to various Municipal Schools in 31 to 50 Divisions
10
2016-17 in Ongole Municipal Corporation (2nd call) 0.87 AE-2

792 / Supply of Laboratory Equipment to various Municipal Schools in 1 to 30 Divisions


11 2016-17 0.90 AE-2
in Ongole Municipal Corporation (2nd call)
Supply and Delivery kirloskar make 8 hp @2200 RPM Single Cylinder Water Cooled
793 /
12 2016-17 Handle Start AV1 XL N4 model Disel Engine 100x100 mm Pump Set with to Ongole 1.38 AE-7
municipal Corporation (2nd call)
794 / Providing Voice Broadcast with Digital Feedback Service in Ongole Municipal
13 2016-17 1.62 AE-5
Corporation (3rd call)
TOTAL 47.52
Download Start Time : 11.11.2016 5.00 P.M
Download End Time : 25.11.2016 5.00 P.M
Receipt of Bids End Time : 25.11.2016 5.15 P.M
Price Bid Opening Time : 25.11.2016 5.30 P.M
Supply and Delivery of Pyrosene Oil - BIS mark (Pyrethrum 0.02%), Pyrethrum
795 /
1 2016-17 extract 0.20 %, Malathion technical 95Ec, Pip Insect Bait (propoxur Gr.) to Ongole 9.22 AE-7
Municipal Corporation
796 / Supply and Delivery of Hand Spray6 14 Ltr. Capacity and POWER SPRAYER to
2 2016-17
Ongole Municipal Corporation 1.25 AE-7

Supply and Delivery of THERMAL FOGGERS fully automaic and semi automatic -
797 /
2016-17 Total Stainless Steel Body combustion chamber - 18.6 KW/25.2 HP to Ongole 2.40
3 AE-7
Municipal Corporation
798 / Engaging of Excavator (JCB/TATA HITACHI) on hire basis for cleaning Vacant Sites
4 2016-17 2.40 AE-7
(Sanitary Division No.5) in Ongole Municipal Corporation
799 / Engaging of Excavator (JCB/TATA HITACHI) on hire basis for cleaning Vacant Sites
5 2016-17
(from Sanitary Division Nos. 1 to 4) in Ongole Municipal Corporation 8.80 AE-7

800 / Supply and Delivery of SFRC Man Hole Covers with Angular Frames in 1 to 50
6 2016-17
Divisions to Ongole Municipal Corporation 10.00 AE-2

801 / Repairs to Dumper Placer (Vehicle No: AP 27 W 8172) in Ongole Municipal


7 2016-17
Corporation (3rd call) 2.75 AE-7

802 / Providing R.C.C N.P 2 Road Crossing Pipes and Quarry Spell Road from Mangamur
8 2016-17 10.00 AE-6
Road to Datta Peetham in Division No.40
803 / Providing C.C Drains both sides and Balance C.C Road in Samatha Nagar 3rd Line in
9 2016-17
Division No.37 (Reserved for L.C.C.S) 9.15 AE-6

804 / Providing Quarry Rubbish Road in Internal Roads in north side from 8th line to 13th
10 2016-17 5.50 AE-6
line in Peerlamanyam (Kurnool road) in Division No.39

805 / Providing Quarry Rubbish Road in Internal Roads in south side from 9th line to 13th
11 2016-17
line in Peerlamanyam (Kurnool road) in Division No.39 (Reserved for L.C.C.S) 4.75 AE-6

806 / Removal of the Desiltation from R.D.O Office to Bhagyanagar 4th line and Trunk
12 2016-17 0.98 AE-5
road Divider Tree Plantation in Ongole Municipal Corporation
TOTAL 67.20
Download Start Time : 28.11.2016 5.00 P.M
Download End Time : 12.12.2016 5.00 P.M
Receipt of Bids End Time : 12.12.2016 5.15 P.M
Price Bid Opening Time : 12.12.2016 5.30 P.M
807 / Construction of 500 KL capacity ELSR at Rangula Factory with 15meters staging
1 2016-17 165.00
under 14th Finance Commission Grants for the year 2015-16
808 / Construction of 500KL ELSR at Chenna Kesava Layout with 15m staging under 14th
2 2016-17 165.00
Finance Commission Grants for the year 2015-16
TOTAL 330.00
Download Start Time : 01.12.2016 5.00 P.M
Download End Time : 17.12.2016 5.00 P.M
Receipt of Bids End Time : 17.12.2016 5.15 P.M
Technical Bid Opening Time : 17.12.2016 5.30 P.M
Price Bid Opening Time : 17.12.2016 5.45 P.M
809 / Providing Iron Safety Structure for LED Display Screen at Gandhi Park in Ongole
1 2016-17 4.85 AE-5
Municipal Corporation
810 / Providing Operation Room for Display Screen at Gandhi Park Container Cabin in
2 2016-17 5.00 AE-5
Ongole Municipal Corporation
811 / Providing Advance Studio Master Sound System to Balabhavan in Ongole Municipal
3
2016-17 Corporation 9.50 AE-5

812 / Repairs and Rectification of Center Lighting Cable from Trunk Road and OMC Office
4
2016-17 Building A.C's Units Wiring in Ongole Municipal Corporation 2.20 AE-5

Supply of Labour for Watch and Ward and Petrolling along N.S.P Canal from
813 /
5 2016-17 Ramatheertham Reservoir to S.S Tanks and additional pumping arrangement to S.S 8.00 AE-5
Tank-2 in Ongole Municipal Corporation
Rennovation of 60 HP Kirloskar Centrifugal Pump for fixing of R.R.Tank and New
814 /
2016-17 filter Bed (Zone-VI) 40 HP Centrifugal Pump Errection in Ongole Municipal 8.15
6 AE-5
Corporation
815 / Providing 40 HP Sub Mersible Motor Deccan V.T for fixing to Hill Tower in Ongole
7 2016-17 4.60 AE-5
Municipal Corporation
Providing A.C Pipe Line and Quarry Spell Road from Potu Krishnaiah house to
816 /
2016-17 Balireddy house opposite Vivekananda Vidyavihar in Revenue Colony in Division 2.35
8 AE-6
No.37
817 / Supply and delivery of Avenue Plants to Plant in Main Roads in Ongole Municipal
9 2016-17 5.00 AE-2
Corporation
818 / Construction of C.C Drain in Jaya Prakash Colony from Existing Drain to Srinu house
10 2016-17
in Division No.50 0.93 AE-7

819 / Cost and Supply of Sanitary Items in Municipal Corporation Schools (High Schools,
11 2016-17 1.33 AE-4
Elementary Schools) in Ongole Municipal Corporation
820 / Construction of C.C Road and C.C Drain from Vanaja house to Chandra Sekhar
12 2016-17 9.80 AE-7
house in Virat Nagar 1st line in Division No.43 (Reserved for L.C.C.S)
821 / Supply and Delivery of Cleaning Materials to Community Toilets in Ongole
13 2016-17
Municipal Corporation 3.50 AE-4

822 / Supply and Delivery of Cleaning Materials to Municipal Corporation School Toilets
14 2016-17
in Ongole Municipal Corporation 3.35 AE-4

823 / Construction of C.C Drain from Christian Burial Ground Compound Wall starting to
15
2016-17 Pothuraju Kaluva an dnear Kalikamma Temple to Pothuraju Canal in Division No.8 9.55 AE-1

824 / Formation of Quarry Rubbish Road and Walking Track at Appayakunta in Division
16 2016-17 4.65 AE-1
No.8
825 / Construction of C.C Road and C.C Drains both sides from B.Anji Babu house to Pole
17 2016-17
No.05210A120300 (1st road) in Division No.5 5.15 AE-1

826 / Construction of C.C Culvert, C.C Road and C.C Patch work from Gopal Nagar 4th line
18 2016-17 4.75 AE-1
starting Amara Krishna house to Gopal Nagar 6th line in Division No.6 and 7
827 / Raising of C.C Road from Gorantla Jayamma house to Y.Mohan House (near Church
19 2016-17 8.15 AE-1
Line) in Indurthy Nagar in Division No.8 (Reserved for L.C.C.S)
828 / Construction of C.C Patches and B.T Patches in Various Places in Division No:7 (6th
20 2016-17 6.35 AE-1
call)

829 / S.C.S.P Grant 2014-15 - Construction of C.C Drain and Culvert from Edipogu Kotaiah
21
2016-17 House to Patra Vinod House Thurpu Christian Palem in Division No.8 (6th call) 1.25 AE-1

830 /
2016-17 Filling with Quarry Spell to Night Shelter in Division No.24 1.15 AE-4
22

Supply and Delivery kirloskar make 8 hp @2200 RPM Single Cylinder Water Cooled
831 /
2016-17 Handle Start AV1 XL N4 model Disel Engine 100x100 mm Pump Set with to Ongole 1.38
23 AE-7
municipal Corporation (3rd call)
832 / Providing Voice Broadcast with Digital Feedback Service in Ongole Municipal
24 2016-17
Corporation (4th call) 1.62 AE-5

833 / Providing Plaster of Paris Ceiling at Balabavan Green Rooms in Ongole Municipal
25 2016-17 0.86 AE-5
Corporation (5th call)
834 / Manufacturing, Supplying and Fixing of Cubical Work Stations at S.S Tanks and
26 2016-17 7.15 AE-5
Filtration Plants in Ongole Municipal Corporation (3rd call)
TOTAL 120.57
Download Start Time : 05.12.2016 5.00 P.M
Download End Time : 19.12.2016 5.00 P.M
Receipt of Bids End Time : 19.12.2016 5.15 P.M
Price Bid Opening Time : 19.12.2016 5.30 P.M

835 / Taking Developmental Activities with and creation of infrastructure facilities -


2016-17 Providing Center Lighting to old Guntur Road from Pothuraju Canal to North 38.50
1 AE-7
Byepass Junction in Ongole Municipal Corporation
836 / Providing Ceiling and Wall Paneling to Dias (Stage) at Balabavan in Ongole
2 2016-17 9.55 AE-5
Municipal Corporation
837 / Levelling the Site in New Vegetable Market area in Division No.24 (Reserved for
3 2016-17 9.50 AE-4
L.C.C.S)
838 /
4 2016-17 Levelling of Site P.V.R Boys Municipal High School Play Ground in Division No.24 9.95 AE-4

Engaging of Hydraulic Chain Mounted Machine, Excavator, Tractor for lifting and
839 /
2016-17 levelling of Garbage and Earth at Guthikondavari Palem Scientific Land Fill Site in 10.00
5 AE-7
Ongole Municipal Corporation
TOTAL 77.50
Download Start Time : 05.12.2016 5.00 P.M
Download End Time : 22.12.2016 5.00 P.M
Receipt of Bids End Time : 22.12.2016 5.15 P.M
Price Bid Opening Time : 22.12.2016 5.30 P.M

840 / Maintenance of Water Supply - Transportation and Supply of Water in various


1
2016-17 places in Ongole Municipal Corporation from 01.01.2017 to 15.02.2017 10.00 AE-6

TOTAL 10.00
Download Start Time : 24.12.2016 5.00 P.M
Download End Time : 31.12.2016 5.00 P.M
Receipt of Bids End Time : 31.12.2016 5.15 P.M
Price Bid Opening Time : 31.12.2016 5.30 P.M
841 / Supply and Errection of E-Toilet (Stainless Steel) at New Vegetable Market area in
1 2016-17 7.00 AE-6
Ongole Municipal Corporation
TOTAL 7.00
Download Start Time : 24.12.2016 5.00 P.M
Download End Time : 07.01.2017 5.00 P.M
Receipt of Bids End Time : 07.01.2017 5.15 P.M
Price Bid Opening Time : 07.01.2017 5.30 P.M
842 / Supply and Delivery of Megafog 100 CC Vehicle Mounted Heavy Fogging Machine
1 2016-17 4.43 AE-7
to Ongole Municipal Corporation
843 / Fixing of P.T.Z Camera and C.C Cameras in various places in Ongole Municipal
2 2016-17 4.75 AE-4
Corporation
844 / Arrangement of Mike Sets and Water Supply Arrangement in Toilets at New
3 2016-17
Vegetable Market area in Ongole Municipal Corporation 1.06 AE-4

845 / Providing Stickering for Public Toilets and Vacant Lands Sign Boards in Ongole
4 2016-17 0.85 AE-4
Municipal Corporation
846 /
5 2016-17 Providing Plastic Drums and Brooms at New Vegetable Market in Division No.24 1.25 AE-4

847 /
2016-17 Laying of 250 mm dia A.C Pipe Line at C.S.S Police Station in Division No.11 1.56 AE-2
6

848 / Rectification of 300 mm dia and 150 mm dia A.C Pipe Line opp. R.R Tank in Division
7 2016-17 0.53 AE-4
No.24
849 / Laying of 150 mm dia A.C Pipe Line from Main Road to P. Venkata Reddy house in
8 2016-17 2.05 AE-2
Division No.15
850 / S.C.S.P Grant 2015-16 - Construction of Disposal C.C Drain in Throvagunta S.C
9
2016-17 Colony in Division No.50 (2nd call) 4.00 AE-7

851 / Procurement of 6seated (3+3) Mobile toilet for putting at Old Vegetable market
10
2016-17 area in Ongole Municipal Corporation 5.35 AE-1

852 / S.C.S.P Grant 2014-15 - Construction of C.C Drain and Culvert from Edipogu Kotaiah
11 2016-17
House to Patra Vinod House Thurpu Christian Palem in Division No.8 (7th call) 1.25 AE-1

Supply and Delivery kirloskar make 8 hp @2200 RPM Single Cylinder Water Cooled
853 /
2016-17 Handle Start AV1 XL N4 model Disel Engine 100x100 mm Pump Set with to Ongole 1.38
12 AE-7
municipal Corporation (4th call)
854 / Providing Voice Broadcast with Digital Feedback Service in Ongole Municipal
13 2016-17 1.62 AE-5
Corporation (5th call)
855 / Repairs to Dumper Placer (Vehicle No: AP 27 W 8172) in Ongole Municipal
14 2016-17 2.75 AE-7
Corporation (4th call)
TOTAL 32.83
Download Start Time : 02.01.2017 5.00 P.M
Download End Time : 09.01.2017 5.00 P.M
Receipt of Bids End Time : 09.01.2017 5.15 P.M
Price Bid Opening Time : 09.01.2017 5.30 P.M
856 / Providing Equipment for Smart Digital Class Rooms in Municipal High Schools in
1
2016-17 Ongole Municipal Corporation 9.00 AE-4
857 / Supply and Delivery of Fiber Modular Toilet Cabins (Indian Model & Western
2016-17 Model) at Pernamitta and S.S Tank I near Bye-Pass in Ongole Municipal Corporation 7.35
2 AE-4

858 / Providing Mural Art Work with Cement Embrossing Art on the Piles of Kurnool
3 2016-17
Road Fly Over on South and North sides in Ongole Municipal Corporation 10.00 AE-7

859 /
4 2016-17 Providing Urinal Blocks at various places in Ongole Municipal Corporation 10.00 AE-4

860 / Supply of Water Tanker for watering the Avenue Plants in Ongole Municipal
5
2016-17 Corporation 9.95 AE-2

861 / Laying of 100 mm dia A.C Pipe Line from Ram Nagar High School to Railway Track in
6
2016-17 Ram Nagar 2nd Line in Division No.15 5.05 AE-2

862 / Supply and Delivery of Piduguralla Stone Powder (Lime) to Ongoe Municipal
7
2016-17 Corporation 5.25 AE-7

863 / Formation of Quarry Rubbish Road from Indla Venkata Subbaiah house to Survey
8 2016-17 6.10 AE-5
Reddy Palem (via) Thufan Nagar in Divisio No.18
Repairs and Rectification of Clarifier Sedimantation Tank Repairs and Rolling
864 /
9 2016-17 Shutter Fixing to 60 HP Motor Pump House and Sludge Sump Cleaning in Ongole 6.65 AE-5
Municipal Corporation (Reserved for L.C.C.S)
865 / Replacement of Damaged Air Blower Pipe and Filter Media in 16.00 MLD
10 2016-17 9.80 AE-5
Filteration Plant at S.S Tank-II in Ongole Municipal Corporation
866 / Supply of Man Mazdoor for Maintenance of Water Supply in 1, 2, 3 and 42, 43, 44
11 2016-17 8.10 AE-8
Divisions in Ongole Municipal Corporation (Reserved for L.C.C.S)

867 / Supply of Man Mazdoor for Maintenance of Water Supply in 28, 29 and 32, 33, 34,
12
2016-17 35, 36 Divisions in Ongole Municipal Corporation (Reserved for L.C.C.S) 8.10 AE-8

868 / Engaging of Man Mazdoor (unskilled labour) for maintenance of Works Inspectors
13
2016-17 for the year 2016-17 in Ongole Municipal Corporation (Reserved for L.C.C.S) 9.40 AE-5

869 /
2016-17 Fixing of Advertisement Hoardings in Ongole Municipal Corporation 9.90 AE-4
14
TOTAL 114.65
Download Start Time : 02.01.2017 5.00 P.M
Download End Time : 16.01.2017 5.00 P.M
Receipt of Bids End Time : 16.01.2017 5.15 P.M
Price Bid Opening Time : 16.01.2017 5.30 P.M
870 / Engaging of Unskilled Mazdoor for Sanitation work in Ongole Municipal
1
2016-17 Corporation (Reserved for L.C.C.S) 9.98 AE-7
TOTAL 9.98
Download Start Time : 12.01.2017 5.00 P.M
Download End Time : 27.01.2017 5.00 P.M
Receipt of Bids End Time : 27.01.2017 5.15 P.M
Price Bid Opening Time : 27.01.2017 5.30 P.M
Name of the works:
(A) Laying of 200 mm,150mm and 100mm dia AC Class-15 pipe line at
Venkateswara Colony in division.No.50 of ongole Municipal Corporation
(B) Laying of water supply pipe line from Sujatha Nagar ELSR to Kurnool road for
improvement of water supply to various colonies i.e. Srinagar colony,Srinivasa
871 /
2016-17 colony,Maruthi nagar,Andhra Kesari nagar,Sri ram colony etc..in Ongole Municipal 140.00
1
Corporation
(C ) Laying of 200mm ,150mm dia AC pipe line from Dheeraj Enclave in Sujatha
Nagar 11th line to Samatha Nagar in Division.No.37 Laying of 200 mm,150mm and
100mm dia AC Class-15 pipe line at Venkateswara Colony in division.No.50 of
ongole Municipal Corporation

Name of the works:


(A) Laying of 250 mm dia Cl 15 A.C Pipe Line from Koppolu ELSR to S.C Colony
872 /
2 2016-17 Community Hall in Division No.9 & 10 in Ongole Municipal Corporation 98.00
(B) Laying of 200 mm, 150 mm and 100 mm dia Water Supply Pipe Lines in Bilal
Nagar and Papa Colony in Division No.3 in Ongole Municipal Corporation

Name of the works:


Providing water supply Pipe Line from Gaddalagunta E.L.S.R upto Prakasam
Panthulu Statue Junction & Providing water supply Pipe Line from Rythu Bazar
873 /
2016-17 Junction to Ayyappa street in Mangamoor Road & Providing water supply Pipe Line 183.00
3
from Bhagya Nagar E.L.S.R to Bank colony and pragathi colony & Laying of R.C C
Pipe line from N.S.P Canal to S.S Tank at Vengamukkala Palem in Division No:18 in
Ongole Municipal Corporation

874 / Developmental Activities and Infrastructure Facilities Grant - Providing Tree Guards
3
2016-17 to plants in Ongole Municipal Corporation 50.00
TOTAL 471.00
Download Start Time : 20.01.2017 5.00 P.M
Download End Time : 08.02.2017 5.00 P.M
Receipt of Bids End Time : 08.02.2017 5.15 P.M
Technical Bid Opening Time : 08.02.2017 5.30 P.M
Price Bid Opening Time : 08.02.2017 5.45 P.M
875 /
2016-17 Filling of Water from N.S Canal to Gudimellapadu Tank (Oil Motor) in Division No.2 0.98 AE-8
1

876 / Filling of Water from N.S Canal to Mukthinuthalapadu Tank (Oil Motor) in Division
2 2016-17 0.98 AE-8
No.2
877 / Repairs and Painting to Public Toilets in New Vegetable Market area in Division
3 2016-17
No.24 2.00 AE-4

878 / Providing Figurative/Non Figurative/Stencils/Letter Writing/Art Work on walls out


4 2016-17 2.02 AE-4
sides of Public Toiles in Ongole Municipal Corporation
879 / Repairs and Rectification of Ongole Municipal Corporation Office and Gandhi Park
5 2016-17 0.999 AE-5
in Ongole Municipal Corporation
880 / Arrangements of Flush Out Boxes in existing Toilets in Market area (South Side
6 2016-17
Block) in Division No.24 1.11 AE-4

881 / Arrangements of Flush Out Boxes in existing Toilets in Market area (East Side Block)
7 2016-17 1.11 AE-4
in Division No.24
882 / Arrangements of Flush Out Boxes in existing Toilets in Market area (West Side
8 2016-17 1.11 AE-4
Block) in Division No.24
883 / Arrangements of Flush Out Boxes in existing Toilets in Market area (North Side
9 2016-17 1.11 AE-4
Block) in Division No.24

884 / Removal of Road High Berms and Site Legvelling in Miriyala Palem, Kabadi Palem
10
2016-17 and Mini Stadium for Special Sanitation Drive in Ongole Municipal Corporation 3.00 AE-5

885 / Supply and Fixing of Children Play Equipments in Rajeev Nagar Park in Division
11 2016-17 2.55 AE-5
No.34
886 / Construction of C.C Culvert near N.H-5 opp. Royal Enfield Show Room in Division
12 2016-17
No.30 1.95 AE-5

887 / Providing Flooring with Vertified Tiles to Display Centre in Skill Upgradation
13 2016-17 1.00 AE-6
Training Centre in Ongole Municipal Corporation
888 / Construction of C.C Drain From Opp.Ameer House to Community Hall in Division
14 2016-17 0.95 AE-1
No: 4 (6th call)
TOTAL 20.869
Download Start Time : 27.01.2017 5.00 P.M
Download End Time : 03.02.2017 5.00 P.M
Receipt of Bids End Time : 03.02.2017 5.15 P.M
Price Bid Opening Time : 03.02.2017 5.30 P.M
889 / Providing Mural Art Work with Cement Embrossing Art on the Beams of Kurnool
1
2016-17 Road Fly Over on North Side in Ongole Municipal Corporation 8.50 AE-7

890 / Providing Mural Art Work with Cement Embrossing Art on the Beams of Kurnool
2
2016-17 Road Fly Over on South Side in Ongole Municipal Corporation 8.50 AE-7

891 / Providing Mural Art Work with Cement Embrossing Art on the Beams of Kurnool
3 2016-17 8.50 AE-7
Road Fly Over (for Entrance 3 and 4) in Ongole Municipal Corporation
892 / Providing Figurative / Non Figurative Wall Art Painting on Pipes of Kurnool Road Fly
4 2016-17 10.00 AE-7
Over in Ongole Municipal Corporation
893 / Rennovation of Nirmal Nagar Park Tree Plantation and Lawn in Ongole Municipal
5 2016-17
Corporation 9.90 AE-5

Supply of Labour for Watch and Petrolling along with Irrigation Canal from
894 /
6 2016-17 Gundlakamm Project to Yedugundlapadu Raw Water Pump House in Ongole 9.35 AE-8
Municipal Corporation
895 / Engaging of Tractors on hire basis for digging of holes and transportation of plants
7 2016-17
to various places in Divisions 1 to 50 in Ongole Municipal Corporation 9.80 AE-2

896 / Maintenance of Electrical Materials (1 to 50 Divisions) 2016-2017 in Ongole


8 2016-17 5.00 AE-2
Municipal Corporation
897 /
9 2016-17 Development of Rajeev Nagar Park in Division No.34 9.90 AE-5

898 / Development of Landscaping and Tree Plantation in Rajeev Nagar Park in Ongole
10
2016-17 Municipal Corporation 9.65 AE-5

Providing C.C Drain and R.C.C Culvert in Hindu Burial Ground opp. Gopal Nagar
899 /
11 2016-17 Extension and Auxillium School Back Side 1st Line to Srinivasa Theatre Road in 5.75 AE-1
Ongole Municipal Corporation
900 / Providing C.C Road from Vysya Hostel to Fire Prasad house in Seetharama Puram in
12 2016-17 9.98 AE-5
Division No.31 (Reserved for L.C.C.S)
901 / Construction of C.C Drains from Housing Board Park south side cross roads in
13 2016-17 5.05 AE-5
Division No.19 (Reserved for L.C.C.S)
902 / Construction of C.C Drains and Culverts from Housing Board Park 5th Cross Roads
14 2016-17 6.75 AE-5
in Division No.19
903 / Providing Quarry Spell Road and Drain from Mangamoor Road to Krishna Mandir in
15 2016-17 4.75 AE-6
Mangamoor Road in Division No.39 (Reserved for L.C.C.S)
TOTAL 121.38 18.21
Download Start Time : 27.01.2017 5.00 P.M
Download End Time : 10.02.2017 5.00 P.M
Receipt of Bids End Time : 10.02.2017 5.15 P.M
Price Bid Opening Time : 10.02.2017 5.30 P.M
904 /
2016-17 Providing C.C Road to I.D.S.M.T Layout Reach-I 3rd Cross Road in Division No.18 9.00 AE-5
1

905 / Providing C.C Drain and Culvert to I.D.S.M.T Layout Reach-I 3rd Cross Road in
2 2016-17 9.15 AE-5
Division No.18
Construction of C.C Road and C.C Drain from Thatakula Kotaiah house to
906 /
3 2016-17 Uppalapati Punnaiah raju house to N.H-5 in Nagendra Nagar Main Road North side 6.40 AE-7
1st Cross Road in Division No.45
907 / Construction of C.C Road from Mani Varma Kumar house to Manyam Rattaiah
4
2016-17 house in Nagendra Nagar 7th Line in Division No.45 5.30 AE-7

908 / Construction of C.C Road from Kutluri Bramareddy house in Nagendra Nagar Main
5 2016-17
Road to Nagendra Nagar 4th Cross Road in Division No.45 (Reserved for L.C.C.S) 8.75 AE-7

909 / Construction of C.C Road from Kunchala Anjaiah house to Narayana Swamy house
6
2016-17 in Nagendra Nagar Main Road North side 6th cross road in Division No.45 3.10 AE-7

910 / Formation of Quarry Spell Road at Damacharla Janardhan Rao Street in Division
7 2016-17 2.75 AE-8
No.3
TOTAL 44.45 6.67
Download Start Time : 31.01.2017 5.00 P.M
Download End Time : 14.02.2017 5.00 P.M
Receipt of Bids End Time : 14.02.2017 5.15 P.M
Price Bid Opening Time : 14.02.2017 5.30 P.M
911 / S.C.S.P Grant 2016-17 - Formation of C.C Road in Throvagunta SC Colony from
1 2016-17 Ganagaiah house to Venkata Subbaiah house in Division No.1 10.00 AE-8

912 / S.C.S.P Grant 2016-17 - Formation of C.C Road in Throvagunta SC Colony from
2 2016-17 10.00 AE-8
Jangam Prasad house to Govada Ramaiah house in Division No.1
913 / S.C.S.P Grant 2016-17 - Construction of C.C Drain From Existing CC Drain to
3 2016-17 10.00 AE-8
Mudiganda Vagu (Bit-2) in Division No.1
S.C.S.P Grant 2016-17 - Construction of CC Drain from Kommu Koteswra rao house
914 /
4 2016-17 to Rayapati Yohosiva house and Rayapati Chandra sekhar house to Rayapati 6.60 AE-8
Ankaiah house in Mukthinutalapadu SC Colony in Division No.2

S.C.S.P Grant 2016-17 - Construction of CC Drain from Rayapati Venkateswarulu


915 / house to Darlapurna Chandrarao house and Darlapurna Chandrarao house to
5 2016-17 8.30 AE-8
Rayapati Martamma house in Mukthinutalapadu SC Colony in Division No.2
(Reserved for L.C.C.S)
916 / S.C.S.P Grant 2016-17 - Construction of CC Drain from Kommu Asirvadham site to
6 2016-17 7.50 AE-8
Dandubata in Mukthinutalapadu SC Colony in Division No.2
917 / S.C.S.P Grant 2016-17 - Construction of CC Drain from Naneepogu Bramaiah house
7 2016-17 7.30 AE-8
to Elementry School in Mukthinutalapadu SC Colony in Division No.2
918 / S.C.S.P Grant 2016-17 - Construction of CC Drain from Elementry School to Pachava
8 2016-17 6.90 AE-8
Subbarao (H) in Mukthinutalapadu SC Colony in Division No.2
S.C.S.P Grant 2016-17 - Construction of CC Drain from Rayapati Asirvadham house
919 /
9 2016-17 to Rayapati Dayanandam house and Perupogu Ankaiah house to Elemenrty School 6.10 AE-8
in Mukthinutalapadu SC Colony in Division No.2
S.C.S.P Grant 2016-17 - Construction of CC Road in Bonthu Nagaraju house to
920 /
10 2016-17 Gudimellapadu Village road and Naneepogu Bramaiah house to Gudimellapadu 8.40 AE-8
Village road in Mukthinuthalapadu SC Colony in Division No.2
S.C.S.P Grant 2016-17 - Construction of CC Drain from Dasari Ramakrishna house to
921 /
11 2016-17 Kala Pranganam in Mukthinutalapadu SC Colony in Division No.2 (Reserved for 10.00 AE-8
L.C.C.S)
922 / S.C.S.P Grant 2016-17 - Formation of CC Road From SC Colony to Main Road in
12 2016-17 10.00 AE-8
Mukthinuthalapadu in Division No.2
923 / S.C.S.P Grant 2016-17 - Formation of CC Road From Main Road to SC Colony in
13 2016-17 Mukthinuthalapadu in Division No.2 10.00 AE-8

924 / S.C.S.P Grant 2016-17 - Construction of CC Drain from Kalapragnam to Dandubata


14 2016-17 10.00 AE-8
in Mukthinutalapadu SC Colony in Division No.2
925 / S.C.S.P Grant 2016-17 - Providing Disposal drain from Throvagunta 1st Line to
15 2016-17 8.95 AE-7
towards Mudigondavagu from Chainage100 to 280 mts in Division No.50
926 / S.C.S.P Grant 2016-17 - Providing Disposal drain from Chainage 280-455 mts along
16 2016-17 8.95 AE-7
the national high way in Division No.50
S.C.S.P Grant 2016-17 - Construction of CC Roads from Existing CC Road in
927 /
17 2016-17 Throvagunta 1st Line to NH-5 Upto Burial ground from chainage 0 to 150 mts in 9.80 AE-7
Division No.50
928 / S.C.S.P Grant 2016-17 - Construction of CC Road from chainage 150 to 300 mts
18 2016-17 9.90 AE-7
towards national high way in Division No.50
929 / S.C.S.P Grant 2016-17 - Construction of CC Roads from chainage 300 to 450 mts in
19 2016-17 7.10 AE-7
Division No.50 (Reserved for L.C.C.S)
930 / S.C.S.P Grant 2016-17 - Laying of Quarry Spell road in Throvagunta 6th cross road in
20 2016-17 2.30 AE-7
in Division No.50
TOTAL 168.10 25.22
Download Start Time : 04.02.2017 5.00 P.M
Download End Time : 18.02.2017 5.00 P.M
Receipt of Bids End Time : 18.02.2017 5.15 P.M
Price Bid Opening Time : 18.02.2017 5.30 P.M
931 / Providing Trunk Main from Hindu Burial Ground ELSR to Kesavaraju Kunta in
1 2016-17 49.53
Ongole Municipal Corporation under 14th Finance Commission Grant
Providing Gravity Main from Mangamoor Road to proposed Chenna kesava Swamy
932 /
2016-17 Layout ELSR in Ongole Municipal Corporation under 14th Finance Commission 25.00
2
Grant
933 / Filling and Levelling of the Site alloted to Survey No.116 Plots 404 to 458 belongs to
3
2016-17 STs residing at New Vegetable Market site in Ongole Municipal Corporation 9.95 AE-2

TOTAL 84.48
Download Start Time : 09.02.2017 5.00 P.M
Download End Time : 23.02.2017 5.00 P.M
Receipt of Bids End Time : 23.02.2017 5.15 P.M
Price Bid Opening Time : 23.02.2017 5.30 P.M
934 / Maintenance of Water Supply - Transportation and Supply of Water in various
1 2016-17 10.00 AE-6
places in Ongole Municipal Corporation from 16.02.2017 to 31.03.2017
935 / Repairs and Rectification of Pipe Line Leaks and Inter Connections to Pelluru,
2 2016-17 2.90 AE-5
Cheruvukommupalem and M.M Donka in Ongole Municipal Corporation
936 / Construction of C.C Road from Amrutha Mineral Water Road Culvert to Pothineni
3 2016-17
Rama rao house in Division No.8 (Reserved for L.C.C.S) 2.35 AE-1

937 / Construction of C.C Culvert at Karumudi Venkateswara house in Gudimellapadu


4
2016-17 road in Division No.1 0.60 AE-1

938 / Construction of R.C.C Slab Culvert at N.Narasimha house in Venkateswara Colony


5 2016-17 0.40 AE-7
main road in Division No.50
TOTAL 16.25
Download Start Time : 09.02.2017 5.00 P.M
Download End Time : 16.02.2017 5.00 P.M
Receipt of Bids End Time : 16.02.2017 5.15 P.M
Price Bid Opening Time : 16.02.2017 5.30 P.M
Supply of Labour for Watch and Ward and Petrolling along NSP canal from
939 /
2016-17 Ramatheertham Reservoir to SS Tanks and additional Pumping arrangement to SS 9.98
1 AE-3
Tank-2 in Ongole Municipal Corporation
TOTAL 9.98
Download Start Time : 17.02.2017 5.00 P.M
Download End Time : 23.02.2017 5.00 P.M
Receipt of Bids End Time : 23.02.2017 5.15 P.M
Price Bid Opening Time : 23.02.2017 5.30 P.M

Name of the works:


(A) Laying of 200 mm,150mm and 100mm dia AC Class-15 pipe line at
Venkateswara Colony in division.No.50 of ongole Municipal Corporation
(B) Laying of water supply pipe line from Sujatha Nagar ELSR to Kurnool road for
improvement of water supply to various colonies i.e. Srinagar colony,Srinivasa
940 /
1 2016-17 colony,Maruthi nagar,Andhra Kesari nagar,Sri ram colony etc..in Ongole Municipal 140.00
Corporation
(C ) Laying of 200mm ,150mm dia AC pipe line from Dheeraj Enclave in Sujatha
Nagar 11th line to Samatha Nagar in Division.No.37 Laying of 200 mm,150mm and
100mm dia AC Class-15 pipe line at Venkateswara Colony in division.No.50 of
ongole Municipal Corporation (2nd call)
Name of the works:
(A) Laying of 250 mm dia Cl 15 A.C Pipe Line from Koppolu ELSR to S.C Colony
941 /
2016-17 Community Hall in Division No.9 & 10 in Ongole Municipal Corporation 98.00
2
(B) Laying of 200 mm, 150 mm and 100 mm dia Water Supply Pipe Lines in Bilal
Nagar and Papa Colony in Division No.3 in Ongole Municipal Corporation (2nd call)

Name of the works:


Providing water supply Pipe Line from Gaddalagunta E.L.S.R upto Prakasam
Panthulu Statue Junction & Providing water supply Pipe Line from Rythu Bazar
942 /
2016-17 Junction to Ayyappa street in Mangamoor Road & Providing water supply Pipe Line 183.00
3
from Bhagya Nagar E.L.S.R to Bank colony and pragathi colony & Laying of R.C C
Pipe line from N.S.P Canal to S.S Tank at Vengamukkala Palem in Division No:18 in
Ongole Municipal Corporation (2nd call)

TOTAL 421.00
Download Start Time : 18.02.2017 5.00 P.M
Download End Time : 08.03.2017 5.00 P.M
Receipt of Bids End Time : 08.03.2017 5.15 P.M
Technical Bid Opening Time : 08.03.2017 5.30 P.M
Price Bid Opening Time : 08.03.2017 5.45 P.M

943 / Maintenance of Water Supply - Transportation and Supply of Water in various


1 2016-17 10.00
places in Ongole Municipal Corporation from 01.04.2017 to 15.05.2017

Providing and Maintenance of Vesavi upasaina kendram's of Nellore Bus stand,


944 /
2 2016-17 Addanki Bus stand, P.V.R Girls High School and P.V.R Boys High School's centers in 8.20
Ongole Municipal Corporation
TOTAL 18.20
Download Start Time : 20.03.2017 5.00 P.M
Download End Time : 28.03.2017 5.00 P.M
Receipt of Bids End Time : 28.03.2017 5.15 P.M
Price Bid Opening Time : 28.03.2017 5.30 P.M
945 /
1 2016-17 Providing C.C Roads in Venkateswara colony in Division No.50 50.00 AE-7

946 /
2016-17 Construction of C.C Road to Srinivasa colony Main road in Division No.44 26.50 AE-7
2

947 / Widening of 60' (feet) Road on both sides from Kurnool Road to Pothuraju Canal in
3 2016-17 50.00 AE-7
Ongole municipal Corporation
948 / Drilling of Deep Bore Well and Fixing of IM-II Hand Pumpsets at various places in
4 2016-17
Ongole Municipal Corporation 11.50 AE-6

949 / Development of landscape works for Housing Board colony Park (1.41 Acres) in
5 2016-17 50.00 AE-3
Ongole Municipal Corporation
950 / Development of Greenary under Kurnool Road Fly Over in Ongole Municipal
6 2016-17 50.00 AE-7
corporation

951 / Construction of Disposal drain from Poleramma Temple to Pothuraju Canal via Old
2016-17 S.C Colony in Pernamitta of Division No.41 and 42 in Ongole Municipal Corporation 50.00
7 AE-6
Providing C.C Road from Venkateswaraswamy Temple in Samatha Nagar to Kurnool
952 /
2016-17 Road via Krishna Nagar and Manikanta Nagar in Division No.38 and 39 in Ongole 50.00
8 AE-6
Municipal Corporation
TOTAL 338.00
Download Start Time : 25.03.2017 5.00 P.M
Download End Time : 10.04.2017 5.00 P.M
Receipt of Bids End Time : 10.04.2017 5.15 P.M
Price Bid Opening Time : 10.04.2017 5.30 P.M
953 / Transportation of Drinking Water at various places of the town in Divisions 1 to 25
1 2016-17 9.99 AE-6
during summer 2017 in Ongole Municipal Corporation
954 / Transportation of Drinking Water at various places of the town in Divisions 26 to 50
2 2016-17
during summer 2017 in Ongole Municipal Corporation 9.99 AE-6

955 / Transportation and supply of water in various places in Ongole Municipal


3 2016-17 9.99 AE-6
Corporation
956 / S.C.S.P Grant 2016-17 - Providing Quarry Rubbish Roads to Main Roads in Pragathi
4 2016-17 10.00
Colony S.C Area in Division No.17
957 / S.C.S.P Grant 2016-17 - Providing Quarry Rubbish Roads to Cross Roads in Pragathi
5
2016-17 Colony S.C Area in Division No.17 10.00
TOTAL 49.97
Download Start Time : 27.03.2017 5.00 P.M
Download End Time : 04.04.2017 5.00 P.M
Receipt of Bids End Time : 04.04.2017 5.15 P.M
Price Bid Opening Time : 04.04.2017 5.30 P.M
203 /
2016-17
204 /
2016-17
205 /
2016-17
206 /
2016-17
207 /
2016-17
208 /
2016-17
209 /
2016-17
210 /
2016-17

211 /
2016-17

212 /
2016-17

213 /
2016-17

214 /
2016-17

215 /
2016-17
216 /
2016-17
217 /
2016-17
218 /
2016-17
219 /
2016-17
220 /
2016-17
221 /
2016-17
222 /
2016-17
223 /
2016-17
224 /
2016-17
225 /
2016-17
226 /
2016-17
227 /
2016-17
228 /
2016-17
229 /
2016-17
230 /
2016-17
231 /
2016-17
232 /
2016-17
233 /
2016-17

234 /
2016-17

235 /
2016-17
236 /
2016-17
237 /
2016-17
238 /
2016-17

239 /
2016-17

240 /
2016-17

241 /
2016-17

242 /
2016-17

243 /
2016-17

244 /
2016-17

245 /
2016-17
246 /
2016-17
247 /
2016-17

248 /
2016-17

249 /
2016-17
250 /
2016-17
251 /
2016-17
252 /
2016-17
253 /
2016-17
254 /
2016-17
255 /
2016-17
256 /
2016-17
257 /
2016-17
258 /
2016-17
259 /
2016-17
260 /
2016-17

261 /
2016-17

262 /
2016-17

263 /
2016-17

264 /
2016-17

265 /
2016-17
266 /
2016-17
267 /
2016-17

268 /
2016-17

269 /
2016-17
270 /
2016-17
271 /
2016-17
272 /
2016-17
273 /
2016-17

274 /
2016-17

275 /
2016-17
276 /
2016-17
277 /
2016-17
278 /
2016-17
279 /
2016-17
280 /
2016-17

281 /
2016-17

282 /
2016-17

283 /
2016-17

284 /
2016-17
285 /
2016-17

286 /
2016-17
287 /
2016-17
288 /
2016-17
289 /
2016-17
290 /
2016-17

291 /
2016-17

292 /
2016-17

293 /
2016-17

294 /
2016-17
295 /
2016-17
296 /
2016-17
297 /
2016-17
298 /
2016-17
299 /
2016-17
300 /
2016-17
301 /
2016-17

302 /
2016-17

303 /
2016-17

304 /
2016-17

305 /
2016-17
306 /
2016-17

307 /
2016-17
308 /
2016-17
309 /
2016-17
310 /
2016-17
311 /
2016-17
312 /
2016-17
313 /
2016-17
314 /
2016-17
359 /
2016-17
360 /
2016-17
361 /
2016-17
362 /
2016-17
363 /
2016-17
364 /
2016-17
371 /
2016-17

451 /
2016-17

378 /
2016-17
424 /
2016-17

425 /
2016-17

426 /
2016-17

427 /
2016-17

391 /
2016-17

393 /
2016-17
394 /
2016-17
395 /
2016-17
401 /
2016-17

402 /
2016-17
403 /
2016-17
381 /
2016-17
485 /
2016-17

489 /
2016-17

452 /
2016-17

379 /
2016-17

409 /
2016-17

410 /
2016-17

411 /
2016-17

417 /
2016-17
420 /
2016-17

422 /
2016-17
438 /
2016-17

444 /
2016-17
388 /
2016-17
400 /
2016-17
396 /
2016-17
397 /
2016-17

404 /
2016-17
603 /
2016-17

562 /
2016-17
500 /
2016-17
594 /
2016-17
686 /
2016-17
687 /
2016-17

506 /
2016-17

593 /
2016-17
507 /
2016-17
718 /
2016-17
610 /
2016-17

575 /
2016-17

194 /
2015-16

522 /
2016-17

523 /
2016-17

744 /
2016-17
747 /
2016-17
748 /
2016-17

751 /
2016-17
766 /
2016-17

705 /
2015-16

757 /
2016-17

758 /
2016-17

378 /
2015-16
762 /
2016-17

784 /
2016-17

793 /
2016-17

794 /
2016-17
764 /
2016-17
E-Off K 20

689 /
2016-17
685 /
2016-17

829 /
2016-17

831 /
2016-17

832 /
2016-17
801 / cancelle
2016-17 d
E-Off K 22

E-Off K 19

E-Off K 21

E-Off K 23
K 71

K 72

K 105

K 106

K 112

K 119

K 120
K 121

K 122

K 114

K 78

578 /
2016-17

K 93

K 94

K 95

K 96

K 69

K 116

K 123

K 113

K 115
K4

K 55

K 54

K 59

K 62

K 70
K 102

K 29
ONGOLE MUNICIPAL CORPORATION
E-PROCUREMENT TENDER NOTICES
S. Tender
No Notice No. Name of the work Est cost

1/ Laying of C.C Road to Mini Stadium North Side Road from Trunk Road to NH-5
1
2017-18 Road in Ongole Municipal Corporation 50.00 AE-3

2
2/ Laying of B.T Road from Bhagya Nagar 4th Line to N.H-5 (Via Velugu Office Road) in 30.00 AE-3
2017-18 Division No.19
3/ Providing C.C Road From Vijaya Nagar Colony Main Road in Ongole Municipal
3 2017-18 50.00 AE-3
Corporation
4/ Formation of Quarry Rubbish Road from Pelluru to Cheruvukomma Palem (Link
4 2017-18
Road) in Ongole Municipal Corporation 40.00 AE-3

5/
5 2017-18
Construction of C.C Drain from Rajiv Nagar to Mamidipalem Christian Burial 49.00 AE-3
Ground on North Side in Ongole Municipal Corporation
6/ Levelling and Construction of Compound walls to Open sites in A.P Housing Board
6 2017-18
Colony in Ongole Municipal Corporation 31.00 AE-3

7/
7 2017-18
Levelling and Construction of Compound Walls to Open Sites of APSEB Employees 43.00 AE-3
Layout in Gaddalagunta, Sridevi Colony in Ongole Municipal Corporation

8/ Laying of C.C Road at Service Road from Vidyuth Soudha Bhavan to Ramnagar 8th
8 2017-18 50.00 AE-2
Line in Division No.15
9/
9 2017-18
Construction of B.T Road from Bethula Christian Church to Bhagyamma house in 50.00 AE-2
Arava Colony in Division No.16
10 / Widening of C.C Road at Miriyala Palem and Kothapatnam Bus Stand to
10 2017-18
Vijayadurga Hall Centre in Division No.12 47.00 AE-2

11 /
2017-18 Laying of C.C Road to Ramnagar 1st Line in Division No.15 35.00 AE-2
11

12 / Providing Storm Water Drain from Venkateswara Colony Main Road to Pothuraju
12 2017-18
Canal in Division No.50 50.00 AE-7

13 / Providing Storm Water Drain from Nehru Nagar to towards North Bye Pass in
13
2017-18 Division No.50 50.00 AE-7

14 / Construction of Compound Wall and Levelling of Open Site in Nehru Nagar in


14 2017-18 40.00 AE-7
Division.No.50
TOTAL 615.00
Download Start Time : 15.04.2017 5.00 P.M
Download End Time : 29.04.2017 5.00 P.M
Receipt of Bids End Time : 29.04.2017 5.15 P.M
Price Bid Opening Time : 29.04.2017 5.30 P.M
15 / Supply of Car on hire basis to Municipal Commissioner for the year 2017-18 in
1 2017-18 2.88 AE-7
Ongole Municipal Corporation
16 / Supply of Car on hire basis to Municipal Engineer for the year 2017-18 in Ongole
2 2017-18
Municipal Corporation 2.88 AE-7

17 / Supply of Car on hire basis to Examiner for the year 2017-18 in Ongole Municipal
3 2017-18 2.88 AE-7
Corporation
18 / Supply of Car on hire basis to Assistant City Planner for the year 2017-18 in Ongole
4 2017-18 2.88 AE-7
Municipal Corporation
19 / Supply of Car on hire basis to Municipal Assistant Commissioner for the year 2017-
5 2017-18 2.88 AE-7
18 in Ongole Municipal Corporation
20 /
2017-18 Engaging of Hire Vehicle for Medical Camp in Ongole Municipal Corporation 2.88 AE-4
6

21 / Supply, Delivery, Laying and Jointing of 1.5 mm thick HDPE Black Multi Layered
7 2017-18
Geo-Membrane Sheet to Ongole Municipal Corporation 9.20 AE-7

22 / Engaging of Crane at Sujatha Nagar 4th Line for arresting of leaks and Motors
8 2017-18
repairs in Pernamitta in Ongole Municipal Corporation 1.65 AE-6

23 /
9 2017-18 Levelling of Chennakesava Swamy Layout Park Site with Gravel in Division No.37 9.10 AE-6

24 / Providing 150 mm dia A.C Pipe Line in Peerlamanyam and Krishna Nagar in Division
10 2017-18 9.20 AE-6
No.39
25 / Providing 200mm dia AC pipeline from milk factory east side to Ambedkar statue in
11
2017-18 Arunoday colony in division no.40 0.46 AE-6

26 /
12 2017-18 Repairs to Open Well at Agraharam in Division No.10 1.80 AE-2

27 /
13 2017-18 Providing Kerb Wall in Annavarappadu Park in Division No.15 (2nd call) 0.52 AE-2

Construction of Compound Wall and Levelling Ground to Balaji Nagar School in


28 /
14 2017-18 Division No.16 and Narayana Rao School in Division No.12 in Ongole Municipal 5.63 AE-2
Corporation
29 / Supply and Fixing of Radium Stickering to Name Boards in 1 to 50 Divisions in
15
2017-18 Ongole Municipal Corporation 1.17 AE-2

Supply, Delivery and Fixing of Electrical Fans and Winding in P.V.R Boys High
30 / School, P.V.R Girls High School, Gandhi Nagar School, Prakasam Pantulu School,
D.R.R.M School and Natu Babu Rao Park and Winding Municipal Office Public 1.55
16 2017-18 AE-2
Toilets in Ongole Municipal Corporation
TOTAL 57.56
Download Start Time : 15.04.2017 5.00 P.M
Download End Time : 24.04.2017 5.00 P.M
Receipt of Bids End Time : 24.04.2017 5.15 P.M
Price Bid Opening Time : 24.04.2017 5.30 P.M
31 / Providing 75 mm dia HDPE Pipe Line from Kunta to Suraksha Apartment (Reach-I)
1 2017-18 10.00 AE-6
in Division No.39
32 / Providing Balance Components of the Pipe Line from Kunta to Suraksha Apartment
2 2017-18 3.10 AE-6
(Reach-II) in Division No.39
33 / Enagaing Hire 10+1 Seater vechiele For Adimission Campain "Prachara Jathara"
3 2017-18
Program in Municipal Schools of Ongole Municipal corporation 2.16 AE-4

34 / Providing Figurative/Non-figurative/Geometrical/Stencils/Art Work on Walls at Skill


4 2017-18 2.85 AE-6
Up-gradation Training Center in Ongole Municipal Corporation
TOTAL 18.11
Download Start Time : 19.04.2017 5.00 P.M
Download End Time : 26.04.2017 5.00 P.M
Receipt of Bids End Time : 26.04.2017 5.15 P.M
Price Bid Opening Time : 26.04.2017 5.30 P.M
35 / Providing C.C.Drains both side NH5 to Malakondaiah masater house in Sambasiva
1 2017-18 5.40 AE-6
nagar in Division no.37
36 / Construction of Plat From for Modular Toilets (Indian & Uropean Model) in Ongole
2 2017-18 1.63 AE-4
Municipal Corporation
37 /
2017-18 Providing C.C Road in Arava Palem in Division No.23 1.52 AE-4
3

38 / Providing Painting to E-Techno School at P.V.R Boys Compound in Division No.24


4 2017-18
(Reserved for L.C.C.S) 5.55 AE-4

39 /
5 2017-18 Providing C.C Road at Bandlamitta Circle in Division No.23 0.85 AE-4

40 / Arrgements of For Swacth Barath Display On Big Hoardings Campaigng in Ongole


6
2017-18 Municipal Corporation 0.65 AE-4

41 / Arrgements of For Loly Pop Boards Flex printing , Branding & Fixing in Ongole
7
2017-18 Municipal Corporation 0.995 AE-4

42 / Arrgements of For Flex printing ,Iron Frames, Fixing Flex Printing Branding & Fixing
8
2017-18 in Ongole Municipal Corporation 3.93 AE-4

43 / Providing A.C Sheet Roofing Sheds at New Vegitable Market South side in Division
9
2017-18 of 24 in Ongole Municipal Corporation 7.50 AE-4

44 / Providing Painting at Viswas Nagar Burial Ground of Division No. 31 in Ongole


10 2017-18 2.55 AE-3
Municipal Corporation.
45 /
11 2017-18 Construction of C.C Culvert from Christian Burial Ground back side in Division No.8 2.15 AE-1

46 / Construction of C.C Road and Culvert from Jhan house to Seshagiri rao house and
12 2017-18 4.95 AE-1
2nd line in Indurthy Nagar in Division No.8
TOTAL 37.68
Download Start Time : 19.04.2017 5.00 P.M
Download End Time : 04.05.2017 5.00 P.M
Receipt of Bids End Time : 04.05.2017 5.15 P.M
Price Bid Opening Time : 04.05.2017 5.30 P.M
47 / Maintenance of Water Supply - Transportation and Supply of Water in various
1 2017-18 10.00 AE-6
places in Ongole Municipal Corporation from 16.05.2017 to 30.06.2017
48 / Transportation of Drinking Water at various places of the town in Divisions 1 to 25
2 2017-18 9.99 AE-6
during summer 2017 in Ongole Municipal Corporation (2nd call)
Transportation of Drinking Water at Various Places of the Town in the jurisdiction
49 /
2017-18 of A.E-3 in Divisions 17 to 21 & 30 to 31 During Summer 2017 in Ongole Municipal 9.99
3 AE-3
Corporation
TOTAL 29.98
Download Start Time : 03.05.2017 5.00 P.M
Download End Time : 10.05.2017 5.00 P.M
Receipt of Bids End Time : 10.05.2017 5.15 P.M
Price Bid Opening Time : 10.05.2017 5.30 P.M
50 /
2017-18 Supply and Delivery of Stationary Items to Ongole Municipal Corporation. 3.00 AE-3
1

51 / Drilling of Deep Bore Wells and Fixing of IM-II Hand Pumpsets at various places in
2 2017-18 9.65 AE-7
Division No.45 to 50 in Ongole Municipal Corporation
52 / Drilling of Deep Bore Wells and Fixing of IM-II Hand Pumpsets at various places in
3 2017-18 10.00 AE-4
A.E-4 section in Ongole Municipal Corporation
53 / Drilling of Bore Wells and Motors at Public Toilets at opp. R.R Tank, Srigiri Hill and
4 2017-18 3.37 AE-4
Gaddala Gunta Toilets in Ongole Municipal Corporation
54 / Drilling of Deep Bore Well and Fixing of IM-II Hand Pumpsets at various places in
5
2017-18 Ongole Municipal Corporation (2nd call) 11.50 AE-6
55 / Manufacture supply and delivery of IM-II Hand Pump Spare Parts to Ongole
6
2017-18 Municipal Corporation 10.00
TOTAL 47.52
Download Start Time : 03.05.2017 5.00 P.M
Download End Time : 17.05.2017 5.00 P.M
Receipt of Bids End Time : 17.05.2017 5.15 P.M
Price Bid Opening Time : 17.05.2017 5.30 P.M

57 / Providing and Maintenance of Vesavi Upasana Kendrams at Municipal Corporation


1 2017-18
Office and Rajiv Gruha Kalpa Road Centes in Ongole Municipal Corporation 4.58 AE-2

58 / Supply of Car on hire basis to Municipal Assistant Commissioner for the year 2017-
2
2017-18 18 in Ongole Municipal Corporation (2nd call) 2.88 AE-7
TOTAL 7.46
Download Start Time : 12.05.2017 5.00 P.M
Download End Time : 19.05.2017 5.00 P.M
Receipt of Bids End Time : 19.05.2017 5.15 P.M
Price Bid Opening Time : 19.05.2017 5.30 P.M
59 / Construction of C.C Culvert at Karumudi Venkateswara house in Gudimellapadu
1 2017-18
road in Division No.2 (2nd call) 0.60 AE-1

60 /
2 2017-18 Providing B.T Patches in various places in Division No.5 (Reserved for L.C.C.S) 2.00 AE-1

61 / Construction of C.C Patches in Gopal Nagar extension line and Kamma Palem lines
3 2017-18 6.85 AE-1
in Division No.5 and 7 in Ongole Municipal Corporation
62 / Repairs and Rectification of Leakages in various plalces in 4 to 9 Divisions in A.E-1
4 2017-18 5.65 AE-1
section in Ongole Municipal Corporation
63 / Supply and Delivery of Pipe Line Materials in 4 to 9 Divisions in A.E-1 section in
5 2017-18
Ongole Municipal Corporation 6.00 AE-1

64 /
6 2017-18 Desiltation and Damaged Open Wells at Housing Board Park in Division No.19 2.40 AE-5

65 /
7 2017-18 Providing of C.C Approaches at Night Shelter in Division No.24 0.95 AE-4

66 /
8 2017-18 Construction of C.C Drain Side Wall at Nght Shelter in Division No.24 1.30 AE-4

67 / Construction of C.C Drain and Culvert in Bheemaraju vari Veedhi 1st Line in Division
9
2017-18 No.25 0.95 AE-4

68 / Laying of B.T Patches in various locations in Divisions 45 to 50 in Ongole Municipal


10
2017-18 Corporation 4.00 AE-7

Engaging of 110 Hydraulic Chain Mounted Machine, Excavater (JCB, TATA HITACHI)
69 /
11 2017-18 and Tractors for lifting and levelling of garbage and earth at Guttikonavariapalem 10.00 AE-7
Scientific land fill site in Ongole Municipal Corporation
70 / Providing Painting at Bala Bhavan in Ongole Municipal Corporation (Reserved for
12 2017-18 8.05 AE-5
L.C.C.S)
71 / Construction of Screen Back Side Sound Room at Bala Bhavan in Ongole Municipal
13 2017-18 5.95 AE-5
Corporation
72 / Providing G.I Sheet and Lettering of Name Board at Bala Bhavan in Ongole
14 2017-18 9.60 AE-5
Municipal Corporation
73 / Providing Flooring with Granite Stone Tiles at Bala Bhavan in Ongole Municipal
15 2017-18
Corporation 8.70 AE-5

74 / Providing Flooring with Granite Stone Tiles at Boat Station in Gandhi Park in
16 2017-18 8.10 AE-5
Ongole Municipal Corporation
75 / Laying of B.T Patches in various places in A.E-3 section in Ongole Municipal
17 2017-18 5.00 AE-5
Corporation (Reserved for L.C.C.S)
76 / Laying of BT patches in Various locations of Div.No's 45 to 50 of Ongole Municipal
18
2017-18 Corporation. (Reserved for L.C.C.S) 2.60 AE-7

77 / Providing Push Back Chairs and Sofas to Bala Bhavan in R.D.O Office Campus in
19
2017-18 Ongole Municipal Corporation 7.50 AE-5

78 /
20 2017-18 Construction of Boat Station at Gandhi Park in Ongole Municipal Corporation 8.70 AE-5

79 / Providing Push Back Chairs and Deep Bore well with Motar to Bala Bhavan in R.D.O
21 2017-18 9.80 AE-5
Office Campus in Ongole Municipal Corporation (2nd call)
80 / Supply and Fixing of Electrical Items and Water Supply in E-Toilets in Old and New
22 2017-18
Vegetable Market area in Division No.24 1.78 AE-4

81 / Fixing of Lawn at Public Toilets and Community Toilets in Ongole Municipal


23 2017-18 0.68 AE-4
Corporation
82 / Construction of C.C Road from Amrutha Mineral Water Road Culvert to Pothineni
24 2017-18 2.35 AE-1
Rama rao house in Division No.8 (Reserved for L.C.C.S)
83 / Providing park under Kurnool Road Fly Over Junction on north side in Ongole
25 2017-18
Municipal Corporation 1.65 AE-7

84 / Providing D Link InterNet Working all Systems Data Stores to O.M.C Office Building
26 2017-18 4.80 AE-5
in Ongole Municipal Corporation.
85 / Providing Toilets at New Filter Bed and S.S Tank II in Ongole Municipal Corporation
27 2017-18 7.70 AE-5
(Reserved for L.C.C.S)
86 / Construction of C.C Drain from Sweet Shop (south to north) to Pothuraju Canal
28 2017-18
west side of Hindu Burial Ground in Division No.7 9.55 AE-1

87 / Construction of C.C Patches and Culverts from Grandhi Subrahmanyam house to


29 2017-18 3.40 AE-1
Gaddam Kodhana Ramaiah house in Tangilla Khasim Street in Division No.7
88 / Construction of C.C Culvert on Pothuraju Canal West Side of Hindu Burial Ground in
30 2017-18 5.35 AE-1
Division No.7
89 / Formation of Road at Skill Up-Gradation Training Centre Building in Ongole
31
2017-18 Municipal Corporation 0.92 AE-6

90 / Engaging of J.C.B for Clearing the Site infront of Skill Upgradation Training Center
32
2017-18 Building in Ongole Municipal Corporation 0.70 AE-6

91 / Engaging of Labour for watch and ward on Skill Upgradation Training Center
33
2017-18 premises for the year 2017-18 in Ongole Municipal Corporation 3.65 AE-6

92 / Construction of C.C Drain and Culvert to IDSMT Plots 9th Cross Raod in Division
34
2017-18 No.31 6.10 AE-5
93 / Construction of C.C Drains and Culverts from DWMA Office to Vijaya Nagar Colony
35 2017-18 4.70 AE-5
Main Road in Division No.31
94 / Construction of CC Road from DWAMA Office to Vijay Nagar Colony Main Road of
36 2017-18 9.65 AE-5
Division No.31
95 /
2017-18 Construction of CC Road from IDSMT Plots 9th Cross Road of Division No.31 7.15 AE-5
37

96 / Replacement of Filter Media in Slow Sand Filters at Mukthinuthalapadu in Ongole


38 2017-18
Municipal Corportion 7.50 AE-8

97 /
39 2017-18 Flooring to Open Site at New Fish Market area in Division No.24 9.80 AE-4

98 /
40 2017-18 Construction of Open Platform at New Fish Market area in Division No.24 9.90 AE-4

99 /
2017-18 Providing Sheds for Store Rooms at south side at Fish Market in Division No.24 9.80 AE-4
41

100 / Providing Sheds for Store Rooms at South-West Corner at Fish Market in Division
42
2017-18 No.24 9.80 AE-4

101 / Providing Sheds for Store Rooms at South-East Corner at Fish Market in Division
43
2017-18 No.24 9.80 AE-4

102 /
44 2017-18 Construction of C.C Roads at New Fish Market area in Division No.24 9.90 AE-4

103 / Construction of Culverts connecting at Fish Market at Ura Cheruvu in Division


45 2017-18 6.10 AE-4
No.24
Supply of Labour for Watch and Ward and Petrolling along N.S.P Canal from
104 /
46 2017-18 Ramatheertham Reservoir to S.S Tanks and Additional Pumping Arrangements to 6.90 AE-5
S.S Tank-2 in Ongole Municipal Corporation
105 /
47 2017-18 Construction of C.C Drain at Narayana E-Techno School in Division No.26 0.68 AE-4

106 /
48 2017-18 Laying of Platform in Edga at Konijedu Bus Stand (Bit-1) in Division No.29 8.35 AE-5

107 /
2017-18 Laying of Platform in Edga at Konijedu Bus Stand (Bit-2) in Division No.29 9.15 AE-5
49

TOTAL 282.51
Download Start Time : 16.05.2017 5.00 P.M
Download End Time : 30.05.2017 5.00 P.M
Receipt of Bids End Time : 30.05.2017 5.15 P.M
Price Bid Opening Time : 30.05.2017 5.30 P.M
S.C.S.P Grant 2016-17 - Formation of C.C Road in Throvagunta SC Colony from
108 /
1 2017-18 Talathoti Jalaiah house to Gonu Venkata Subbaiah house in Division No.1 10.00 AE-8
(RESERVED FOR L.C.C.S)
109 / S.C.S.P Grant 2016-17 - Construction of C.C Drain from Existing CC Drain to
2 2017-18 10.00 AE-8
Mudiganda Vagu (Bit-1) in Division No.1 (RESERVED FOR L.C.C.S)
110 / S.C.S.P Grant 2016-17 - Construction of Compound wall at East side SC Colony
3 2017-18 10.00 AE-8
Burrial Ground in Throvagunta in Division No.1
111 / S.C.S.P Grant 2016-17 - Construction of Compound wall at West side SC Colony
4 2017-18 Burrial Ground in Throvagunta in Division No.1 10.00 AE-8
112 / S.C.S.P Grant 2016-17 - Construction of Compound wall at North side SC Colony
5 2017-18 10.00 AE-8
Burrial Ground in Throvagunta in Division No.1
113 / S.C.S.P Grant 2016-17 - Construction of Compound wall at South side SC Colony
6 2017-18 10.00 AE-8
Burrial Ground in Throvagunta in Division No.1
114 / S.C.S.P Grant 2016-17 - Providing CC Drain from Burri venkateswarlu house to O.K
7 2017-18 9.00 AE-2
road of Old S.C colony in Division No.10 (RESERVED FOR L.C.C.S)
S.C.S.P Grant 2016-17 - Providing CC Drain from Jada subramanyam house to
115 /
8 2017-18 nukathoti subbarayudu house of Old Sc colony in Division No.10 (RESERVED FOR 7.00 AE-2
L.C.C.S)
116 / S.C.S.P Grant 2016-17 - Providing CC Drain from konuru venkatarao house to
9 2017-18 Katoori polaiah house of Old S.C colony in Division No.10 4.00 AE-2

117 / S.C.S.P Grant 2016-17 - Providing CC Drain from Kasukurthi lakshmiah house to
10 2017-18 3.50 AE-2
dasari chandramouli house of Old Sc colony in Division No.10
118 / S.C.S.P Grant 2016-17 - Providing CC Drain from karavadi ramaiah house to Ok
11 2017-18 4.00 AE-2
road house of Old Sc colony in Division No.10
S.C.S.P Grant 2016-17 - Providing CC Drain from Burri vankateswarlu house to
119 /
12 2017-18 Ambati vankateswarlu house and madila Adinarayana house to Nukathoti subbiah 7.00 AE-2
house of Old Sc colony in Division No.10
120 / S.C.S.P Grant 2016-17 - Providing CC Roads and CC Drains of New Sc colony at
13 2017-18 N.Agraharam in Division No.10 9.30 AE-2

122 / S.C.S.P Grant 2016-17 - Construction of Storm Water Drain from Gundala Rosaiah
14 2017-18 10.00 AE-2
House to cause way of New Sc colony at Agraharam in Division No.10
123 / S.C.S.P Grant 2016-17 - Construction of CC Drain East side Road of church of
15 2017-18 10.00 AE-2
Gandhi nagar Sc colony of koppolu in Division No.10 (RESERVED FOR L.C.C.S)
124 / S.C.S.P Grant 2016-17 - Providing CC Roads of Burri venkateswarlu house to
16 2017-18 10.00 AE-2
Ambati venkateswarlu house new Sc colony in Division No.10
125 / S.C.S.P Grant 2016-17 - Providing CC Roads of madiri Adinarayana house and
17 2017-18 10.00 AE-2
kannedari chennaiah to community hall new Sc colony in Division No.10
126 / S.C.S.P Grant 2016-17 - Providing CC Roads ofgaddala sundaram house gaddala
18 2017-18 Anjaiahof new Sc colony in Division No.10 (RESERVED FOR L.C.C.S) 10.00 AE-2

127 / S.C.S.P Grant 2016-17 - Providing CC Road from Gadhala mani sankar house to
19 2017-18 Gadhala sundha rao House of Gandhi nagar SC colony of koppolu in Division No.10 9.00 AE-2

128 / S.C.S.P Grant 2016-17 - Providing CC Road from Raice mill to Gadhala Suresh
20 2017-18 9.30 AE-2
house to of Gandhi nagar SC colony of koppolu in Division No.10
129 / S.C.S.P Grant 2016-17 - Providing South side CC road of New SC colony at N
21 2017-18 8.00 AE-2
Agraharam in Division No.10
S.C.S.P Grant 2016-17 - Construction of Quarry Rubbish Road of SC Burrial ground
130 /
22 2017-18 from N Agraharam road to Ungarala Anjamma site of N Agraharam in Division 10.00 AE-2
No.10

131 / S.C.S.P Grant 2016-17 - Construction of Quarry Rubbish Road of SC Burrial ground
23 2017-18 10.00 AE-2
from Ungarala Anjamma site to Burrial ground of N Agraharam in Division No.10

132 / S.C.S.P Grant 2016-17 - Providing CC Road from Indla chenchiah house to adapala
24 2017-18 srinivasulu house in Agraharam S.T Colony in Division No.10 10.00 AE-2
133 / S.C.S.P Grant 2016-17 - Construction CC Drains of south and middle cross roads of
25 2017-18 8.40 AE-2
New ST colony at N.Agraharam in Division No.10
134 / S.C.S.P Grant 2016-17 - Providing of CC Roads of 1st and 2nd Cross Roads of New
26 2017-18 10.00 AE-2
St colony of N Agraharam in Division No.10 (RESERVED FOR L.C.C.S)
135 / S.C.S.P Grant 2016-17 - Providing of CC Roads of 3rd Cross Road of New St colony
27 2017-18 5.00 AE-2
of N Agraharam in Division No.10
136 / S.C.S.P Grant 2016-17 - Providing CC Roads at Ambati venkateswarlu house in New
28 2017-18 SC Colony in Division No.10 10.00 AE-2

137 / S.C.S.P Grant 2016-17 - Providing CC Roads of madiri Adinarayana house and
29 2017-18 10.00 AE-2
kannedari chennaiah to community hall new Sc colony in Division No.10
141 / S.C.S.P Grant 2016-17 - Providing East side CC road of New SC colony at N
30 2017-18 9.30 AE-2
Agraharam in Division No.10
144 / S.C.S.P Grant 2016-17 - Providing 12 Mtrs Galvanized High mast lighting system at
31 2017-18 Church center of Gandhi nagar SC colony koppolu in Division No.10 5.50 AE-2

145 / S.C.S.P Grant 2016-17 - Providing 12 Mtrs Galvanized High mast lighting system at
32 2017-18 5.50 AE-2
Cumunity hall of Ambedhkar nagar SC colony koppolu in Division No.10

146 / S.C.S.P Grant 2016-17 - Providing 12 Mtrs Galvanized High mast lighting system at
33 2017-18 5.50 AE-2
New SC colony of N Agraharam in Division No.10
147 / S.C.S.P Grant 2016-17 - Providing CC Drains of Clowpet SC colony in Division No.11
34 2017-18 (RESERVED FOR L.C.C.S) 10.00 AE-2

148 /
35 2017-18 S.C.S.P Grant 2016-17 - Providing CC Roads of Clowpet SC colony in Division No.11 10.00 AE-2

S.C.S.P Grant 2016-17 - Construction of C.C Drain from Jangala Jameeba house to
149 /
36 2017-18 ES Augustian house and Nukathoti kotamma house to Vinod house in Division 9.20 AE-2
No.13
S.C.S.P Grant 2016-17 - Construction of C.C Drain from Kollam Durga paster house
150 /
37 2017-18 and cc culverts Vijayadurga hall to Eckol Church and Anand rao road of various 9.20 AE-2
places in Division No.13
151 / S.C.S.P Grant 2016-17 - Construction of C.C Drians & CC Culverts at Kabadi palem
38 2017-18 10.00 AE-2
in Division No.13
152 / S.C.S.P Grant 2016-17 - Providing CC Drains of Arava colony Extension Sc Area in
39 2017-18 10.00 AE-2
Division No.16
153 /
40 2017-18 S.C.S.P Grant 2016-17 - Providing CC Drains of Sc Area in Division No.16 10.00 AE-2

154 / S.C.S.P Grant 2016-17 - Providing strom water Drain of pilli chenniah house to
41 2017-18 10.00 AE-2
chinthala Rangiah house of Sc Area in Division No.16

155 / S.C.S.P Grant 2016-17 - Providing strom water Drain of chinthala Rangiah house to
42 2017-18 10.00 AE-2
Gundala Ramulu house of Sc Area in Division No.16 (RESERVED FOR L.C.C.S)

156 / S.C.S.P Grant 2016-17 - Providing strom water Drain of Gundala Ramulu house to
43 2017-18 10.00 AE-2
Chinthapali Rathnam house of Sc Area in Division No.16
157 / S.C.S.P Grant 2016-17 - Providing CC Drains from Namala visaka House to canon
44 2017-18 10.00 AE-2
Church of Arava colony 2nd line Sc Area in Division No.16
158 / S.C.S.P Grant 2016-17 - Providing CC Road at Canon Church in Arava colony 2nd
45 2017-18 line Sc Area in Division No.16 10.00 AE-2
159 / S.C.S.P Grant 2016-17 - Providing CC Road from Thirumalasetti uncle house to
46 2017-18 10.00 AE-2
south hospital road of balaji nagar st colony in Division No.16
160 / S.C.S.P Grant 2016-17 - Providing CC Road from kanakaiah house north side to
47 2017-18 3.00 AE-2
kotapati koteswarao house of balaji nagar st colony in Division No.16
161 / S.C.S.P Grant 2016-17 - Providing CC Road from kotapati koteswarao house to
48 2017-18 9.00 AE-2
thupakula chittemma house in Balaji Nagar S.T Colony in Division No.16
162 / S.C.S.P Grant 2016-17 - Providing CC Drain from kotapati koteswarao house to
49 2017-18 thupakula chittemma house in Balaji Nagar S.T Colony in Division No.16 7.00 AE-2

163 / S.C.S.P Grant 2016-17 - Providing CC Road from kotapati koteswarao house to
50 2017-18 3.00 AE-2
Agharam road in Balaji Nagar S.T Colony in Division No.16
164 / S.C.S.P Grant 2016-17 - Providing 12 Mtrs Galvanized High mast lighting system at
51 2017-18 5.50 AE-2
Arava colony center at SC colony in Division No.16
165 / S.C.S.P Grant 2016-17 - Providing 12 Mtrs Galvanized High mast lighting system at
52 2017-18 5.50 AE-2
Balaji nagar ST colony in Division No.16

166 / S.C.S.P Grant 2016-17 - Providing 12 Mtrs Galvanized High mast lighting system at
53 2017-18 5.50 AE-2
Mahila swasakthi Bavan of Bathulavari kunta SC colony in Division No.16

167 / S.C.S.P Grant 2016-17 - Construction of C.C Roads in Thurpu christain palem (Sc
54 2017-18 Colony) in Division No.8 10.00 AE-1

168 / S.C.S.P Grant 2016-17 - Construction of C.C Roads & C.C Drains in Thurpu christain
55 2017-18 10.00 AE-1
palem (Sc Colony) in Division No.8
169 / S.C.S.P Grant 2016-17 - Laying of 150mm dia water supply pipe line in Thurpu
56 2017-18 5.00 AE-1
Christain Palem in Division No.8
170 / S.C.S.P Grant 2016-17 - Construction Of Additional Toilet Block and Compound wall
57 2017-18 in Thurpu christain palem (Sc Colony) in Division No.8 10.00 AE-1

171 / S.C.S.P Grant 2016-17 - Providing GSB Road in NTR Colony (at SC Area ) 1st Main
58 2017-18 Road in Division No.9 5.65 AE-1

172 / S.C.S.P Grant 2016-17 - Construction of C.C Roads in NTR Colony (at SC Area ) south
59 2017-18 9.95 AE-1
to North Side of 2ndCross Road & 4th Cross Road in Division No.9
173 / S.C.S.P Grant 2016-17 - Construction of C.C Roads in NTR Colony (at SC Area ) south
60 2017-18 8.32 AE-1
to North Side of 5thCross Road & 6th Cross Road in Division No.9
174 / S.C.S.P Grant 2016-17 - Construction of C.C Roads in NTR Colony (at SC Area ) West
61 2017-18 to East Side of 1st Main Road & 2nd Main Road in Division No.9 9.99 AE-1

175 / S.C.S.P Grant 2016-17 - Construction of C.C Roads in NTR Colony (at SC Area ) West
62 2017-18 9.99 AE-1
to East Side of 3rd Main Road & 4th Main Road in Division No.9
176 / S.C.S.P Grant 2016-17 - Construction of C.C Road of west side of 1 to 4th line in
63 2017-18 9.96 AE-1
Puli venkata Reddy colony in in Division No.9
177 / S.C.S.P Grant 2016-17 - Construction of C.C Road of west side of 6th Line to 9th
64 2017-18 line in Puli venkata Reddy colony in Division No.9 9.96 AE-1

178 / S.C.S.P Grant 2016-17 - Construction of C.C Road of west side of 9th Line to 13th
65 2017-18 9.96 AE-1
line in Puli venkata Reddy colony in Division No.9
179 / S.C.S.P Grant 2016-17 - Construction of C.C Road from East side of 1st line to 4th
66 2017-18 9.95 AE-1
line of Pulivenkata Reddy colony in Division No.9
180 / S.C.S.P Grant 2016-17 - Construction of C.C Road from East side of 5th line to 9th
67 2017-18 line of Pulivenkata Reddy colony in Division No.9 9.95 AE-1
181 / S.C.S.P Grant 2016-17 - Construction of C.C Road from 1st,2nd line & 6 th line
68 2017-18 9.99 AE-1
(South Side to Main Road) in Indira Colony (SC Area) in Division No.9
182 / S.C.S.P Grant 2016-17 - Construction of C.C Road from 3rd Line to 4th line (South
69 2017-18 9.60 AE-1
Side to Main Road) in Indira Colony (SC Area) in Division No.9
183 / S.C.S.P Grant 2016-17 - onstruction of C.C Road from 10th line to 12 th line (South
70 2017-18 9.99 AE-1
Side to Main Road) in Indira Colony (SC Area) in Division No.9
184 / S.C.S.P Grant 2016-17 - Construction of C.C Road from 13th lines (South to North
71 2017-18 sides) in Indira Colony (SC Area) in Division No.9 8.90 AE-1

185 / S.C.S.P Grant 2016-17 - Construction of C.C Road from 14th lines (South to North
72 2017-18 8.90 AE-1
sides) in Indira Colony (SC Area) in Division No.9

186 / S.C.S.P Grant 2016-17 - Construction of C.C Drains From 1 line to 4th line and 6th
73 2017-18 9.65 AE-1
line to 7th line and Main Road of Puli venkata Reddy colony in Division No.9

187 / S.C.S.P Grant 2016-17 - Construction of C.C Drains From 8th line to 13th line of Puli
74 2017-18 7.65 AE-1
venkata Reddy colony in Division No.9
188 / S.C.S.P Grant 2016-17 - Construction of C.C Drain from East side of 1st line to 6th
75 2017-18 line of Pulivenkata Reddy colony in Division No.9 9.99 AE-1

189 / S.C.S.P Grant 2016-17 - Construction of C.C Drain from East side of 7th line to 9th
76 2017-18 line and Main Road of Pulivenkata Reddy colony in Division No.9 9.99 AE-1

190 / S.C.S.P Grant 2016-17 - Construction of park site Compound wall in Indira Colony
77 2017-18 8.00 AE-1
(SC Area) in Division No.9
191 / S.C.S.P Grant 2016-17 - Construction of Compound wall in Indira Colony in Division
78 2017-18 10.00 AE-1
No.9
192 / S.C.S.P Grant 2016-17 - Providing CC road in 1st line (east to west) in
79 2017-18 Ramalingareddy nagar (SC colony) in Pernamitta in Division No.41 7.00 AE-6

193 / S.C.S.P Grant 2016-17 - Providing CC road in 2nd line (east to west) in
80 2017-18 Ramalingareddy nagar (SC colony) in Pernamitta in Division No.41 7.00 AE-6

194 / S.C.S.P Grant 2016-17 - Providing CC road in 3rd line (east to west) in
81 2017-18 7.00 AE-6
Ramalingareddy nagar (SC colony) in Pernamitta in Division No.41
195 / S.C.S.P Grant 2016-17 - Providing CC road in 4th line (east to west) in
82 2017-18 7.00 AE-6
Ramalingareddy nagar (SC colony) in Pernamitta in Division No.41
196 / S.C.S.P Grant 2016-17 - Providing CC road in 5th line (east to west) in
83 2017-18 Ramalingareddy nagar (SC colony) in Pernamitta in Division No.41 7.00 AE-6

197 / S.C.S.P Grant 2016-17 - Providing CC road in 6th line (east to west) in
84 2017-18 7.00 AE-6
Ramalingareddy nagar (SC colony) in Pernamitta in Division No.41
198 / S.C.S.P Grant 2016-17 - Providing CC road in 7th line (east to west) in
85 2017-18 7.00 AE-6
Ramalingareddy nagar (SC colony) in Pernamitta in Division No.41
199 / S.C.S.P Grant 2016-17 - Providing CC road in 8th line (east to west) in
86 2017-18 Ramalingareddy nagar (SC colony) in Pernamitta in Division No.41 7.00 AE-6

200 / S.C.S.P Grant 2016-17 - Providing CC road in Main road (East to west)(REACH-I) in
87 2017-18 10.00 AE-6
Ramalingareddy nagar in Pernamitta in Division No.41
201 / S.C.S.P Grant 2016-17 - Providing CC road in Main road (East to west)(REACH-II) in
88 2017-18 5.00 AE-6
Ramalingareddy nagar in Pernamitta in Division No.41
S.C.S.P Grant 2016-17 - Providing CC road in Main road (East to west) and Vadala
202 /
89 2017-18 subbarao house to Narasimharao house in Ramalingareddy nagar in Pernamitta in 10.00 AE-6
Division No.41 (RESERVED FOR L.C.C.S)
S.C.S.P Grant 2016-17 - Providing CC road from Sankaramma house to Sivakumar
203 /
90 2017-18 house and Narsimharao house to Benziman house in Ramalingareddy nagar in 10.00 AE-6
Pernamitta in Division No.41
204 / S.C.S.P Grant 2016-17 - Providing 200 mm dia AC Pipeline from Kurnool road to
91 2017-18 Ramalingareddy sc colony in Division No.40 10.00 AE-6

205 / S.C.S.P Grant 2016-17 - Providing 150 mm and 100 mm dia AC Pipelines in
92 2017-18 10.00 AE-6
Ramalingareddy sc colony (Reach-I) in Division No.40
206 / S.C.S.P Grant 2016-17 - Providing 150 mm and 100 mm dia AC Pipelines in
93 2017-18 8.00 AE-6
Ramalingareddy sc colony (REACH-II) in Division No.40
S.C.S.P Grant 2016-17 - Providing CC road and Drains in 1st line South side of
207 /
94 2017-18 Botling company Indira nagar in Pernamitta in Division No.40 (RESERVED FOR 9.00 AE-6
L.C.C.S)
208 / S.C.S.P Grant 2016-17 - Providing CC road and Drains in 2nd line South side of
95 2017-18 9.00 AE-6
Botling company Indira nagar in Pernamitta in Division No.40
209 / S.C.S.P Grant 2016-17 - Providing CC road and Drains in 3rd line South side of
96 2017-18 Botling company Indira nagar in Pernamitta in Division No.40 9.00 AE-6

210 / S.C.S.P Grant 2016-17 - Providing CC road and Drains in 4th line South side of
97 2017-18 9.00 AE-6
Botling company Indira nagar in Pernamitta in Division No.40
211 / S.C.S.P Grant 2016-17 - Providing CC road South side (from east to west )of Botling
98 2017-18 company Indira nagar in Pernamitta in Division No.40 10.00 AE-6

212 / S.C.S.P Grant 2016-17 - Providing CC Drains in Main road (East to west) of Botling
99 2017-18 8.00 AE-6
company Indira nagar in Pernamitta in Division No.40
S.C.S.P Grant 2016-17 - providing C.C.Road and drains from Alla Ravi Kumar houe
213 /
2017-18 to kandukuri Ramanaiah house in Indira Nagar Indira nagar in Pernamitta in 10.00
100 AE-6
Division No.40
214 / S.C.S.P Grant 2016-17 - Providing 200 mm dia AC Pipeline from Kurnool road to
101
2017-18 Indira nagar SC colony in Division No.40 10.00 AE-6

215 / S.C.S.P Grant 2016-17 - Providing 200 mm dia AC Pipeline from Indira nagar SC
102
2017-18 colony to Indira nagar church south side tail end point in Division No.40 10.00 AE-6

216 / S.C.S.P Grant 2016-17 - Providing 150 mm and 100 mm dia AC Pipelines in Indira
103
2017-18 nagar sc colony( REACH-I) in Division No.40 10.00 AE-6

217 / S.C.S.P Grant 2016-17 - Providing 150 mm and 100 mm dia AC Pipelines in Indira
104
2017-18 nagar sc colony( REACH-II) in Division No.40 (RESERVED FOR L.C.C.S) 7.00 AE-6

218 / S.C.S.P Grant 2016-17 - Construction of Disposal drain from Indira nagar to
105
2017-18 Prathibha college IN 1 to 3 in Division No.40 10.00 AE-6

S.C.S.P Grant 2016-17 - providing C.C.Road and drains from Christianpalem


219 /
2017-18 Community hall to Tella Koteswarao house in Christianpalem of Pernamitta in 10.00
106 AE-6
Division No.40

220 / S.C.S.P Grant 2016-17 - Providing CC road from colony to Christian palem Burial
107
2017-18 ground (SC colony) of Pernamitta in Division No.40 (RESERVED FOR L.C.C.S) 10.00 AE-6

S.C.S.P Grant 2016-17 - Construction of CC Drain from existing culvert at Peram


221 /
2017-18 Ravi house to Cheruvu via Christianpalem Church in Division No.40 (RESERVED FOR 10.00 AE-6
108
L.C.C.S)
S.C.S.P Grant 2016-17 - Providing CC approaches to existing Culverts in Shool road
222 /
2017-18 and Providing CC road and drains from shool road to chrch in Christianpalem in 10.00
109 AE-6
Division No.40 (RESERVED FOR L.C.C.S)
223 / S.C.S.P Grant 2016-17 - Providing Disposal drain from Anandarao house to Burial
110
2017-18 ground road in Division No.40 5.00 AE-6

224 / S.C.S.P Grant 2016-17 - Providing Disposal drain from SC colony to Cheruvu via
111
2017-18 VaddipalemAnandarao house to Burial ground road in Division No.40 10.00 AE-6

225 / S.C.S.P Grant 2016-17 - Providing 150 mm AC Rider line from Ambedkar statue to
112
2017-18 Dimpudukallam and to NTR colony in Division No.41 10.00 AE-6

226 / S.C.S.P Grant 2016-17 - Providing AC Distribution pipe lines in NTR SC


113
2017-18 Colony(REACH-I ) in Division No.41 10.00 AE-6

227 / S.C.S.P Grant 2016-17 - Providing AC Distribution pipe lines in NTR SC Colony
114
2017-18 (REACH-II) in Division No.41 10.00 AE-6

228 / S.C.S.P Grant 2016-17 - Construction of Compound wall to open space in NTR
115
2017-18 colony in Division No.41 10.00 AE-6

229 / S.C.S.P Grant 2016-17 - Providing Gravity main from existing ELSR on hillock to
116
2017-18 Proposed ELSR at Dimpudukallam (REACH-I) in Division No.42 10.00 AE-6

230 / S.C.S.P Grant 2016-17 - Providing Gravity main from existing ELSR on hillock to
117
2017-18 Proposed ELSR at Dimpudukallam (REACH-II) in Division No.42 10.00 AE-6

231 / S.C.S.P Grant 2016-17 - Providing Distribution main from ELSR to NTR Colony in
118
2017-18 Division No.42 10.00 AE-6

232 / S.C.S.P Grant 2016-17 - Providing Distribution main from ELSR to Ambedkar statue
119
2017-18 near Veternary Hospital in Division No.42 10.00 AE-6

233 / S.C.S.P Grant 2016-17 - Providing Distribution main from ELSR to Santhi nagar well
120
2017-18 via Chinthagunta Kaila Seshaiah house in Division No.42 10.00 AE-6

234 / S.C.S.P Grant 2016-17 - Construction of C.C Drains from Perugu Anjaiah house to
121
2017-18 Dasari Sundaram house of Pelluru SC Colony in Division No.17 10.00 AE-3

235 / S.C.S.P Grant 2016-17 - Providing C.C Road & Disposel Drain at Pelluru SC Colony in
122
2017-18 Division No.17 (RESERVED FOR L.C.C.S) 10.00 AE-3

236 / S.C.S.P Grant 2016-17 - Laying of 100 mm and 150 mm dia AC Pipe Line from
123
2017-18 Pelluru SC Colony in Division No.17 10.00 AE-3

S.C.S.P Grant 2016-17 - Construction of C.C Drains&Culverts from Balabhadra


237 /
2017-18 Chenchaiah house to Boppuri Edman house at Cheruvukommupalem Sc Colony in 10.00 AE-3
124
Division No.18 (RESERVED FOR L.C.C.S)
S.C.S.P Grant 2016-17 - Construction of C.C Drains&Culverts from Jada Matheya
238 /
2017-18 house to Thatiaprthi Symson house at Cheruvukommupalem Sc Colony in Division 10.00 AE-3
125
No.18
S.C.S.P Grant 2016-17 - Construction of C.C Drains&Culverts from Thatiaprthi
239 /
2017-18 Chinnaiah house to Attinti Devasahayam house at Cheruvukommupalem Sc Colony 10.00
126 AE-3
in Division No.18
S.C.S.P Grant 2016-17 - Construction of C.C Drains&Culverts from Thatiaprthi
240 /
2017-18 Ragaiah house to Thatiaprthi Ramulu house at Cheruvukommupalem Sc Colony in 10.00
127 AE-3
Division No.18
S.C.S.P Grant 2016-17 - Construction of C.C Drains and Culverts from Bhimavarapu
241 /
2017-18 Janu house to Thatiaprthi Mahesh house at Cheruvukommupalem Sc Colony in 10.00 AE-3
128
Division No.18 (RESERVED FOR L.C.C.S)
S.C.S.P Grant 2016-17 - Construction of C.C Drains&Culverts from Kanumuri
242 /
2017-18 Namcheru house to Thatiaprthi Sulthanamma house at Cheruvukommupalem Sc 10.00
129 AE-3
Colony in Division No.18
S.C.S.P Grant 2016-17 - Construction of C.C Drains and Culverts from Thatiparthi
243 /
2017-18 Vijayanadam house to Mandha Sujatha house at Cheruvukommupalem Sc Colony 10.00 AE-3
130
in Division No.18
S.C.S.P Grant 2016-17 - Construction of C.C Drains and Culverts from Balabhadra
244 /
2017-18 Annamma house to Mandha Sujatha house at Cheruvukommupalem Sc Colony in 10.00 AE-3
131
Division No.18
S.C.S.P Grant 2016-17 - Providing C.C Road and Quarry Rubbish Road from
245 /
2017-18 Thartiparthi Sulthanamma house to kanumuri Namcheru house at Cheruvukommu 10.00
132 AE-3
Palem SC Colony in Division No.18
246 / S.C.S.P Grant 2016-17 - Providing C.C Road and Patch work from Tenali Ramesh
133
2017-18 house to Vinayaka Swami Statue at Mamidipalem in Division No.30 10.00 AE-3

247 / S.C.S.P Grant 2016-17 - Widening of C.C Road from Dhara Ankababu house to
134
2017-18 Devarapalli Pothuraju house at Mamidtpalem Sc Colony in Division No.30 10.00 AE-3

248 / S.C.S.P Grant 2016-17 - Construction of C.C Road from Medikonda saymiyelu ouse
135
2017-18 to Rijaklan Church at Mamidtpalem Sc Colony in Division No.30 10.00 AE-3

249 / S.C.S.P Grant 2016-17 - Construction of C.C Drains and Culverts at Thufan Nagar 1st
136
2017-18 Cross Road ST Colony in Division No.18 10.00 AE-3

250 / S.C.S.P Grant 2016-17 - Construction of C.C Drains and Culverts at Thufan Nagar
137
2017-18 2nd Cross Road ST Colony in Division No.18 10.00 AE-3

251 / S.C.S.P Grant 2016-17 - Construction of C.C Drains and Culverts at Thufan Nagar 3rd
138
2017-18 Cross Road ST Colony in Division No.18 10.00 AE-3

252 / S.C.S.P Grant 2016-17 - Construction of Disposel Drain at Thufan Nagar Main Road
139
2017-18 ST Colony(Bit-1) in Division No.18 (RESERVED FOR L.C.C.S) 10.00 AE-3

253 / S.C.S.P Grant 2016-17 - Construction of Disposel Drain at Thufan Nagar Main Road
140
2017-18 ST Colony(Bit-2) in Division No.18 (RESERVED FOR L.C.C.S) 10.00 AE-3

254 / S.C.S.P Grant 2016-17 - Construction of C.C Drains and Culverts at Thufan Nagar 1st
141
2017-18 and 2nd Cross Roads ST Colony in Division No.18 10.00 AE-3

255 / S.C.S.P Grant 2016-17 - Providing C.C Road from Thufan Nagar ST Colony 1st Cross
142
2017-18 Road in Division No.18 10.00 AE-3

256 / S.C.S.P Grant 2016-17 - Providing C.C Road from Thufan Nagar ST Colony 2nd Cross
143
2017-18 Road in Division No.18 10.00 AE-3

257 / S.C.S.P Grant 2016-17 - Providing C.C Road from Thufan Nagar ST Colony 3rd Main
144
2017-18 Road in Division No.18 10.00 AE-3

258 / S.C.S.P Grant 2016-17 - Construction of C.C Drain and Culverts at Yanadhi Colony
145
2017-18 1st Cross Road ST Area in Division No.18 10.00 AE-3

259 / S.C.S.P Grant 2016-17 - Construction of C.C Drain and Culverts at Yanadhi Colony
146
2017-18 2nd Cross Road ST Area in Division No.18 10.00 AE-3

260 / S.C.S.P Grant 2016-17 - Construction of C.C Drain & Culverts at Yanadhi Colony 3rd
147
2017-18 Cross Road ST Area in Division No.18 10.00 AE-3

261 / S.C.S.P Grant 2016-17 - Construction of Disposel Drain and Culverts at Yanadhi
148
2017-18 Colony Main Road ST Area in Division No.18 10.00 AE-3

262 / S.C.S.P Grant 2016-17 - Construction of C.C Road at Yanadhi Colony 1st Cross Road
149
2017-18 ST Area in Division No.18 10.00 AE-3
263 / S.C.S.P Grant 2016-17 - Construction of C.C Road at Yanadhi Colony 2nd Cross Road
150
2017-18 ST Area in Division No.18 10.00 AE-3

264 / S.C.S.P Grant 2016-17 - Construction of C.C Road at Yanadhi Colony 3rd Cross Road
151
2017-18 ST Area in Division No.18 10.00 AE-3

265 / S.C.S.P Grant 2016-17 - Construction of C.C Road at Yanadhi Colony Main Road ST
152
2017-18 Area in Division No.18 10.00 AE-3

266 / S.C.S.P Grant 2016-17 - Construction of C.C Drains at Vijaya Nagar Colony North
153
2017-18 Side Exitensition SC Area in Division No.31 10.00 AE-3

267 / S.C.S.P Grant 2016-17 - Formatoion Quarry Rubbish Roads at Vijaya Nagar Colony
154
2017-18 North Side Exitensition SC Area in Division No.31 (RESERVED FOR L.C.C.S) 10.00 AE-3

268 / S.C.S.P Grant 2016-17 - Construction of Disposal Drain at Viswas Nagar SC Colony in
155
2017-18 Division No.31 10.00 AE-3

269 / S.C.S.P Grant 2016-17 - Laying of 100 mm dia AC Pipe Line from Pragathi Colony SC
156
2017-18 Colony in Division No.17 10.00 AE-3

270 / S.C.S.P Grant 2016-17 - Laying of 150 mm dia AC Pipe Line from Pragathi Colony SC
157
2017-18 Colony in Division No.17 10.00 AE-3

271 / S.C.S.P Grant 2016-17 - laying of 100mm dia A.C pipe lines from 1st line to 8th line
158
2017-18 SC colony pulivenkatareddy colony in Division No.9 10.00 AE-1

272 / S.C.S.P Grant 2016-17 - Laying of 100 mm dia A.C Pipe Line from 9th line to 13th
159
2017-18 line in S.C Colony in Pulivenkatareddy Colony in Division No.9 9.00 AE-1

273 / S.C.S.P Grant 2016-17 - Laying of 100 mm dia A.C Pipe Line from 1st line to 9th line
160
2017-18 east side in S.C Colony in Pulivenkatareddy Colony in Division No.9 10.00 AE-1

274 / S.C.S.P Grant 2016-17 - Laying of 100 mm dia A.C Pipe Line to Vengamukka Palem
161
2017-18 in Division No.18 10.00 AE-3

275 / S.C.S.P Grant 2016-17 - Construction of Drains and Culvert to Vengamukka Palem in
162
2017-18 Division No.18 (RESERVED FOR L.C.C.S) 10.00 AE-3

276 / Providing Barbed Wire Fencing and Laying of Quarry Spell Road at Throvagunta
163
2017-18 Water Tank in Division No.1 (RESERVED FOR L.C.C.S) 3.95 AE-8

277 / Construction of C.C Drain from R.Venu house to Podapati Ranga rao site and
164
2017-18 Podapati Ramesh house to Transform in Division No.2 1.80 AE-8

278 / Construction of C.C Road and C.C Drain from Tanniru Yedukondalu house to
165
2017-18 Tanniru Ankamma house in B.C Colony in Division No.2 7.35 AE-8

279 / Construction of C.C Road and C.C Drain from Podapati Srinivasa rao house to
166
2017-18 Karumurivari Devara house in Gudimellapadu in Division No.2 8.95 AE-8

280 / Construction of Balance C.C Road and C.C Drain from Mudluri Anjaiah house to
167
2017-18 Koya Nagendramma house in B.C Colony in Division No.2 (RESERVED FOR L.C.C.S) 9.20 AE-8

281 / Construction of Balance C.C Road and C.C Drain from Koya Nagendra house to
168
2017-18 Meesala Lakshmaiah house in B.C Colony in Division No.2 (RESERVED FOR L.C.C.S) 9.35 AE-8

282 / Construction of C.C Drain &Culvert from Basha Tailor Shop to Kayyum House in
169
2017-18 Division No: 4 (6th call) 2.30 AE-1

283 / Construction of C.C Road and C.C Drain from Apex School to Sardar house in
170
2017-18 Islampet extension in Division No.4 6.20 AE-1
284 / Providing C.C Road and C.C Drain from Power Office to Pattan Inthias khan house in
171
2017-18 Division No.5 (RESERVED FOR L.C.C.S) 7.00 AE-1

285 / Laying of Water Supply Line Gaps at various places in 5 to 7 Divisions in Ongole
172
2017-18 Municipal Corporation 10.00 AE-1

286 / Providing Burning Platforms and North side of Levelling Site in Hindu Burial Ground
173
2017-18 in Division No.7 8.75 AE-1

287 / Construction of C.C Patches and B.T Patches in Various Places in Division No:7 (7th
174
2017-18 call) 6.35 AE-1

Construction of C.C Drain and C.C Patch from G.Srinivasulu house (D.No.27-45-271)
288 /
2017-18 to N.Mallikarjuna rao house (D.No.27-45-201) and Ramesh Babu house opp. Site 3.15
175 AE-1
C.C Patch in Division No.7
289 / Construction of C.C Culvert and Approach on Pothuraju Canal North side of Hindu
176
2017-18 Burial Ground Ground in Division No.7 4.95 AE-1

Construction of C.C Road and C.C Drain from Ambula Padmavathi house to
290 /
2017-18 Ankammathalli Temple and Ankammathalli Temple to K.Uma maheswara rao 4.55
177 AE-1
nilayam in Thurpu Sivalayam in Division No.7
Construction of C.C Road and C.C Drain from Polavarapu Sujatha house (Srinu
291 /
2017-18 Bunk) to opp. Srinivasa Nilayam Gopal Nagar (Gopal Nagar 4th line extension) in 5.30 AE-1
178
Gopal Nagar 3rd Line extension in Division No.7
Formation of Quarry Rubbish Road from Church East Side and West Side Roads and
292 /
2017-18 Sundara rao house to Karavadi Donka Road (Hindu Burial Ground South Side) in 6.85 AE-1
179
Gopal Nagar extension in Division No.7 (RESERVED FOR L.C.C.S)
293 / Laying of 150 mm dia A.C Pipe Line from Fly Over to Chandrapati Daveedu house in
180
2017-18 Thurpu Christian Palem in Division No.8 1.60 AE-1

294 / Construction of C.C Drain from Bollineni Chandara rao house to Bhimineni
181
2017-18 Venkateswarlu house (right side along Kadaravi Donka) in Division No.8 5.70 AE-1

295 / S.C.S.P Grant 2014-15 - Construction of C.C Drain and Culvert from Edipogu Kotaiah
182
2017-18 House to Patra Vinod House Thurpu Christian Palem in Division No.8 (8th call) 1.25 AE-1

296 / Construction of C.C Road and C.C Drain from Krishnaveni Nilayam to T.K Boys
183
2017-18 School back side in Kamma Palem in Division No.8 2.20 AE-1

Consturction of C.C Road and C.C Drain from Sri Venkata Sai Nilayam to Vajja
297 /
2017-18 Rajesh house (D.No.42-1-178) and Dwarakamayi house to B.S.N.L Office (at 8.90
184 AE-1
Kothapatnam Fly Over Bridge) in Indurthy Nagar in Division No.8
Providing C.C Road, C.C Drain and C.C Culvert from Aluri Ramesh House to Thurpu
298 /
2017-18 Christian Palem 1st Line (Aluri Bhaskara Rao Street) and A.R.R Hospital to K.Sujatha 9.85
185 AE-1
house (Bonthavari Street) in Division No.8

299 / Formation of Quarry Rubbish Road from Kakathiya Nagar Extension Park South Side
186
2017-18 to North Side and East to West Side in Division No.8 (RESERVED FOR L.C.C.S) 5.00 AE-1

Providing Quarry Rubbish Road and C.C Drain from Aluri Lakshmi house to Polineni
300 /
2017-18 Aruna house in Old Karavadi Donka Road (near Venkateswara Swamy Temple 3.30 AE-1
187
Road) in Division No.8 (RESERVED FOR L.C.C.S)
301 / Providing Quarry Rubbish Road and C.C Drain at Muslim Burial Ground in
188
2017-18 Kothapatnam Fly Over opposite in Division No.8 (RESERVED FOR L.C.C.S) 6.70 AE-1
Removal of Silt and Jammu in Mondivagu from Trunk Road near Rao and Naidu
302 /
2017-18 College to Nallavagu Junction at N.Agraharam and Providing 200 chain mounted 3.85
189 AE-2
machine in engaged on hire basis in Division No.10 (RESERVED FOR L.C.C.S)

303 / Laying of 150 mm dia A.C Pipe Line at Jayaprakash Colony at K.P Road in Division
190
2017-18 No.10 6.20 AE-2

Providing C.C Road from Nallamalapu Siva Leela house to Gudipati Venkata dasu
304 /
2017-18 house and Adapala Kotaiah house to Brahmamgari Temple house in N. Agraharam 8.60
191 AE-2
in Division No.10
305 / Providing C.C Road at Sk.Peer Saheb house Racha banda in Koppolu in Division
192
2017-18 No.10 7.40 AE-2

306 / Providing C.C Road from Sunkara Ragava reddy house to Brahmamgari temple in
193
2017-18 Agraharam in Division No.10 5.10 AE-2

Construction of C.C Drains at Sundaraiah school road Area and Koduru Ramaiah
307 /
2017-18 house to Katragadda srinivasarao house in Division No.10 (3rd call) (RESERVED FOR 10.00
194 AE-2
L.C.C.S)
308 / Providing C.C Road and C.C Drain from Panchaithi Office to Sunkara Raghava reddy
195
2017-18 house in Agraharam in Division No.10 8.30 AE-2

309 / Repairs and Painting to Public Toilet at Ananda Rao Road in Ongole Municipal
196
2017-18 Corporation (RESERVED FOR L.C.C.S) 0.81 AE-4

310 / Construction CC Drain of Muslim Burial Ground Besides Pedda Masjid in Division
197
2017-18 No.12 (4th call) 3.00 AE-2

Construction of C.C Drains from Banka Haribabu house to Marati palem well,
311 /
2017-18 Miriyala palem main road to nanduri umamaheswa rao house and Chivukula vari 7.90
198 AE-2
veedhi of Miriyala palem Rekha Studio to Bundhar Road in Division No.12 (2nd call)

312 / Construction of C.C Drain From Sathya Nivas house to Ajantha Silk Carcana in
199
2017-18 Division No.12 (6th call) 4.75 AE-2

313 / Construction of Repairs C.C Drain From Pakeerupalem punuri ramesh house to
200
2017-18 Mashumsha Street in Division No.12 (6th call) 0.95 AE-2

314 / Repairs to Compound Wall to the School Building of D.R.R.M High School in
201
2017-18 Division No.14 9.90 AE-2

315 / Construction of C.C Drain and Culvert from Annavarapadu Main road from 3rd line
202
2017-18 to Ram nagar 2nd line in Division No.15 (2nd call) 5.20 AE-2

316 / Providing C.C Road from Hosanna Mandiram Road to G. Subba Rao house in
203
2017-18 Division No.16 3.05 AE-2

Providing C.C Road from north side of Narayana house to Gaddam Yakob house
317 /
2017-18 and north side of Sankara Sastri house to Chennaiah house at Pothuraju Palemin 4.30 AE-2
204
Division No.16
318 / Providing C.C Drain and Culvert from Thadi Arunamma house to N.S.P Canal in
205
2017-18 Division No.16 3.35 AE-2

319 / Providing C.C Drain and Culvert from Ungarala Koteswara Rao house to Thadi
206
2017-18 Arunamma house in Division No.16 8.85 AE-2

320 / Providing C.C Drain and Culvert from Gundala Armulu house to Koteswaramma
207
2017-18 houe in Balaji Nagar Extension in Division No.16 2.80 AE-2
321 / Providing C.C Road and C.C Drain from Battulavari Kunta East Side of Sangivareddy
208
2017-18 house to Thirlaga Srinu house in Division No.16 8.95 AE-2

322 / Providing C.C Road and C.C Drain from Adapala Venkaiah house to Sankara Sastry
209
2017-18 house ion Division No.16 9.50 AE-2

323 / Providing C.C Road and C.C Drain from Agraharam Road to Bandi Devadanam
210
2017-18 house in Division No.16 9.40 AE-2

324 / Providing C.C Road and C.C Drain from south side of Sankara Sastri house to Srinu
211
2017-18 house in Agraharam Road in Division No.16 9.95 AE-2

325 / Construction of Compound Wall at Anganwadi School in Pelluru B.C Colony in


212
2017-18 Division No.17 9.98 AE-5

326 /
2017-18 Construction of Compound Wall of OMC Library Site in Pelluru in Division No.17 9.25 AE-5
213

327 /
2017-18 Construction of Compound Wall at Mandabayata Kunta in Pelluru in Division No.17 9.98 AE-5
214

328 / Construction of Compound Wall to Muslim Burial Ground in Pelluru in Division


215
2017-18 No.17 9.89 AE-5

329 / Construction of Compound Wall at Hindu Burial Ground in Perlluru in Division


216
2017-18 No.17 9.55 AE-5

330 / Laying of 200 mm dia and 100 mm dia Water Supply Pipe Lines in Pelluru in
217
2017-18 Division No.17 10.00 AE-5

331 / Laying of 200 mm dia A.C Pipe Line from Ram Nagar 12th Line to South Bye Pass
218
2017-18 Road (N.H-5) in Division No.17 6.60 AE-2

332 / Laying of 200 mm dia A.C Pipe Line from Ram Nagar 9th Line Water Tank to Ram
219
2017-18 Nagar 12th Line in Division NO.17 6.95 AE-2

Construction of C.C Drain&Culverts from Gattuboina Madava Rao House to Siri


333 /
2017-18 Malla Kotaiah House at Pelluru Kotha Colony in Division No:17 in Ongole Municipal 9.80 AE-5
220
Corporation
334 / Providing Fencing Poles at Cheruvukommu Palem Elementary School in Division
221
2017-18 No.18 5.85 AE-5

335 / Providing C.C Roads from Nomber Kotaiah house to Bubu Open Plat at
222
2017-18 VengamukkalaPalem SC Colony in Division No:18 10.00 AE-5

336 /
2017-18 Providing C.C Road to I.D.S.M.T Layout Reach-I 2nd Cross Road in Division No.18 9.20 AE-5
223

337 / Providing C.C Drain and Culvert to I.D.S.M.T Layout Reach-I 2nd Cross Road in
224
2017-18 Division No.18 9.15 AE-5

338 / Formation of Quarry Spell Roads at Bank Colony 3rd Cross Road Lest (opp.
225
2017-18 Raghavulu Apartment) in Division No.19 (RESERVED FOR L.C.C.S) 1.20 AE-5

339 / Providing Quarry Spell Road and Culvert from Mamidi Palem S.C Hostel to N.H-5
226
2017-18 Link Road in Division No.19 9.95 AE-5

340 / Providing CC Drain from Bhagya Nagar 2nd Line at MLA Guest House (Bit-1)in
227
2017-18 Division No.20 9.40 AE-5

341 / Providing CC Drain from Bhagya Nagar 2nd Line at MLA Guest House (Bit-2)in
228
2017-18 Division No.20 8.80 AE-5

342 / Construction C.C Drain from Dwakra Bazar to Eunugu Chettu Road in Division N.22
229
2017-18 (2nd call) 3.20 AE-4
343 / Repairs and Painting to Public Toilet at Bandlamitta in Ongole Municipal
230
2017-18 Corporation (RESERVED FOR L.C.C.S) 0.71 AE-4

344 / Construction of Compound Wall inbetween Horticulture Building and Slaughter


231
2017-18 House Building in Division No.24 6.28 AE-4

345 / Providing C.C Road from E-Seva centre to Bandlamitta Circle (beside divider along
232
2017-18 divider) in Division No.24 2.67 AE-4

346 /
2017-18 Providing Solid Waste Compost Machine in Division No.24 0.99 AE-4
233

347 / Construction of Fountain at Jyothi Rao Pule Statue in New Vegetable Market area
234
2017-18 in Ongole Municipal Corporation 2.10 AE-4

348 / Procurement of 6 seated (3+3) Mobile toilet for putting at Old Vegetable market
235
2017-18 area in Ongole Municipal Corporation (2nd call) 5.35 AE-1

349 / Construction of Balance Compound Wall and Levelling of Ground at P.V.R Boys
236
2017-18 High School in Division No.24 9.30 AE-4

350 / Construction of Compound Wall at Shadi Khana South Side to Horticulture Building
237
2017-18 in Division No.24 9.20 AE-4

351 / Construction of Dhobi Khanas at P.V.R Boys High School in Ongole Municipal
238
2017-18 Corporation 9.25 AE-4

352 / Providing Balance C.C Drain from Vadde Palem in Uracheruvu upto Culvert at New
239
2017-18 Addanki Bus Stand Reservoir in Division No.24 7.65 AE-4

353 / Providing Balance C.C Drain from Vaddepalem in Uracheruvu upto Culvert at New
240
2017-18 Addanki Bus Stand Reservoir in Division No.24 (RESERVED FOR L.C.C.S) 9.40 AE-4

354 / Construction of Culverts at Vantavari Colony Main Road south side in Division
241
2017-18 No.24 0.99 AE-4

355 / Providing C.C Road and C.C Drain from Eswaramm house to Mutyalu house in
242
2017-18 Ekalavya Nagar and Samaikyatha Nagar 2nd line in Division No.24 5.40 AE-4

356 / Providing Internal C.C Road and C.C Drains in Bondili vari Veedhi and Bheemaraju
243
2017-18 vari Veedhi in Division No.26 (RESERVED FOR L.C.C.S) 6.95 AE-4

357 /
2017-18 Repairs and Painting to Toilet at Rajapanagal Road in Ongole Municipal Corporation 0.81 AE-4
244

358 / Construction of C.C Culvert at Sangavarapu Nilayam (Kondaiah Bunk) in Division


245
2017-18 No.28 2.40 AE-5

359 / Repairs and Painting to Public Toilet at Gaddala Gunta near S.S Tank in Ongole
246
2017-18 Municipal Corporation 0.71 AE-4

360 / Construction of Balanced C.C Road, Retaining Wall and Steps in Hill Area in Division
247
2017-18 No.29 8.85 AE-5

362 / Construction of C.C Drain from Rajapanagal Road Main Road Hanuman Temple to
248
2017-18 D.No.2-4-34 in Rajapanagal Road in Division No.29 3.90 AE-5

363 / Construction of C.C Drain at Konijeti Bus Stand Well, Galagala Srinivasulu House to
2017-18 Vinayaka Temple and C.C Aproches at Rajapanagal Road in Division No:29 (4th call) 4.60
249 AE-5

364 / Construction of C.C Drain and Damaged C.C Road at 14th - 15th Cross Roads in
250
2017-18 Rajapanagal Road in Division No.29 2.75 AE-5

365 / Construction of C.C Drain and Culvert at Gaddalagunta School back Side in Division
251
2017-18 No.30 (2nd call) (RESERVED FOR L.C.C.S) 3.30 AE-5
366 / Providing C.C Drain and Culvert to Kakumani Bujji Babu House Road in Gaddala
252
2017-18 Gunta in Division No.30 (4th call) 5.05 AE-5

367 / Providing C.C Road from C.R.P.F Quarters Down North Side (near Hill) in Division
253
2017-18 No.31 9.65 AE-5

368 / Providing 12 Mtrs. Galvanised High Mast Lighting System at Gaddala Gunta
254
2017-18 Marrichettu in Division No.32 5.50 AE-2

369 / Providing 12 Mtrs. Galvanised High Mast Lighting System at Gaddala Gunta Nehru
255
2017-18 Statue in Division No.32 5.50 AE-2

370 / Construction of Compound Wall at Gaddala Gunta Burial Ground of North Side (Bit-
256
2017-18 1) in Division No.32 9.40 AE-5

371 /
2017-18 Construction of C.C Road at Lawyerpet Burial Ground in Division No.34 4.95 AE-5
257

372 /
2017-18 Development of Rajeev Nagar Park in Division No.34 9.90 AE-5
258

373 / Development of Landscaping and Tree Plantation in Rajeev Nagar Park in Ongole
259
2017-18 Municipal Corporation 9.65 AE-5

374 / Construction of C.C Drain from Bhagavanulu house in Rajeev Nagar 4th Line to
260
2017-18 Rajeev Nagar Main Road in Division No.34 0.80 AE-5

Providing C.C Road and C.C Drain from Kondas Anjaiah house to Existing Rajeev
375 /
2017-18 nagar 40' Feet Road vide D.No.8/165-313 (beside Sathya Residency) in Division 7.50 AE-5
261
No.34
376 /
2017-18 Providing Sintex Mobile Toilet Van at Mangamoor Road in Division No.35 9.70 AE-5
262

377 / Rennovation of Nirmal Nagar Park Tree Plantation and Lawn in Ongole Municipal
263
2017-18 Corporation 9.90 AE-5

Construction of C.C Drain from D.No.36-72-338 to 36-72-332 (Narayana High


378 /
2017-18 School), D.No.36-72-309 to 36-72-312 (Reddy garu) and Panchamuka Anjaneya 6.30 AE-5
264
Swamy Temple opp. Line in Division No.35
Providing Pre-Cast Slabs and Raising of C.C Drain Walls raising at around the
379 /
2017-18 Gandhi Park beside Kalanikethan Show Room to Gandhi Park Main Gate in Division 3.90
265 AE-5
No.36
380 / Providing C.C Drains both side in Sivaji Nagar 1st Line (Janani Apartment Line) in
266
2017-18 Division No.37 10.00 AE-6

381 / Providing C.C.Drains and Quarry Spell road from SSN college to Ankammathalli
267
2017-18 apatment road in Division no.37 2.00 AE-6

382 / Providing CC Road and CC Drains both sides from Pragathi Nagar Main Road to
268
2017-18 Marrichettu Colony Road in Pragathi Nagar of O.M.C Division No.37 9.20 AE-6

384 /
2017-18 Providing C.C Drain both sides in Sambasiva Nagar 3rd Line in Division No.37 4.30 AE-6
269

385 /
2017-18 Providing 100 mm dia A.C Pipe Line in Lakshmi Narasimha Puram in Division No.38 3.20 AE-6
270

386 / Providing C.C Road from Kurnool Road to Guptha's Apartment in Mahalakshmi
271
2017-18 Nagar 3rd line in Division No.38 6.35 AE-6

Providing C.C Drains from Samatha Nagar School to ABK Murthy house,
387 /
2017-18 Srinivasachary house to Sk.Jilani house and Tirupathi reddy house to V.Anjaiah 8.25 AE-6
272
house in Samatha Nagar in Division No.39
Providing C.C Drains from Ramesh house to Krishna nagar main road, ABK Murthy
388 /
2017-18 house to V.Ranga rao house and V.Ranga rao house to Krishna Nagar Main Road in 8.15
273 AE-6
Samatha Nagar in Division No.39
Providing C.C Drains from Sk.Nabi basaha house to K.Venkateswarlu housein
389 /
2017-18 Krishna nagar main road and Ramesh house to Krishna nagar main road in Samatha 8.15 AE-6
274
Nagar in Division No.39
390 / Providing C.C Drain from G.China kotaiah house to Y.Venkata narayana house in
275
2017-18 Marrichettu Colony in Division No.39 8.80 AE-6

391 /
2017-18 Providing C.C Drains in Rajula Colony 2nd line in Division No.39 3.85 AE-6
276

392 /
2017-18 Providing C.C Drains in Samatha Nagar 1st Line in Division No.39 7.00 AE-6
277

393 /
2017-18 Providing C.C Drains in Samatha Nagar 2nd Line in Division No.39 5.00 AE-6
278

394 /
2017-18 Providing C.C Drains in Samatha Nagar 4th Line in Division No.39 5.00 AE-6
279

395 /
2017-18 Providing C.C Drains in Samatha Nagar 6th Line in Division No.39 3.50 AE-6
280

396 / Providing C.C Disposal Drain from Manikanta Nagar Vinayaka Temple to Samatha
281
2017-18 Nagar Main Road via Krishna Nagar in Division No.39 (RESERVED FOR L.C.C.S) 8.80 AE-6

397 / Providing C.C Drain from Peerlamanyam 10th line to Kurnool Road via S.T Yanadi
282
2017-18 Colony in Division No.39 (RESERVED FOR L.C.C.S) 6.60 AE-6

398 / Providing Internal C.C Drains in both sides (South side) from 7nd line to 13th line
283
2017-18 roads in Peerlamanyam (Kurnool road) in Division No.39 (RESERVED FOR L.C.C.S) 9.80 AE-6

399 / Providing Internal C.C Drains in both sides (South side) from 1st line to 6th line
284
2017-18 roads in Peerlamanyam (Kurnool road) in Division No.39 9.80 AE-6

400 / Providing Internal C.C Drains in both sides (north side) from 7nd line to 13th line
285
2017-18 roads in Peerlamanyam (Kurnool road) in Division No.39 9.80 AE-6

401 / Providing Internal C.C Drains in both sides (north side) from 1st line to 6th line
286
2017-18 roads in Peerlamanyam (Kurnool Road) in Division No.39 (RESERVED FOR L.C.C.S) 9.85 AE-6

402 / Providing C.C Road from Tanneru Tirupalu house to Gunja Venkateswarlu house in
287
2017-18 Vaddipalem in Pernamitta in Division No.40 3.20 AE-6

403 / Providing C.C Road from O.K Road to Yenuganti Nageswara Rao house in
288
2017-18 Pernamitta in Division No.40 5.50 AE-6

404 / Providing C.C Drains from N.S.P Canal to Damacherla Sakkubayamma Trust Road
289
2017-18 (Ramalingareddy Nagar Road) in Dwaraka Nagar in Pernamitta in Division No.40 10.00 AE-6

405 / Providing C.C Road and C.C Drain from Jayamma house to Kukkapalli Anjaneyulu
290
2017-18 house in Pernamitta in Division No.40 9.25 AE-6

Providing Quarry Rubbish Road from N.S.P Canal to Damacharla Sakkubayamma


406 /
2017-18 Trust Road (Ramalingareddy Nagar) in Dwaraka Nagar in Pernamitta in Division 4.75 AE-6
291
No.40
Providing C.C Roads and C.C Drains from O.K Road to Ogirala Subba Rao house, O.K
407 /
2017-18 Road to Gunja Raghavulu house and at Gunja Sayanna house in Pernamitta in 8.75
292 AE-6
Division No.41
Providing C.C Roads and C.C Drains from Kandula Venkateswarlu house to
408 /
2017-18 Brahmaiah house, Daggubati Immanialu house to Factory Road and at Jkattineni 8.10 AE-6
293
Venkareddy house in Pernamitta in Division No.41
409 / Providing C.C Drain from Pandi Narayana house to Rathikinda Ananda rao house in
294
2017-18 Sundaraiah Colony 5th Line in Pernamitta in Division No.42 6.35 AE-6

410 / Providing C.C Road from O.K Road to Kola Mahesh House in Pernamitta in Division
295
2017-18 No.42 5.60 AE-6

411 / Providing C.C Drains both sides and balance C.C Road from Yedukondalu Venkaiah
296
2017-18 house to Sundaraiah Colony Main Road in Pernamitta in Division No.42 7.55 AE-6

412 / Providing C.C Drain from Sundaraiah Colony Main Road to Battula Peddamai house
297
2017-18 in Sundaraiah Colony in Pernamitta in Division No.42 (RESERVED FOR L.C.C.S) 6.90 AE-6

413 / Providing C.C Road and C.C Drain from Gunja Venkateswarlu house to Challa
298
2017-18 Nageswara Rao house (Main Road) in Pernamitta in Division No.42 9.40 AE-6

414 / Construction of C.C Drain from Indian School to B.Srinu house in Virat Nagar in
299
2017-18 Division No.43 2.75 AE-8

Construction of C.C Drain from Yanadi Colony Ankammathalli Nialayam to Rangasai


415 / house, Sriram Colony Main T.Veeraiah house to T.Siddaiah house,
2017-18 B.Koteswaramma house to Pothuraju Canal Bridge and E.Sujatha hose to 4.00 AE-8
300

T.Brahmaiah house in Division No.43

Construction of C.C Drain from Shirdi Sai Mandiram to M.Venkateswaralu house


416 /
2017-18 and from D.No.33-056-701 to D.No.33-056-707 in Shirdi Sai Baba Nagar 1st Cross 7.70
301 AE-8
Road in Division No.43
417 / Construction of C.C Drain from B.V.S Internet to Sri Sai Nilayam in Shirdi Sai Baba
302
2017-18 Nagar in Division No.43 8.95 AE-8

Construction of C.C drain from Rattaiah house to Yogaiah house, 4th Cross Road
418 / opp. Sivaiah Pantulu house to B.Nageswara rao house in Andhra Kesari Nagar 3rd
2017-18 Line and from V.Rangaraju house to D.No.33-56-1594 in Andhra Kesari Nagar 2nd 5.00
303 AE-8
Line in Division No.43

419 /
Construction of Balance C.C Road and C.C Drain from Yanadi Colony Poleramma
2017-18 Temple to Y.Annapurna house and D.No.33-056-1729 to B.Narasamma house in 3.35
304 AE-8
Division No.43
420 / Construction of C.C Road and C.C Drain from Kurnool Road Existing Culvert to
305
2017-18 Prathikantam Ramamma hourse in Sriram Colony 2nd Line in Division No.43 7.85 AE-8

Laying of Quarry Spell Roads from Ankammathalli Nilayam to Srinidhi Nilayam in


421 / Andhra Kesari Nagar 3rd line, Rangasai house to Tirupatahamma house in Andhra
2017-18 Kesarai Nagar 2nd line and from D.No.33-51-1375 to D.No.33-51-1370 in Andhra 7.35
306 AE-8
Kesari Nagar 2nd line in Division No.43

Providing Quarry Spell Road and C.C Drain from Chandra rao house to V.Vanaja
422 /
2017-18 house and from Brahmam gari temple to Chaitanya colony entrance in Division 5.30
307 AE-8
No.43
423 / Laying of 100 mm dia A.C Pipe Line from Vijetha School to Anji Reddy house in
308
2017-18 Maruthi Nagar 2nd Line 1st Cross Road in Division No.44 1.95 AE-8

424 / Construction of C.C Drain from Kasi reddy house to Anji reddy house and
309
2017-18 Ramachandra reddy house in Maruthi Nagar 2nd line in Division No.44 5.90 AE-8

425 / Laying of Quarry Spell Roads in various places in Division No.44 (RESERVED FOR
310
2017-18 L.C.C.S) 2.30 AE-8

426 /
2017-18 Construction of C.C Road in New N.G.O Colony N.H-5 to towards in Division No.45 9.05 AE-7
311

427 / Construction of C.C Road from Nagendra Nagar 4th Cross Road to Nelko house in
312
2017-18 Nagendra Nagar Main Road in Division No.45 3.00 AE-7

428 / Construction of C.C Drain in Nagendra Nagar Main Road South side from N.H-5 to
313
2017-18 towards in Division No.45 3.35 AE-7

429 / Construction of C.C Drain from Gunturi Satyanarayana house to Ganapati Anjamma
314
2017-18 house in Sri Nagar Colony 1st Line in Division No.45 5.50 AE-7

430 / Construction of C.C Road and C.C Drain to Nagendra Nagar Main Road South side
315
2017-18 2nd Cross and 3rd Cross Road in Division No.45 4.55 AE-7

431 / Construction of C.C Road from Manyam Rathaiah house to Konda Prathap Reddy
316
2017-18 house in Peerlamanyam Main Road in Division No.45 7.65 AE-7

432 / Construction of C.C Road and C.C Drain to Sri Nagar Colony 3rd Line West Side 1st
317
2017-18 Cross Road and 2nd Cross Road in Division No.45 4.45 AE-7

Construction of C.C Road and C.C Drain from Pidikiti Narasimha Rao house to
433 /
2017-18 Konda Pratap reddy house in Nagendra Nagar Main Road north side in Division 6.17 AE-7
318
No.45
Construction of C.C Road and C.C Drain from Sk.Kasim saheb house to Thotampudi
434 /
2017-18 Amitha kumari house in New N.G.O Colony South Side 1st Cross Road in Division 2.80 AE-7
319
No.45
435 / Construction of C.C Drain and Quarry Rubbish Road in Sri Nagar Colony 1st Line
320
2017-18 Last Cross Road East Side in Division No.45 5.50 AE-7

436 /
2017-18 Construction of C.C Drain from K.Narasimha Rao house to N.H-5 in Division No.46 1.05 AE-7
321

437 /
2017-18 Raising of C.C Road in Matam Bazar in Division No.49 7.25 AE-7
322

438 /
2017-18 Construction of C.C Drain in Matam Mazar in Division No.49 9.10 AE-7
323

Construction of C.C Drains at Indira Nagar 1st line (Sai Public School) and from
439 /
2017-18 Subbasani Chenchamma house to Katragadda Eswaramma house in Iskan Temple 3.05 AE-7
324
Road in Division No.49
440 / Construction of C.C Drains in Yadavula Bazar 1st and 2nd Line in Satyanarayana
325
2017-18 Puram in Division No.49 5.70 AE-7

Construction of C.C Drains from Galam Subbaiah house to Tagore Srinu Auto
441 /
2017-18 Consultancy in Sathyanarayana Puram 1st line and from Raya Yalamandaih house 9.00 AE-7
326
to Rami Reddy house in Sathyanarayana Puram 2nd line in Division No.49

Construction of C.C Drain from Raya Vengala Rao house to Vemuri Narasimha Rao
442 /
2017-18 house in Vijetha School back side road in Sathyanarayana Puram in Division No.49 4.30 AE-7
327
(RESERVED FOR L.C.C.S)
443 / Construction of C.C Drain from Surineeni Polaiah house to Pothuraju Canal in
328
2017-18 Sathyanarayana Puram 1st Line in Division No.49 5.00 AE-7

444 / Construction of C.C Drains in Venkateswara Colony 1st line east side 1st, 1/1 cross
329
2017-18 roads from Kondalu Nilayam to Sk.Meeravali house in Division No.50 10.00 AE-7

445 / Construction of C.C Drains in Venkateswara Colony 1st line east side 5th, 4th and
330
2017-18 3rd cross roads in Division No.50 8.75 AE-7

446 / Construction of C.C Drains on west side of 1st, 2nd and 1/1 cross roads in
331
2017-18 Venkateswara Colony in Division No.50 7.80 AE-7

Construction of C.C Drains and Quarry Rubbish Roads in Venkateswara Colony 2nd
448 /
2017-18 line west side 7th, 6th, 5th and 4th cross roads in Division No.50 (RESERVED FOR 6.25
333 AE-7
L.C.C.S)
Construction of C.C Drains and Quarry Rubbish Roads in Venkateswara Colony 1st
449 /
2017-18 line west side 2nd, 1/1, 3rd cross road and Sd.Babji Nilayam to towards south side 8.90
334 AE-7
in Division No.50 (RESERVED FOR L.C.C.S)
450 / Laying of Quarry Rubbish road from Peerla Arogya rao (H) to Nagaraju(H) at
335
2017-18 Chaitnaya Colony last Cross road in Division.No.50 (RESERVED FOR L.C.C.S) 0.80 AE-7

451 / Arrangement of Mike Sets in Municipal Corporation Schools and Municipal


336
2017-18 Corporation premises in Ongole Municipal Corporation 4.62 AE-4

452 / Providing Figurative/Non-figurative/Geometrical/ Patterns Art Work on walls out


337
2017-18 side of Devudu Cheruvu Park in Ongole Municipal Corporation 8.60 AE-5

453 / Supply of Man Mazdoor for Maintenance of Water Supply in 17,18,19,20,21,30 and
338
2017-18 31 Divisions in Ongole Municipal Corporation (RESERVED FOR L.C.C.S) 8.10 AE-5

Providing Thermoplastic Road Marking and Supply and Fixing of Raised Pavement
454 / Markers (Road Studs) with Twin Moulded Shanks at Market Road, Court Center to
2017-18 TrunkRoad and Anjaiah Road P.V.R High School to Byepass Road in Ongole 10.00
339 AE-2
Municipal Corporation

Providing Thermoplastic Road Marking and Supply and Fixing of Raised Pavement
455 / Markers (Road Studs) with Twin Moulded Shanks from Laywerpet Main Road to
2017-18 Byepass Road, R.R Tank to R.T.C Bus Stand and Sai Baba Temple Road Traffic Police 6.00 AE-2
340

Station to R.R Tank in Ongole MunicipalCorporation

Providing Thermoplastic Road Marking and Supply and Fixing of Raised Pavement
456 / Markers (Road Studs) with Twin Moulded Shanks from Kothapatnam Bus Stand to
2017-18 Fly Over, Rajeev Gandhi Statue to Railway Station and Railway Station to 5.05 AE-5
341

Kesavaswamy peta in Ongole Municipal Corporation


457 / Construction of Platforms for placing of Dumper Bins in various places in Ongole
342
2017-18 Municipal Corporation 4.70 AE-7

458 / Arrangement of Auto for Advertisement Swatch Sarvekshana Survey in Ongole


343
2017-18 Municipal Corporation 0.43 AE-4

459 / Providing Stainless Steel Grills and Lawn for beautification of Dr.Br.Ambedkar
344
2017-18 Statue Pylon at H.C.M College opposite in Ongole Municipal Corporation 2.70 AE-2

460 / Providing Plaster of Paries Ceiling at Computer Room in Main Office in Ongole
345
2017-18 Municipal Corporation office in Ongole Municipal Corporation (2nd call) 0.90 AE-5

Supply and Delivery kirloskar make 8 hp @2200 RPM Single Cylinder Water Cooled
461 /
2017-18 Handle Start AV1 XL N4 model Disel Engine 100x100 mm Pump Set with to Ongole 1.38
346 AE-7
municipal Corporation (5th call)
462 / Rennovation of Motor Room and Beral Pipe at S.S Tank-II in Ongole Municipal
347
2017-18 Corporation 1.90 AE-5

463 / Providing Pipe Line C.C Patches at Various Places in Division No.17 to 21, 30 and 31
348
2017-18 in Ongole Municipal Corporation (3rd call) 10.00 AE-5

464 / Providing Plastic Drums and Sanitary Napkins, Vending Machine to Ongole
349
2017-18 Municipal Corporation 0.99 AE-4

Providing Quarry Spell to all Damageded Main Road and for Pot Holes, Wheel Track
465 /
2017-18 damaged in various places in A.E-5 section in Ongole Municipal Corporation (2nd 2.00
350 AE-5
call)

Repairs and Rectification of 650 KVA Distribution Transformer Replacement of H.T


466 / Coil and Transformer oil Changing in S.S Tank-II and New Filter Bed Water Works
2017-18 Transformer Yard 250 KVA, 315 KVA Transformer Over Oiling Changing and minor 6.60
351 AE-5
Repairs,and General Maintaince of Water Supply in Ongole Municipal Corporation

467 / Supply and Delivery of Hand Spray6 14 Ltr. Capacity and POWER SPRAYER to
352
2017-18 Ongole Municipal Corporation (2nd call) 1.25 AE-7

Supply and Delivery of THERMAL FOGGERS fully automaic and semi automatic -
468 /
2017-18 Total Stainless Steel Body combustion chamber - 18.6 KW/25.2 HP to Ongole 2.40 AE-7
353
Municipal Corporation (2nd call)
469 / Drilling of Deep Bore Wells and Fixing of IM-II Hand Pumpsets at various places in
354
2017-18 Division No.45 to 50 in Ongole Municipal Corporation (2nd call) 9.65 AE-7

470 / Drilling of Deep Bore Wells and Fixing of IM-II Hand Pumpsets at various places in
355
2017-18 A.E-4 section in Ongole Municipal Corporation (2nd call) 10.00 AE-4

471 / Drilling of Deep Bore Well and Fixing of IM-II Hand Pumpsets at various places in
356
2017-18 Ongole Municipal Corporation (3rd call) 11.50 AE-6

S.C.S.P Grant 2016-17 - Construction of CC Drain and CC road in Throvagunta SC


472 /
2017-18 Colony 5th line and laying of quarry rubbish road in Throvagunta 6th line in 10.00 AE-7
357
division.No.50 (RESERVED FOR L.C.C.S)
473 / S.C.S.P Grant 2016-17 - Raising of CC road from 1st line to National Highway in
358
2017-18 Throvagunta SC colony in division.No.50 (RESERVED FOR L.C.C.S) 9.80 AE-7
TOTAL 2677.65
Download Start Time : 24.05.2017 5.00 P.M
Download End Time : 07.06.2017 5.00 P.M
Receipt of Bids End Time : 07.06.2017 5.15 P.M
Price Bid Opening Time : 07.06.2017 5.30 P.M
Supply of Workers on Outsourcing basis for Maintenance of Water supply,
474 /
1 2017-18 engaging of Work Inspector and Data Entry Operators relating to Office Procedure 197.00
in Ongole Municipal Corporation (Reserved for L.C.C.S)

Supply of Workers on Outsourcing basis for Maintenance of Parks, Debris on Call,


475 / Encroachement removal squad, Tree Plantation and Drivers / Operators for
2 2017-18 100.30
Vehicles in Ongole Municipal Corporation in Ongole Municipal Corporation
(Reserved for L.C.C.S)
TOTAL 297.30
Download Start Time : 24.05.2017 5.00 P.M
Download End Time : 07.06.2017 5.00 P.M
Receipt of Bids End Time : 07.06.2017 5.15 P.M
Price Bid Opening Time : 07.06.2017 5.30 P.M
478 / Desiltation of Drains in 4 to 9 Divisions in A.E-1 section in Ongole Municipal
1 2017-18 6.00 AE-1
Corporation
479 / Desiltation of Drains and Repairs of C.C Drains in various places in 4 to 9 Divisions
2 2017-18
in A.E-1 section in Ongole Municipal Corporation 0.999 AE-1

480 / Desiltation of Drains in 10 to 16 Divisions in A.E-2 section in Ongole Municipal


3 2017-18 6.00 AE-2
Corporation
481 / Desiltation of Drains in various places in A.E-4 section in Ongole Municipal
4 2017-18 5.00 AE-4
Corporation
482 / Desiltation of Drains in Divisions 28, 29 and 32 in A.E-5 section in Ongole Municipal
5 2017-18
Corporation 5.50 AE-5

483 / Desiltation of Drains in Divisions 33, 34, 35 and 36 in A.E-5 section in Ongole
6 2017-18 6.00 AE-5
Municipal Corporation
484 / Desiltation of Drains in Divisions 37 to 41 in A.E-6 section in Ongole Municipal
7 2017-18 4.90 AE-6
Corporation
485 / Desiltation of Drains in Divisions 45 to 50 in A.E-7 section in Ongole Municipal
8 2017-18
Corporation 5.50 AE-7

Supply of Excavators, Tractors, Dozing Tractors and Man Mazdoor for Clearing of
486 /
2017-18 High Berms and Debris in 4 to 9 Divisions in A.E-1 section for Special Sanitation 6.00
9 AE-1
Drive in Ongole Municipal Corporation
487 / Development of Landscape Work at Central Median in Guntur Road in Division
10 2017-18 5.75 AE-7
No.50
TOTAL 51.649
Download Start Time : 13.06.2017 5.00 P.M
Download End Time : 20.06.2017 5.00 P.M
Receipt of Bids End Time : 20.06.2017 5.15 P.M
Price Bid Opening Time : 20.06.2017 5.30 P.M
Developmental Activities and Infrastructure Facilities for the year 2015-16 and
489 /
1 2017-18 2016-17 - Package 17 - Providing B.T Road from NH-5 to Gandhi Nagar Offtake 130.00
Point in Ongole Municipal Corporation

Developmental Activities and Infrastructure Facilities for the year 2015-16 and
490 / 2016-17 - Package 23 - Formation B.T Road from NH-5 at Royal Enfeald Show Room
2 2017-18 156.00
to Mamidipalem Christen Buriyal Ground & Kothamamidi Palem Main Road in
Ongole Municipal Corporation in Ongole Municipal Corporation

Developmental Activities and Creation of Infrastructure facilities for the year 2015-
491 / 16 and 2016-17 - Providing Strom Water Drain besides N.S.P Canal from Ramnagar
3
2017-18 37.00
10th Line to Sanghamitra Hospital in Division No.15 in Ongole Municipal
Corporation
TOTAL 323.00
Download Start Time : 23.06.2017 5.00 P.M
Download End Time : 15.07.2017 5.00 P.M
Receipt of Bids End Time : 15.07.2017 5.15 P.M
Price Bid Opening Time : 15.07.2017 5.30 P.M
495 / Supply and Delivery of Pyrosene Oil - BIS mark Mallathion Technical in Ongole
1
2017-18 Municipal Corporation 8.90 AE-7
496 / Providing Transformer and D.P Structure at Bala Bhavan in Ongole Municipal
2 2017-18 4.10 AE-8
Corporation
497 / Plantation and Maintenance of Central Dividers from Addanki Bus Stand to
3 2017-18 4.30 AE-2
Pothuraju Canal in Ongole Municipal Corporation
498 / Supply of Heavy Base P.V.C Cones and Non Parking SignBoards to Traffice Police in
4
2017-18 Ongole Municipal Corporation 0.99 AE-1

499 /
2017-18 Supply of Iron Stoppers to Traffic Police in Ongole Municipal Corporation 2.25 AE-1
5

500 / Supply of Breath Alcohol Analysers to Traffic Police in Ongole Municipal


6 2017-18 0.99 AE-1
Corporation
501 / Engaging of Unskilled Mazdoors and Tractor to Sanitary Section of Ongole
7 2017-18
Municipal Corporation (Reserved for L.C.C.S) 9.95 AE-7

502 /
2017-18 Desiltaion of Drains in A.E-8 section in Ongole Municipal Corporation 5.50 AE-8
8

503 / Desiltation of Drains from Mangamoor Road Bye Pass Road to S.S Tank-1 and from
9
2017-18 S.S Tank-2 to Sanghamithra Hospital in Ongole Municipal Corporation 6.60 AE-8

TOTAL 43.58
Download Start Time : 24.06.2017 5.00 P.M
Download End Time : 01.07.2017 5.00 P.M
Receipt of Bids End Time : 01.07.2017 5.15 P.M
Price Bid Opening Time : 01.07.2017 5.30 P.M
504 / Supply of Water Tanker for Watering the Avenue to Avenue Plants in Ongole
1 2017-18 9.93 AE-2
Municipal Corporation
505 / Development of Landscape Work at Central Median in Guntur Road in Division
2
2017-18 No.50 (2nd call) 5.75 AE-7
TOTAL 15.68
Download Start Time : 04.07.2017 5.00 P.M
Download End Time : 11.07.2017 5.00 P.M
Receipt of Bids End Time : 11.07.2017 5.15 P.M
Price Bid Opening Time : 11.07.2017 5.30 P.M
506 / S.C.S.P Grant 2016-17 - Providing CC Roads and CC Drains of New Sc colony at
1 2017-18 9.30 AE-2
N.Agraharam in Division No.10 (2nd call)
S.C.S.P Grant 2016-17 - Construction of CC Drain East side Road of church of
507 /
2 2017-18 Gandhi nagar Sc colony of koppolu in Division No.10 (RESERVED FOR L.C.C.S) (2nd 10.00 AE-2
call)
508 / S.C.S.P Grant 2016-17 - Construction of C.C Drians & CC Culverts at Kabadi palem
3 2017-18 in Division No.13 (2nd call) 10.00 AE-2

509 / S.C.S.P Grant 2016-17 - Providing CC Drain from kotapati koteswarao house to
4 2017-18 thupakula chittemma house in Balaji Nagar S.T Colony in Division No.16 (2nd call) 7.00 AE-2

510 / S.C.S.P Grant 2016-17 - Construction of C.C Drains From 8th line to 13th line of Puli
5 2017-18 venkata Reddy colony in Division No.9 (2nd call) 7.65 AE-1

511 / S.C.S.P Grant 2016-17 - Providing CC Drains in Main road (East to west) of Botling
6 2017-18 company Indira nagar in Pernamitta in Division No.40 (2nd call) 8.00 AE-6
S.C.S.P Grant 2016-17 - Providing CC approaches to existing Culverts in Shool road
512 /
7 2017-18 and Providing CC road and drains from shool road to chrch in Christianpalem in 10.00 AE-6
Division No.40 (RESERVED FOR L.C.C.S) (2nd call)
S.C.S.P Grant 2016-17 - Construction of C.C Drains&Culverts from Balabhadra
513 /
8 2017-18 Chenchaiah house to Boppuri Edman house at Cheruvukommupalem Sc Colony in 10.00 AE-3
Division No.18 (2nd call)
514 / S.C.S.P Grant 2016-17 - Providing C.C Road from Thufan Nagar ST Colony 3rd Main
9 2017-18 Road in Division No.18 (2nd call) 10.00 AE-3

515 / S.C.S.P Grant 2016-17 - Construction of C.C Drain & Culverts at Yanadhi Colony 3rd
10 2017-18 10.00 AE-3
Cross Road ST Area in Division No.18 (2nd call)
516 / S.C.S.P Grant 2016-17 - Construction of Disposel Drain and Culverts at Yanadhi
11 2017-18 10.00 AE-3
Colony Main Road ST Area in Division No.18 (2nd call)
517 / Construction of C.C Drain &Culvert from Basha Tailor Shop to Kayyum House in
12 2017-18 2.30 AE-1
Division No: 4 (7th call)
518 / Construction of C.C Road and C.C Drain from Apex School to Sardar house in
13 2017-18 Islampet extension in Division No.4 (2nd call) 6.20 AE-1

519 / Construction of C.C Road and C.C Drain from Krishnaveni Nilayam to T.K Boys
14 2017-18 2.20 AE-1
School back side in Kamma Palem in Division No.8 (2nd call)
Providing C.C Road, C.C Drain and C.C Culvert from Aluri Ramesh House to Thurpu
520 /
15 2017-18 Christian Palem 1st Line (Aluri Bhaskara Rao Street) and A.R.R Hospital to K.Sujatha 9.85 AE-1
house (Bonthavari Street) in Division No.8 (2nd call)
Providing C.C Road from Nallamalapu Siva Leela house to Gudipati Venkata dasu
521 /
16 2017-18 house and Adapala Kotaiah house to Brahmamgari Temple house in N. Agraharam 8.60 AE-2
in Division No.10 (2nd call)
522 / Construction CC Drain of Muslim Burial Ground Besides Pedda Masjid in Division
17 2017-18 3.00 AE-2
No.12 (5th call)

Construction of C.C Drains from Banka Haribabu house to Marati palem well,
523 /
18 2017-18 Miriyala palem main road to nanduri umamaheswa rao house and Chivukula vari 7.90 AE-2
veedhi of Miriyala palem Rekha Studio to Bundhar Road in Division No.12 (3rd call)

524 / Construction of C.C Drain From Sathya Nivas house to Ajantha Silk Carcana in
19 2017-18 4.75 AE-2
Division No.12 (7th call)
525 / Construction of Repairs C.C Drain From Pakeerupalem punuri ramesh house to
20 2017-18 0.95 AE-2
Mashumsha Street in Division No.12 (7th call)
526 / Construction of C.C Drain and Culvert from Annavarapadu Main road from 3rd line
21 2017-18 to Ram nagar 2nd line in Division No.15 (3rd call) 5.20 AE-2

527 /
22 2017-18 Providing Solid Waste Compost Machine in Division No.24 (2nd call) 0.99 AE-4

528 / Procurement of 6 seated (3+3) Mobile toilet for putting at Old Vegetable market
23 2017-18 area in Ongole Municipal Corporation (3rd call) 5.35 AE-1

529 / Providing Balance C.C Drain from Vadde Palem in Uracheruvu upto Culvert at New
24 2017-18 7.65 AE-4
Addanki Bus Stand Reservoir in Division No.24 (2nd call)

530 / Providing Balance C.C Drain from Vaddepalem in Uracheruvu upto Culvert at New
25 2017-18 9.40 AE-4
Addanki Bus Stand Reservoir in Division No.24 (RESERVED FOR L.C.C.S) (2nd call)
531 / Providing C.C Road and C.C Drain from Eswaramm house to Mutyalu house in
26 2017-18 5.40 AE-4
Ekalavya Nagar and Samaikyatha Nagar 2nd line in Division No.24 (2nd call)
532 / Construction of Balanced C.C Road, Retaining Wall and Steps in Hill Area in Division
27 2017-18 8.85 AE-5
No.29 (2nd call)

533 / Construction of C.C Drain at Konijeti Bus Stand Well, Galagala Srinivasulu House to
28 2017-18 4.60 AE-5
Vinayaka Temple and C.C Aproches at Rajapanagal Road in Division No:29 (5th call)

534 / Providing C.C.Drains and Quarry Spell road from SSN college to Ankammathalli
29 2017-18 apatment road in Division no.37 (2nd call) 2.00 AE-6

535 / Providing C.C Drain both sides in Sambasiva Nagar 3rd Line in Division No.37 (2nd
30 2017-18 4.30 AE-6
call)
Providing C.C Drains from Samatha Nagar School to ABK Murthy house,
536 /
31 2017-18 Srinivasachary house to Sk.Jilani house and Tirupathi reddy house to V.Anjaiah 8.25 AE-6
house in Samatha Nagar in Division No.39 (2nd call)
537 /
32 2017-18 Providing C.C Drains in Samatha Nagar 1st Line in Division No.39 (2nd call) 7.00 AE-6
538 /
33 2017-18 Providing C.C Drains in Samatha Nagar 2nd Line in Division No.39 (2nd call) 5.00 AE-6

539 /
34 2017-18 Providing C.C Drains in Samatha Nagar 6th Line in Division No.39 (2nd call) 3.50 AE-6

540 / Providing Internal C.C Drains in both sides (South side) from 1st line to 6th line
35 2017-18 9.80 AE-6
roads in Peerlamanyam (Kurnool road) in Division No.39 (2nd call)
541 / Providing C.C Drain from Pandi Narayana house to Rathikinda Ananda rao house in
36 2017-18 6.35 AE-6
Sundaraiah Colony 5th Line in Pernamitta in Division No.42 (2nd call)

Construction of C.C Drains from Galam Subbaiah house to Tagore Srinu Auto
542 /
37 2017-18 Consultancy in Sathyanarayana Puram 1st line and from Raya Yalamandaih house 9.00 AE-7
to Rami Reddy house in Sathyanarayana Puram 2nd line in Division No.49 (2nd call)

Construction of C.C Drain from Raya Vengala Rao house to Vemuri Narasimha Rao
543 /
38 2017-18 house in Vijetha School back side road in Sathyanarayana Puram in Division No.49 4.30 AE-7
(RESERVED FOR L.C.C.S) (2nd call)
544 / Providing Plastic Drums and Sanitary Napkins, Vending Machine to Ongole
39 2017-18 0.99 AE-4
Municipal Corporation (2nd call)
545 / Drilling of Deep Bore Wells and Fixing of IM-II Hand Pumpsets at various places in
40 2017-18 9.65 AE-7
Division No.45 to 50 in Ongole Municipal Corporation (3rd call)
546 / Drilling of Deep Bore Wells and Fixing of IM-II Hand Pumpsets at various places in
41 2017-18 A.E-4 section in Ongole Municipal Corporation (3rd call) 10.00 AE-4

547 / Drilling of Deep Bore Well and Fixing of IM-II Hand Pumpsets at various places in
42 2017-18 Ongole Municipal Corporation (4th call) 11.50 AE-6

548 / Laying of B.T Patches in various places in 37 to 41 Divisions in A.E-6 section in


43 2017-18 3.20 AE-6
Ongole Municipal Corporation

549 / Replacement of Damaged Air Blower Pipe and Alum Tank Agitator in 16.00 MLD
44 2017-18 2.86 AE-8
Filteration Plant at S.S Tank-2 for Bed No.4 to 6 in Ongole Municipal Corporation

550 / Laying of 150 mm dia A.C Pipe Line from R.T.C In-Gate to Out-Gate in Division
45 2017-18 3.83 AE-4
No.24
551 /
46 2017-18 Supply and Delivery of M.S Push Carts to Ongole Municipal Corporation 6.48 AE-7

552 / Construction of C.C Road from Bollineni Venkateswarlu house to Gaddam Srinivasa
47 2017-18 rao house (Gilakala Bavi in Kamma Palem 1st Line) in Division No.7 8.96 AE-1

553 / Construction of C.C Road from Kamma Palem 1st Line to Bollineni Venkateswarlu
48 2017-18 8.96 AE-1
house in Division No.7
554 / Providing balance C.C Drain from Vaddepalem in Uracheruvu upto Culvert at New
49 2017-18 9.45 AE-4
Addanki Bus Stand Reservoir in Division No.24
555 / Construction of Fire Guard Shelter ata Gaddala Gunta Burial Ground (Lawyerpet
50 2017-18 extension) in Division No.34 9.10 AE-8

556 /
51 2017-18 Levelling of Site in Center in Ura Cheruvu in Division No.24 9.88 AE-4

557 / Repairs and Fabrication works of D.P Structure at 200 KVR DTR in Ongole Municipal
52 2017-18 1.25 AE-8
Corporation
558 / Replacement of Filter Media in 16.00 MLD Filteration Plant at S.S Tank-2 in Bed
53 2017-18 No.4 to 6 in Ongole Municipal Corporation 9.86 AE-8

559 /
54 2017-18 Providing B.T Patches and Improvement of Island under Fly Over in Division No.45 5.40 AE-7

560 / Providing B.T Patches in various places in A.E-4 section in Ongole Municipal
55 2017-18 2.00 AE-4
Corporation (RESERVED FOR L.C.C.S)
561 / Raising of C.C Road and C.C Drain from R.Venkateswarlu house to Y.Bharathi house
56 2017-18 9.95 AE-7
in Venkateswara Nagar in Division No.47
562 / Providing Figurative/Geometric/Stencils/Art Work on Kurnool Road Fly Over Slant
57 2017-18 Position of Wall in Ongole Municipal Corporation 8.45 AE-7

563 / Construction of Primary Elementary School in Chinna Malleswara Colony in Divison


58 2017-18 10.00 AE-4
NO.2
564 / Construction of Primary Elementary School in DWAMAA Office Campus in Division
59 2017-18 10.00 AE-4
No.31
565 / Construction of C.C Road and C.C Drain at Kothapatnam Bus Stand opp. C.C.S Police
60 2017-18 9.70 AE-1
Station in Division No.7
566 / Construction of C.C Drain south side of Mini Bye Pass Road from Uppalapati
61 2017-18 Ramadevi house to Karavadi Donka Road in Division NO.7 1.30 AE-1

567 / Construction of C.C Drain and Culvert from Sk.Kumbarambi housse to Masjid in
62 2017-18 7.40 AE-1
Division No.7
568 / Construction of C.C Drain and Culvert from Tangella Khasim Street near Masjid to
63 2017-18 Kammapalem 2nd Line in Division No.7 8.60 AE-1

569 / Construction of C.C Drain and Culvert from Bollinenivari palem 3rd Line to Karavadi
64 2017-18 10.00 AE-1
Donka Road (near N.T.R Statue) in Division No.7
570 /
65 2017-18 Construction of C.C Drain from left side Kamma Palem 2nd Line in Division No.7 6.00 AE-1

571 /
66 2017-18 Construction of C.C Drain from right side Kamma Palem 2nd Line in Division No.7 6.00 AE-1

572 / Construction of C.C Drain from Gopal Nagar 4th Line (via Gopal Nagar 5th and 6th
67 2017-18 Lines) to Tangella Khasim Street near Gilakala Bavi in Division No.7 4.40 AE-1

573 / Construction of C.C Drain from Bollineni Srinivasa Rao Shed to Pothuraju Canal in
68 2017-18 9.10 AE-1
Division No.8
574 /
69 2017-18 Construction of C.C Drain from Boring to Transform in Division No.8 7.50 AE-1

Repairs and Rectification of Clarifier, 400 mm dia R.C.C Intake Pipe Rrpairs and
575 /
70 2017-18 Construction of Transformer Foundation and Water Supply Maintenance in Ongole 3.85
Municipal Corporation (RESERVED FOR L.C.C.S)
576 / Construction of C.C Drain from M.Hanumantha Rao house to B.Venkaiah house and
71 2017-18 4.45 AE-7
from Dibbala Road to V.Venkaiah house in Division No.48
577 / Construction of C.C Road from Bellamkonda Venkaiah house to M.Hanumantha
72 2017-18 Rao house in Division No.48 7.00 AE-7
TOTAL 491.71
Download Start Time : 06.07.2017 5.00 P.M
Download End Time : 20.07.2017 5.00 P.M
Receipt of Bids End Time : 20.07.2017 5.15 P.M
Price Bid Opening Time : 20.07.2017 5.30 P.M
579 /
1 2017-18 Supply of Conocorpus Plants for Plantation in Ongole Municipal Corporation 20.00

580 / Supply of Bouganvilla Plants for Avenue Plantation in Ongole Municipal


2 2017-18 Corporation 20.00

581 / Supply, Delivery and Fixing of Chairs and Tables for MEPMA Building in Ongole
3 2017-18 1.66 AE-4
Municipal Corporation
582 / Construction of Compound Wall to Mahalakshmi Temple in Pelluru in Division
4 2017-18 6.30 AE-8
No.17
583 /
5 2017-18 Construction of C.C Culvert in P&T Employees Colony in Division No.19 2.90 AE-5

584 / Providing Painting and Arranging Windows to E-Techno School at P.V.R Boys
6 2017-18 Municipal School in Ongole Municipal Corporation 7.41 AE-4

585 /
7 2017-18 Construction of Divider from Filter Bed Road to Madhan Wine in Division No.24 9.85 AE-4

586 /
8 2017-18 Construction of Divider from Madhan Wines to Kurnool Road in Division No.24 10.00 AE-4

587 / Construction and Repairs to west side of Compound Wall in Hindu Burial Ground in
9 2017-18 3.60 AE-1
Division No.7
588 / Supply and Delivery of Chetan Plastic Dust Bins and Stickering to Ongole Municipal
10 2017-18 4.90 AE-7
Corporation
589 / Providing Continuty Water to Toilets at D.R.R.M High School in Ongole Municipal
11 2017-18 1.75 AE-4
Corporation
590 / Providing Continuty Water to Toilets at P.V.R Boys High School in Ongole Municipal
12 2017-18 Corporation 1.75 AE-4

591 / Providing Continuty Water to Toilets at P.V.R Girls High School in Ongole Municipal
13 2017-18 1.75 AE-4
Corporation
592 / Providing Continuty Water to Toilets at Ram Nagar High School in Ongole Municipal
14 2017-18 1.70 AE-4
Corporation
593 /
15 2017-18 Providing Children Furniture to Pre-Schools in Ongole Municipal Corporation 9.90 AE-1

594 / Providing Children Furniture to Pre-Schools in Pernamitta and Merged Areas in


16 2017-18 Ongole Municipal Corporation 10.00
Providing Wall Painting from Church Center to Ranga Rayudu Cheruvu, R.T.C Bus
595 /
17 2017-18 Stand and Addanki Bus Stand area for concept of Poster Free City in Ongole 8.33 AE-4
Municipal Corporation
596 /
18 2017-18 Providing Aminities to Merged Schools in Ongole Municipal Corporation 5.20 AE-1

597 / Providing Asian Apex Exterior Emulsion Painting to Kurnool road both side, Guntur
19 2017-18 9.85 AE-7
Road both sides in Ongole Municipal Corporation
Providing Figurative/Non Figurative/Geometrical/Stencils/ Art Work on walls and
598 /
20 2017-18 Electrical Item to Anganwadi Building in Pernamitta in Ongole Municipal 7.60
Corporation

599 / Laying of 150 mm dia A.C Pipe Line from Subrahmanyeswara Swamy Temple (Putta
21 2017-18 6.25 AE-1
Chettu) to Mini Bye Pass Road in Gopal Nagar 1st Line in Division No.6
600 / Supply and Delivery of Laboratory Tables to P.V.R Boys High School (AFC) in Ongole
22 2017-18 4.95
Municipal Corporation
601 / Providing C.C Drain from Sk.Hussain house to Amara Krishna house in Gopal Nagar
23 2017-18 2.30 AE-1
in Division No.6

602 / Laying of 150 mm and 100 mm dia A.C Pipe Line at Old Age Home (Hindu Burial
24 2017-18 5.25 AE-1
Ground) both sides and back side roads in Kamma Palem extension in Division No.7

TOTAL 163.20
Download Start Time : 26.07.2017 5.00 P.M
Download End Time : 02.08.2017 5.00 P.M
Receipt of Bids End Time : 02.08.2017 5.15 P.M
Price Bid Opening Time : 02.08.2017 5.30 P.M

604 / Providing C.C Road and repairs to Drains, Culverts from Mini Bye Pass Road from
1 2017-18 Karavadi Donka to Srinivasa Deluxe Road in Ongole Municipal Corporation 75.00

605 / Widening of C.C Road from K.P Road to Pothuraju Canal with Divider and Central
2 2017-18 155.00
Lighting in Ongole Municipal Corporation
606 / Widening of C.C Road with Divider and Central Lighting to Srinivasa Hall Road upto
3 2017-18 136.00
Pothuraju Kaluva in Ongole Municipal Corporation

607 / Rennovation of Drains and providing Foot Path on Drains from BSNL Office towards
4 2017-18 75.00
Addanki Busstand via Anjali Dresses in Ongole Municipal Corporation

608 / Development of C.C Road as 4 Lines Road and Central Lighting at North and South
5 2017-18 150.00
side of Vegetable Market Road in Ura Cheruvu in Ongole Municipal Corporation

Construction of Drain and Providing Foot Path on North and South Sides of
609 /
6 2017-18 Kurnool Road from Petrol Bunk at R.T.C Bus Stand to Kurnool Road Fly Over 80.00
Junction in Ongole Municipal Corporation
610 / Providing Green Belt with Chain Link Mesh Fencing at Guntur road in Ongole
7 2017-18 70.00
Municipal Corporation
611 / Widening of C.C Road from Old Vegetable Market to P.V.R Boys School in Ongole
8 2017-18 Municipal Corporation 80.00
Widening of C.C Road, Construction of Divider and Providing Central Lighting from
612 /
9 2017-18 Ambedkar Statue Junction to Mamidipalem Juction in Ongole Municipal 136.00
Corporation
613 / Providing Strom Water Drain opp. RIMS to Railway Track in Ram Nagar 6th Line in
10 2017-18 Division No.15 in Ongole Municipal Corporation 50.00
TOTAL 1007.00
Download Start Time : 02.08.2017 5.00 P.M
Download End Time : 19.08.2017 5.00 P.M
Receipt of Bids End Time : 19.08.2017 5.15 P.M
Technical Bid Opening Time : 19.08.2017 5.30 P.M
Price Bid Opening Time : 19.08.2017 5.45 P.M
614 /
1 2017-18 Supply and Delivery of Water Supply Materials in Ongole Muncipal Corporation 40.00

615 / Transportation and Supply of Water in various places in Ongole Municipal


2 2017-18 Corporation 50.00
TOTAL 90.00
Download Start Time : 03.08.2017 5.00 P.M
Download End Time : 10.08.2017 5.00 P.M
Receipt of Bids End Time : 10.08.2017 5.15 P.M
Price Bid Opening Time : 10.08.2017 5.30 P.M

616 /
Supply of Labour for Watch and Ward and Petrolling along N.S.P Canal from
1 2017-18 Ramatheertham Reservoir to S.S Tanks and additional pumping arrangements to 9.85 AE-8
S.S Tank-2 in Ongole Municipal Corporation
617 / Construction of C.C Drain at Bhagya Nagar 4h Line from Trunk Road to existing
2 2017-18 drain in Division No.19 9.98 AE-8

618 / Providing Precast Slabs on drain at New Vegetable Market area (Bit-1) in Division
3 2017-18 No.24 8.35 AE-4
TOTAL 28.18
Download Start Time : 04.08.2017 5.00 P.M
Download End Time : 11.08.2017 5.00 P.M
Receipt of Bids End Time : 11.08.2017 5.15 P.M
Price Bid Opening Time : 11.08.2017 5.30 P.M
Providing Asian Apex exterior emulsion Wall painting from south bypass via
620 /
1 2017-18 collectorate up to railway station road for concept of poster free city of 13,14 and 9.35 AE-2
15th Divisions in Ongole Municipal Corporation
Laying of 200 mm dia A.C Pipe Line from Maha Lakshmi Temple back side
621 /
2 2017-18 connecting K.P Road to Mannam Kotamma house in Kamma Palem 2nd Line in 6.80 AE-1
Division No.7
Figurative/Non figarative/Stencils/Letter Writing/Art Work on walls over a double
622 /
3 2017-18 coats of Enamel paint For Anganwadi Free Schools In Ongole Municipal 4.65 AE-4
Corporation.
623 / Construction of Body walls and repairs to Siphon at Road Crossing near SS Tank 2in
4 2017-18 Ongole Municipal Corporation 2.70 AE-8

624 / Providing figurative/non-figurative/geometrical/patterns Art Work on Anjanvadi


5 2017-18 1.25 AE-1
School in Papa Colony of Ongole Municipal Corporation
Engaging of 110 Chain Mounted Machine for Jungle Clearance, Kutcha Drain,
625 /
6 2017-18 Removal of High Berms in Major Drains in S.S Tank-I in Ongole Municipal 4.91 AE-8
Corporation
Drilling of Deep Bore Wells and Fixing of IM-II Hand Pumpsets at various places in
626 /
7 2017-18 Division No.45 to 50 in Ongole Municipal Corporation (4th call) (Reserved for 9.65 AE-7
L.C.C.S)

627 / Drilling of Deep Bore Wells and Fixing of IM-II Hand Pumpsets at various places in
8 2017-18 10.00 AE-4
A.E-4 section in Ongole Municipal Corporation (4th call) (Reserved for L.C.C.S)

628 / Repairs and Fabrication works of D.P Structure at 200 KVR DTR in Ongole Municipal
9 2017-18 Corporation (2nd call) 1.25 AE-8

629 / Providing Central Lighting New Poles existing Damaged Old Poles at Addanki Bus
10 2017-18 9.85 AE-2
Stand and Kurnool Road in Ongole Municipal Corporation
630 / Providing Central Lighting New Poles existing Damaged Old Poles at RIMS Hospital
11 2017-18 9.85 AE-2
in Ongole Municipal Corporation
631 /
12 2017-18 Lifting of Garbage at various places in Ongole Municipal Corporation 10.00 AE-7
TOTAL 80.26
Download Start Time : 22.08.2017 5.00 P.M
Download End Time : 29.08.2017 5.00 P.M
Receipt of Bids End Time : 29.08.2017 5.15 P.M
Price Bid Opening Time : 29.08.2017 5.30 P.M

Name of the works:


(A) Laying of 200 mm,150mm and 100mm dia AC Class-15 pipe line at Venkateswara Colony in
division.No.50 of ongole Municipal Corporation

1 632 / (B) Laying of water supply pipe line from Sujatha Nagar ELSR to Kurnool road for improvement of
water supply to various colonies i.e. Srinagar colony,Srinivasa colony,Maruthi nagar,Andhra Kesari 140.00
2017-18 nagar,Sri ram colony etc..in Ongole Municipal Corporation
(C ) Laying of 200mm ,150mm dia AC pipe line from Dheeraj Enclave in Sujatha Nagar 11th line to
Samatha Nagar in Division.No.37 Laying of 200 mm,150mm and 100mm dia AC Class-15 pipe line
at Venkateswara Colony in division.No.50 of ongole Municipal Corporation (3rd call)

TOTAL 140.00
Download Start Time : 26.08.2017 5.00 P.M
Download End Time : 11.09.2017 5.00 P.M
Receipt of Bids End Time : 11.09.2017 5.15 P.M
Technical Bid Opening Time : 11.09.2017 5.30 P.M
Price Bid Opening Time : 11.09.2017 5.45 P.M
633 / Transportation and Supply of Water in various places in Ongole Municipal
1 2017-18 50.00
Corporation (2nd call)
TOTAL 50.00
Download Start Time : 26.08.2017 5.00 P.M
Download End Time : 31.08.2017 5.00 P.M
Receipt of Bids End Time : 31.08.2017 5.15 P.M
Price Bid Opening Time : 31.08.2017 5.30 P.M
636 / Construction of Bilal Community Hall beside Padmavathi Function Hall in Bilal
1
2017-18 Nagar in Division No.3 9.70 AE-1
637 / Construction of C.C Drain from Bethamsetty Hari Babu house to Community Toilet
2 2017-18 6.50 AE-4
in Division No.24
TOTAL 16.20
Download Start Time : 29.08.2017 5.00 P.M
Download End Time : 05.09.2017 5.00 P.M
Receipt of Bids End Time : 05.09.2017 5.15 P.M
Price Bid Opening Time : 05.09.2017 5.30 P.M
638 / Laying of 100 mm dia A.C Pipe Line from Somasi Siva Rao house to Amburi Anjali
1 2017-18 house in Chukula vari veedhi in Division No.12 2.07 AE-2

639 / Construction of C.C Drain from Voturi Vallinadh house to Kumari Ankaiah house in
2 2017-18 Gopal Nagar Extension 4th Line 6th Cross Road in Division No.5 3.60 AE-1

640 / Construction of C.C Drain from Adusumalli Ramaiah house to Karavadi Donka road
3 2017-18 (via Devudu Cheruvu Arugu) in Thurpu Kamma Palem in Division No.7 3.65 AE-1

Construction of C.C Drain, Culvert and C.C Road Patch at Ramalayam Temple near
641 /
4 2017-18 Devudu Arugu connecting B.Sriram Murthy house to Karavadi Donka Road in 9.50 AE-1
Division No.7
642 / Laying of 200 mm and 150 mm dia A.C Pipe Line from Gopal Nagar 4th Line to
5 2017-18 8.80 AE-1
Karavadi Donka Road in Division No.7

643 / Laying of 150 mm dia A.C Pipe Line from Andhra Pragathi Grameena Bank to Burial
6 2017-18 8.40 AE-1
Gournd west side of Karavadi Donka (Dasaraju Palli Road) in Division No.7

Repairs and Rectification of 1200 mm dia Gravity Main, 500 mm and 600 mm dia
644 /
7 2017-18 PSC Pumping Mains and Gandhi Nagar Intake Well and Shutter Repairs in Ongole 2.70 AE-5
Municipal Corporation
645 /
8 2017-18 Providing Pipe Line Trench C.C Patches at Pothuraju Palem in Division No.16 2.20 AE-2

646 / Providing Quarry Spell Road in Dattatreya Colony near Bathulavari Kunta in Division
9 2017-18 7.30 AE-2
No.16 (Reserved for L.C.C.S)
647 / Construction of Compound Wall for Municipal Elementary School in Gandhi Nagar
10 2017-18 7.75 AE-4
in Ongole Municipal Corporation
648 / Laying of 200 mm dia A.C Pipe Line to Rajeev Nagar, Kothadonka, Housing Board
11 2017-18 8.95 AE-5
Colony in Ongole Municipal Corproration
649 / Laying of B.T Patches from Kolla Hanumantha Rao Arch in Mangamoor Road to
12 2017-18 Suraksha Apartments in Division No.39 9.40 AE-6

650 / Supply and Errection of E-Toilet (Stainless Steel) at Thurpu Christian palem area in
13 2017-18 7.45 AE-4
Ongole Municipal Corporation
651 / Supply and Errection of E-Toilet (Stainless Steel) at Kurnool Road Fly Over area in
14 2017-18 7.45 AE-4
Ongole Municipal Corporation
652 / Providing balance Pre-Cast Slabs and Culverts in Kanyaka Parameswari Temple
15 2017-18 2.11 AE-4
Road in Division No.25
653 / Construction of C.C culvert and jungle clerance bhrath colony at pothuraju kaluva
16 2017-18 bridge (dasaradi palli road) in Division No.3 3.50 AE-1

654 / Engaging Of Labour to Tractor For Digger Of Maintenance of Tree Plantation in


17 2017-18 8.20 AE-2
Ongole Municipal Corporation
655 / Reapires and Painting to Diseabled Persons Building(Vemuri Kotaih School Old)
18 2017-18 3.36 AE-4
Ongole Municipal Corporation
656 /
19 2017-18 Construction of Park Compound Wall at Old Sujatha Nagar In Division No:34 7.80 AE-8

657 / Construction of Compound wall at from South Side to East Side of Hindu Burial
20 2017-18 Ground in Srinivasa Theature Road (Beside Axillium School) in Division No.5 10.00 AE-1

658 / Laying of C.C Road from Veeraiah Chowdary Garu House to Eletrical D.E Srinivasa
21 2017-18 9.98 AE-8
Garu House Road In Division No.31
659 / Laying of Quarry Rubbish Road at Jayaprakash Colony 5th Cross Road and
22 2017-18 4.05 AE-7
Jayaprakash Colony Extension from Danam(H) to Ramu (H) in Division No.50
660 / Construction of CC Road at Andhrakesari Nagar 2nd line 2nd C/R P.Srinivasarao(H)
23 2017-18 to J.Balaraju(H) in Divisioin No.43 5.60 AE-7

661 / Construction of CC Road at Vitrat Nagar 2nd line from A.Subbarao(H) to Vasu
24 2017-18 6.85 AE-7
babu(H) in Division No:43
662 / Construction of CC Road at Vitrat Nagar 5th Line from E.Suresh to
25 2017-18 6.45 AE-7
Malleswararao(H) in Division No:43
663 / Construction of CC Road at Vitrat Nagar 3rd line from Pasupathi Rao(H) to towards
26 2017-18 Kurnool Road in Division No:43 9.95 AE-7

664 / Construction of CC Road at Andhrakesari Nagar 3rd line line from Police
27 2017-18 Narasimharao(H) to Pemma Nageswararao(H) in Division No:43 6.85 AE-7

665 / Construction of C.C Drain & Culverts at Veeraiah Chowdary Garu House to Housing
28 2017-18 8.75 AE-8
Bord Colony Main Road in Division No.19
666 /
29 2017-18 Construction of Park Compound Wall near Nirmala High School in Division No.35 10.00 AE-8

667 / Rennovation of Compound wall and Culvert at Christian Burial ground near
30 2017-18 Pothuraju Canal in Division.No. 7 3.20 AE-1

668 /
31 2017-18 Providing Internal C.C Roads and C.C Drain at various places in Division No.24 3.20 AE-4

669 / Construction and Repaires to west side of Compound Wall in Hindu Burial ground
32 2017-18 3.60 AE-1
in Division No.7
670 / Supply and Delivery of Plastic Dust Bins and Stickering to Ongole Municipal
33 2017-18 4.90 AE-7
Corporation
Laying of 150 mm and 100 mm dia A.C Pipe Line at Old Age Home (Hindu Burial
671 /
34 2017-18 Ground) both sides and back side roads in Kamma Palem extension in Division No.7 5.25 AE-1
(2nd call)
672 / S.C.S.P Grant 2016-17 - Construction of C.C Drians & CC Culverts at Kabadi palem
35 2017-18 in Division No.13 (3rd call) 10.00 AE-2

673 / Laying of 150 mm dia A.C Pipe Line from R.T.C In-Gate to Out-Gate in Division
36 2017-18 3.83 AE-4
No.24 (2nd call)

674 / Construction of C.C Drain from M.Hanumantha Rao house to B.Venkaiah house and
37 2017-18 4.45 AE-7
from Dibbala Road to V.Venkaiah house in Division No.48 (2nd call)

TOTAL 231.10
Download Start Time : 31.08.2017 5.00 P.M
Download End Time : 14.09.2017 5.00 P.M
Receipt of Bids End Time : 14.09.2017 5.15 P.M
Price Bid Opening Time : 14.09.2017 5.45 P.M
675 / Engaging of Tractors on hire basis for transportation of garbage in various places in
1 2017-18 50.00
Divsions 1 to 50 in Ongole Municipal Corporation
TOTAL 50.00
Download Start Time : 08.09.2017 5.00 P.M
Download End Time : 22.09.2017 5.00 P.M
Receipt of Bids End Time : 22.09.2017 5.15 P.M
Price Bid Opening Time : 22.09.2017 5.30 P.M
676 / Pumping Water to Gundlakamma Right Canal from Dead Storage for Water Supply
1
2017-18 Maintenance in Ongole Municipal Corporation 9.94 AE-8

677 / Formation of Kutcha Canal from Dead Storage point of Gundlakamma project to
2 2017-18 Right canal in Gundlakamma Reservoir project in Ongole Municipal Corporation 7.80 AE-8

678 / Construction of C.C Culverts in 40 Feet Road at Kammapalem 1st, 2nd and 3rd lines
3 2017-18 2.20 AE-8
in Division No.7
TOTAL 19.94
Download Start Time : 12.09.2017 5.00 P.M
Download End Time : 19.09.2017 5.00 P.M
Receipt of Bids End Time : 19.09.2017 5.15 P.M
Price Bid Opening Time : 19.09.2017 5.30 P.M
680 / Plantation and Maintenance of Dwarf Bouganavilla Plants at Central Dividers from
1 2017-18 9.97 AE-2
Church Center to Ratnamahal Theater in Ongole Municipal Corporation
681 / Plantation and Maintenance of Aristonia Scolaris Plants at Central Dividers from
2
2017-18 Church Center to South Bye Pass Road in Ongole Municipal Corporation 4.56 AE-2

Supply and Delivery of Fox Tail Palm of bag size 25'' X 25' with 10 to 12 feet height
682 /
3 2017-18 to plant and Conservency Articles and supply of tree plantation from Church Centre 3.65 AE-1
to Railway Station Road in Ongole Municipal Corporation
683 /
4 2017-18 Construction of Steps at S.S Tank-I in Division No.32 3.85 AE-8
TOTAL 22.03
Download Start Time : 22.09.2017 5.00 P.M
Download End Time : 29.09.2017 5.00 P.M
Receipt of Bids End Time : 29.09.2017 5.15 P.M
Price Bid Opening Time : 29.09.2017 5.30 P.M
686 / Supply of Car on Hire Basis to Anganwadi Supervisors to the Year 2017-18 in
1 2017-18 2.00 AE-4
Ongole Municipal Corporation
Providing Figurative/Non-figurative/Geometrical/Stencils/Art Work on walls in V.I.P
687 /
2 2017-18 Road, P.V.R School Road and Lawyerpet in various places in Ongole Municipal 10.00 AE-6
Corporation
688 / Engaging of Drivers to Garbage Compactors and Water Tanker on Outsourcing
3 2017-18 9.70 AE-7
basis in Ongole Municipal Corporation
689 / Laying of 150 mm A.C Pipe Line from Srinivasa Theater to Gopal Nagar 6th Line in
4 2017-18 Division No.5 and 6 in Ongole Municipal Corporation 7.40 AE-1

690 / Laying of B.T Road along the kurnool road flyover on south side (Shoulder Portion)
5 2017-18 5.65 AE-7
in Ongole Municipal Corporation
691 / Providing Windows And Doors for P.V.R Boys Municipal Bhigh School in Ongole
6 2017-18 5.62 AE-4
Municipal Corporation
692 / Supply and Fixing of Electrical Items at P.V.R Boys High School in Ongole Municipal
7 2017-18 3.10 AE-4
Corporation
693 / Drilling of Bore well at and S.S Tank-I and near DWAMA Office for supplying of of
8 2017-18 7.67 AE-4
Drinking Water to RIMS Hospital in Ongole Municipal Corporation
Supply of Tractor Dozer and Man Mazdoor for clearing of High Berms and Debris,
694 /
9 2017-18 Desilting of Drains in Divisions 4 to 9 in A.E-1 Section for special santation drive in 3.00 AE-1
Ongole Municipal Corporation
Supply of Tractor Dozer and Man Mazdoor for clearing of High Berms and Debris,
695 /
10 2017-18 Desilting of Drains in Divisions 1 to 3 in A.E-1 Section for special santation drive in 2.10 AE-1
Ongole Municipal Corporation
Supply of Tractor Dozer and Man Mazdoor for clearing of High Berms and Debris,
696 /
11 2017-18 Desilting of Drains in Divisions 17, 18, 19, 20 and 21 in A.E-3 Section for special 2.25 AE-8
santation drive in Ongole Municipal Corporation

697 /
Supply of Tractor Dozer and Man Mazdoor for Clearing of High Berms and Debris,
12 2017-18 Desilting of Drains in Divisions 37 to 42 in A.E-6 Section for special santation drive 3.80 AE-6
in Ongole Municipal Corporation
Supply of Tractor Dozer and Man Mazdoor for clearing of High Berms and Debris,
698 /
13 2017-18 Desilting of Drains in Divisions 28, 29 and 32 to 36 in A.E-5 Section for special 2.95 AE-8
santation drive in Ongole Municipal Corporation
699 / Providing Figurative/Non-Figurative Art Work on Anjanvadi Schools in 1 to 9
14 2017-18 5.50 AE-1
Divisions in Ongole Municipal Corporation
700 / Providing Equipment for Smart Digital Class Rooms in Municipal High Schools in
15 2017-18 Ongole Municipal Corporation 8.76 AE-4

701 / Construction of Drain from Andhra Pragathi Grameena Bank opp. to C.C.S Police
16 2017-18 9.60 AE-1
Station west side in Kamma Palem in Division No.7
702 / Construction of C.C Drain from Ciyonu Prardhana Mandiram to B.Suresh house in
17 2017-18 9.98 AE-8
Division No.8
703 / Construction of R.C.C Buring Platform at Hindu Burial Ground north portion
18 2017-18 (Dasarajupalli Road at Pothuraju canal) in Ongole Municipal Corporation 9.90 AE-1

704 / Construction of R.C.C Buring Platform at Hindu Burial Ground south portion
19 2017-18 (Dasarajupalli Road at Pothuraju canal) in Ongole Municipal Corporation 9.90 AE-1

705 / Construction of C.C Culverts in 40 Feet Road at Kammapalem 1st, 2nd and 3rd lines
20 2017-18 2.20 AE-8
in Division No.7 (2nd call)
TOTAL 121.08
Download Start Time : 13.10.2017 5.00 P.M
Download End Time : 20.10.2017 5.00 P.M
Receipt of Bids End Time : 20.10.2017 5.15 P.M
Price Bid Opening Time : 20.10.2017 5.30 P.M
707 / Water Pumping from N.S.P Canal to Vengamukkalapalem Tank in Ongole Municipal
1 2017-18
Corporation 2.00 AE-8
TOTAL 2.00
Download Start Time : 17.10.2017 5.00 P.M
Download End Time : 21.10.2017 5.00 P.M
Receipt of Bids End Time : 21.10.2017 5.15 P.M
Price Bid Opening Time : 21.10.2017 5.30 P.M
709 / Engaging of Six Tractors on hire basis for transportation of Garbage in various
1 2017-18 8.10 AE-7
places in Divisions Nos.1 to 50 in Ongole Municipal Corporation
710 / Supply and delivery of Pyrosene Oil - BIS Mark, Pyetherum 2% extract and
2 2017-18 9.50 AE-7
Maletrion Technical to Ongole Municipal Corporation
711 / Engaging of Drivers to Garbage Compactors and Helper on Outsourcing basis in
3 2017-18 3.70 AE-7
Ongole Municipal Corporation
TOTAL 21.30
Download Start Time : 23.10.2017 5.00 P.M
Download End Time : 30.10.2017 5.00 P.M
Receipt of Bids End Time : 30.10.2017 5.15 P.M
Price Bid Opening Time : 30.10.2017 5.30 P.M
712 /
1 2017-18 Supply and Delivery of Tabs for office purpose in Ongole Municipal Corporation 5.35 AE-8
TOTAL 5.35
Download Start Time : 23.10.2017 5.00 P.M
Download End Time : 30.10.2017 5.00 P.M
Receipt of Bids End Time : 30.10.2017 5.15 P.M
Price Bid Opening Time : 30.10.2017 5.30 P.M
714 / Construction of R.C.C Burning Platform at Hindu Burial Ground North Portion in
1 2017-18 9.85 AE-1
Srinivasa Threature Road in Division No.5
715 / Laying of 100 mm dia A.C Pipe Line from Somasi Siva house to amburi Anjali house
2 2017-18 2.07 AE-2
of chukula vari veedi in Division No.12
716 / Construction of C.C Road and C.C Drain from Katari Venkateswarlu house to
3 2017-18 9.62 AE-2
Mechanic Gopi house and from Bunder Road to Sivaji Statue of division No.12
717 /
4 2017-18 Providing R.C.C Benches to 1 to 50 Divisions in Ongole Municipal Corportaion 1.94 AE-2

718 / Construction of C.C Drain From Bottu Satyanarayana house to Ajantha Karkhana in
5 2017-18 3.70 AE-2
Division No.12

719 / Construction of C.C Road from Miriyalapalem Padmsri house to Miriyala Jyothi
6 2017-18 5.56 AE-2
house and C.C Drain and C.C Road at Tota Govindarajulu Street in Division No.12

720 / Construction of C.C Drain from Rangu Thota Chatrapathi Sivaji Statue to Bundar
7 2017-18 5.96 AE-2
Road in Division No.12
721 / Construction of C.C Road and C.C Drain from Katari Venkata Ramaiah house to
8 2017-18 Maratipalem Road and Sivalayam opposite in Division No.12 6.28 AE-2

722 / Providing C.C Drain and Balance C.C Road to IDSMT Flats Layout Alfonse House
9 2017-18 9.90 AE-4
Street In Division No.31
723 /
10 2017-18 Providing Quarry Spell Road besides Siva Ramakrishna Granites in Division No.18 6.15 AE-5

724 /
11 2017-18 Supply and Fixing of Children Play Equipments in Gandhi Park in Division No.36 7.70 AE-5

725 / Providing Qurry Spell Road from Mangamur Road to Samatha Nagar on N.S.P Canal
12 2017-18 Bund in Divison No.39 9.75 AE-6

Construction of Sumps under Kurnool Road Flyover for Green Belt , Removing of
726 /
13 2017-18 High Berms along Flyover and Laying of C.C Patch at Flyover Junction in Ongole 3.85 AE-7
Municipal Corporation
727 / Construction of C.C Drain from Brundavan Nagar Swathi Kalyana Mandapam to Sri
14 2017-18 7.35 AE-7
Boys Hostel in Division No.49
728 / Construction of C.C Drain at Palabazar from Ch.Srinivasarao house to Narayana
15 2017-18 6.90 AE-7
Reddy house in Division No.46
729 / Providing Figurative/Non-figurative Paintings at east aide of the Fly Over Side Walls
16 2017-18 7.55 AE-7
(Anjaiah Road side) in ongole Municipal Gorporation

730 / Construction of CC Road from Ch.Lingaiah house to Yerra Anjaiah house and from
17 2017-18 9.95 AE-7
Chandrasekhar house to M.Aruna house in Andhra Kesari Nagar in Division No.43

731 / Construction of CC Road from A.Srinu house to Jallipalli Hanumathurao house in


18 2017-18 Andhra Kesari Nagar in Division No.43 9.00 AE-7

732 / Construction of C.C Road from Kurnool Road to M.Aruna house in Andhra Kesari
19 2017-18 9.85 AE-7
Nagar 3rd line in Division No.43
733 / Laying of Quarry Spell Road from Sk.Himambhi house to Nageswararao house in
20 2017-18 3.95 AE-7
Ganapathi Nagar in Division No.43

734 / Providing Mural Art Work with Cement Embrossing Art Work under Kurnool Road
21 2017-18 9.25 AE-7
Fly Over Pillars on south side (3rd phase) in Ongole Municipal Corporation

735 / Providing Mural Art Work with Cement Embrossing Art Work under Kurnool Road
22 2017-18 9.25 AE-7
Fly Over Pillars on north side (3rd phase) in Ongole Municipal Corporation

736 /
23 2017-18 Supply and Delivery of Water Meters in Ongole Municipal Corporation 9.80 AE-8

737 / Laying of 100 mm dia A.C Pipe Line from Marabavi to Walking Track in Bhagya
24 2017-18 Nagar 2nd Line in Divission No.20 3.50 AE-8

738 / Providing Vitrified Tiles at Balabhavan (infront of Toilets) in Ongole Municipal


25 2017-18 3.05 AE-8
Corporation
Construction of C.C Road and C.C Drain from Gaddalagunta Lawyer Krishna Mohan
739 /
26 2017-18 House to Somisetty Chandraiah house (Elec. Pole No.044 31A 020 600) in Division 4.95 AE-5
No.32
740 /
27 2017-18 Development of Park and Walk Tracking at towards Bunder Road in Division No.12 8.00 AE-2
TOTAL 184.68
Download Start Time : 30.10.2017 5.00 P.M
Download End Time : 13.11.2017 5.00 P.M
Receipt of Bids End Time : 13.11.2017 5.15 P.M
Price Bid Opening Time : 13.11.2017 5.30 P.M
741 / Engaging of 110 Hydraulic Chain Mounted Machine, Excavator (JCB, TATA HITACHI)
1 2017-18 10.00 AE-7
and Tractors for lifting of Garbage in Ongole Municipal Corporation
TOTAL 10.00
Download Start Time : 04.11.2017 5.00 P.M
Download End Time : 18.11.2017 5.00 P.M
Receipt of Bids End Time : 18.11.2017 5.15 P.M
Price Bid Opening Time : 18.11.2017 5.30 P.M
743 / Construction of 500KL ELSR at Chenna Kesava Layout with 15m staging under 14th
1 2017-18 165.00
Finance Commission Grants for the year 2015-16 (2nd call)
Providing Gravity Main from Mangamoor Road to proposed Chenna kesava Swamy
744 /
2016-17 Layout ELSR in Ongole Municipal Corporation under 14th Finance Commission 25.00
2
Grant (2nd call)
TOTAL 190.00
Download Start Time : 10.11.2017 5.00 P.M
Download End Time : 27.11.2017 5.00 P.M
Receipt of Bids End Time : 27.11.2017 5.15 P.M
Technical Bid Opening Time : 27.11.2017 5.30 P.M
Price Bid Opening Time : 27.11.2017 5.45 P.M
745 / Drilling of Deep Bore Well and Fixing of IM-II Hand Pumpsets at various places in
1 2017-18 Ongole Municipal Corporation (5th call) 11.50 AE-6

746 / Engaging of Tractors for Lifting of High Berms and Debris in Ongole Municipal
2 2017-18 Corporation 3.80

747 / Providing Computers for Advanced Foundation Course in P.V.R Boys High School in
3 2017-18 Ongole Municipal Corporation 3.53 AE-4

748 / Construction of C.C Drain from M.Nageswararao house to A.Bhaskara Rao house at
4 2017-18 1.30 AE-7
petrol bunk beside road in Division No.45
749 / Engaging of Drivers to Garbage Compactors and Helper on Outsourcing basis in
5 2017-18 3.70 AE-7
Ongole Municipal Corporation (2nd call) (Reserved for L.C.C.S)

750 / Providing Figurative/Non-Figurative/Geometric/Stencits/ Pattterns Art Work on


6 2017-18 Kurnooll Road Fly Over Bottom Slabs and Piers in Ongole Municipal Corporation 3.00 AE-7

751 / Providing Figurative/Non-figurative Paintings at west side of Fly Over side walls
7 2017-18 (Taluka Police Station) side in Ongole Municipal Corporation 7.55 AE-7
TOTAL 34.38
Download Start Time : 10.11.2017 5.00 P.M
Download End Time : 17.11.2017 5.00 P.M
Receipt of Bids End Time : 17.11.2017 5.15 P.M
Price Bid Opening Time : 17.11.2017 5.30 P.M
753 / Supply and Delivery of Conservancy Articles to Ongole Municipal Corporation
1 8.90 AE-7
2017-18
754 / Engaging of Unskilled Mazdoor for Clearing of Debris, High Berms, Sweeping, Cleaning of
2 9.35 AE-7
2017-18 Debris in Ongole Municipal Corporation
755 / Supply and Delivery of Piduguralla Stone Powder (Lime) and Bleaching Powder to Ongole
3 3.10 AE-7
2017-18 Municipal Corporation

4 757 / Repairs to Open Well at Guthikondavari Palem in Ongole Municipal Corporation 2.35 AE-2
2017-18

5 758 / Engaging of 110 Chain Mounted Mechine for jungle Clearance and Cleaning of Tank in 2.60 AE-1
2017-18 Muthinuthalapadu in Division No.2
759 /
6 Construction and Repairs to Flooring, Gate and Parapet Valve in Dinalabavi in Division No.8 4.80 AE-1
2017-18
760 /
7 9.05 AE-1
2017-18 Construction and Repairs to Compound wall and Toilets and Dinalabavi in Division No.8
761 / Construction of B.T Road from Arava Colony N.S.P Canal to Betastu Church in Agraharam
8 6.45 AE-2
2017-18 Road in Division No.16
Hiring of Excavator, Tractor Dozer and Tractors for Removal of High berms and Debris,
762 /
9 Jungl Clearance, Formation of Kutcha Drains in Division Nos.10 to 16 in Ongole Municipal 2.00 AE-2
2017-18
Corporation

10 763 / Providing Balance C.C Road from Ch.0 to Ch.197 in Vijayanagar Colony in Division No.31 1.65 AE-4
2017-18 (Reserved for L.C.C.S)
764 / Laying P.V.C Pipe Line from Bandlamitta Main Road to Bheema Rajula Vari veedhi Cross
11 5.47 AE-4
2017-18 Roads 3,4,5 in Division No.25
765 / Laying P.V.C Pipe Line from Bandlamitta Main Road to Swarna Venkateswra Bazar in
12 2.19 AE-4
2017-18 Division No.23

13 766 / Laying of Internal G.I Pipe line opposite Jakraiah Hospatal Area in Division No.27 5.98 AE-4
2017-18
767 / Construction of Disposal Drain from Chunduri Srinivasa Rao house to Srirama Nagaiah
14 5.90 AE-7
2017-18 house in Venkateswara Colony North side in Division No.50
768 / Constuction of R.C.C Slab Culvert at Saraswathi Sisu Mandir Road and Approach at
15 3.75 AE-7
2017-18 Nagendra Nagar beside MRF Show Room in Division No.47
Providing Painting to Compound Wall and R.C.C Pipe Culvert at Viswabrahmana Burial
769 /
16 Ground and Construction of balance Compound Wall at Muslim Burial Ground in 5.20 AE-8
2017-18
Cheruvukommu Palem in Division No.18
770 /
17 2017-18 Laying of B.T Patches from N.H-5 to Cheruvukommupalem Main Road in Division No.18 8.85 AE-8

771 / Construction of Compound Wall and Stage at Anganwadi Kendram in vengamukkala Palem
18 2017-18 in Division No.18 9.55 AE-8

772 / Formation of C.C Bed in S.S Tank-2 and Providing Approach at temporarily pumping at S.S
19 2017-18 Tank-2 in Ongole Municipal Corporation 2.40 AE-8

773 / Supply and Delivery of Chlorine Gas Cylinder, Ferric Alum and Bleaching Powder for the
20 2017-18 Maintenance of Water Supply in Ongole Muncicipal Corporation 9.86 AE-8

774 / Providing Equipment for Smart Digital Class Rooms in Municipal High Schools in Ongole
21 2017-18 Municipal Corporation (2nd call) 8.76 AE-4

775 / Construction CC Drain from Marturi Venkateswarlu house to Miravali Shop at


22 0.96 AE-8
2017-18 Cheruvukommu Palem in Division No.18

23 776 / Repairs and Rectification of Leaks on 400mm Dia Pumping main NH-5 to RR Tank 2.70 AE-8
2017-18
777 / Providing C.C.Drains and Quarry Spell road from SSN college to Ankammathalli apatment
24 2.00 AE-6
2017-18 road in Division no.37 (3rd call)

25 778 / Construction of Compound wall at from north side of Hindu Burial Ground in Srinivasa 9.40 AE-1
2017-18 Theature Road in Division No.5
779 / Laying of 100 mm dia A.C Pipe Line from Karavadi Donka 3rd Line in Division No.7
26 2.20 AE-1
2017-18
780 / Providing Quarry Spell Roads from Alluri Mariyamma house to Gollapothu Srinu house
27 8.85 AE-1
2017-18 (4th, 5th, 6th and 7th Cross Roads) in Division No.2 (Reserved for L.C.C.S)
781 / Providing Quarry Spell Roads from Transform to A.Durga rao house & 1st, 2nd and 3rd
28 2017-18 cross Roads K.Dayid house to P.Babhul house in Division No.2 7.80 AE-1

782 /
29 2017-18 Providing C.C Drain from Burial Ground Gate to Karavadi Donka 7th Line in Division No.7 9.25 AE-1

783 / Construction of C.C Road from B.V.Subbarao house to Chinnareddy Venkateswarulu house
30 2017-18 (40" Feet Road) in Kammapalem 2nd line in Division No.7 9.30 AE-1

784 / Construction of C.C Road from Bollineni Yalamandha house to B.V.Subbarao house in
31 2017-18 Kammapalem 2nd line in Division No.7 9.30 AE-1
785 /
32 Providing Dias at Park in Bunder Road in Division No.12 2.80 AE-2
2017-18
Laying of 150 mm dia A.C Pipe Line from Ananda Rao Road Soujanya Mess to Chakri
786 /
33 Maruthi kumar house and 100 mm dia A.C Pipe Line from Ananda Rao road Lalam 4.40 AE-2
2017-18
Pitchaiah house to Bundar Road in Division No.13
787 / Laying of 250 mm dia A.C Pipe Line at C.S.S Police Station back side in Zone 7 in Ongole
34 2.57 AE-2
2017-18 Municipal Corporation
788 /
35 Providing Quarry Spell Road from Ram Nagar 11th Line to 15th Line in Division No.17 8.70 AE-2
2017-18
789 / Construction of C.C Drain, Culvert and C.C Road in Annavarappadu 2nd Line and 3rd Line in
36 7.40 AE-2
2017-18 Division No.15
790 / Construction of CC Road and C.C Drain from Katari Venkata Ramaiah house to Marati
37 6.15 AE-2
2017-18 Palem Road and Sivalayam opposite in Division No.12
791 /
38 2017-18 Laying of 100 mm dia A.C Pipe Line at Iyyanna Setty Satram in Division No.11 1.95 AE-2

Providing Asian Apex Exterior Emulsion Wall Painting at Kothapatnam Busstand Road,
792 /
39 2017-18 Ananda Rao Road and Sivalayam area of various places for concept of Poster Free City in 9.88 AE-2
Ongole Municipal Corporation

Providing Asian Apex Exterior Emulsion Wall Painting at Santhapeta, Annavarpadu and
793 / Ramnagar of various places for concept of Poster Free City in Ongole Municipal
40 9.87 AE-2
2017-18 Corporation

41 794 / Providing C.C Patches in various places in Division No.25 in Ongole Municipal Corporation 4.10 AE-4
2017-18
795 / Providing C.C Road and C.C Drain opp. Jakaraiah Nagar Church Hill Area in Division No.27
42 4.84 AE-4
2017-18
796 / Laying of 150 mm Dia AC Pipe Line from Paravathamma Temple To Lambadi Donka in
43 9.85 AE-4
2017-18 Division No.25

44 797 / Providing C.C Road and C.C Drain to Vijaya Nagar Extension Cross Road (IDSMT Flats 1st 9.25 AE-4
2017-18 Crosss Road) in Division No.31
798 / Providing C.C Road to Vijaya Nagar Extension Cross Road (IDSMT Flats 1st Crosss Road) in
45 7.75 AE-4
2017-18 Division No.31
799 /
46 Providing C.C Road at I.D.S.M.T Layout in Division No.31 9.15 AE-4
2017-18
800 / Laying of 100 mm dia A.C Pipe Line from Abburi Venkateswarlu house line, back side of
47 2017-18 Meghana Bar & Restaurant South Bye Pass in Division No.33 5.95 AE-5

801 /
48 2017-18 Providing C.C Road and C.C Drain to Sharma gari Line in Z.P Colony in Division No.33 6.60 AE-5

802 /
49 Providing C.C Road at Z.P Colony Sub Station back side in Division No.33 8.25 AE-5
2017-18
803 / Construction of C.C Drain from Mangamoor Road to Sivaprasad Colony (beside Adithya
50 2017-18 Super Market Line) in Division No.33 4.45 AE-5

804 / Construction of Compound Wall to Park place in Soniyagandhi Nagar 3rd cross road in
51 9.15 AE-6
2017-18 Division no.37 (Reserved for L.C.C.S)
805 / Providing C.C Road from Sujatha Nagar Main Road to Park Site in Soniya Gandhi Nagar 1st
52 9.05 AE-6
2017-18 Line in Division No.37
806 / Construction of Auditorium in Chennakesavaswamy Temple Layout Park in Division No.37
53 7.55 AE-6
2017-18
807 / Construction of C.C Drain in Lingamma Bazar north side from Prasad house to Sri Balaji
54 6.40 AE-7
2017-18 traders south side from M.Sarada house to G.Tirupataiah house in Division No.47

808 / Laying of Quarry Rubbish Road from K.Sivareddy house to G.Yedukondalu house in
55 2.00 AE-7
2017-18 Maruthi Nagar 1st Line in Division No.45
809 / Construction of C.C Drain from Ch.Venkateswarlu house to Ravanaiah house in Store Bazar
56 7.50 AE-7
2017-18 in Division No.47
810 / Laying of 150 mm dia A.C Pipe Line from Venkateswara Reddy house to Srinivasa Colony
57 2.45 AE-7
2017-18 Main Road at Andhrakesari Nagar 3rd Line 5th Cross Roa in Division No.43
811 /
58 Providing C.C Road from Dibbala Road to Sridevi Skin Clinic in R.T.C Colony in Divisio No.48 3.80 AE-7
2017-18
812 / Construction of Compound Wall at Muslim Burial Ground (Mominoon) in Peerlamanyam in
59 9.30 AE-7
2017-18 Division No.43
813 / Construction of Disposal Drain from Ch.Subbarao house to P.Kondaiah house in
60 2017-18 Venkateswara Colony in Division No.50 6.25 AE-7

814 / Providing Wall Painting with Exterior Emulsion Paint in Division Nos.43 to 50 in Ongole
61 2017-18 Municipal Corporation 9.80 AE-7

815 / Providing Figurative/Non-Figurative Art Work on Fly Over east side wall towards north side
62 9.65 AE-7
2017-18 (Udipi Hotel to Guntur Road) in Ongole Municipal Corporation
816 / Providing Figurative/Non-Figurative/Geometric/Stencils/ Patterns Art Work on Kurnool
63 3.90 AE-7
2017-18 Road Fly Over Piers in Ongole Municipal Corporation

64 817 / Laying of 100 mm and 150 mm dia A.C Pipe Line from Santhi Nagar S.C Colony Main Road 2.30 AE-8
2017-18 Ending in Division No.43
818 / Construction of Reading Room (Damacharla Anjaneyulu Gari Bhavanam) in 10.00
65
2017-18 Vengamukkalapalem in Division No.18
AE-8

819 / Construction of Community Hall in Vengamukkala Palem in Division No.18


66 10.00 AE-8
2017-18

67 820 / Construction C.C Drain from Kotha Colony Main Road existing drain to N.H-5 in Pelluru in 1.25 AE-8
2017-18 Division No.17

Providing Figurative/Non-Figurative/Geometrical/Patterns Art Work at Housing Board


821 / Colony Park, Sarma College, Devudu Cheruvu Park, Ambethkar Bhavanam, C.R.P Quarters
68 9.95 AE-8
2017-18 Park, S.C Hostel, Bhagya Nagar 3rd Line Park and Bhagya Nagar 2nd Line Park in A.E-8
Section in Ongole Municipal Corporation

822 / Laying of 100 mm dia A.C Pipe Line and Culvert from Dharavarithota 6th line to
69 2017-18 Gavadhakatla Srinu House in Division No.20 4.15 AE-8

823 / Construction of C.C Drain from Rangu Thota Chatrapathi Sivaji Statue to Bundar Road in
70 2017-18 Division No.12 (2nd call) 5.96 AE-2

824 / Construction of C.C Road and C.C Drain from Katari Venkata Ramaiah house to
71 6.28 AE-2
2017-18 Maratipalem Road and Sivalayam opposite in Division No.12 (2nd call)
Providing C.C Road, C.C Drain and C.C Culvert from Aluri Ramesh House to Thurpu
825 /
72 Christian Palem 1st Line (Aluri Bhaskara Rao Street) and A.R.R Hospital to K.Sujatha house 9.85 AE-1
2017-18 (Bonthavari Street) in Division No.8 (3rd call)

826 / Laying of 150 mm Dia AC Pipe Line from Mastan Durga to Sivalayam Temple near
73 8.20 AE-1
2017-18 Kothapatnam Busstand in Ongole Muncipal Corporation (2nd call)
TOTAL 458.57
Download Start Time : 04.12.2017 5.00 P.M
Download End Time : 18.12.2017 5.00 P.M
Receipt of Bids End Time : 18.12.2017 5.15 P.M
Price Bid Opening Time : 18.12.2017 5.30 P.M
827 / Providing Path way Ilumanation in Chennakesava Swamy Layout Park in Ongole
1 2017-18 5.30 AE-6
Municipal Corporation
828 / Providing Water Supply and Irrigation Facilities and Drips and Sprinklers in
2 2017-18 2.95 AE-6
Chennakesava Swamy Layout Park in Ongole Municipal Corporation
829 / Providing Children Play Equipment and Gym Equipment in Chennakesava Swamy
3 2017-18 4.05 AE-6
Layout Park in Ongole Municipal Corporation
830 / Providing water supply and Irrigation Facilities and Construction of Sump in
4 2017-18 Chennakesava Swamy Layout Park in Ongole Municipal Corporation 2.95 AE-6

831 / Construction of Gazebos (4mX4m) in Chennakesava Swamy Layout Park in Ongole


5 2017-18 Municipal Corporation 4.45 AE-6
TOTAL 19.70
Download Start Time : 19.12.2017 5.00 P.M
Download End Time : 22.12.2017 5.00 P.M
Receipt of Bids End Time : 22.12.2017 5.15 P.M
Price Bid Opening Time : 22.12.2017 5.30 P.M
832 /
1 2017-18 Supply and Delivery of M.S Push Carts to Ongole Municipal Corporation 24.00

833 / Providing Figurative/Non-Figurative/Geometrical/Patterns Art Work to Anganwadi


2 2017-18 2.30 AE-8
Schools in Cheruvukommupalem and Pelluru in Ongole Municipal Corporation

834 / Painting with synthatic Enamil Paint to Sri Babu Jagajjevanarao Statue and Swami
3 2017-18 Vivekananda Statue at various places in Ongole Municipal Corporation 0.94 AE-2

835 / Providing Stainless Steel Grills and Lawn for beautification of Sri Swami
4 2017-18 Vivekananda Statue at K.P Bus Stand in Division No.12 1.82 AE-2

836 / Construction of Building Repairs at Samajika Bhavanam and Anganvadi Kendram of


5 2017-18 2.80 AE-8
Christian Palem in Vengamukkala Palem in Division No.18
Providing Asian Apex Exterior Emulsion Wall Painting for Dividers at Ratnamahal
837 /
6 2017-18 Theater to South Byepass Tobacco Board for concept of poster free city in Ongole 9.66 AE-2
Municipal Corporation

838 /
Providing Asian Apex Exterior Emulsion Wall Painting at Aganavadi school in
7 2017-18 koppolu and Diveders from Church Center to Srinivasa Lodge at Trunk Road for 8.28 AE-2
concept of poster free city in Ongole Municipal Corporation

839 / Providing Non figurative/Non-figurative Art work on Flyover West side Wall
8 2017-18 9.65 AE-7
towards North side (Udipi Hotel to Guntur Road) in Ongole Municipal Corporation

840 / Providing Figurative/Non-Figurative/Geometric/Stencils/ Patterns Art Work on


9 2017-18 8.80 AE-7
Kurnool Road Flyover Tapper Portion in Ongole Municipal Corporation
841 /
10 2017-18 Construction of balance Primary Elementry School in DWAMA Office Division No.31 5.79 AE-4

842 / Construction of Balance Primary elementry School in Chinna Malleswara Colony in


11 2017-18 8.76 AE-4
Division No.2
843 /
12 2017-18 Repairs to Public Toilets in Ongole Municipal Corporation 1.82 AE-8
Providing Onsite Composting Pits from Gandhi Park, Gaddalagunta, Bhagya Nagar,
844 /
13 2017-18 Housing Board Colony, Nirmal Nagar Park and Devudu Cheruvu Park in Ongole 0.28 AE-3
Municipal Corporation
TOTAL 84.90
Download Start Time : 30.12.2017 5.00 P.M
Download End Time : 06.01.2018 5.00 P.M
Receipt of Bids End Time : 06.01.2018 5.15 P.M
Price Bid Opening Time : 06.01.2018 5.30 P.M
846 / Supply and Delivery of Approns, Hand Gloves, Masks and Gum Boots to Ongole
1 2017-18 8.85 AE-7
Municipal Corporation
847 / Engaging of Unskilled Mazdoor for Clearing of Debris, Sweeping, Clearing of Drains
2 2017-18 at various places in Ongole Municipal Corporation 9.85 AE-7

848 / Supply and Delivery of Wheeled Plastic Dust Bins of 240 Liters capacity (Model
3 2017-18 2.65 AE-7
No.WB240LI) to Ongole Municipal Corporation
849 / Supply and Delivery of Plastic Dust Bins of 80 Liters capacity (Model No.RLB 80 Ltr)
4 2017-18 9.75 AE-7
to Ongole Municipal Corporation
850 / Supply and Delivery of Bin Cases for Storage of Dust Bins to Ongole Municipal
5 2017-18 4.00 AE-7
Corporation
851 / Laying of B.T Patches at Kurnool Road Flyover Junction (middle portion) in Division
6
2017-18 No.45 and at 40' Feet Road in Division No.49 2.00 AE-7

852 / Supply and Delivery of Plastic Wheeled Bins of 360 Liters, 660 Liters and 1100
7 2017-18 9.85 AE-7
Liters capacity Bins to Ongole Municipal Corporation
853 / Supply and Delivery of Mobile Public Addressing System (Speaker with Mouth and
8 2017-18 U.S.B) to Ongole Municipal Corporation 2.65 AE-7

854 / Maintenance of Water Supply - Transportation and Supply of Water in various


9 2017-18 10.00 AE-6
places in Ongole Municipal Corporation
855 / Providing Flexis for Swacha Sarvekshan Survey Programme in Ongole Municipal
10 2017-18 3.80 AE-4
Corporation
856 / Laying of A.C Pipe Line, MS Pipe for leakage and C.C Culvert opp. Srinivasa Theater
11 2017-18 2.10 AE-1
in Division No.5
TOTAL 65.50
Download Start Time : 10.01.2018 5.00 P.M
Download End Time : 17.01.2018 5.00 P.M
Receipt of Bids End Time : 17.01.2018 5.15 P.M
Price Bid Opening Time : 17.01.2018 5.30 P.M
857 / Maintenance of Water Supply - Transportation and Supply of Water in various
1 2017-18 10.00 AE-6
places in Ongole Municipal Corporation (2nd call)
/ Supply and Delivery of Bin Cases for Storage of Dust Bins to Ongole Municipal
2 857(a)
2017-18 Corporation (2nd call) 4.00 AE-7
TOTAL 14.00
Download Start Time : 18.01.2018 5.00 P.M
Download End Time : 22.01.2018 5.00 P.M
Receipt of Bids End Time : 22.01.2018 5.15 P.M
Price Bid Opening Time : 22.01.2018 5.30 P.M
858 / Supply and delivery of Megafog 100 CC Vehicle Mounted Heavy Fogging Machines
1 2017-18 9.45
to Ongole Municipal Corporation
859 / Providing Pathway and 1.5 HP Submersible Motor in Bhagyanagar 2 line Park in
2 2017-18 6.90 AE-5
Division No.20 (2nd call)
860 / Construction of C.C Drain and Culvert from Karavadi Donka 3rd Line and
3 2017-18 9.60 AE-1
Kammapalem 3rd Line east side in Division No.7
TOTAL 25.95
Download Start Time : 18.01.2018 5.00 P.M
Download End Time : 25.01.2018 5.00 P.M
Receipt of Bids End Time : 25.01.2018 5.15 P.M
Price Bid Opening Time : 25.01.2018 5.30 P.M
861 / Laying of 100 mm A.C Pipe Line from Elaturi Srinu house to Babu house at Chirala
1 2017-18 3.35 AE-1
Road Entrance and near Venkateswara Swami Temple in Division No.1
862 / Laying of C.C Road and C.C Drain from Elaturi Srinu house to Babu house at Chirala
2 2017-18 8.60 AE-1
Road Entrance in Division No.1
863 /
3 2017-18 Repairs and Development of Park in Throvagunta in Division No.1 10.00 AE-1

864 / Construction of Revertment, Culvert and Steps on Tank in Gudimellapadu in


4 2017-18 Division No.2 3.15 AE-1

865 / Laying of C.C Road and C.C Drain from Elampati Subba Rao house to Gorantla
5 2017-18 Kondaiah house in Mukthinuthalapadu B.C Colony in Division No.2 9.80 AE-1

866 /
6 2017-18 Construction of Water Sump for Tank in Mukthinuthalapadu in Division No.2 1.60 AE-1

867 / Construction of C.C Drains to Internal Cross Roads in Ponugupati Colony in Division
7 2017-18 10.00 AE-1
No.3
868 /
8 2017-18 Construction of C.C Drains to Internal Cross Roads in Bilal Nagar in Division No.3 10.00 AE-1

869 / Construction of C.C Drains to Internal Cross Roads in Balaram Colony in Division
9 2017-18 10.00 AE-1
No.3
870 / Construction of C.C Drain from Chavala Saraswathi house to Transformer (at
10 2017-18 9.70 AE-1
Ramesh house) in Division No.3
871 / Laying of Balance C.C Road and C.C Drain from Vankayalapati Syamala house to
11 2017-18 Guntur Road in Prakasam Colony in Division No.4 9.95 AE-1

Laying of 100 mm dia A.C Pipe Line from Motupalli Masthan house to Pathan Jilani
872 /
12 2017-18 house in Islampeta-2 6th Line and Prakasam Elementry School opposite Road in 3.70 AE-1
Division No.4
873 / Construction of C.C Drain from Itukulla Batti to Tirupatamma Temple and from
13 2017-18 Rajesh Fancy Shop to Paturi Subbarao house in 60" Feet Road in Division No.5 8.40 AE-1

874 / Construction of C.C Drain from Manyam Adhi Lakshmi Nilayam to Rajesh Fancy
14 2017-18 Shop at 60" Feet Road in Division No.5 9.95 AE-1

875 / Laying of CC Road and C.C Drain from Marinati Subbamma house to Avula Chenchu
15 2017-18 9.85 AE-1
house in Gopal Nagar 2nd Line in Division No.6
Laying of CC Road and C.C Drain from Tanjavuri Sankarao house to Vejendla
876 /
16 2017-18 Krishnarao house at Ramalayam and from Boddu Suresh house to Kotari Sai house 7.50 AE-1
in Gopal Nagar 1st Line in Division No.6
Laying of CC Road and C.C Drain from Karula Padma house to Bruluhola Srinu
877 /
17 2017-18 house and from Chapiti Balakotaiah house to Dasari Padma house in Battulavari 3.80 AE-1
street in Division No.6
878 / Laying of C.C Road and C.C Drain from Kammapalem 3rd Line Extenction 3rd Cross
18 2017-18 Road (60" Feet Road) in Division No.7 10.00 AE-1

879 / Laying of C.C Road and C.C Drain from Pasidi Nagarpamma Temple to
19 2017-18 6.70 AE-1
Ayinabathinna Ramesh house in Abburuvari Veedhi in Division No.7
Providing C.C Road, C.C Drain and C.C Culvert from Aluri Ramesh House to Thurpu
880 /
20 2017-18 Christian Palem 1st Line (Aluri Bhaskara Rao Street) and A.R.R Hospital to K.Sujatha 9.85 AE-1
house (Bonthavari Street) in Division No.8 (4th call)
881 / Providing Quarry Spell Road at Prakasam District VDO's House 'Co op' House
21 2017-18 6.90 AE-1
Buildings in Division No.9
882 /
22 2017-18 Construction of Compound Wall to I.D.S.M.T Open Site in Division No.31 10.00 AE-4

883 / Construction of C.C Road from Ginella Pardasaradhi house to Konidhela Sujatha
23 2017-18 10.00 AE-1
house in Indiramma Gruhalu 1st Line in Division No.9
884 / Construction of C.C Road from Pallava Srinivasulu house to Makana Boyina
24 2017-18 10.00 AE-1
Subbaratnam house in Rajeev Gruha Kalpa in Division No.9
885 / Laying of Quarry Spell Road to Rajeev Gruha Kalpa, Vilekara Colony and Indiramma
25 2017-18 Gruhalu in Division No.9 9.80 AE-1

886 / Providing Quarry Spell Road from Y.S.R Colony to Katta Sudhakar house in
26 2017-18 2.95 AE-1
Division.No. 9
887 / Construction of C.C Road from Ganji Satyanarayana house to Rayala Murali Krishna
27 2017-18 10.00 AE-1
house in Indiramma Gruhalu 2nd Line in Division No.9
888 / Construction of C.C Road from Pallamsetti Kotaiah house to Jajulla Sulochana
28 2017-18 house in Indiramma Gruhalu 3rd Line in Division No.9 5.00 AE-1

889 /
29 2017-18 Laying of Quarry Spell Road from O.K Road to Para Ramesh house in Division No.9 9.80 AE-1

890 / Providing Quarry Spell Road from O.K Road to Mannepali sailaja house in Indira
30 2017-18 4.27 AE-1
Gruhalu 1st Line in Division No.9
891 / Laying of C.C Road from Patan Yasdani house to Kurapati Rama Rao house in Rajiv
31 2017-18 10.00 AE-1
Gruhakalpa 2nd Line in Division No.9
Providing C.C Road from Nagaramma Temple to Bathula Balakoteswarao house,
892 /
32 2017-18 from K.P Road to Singamaneni Kishtaiah house and from Bathula Rangarao house 5.60 AE-2
to Sundaraiah School in Koppolu in Division No.10
893 / Providing C.C Road from O.K Road to Vinayaka Apartment in Karthikeya Nagar in
33 2017-18 Division No.10 9.55 AE-2

894 / Providing C.C Road from Nagarapamma Temple to Makkena Anjaneyulu house in
34 2017-18 9.45 AE-2
Division No.10
895 / Providing Quarry Spell Road from Cheruvu Tank to Bridge in Agraharam in Division
35 2017-18 5.90 AE-2
No.10
896 / Providing Quarry Spell Road from Bridge to N.S.P Canal in Agraharam in Division
36 2017-18 5.95 AE-2
No.10
897 / Laying of 150 mm dia A.C Pipe Line from 1st Cross Road of Clowpeta 4th Line to
37 2017-18 Ananda Rao Road in Division No.11 2.45 AE-2
898 / Laying of 200 mm dia A.C Pipe Line from Rajiv Gandhi Statue to Railpeta 2nd Line of
38 2017-18 8.25 AE-2
Railway Station Road in Division No.11
899 / Laying of 100 mm dia A.C Pipe Line at Iyyanna Setty Satram in Division No.11 (2nd
39 2017-18 1.95 AE-2
call)
900 / Providing C.C. Road and C.C Drain besides Narayana Rao School from Main Road to
40 2017-18 8.50 AE-2
Goodwill house in Mashumsha Street in Division No.12
901 / Laying of 150 mm Dia AC Pipe Line from Mastan Durga to Sivalayam Temple near
41 2017-18 Kothapatnam Busstand in Ongole Muncipal Corporation (3rd call) 8.20 AE-1

Providing C.C Road and C.C Drain from Jangila Jameeba house to Pandi Lumiyanraj
902 /
42 2017-18 house and from Nukathoti Kotamma house to Bank Vinod house in Kabadi Palem in 6.40 AE-2
Division No.13
Laying of 150 mm dia A.C Pipe Line from Ananda Rao Road Soujanya Mess to Chakri
903 /
43 2017-18 Maruthi kumar house and 100 mm dia A.C Pipe Line from Ananda Rao road Lalam 4.40 AE-2
Pitchaiah house to Bundar Road in Division No.13 (2nd call)
904 / Providing C.C Drain from Donepudi Ramesh House to Santhapeta Main Road in
44 2017-18 7.50 AE-2
Division No.14
905 / Construction of C.C Drains from Chavalavari Veedhi in Trunk Road to Donepudi
45 2017-18 Ramesh house in Division No.14 8.15 AE-2

906 / Providing C.C. Road and C.C Drain at Tanguturi Gopalakrishna house in Ram Nagar
46 2017-18 9.40 AE-2
8th Line in Division No.15
907 / Providing C.C. Road and C.C Drain from Gaddam Haribabu house to Ram Nagar 5th
47 2017-18 4.45 AE-2
Line in Division No.15
908 /
48 2017-18 Providing C.C Drain at Ram Nagar 9th Line in Division No.15 9.35 AE-2

909 / Construction of C.C Drain from G.T Road to Annavarappadu 5(A) Line in Division
49 2017-18 9.35 AE-2
No.15
910 / Construction of C.C Road from Agraharam Main Road to Yadala kantha rao house in
50 2017-18 8.80 AE-2
Division No.16
Providing C.C Road from Agraharam Main Road to Railway Track, from Ungarala
911 /
51 2017-18 Venkateswarlu house to Chennaiah house and from Thirupathaiah house to 8.75 AE-2
Ungarala Kishtaiah house in Division No.16
Providing CC Road from Pothuraju Palem Premananda Asramam Centre to
912 /
52 2017-18 Parvathareddy Subbarao house and from Chopparapu Polaiah house to Chennaiah 9.30 AE-2
house in Division No.16
913 / Providing C.C Road from Trunk Road to 2nd Cross Road in Ram Nagar 15th Line in
53 2017-18 Division No.17 9.00 AE-2

914 / Providing C.C Drain from Trunk Road to N.S.P Canal in Ram Nagar 15th Line in
54 2017-18 Division No.17 8.60 AE-2

915 / Providing C.C Road from 2nd Cross Road to Church in Ram Nagar 15th Line in
55 2017-18 5.50 AE-2
Division No.17
916 / Construction of CC Drain and Culverts from Ramalayam to Community Hall at
56 2017-18 9.95 AE-8
Pelluru in Division No.17
Construction of CC Drain and Culverts from Battula Venkata Swamy house to
917 /
57 2017-18 Pasupuleti Venkaiah house and from Nagam Ramaiah house to Gangadi Mala 9.98 AE-8
Kondaiah house in Pelluru in Division No.17
918 / Construction C.C Drain from Kotha Colony Main Road existing drain to N.H-5 in
58 2017-18 1.25 AE-8
Pelluru in Division No.17 (2nd call)
919 /
59 2017-18 Construction of C.C Culvert at Sangamithra opposite in Division No.17 4.65 AE-8

920 / Providing Quarry Spell Road and Culvert from Manda Bayata Kunta to Mandarapu
60 2017-18 Sivanarayana house in Kummari Colony in Pelluru in Division No.17 3.50 AE-8

921 / Construction of Compound wall to Cheruvukommu palem School Building in


61 2017-18 Division No.18 8.65 AE-8

922 / Laying of 100 mm dia A.C Pipe Line and Culvert from Dharavarithota 6th line to
62 2017-18 4.15 AE-8
Gavadhakatla Srinu House in Division No.20 (2nd call)
923 / Laying of C.C Road from Bhagya Nagar 3rd Line 2nd Cross Road to towards south
63 2017-18 8.90 AE-8
side in Division No.20
924 /
64 2017-18 Construction of Watchman Room in Devudu Cheruvu Park in Division No.21 3.00 AE-5

925 / Construction of C.C Road and C.C Drain from Chinmaya Saradha house to
65 2017-18 3.90 AE-8
Chalapathi Rao House at N.G.O Home Main Road in Balaji Nagar in Division No.21

Construction of C.C Road from Paiavula Srinivasa house to Kodamala Kiran house in
926 / Balaji Nagar (Hill), from Palaparthi Anjaiah house to Jada Jims house in Balaji Nagar
66 2017-18 9.40 AE-8
(Hill) and from K.Chiranjeevi house to Ruthu house (near C.R.P Quarters Down
Road) in Division No.21
927 / Construction of C.C Drains and Culverts from Maruthi Apartment to Vinayaka
67 2017-18 6.10 AE-8
Swami Temple in Dharavarithota in Division No.21
928 / Formation of C.C Road, C.C Drain and Culvert at Varun Apartments in Devudu
68 2017-18 Cheruvu in Division No.21 4.35 AE-8

929 / Extension of 150 mm dia A.C Pipe Line from Church Compound to Yaswanth
69 2017-18 2.80 AE-8
Nilayam at Pindimara Veedhi in Division No.21
930 /
70 2017-18 Construction of Arama Kshetram near Dwaakra Bazar in Division No.22 8.70 AE-4

931 / Providing Mini High Mast Poles at Parks of various places in ongole Municipal
71 2017-18 9.41 AE-2
Corporation
932 / Constructon of Galvalum Roofing Shed and C.C Drain in New Vegetable Market
72 2017-18 area in Division No.24 4.03 AE-4

933 / Laying of 100 mm dia A.C Pipe Line at Managalipalem and Venugopala Swamy
73 2017-18 4.15 AE-4
Temple opposite in Division No.22
934 / Providing Balance Sheds for Store Rooms in New Vegetable Market in Division
74 2017-18 No.24 10.00 AE-4

935 /
75 2017-18 Construction balance work of Skating Court in Uracheruvu in Division No.24 2.85 AE-4

936 / Providing C.C Drain and Culverts at I.D.S.M.T Layout near Veeraiah House area in
76 2017-18 5.27 AE-4
Division No.31
937 / Construction of Community Hall at Yanadhi Colony in Kesava Swamy Peta (Near
77 2017-18 Pump House) in Division No.27 4.25 AE-4

938 / Dismantling of Old Shop and Consrtuction of New Shop at Jayaram Hall Center in
78 2017-18 Division No.27 1.65 AE-4
939 / Construction of Damaged Compound Wall at Sri Tanguturi Prakasam Municipal
79 2017-18 6.60 AE-3
School in Godugu Palem in Division No.28
940 / Construction of C.C Drain opposite to Sai Baba Temple (Kothapeta 2nd Line ) in
80 2017-18 9.35 AE-3
Division No.28
941 / Construction of C.C Drain from Subodhayam Tea Stall north side to Harerama Bazar
81 2017-18 9.05 AE-3
in Division No.28
942 /
82 2017-18 Construction of Damaged C.C Drain at Rajapanagal Road in Division No.29 9.60 AE-3

943 / Construction of C.C Drain and C.C Road from Bhakthavashalam house to Karugunta
83 2017-18 9.88 AE-4
house in Mamidipalem S.C Colony in Division No.30
944 / Construction of C.C Drain and C.C Road from Koppolu Jayapal house to Midasala
84 2017-18 9.90 AE-4
Raju house in Mamidipalem S.C Colony in Division No.30
945 / Construction C.C Road and C.C Drain from Chidithoti Kiran house to Old Toilets in
85 2017-18 Mamidipalem in Division No.30 9.81 AE-4

946 / Providing C.C Road and C.C Drain from Bejjam Ramakoteswara Rao house to T.V-5
86 2017-18 Haribabu house in Mamidipalem in Division No.30 8.87 AE-4

947 / Laying of 100 mm dia A.C Pipe Line at various places in I.D.S.M.T Layout in Division
87 2017-18 5.55 AE-4
No.31

948 / Providing Figurative/Non-figarative/Stencils/Letter Writing/Art Work on Walls over


88 2017-18 9.85 AE-4
a double coats of Enamel Paint in A.E-4 area in Ongole Municipal Corporation

949 /
89 2017-18 Raising of C.C Road at Gaddalagunta Nehru Bomma Centre in Division No.32 8.95 AE-5

Construction of C.C Drain from Ariga Venkateswarlu house to Totapalli


950 /
90 2017-18 Venkateswarlu house, from Sai Charitable Trust to Aruna house and from 6.25 AE-5
Gangisetty Kotaiah house to Bore Well end in Division No.32
951 / Construction of Compound Wall to Open Site near Gandhi Statue in Gaddala Gunta
91 2017-18 in Division No.32 7.20 AE-5

952 / Construction of C.C Drain from Chennakesavaswamy Temple to Dande Venkanna


92 2017-18 house and from Poleramma Temple to Gaddala Gunta Park End in Division No.32 8.25 AE-5

953 / Construction of C.C Drain from Gaddalagunta Well to existing C.C Culvert in
93 2017-18 4.15 AE-5
Division No.32
954 / Raising of CC Road at Gandhi Bomma Centre and Gangisetty Kotaiah House in
94 2017-18 8.90 AE-5
Division No.32
955 / Construction of C.C Drain from Ramalayam to Christian Burial Ground in Gaddala
95 2017-18 Gunta in Division No.32 10.00 AE-3

956 / Construction of C.C Drain at Rajeev Nagar opposite to Sri Sai Sudha Apartment
96 2017-18 9.10 AE-3
(Chirra Rajarama Reddy) in Division No.32
957 / Construction of C.C Road from Z.P.Colony to Sivaprasad Colony (R.V.Subbarao
97 2017-18 5.50 AE-3
House) 0.00 m to 60.00 m in Division No.33
958 / Construction of C.C Road from Z.P.Colony to Sivaprasad Colony (R.V.Subbarao
98 2017-18 7.40 AE-3
House) 61.00 m to 148.00 m in Division No.33
959 / Construction of C.C Drain at Kotha Donka Road (0.00 m to 424.00 m) in Division
99 2017-18 No.33 9.40 AE-3
960 / Construction of C.C Drain at Kotha Donka Road (425.00 m to Sagar canal end) in
100
2017-18 Division No.33 9.80 AE-3

961 /
2017-18 Construction of Watchman Room in Lawyerpet Burial Ground in Division No.34 9.05 AE-5
101

962 /
2017-18 Construction of C.C Road and C.C Drain at D.No.36-071-554 in Division No.34 8.95 AE-3
102

963 / Construction of C.C Drain at Old Sujatha Nagar Sri Gayathri Nilayam D.No:36-071-
103
2017-18 396 in Division No.34 10.00 AE-3

964 / Construction of C.C.Drain from N.H-5 Bye-pass to Narayana Heigh School end in
104
2017-18 Division No.35 7.80 AE-3

965 / Construction of Damaged C.C.Drain from D.No.36-71-145 to existing M.M Road in


105
2017-18 Old Sujatha Nagar in Division No.35 9.60 AE-3

966 / Providing C.C Drain from R.S Apartment via Reddamma Apartment to Indian Gas
106
2017-18 Company in Chennakesava Swamy Layout in Division No.37 7.75 AE-6

967 / Providing C.C.Road from Chennakesavaswamy Temple Layout Main road to Indane
107
2017-18 Gas company in Chennakesavaswamy Layout (Reach-I) in Division No.37 10.00 AE-6

968 / Providing C.C.Road from Chennakesavaswamy Temple Layout Main road to Indane
108
2017-18 Gas company in Chennakesavaswamy Layout (Reach-II) in Division No.37 8.10 AE-6

969 /
2017-18 Providing C.C.Drains to both sides in Revenue Colony 3rd Line in Division No.37 8.85 AE-6
109

970 /
2017-18 Providing C.C.Road in Revenue Colony 3rd Line (Reach-I) in Division No.37 8.65 AE-6
110

971 / Providing Balance C.C.Road in Revenue Colony 3rd Line (Reach-II) and Disposal
111
2017-18 Drain from Revenue Colony 3rd Line to Sreeja Apartment in Division No.37 8.80 AE-6

972 / Providing Qurry Spell Road from Chinthagunta Burial Ground to Pothuraju Canal in
112
2017-18 Pernamitta in Divison No.42 8.35 AE-6

Laying of 150 mm dia A.C Pipe Line from Venkateswara Reddy house to Srinivasa
973 /
2017-18 Colony Main Road at Andhrakesari Nagar 3rd Line 5th Cross Roa in Division No.43 2.45
113 AE-7
(2nd call)
974 / Providing C.C Road from Nali Pedda Adavaiah house to Ch.Pullaiah house in Sri
114
2017-18 Ram Colony 2nd Line in Division No.43 9.35 AE-7

975 / Providing C.C Road from Ch.Pullaiah house to Pasam Kondaiah house in Sri Ram
115
2017-18 Colony 2nd Line in Division No.43 9.35 AE-7

Providing C.C Road at Sri Ram Colony 2nd Line west side 1st, 2nd, 3rd, 4th, 5th
976 /
2017-18 Cross Roads and from Pasam Kondaiah house to Pothuraju Canal in Sri Ram Colony 6.65 AE-7
116
2nd Line in Division No.43

Providing C.C Road at Andhra Kesar nagar Main Road 4/1 C/R, 5th C/R and Laying
of Quarry Spell Road at Andhra Kesari Nagar Main Road East side 6th C/R, Virat
977 /
2017-18 Nagar Main Road West side 3rd C/R from Kondaiah (H) to Krishna Site and Sriram 6.50
117 AE-7
Colony 2nd Lane from Ramulavari Temple to Virat Nagar Kandipappu Mill in
Division No.43

978 / Construction of C.C Road at Nagendra Nagar Main Road from Raghu Super Market
118
2017-18 to existing C.C Road in Division No.45 4.35 AE-7
979 / Construction of C.C Road at Nagendra Nagar north side 6th Cross Road and south
119
2017-18 side 3rd Cross Road in Division No.45 8.65 AE-7

980 / Construction of C.C Road at Poleramma temple Road from Sk.Jeenath house to
120
2017-18 Teacher Naidu Building in Division No.45 8.95 AE-7

981 / Construction of C.C Road at Nagendra Nagar 7th Cross Road from Jalaramaiah
121
2017-18 house to Rathaiah house in Division No.45 6.60 AE-7

Construction of C.C Road from Kunchala Anjaiah House to Narayana Swami House
982 /
2017-18 in Nagendra nagar Main Road north Side 6th Cross Road in Division No.45 (2nd 3.10
122 AE-7
Call)
983 / Construction of C.C Road from Mani varma Kumar House to Manyam Rattaiah
123
2017-18 House in Nagendra nagar 7th Line in Division No.45 (2nd Call) 5.30 AE-7

984 / Construction of C.C Drain from M.Hanumantha Rao house to B.Venkaiah house and
124
2017-18 from Dibbala Road to V.Venkaiah house in Division No.48 (3rd call) 4.45 AE-7

985 / Construction of C.C Drain at Venkateswara Colony north side 1st Line of east side in
125
2017-18 Division No.50 3.95 AE-7

986 / Construction of C.C Drain at Venkateswara Colony north side 1st Line of west side
126
2017-18 in Division No.50 9.30 AE-7

987 / Construction of C.C Drain at Venkateswara Colony north side 2nd Line of east side
127
2017-18 in Division No.50 9.30 AE-7

988 / Construction of CC Drain at Venkateswara Colony north side 2nd Line of west side
128
2017-18 in Division No.50 9.30 AE-7

989 / Construction of C.C Drain and C.C Road at Jayaprakash Colony north side 3rd, 4th
129
2017-18 and 6th Cross Roads in Division No.50 8.60 AE-7

990 / Construction of C.C Drain and C.C Road at Jayaprakash Colony north side 7th, 8th
130
2017-18 and 9th Cross Roads in Division No.50 9.35 AE-7

Construction of C.C Drain at Nehru Nagar 2nd Line from Mosque to


991 /
2017-18 G.Venkateswarlu house and C.C Road at Nehru Nagar 1st Line 1st Cross Road and 7.65
131 AE-7
2nd Line 1st Cross Road in Division No.50
992 / Laying of Quarry Spell Road at Guntur Road west side Last Cross Road from
132
2017-18 Raghavendra steel Railing Works to National Highway in Division No.50 1.55 AE-7

993 / Development of landscape works for Housing Board colony Park (1.41 Acres) in
133
2017-18 Ongole Municipal Corporation (2nd call) 50.00 AE-3

Providing Quarry Spell Road to the site alloted to Survey No.116 plots 404 to 458
994 /
2017-18 belongs to STs residing at New Vegetable Market site in Ongole Municipal 2.75
134 AE-2
Corporation
995 / Formation of Quarry Spell Road from Vijaya Nagar Colony to DWAMA Office Main
135
2017-18 Road (parallel to Main Road) in Division No.31 6.80 AE-4

996 / Removal of Old M.S Suction Pipes and Providing Suction arrangement with Pipes to
136
2017-18 40 HP Raw Water Pump Set at S.S Tank-2 in Ongole Municipal Corporation 8.20 AE-8

997 / Maintenance of Electrical Materials in 1 to 50 Divisions (for the year 2017-2018) in


137
2017-18 Ongole Municipal Corporation 3.65 AE-2

Providing Asian Apex Exterior Emulsion Wall Painting from Islampeta Srinivasa
998 /
2017-18 Threature to (via Masthan Darga) Dasarajupalli Road and Koppolu Road in Ongole 5.90 AE-1
138
Municipal Corporation
Providing Figurative/Non-figurative/Geometrical/Patterns Art Work at Rajeev
999 /
2017-18 Nagar Park, Gaddalagunta Park, Gandhi Nagar School, ELSR Compound Wall in 8.43
139 AE-5
Division Nos.28, 29 and 32-36 in Ongole Municipal Corporation

1000 / Construction of western side C.C Drain in the premises of Water Supply Scheme at
140
2017-18 3.15 MGD Filtration Plant Compound in Ongole Municipal Corporation 10.00 AE-4

1001 / Construction of Compound Wall in the premises of Water Supply Scheme at 3.15
141
2017-18 MGD Filtration Plant Compound in Ongole Municipal Corporation 10.00 AE-4
TOTAL 1079.95
Download Start Time : 20.01.2018 5.00 P.M
Download End Time : 06.02.2018 5.00 P.M
Receipt of Bids End Time : 06.02.2018 5.15 P.M
Price Bid Opening Time : 06.02.2018 5.30 P.M
1002 / Maintenance of Water Supply - Transportation and Supply of Water in various
1 2017-18 places in Ongole Municipal Corporation 10.00
TOTAL 10.00
Download Start Time : 22.01.2018 5.00 P.M
Download End Time : 29.01.2018 5.00 P.M
Receipt of Bids End Time : 29.01.2018 5.15 P.M
Price Bid Opening Time : 29.01.2018 5.30 P.M

1002 /
Providing C.C Road and repairs to Drains, Culverts from Mini Bye Pass Road from
1 2017-18 Karavadi Donka to Srinivasa Deluxe Road in Ongole Municipal Corporation (2nd 75.00
call)
1003 / Widening of C.C Road with Divider and Central Lighting to Srinivasa Hall Road upto
2 2017-18 Pothuraju Kaluva in Ongole Municipal Corporation (2nd call) 136.00

1004 / Rennovation of Drains and providing Foot Path on Drains from BSNL Office towards
3 2017-18 75.00
Addanki Busstand via Anjali Dresses in Ongole Municipal Corporation (2nd call)

Development of C.C Road as 4 Lines Road and Central Lighting at North and South
1005 /
4 2017-18 side of Vegetable Market Road in Ura Cheruvu in Ongole Municipal Corporation 150.00
(2nd call)
Widening of C.C Road, Construction of Divider and Providing Central Lighting from
1006 /
5 2017-18 Ambedkar Statue Junction to Mamidipalem Juction in Ongole Municipal 136.00
Corporation (2nd call)
TOTAL 572.00
Download Start Time : 18.01.2018 5.00 P.M
Download End Time : 01.02.2018 5.00 P.M
Receipt of Bids End Time : 01.02.2018 5.15 P.M
Technical Bid Opening Time : 01.02.2018 5.30 P.M
Price Bid Opening Time : 01.02.2018 5.45 P.M
Providing 250 mm dia A.C Class-15 Pipe Line from Dibbala Road E.L.S.R to T.D.P
1007 /
1 2017-18 Party Office at Guntur Road and 150 mm dia A.C Pipe Line at Vijetha Hospital 16.34
Hospital Road in Division No.49 in Ongole Municipal Corporation
1008 / Engaging of 110 Hydraulic Chain Mounted Machine, Excavator (JCB, TATA HITACHI)
2 2017-18 30.00
and Tractors for Lifting of Garbage in Ongole Municipal Corporation
1009 / Providing Separate A.C Pipe Line from Bhagya Nagar OHSR to JNVO Campus in
3 2017-18 13.10
Division No.19 in Ongole Municipal Corporation
1010 / Providing 100 mm dia A.C Pipe Line from Old RIMS Bore Well to Water Sump at
4 2017-18 11.84
New RIMS in Ongole Municipal Corporation
TOTAL 71.28
Download Start Time : 02.02.2018 5.00 P.M
Download End Time : 16.02.2018 5.00 P.M
Receipt of Bids End Time : 16.02.2018 5.15 P.M
Price Bid Opening Time : 16.02.2018 5.30 P.M
1013 / Maintenance of Water Supply - Transportation and Supply of Water in various
1 2017-18 places in Ongole Municipal Corporation 10.00 AE-6

1014 / Providing 16 Mts. Galvanised High Mast Lighting System at Trunk Road at Town
2 2017-18 4.70 AE-2
Church opposite in Ongole Municipal Corporation
1015 / Supply and Delivery of Pyrosene Oil BIS Mark, Malathions Technical and
3 2017-18 9.35 AE-7
Daichloravil in Ongole Municipa Corporation
TOTAL 24.05
Download Start Time : 12.02.2018 5.00 P.M
Download End Time : 19.02.2018 5.00 P.M
Receipt of Bids End Time : 19.02.2018 5.15 P.M
Price Bid Opening Time : 19.02.2018 5.30 P.M
1017 / SDRF (Summer) Grant 2017 - Transportation and Supply of Water in various places
1 2017-18 50.00
in Ongole Municipal Corporation
1018 / SDRF (Summer) Grant 2017 - Manufacture, Supply and delivery of IM-II Hand Pump
2 2017-18 20.00
Spare Parts to Ongole Municipal Corporation
1019 / SDRF (Summer) Grant 2017 - Supply and Delivery of Water Supply Materials in
3 2017-18 30.00
Ongole Muncipal Corporation
TOTAL 100.00
Download Start Time : 19.02.2018 5.00 P.M
Download End Time : 01.03.2018 5.00 P.M
Receipt of Bids End Time : 01.03.2018 5.15 P.M
Price Bid Opening Time : 01.03.2018 5.30 P.M
1 1017(a)/ Laying of B.T Road from Guttikondavaripalem Village Entrance to towards North 9.50 AE-7
2017-18 side from Chainage 0-200 mts in Ongole Municipal Corporation

2 1018(a)/ Laying of B.T Road from N.S.P Canal to towards South side in Guttikondavaripalem 9.50 AE-7
2017-18 Village from Chainage 0-200 mts in Ongole Municipal Corporation

3 1019(a)/ Laying of B.T Road from N.S.P Canal to towards Dumping Yard from Chainage 0-200 9.50 AE-7
2017-18 mts in Ongole Municipal Corporation
1020 / Laying of B.T Road from Guttikondavaripalem Dumping Yard to Mudigondavagu in
4 2017-18 Ongole Municipal Corporation 9.50 AE-7

1021 / Construction of C.C Road in Guttikondavaripalem from Alluru B.T Road to


5 2017-18 9.50 AE-7
Guttikondavaripalem Village Entrance in Ongole Municipal Corporation
1022 / Providing Galvalume sheet to open site at Guttikondavari palem Dumping Yard on
6 2017-18 West side in Ongole Municipal Corporation 9.85 AE-7
1023 / Providing Galvalume Sheet to Open Site at Guttikondavaripalem Dumping Yard on
7 2017-18 9.85 AE-7
East side of Ongole Municipal Corporation
1024 / Providing Borewells at Guttikondavaripalem Dumping Yard in Ongole Municipal
8 2017-18 1.00 AE-7
Corporation
1025 / Construction of Internal C.C Roads in Guttikondavaripalem Dumping Yard in Ongole
9 2017-18 3.00 AE-7
Municipal Corporation
TOTAL 71.20
Download Start Time : 17.02.2018 5.00 P.M
Download End Time : 24.02.2018 5.00 P.M
Receipt of Bids End Time : 24.02.2018 5.15 P.M
Price Bid Opening Time : 24.02.2018 5.30 P.M
1026 /
1 2017-18 Providing Toilets and Maintenance of D.R.R.M School in Division No.14 4.60 AE-2

1027 / Providing Toilets and Maintenance work of Santhapet Municipal School in Division
2 2017-18 2.25 AE-2
No.14
1028 / Providing Toilets and Maintenance work of Ramnagar 2nd Line Municipal School in
3 2017-18 Division No.15 2.20 AE-2

Dismantling old Bulding and Fixing of Eletrical Item Motors Pump Set, Lifting Derbis
1029 /
4 2017-18 at Tangutur Prakasam School and Padamatipalem Municipal School in Ongole 3.53 AE-3
municipal corporation

1030 / Providing balance C.C Drain from O.M.C Community Toilets and Bethamsetty Hari
5 2017-18 Babu house to Urachervu and Bondili Vaari Veeedhi Opposite Road Division no.24 9.00 AE-4

Providing C.C Road at Swarna Venkateswarlu house in Mangala Palem and from
1031 /
6 2017-18 Kota Gulla Vasundra house to Vada palli Venkayamma house Main Road Division 6.85 AE-4
No.24
TOTAL 28.43
Download Start Time : 22.02.2018 5.00 P.M
Download End Time : 08.03.2018 5.00 P.M
Receipt of Bids End Time : 08.03.2018 5.15 P.M
Price Bid Opening Time : 08.03.2018 5.30 P.M
Developmental Activities and Infrastructure Facilities for the year 2015-16 and
1034 /
1 2017-18 2016-17 - Levelling and Construction of Compound walls to Open sites in Pelluru, 62.46
Vengamukkalapelem in Ongole Municipal Corporation

Developmental Activities and Infrastructure Facilities for the year 2015-16 and
1035 / 2016-17 - Construction of C.C Drain from existing culvert at N.H-5 along eastern
2 2017-18 93.85
side of S.S Tank-1 in Yarajarla Road to Mamidipalem Burial Ground in Ongole
Municipal Corporation

1008
1036 / Engaging of 110 Hydraulic Chain Mounted Machine, Excavator (JCB, TATA HITACHI) /
3 2017-18 30.00
and Tractors for Lifting of Garbage in Ongole Municipal Corporation (2nd call) 2017-
18

TOTAL 186.31
Download Start Time : 03.03.2018 5.00 P.M
Download End Time : 17.03.2018 5.00 P.M
Receipt of Bids End Time : 17.03.2018 5.15 P.M
Technical Bid Opening Time : 17.03.2018 5.30 P.M
Price Bid Opening Time : 17.03.2018 5.45 P.M
1037 / Providing C.C Patch Work at Reddy Hostel opposite and S.S Tank-I and Bank Colony
1 2017-18 4.85 AE-8
3rd Line in Division No.19

Construction of C.C Drain from Alla Venkateswarlu house to Sri Sai Brundavan
1038 /
2 2017-18 Enclave, Construction of C.C Approachess at Sai Krishna Enclave and Construction 4.40 AE-8
of C.C Approches at Bhagya Nagar 2nd Line Park in Division No.20

1039 / Removal of Desiltation in Major and Minor Drains at Housing Board Colony, Bhagya
3 2017-18 1.75 AE-8
Nagar 4th Line and Pelluru in Ongole Municipal Corporation
1040 / Laying of B.T Road from Mudigonda Vagu to towards south sid from Chainage 0-
4 2017-18 110 Mts. in Ongole Municipal Corporation 9.60 AE-7

1041 / Providing C.C Road from Guthikondavari Palem enranct towards south side from
5 2017-18 6.45 AE-7
Chanage0-110 Mts. in Ongole Municipal Corporation
1042 / Construction of Internal C.C Roads in Guthikondavari Palem Dumping Yard in
6 2017-18 10.00 AE-7
Ongole Municipall Corporation
Providing C.C Drain from Prasanthi Nilayam Apartment to Palle Swarnasri house
1043 /
7 2017-18 and Providing Quarry Spell Shoulders to existing C.C Road in Pardhasaradhi Nagar 5.30 AE-6
(Ashramam) in Mangamoor Road in Division No.40
TOTAL 42.35
Download Start Time : 02.03.2018 5.00 P.M
Download End Time : 09.03.2018 5.00 P.M
Receipt of Bids End Time : 09.03.2018 5.15 P.M
Price Bid Opening Time : 09.03.2018 5.30 P.M
1045 / Supply, Fixing, Operation and Maintenance of Vehicle Tracking Solution on Rental
1 2017-18 1.60 AE-6
Basis to the Vehicles of Ongole Municipal Corporation
1046 / Supply of Car on Hire basis to Municipal Commissioner for the Year 2018-19 in
2 2017-18 4.20 AE-7
Ongole Municipal Corporation
1047 / Supply of Car on Hire basis to Examiner of Accounts for the Year 2018-19 in Ongole
3 2017-18 Municipal Corporation 4.20 AE-7

1048 / Supply of Car on Hire basis to Municipal Engineer for the Year 2018-19 in Ongole
4 2017-18 Municipal Corporation 4.20 AE-7

1049 / Supply of Car on Hire basis to Assistant City Planner for the Year 2018-19 in Ongole
5 2017-18 4.20 AE-7
Municipal Corporation
1050 / Supply of Car on Hire basis to Municipal Assistant Commissioner for the Year 2018-
6 2017-18 4.20 AE-7
19 in Ongole Municipal Corporation
1051 / Supply and Fixing of Toilet Name Boards at Fuel Stations in Division 1 to 50 in
7 2017-18 Ongole Municipal Corporation 1.73 AE-1

1052 / Providing S.S Railings to Steps on east side at S.S Tank-I in Ongole Municipal
8 2017-18 3.70 AE-8
Corporation
1053 / Construction of Culverts Extension at various places in Divisions 45 to 50 in Ongole
9 2017-18 9.20 AE-7
Municipal Corporation
1054 /
10 2017-18 Providing A.C Sheet Roofing Sheds at New Fish Market south side in Division No.24 8.89 AE-4

Providing Abstract/Geometrical/Patterns Art/Nature Art Work on walls with


1055 /
11 2017-18 Professional Artists (Not Less than BFA Qualifiacation) at Kurnool Road Flyover 10.00 AE-7
inside Portion in Ongole Municipal Corporation
Providing Abstract/Geometrical/patterns Art/Nature Art Work on Walls with
1056 /
12 2017-18 Professional Artists (not less than BFA Qualification) at Kurnool Road Fly Over 10.00 AE-7
inside portion and north side in Ongole Municipal Corporation
Providing Abstract/Geometrical/patterns Art/Nature art Work on walls with
1057 /
13 2017-18 Professional Artists (not less than BFA Qualification) at Fly Over inside walls north 9.95 AE-7
and south sides in Ongole Municipal Corporation
Providing Mural Art Work with High Cement Embossing Art on the Beams at
1058 /
14 2017-18 Kurnool Road Fly Over (on south side) of Pillar Face No.25 to 32 in Ongole 8.05 AE-7
Municipal Corporation
Providing Mural Art Work with High Cement Embossing Art on the beams at
1059 /
15 2017-18 Kurnool Road Fly Over (on north side) of Pillar Face No.17 to 24 in Ongole 8.05 AE-7
Municipal Corporation
Providing Oil Base Primer cum Enamel to Kurnool Road Flyover Bottom Slab, Slant
1060 /
16 2017-18 portion etc., and Figurative Work at Police Parade Grounds Water Plant in Ongole 3.10 AE-7
Municipal Corporation
1061 / Providing 12 Mtrs Galvanized High Mast Lighting System at Railway Station Road in
17 2017-18 Division No.11 3.85 AE-2

1062 / Construction of C.C Drain and C.C Patches in Kammapalem 2nd, 3rd Lines and Cross
18 2017-18 Roads in Division No.7 7.70 AE-1

Construction of C.C Road from B.V.Subbarao house to Chinnareddy


1063 /
19 2017-18 Venkateswarulu house (40" Feet Road) in Kammapalem 2nd line in Division No.7 9.30 AE-1
(2nd call)
Providing and Maintenance of Vesavi Upasana Kendrams at Nellore Bus Stand,
1064 /
20 2017-18 Addanki Bus Stand, P.V.R Girls High School and P.V.R Boys High School Centers in 9.40 AE-2
Ongole Municipal Corporation
1065 /
21 2017-18 Fixing M.S Railing for Lawn at Community Toilets in Ongole Municipal Corporation 1.49 AE-4
TOTAL 127.01
Download Start Time : 14.03.2018 5.00 P.M
Download End Time : 26.03.2018 5.00 P.M
Receipt of Bids End Time : 26.03.2018 5.15 P.M
Price Bid Opening Time : 26.03.2018 5.30 P.M
Supply of Outsourcing Workers for maintenance of Water Supply, Leaks Repairs
1066 /
1 2017-18 and Turn Cocks for the year 2018-19 in Ongole Municipal Corporation (Reserved 119.85
for L.C.C.S)
1067 / Supply of Outsourcing Workers for maintenance of Work Inspectors and Parks for
2
2017-18 the year 2018-19 in Ongole Municipal Corporation (Reserved for L.C.C.S) 93.50

1068 / Supply of Outsourcing Workers for maintenance of Computer Operators and


2017-18 Drivers for the year 2018-19 in Ongole Municipal Corporation (Reserved for L.C.C.S) 81.60
3

Supply of Outsourcing Workers for maintenance of Debris on call, Encroachments


1069 / Removal Squal, Tree Plantation, Street Lighting Helpers, Heavy Vehicles Helpers
2017-18 and Skill Upgradation Training Centre for the year 2018-19 in Ongole Municipal 81.60
4
Corporation (Reserved for L.C.C.S)
TOTAL 376.55
Download Start Time : 16.03.2018 5.00 P.M
Download End Time : 27.03.2018 5.00 P.M
Receipt of Bids End Time : 27.03.2018 5.15 P.M
Price Bid Opening Time : 27.03.2018 5.30 P.M

Providing Pumping Main and Pump Sets from S.S tank-II Filter Beds to
1070 /
1 2017-18 Vengamukkapalem, Cheruvukommupalem, Pelleru and Kotha Mamidipalem under 497.14
14th Finance Commission Grants (2016-17) in Ongole Municipal Corporation

Providing Trunk Main from Ram Nagar E.L.S.R to N. Agraharam including Railway
1071 /
2 2017-18 crossing under 14 th Finance Commission Grants (2016-17) in Ongole Municipal 135.81
Corporation
TOTAL 632.95
Download Start Time : 17.03.2018 5.00 P.M
Download End Time : 31.03.2018 5.00 P.M
Receipt of Bids End Time : 31.03.2018 5.15 P.M
Technical Bid Opening Time : 31.03.2018 5.30 P.M
Price Bid Opening Time : 31.03.2018 5.45 P.M
1072 / Transportation and Supply of Water to the merged villages in Ongole Municipal
1 2017-18 10.00 AE-6
Corporation
1073 / Transportation and Supply of Water to Koppolu and Pelluru areas in Ongole
2 2017-18 10.00 AE-6
Municipal Corporation
1074 / Providing 8.5 Tonne Ducttouble Outdoor Unit to Collector's Conference Hall at
3 2017-18 1.80 AE-2
Prakasam Bhavan in Ongole Municipal Corporation
1075 / Providing 2 Tonne A.C and Stabilisers to NIC Video Conference Hall at Prakasam
4 2017-18 Bhavan in Ongole Municipal Corporation 1.20 AE-2

1076 / Supply and Delivery of Office Chairs to C.P.O Conference Hall in Prakasam Bhavan
5 2017-18 3.50 AE-2
in Ongole Municipal Corporation
1077 / Providing Lighting Arrangements at N.T.R Circle (south side Garden) under R&B Fly
6 2017-18 7.40 AE-2
Over Bbridge in Ongole Municipal corporation

1078 /
Painting to Collector's video Conference Hall and Collector's Chamber and
7 2017-18 Collectors Main Conference Hall and NIC Video Conference Hall in Ongole 1.70 AE-2
Municipal Corporation
1079 / Providing Lighting Arrangements at N.T.R Circle (north side Garden) under R&B Fly
8 2017-18 Over Bridge in Ongole Municipal corporation 9.20 AE-2

1080 / Drilling of Deep Bore Wells and Fixing of IM-II Hand Pumpsets at various places in
9 2017-18 Ongole Municipal Corporation 10.00 AE-6

1081 / Reparis to existing Push Cart Wheels with Bearings in Ongole Municipal
10 2017-18 7.40 AE-7
Corporation

Supply, Delivery and Errection of 0 to 5 Kg/Hr Chlorination Plant Vaporised Liquid


1082 /
11 2017-18 Chlorine Gas Cylinder (100 Kgs) and 10 HP Motor Strater with required accessories 2.59 AE-8
at Mukthinuthalapadu Pump House in Ongole Municipal Corporation

1083 / Supply and Delivery of Chlorine Gas Cylinder, Ferric Alum and Bleaching Powder for
12 2017-18 9.995 AE-8
the Maintainence of Water Supply in Ongole Municipal Corporation
Supply of Labour for Watch and Ward and Petrolling along N.S.P Canal from
1084 /
13 2017-18 Ramatheertham Reservoir to S.S Tanks and additional Pumping arrangement to S.S 9.52 AE-8
Tank-2 in Ongole Municipal Corporation
1085 / Supply ad Fixing of exiting Toilet Materials and Electrical Items and Providing Hand
14 2017-18 Railing for Public and Community Toilets in Ongole Municipal Corporation 6.96 AE-4

1086 / Engaging of Labour for Supply and Cleaning Materials Community Toilets in Ongole
15 2017-18 Municipal Corporation 9.50 AE-4

1087 / Supply of Car on Hire basis to Municipal Engineer for the Year 2018-19 in Ongole
16 2017-18 4.20 AE-7
Municipal Corporation
Providing Painting, Garland Decoration, Supply of Butter Milk Packets and
1088 / Providing Water to Sri babu Jagajievanarao, Sri Dr.B.R. Ambedkar, Sri Gurram
17 2017-18 3.86 AE-2
Jashuva, Sri Prakasam Panthulu and Swami Vivekananda Statues at various places
in Ongole Municipal Corporation
TOTAL 108.825
Download Start Time : 19.03.2018 5.00 P.M
Download End Time : 02.04.2018 5.00 P.M
Receipt of Bids End Time : 02.04.2018 5.15 P.M
Price Bid Opening Time : 02.04.2018 5.30 P.M
ONGOLE MUNICIPAL CORPORATION
E-PROCUREMENT TENDER NOTICES
S. Tender
No Notice No. Name of the work Est cost

1003
1/ Widening of C.C Road with Divider and Central Lighting to Srinivasa Hall Road 136.00 /
1 2018-19 upto Pothuraju Kaluva in Ongole Municipal Corporation (3rd call) 2017
-18

Rennovation of Drains and providing Foot Path on Drains from BSNL Office 1004
2/ /
2 2018-19 towards Addanki Busstand via Anjali Dresses in Ongole Municipal 75.00 2017
Corporation (3rd call) -18

TOTAL 211.00
Download Start Time : 17.04.2018 5.00 P.M
Download End Time : 01.05.2018 5.00 P.M
Receipt of Bids End Time : 01.05.2018 5.15 P.M
Technical Bid Opening Time : 01.05.2018 5.30 P.M
Price Bid Opening Time : 01.05.2018 5.45 P.M
3/ SDRF (Summer) Grant 2017 - Transportation and Supply of Water to Divisions
1 2018-19 50.00 AE-6
1 to 25 areas in Ongole Municipal Corporation
4/ SDRF (Summer) Grant 2017 - Transportation and Supply of Water to Divisions
2 2018-19 50.00 AE-6
26 to 50 areas in Ongole Municipal Corporation
TOTAL 100.00
Download Start Time : 23.04.2018 5.00 P.M
Download End Time : 07.05.2018 5.00 P.M
Receipt of Bids End Time : 07.05.2018 5.15 P.M
Price Bid Opening Time : 07.05.2018 5.30 P.M
5/
1 2018-19 Providing and Maintenance of Vesavi Upasaina Kendram at Corporation 2.93 AE-2
Office in Ongole Municipal Corporation
Providing Chali Vendrams at Addanki Bus Stand, Old Vegetable Market,
6/
2 2018-19 Mangamoor Road, Rangula Factory and South Bye-Pass Junction in Ongole 2.38 AE-2
Municipal Corporation
Providing Chali Vendrams at Papa Rice Mill, APSEB Office, North Bye-pass
7/
3 2018-19 Junction, PVR High School, Sundaraiah Bhavan Road and Kothapatnam Bus 2.38 AE-2
Stand in Ongole Municipal Corporation
8/
4 2018-19 Arranging the Medical Camp Vehicle in Ongole Municipal Corporation 2.40 AE-4

9/
5 2018-19 Arranging Vehicle to Anganwadi School Co-ordinator for monitoring Schools 3.85 AE-7
in Prakasam District
TOTAL 13.94
Download Start Time : 30.04.2018 5.00 P.M
Download End Time : 05.05.2018 5.00 P.M
Receipt of Bids End Time : 05.05.2018 5.15 P.M
Price Bid Opening Time : 05.05.2018 5.30 P.M
10 / Construction of Water Sump for Tank in Mukthinuthalapadu in Division No.2
1 2018-19 1.60 AE-1
(2nd call)
Laying of 100 mm dia A.C Pipe Line from Motupalli Masthan house to Pathan
11 /
2 2018-19 Jilani house in Islampeta-2 6th Line and Prakasam Elementry School opposite 3.70 AE-1
Road in Division No.4 (2nd call)
Laying of CC Road and C.C Drain from Karula Padma house to Bruluhola Srinu
12 /
3 2018-19 house and from Chapiti Balakotaiah house to Dasari Padma house in 3.80 AE-1
Battulavari street in Division No.6 (2nd call)

13 / Laying of C.C Road and C.C Drain from Pasidi Nagarpamma Temple to
4 2018-19 6.70 AE-1
Ayinabathinna Ramesh house in Abburuvari Veedhi in Division No.7 (2nd call)

14 / Laying of 100 mm dia A.C Pipe Line at Iyyanna Setty Satram in Division No.11
5 2018-19 (3rd call) 1.95 AE-2

Providing C.C Road and C.C Drain from Jangila Jameeba house to Pandi
15 /
6 2018-19 Lumiyanraj house and from Nukathoti Kotamma house to Bank Vinod house 6.40 AE-2
in Kabadi Palem in Division No.13 (2nd call)

Laying of 150 mm dia A.C Pipe Line from Ananda Rao Road Soujanya Mess to
16 /
7 2018-19 Chakri Maruthi kumar house and 100 mm dia A.C Pipe Line from Ananda Rao 4.40 AE-2
road Lalam Pitchaiah house to Bundar Road in Division No.13 (3rd call)

17 / Laying of 100 mm dia A.C Pipe Line and Culvert from Dharavarithota 6th line
8 2018-19 to Gavadhakatla Srinu House in Division No.20 (3rd call) 4.15 AE-8

Construction of C.C Road and C.C Drain from Chinmaya Saradha house to
18 /
9 2018-19 Chalapathi Rao House at N.G.O Home Main Road in Balaji Nagar in Division 3.90 AE-8
No.21 (2nd call)
19 / Extension of 150 mm dia A.C Pipe Line from Church Compound to Yaswanth
10 2018-19 2.80 AE-8
Nilayam at Pindimara Veedhi in Division No.21 (2nd call)
20 / Laying of 100 mm dia A.C Pipe Line at Managalipalem and Venugopala
11 2018-19 4.15 AE-4
Swamy Temple opposite in Division No.22 (2nd call)
21 / Construction of Community Hall at Yanadhi Colony in Kesava Swamy Peta
12 2018-19 4.25 AE-4
(Near Pump House) in Division No.27 (2nd call)
22 / Construction of Damaged C.C Drain at Rajapanagal Road in Division No.29
13 2018-19 9.60 AE-3
(2nd call)

23 / Supply, Fixing, Operation and Maintenance of Vehicle Tracking Solution on


14 2018-19 Rental Basis to the Vehicles of Ongole Municipal Corporation (2nd call) 1.60 AE-6

24 / Supply and Fixing of Name boards and No Parking Sign Boards at various
15 2018-19 3.19 AE-4
places at New Vegetable Market area in Ongole Municipal Corporation

25 / Supply of Outsourcing Workers in Ongole Municipal Corporation (Reserved


16 2018-19 9.70 AE-1
for L.C.C.S)
26 / Rectification of Leaks on Koppolu Water Supply Main due to road widening in
17 2018-19 8.00 AE-1
Division No.9 and 10 in Ongole Municipal Corporation
27 / Rectification of Leaks in Division No.11 to 16 in Ongole Municipal
18 2018-19 7.00 AE-2
Corporation
TOTAL 86.89
Download Start Time : 30.04.2018 5.00 P.M
Download End Time : 10.05.2018 5.00 P.M
Receipt of Bids End Time : 10.05.2018 5.15 P.M
Price Bid Opening Time : 10.05.2018 5.30 P.M
28 / Construction of C.C road from Venkateswara Temple to via Sudhakar house
1 2018-19 9.55 AE-1
in Throvagunta in Division No.1
29 / Laying of Quarry Spell Road from Vemuri Kotaiah house to around Nimmala
2 2018-19 2.65 AE-1
Gunta in Throvagunta in Division No.1
30 / Laying of C.C Drain from Killa Venkaiah house to Nimmalagunta in
3 2018-19 Throvagunta in Division No.1 5.30 AE-1

31 / Construction of C.C Road from K.Subbarao house to Bandaru Ramu house in


4 2018-19 Throvagunta in Division No.1 10.00 AE-1

32 / Construction of C.C Road from Peramma Bunk to Poleramma Temple in


5 2018-19 10.00 AE-1
Throvagunta in Division No.1

33 /
Construction of C.C Road from Upputuri Sudhakar house to Masthan Darga
6 2018-19 and from Upputuri Venkateswarulu house to Eluri Subbarao house in 8.95 AE-1
Throvagunta in Division No.1
34 / Construction of C.C Drain from Bodapati Venkateswarulu house to
7 2018-19 10.00 AE-1
Gudimellapadu Road in Division No.2
35 / Construction of C.C Drain from Kamepalli Nageswararao house to Sivalayam
8 2018-19 in Division No.2 9.70 AE-1

36 / Construction of C.C Road from Babu Cooldrinks Shop to Sanitation Muster


9 2018-19 7.55 AE-1
Office (Chunduri Petrol Bunk back side) in Division No.4
37 / Construction of C.C Drain from Dasu Venkatarao house to Panchayat Office in
10 2018-19 7.60 AE-1
Nargarpamma Bazar in Division No.2
38 / Providing Quarry Spell Road from Valeti Nageswra Rao Koshtam to
11 2018-19 7.65 AE-1
Gudimellapadu Cheruvu (via N.S.P Canal) in Division No.2
39 /
12 2018-19 Construction of C.C Drain at Vaddepalem B.C Colony in Division No.2 9.60 AE-1

40 / Construction of C.C Drain from Malluri Sivaiah house to Chakali Jakraiah


13 2018-19 8.70 AE-1
house in Mukthinuthalapadu B.C Colony in Division No.2
Construction of C.C Drain from beside Boddurayi to Valleti Venkateswarulu
41 /
14 2018-19 house and from Kammepalli Srinivasarao house to Malluri Sivaiah house in 7.35 AE-1
Muthinuthalapadu B.C Colony in Division No.2
42 / Providing Quarry Spell Roads from Guntur Road to Sk.Kalesha house opposite
15 2018-19 2.80 AE-1
to Coca-Cola Company in Division No.3
43 / Laying of 150 and 100 mm Dia A.C Pipe Line from Tranformer to Gaddikayalu
16 2018-19 at Gopal Nagar Extention in Division No.5 6.00 AE-1

44 / Providing C.C Drain from Mini Bye Pass Road (Kalikamma Temple) to
17 2018-19 10.00 AE-1
Katavadhi Donka 7th Line in Division No. 7
45 / Providing C.C Drain from Karavadhi donka 3rd Line to 5th Line in Division
18 2018-19 10.00 AE-1
No.7
46 / Construction of C.C Drain and Culvert from P.Kotireddy houose to Entrance
19 2018-19 7.30 AE-1
of C.C Road in Division No.9
47 / Construction of CC Drain from Chennereddy Koteswara Rao house to
20 2018-19 Byrapuneni Venkateswarulu house in Division No.8 10.00 AE-1
48 / Laying of C.C Road and C.C Drain from K.Koteswara Rao house to P.Rama
21 2018-19 10.00 AE-1
Devi house in Indurthi Nagar 3rd Line in Division No.8
Construction of C.C Drain from Potheneni Nageswara Rao house) to
49 / Katragadda Vanaja Kumari house and Madda Venkateswarulu house to
22 2018-19 Pandyala Kavalamma house at Karavadhi Donka in Thrupu Kammapalem in 7.30 AE-1
Division No.8
50 / Construction of C.C Drain from K.P Bus Stand upto Muslim Burial Ground in
23 2018-19 Division No.8 7.40 AE-1

51 / Construction of C.C Drain and Culvert from Gagom Sai shop to Janatha
24 2018-19 9.60 AE-1
Medical shop (D.J.R Street) in Guntur Road in Division No.3
52 / Construction of Compound Wall in east side of Park Site at Kakathiya Nagar
25 2018-19 9.00 AE-1
in Division No.8
53 / Laying of 150 mm and 100 mm Dia A.C Pipe Line along Railway Track Road
26 2018-19 4.95 AE-1
and Indurthi Nagar 2nd Line in Indurthi Nagar in Division No.8
54 / Repairs and Construction of C.C Drains and Culverts at Christian Palem in
27 2018-19 Division No.8 3.55 AE-1

55 / Construction of C.C Road from O.K Road to Indiramma Gruhalu 9th line in
28 2018-19 10.00 AE-1
Division No.9
56 / Providing C.C Road and C.C Drain from Gangadi Srinivasulu house to Gangadi
29 2018-19 8.85 AE-2
Ramanayya house in Koppolu in Division No.10
Providing C.C Drain from (Vijayadurga Theater) opposite Bundar Road to
57 /
30 2018-19 Anand Rao Road and C.C Drain from Jangala Sundaram house to Velchuri 9.80 AE-2
Kruparao house in Division No.13
58 /
31 2018-19 Construction of C.C Drain at Dakshina Murthy Street in Division No.13 2.35 AE-2

59 / Construction of C.C Drain both sides from Vijayadurga Theater to Mandiram


32 2018-19 in Kabadipalem in Division No.13 7.25 AE-2

60 /
33 2018-19 Providing C.C Drain at Ungarala Veedhi Road in Division No.14 9.00 AE-2

61 / Construction of C.C Drain from north side of Ramakurivaari Street in G.T


34 2018-19 9.60 AE-2
Road to Annavarappadu at Santhapeta in Division No.14
62 / Providing C.C Drain and Culverts from Panchayathraj Office to Railway Gate
35 2018-19 in Santhapeta in Division No.14 9.70 AE-2

63 / Providing C.C Drain from Aiswarya Apartment to Donepudi Ramesh house,


36 2018-19 8.50 AE-2
Purneswari Veedhi and Vinayakudi Bazar Road in Division No.14

64 /
37 2018-19 Providing C.C Drain at Santhapeta Anjaneya Swamy Temple in Division No.14 9.35 AE-2

65 / Providing C.C Road from Donepudi Ramesh house to Santhapeta Main Road
38 2018-19 9.75 AE-2
in Division No.14
66 /
39 2018-19 Providing C.C Drain near B.M Apartment in Division No.14 7.35 AE-2

67 / Providing C.C Storm Water Drain from Santhapeta Saibaba Temple to


40 2018-19 9.80 AE-2
Agraharam Railway Gate in Division No.14
68 / Providing C.C Road from Chavalavari Veedhi to Donepudi Ramesh house in
41 2018-19 9.75 AE-2
Trunk Road in Division No.14
Providing C.C Road from Vinayakuni Bazar Road to Chavalavari Veedhi Road
69 /
42 2018-19 and DRRM High School Road (Panchayat Raj Office north side) and C.C Road 5.85 AE-2
in Division No.14

70 / Engaging of 110 Hydraulic Chain Mounted Machine, Excavator (JCB, TATA


43 2018-19 6.79 AE-2
HITACHI) and Tractors to improvments in Battulavarikunta in Division No.16

71 / Laying of 150 mm dia and 100 mm dia A.C Pipe Line from Trunk Road to N.S.P
44 2018-19 5.65 AE-2
Canal in Ram Nagar 15th Line in Division No.17
72 / Providing C.C Road from R&B Road to Yadava Bazar in Cheruvukommu Palem
45 2018-19 in Division No.18 5.50 AE-8

Providing C.C Road from Pakanti Sesha Reddy house to Pusapati Gopala
73 /
46 2018-19 Reddy house and from Gummalapu Venkateswarlu house to Anjaneyulu 3.40 AE-8
house in Cheruvukommu Palem in Divison No.18
74 / Providing C.C Road and C.C Drain from M.Venkateswarlu house to
47 2018-19 S.Nagabramma Chari house in Cheruvukommu Palem in Division No.18 3.35 AE-8

75 / Providing C.C Road and Pre-cast Slabs at S.C Colony 1st Cross Road in
48 2018-19 4.80 AE-8
Vengamukkala Palem in Division No.18
76 / Construction of C.C Road from Jajula Nagaraju house to Burial Ground Road
49 2018-19 9.96 AE-8
in Cheruvukommu Palem in Division No.18
77 / Construction of C.C Road and C.C Drain from Dasari Bazar to Anjaneya
50 2018-19 9.98 AE-8
Swamy Temple in Cheruvukommu palem in Division No.18

78 / Providing 600 mm dia R.C.C NP3 Class ipes across road (in 3 junctions) in
51 2018-19 1.80 AE-8
Quarry Spell Road from Cheruvukommupalem to NH-5 in Division No.18

79 / Construction of C.C Drain from T.V.S Showroom to Gangam Sai Shop in


52 2018-19 9.45 AE-1
Guntur Road in Division No.3
80 / Laying of B.T Road from existing Road to N.H-5 (via Velugu Office Road) in
53 2018-19 Division No.19 9.98 AE8

81 / Construction of C.C Drain and Culvert from LIG-137 to LIG-163 and from LIG-
54 2018-19 9.90 AE-8
81 to LIG-93 in Housing Board Colony in Division No.19
82 / Construction of C.C Drain from Bhagya Nagar 4th Line south side 5th, 6th,
55 2018-19 9.40 AE-8
7th, 9th, 10th Cross roads in Division No.19
83 / Construction of C.C Drain and Culvert from Raghavulu Apartment to N.H-5 in
56 2018-19 6.65 AE-8
Bank Colony 3rd Line in Division No.19
84 / Construction of C.C Drain from Bhagya Nagar 4th Line south side 1st, 2nd,
57 2018-19 3rd, 4th Cross Roads in Division No.19 9.98 AE-8

85 / Construction of C.C Drain from Bhagya Nagar 4th Line from Bank Colony 1st
58 2018-19 2.60 AE-8
Line to 3rd Line in Division No.19
86 / Providing C.C Road at Sai Maharaj Willas back Side in Housing Board Colony
59 2018-19 6.30 AE-8
in Division No.19
87 / Construction of C.C Drain and Culvert from Sai General Stores to Sairam Cool
60 2018-19 Drinks Shop in Housing Board Colony in Division No.19 3.38 AE-8

88 / Construction of C.C Drain from Polytechnic College Compound Wall to


61 2018-19 1.55 AE-8
G.Venkateswarlu house in Division No.19
89 / Providing CC Drains from D.No.26-42-49 to D.No.26-42-292 in Bhagya Nagar
62 2018-19 10.00 AE-8
Donka in Division No.20
90 / Construction of C.C Drain and Culvert from Registrar Office to Sri Chaitanya
63 2018-19 10.00 AE-8
School in Bhagya Nagar 2nd Line in Division No.20

91 / Construction of C.C Drain and Culvert from Sri Chaitanya School to Lakshmi
64 2018-19 10.00 AE-8
Narayana Mess (D.No.26-42-442) in Bhagya Nagar 2nd Line in Division No.20

Construction of one Side C.C Drain from M.V.R Water Plant to Mara Baavi
92 / Road in Dharavari Thota 4th Line, from Bhagya Nagar 1st Line to 4th line 2nd
65 2018-19 10.00 AE-8
Cross Road and from G.T Road to S.R.K Degree College (D.No.2-42-168 to 26-
42-161) in Bhagya Nagar 1st Line in Division No.20

93 / Construction of C.C Drain from Bhagya Nagar 1st Line to 4th Line to 4th Line
66 2018-19 10.00 AE-8
2nd Cross Road (D.No.26-42-156 to 26-42-256) in Division No.20

94 / Providing C.C Road from Sheshamma house to Kandukuri Sridar house at


67 2018-19 7.50 AE-8
Bhagya Nagar 2nd Line Walking Track north side in Division No.20
95 / Providing C.C Road from Gottam Srinivasa Rao house to S.R.K Degree College
68 2018-19 10.00 AE-8
(D.No.26-42-168 to 26-42-161) in Bhagya Nagar 1st Line in Division No.20
96 / Providing C.C Drains from Dasari Ankaiah house to Daravari Thota 5th Line in
69 2018-19 Division No.20 10.00 AE-8

98 / Providing C.C Road from Registrar Office to Sukeerthi Medical Agencies in


70 2018-19 10.00 AE-8
Bhagya Nagar 2nd Line in Division No.20
99 / Laying of C.C Road from Venkata Rami Reddy house to Linga Reddy house in
71 2018-19 9.40 AE-8
Bhagya Nagar 2nd Line in Division No.20

100 / Providing CC road from Potturi Venkateswarlu house to Seshamma house at


72 2018-19 9.95 AE-8
Bhagya Nagar 2nd Line Walking Track north side in Divison No.20

101 / Laying of 150 mm and 100 mm dia A.C Pipe Line at Daravarithota Main Road
73 2018-19 5.70 AE-8
and Durga Cross Roads in Division No.20
102 / Repairs and Rectification of Walking Track and Children Play Equipment in
74 2018-19 C.R.P Quarters Park in Division No.21 8.40 AE-8

Construction of C.C Drain and Culverts from Kunchala Chalapathi house to


103 /
75 2018-19 Vengamamba Cool Drink Shop at Maruthi Apartment back side in Dharavari 9.98 AE-8
Thota in Division No.21
Laying of 100 mm dia A.C Pipe Line from Kunchala Chalapathi house to
104 /
76 2018-19 Vengamamba Cool Drink Shop at Maruthi Apartment back side in Dharavari 3.35 AE-8
Thota in Division No.21
Construction of C.C Road from Chalapathi Rao house to Lawyer Govindaraju
105 /
77 2018-19 house and C.C Drain from Gollapudi Madavi house to Palaparthi Jitson house 8.10 AE-8
in Balaji Nagar in Division No.21
106 / Laying of 150 mm dia A.C Pipe Line at Ankamma Palem and Vemana Palem in
78 2018-19 Division No.22 1.37 AE-4

107 / Construction of C.C Drain from Nallaiah Rice Mill to Muneer Chicken Center
79 2018-19 1.05 AE-4
in Division No.23
108 /
80 2018-19 Laying of P.V.C Pipe Line in Gandhi Road and Ganuga Palem in Division No.23 4.20 AE-4
109 / Providing C.C Drain in Gandhi Road From Potti Sri Ramulu Statue to Trunk
81 2018-19 7.50 AE-4
Road in Division No.23
110 /
82 2018-19 Providing C.C Drain at Ganuga Palem Main Road north side Division No.23 5.65 AE-4

111 / Providing C.C Drain from Hindhusthan Hotel to Ramalayam and from Kota
83 2018-19 1.65 AE-4
Veedhi east to west Abdulla House to Old Market Road in Division No.23

112 / Providing C.C Road from Hindhusthan Hotel to Ramalayam and from Kota
84 2018-19 5.10 AE-4
Veedhi east to west Abdulla house to Old Market Road in Division No.23

113 / Providing Internal C.C Road and C.C Drain at Pendyala Vari Satram Road in
85 2018-19 3.05 AE-4
Division No.23
114 / Providing C.C Road from Old Sri Ram Theater to Top Town Tea and from Potti
86 2018-19 7.80 AE-4
Sri Ramulu Statue to Trunk Road Center in Division No.23
115 / Providing C.C Drain from Old Sri Ram Theater to Top Town Tea Center in
87 2018-19 Division No.23 5.45 AE-4

116 / Providing C.C Drain from Bethamsettty Hari Babu house to Paravathamma
88 2018-19 8.95 AE-4
Temple (Bandlamitta Road north side) in Division No.24

117 / Providing C.C Road and R.C.C Slabs on the Drian at Vantapani Vaari Colony
89 2018-19 10.00 AE-4
Road in Division No.24
118 / Providing C.C Drain from Abburivari Veedhi to Paravathamma Temple
90 2018-19 8.95 AE-4
(Bandlamitta Road south side) in Division No.25
119 / Providing C.C Drain from Abburivari Veedhi to Paravathamma Temple
91 2018-19 (Bandlamitta Road north side) in Division No.25 9.10 AE-4

120 /
92 2018-19 Providing C.C Patches at various places in Division No.25 4.45 AE-4

Providing C.C Drain in Centeral Cafe area towards Gandhi Road and Polapala
121 /
93 2018-19 Jalaihai house to Mallisetti Srinu house and Central Cafe to Tyagaraja 8.95 AE-4
Mandiram towards Gandhi Road (Gandhi Road North Side) in Division No.25

122 / Providing C.C Drain from Indira Gandhi Statue Road to Subba Rao Hospital
94 2018-19 6.40 AE-4
Road in Division No.25
Providing C.C Drain from Srigiri Steps to Hill Tower Pump House, from Gandi
123 /
95 2018-19 kota Chandhu house to Srihari house and from Srigiri Steps to Hill Tower 6.10 AE-4
Pump House in Division No.27
124 / Construction C.C Drain to Rajapanajal Road 1st Line to 4th Line in Division
96 2018-19 7.30 AE-4
No.27
125 / Construction of C.C Drain from Vinayaka Swamy Temple to Bujjamma Kottu
97 2018-19 in Division No.27 9.10 AE-4

126 / Construction of C.C Culverts at Kothapeta 1st Line, 2nd Line, Hareram Bazar
98 2018-19 3.15 AE-5
and Jammichettu Veedhi in Division No.28
127 /
99 2018-19 Providing Slabs to Major Drain at Kondaiah Bunk in Division No.28 9.75 AE-3

128 / Repairs and Rectification of C.C Road and C.C Drain at Rajapanagal Road in
100
2018-19 Division No.29 9.10 AE-3
129 / Providing Balance C.C Drain and Culverts at Kakumani Bujji House Road in
101
2018-19 Mamidi Palem in Division No.30 2.30 AE-4

130 /
2018-19 Providing C.C Road at Hill Top Raamula Vaari Temple in Division No.30 10.00
102 AE-4

131 / Providing C.C Drain and Culverts at I.D.S.M.T Flats south side (4th Class
103
2018-19 Employees Main Road north side) in Division No.31 10.00 AE-4

132 / Construction of C.C Road opposite to Quality Residency from Sri Venkata Sai
104
2018-19 Lakshmi Nilayam in Rajeev Nagar in Division No.32 9.99 AE-3

133 / Construction of C.C Road beside Quality Residency from D.No.8-165-314 to


105
2018-19 existing C.C Road in Rajeev Nagar in Division No.32 9.95 AE-3

134 / Construction of C.C Road and C.C Drain (Road Encroachment) From
2018-19 T.Nageswara Rao house to Rambabu house in R.T.C Colony in Division No.33 2.65
106 AE-5

135 / Construction of C.C Drain from existing C.C Road to M.M Road
107
2018-19 (Vaddevanikunta 1st Line) in Division No.33 6.65 AE-5

136 /
2018-19 Construction of C.C Drain at Vaddivanikunta in Division No.33 10.00
108 AE-3

137 /
2018-19 Construction of C.C Road at Vaddivanikunta in Division No.33 10.00
109 AE-3

138 / Construction of C.C Drain at Rajeev nagar Park opposite Line (D.No8-162/5)
110
2018-19 in Division No.34 5.80 AE-3

139 /
2018-19 Construction of Reading Room in Rajiv Nagar Park in Division No.34 8.15
111 AE-3

140 / Construction of C.C Drain and Culvert from Pundarikankshaiah house to


112
2018-19 Anjaiah Road in Division No.36 8.50 AE-3

Construction of C.C Drain at SundharNagar 2nd Line Byepass to Existing C.C


141 /
2018-19 Culvert (Chiditoti Jeevan Nilayam) and Construction of C.C Drain and Culverts 8.00
113 AE-3
from at Senkar Narayana Kalyana Mandapam Line in Division No.36

142 /
2018-19 Providing Urinal Blocks at beside Kapu Kalayana Mandapam in Division No.36 2.21
114 AE-3

143 / Providing C.C Drain from east side of Main Road from Military Colony to
115
2018-19 Yanadi Colony in Division No.37 10.00 AE-6

144 / Providing C.C Road from existing C.C Road to Ramaswami house and infront
116
2018-19 of N.Subba Rao house in Sujatha Nagar 2nd Cross Road in Division No.37 10.00 AE-6

145 /
2018-19 Providing Balance C.C Road in Sujatha Nagar 9th Line in Division No.37 10.00
117 AE-6

146 / Providing C.C Road in 2nd Cross Road in Soniya Gandhi Nagar 1st Line in
118
2018-19 Division No.37 9.70 AE-6

147 / Providing C.C Drains in 2nd Cross Road in Soniya Gandhi Nagar 1st Line in
119
2018-19 Division No.37 8.70 AE-6
Providing 150 mm dia A.C Pipe Line from M.M Road at BR homes to
148 / Sivasankar Apartments near water plant and Sivasankar Apartments near
2018-19 water plant to Ramachandruni Srinivasulu house and Sujatha nagar 6th line 4.35
120 AE-6

Madala Ramaswamy house (2nd cross road) in Division No.37

149 / Construction of C.C Drain from B.R Homes to Srinivasa Villa via Sivasankar
121
2018-19 Apartment in Division No.37 5.45 AE-6

150 /
2018-19 Providing C.C Drains in Sujatha Nagar 4th Line both sides in Division No.37 8.55
122 AE-6

151 / Providing C.C Road to west side of road in Dattasai Nagar in Mangamoor
123
2018-19 Road Road in Division No.39 10.00 AE-6

152 / Providing C.C Drain to west side of road in Dattasai Nagar in Mangamoor
124
2018-19 Road in Division No.39 3.20 AE-6

153 / Providing Quarry Spell Road from Kaki Madhavarao house to Vinayaka
125
2018-19 Temple in Arunodaya Colony in Division No.39 3.25 AE-6

154 / Construction of Compound Wall to Open Space alround ELSR (South and
126
2018-19 East) in Arunodaya Colony in Pernamitta in Division No.39 10.00 AE-6

155 / Construction of Compound Wall to Open Space alround ELSR (West and
127
2018-19 North) in Arunodaya Colony in Pernamitta in Division No.39 10.00 AE-6

156 /
2018-19 Providing C.C Road in Samatha Nagar 1st Line (Reach-1) in Division No.39 9.95
128 AE-6

157 / Providing Balance C.C Road in Samatha Nagar 1st Line (Reach-2) in Division
129
2018-19 No.39 3.95 AE-6

Providing C.C Drain from Kamineni Bramhanandam house to Ashram Main


158 /
2018-19 Gate via Venkateswara Raeddy house in Ramachandra Mission Ashram in 6.95
130 AE-6
Mangamoor Road in Division No.40
159 / Providing C.C Road from Pravallika Residency to Ram Nivas Apartment near
131
2018-19 Ramachandra Ashramam in M.M Road in Division No.40 8.75 AE-6

160 / Construction of Compound Wall to Chinthagunta Burial ground in Pernamitta


132
2018-19 in Division No.42 10.00 AE-6

161 / Construction of Room in Chinthagunta Burial Ground in Pernamitta in


133
2018-19 Division No.42 4.85 AE-6

162 / Construction of C.C Drain from Pantulu Venateswarlu house to Srinivasa


134
2018-19 Reddy house in Andhra Kesari Nagar Main Road in Division No.43 7.70 AE-7

163 / Construction of C.C Drain and C.C Road from S.Krishna Reddy house to
135
2018-19 Anjaneya Swamy Temple in Maruthi Nagar 2nd Line in Division No.44 4.90 AE-7

164 / Construction of C.C Drain at Anjaiah Road north side from Kalyani E.N.T
136
2018-19 Hospital to Legend Furniture World in Division No.46 9.10 AE-7

165 / Construction of C.C Drain at Anjaiah Road north side from N.H-5 to Kalyani
137
2018-19 E.N.T Hospital in Division No.46 10.00 AE-7

Construction of C.C Drains at Sundaraiah Bhavan Road from Chandamama


166 / Children Hospital to Srija Opticlas and C.C Road and C.C Drain at Lambadi
2018-19 Donka from Rayapati Prasada Rao house to Aluri Swarna house in Division 6.20
138 AE-7

No.46
167 / Construction of C.C Drain from Sujatha Nilayam to Venkata Sai Nilayam in
139
2018-19 Dibbala Road in Division No.48 4.05 AE-7

168 /
Construction of C.C Drain from Chandraiah Nagar Community Hall to 60' Feet
2018-19 Road and from D.Ramarao house to M.Venka reddy house in Chanadraiah 8.65
140 AE-7
Nagar Main Road in Division No.48
169 / Construction of C.C Drain from Ch.Bala Kondaiah house to V.Subbararo
141
2018-19 house in Dibbala Road on east side in Division No.48 8.65 AE-7

Construction of C.C Drain from Devarapu Rama Kotaiah house to Sk.Kadarvali


170 /
2018-19 house in Pedda Yadavala Bazar opposite Road and south side of Sai Public 4.75
142 AE-7
School in Division No.49
171 / Construction of C.C Drain from G.Nageswararao house to 60' Feet Road in
143
2018-19 Chavalivari Veedhi in Division No.49 7.40 AE-7

172 / Construction of C.C Road at Balakrishna Puram 1st Cross Road, 2nd Cross
144
2018-19 Road, 3rd Cross Road and 4th Cross Road in Division No.49 4.75 AE-7

173 / Construction of Culvert and Approaches at Nehru Nagar 3rd and 4th Lines in
145
2018-19 Division No.50 2.30 AE-7

174 / Construction of Sluice on Koppolu Major at S.S Tank-2 in Ongole Municipal


146
2018-19 Corporation 4.80 AE-8

Providing Figurative/Non-Figarative Art Work on walls over a double coats of


176 /
2018-19 Enamel paint at Anganwadi Schools, Public Toilets and Ramalayam Vaari 3.77
147 AE-4
Veedhi in Ongole Municipal Corporation
177 / Formation of Granular Sub-Base by using Quarry Spell in Various Places of
148
2018-19 Sub Division-2 area in Ongole Municipal Corporation 4.00 AE-8

178 / Desiltation of existing Drains in Dy.E.E-2 area in Ongole Municipal


149
2018-19 Corporation 3.11 AE-4

179 / Supply and delivery of Stationary Items and Computer Spare Parts to
150
2018-19 Engineering Section to Ongole Municipal Corporation 5.00 AE-8
TOTAL 1097.30
Download Start Time : 07.05.2018 5.00 P.M
Download End Time : 21.05.2018 5.00 P.M
Receipt of Bids End Time : 21.05.2018 5.15 P.M
Price Bid Opening Time : 21.05.2018 5.30 P.M
180 / Construction of School Building in Rajeev Gruha Kalpa area in Koppolu in
1 2018-19 10.00 AE-1
Division No.9
181 /
2 2018-19 Construction of School Building in Balaram Colony in Division No.3 10.00 AE-1

182 /
3 2018-19 Construction of School Building in Mother Theresa Colony in Division No.18 10.00 AE-8

TOTAL 30.00
Download Start Time : 08.05.2018 5.00 P.M
Download End Time : 16.05.2018 5.00 P.M
Receipt of Bids End Time : 16.05.2018 5.15 P.M
Price Bid Opening Time : 16.05.2018 5.30 P.M
Construction of 700 KL ELSR at Hindu Burial Ground at Srinivasa Hall Road in
183 /
1 2018-19 Ongole Municipal Corporation under 14th Finance Commission Grants 2016- 154.17
17
TOTAL 154.17
Download Start Time : 09.05.2018 5.00 P.M
Download End Time : 23.05.2018 5.00 P.M
Receipt of Bids End Time : 23.05.2018 5.15 P.M
Technical Bid Opening Time : 23.05.2018 5.30 P.M
Price Bid Opening Time : 23.05.2018 5.45 P.M
Supply and Fixinig of Electrical Items in Toilets in krishna yadav School and
184 /
2018-19 chinnamaleswara colony in Division Nos. 2 and 5 in Ongole Municipal 1.90
1 AE-1
Corporation
185 / Filling Tank and Cleaning of Mukthinuthalapadu and Gudimellapadu Cheruvu
2
2018-19 with (Current Motor and Oil Motor) in Division No.2 3.10 AE-1

186 / Construction of C.C Drain from Kondabathina Siddaiah house to


3
2018-19 Gudimellapadu Road in Division No.2 10.00 AE-1

187 / Construction of C.C Road from Dasu Anja Rao house to Hindu Burial Ground
4
2018-19 in Mukthinuthalapdu in Division No.2 (Reserved for L.C.C.S) 10.00 AE-1

188 / Construction of C.C Road from at existing C.C Road from B.C Colony to N.S.P
5
2018-19 Canal at Mukthinuthalapdu in Division No.2 10.00 AE-1

189 / Construction of Internal C.C Road and C.C Drain in Chakalipalem in


6
2018-19 Mukthinuthalapdu in Division No.2 10.00 AE-1

190 / Providing Quarry Rubbish Road from Agraharam Road to Hosanna Mandiram
7
2018-19 north side in Division No.16 7.20 AE-2

Construction of C.C Drain and Culverts from Anjaneya Swamy Statue To


191 /
2018-19 Pasumarthi Vemanatham House and from Matti Seshamma house to Gandi 9.98
8 AE-8
Yanadi house in Pelluru in Division No.17 (Reserved for L.C.C.S)

192 /
Construction of C.C Drain and Culverts from Sanniboina Srinivasulu house to
2018-19 NH-5 and from Pasumarthi Venu house to N.H-5 (right side of Anjaneya 9.98
9 AE-8
Swamy Statue) in Pelluru in Division No.17
Construction of C.C Drain and Culverts from Oosuri Srinu house to Gumadi
193 /
2018-19 Samrajayam house and from Sunkara Nageswar Rao house to N.H-5 in 9.98
10 AE-8
Pelluru in Division No.17

194 / Construction of C.C Drain and Culverts from Madduvari Chinna Malakondaiah
11
2018-19 house to M.P.P School in Pelluru in Division No.17 (Reserved for L.C.C.S) 9.98 AE-8

195 / Construction of C.C Drain and Culverts from M.M.P.P School to Sunkara
12
2018-19 Nageswara Rao house in Pelluru in Division No.17 9.20 AE-8

196 / Construction of C.C Drains and Culverts in Vengamukka Palem New S.C
13
2018-19 Colony in Division No.18 (Reserved for L.C.C.S) 9.98 AE-8

197 / Construction of C.C Drains and Culverts in Harijanavada Anganvadi School in


14
2018-19 Vengamukka Palem New S.C Colony in Division No.18 9.98 AE-8

198 / Providing C.C Road from Meda Balimi Prabhudasu house to Nattala Venkaiah
15
2018-19 house in Vengamukka Palem SC Colony in Division No.18 9.98 AE-8

199 / Laying of B.T Road from Existing Road to Kothamamidipalem Village in


16
2018-19 Division No.18 9.98 AE-8

200 / Providing C.C Drain from Shake Kondaiah house to Shake Nagur house in
17
2018-19 Cheruvukommupalem in Division No.18 (Reserved for L.C.C.S) 1.90 AE-8
201 / Filling and Levelling to Play Ground of B.C Employees Housing Board Society
18
2018-19 Colony near Pothuraju Palem in Division No.16 5.35 AE-2

202 /
2018-19 Construction of C.C Drain at Velugu Office Road in Division No:19 4.20
19 AE-8

203 / Construction of C.C Drain and Culvert from Bhagya Nagar 2nd Line to 4th Line
20
2018-19 1st Cross Road in Division No.20 9.90 AE-8

204 / Construction of C.C Drain from Bhagya Nagar 2nd Line Gorantla
21
2018-19 Chandrasekhar house to Bhagya Nagar 4th Line in Division No.20 9.20 AE-8

Construction of C.C Drain from Miriyala Sreenu house to Saikrishna Enclave


205 /
2018-19 and from Alla Venkateswarlu house to Sai Krishna Enclave in Bhagya Nagar 3.00
22 AE-8
2nd Line Park in Division No.20
206 / Construction of C.C Drain from Bhagyanagar 2nd Line Alla Venkateswarlu
23
2018-19 house to Bhagyanagar 4th Line in Division No.20 9.40 AE-8

207 / Providing C.C Road from Sk.Anjimunnisha house to Thummapudi Appa Rao
24
2018-19 house in Dharavari Thota (Mara Baavi Road) in Division No.20 9.85 AE-8

Construction of C.C Drain and Culverts from Kunchala Chalapathi house to


208 /
2018-19 Vengamabha Cooldrink Shop at Maruthi Apartment back side in Dharavari 9.98
25 AE-8
Thota in Division No.21 (Reserved for L.C.C.S)
209 / Providing Quarry Rubbish Road from Agraharam Road to New Byepass Road
26
2018-19 in Division No.16 6.50 AE-2

211 / Extension of 150 mm dia A.C Pipe Line from Church Compound to Yaswanth
27
2018-19 Nilayam at Pindimara Vedhi in Division No.21 2.80 AE-8

212 / Laying C.C Roads at Deavudu Cheruvu Park in Division No.21 (Reserved for
28
2018-19 L.C.C.S) 9.95 AE-8

Construction of C.C Drain and Culverts from C.R.P Quarters down Bhavya
213 /
2018-19 Chicken Center to Banka Anjamma house in Dharavarithota Main Road in 8.95
29 AE-8
Division No.21
214 / Providing P.V.C Pipe Line from M.Srinivasa Rao (Principal) house to existing
30
2018-19 Rajapanagal Main Road in Godugu Palem in Division No.28 1.75 AE-3

215 / Construction of C.C Road opposite to Meghana Nilayam (115.00 m to existing


31
2018-19 C.C Road) in Rajeev Nagar in Division NO.32 9.85 AE-3

216 / Construction of C.C Drain opposite to Meghana Nilayam Line in Rajeev Nagar
32
2018-19 in Division No.32 10.00 AE-3

217 / Constructin of C.C Drain and C.C Patch Work at Gaddalagunta (Marrichettu)
33
2018-19 in Division No.32 1.65 AE-3

218 / Construction of C.C Road at Gandla Venkateswarlu House in Gaddalagunta in


34
2018-19 Division No.32 (Reserved for L.C.C.S) 1.45 AE-3

219 / Providing Govardhana Giri Life Style Sculpture Work at Rajeev Nagar Park in
35
2018-19 Division No.34 6.45 AE-3

Construction of C.C Drain from Sidha Venkateswrlu gari house to D.No.36-72-


220 /
2018-19 302, Panchamuka Anjaneya Swamy Temple (beside old Andhra Bank) in 9.35
36 AE-3
Division No.35 (Reserved for L.C.C.S)
221 / Construction of C.C Drain from D.No.36-72-192 to existing M.M Road in
37
2018-19 Division No.36 10.00 AE-3

222 / Construction of C.C Drain from existing M.M Road beside Kalanikethan
38
2018-19 Showroom to Ayappa Swamy Temple Main Gate in Division No.36 7.75 AE-3
223 / Construction of C.C Drain from D.No.36-72-200 to D.No.36-72-205 in Division
39
2018-19 No.36 2.35 AE-3

224 / Construction of C.C Drain from Anjaiah Road to Nirmala Heights via G.S.R
40
2018-19 Hospital in Division No.36 6.75 AE-3

225 /
2018-19 Providing C.C Roads to Ashok Nagar 1st Line and 2nd Line in Division No.16 8.30
41 AE-2

226 / Construction of C.C road from Vijetha School to Anji Reddy house in Maruthi
42
2018-19 Nagar 2nd Line 1st Cross Road in Division No.44 9.35 AE-7

227 / Repairs and Rectfication of Leaks in 17, 18, 19, 20 and 21 Divisions in A.E-3
43
2018-19 Section in Ongole Municipal Corporation 5.00 AE-8

228 / Engaging of Labour for Digger Maintanance for Tree Plantation in Ongole
44
2018-19 Municipal Corporation 9.25 AE-2

229 / Supply of Outsourcing Workers for maintenance of Senior Stenographer for


45
2018-19 the year 2018-19 in Ongole Municipal Corporation (Reserved for L.C.C.S) 2.95 AE-3

230 / Repairs and Rectfication of Leaks in 28, 29 and 32 to 36 Divisions in Ongole


46
2018-19 Municipal Corporation 10.00 AE-3

231 / Construction of C.C Road from Kurnool Road to Pagidi Ramulu house in
47
2018-19 Samtha Nagar in Division No.38 7.00 AE-7

Construction of CC Road and C.C Drain from S.Sarojini house to


232 /
2018-19 A.Vasantharao house at Samtha Nagar Venkateswara Swamy Temple in 4.30
48 AE-7
Division No.38

233 / Construction of C.C Road from Ch.Prakash Rao house to G.Brahmareddy


49
2018-19 house in Samtha Nagar 2nd Cross Road in Division No.38 7.90 AE-7

234 / Construction of C.C Road and C.C Drain from K.Venkateswarlu house to
50
2018-19 G.Brahmareddy house in Division No.38 6.60 AE-7

235 / Construction of C.C Road from Divya Saisrinidhi Apartment to opposite Subba
51
2018-19 Rao house in Samtha Nagar in Division No.38 10.00 AE-7

236 / Construction of C.C Road from Sai Nagar 1st Line to towards south side in
52
2018-19 Samtha Nagar in Division No.38 9.95 AE-7

237 / Construction of CC Road from Mahalaksmamma Nagar 1st Line to towards


53
2018-19 south side in Samtha Nagar in Division No.38 (Reserved for L.C.C.S) 10.00 AE-7

Construction of C.C Road from Kotte Venkateswarlu houe to Rajya Lakshmi


238 /
2018-19 house in Samatha Nagar 1st Line and from K.Srinivasareddy house to 9.35
54 AE-7
SK.Basha house in Sai Nagar 1st Line in Division No.38
Construction of C.C Road from Gupatas Suare Apartment to A.Apparao house
239 /
2018-19 in Samatha Nagar and from Venkateswarlu house to Battina Venkateswrlu 8.40
55 AE-7
house in Mahalakshmi Nagar 1st Line in Division No.38
240 /
2018-19 Laying of Internal G.I Pipe Line in Kesava Swamy peta in Division No.27 9.05
56 AE-4

Laying of C.C Road and C.C Drain from Karula Padma house to Bruluhola
241 /
2018-19 Srinu house and from Chapiti Balakotaiah house to Dasari Padma house in 3.80
57 AE-1
Battulavari street in Division No.6 (3rd call)
242 / Laying of C.C Road and C.C Drain from Pasidi Nagarpamma Temple to
2018-19 Ayinabathinna Ramesh house in Abburuvari Veedhi in Division No.7 (3rd call) 6.70
58 AE-1

Providing C.C Road and C.C Drain from Jangila Jameeba house to Pandi
243 /
2018-19 Lumiyanraj house and from Nukathoti Kotamma house to Bank Vinod house 6.40
59 AE-2
in Kabadi Palem in Division No.13 (3rd call)
244 / Laying of 100 mm dia A.C Pipe Line and Culvert from Dharavarithota 6th line
60
2018-19 to Gavadhakatla Srinu House in Division No.20 (4th call) 4.15 AE-8

245 / Extension of 150 mm dia A.C Pipe Line from Church Compound to Yaswanth
61
2018-19 Nilayam at Pindimara Veedhi in Division No.21 (3rd call) 2.80 AE-8

Providing Quarry Spell Road and Culvert from Manda Bayata Kunta to
246 /
2018-19 Mandarapu Sivanarayana house in Kummari Colony in Pelluru in Division 3.50
62 AE-8
No.17 (2nd call) (Reserved for L.C.C.S)
247 / Construction of Watchman Room in Devudu Cheruvu Park in Division No.21
63
2018-19 (2nd call) 3.00 AE-5

248 / Conducting of Happy Sunday and Ananda Lahari Programmes at various


64
2018-19 places in Ongole Municipal Corporation 10.00 AE-7

TOTAL 467.32
Download Start Time : 14.05.2018 5.00 P.M
Download End Time : 30.05.2018 5.00 P.M
Receipt of Bids End Time : 30.05.2018 5.15 P.M
Price Bid Opening Time : 30.05.2018 5.30 P.M
249 /
1 2018-19 Desiltation of Drains in Division No.1 to 3 in Ongole Municipal Corporation 1.71 AE-1

250 /
2 2018-19 Desiltation of Drains in Division No.4 to 9 in Ongole Municipal Corporation 4.80 AE-1

251 /
3 2018-19 Desiltation of Drains in Division No.10 to 16 in Ongole Municipal Corporation 4.90 AE-2

252 /
4 2018-19 Desiltation of Drains in Division No.17 to 21 in Ongole Municipal Corporation 4.50 AE-3

253 /
5 2018-19 Desiltation of Drains in Division No.22 to 27 in Ongole Municipal Corporation 3.47 AE-4

254 / Desiltation of Drains in Division No.28, 29, 32-36 in Ongole Municipal


6 2018-19 Corporation 4.55 AE-5

255 /
7 2018-19 Desiltation of Drains in Division No.36 to 42 in Ongole Municipal Corporation 3.20 AE-6

256 /
8 2018-19 Desiltation of Drains in Division No.43 to 50 in Ongole Municipal Corporation 4.00 AE-7

257 / Construction of Compound Wall and Pheripheral Flooring to Anna Canteen at


9 2018-19 6.90 AE-3
Old RIMS in Division No.21
258 / Construction of Compound Wall for Anna Canteen and Widening of C.C Road
10 2018-19 at Power office in Division No.46 9.70 AE-7

259 / Supply and Fixing of Drones for Aerial Survey in Ongole Municipal
11 2018-19 Corporation 2.13 AE-5
260 / Desiltation of Closed Drains from Mangamooru Road RK Plaza to Pothuraju
12 2018-19 canal for One Year Maintainanace in Ongole Municipal Corporation 6.65 AE-6

261 /
13 2018-19 Repairs and Maintanance of Vehicles in Ongole Municipal Corporation 9.95 AE-7

262 / Drilling of Deep Bore Well and Fixing of IM-II Hand Pumpsets at various
14 2018-19 9.99 AE-6
places in Ongole Municipal Corporation
263 /
15 2018-19 Desiltation of Medium Drains in Ongole Municipal Corporation 9.50 AE-7

TOTAL 85.95
Download Start Time : 18.05.2018 5.00 P.M
Download End Time : 28.05.2018 5.00 P.M
Receipt of Bids End Time : 28.05.2018 5.15 P.M
Price Bid Opening Time : 28.05.2018 5.30 P.M
Construction of 700 KL ELSR at Hindu Burial Ground at Srinivasa Hall Road in
264/ 183 /
1 2018-19 Ongole Municipal Corporation under 14th Finance Commission Grants 2016- 154.17 2018
-19
17 (2nd call)
TOTAL 154.17
Download Start Time : 25.05.2018 5.00 P.M
Download End Time : 01.06.2018 5.00 P.M
Receipt of Bids End Time : 01.06.2018 5.15 P.M
Technical Bid Opening Time : 01.06.2018 5.30 P.M
Price Bid Opening Time : 01.06.2018 5.45 P.M
265 / Providing C.C Drain from Mini Bye Pass Road (Kalikamma Temple) to
1 2018-19 10.00 AE-1
Katavadhi Donka 7th Line in Division No. 7 (2nd call)
266 / Providing C.C Drain from Karavadhi donka 3rd Line to 5th Line in Division
2 2018-19 10.00 AE-1
No.7 (2nd call)
267 / Construction of C.C Drain and C.C Patch from Karavadi Donka 3rd cross Road
3 2018-19 2.65 AE-1
at Pathuri Sankar (H) (beside Ketelu Arch) in Division No.7
268 / Painting and Flooring to Ayina Bathina Ramaiah Municipal School in Division
4 2018-19 No.49 6.85 AE-7

Providing Mural Art Work with High Cement Embossing Art on the beams at
269 /
5 2018-19 Kurnool Road Fly Over (on north side) of Pillar face No.25 to 31 in Ongole 8.05 AE-7
municipal Corporation
Providing Mural Art Work with High Cement Embossing Art on the beams at
270 /
6 2018-19 Kurnool Road Fly Over (on north side) of Pillar face No.32 to 38 in Ongole 8.05 AE-7
municipal Corporation
271 / Providing Faculty for Skill Development Center at Nehru Nagar in Division
7 2018-19 4.85 AE-7
No.50 (Reserved for L.C.C.S)
Engaging of Unskilled Mazdoor for Maintanance of Park at
272 /
8 2018-19 Guthikondavaripalem Scientific Land Fill Site in Ongole Municipal 4.70 AE-7
Corporation (Reserved for L.C.C.S)
273 / Construction of Valve pits at Various Places in Division No.43 and 44 in
9 2018-19 Ongole Municipal Corporation 2.00 AE-7

274 / Providing Chain Link Mesh Fencing under Kurnool Road Fly Over on north
10 2018-19 side in Ongole municipal Corporation 6.05 AE-7
275 / Supply and Delivery of Wheeled Plastic Dust bins of 1100 Ltr Capacity to
11 2018-19 9.10 AE-7
Ongole Municipal Corporation
276 / Supply and Delivery of Wheeled Plastic Dust bins of 660 Ltr Capacity to
12 2018-19 9.65 AE-7
Ongole Municipal Corporation
277 / Hiring of Excavator for Removal of High Berms, Debris and Jungle Clearance
13 2018-19 1.80 AE-7
in A.E-7 section in Ongole Municipal Corporation
278 / Drilling of Horizental Anger by HDD Technology for laying of 100 mm dia
14 2018-19 H.D.P.E Pipe at Throvagunta S.C Colony in Division No.50 1.35 AE-7

279 / Providing Plantation and Water Sump at Guthikondavaripalem Scientific Land


15 2018-19 2.05 AE-7
Fill Site in Ongole Municipal Corporation
280 / Supply, Delivery and Fixing of Flexis in A.E-7 section in Ongole Municipal
16 2018-19 0.90 AE-7
Corporation
281 / Laying of Shoulders at Guthikondavaripalem Scientific Land Fill Site in Ongole
17 2018-19 5.15 AE-7
Municipal Corporation
282 / Construction of Incomplete B.T Road from Bheemavarapu Subba Rao house
18 2018-19 to Bestatu Church in Agraharam Road in Division No.16 6.55 AE-2

283 / Construction of C.C Drain from Agraharam Main Road to Yadala Kantha Rao
19 2018-19 6.90 AE-2
house in Division No.16
284 / Providing Storm Water Drain from Bestatu Church to Agraharam Road
20 2018-19 10.00 AE-2
turning in Division No.16
285 /
21 2018-19 Construction of Community Hall at Bunder Road in Division No.12 9.05 AE-2

286 / Construction of Compound Wall to Community Hall at Bunder Road in


22 2018-19 6.78 AE-2
Division No.12
287 / Providing Stainless Steel Railing under Kurnool Road Fly Over Island in
23 2018-19 2.80 AE-7
Division No.45
288 / Supply and Delivery of SFRC Man Hole Covers with Angular Frames in 1 to 50
24 2018-19 Divisions in Ongole Municipal Corporation 9.40 AE-2

Providing Track Lighting Arrangements to balance work of Ranga Rayudu


289 /
25 2018-19 Cheruvu from Sri Budha Statue (Diagram) to Gandhi Statue to Pump House in 6.75 AE-2
Ongole Municipal Corporation
TOTAL 151.43
Download Start Time : 25.05.2018 5.00 P.M
Download End Time : 07.06.2018 5.00 P.M
Receipt of Bids End Time : 07.06.2018 5.15 P.M
Price Bid Opening Time : 07.06.2018 5.30 P.M
Developmental Activities and Infrastructure Facilities for the year 2015-16 1035
290 / and 2016-17 - Construction of C.C Drain from existing culvert at N.H-5 along /
1 2018-19 93.85
eastern side of S.S Tank-1 in Yarajarla Road to Mamidipalem Burial Ground in 2017
-18
Ongole Municipal Corporation (2nd call)
291 /
2 2018-19 Dismantling of Old Sheds at P.V.R Girls High School in Division No.28 2.26 AE-3

292 / Providing Painting Work and Electrical Work at P.V.R Girls High School in
3 2018-19 8.92 AE-3
Division No.28
293 / Providing Painting from Sri Tanguturi Prakasam School (Godugu Palem) and
4 2018-19 Municipal Primary School Padamati Palem in Ongole Municipal Corporation 3.26 AE-3

294 /
5 2018-19 Supply of Stationary at Municipal Schools in Ongole Municipal Corporation 5.30 AE-3

295 / Construction of Damaged Compound Wall at Sri Sayyad Yadava Municipal


6 2018-19 9.90 AE-3
School in Division No.33
296 /
7 2018-19 Construction of Balance Community Hall in Bilal Nagar in Division No.3 10.00 AE-1

297 /
8 2018-19 Providing Amenities for Anganwadi Schools in Ongole Municipal Corporation 9.99 AE-3

298 /
9 2018-19 Construction of First Floor to Community Hall in Islampet in Division No.4 10.00 AE-1

299 /
10 2018-19 Providing Painting to D.R.R.M School in Division No.14 9.65 AE-2

300 /
11 2018-19 Providing Painting to Balaji Nagar Narayana Rao School in Division No.12 8.85 AE-2

TOTAL 171.98
Download Start Time : 08.06.2018 5.00 P.M
Download End Time : 18.06.2018 5.00 P.M
Receipt of Bids End Time : 18.06.2018 5.15 P.M
Technical Bid Opening Time : 18.06.2018 5.30 P.M
Price Bid Opening Time : 18.06.2018 5.45 P.M
Developmental Activities and Infrastructure Facilities for the year 2015-16
301 / and 2016-17 - Construction of C.C Drain from existing culvert at N.H-5 along
1 2018-19 eastern side of S.S Tank-1 in Yarajarla Road to Mamidipalem Burial Ground in 93.85
Ongole Municipal Corporation (3rd call)

302 / Construction of C.C Drain from Bodapati Venkateswarulu house to


2 2018-19 10.00 AE-1
Gudimellapadu Road in Division No.2 (2nd call)
303 / Construction of C.C Drain from Kamepalli Nageswararao house to Sivalayam
3 2018-19 9.70 AE-1
in Division No.2 (2nd call)
304 / Construction of C.C Drain from Dasu Venkatarao house to Panchayat Office in
4 2018-19 7.60 AE-1
Nargarpamma Bazar in Division No.2 (2nd call)

Construction of C.C Drain from beside Boddurayi to Valleti Venkateswarulu


305 /
5 2018-19 house and from Kammepalli Srinivasarao house to Malluri Sivaiah house in 7.35 AE-1
Muthinuthalapadu B.C Colony in Division No.2 (2nd call)

306 / Construction of C.C Drain from K.P Bus Stand upto Muslim Burial Ground in
6 2018-19 Division No.8 (2nd call) 7.40 AE-1

Providing C.C Drain from (Vijayadurga Theater) opposite Bundar Road to


307 /
7 2018-19 Anand Rao Road and C.C Drain from Jangala Sundaram house to Velchuri 9.80 AE-2
Kruparao house in Division No.13 (2nd call)
308 / Construction of C.C Drain at Dakshina Murthy Street in Division No.13 (2nd
8 2018-19 2.35 AE-2
call)
309 / Construction of C.C Drain both sides from Vijayadurga Theater to Mandiram
9 2018-19 7.25 AE-2
in Kabadipalem in Division No.13 (2nd call)

310 /
10 2018-19 Providing C.C Drain at Ungarala Veedhi Road in Division No.14 (2nd call) 9.00 AE-2

311 / Construction of C.C Drain from north side of Ramakurivaari Street in G.T
11 2018-19 9.60 AE-2
Road to Annavarappadu at Santhapeta in Division No.14 (2nd call)

312 / Providing C.C Storm Water Drain from Santhapeta Saibaba Temple to
12 2018-19 9.80 AE-2
Agraharam Railway Gate in Division No.14 (2nd call)
Providing C.C Road from Vinayakuni Bazar Road to Chavalavari Veedhi Road
313 /
13 2018-19 and DRRM High School Road (Panchayat Raj Office north side) and C.C Road 5.85 AE-2
in Division No.14 (2nd call)
314 / Providing C.C Road and Pre-cast Slabs at S.C Colony 1st Cross Road in
14 2018-19 4.80 AE-8
Vengamukkala Palem in Division No.18 (2nd call)

315 / Construction of C.C Drain and Culvert from Sai General Stores to Sairam Cool
15 2018-19 Drinks Shop in Housing Board Colony in Division No.19 (2nd call) 3.38 AE-8

Construction of one Side C.C Drain from M.V.R Water Plant to Mara Baavi
316 / Road in Dharavari Thota 4th Line, from Bhagya Nagar 1st Line to 4th line 2nd
16 2018-19 10.00 AE-8
Cross Road and from G.T Road to S.R.K Degree College (D.No.2-42-168 to 26-
42-161) in Bhagya Nagar 1st Line in Division No.20 (2nd call)

Laying of 100 mm dia A.C Pipe Line from Kunchala Chalapathi house to
317 /
17 2018-19 Vengamamba Cool Drink Shop at Maruthi Apartment back side in Dharavari 3.35 AE-8
Thota in Division No.21 (2nd call)
318 / Construction of C.C Drain from Nallaiah Rice Mill to Muneer Chicken Center
18 2018-19 1.05 AE-4
in Division No.23 (2nd call)

319 / Providing C.C Drain in Gandhi Road From Potti Sri Ramulu Statue to Trunk
19 2018-19 7.50 AE-4
Road in Division No.23 (2nd call)

320 / Providing C.C Drain at Ganuga Palem Main Road north side Division No.23
20 2018-19 5.65 AE-4
(2nd call)
Providing C.C Drain from Hindhusthan Hotel to Ramalayam and from Kota
321 /
21 2018-19 Veedhi east to west Abdulla House to Old Market Road in Division No.23 1.65 AE-4
(2nd call)
322 / Providing C.C Drain from Indira Gandhi Statue Road to Subba Rao Hospital
22 2018-19 6.40 AE-4
Road in Division No.25 (2nd call)
323 / Construction of C.C Drain from Vinayaka Swamy Temple to Bujjamma Kottu
23 2018-19 9.10 AE-4
in Division No.27 (2nd call)
324 / Construction of C.C Culverts at Kothapeta 1st Line, 2nd Line, Hareram Bazar
24 2018-19 3.15 AE-5
and Jammichettu Veedhi in Division No.28 (2nd call)
325 / Repairs and Rectification of C.C Road and C.C Drain at Rajapanagal Road in
25 2018-19 9.10 AE-3
Division No.29 (2nd call)
Construction of C.C Road and C.C Drain (Road Encroachment) From
326 /
26 2018-19 T.Nageswara Rao house to Rambabu house in R.T.C Colony in Division No.33 2.65 AE-5
(2nd call)
327 / Construction of C.C Drain from existing C.C Road to M.M Road
27 2018-19 6.65 AE-5
(Vaddevanikunta 1st Line) in Division No.33 (2nd call)

Construction of C.C Drain at SundharNagar 2nd Line Byepass to Existing C.C


328 /
28 2018-19 Culvert (Chiditoti Jeevan Nilayam) and Construction of C.C Drain and Culverts 8.00 AE-3
from at Senkar Narayana Kalyana Mandapam Line in Division No.36 (2nd call)

329 / Providing C.C Drains in Sujatha Nagar 4th Line both sides in Division No.37
29 2018-19 (2nd call) 8.55 AE-6

330 / Construction of Compound Wall to Chinthagunta Burial ground in Pernamitta


30 2018-19 in Division No.42 (2nd call) 10.00 AE-6

331 / Construction of Room in Chinthagunta Burial Ground in Pernamitta in


31 2018-19 Division No.42 (2nd call) 4.85 AE-6

Construction of C.C Drain and C.C Road from S.Krishna Reddy house to
332 /
32 2018-19 Anjaneya Swamy Temple in Maruthi Nagar 2nd Line in Division No.44 (2nd 4.90 AE-7
call)

Construction of C.C Drains at Sundaraiah Bhavan Road from Chandamama


333 / Children Hospital to Srija Opticlas and C.C Road and C.C Drain at Lambadi
33 2018-19 6.20 AE-7
Donka from Rayapati Prasada Rao house to Aluri Swarna house in Division
No.46 (2nd call)

Construction of C.C Drain from Chandraiah Nagar Community Hall to 60' Feet
334 /
34 2018-19 Road and from D.Ramarao house to M.Venka reddy house in Chanadraiah 8.65 AE-7
Nagar Main Road in Division No.48 (2nd call)
335 / Construction of C.C Drain from Ch.Bala Kondaiah house to V.Subbararo
35 2018-19 8.65 AE-7
house in Dibbala Road on east side in Division No.48 (2nd call)
Construction of C.C Drain from Devarapu Rama Kotaiah house to Sk.Kadarvali
336 /
36 2018-19 house in Pedda Yadavala Bazar opposite Road and south side of Sai Public 4.75 AE-7
School in Division No.49 (2nd call)
337 / Construction of C.C Drain from G.Nageswararao house to 60' Feet Road in
37 2018-19 7.40 AE-7
Chavalivari Veedhi in Division No.49 (2nd call)

338 / Construction of C.C Road at Balakrishna Puram 1st Cross Road, 2nd Cross
38 2018-19 Road, 3rd Cross Road and 4th Cross Road in Division No.49 (2nd call) 4.75 AE-7

339 / Construction of Culvert and Approaches at Nehru Nagar 3rd and 4th Lines in
39 2018-19 2.30 AE-7
Division No.50 (2nd call)
340 / Extension of 150 mm dia A.C Pipe Line from Church Compound to Yaswanth
40 2018-19 Nilayam at Pindimara Vedhi in Division No.21 (2nd call) 2.80 AE-8

341 / Construction of C.C Drain from D.No.36-72-200 to D.No.36-72-205 in Division


41 2018-19 No.36 (2nd call) 2.35 AE-3

342 / Construction of Valve pits at Various Places in Division No.43 and 44 in


42 2018-19 Ongole Municipal Corporation (2nd call) 2.00 AE-7
343 / Providing Chain Link Mesh Fencing under Kurnool Road Fly Over on north
43 2018-19 6.05 AE-7
side in Ongole municipal Corporation (2nd call)
Laying of C.C Road and C.C Drain from Karula Padma house to Bruluhola
344 /
44 2018-19 Srinu house and from Chapiti Balakotaiah house to Dasari Padma house in 3.80 AE-1
Battulavari street in Division No.6 (4th call)

345 /
Providing C.C Road and C.C Drain from Jangila Jameeba house to Pandi
45 2018-19 Lumiyanraj house and from Nukathoti Kotamma house to Bank Vinod house 6.40 AE-2
in Kabadi Palem in Division No.13 (4th call)

346 / Laying of 100 mm dia A.C Pipe Line and Culvert from Dharavarithota 6th line
46 2018-19 4.15 AE-8
to Gavadhakatla Srinu House in Division No.20 (5th call)
347 / Extension of 150 mm dia A.C Pipe Line from Church Compound to Yaswanth
47 2018-19 2.80 AE-8
Nilayam at Pindimara Veedhi in Division No.21 (4th call)

Supply, Delivery and Fixing of Elecrtical Items and Sanitary Items to Teachers
348 /
48 2018-19 Toilet Rooms, Children Toilet Rooms Water supply, Drinking Water, Urinals 2.61 AE-4
and Wash Basins At A.F.C School in Ongole Municipal Corporation

349 / Arrangement of Fiber Doors for Toilets at New Vegetable Market, Ghat Road-
49 2018-19 1.00 AE-4
2 and Vaddepalem in Ongole Municipal Corporation
Supply, Delivery and Fixing of Electrical Items and Water Supply Bore and
350 /
50 2018-19 Motor Supply in E-Toilets in Kottapatanm Bus Stand Fly Over, Kurnool Road 5.20 AE-4
and R.T.C Bus Stand in Ongole Municipal Corporation
Supply, Delivery and Fixing of Electrical Items and Water Supply Bore and
351 /
51 2018-19 Motor Supply in E-Toilets in Kottapatanm Bus Stand Fly Over, Kurnool Road 2.95 AE-4
and R.T.C Bus Stand in Ongole Municipal Corporation
352 / Providing 500 Litrs per hour R.O Purifier System in A.F.C School Staff and
52 2018-19 Childrens Room with Solar System in Ongole Municipal Corporation 2.80 AE-4

353 / Repairs and Painting to Ram Nagar 2nd Line Municipal High School in Division
53 2018-19 No.15 9.35 AE-2

354 /
54 2018-19 Repairs and Painting to Santhapeta Elementry School in Division No.15 9.75 AE-2

355 / Widening of Balance C.C Road at 60 Feet Road (near Pothuraju Canal) in
55 2018-19 0.80 AE-7
Division No.48

Laying of Quarry Spell Road at Amulya Apartment north side road, Srinivasa
356 / Colony West side 3rd C/R and 2nd C/R and C.C Drain Virat Nagar Main Road
56 2018-19 Eswaramma (H) to Subramanyam (H), Amulya Apartment north side Road 3.55 AE-7
and Srinivasa Colony west side 2nd C/R in Division No.43

Construction of Flooring and Parking Shed in the premises of Water Supply


357 /
57 2018-19 Scheme at 3.15 MGD Filtration Plant Compound in Ongole Municipal 10.00 AE-4
Corporation

358 / Arrangements of Flex Printing, Iron Frames, Fixing Flex Printing Branding and
58 2018-19 9.00 AE-4
Fixing and Vinyle Stickers, Glow Sign Board in Ongole Municipal Corporation

359 / Construction of Balance Community Toilets Work in Ongole Municipal


59 2018-19 Corporation 8.75 AE-4
TOTAL 439.09
Download Start Time : 19.06.2018 5.00 P.M
Download End Time : 29.06.2018 5.00 P.M
Receipt of Bids End Time : 29.06.2018 5.15 P.M
Price Bid Opening Time : 29.06.2018 5.30 P.M
Construction of 700 KL ELSR at Hindu Burial Ground at Srinivasa Hall Road in
360 / 264/
1 2018-19 Ongole Municipal Corporation under 14th Finance Commission Grants 2016- 154.17 2018
-19
17 (3rd call)
361 / Construction of C.C Drain from Lakshmi Fertilisers Shop to Pothuraju Canal in
2 2018-19 10.00 AE-1
Guntur Road in Division No.3
362 / Construction of C.C Drain from Janatha Medical Shop to Papa Complex in
3 2018-19 Guntur Road in Division No.3 10.00 AE-1

363 / Construction of C.C Drain from Papa Complex to Lakshmi Fertilisers Shop in
4 2018-19 10.00 AE-1
Guntur Road in Division No.3

Providing Asian Apex Exterior Emulsion Wall Painting for Dividers at Church
364 /
5 2018-19 Center to State bank and Magunta Subbarami Reddy statue to Railway 5.50 AE-2
station for concept of poster free city in Ongole Municipal Corporation

365 / Providing Abstract/Geometrical/patterns Art/Nature Art Work on walls with


6 2018-19 1.25 AE-2
Professional Artists at Anganwadi Schools in Ongole Municipal Corporation

366 / Laying of H.D.P.E Pipe Line and Repairs to Water Supply Taps in Uppara
7 2018-19 2.70 AE-4
Nagaiagih Street and C.R.P.F Quarters area in Ongole Municipal Corporation

367 /
8 2018-19 Providing C.C Road and C.C Drain at Red Cross Office area in Division No.24 9.90 AE-4

368 /
9 2018-19 Providing CC Drain at C.R.P.F Quarters Down Right Side in Division No.31 4.00 AE-4

369 /
10 2018-19 Construction of Galvalume Shed in New Fish Market in Division No.24 4.35 AE-4

370 / Laying of Internal G.I Pipe Line opposite Jakraiah Hospital area in Division
11 2018-19 No.27 0.95 AE-4

371 /
12 2018-19 Providing balance C.C Road at Bandlamitta Ceneter in Division No.24 3.42 AE-4

372 / Providing C.C Drain from Subbarami Reddy Statue to Samaikyatha Nagar
13 2018-19 10.00 AE-4
Road in Division No.24
373 / Providing C.C Drain from Fish Market Road to Samaikyatha Nagar Road in
14 2018-19 10.00 AE-4
Division No.24
374 / Providing C.C Road infront of Sri Malladi Enclave in Pardha Saradi Nagar at
15 2018-19 Ramachandra Mission Asramam in Division No.40 10.00 AE-6

375 / Construction of Watchman Shed and Filling of Gravel at Dibbala Road E.L.S.R
16 2018-19 7.10 AE-7
in Division No.48
376 / Construction of C.C Road at Skill Upgradation Centre Road and Nehru Nagar
17 2018-19 9.90 AE-7
Extension 2nd Cross Road in Division No.50
377 / Construction of Storm Water Drain from Pothuraju Canal Bridge to Nehru
18 2018-19 9.80 AE-7
Nagar 1st Line in Division No.50
378 / Supply and Delivery of M.S Push Carts for 26 to 50 Divisions in Ongole
19 2018-19 9.90 AE-7
Municipal Corporation
379 / Supply and Delivery of M.S Push Carts for 1 to 25 Divisions in Ongole
20 2018-19 9.90 AE-7
Municipal Corporation
380 / Providing 3 HP Motor Fixing and Water Pumping from N.S.P Canal
21 2018-19 1.40 AE-8
(Mangamooru) to Kothamamidi Palem Tank in Division No.18
381 / Laying of B.T patches at various locations in Division Nos.17 to 21 in Ongole
22 2018-19 Municipal Corporation 6.85 AE-8

382 / Providing C.C Storm Water Drain from Santhapeta Saibaba Temple to
23 2018-19 9.80 AE-2
Agraharam Railway Gate in Division No.14 (3rd call)
Providing C.C Road and C.C Drain from Jangila Jameeba house to Pandi
383 /
24 2018-19 Lumiyanraj house and from Nukathoti Kotamma house to Bank Vinod house 6.40 AE-2
in Kabadi Palem in Division No.13 (5th call)
Construction of C.C Drain, Culvert and Pre-Cost Slabs from Anna Canteen to
384 /
25 2018-19 Sri Raghavendhara Book Depot along Old RIMS Compound Wall in Division 9.98 AE-8
No.21
385 / Providing Foot path from Collectors Bunglow Road of Church center to Red
26 2018-19 Cross Building Road in Division No.13 10.00 AE-2

TOTAL 337.27
Download Start Time : 02.07.2018 5.00 P.M
Download End Time : 16.07.2018 5.00 P.M
Receipt of Bids End Time : 16.07.2018 5.15 P.M
Technical Bid Opening Time : 16.07.2018 5.30 P.M
Price Bid Opening Time : 16.07.2018 5.45 P.M
386 / Laying of 100 mm dia A.C Pipe Line at C.R.P Quarters Down Left Side Road in
1 2018-19 Division No.31 3.55 AE-4

387 / Providing C.C Road from Anjaneya Swamy Temple to V.Venkat Rao house at
2 2018-19 9.35 AE-4
C.R.P.F Quarters down area in Division No.31
388 / Providing Internal C.C Roads at Various Places in C.R.P.F Quarters Down Left
3 2018-19 6.75 AE-4
Side Area (T. Srinivasulu house to V.Vinod House) in Division No.31

Providing Internal C.C Drains at various places In C.R.P.F Quarters Down Left
389 /
4 2018-19 Side (T. Srinivasulu house to V.Vinod house, M.Gangadhar house to Sk.Chand 7.15 AE-4
house, T. Srinivasulu house to Roosevelt Building) in Division No.31

390 / Repairs to Well at Uppara Nagaiah Bazar and Toilet Repair At New Market
5 2018-19 Fruits Wing in Ongole Municipal Corporation 0.90 AE-4

TOTAL 27.70
Download Start Time : 07.07.2018 5.00 P.M
Download End Time : 17.07.2018 5.00 P.M
Receipt of Bids End Time : 17.07.2018 5.15 P.M
Price Bid Opening Time : 17.07.2018 5.30 P.M
Providing incomplete Stainless Steel Grill and Granite for beautification of
391 /
1 2018-19 Dr.B.r Ambedhkar statue Pylon opposite H.C.M College in Ongole Municipal 1.50 AE-2
Corporation
392 / Providing Park Compound wall Fenshing at Aishwarya Nagar 7 Buildings east
2 2018-19 2.10 AE-3
side Park in Division No.36
393 / Maintenance of Water Supply Scheme Submersible Motors in Pernamitta in
3 2018-19 6.60 AE-6
Division No.39
394 / Construction of Gym Platform and Roofing in Chenna Kesava Swamy Layout
4 2018-19 10.00 AE-6
Park in Division No.37
395 / Construction of Watchman Room and Toilets in Chennakesavaswamy Park in
5 2018-19 Division No.37 7.10 AE-6

396 / Construction of Storm Water Drain from Zubedha Mosque at Nehru Nagar
6 2018-19 9.80 AE-7
3rd Line to Nehru Nagar 1st Line in Division No.50

397 / Laying of Quarry Spell Road at Guthikondavari Palem Scientific Land fill site
7 2018-19 6.65 AE-7
from Survey No.105 to 104 in Koppolu in Ongole Municipal Corporation

398 / Construction of Storm Water Drain from Pothuraju Canal Bridge to Nehru
8 2018-19 9.80 AE-7
Nagar 1st Line in Division No.50 (2nd call)

399 / Repairs to Well at Uppara Nagaiah Bazar and Toilet Repair At New Market
9 2018-19 0.90 AE-4
Fruits Wing in Ongole Municipal Corporation (2nd call)
TOTAL 54.45
Download Start Time : 17.07.2018 5.00 P.M
Download End Time : 24.07.2018 5.00 P.M
Receipt of Bids End Time : 24.07.2018 5.15 P.M
Price Bid Opening Time : 24.07.2018 5.30 P.M
Developmental Activities and Infrastructure Facilities for the year 2015-16
400 / and 2016-17 - Providing Foot Paths and Construction of Drain to West Side of
1 2018-19 129.99
Road from R.D.O Office to South Byepass Road in Ongole Municipal
Corporation

401 / Laying of 100 mm dia A.C Pipe Line and Inter Connections from Vaka Ramesh
2 2018-19 2.25 AE-1
house to A.Ratnamma house and at Pragna School Line Road in Division No.6

402 / Construction of C.C Road from Kakinada Mohan Rao house to Kavali Suresh
3 2018-19 10.00 AE-1
house (beside Park) in Rajiv Gruha Kalpa in Division No.9
403 / Construction of C.C Road from Annapureddy Soujanya houe to Mettu
4 2018-19 Sukanya house in Kesavarajukunta in Division No.2 9.90 AE-1

Construction of C.C Road and C.C Drain from Thirupathamma Temple to


404 /
5 2018-19 Ravulapali Venkateswarlu house in 60 Feet Road and to Chapala Bazar in 10.00 AE-1
Division No.5
405 / Construction of C.C Drain and Culvert from Chennareddy Koteswara Rao site
6 2018-19 10.00 AE-1
to Damacharla Subbarao house in Division.No. 7
406 / Construction of C.C Drain and Culvert from D.Subba Rao house to Karavadi
7 2018-19 10.00 AE-1
Donka 4th Line in Division No.7
407 / Construction of C.C Road and C.C Drain from Kammapalem 3rd Line
8 2018-19 7.40 AE-1
Extention 1st and 2nd Cross Road in Division No.7
408 / Construction of C.C Road and C.C Drain from west side of Old Age Home to
9 2018-19 D.No.27-45-1882 in Kammapalem Extension in Division No.7 10.00 AE-1
409 / Construction of C.C Road and C.C Drain from widening at 60" Feet Road in
10 2018-19 9.70 AE-1
Division No.7
410 / Construction of C.C Road and Widening from D.No.21-30-129 to D.No.21-30-
11 2018-19 10.00 AE-1
114 in Kammapalem Main Road in Division No.7
411 / Construction of C.C Road and Widening from D.No.21-30-114 to Pasidi
12 2018-19 10.00 AE-1
Nagarpamma Temple in Kammapalem Main Road in Division No.7
412 / Construction of C.C Drain to North Side Cross Roads in N. Agraharam in
13 2018-19 Division No.10 9.90 AE-2

413 / Construction of C.C Drain from Nallamalapu Ankireddy house to Ramalayam


14 2018-19 10.00 AE-2
Street in N. Agraharam in Division No.10
Construction of C.C Drain from Chityala Hanumareddy house to Agraharam
414 /
15 2018-19 Main Road and from Sunkara Padmavathi house to back side of Panchayath 9.50 AE-2
Office in N. Agraharam in Division No.10
415 / Laying of 150 mm dia A.C Pipe Line from Miriyala Palem Center to
16 2018-19 5.65 AE-2
Vijayadurga Hall Center in Division No.12
416 / Construction of C.C Drain from Ramalayam to Gemidi Raayi in N.Agraharam
17 2018-19 7.25 AE-2
in Division No.10
417 / Construction of C.C Drain from Sunkara Padmavathi house to Gemidi Raayi in
18 2018-19 N.Agraharam in Division No.10 5.75 AE-2

418 / Construction of C.C Drain from Gundala Rosaiah house to Pond and from
19 2018-19 Venkareddy house to Kata Surareddy house in N.Agraharam in Division No.10 9.85
AE-2

419 / Construction of C.C Drain and C.C Road from Chakiri Maruthi kumar house to
20 2018-19 3.20 AE-2
towards Ananda Rao Road Junction in Division No.13

420 / Construction of C.C Drain and C.C Road from Anantha Mallikarjuna house
21 2018-19 9.35 AE-2
towards back side of Saradha Balakutir to Ananda Rao Road in Division No.13

421 / Repairs to existing Culverts and Levelling Site at Various Places in Division
22 2018-19 0.87 AE-4
No.22
422 / Providing balance C.C Drain (Bit-3) from Vadde Palem in Uracheruvu to
23 2018-19 Culvert at New Addanki Bus Stand Reservoir in Division No.24 8.98 AE-4

423 / Providing C.C Drain at C.R.P.F Quarters Down Right Side (opp. Vijayalakshmi
24 2018-19 4.10 AE-4
house line) in Division No.31
424 /
25 2018-19 Laying P.V.C Pipe Line at C.R.P.F Quarters Down Right Side in Division No.31 2.15 AE-4

Providing C.C Drain from Nagendra Nagar temple to Kendriya Vidyalayam


425 /
26 2018-19 Out Gate, at Swarna Venkateswarlu hosue and from Ramanamma house to 8.95 AE-4
Mangala Palem Main Road in Division No.24
426 /
27 2018-19 Repairs to Water Supply Taps in New Fish Market area in Division No.24 3.65 AE-4

Providing Figurative/Non figurative/Stencils/Letter Writing/Art Work on walls


427 /
28 2018-19 over a double coats of Enamel paint at Bandlamitta, Kurnool Road, Bapuji 10.00 AE-4
Complex area, Old Market area in Ongole Municipal Corporation
Providing Abstract/Geometrical/patterns Art/Nature Art Work on walls with
428 /
29 2018-19 Professional Artists at Anganwadi Schools and New Vegetable Market area 5.32 AE-4
Dividers in Ongole Municipal Corporation
429 / Providing C.C Roads for Main Road and 1st Line in Police Colony near Ongole
30 2018-19 9.95 AE-6
Minor in Pernamitta in Division No.40
430 / Providing C.C Drain from Samatha Nagar Main Road to J.Gopal Rao house in
31 2018-19 7.35 AE-6
Samatha Nagar 8th Line in Division No.37
431 / Providing C.C Drain from J.Gopal Rao house to Samatha Nagar 3rd Line in
32 2018-19 4.35 AE-6
Division No.37
432 /
33 2018-19 Providing C.C Drains both sides in Sivaji Nagar 4th Line in Division No.37 7.85 AE-6

433 / Development of Greenary at Kurnool Road Flyover South Side 2nd bit in
34 2018-19 10.00 AE-7
Ongole Municipal Corporation
434 / Formation of Quarry Spell Road from A1 Function Hall in Guntur Road to
35 2018-19 3.05 AE-7
National Highway in Division No.50
Providing Abstract/Geometrical/Patterns Art/Nature Art Work on Divider
435 /
36 2018-19 Walls with Professional Artists at Kurnool Road Divider from Flyover to R.T.C 9.95 AE-7
Bus Stand Junction in Ongole Municipal Corporation
Providing Abstract/Geometrical/Patterns Art/Nature Art Work on walls with
436 /
37 2018-19 Professional Artists at Old Guntur Road Divider in Ongole Municipal 10.00 AE-7
Corporation
437 / Laying of Quarry Rubbish Road from Sriram School to R.S Rao house in
38 2018-19 Division No.44 1.90 AE-7

438 /
39 2018-19 Laying of 100 mm dia A.C Pipe Line in RIMS Hospital in Division No.19 3.45 AE-8

439 / Construction of C.C Drain and Culvert from S.C Hostel to S.S Tank-I in Mamidi
40 2018-19 8.95 AE-8
Palem in Division No.19
440 / Supplying and Laying of 3/8" Turffed Synthetic Royal Grass and 2 HP Mortar
41 2018-19 in Bhagya Nagar 2nd Line Park in Division No.20 5.55 AE-8

441 / Construction of C.C Drain from K.P Bus Stand upto Muslim Burial Ground in
42 2018-19 7.40 AE-1
Division No.8 (3rd call)
Providing C.C Drain from (Vijayadurga Theater) opposite Bundar Road to
442 /
43 2018-19 Anand Rao Road and C.C Drain from Jangala Sundaram house to Velchuri 9.80 AE-2
Kruparao house in Division No.13 (3rd call)
443 / Construction of C.C Drain both sides from Vijayadurga Theater to Mandiram
44 2018-19 7.25 AE-2
in Kabadipalem in Division No.13 (3rd call)
444 /
45 2018-19 Providing C.C Drain at Ungarala Veedhi Road in Division No.14 (3rd call) 9.00 AE-2

Construction of one Side C.C Drain from M.V.R Water Plant to Mara Baavi
445 / Road in Dharavari Thota 4th Line, from Bhagya Nagar 1st Line to 4th line 2nd
46 2018-19 10.00 AE-8
Cross Road and from G.T Road to S.R.K Degree College (D.No.2-42-168 to 26-
42-161) in Bhagya Nagar 1st Line in Division No.20 (3rd call)

446 / Construction of C.C Drain from Nallaiah Rice Mill to Muneer Chicken Center
47 2018-19 in Division No.23 (3rd call) 1.05 AE-4

447 / Construction of C.C Culverts at Kothapeta 1st Line, 2nd Line, Hareram Bazar
48 2018-19 and Jammichettu Veedhi in Division No.28 (3rd call) 3.15 AE-5

448 / Repairs and Rectification of C.C Road and C.C Drain at Rajapanagal Road in
49 2018-19 Division No.29 (3rd call) 9.10 AE-3
449 / Construction of C.C Road and C.C Drain from T.Nageswara Rao house to
50 2018-19 2.65 AE-5
Rambabu house in R.T.C Colony in Division No.33 (3rd call)

450 / Construction of C.C Road at Balakrishna Puram 1st Cross Road, 2nd Cross
51 2018-19 Road, 3rd Cross Road and 4th Cross Road in Division No.49 (3rd call) 4.75 AE-7

451 / Construction of Culvert and Approaches at Nehru Nagar 3rd and 4th Lines in
52 2018-19 2.30 AE-7
Division No.50 (3rd call)

452 / Providing C.C Storm Water Drain from Santhapeta Saibaba Temple to
53 2018-19 9.80 AE-2
Agraharam Railway Gate in Division No.14 (4th call)
Laying of C.C Road and C.C Drain from Karula Padma house to Bruluhola
453 /
54 2018-19 Srinu house and from Chapiti Balakotaiah house to Dasari Padma house in 3.80 AE-1
Battulavari street in Division No.6 (5th call)
TOTAL 506.11
Download Start Time : 28.07.2018 5.00 P.M
Download End Time : 13.08.2018 5.00 P.M
Receipt of Bids End Time : 13.08.2018 5.15 P.M
Technical Bid Opening Time : 13.08.2018 5.30 P.M
Price Bid Opening Time : 13.08.2018 5.45 P.M
454 / Supply and Delivery of Wheeled Plastic Dust Bins of 1000 Ltr capatity to
1 2018-19 50.00
Ongole Municipal Corporation
455 / Supply and Fixing of Electrical Items for Smart Digital Class Rooms in
2 2018-19 1.50 AE-4
Municipal Schools in Ongole Municipal Corporation
456 / Construction of balance C.C Drain from Penapamula Gudi Center to towards
3 2018-19 2.70 AE-4
Goda Sadan house in Division No.30
Providing Electrification to Skill Upgradation Center in Division No.50 and to
457 /
4 2018-19 Ayinabattina Ramaiah Municipal School in Division No.49 in Ongole 5.00 AE-7
Municipal Corporation
458 /
5 2018-19 Providing Furniture for Anganwadi Schools in Ongole Municipal Corporation 9.50 AE-3

459 / Supply and Delivery of Customer Feed Back Machine with G.S.M for
6 2018-19 3.60 AE-4
Community Toilets at various places in Ongole Municipal Corporation
TOTAL 72.30
Download Start Time : 02.08.2018 5.00 P.M
Download End Time : 16.08.2018 5.00 P.M
Receipt of Bids End Time : 16.08.2018 5.15 P.M
Price Bid Opening Time : 16.08.2018 5.30 P.M
460 / Providing Interconnections for improving Water Supply in Throvagunta S.C
1 2018-19 7.00 AE-1
Colony in Division No.1 under S.C.C Grant
461 / Construction of Internal C.C Drains and Culverts in Throvagunta S.C area in
2 2018-19 30.00 AE-1
Division No.1 under S.C.C Grant
462 / Construction of C.C Roads in Throvagunta S.C area in Division No.1 under
3 2018-19 S.C.C Grant 30.00 AE-1

463 / Providing Internal C.C Drains in Mukthinuthalapadu S.C Colony in Division


4 2018-19 36.00 AE-1
No.2 under S.C.C Grant
464 / Construction of C.C Roads in Mukthinuthapadu S.C Colony in Division No.2
5 2018-19 20.00 AE-1
under S.C.C Grant
465 / Construction of C.C Roads in Gudimellapadu S.C Colony in Division No.2
6 2018-19 15.00 AE-1
under S.C.C Grant
466 / Construction of Internal C.C Roads and Drains in Neelayapalem S.C Colony in
7 2018-19 10.00 AE-1
Division No.6 under S.C.C Grant
467 / Construction of Internal C.C Drains and Culverts in Thurpu Christian Palem
8 2018-19 S.C Colony in Division No.8 under S.C.C Grant 10.00 AE-1

468 / Construction of Internal Roads in Thurpu Christian Palem near Pothuraju


9 2018-19 10.00 AE-1
Canal in Division No.8 under S.C.C Grant
469 / Construction of C.C Roads in Pulivenkata Reddy Colony in Division No.9
10 2018-19 30.00 AE-1
under S.C.C Grant
470 / Construction of C.C Roads in Indira Colony S.C area in Division No.9 under
11 2018-19 25.00 AE-1
S.C.C Grant
471 / Laying of Water Supply Pipe Line in Koppolu S.C Colony in Division No.10
12 2018-19 under S.C.C Grant 25.00 AE-2

472 / Construction of Internal C.C Drains in Gandhi Nagar S.C Colony in Koppolu in
13 2018-19 15.00 AE-2
Division No.10 under S.C.C Grant
473 / Construction of Internal C.C Drains in Old S.C Colony in Division No.10 under
14 2018-19 15.00 AE-2
S.C.C Grant
474 / Providing Internal C.C Drains in Gurram Jashuva Colony S.C area in Division
15 2018-19 40.00 AE-2
No.10 under S.C.C Grant
475 / Providing C.C Road from O.K Road to Gurram Jashuva Colony S.C area in
16 2018-19 Division No.10 under S.C.C Grant 30.00 AE-2

476 / Construction of C.C Roads in New S.C Colony in Koppolu in Division No.10
17 2018-19 18.00 AE-2
under S.C.C Grant
477 / Construction of Internal C.C Drains in Cloughpet S.C area in Division No.11
18 2018-19 under S.C.C Grant 15.00 AE-2

478 / Construction of Internal C.C Drains in Railpeta S.C area in Division No.11
19 2018-19 10.00 AE-2
under S.C.C Grant
479 / Construction of C.C Roads in Cloughpet S.C Colony in Division No.11 under
20 2018-19 30.00 AE-2
S.C.C Grant
480 / Providing Central Divider and Plantation from Cloughpet Junction to Railpeta
21 2018-19 20.00 AE-2
Junction in S.C area in Division No.11 under S.C.C Grant
481 / Providing Central Lighting from Cloughpet to Railpeta Junction in S.C area in
22 2018-19 Division No.12 under S.C.C Grant 25.00 AE-2

483 / Construction of Internal C.C Drains in Balaji Nagar S.C area in Division No.16
23 2018-19 15.00 AE-2
under S.C.C Grant
Construction of Storm Water Drain from Batasthu Mandiram to N.S.P Canal
484 /
24 2018-19 in Battulavarikunta S.C area in Agraharam Road in Division No.16 under S.C.C 35.00 AE-2
Grant

Construction of C.C Road from Perugu Jyothi house to Pendyala Lakshmi


485 / house, from Kotapati Koterswarao house to Thupakula Chittema house and
25 2018-19 from Dasari Ramulamma house to Chanda house in Balaji Nagar S.C Colony in 10.00 AE-2
Division No.16 under S.C.C Grant
486 / Providing C.C Roads in Arava Colony S.C area in Division No.16 under S.C.C
26 2018-19 40.00 AE-2
Grant
487 / Supply of Outsourcing Workers in Ongole Municipal Corporation for the Year
27 2018-19 10.00 AE-3
2018-19 (Reserved for L.C.C.S)
489 / Providing Water Supply Pipe Line in Pragathi Colony S.C Colony in Division
28 2018-19 20.00 AE-8
No.17 under S.C.C Grant
490 / Construction of Internal C.C Drains in Pragathi Colony in Division No.17 under
29 2018-19 S.C.C Grant 10.00 AE-8

491 / Laying of C.C Road in S.C Colony in Pelluru in Division No.17 under S.C.C
30 2018-19 10.00 AE-8
Grant
492 / Construction of Internal C.C Drains in Cheruvukommupalem S.C Colony in
31 2018-19 20.00 AE-8
Division No.18 under S.C.C Grant
Construction of C.C Drains and Culverts from Kommu Thirupalu house to
493 /
32 2018-19 Number Kotaiah house in Vengamukkala Palem S.C Colony in Division No.18 10.00 AE-8
under S.C.C Grant
494 / Construction of C.C Roads in Cheruvukommu palem S.C Colony in Division
33 2018-19 No.18 under S.C.C Grant 30.00 AE-8

495 / Laying of C.C Roads in Vengamukkala Palem S.C Colony in Division No.18
34 2018-19 under S.C.C Grant 30.00 AE-8

496 / Providing Internal C.C Roads in Arava Palem and Dandu Palem in Division
35 2018-19 10.00 AE-4
No.23 under S.C.C Grant

498 /
Widening of C.C Road and Construction of balance Drains from Sarma
36 2018-19 College Ground to Midasala Raju house in Mamidi Palem S.C Colony in 40.00 AE-4
Division No.31 under S.C.C Grant
499 / Construction of C.C Drain from Gaddalagunta Public Toilets to existing S.S
37 2018-19 6.85 AE-3
Tank-I Main Road in Division No.32 under S.C.C Grant
500 / Construction of C.C Drain from Chennakesavaswamy Temple to Kollabathina
38 2018-19 Prabakar house in Division No.32 under S.C.C Grant 5.45 AE-3

501 / Providing C.C Drains in Indira Nagar and Christian Palem S.C Colony in
39 2018-19 34.00 AE-6
Pernamitta in Division No.40 under S.C.C Grant

502 / Providing C.C Disposal Drain from Santhi Nagar Main Road at Kumari house
40 2018-19 30.00 AE-6
to Patimeedapalem Road in Pernamitta in Division No.42 under S.C.C Grant

503 / Providing C.C Drains in N.T.R Colony, Old Harijanawada and Santhi Nagar S.C
41 2018-19 37.00 AE-6
Colonies in Pernamitta in Division Nos.41 & 42 under S.C.C Grant
TOTAL 869.30
Download Start Time : 03.08.2018 5.00 P.M
Download End Time : 17.08.2018 5.00 P.M
Receipt of Bids End Time : 17.08.2018 5.15 P.M
Price Bid Opening Time : 17.08.2018 5.30 P.M
Construction of 700 KL ELSR at Hindu Burial Ground at Srinivasa Hall Road in
504 /
1 2018-19 Ongole Municipal Corporation under 14th Finance Commission Grants 2016- 154.17
17
TOTAL 154.17
Download Start Time : 13.08.2018 5.00 P.M
Download End Time : 21.08.2018 5.00 P.M
Receipt of Bids End Time : 21.08.2018 5.15 P.M
Technical Bid Opening Time : 21.08.2018 5.30 P.M
Price Bid Opening Time : 21.08.2018 5.45 P.M

Supply of Labour for Watch and Ward and Petrolling along NSP canal from
505 /
1 2018-19 Ramatheertham Reservoir to SS Tanks and additional Pumping arrangement 4.50 AE-8
to SS Tank-2 in Ongole Municipal Corporation (Reserved for L.C.C.S)

TOTAL 4.50
Download Start Time : 20.08.2018 5.00 P.M
Download End Time : 27.08.2018 5.00 P.M
Receipt of Bids End Time : 27.08.2018 5.15 P.M
Price Bid Opening Time : 27.08.2018 5.30 P.M
506 / Rectification and Repairs To Commissioner Quarters in Ongole Municipal
1 2018-19 6.48 AE-4
Corporation
507 / Repairs and Painting for B.C Girls Hostel (Municipal Building) at Mee Seva
2 2018-19 10.00 AE-3
Center near Gosha Hospital area in Division No.28
TOTAL 16.48
Download Start Time : 20.08.2018 5.00 P.M
Download End Time : 30.08.2018 5.00 P.M
Receipt of Bids End Time : 30.08.2018 5.15 P.M
Price Bid Opening Time : 30.08.2018 5.30 P.M
508 / Providing Digital Library in Bunder Road S.C Colony in Division No.12 under
1 2018-19 20.00 AE-2
S.C.C Grant
509 / Providing Digital Library in Balaji nagar S.C Colony in Division No.16 under
2 2018-19 S.C.C Grant 20.00 AE-2

510 / Construction of Digital Library Building and Providing Digital Library in


3 2018-19 Gaddalagunta S.C Colony in Division No.30 under S.C.C Grant 40.00 AE-4

511 / Development of Burial Ground in SC Colony in Gaddalagunta in Division


4 2018-19 10.00 AE-4
No.30 under S.C.C Grant
512 / Construction of Aramakshetram in S.C Colony in Gaddalagunta in Division
5 2018-19 30.00 AE-4
No.30 under S.C.C Grant
513 / Construction of Compound Wall at S.C Burial Ground in Mamidipalem in
6 2018-19 Division No.32 under S.C.C Grant 30.00 AE-3

514 / Construction of Park Compound Wall in Gudimellapadu S.C area in Division


7 2018-19 No.2 under S.C.C Grant 10.00 AE-1

515 / Construction of Park Compound wall in Gandhi Nagar S.C Colony in Koppolu
8 2018-19 25.00 AE-2
in Division No.10 under S.C.C Grant
516 / Construction of Internal C.C Roads and Drains in Neelayapalem S.C Colony in
9 2018-19 10.00 AE-1
Division No.6 under S.C.C Grant (2nd call)
517 / Construction of Internal C.C Drains and Culverts in Thurpu Christian Palem
10 2018-19 S.C Colony in Division No.8 under S.C.C Grant (2nd call) 10.00 AE-1

518 / Construction of Internal Roads in Thurpu Christian Palem near Pothuraju


11 2018-19 Canal in Division No.8 under S.C.C Grant (2nd call) 10.00 AE-1

519 / Construction of Internal C.C Drains in Gandhi Nagar S.C Colony in Koppolu in
12 2018-19 15.00 AE-2
Division No.10 under S.C.C Grant (2nd call)
520 / Construction of Internal C.C Drains in Old S.C Colony in Division No.10 under
13 2018-19 15.00 AE-2
S.C.C Grant (2nd call)
521 / Construction of Internal C.C Drains in Pragathi Colony in Division No.17 under
14 2018-19 10.00 AE-8
S.C.C Grant (2nd call)

522 / Construction of C.C Drain from Chennakesavaswamy Temple to Kollabathina


15 2018-19 5.45 AE-3
Prabakar house in Division No.32 under S.C.C Grant (2nd call)

523 / Providing C.C Drains in N.T.R Colony, Old Harijanawada and Santhi Nagar S.C
16 2018-19 37.00 AE-6
Colonies in Pernamitta in Division Nos.41 & 42 under S.C.C Grant (2nd call)

TOTAL 297.45
Download Start Time : 21.08.2018 5.00 P.M
Download End Time : 04.09.2018 5.00 P.M
Receipt of Bids End Time : 04.09.2018 5.15 P.M
Price Bid Opening Time : 04.09.2018 5.30 P.M
524 / Construction of Internal C.C Drains and Culverts in Throvagunta S.C area in
1 2018-19 30.00 AE-1
Division No.1 under S.C.C Grant (2nd call)
525 / Construction of C.C Roads in Throvagunta S.C area in Division No.1 under
2 2018-19 30.00 AE-1
S.C.C Grant (2nd call)
526 / Providing Internal C.C Drains in Mukthinuthalapadu S.C Colony in Division
3 2018-19 No.2 under S.C.C Grant (2nd call) 36.00 AE-1

527 / Construction of C.C Roads in Gudimellapadu S.C Colony in Division No.2


4 2018-19 under S.C.C Grant (2nd call) 15.00 AE-1

528 / Construction of C.C Roads in Pulivenkata Reddy Colony in Division No.9


5 2018-19 30.00 AE-1
under S.C.C Grant (2nd call)
529 / Construction of C.C Roads in Indira Colony S.C area in Division No.9 under
6 2018-19 25.00 AE-1
S.C.C Grant (2nd call)
530 / Laying of Water Supply Pipe Line in Koppolu S.C Colony in Division No.10
7 2018-19 under S.C.C Grant (2nd call) 25.00 AE-2

531 / Construction of Internal C.C Drains in Cloughpet S.C area in Division No.11
8 2018-19 under S.C.C Grant (2nd call) 15.00 AE-2

532 / Construction of C.C Roads in Cloughpet S.C Colony in Division No.11 under
9 2018-19 30.00 AE-2
S.C.C Grant (2nd call)

533 / Providing Central Divider and Plantation from Cloughpet Junction to Railpeta
10 2018-19 20.00 AE-2
Junction in S.C area in Division No.11 under S.C.C Grant (2nd call)

534 / Construction of Internal C.C Drains in Balaji Nagar S.C area in Division No.16
11 2018-19 15.00 AE-2
under S.C.C Grant (2nd call)
Construction of Storm Water Drain from Batasthu Mandiram to N.S.P Canal
535 /
12 2018-19 in Battulavarikunta S.C area in Agraharam Road in Division No.16 under S.C.C 35.00 AE-2
Grant (2nd call)
536 / Providing C.C Roads in Arava Colony S.C area in Division No.16 under S.C.C
13 2018-19 Grant (2nd call) 40.00 AE-2

537 / Construction of C.C Roads in Cheruvukommu palem S.C Colony in Division


14 2018-19 30.00 AE-8
No.18 under S.C.C Grant (2nd call)
538 / Laying of C.C Roads in Vengamukkala Palem S.C Colony in Division No.18
15 2018-19 30.00 AE-8
under S.C.C Grant (2nd call)
Widening of C.C Road and Construction of balance Drains from Sarma
539 /
16 2018-19 College Ground to Midasala Raju house in Mamidi Palem S.C Colony in 40.00 AE-4
Division No.31 under S.C.C Grant (2nd call)
Providing C.C Disposal Drain from Santhi Nagar Main Road at Kumari house
540 /
17 2018-19 to Patimeedapalem Road in Pernamitta in Division No.42 under S.C.C Grant 30.00 AE-6
(2nd call)
TOTAL 476.00
Download Start Time : 27.08.2018 5.00 P.M
Download End Time : 06.09.2018 5.00 P.M
Receipt of Bids End Time : 06.09.2018 5.15 P.M
Price Bid Opening Time : 06.09.2018 5.30 P.M
541 /
1 2018-19 Supply of Conocorpus Plants for Plantation in Ongole Municipal Corporation 5.00 AE-2

542 / Transportation of Plants from Srikalahasthi Nursery to Ongole in Ongole


2 2018-19 6.40 AE-2
Municipal Corporation
543 / Landscape Estimate for Beautification from Addanki Bus Stand to Masthan
3 2018-19 10.00 AE-2
Darga of Central Median in Ongole Municipal Corporation
544 / Landscape Estimate for Beautification from Kurnool Road Fly Over to Addanki
4 2018-19 Bus Stand of Central Median in Ongole Municipal Corporation 10.00 AE-2

TOTAL 31.40
Download Start Time : 03.09.2018 5.00 P.M
Download End Time : 10.09.2018 5.00 P.M
Receipt of Bids End Time : 10.09.2018 5.15 P.M
Price Bid Opening Time : 10.09.2018 5.30 P.M
545 / Development of Burial Ground in Gudimellapadu S.C Colony in Division No.2
1 2018-19 20.00 AE-1
under S.C.C Grant
546 / Development of Burial Ground in Koppolu SC Colony in Division No.9 under
2 2018-19 10.00 AE-1
S.C.C Grant
547 / Construction of Quarry Rubbish Road at S.C Burial Ground in N.Agraharam in
3 2018-19 Division No.10 under S.C.C Grant 20.00 AE-2

548 / Development of Burial Ground in SC Colony in N.Agraharam in Division No.10


4 2018-19 40.00 AE-2
under S.C.C Grant
549 / Construction of Aramakshetram in Bathulavari kunta S.C Colony in Division
5 2018-19 No.16 under S.C.C Grant 20.00 AE-2

550 / Construction of Compound Wall at Pelluru SC Colony Burial Ground in


6 2018-19 30.00 AE-8
Division No.17 under S.C.C Grant
551 / Construction of Compound Wall at Vengamukkalapalem S.C Colony Burial
7 2018-19 10.00 AE-8
Ground in Division No.18 under S.C.C Grant
552 / Construction of Compound Wall and Shelter to Christian Palem S.C Burial
8 2018-19 20.00 AE-6
Ground in Pernamitta in Division No.40 under S.C.C Grant
553 / Construction Park Compound Wall to Open Space in Rama Linga Reddy Nagar
9 2018-19 S.C area in Division No.40 under S.C.C Grant 10.00 AE-6
Providing C.C Road from Chithagunta Burial Ground to Sarala Devi Nagar and
554 /
10 2018-19 from Gaddam Ayyanna house to Sarala Devi Nagar S.C Colonies in Pernamitta 35.00 AE-6
in Division No.42 under S.C.C Grant
555 / Construction of Compound Wall to Chintha Gunta S.C Burial Ground in
11 2018-19 Pernamitta in Division No.42 under S.C.C Grant 25.00 AE-6

556 / Construction of Internal C.C Roads and Drains in Neelayapalem S.C Colony in
12 2018-19 10.00 AE-1
Division No.6 under S.C.C Grant (3rd call)
557 / Construction of Internal C.C Drains and Culverts in Thurpu Christian Palem
13 2018-19 10.00 AE-1
S.C Colony in Division No.8 under S.C.C Grant (3rd call)
558 / Providing D.I. K7 clear water Gravity mains from Srinivasahall Road to
14 2018-19 25.00
Proposed ELSR at Hindu Burial Ground in Ongole Municipal Corporation
559 / Construction of Internal C.C Drains in Gandhi Nagar S.C Colony in Koppolu in
15 2018-19 15.00 AE-2
Division No.10 under S.C.C Grant (3rd call)
560 / Construction of Internal C.C Drains in Old S.C Colony in Division No.10 under
16 2018-19 15.00 AE-2
S.C.C Grant (3rd call)
561 / Construction of Internal C.C Drains in Pragathi Colony in Division No.17 under
17 2018-19 S.C.C Grant (3rd call) 10.00 AE-8

562 / Providing C.C Drains in N.T.R Colony, Old Harijanawada and Santhi Nagar S.C
18 2018-19 37.00 AE-6
Colonies in Pernamitta in Division Nos.41 & 42 under S.C.C Grant (3rd call)

TOTAL 362.00
Download Start Time : 06.09.2018 5.00 P.M
Download End Time : 19.09.2018 5.00 P.M
Receipt of Bids End Time : 19.09.2018 5.15 P.M
Price Bid Opening Time : 19.09.2018 5.30 P.M
563 / Supply, Delivery and Fixing of Sub-Mersible Motor Pumpsets in S.S Tank-I in
1 2018-19 Ongole Municipal Corporation 2.20 AE-6

564 / Removal of Debris and Jungle Clearence for open sites in Santhapeta and
2 2018-19 6.10 AE-2
Ramnagar areas in Ongole Municipal Corporation
565 / Construction of C.C Drain from Bombay Cloth Store to Gopika Ladies Shop
3 2018-19 4.10 AE-2
besides Alluraiah Sweets at Pedda Masjid Center in Division No.12
566 / Supply and Delivery of Pyrosene Oil-BIS mark and Malathion Technical in
4 2018-19 9.95 AE-7
Ongole Municipal Corporation
567 / Construction of C.C Drain, Culvert and C.C Patches at Crescent School Road
5 2018-19 near Railway Track in Division No.8 4.45 AE-1

568 / Supply and Delivery of Laboratory Tables to D.R.R.M High School and Ram
6 2018-19 Nagar High School in Ongole Municipal Corporation 9.10 AE-2

569 / Supply and Delivery of Laboratory Tables to P.V.R Boys High School and P.V.R
7 2018-19 9.10 AE-4
Girls High School in Ongole Municipal Corporation
Providing Thermoplastic Road Marking and Supply Fixing of Raised Pavement
570 /
8 2018-19 Markers (Road Studs) from Church Center to South Byepass Road in Ongole 8.75 AE-2
Municipal Corporation

Providing Thermoplastic Road Marking and Supply Fixing of Raised Pavement


571 /
9 2018-19 Markers (Road Studs) from Railway Station to Church Center in Ongole 5.55 AE-2
Municipal Corporation
572 / Maintenance of Bund Strengthening of Tank Removal of Jungle and Nachu all
10 2018-19 round Bund and formation of road in N.Agraharam in Division No.10 4.20 AE-2

TOTAL 63.50
Download Start Time : 15.09.2018 5.00 P.M
Download End Time : 25.09.2018 5.00 P.M
Receipt of Bids End Time : 25.09.2018 5.15 P.M
Price Bid Opening Time : 25.09.2018 5.30 P.M
Ongole Municipal Corporation - Construction of C.C Drain from Mamidi
573 /
1 2018-19 Palem Burial Ground to existing Major C.C Drain north side of S.S Tank-I in 90.00 AE-4
Division No.32 under S.C.C Grant
574 / Ongole Municipal Corporation - Construction of Internal C.C Drains in Puli
2 2018-19 90.00 AE-1
Venkata Reddy S.C Colony in Division No.9 under S.C.C Grant
Ongole Municipal Corporation - Construction of Strom Water Drain from
575 /
3 2018-19 Hero Honda Show Room to Pothuraju Canal in Division No.50 under S.C.C 60.00 AE-7
Grant
576 / Ongole Municipal Corporation - Construction of Medium C.C Drains and
4 2018-19 70.00 AE-4
Culverts in Mamidi Palem S.C Colony in Division No.31 under S.C.C Grant
577 / Ongole Municipal Corporation - Widening and Construction of C.C Roads in
5 2018-19 80.00 AE-4
Viswas Nagar S.C Colony in Division No.31 under S.C.C Grant
Ongole Municipal Corporation - Providing Distribution Line in N.T.R Colony
578 /
6 2018-19 and Santhi Nagar S.C Colonies in Pernamitta in Division No. 41 & 42 under 48.50 AE-6
S.C.C Grant
Ongole Municipal Corporation - Providing C.C Road in Indira Nagar, Christian
579 /
7 2018-19 Palem and Santhi Nagar S.C Colonies in Pernamitta in Division Nos.40 & 42 50.00 AE-6
under S.C.C Grant
Ongole Municipal Corporation - Construction of C.C Drain from Pakala
580 /
8 2018-19 Rosamma house to Patibandla Bhaskar Rao house in Vengamukkala Palem 43.00 AE-8
S.C Colony Main Road in Division No.18 under S.C.C Grant

581 / Ongole Municipal Corporation - Construction of Strom Water Drain from


9 2018-19 50.00 AE-2
N.Agraharam S.C Colony to Mondivagu in Division No.16 under S.C.C Grant

Ongole Municipal Corporation - Providing C.C Road from Gurram Jashuva


582 /
10 2018-19 Colony to Muppavarapu Gopi house in Ambedkar Nagar S.C Colony in 60.00 AE-2
Division No.10 under S.C.C Grant
Ongole Municipal Corporation - Construction of Strom water Drain from
583/
11 2018-19 Arava Colony S.C area to Mondivagu in Division Nos.10 & 16 under S.C.C 70.00 AE-2
Grant
584 / Ongole Municipal Corporation - Providing C.C Roads in Gurram Jashuva
12 2018-19 Colony S.C area in Division No.10 under S.C.C Grant 80.00 AE-2

585 / Providing Lawn and Steel Railing at Velugu Office Main Road in Division
13 2018-19 2.65 AE-8
No.19
586 / Construction of GYM Plat form and Roofing in Bhagya Nagar 2nd Line Park in
14 2018-19 8.95 AE-8
Division No.20
TOTAL 803.10
Download Start Time : 18.09.2018 5.00 P.M
Download End Time : 03.10.2018 5.00 P.M
Receipt of Bids End Time : 03.10.2018 5.15 P.M
Technical Bid Opening Time : 03.10.2018 5.30 P.M
Price Bid Opening Time : 03.10.2018 5.45 P.M

587 / Laying of 200 mm dia and 150 mm dia (110 mm to 250 mm dia H.D.P.E)
1 2018-19 Water Supply Pipe Line from Panchayath Office to Gandhi Nagar S.C Colony 50.00 AE-2
in Koppolu in Division No.10 under S.C.C Grant

588 / Laying of 150 mm dia (110 mm dia to 225 mm dia H.D.P.E) Water Supply Pipe
2 2018-19 Line to New and Old Ambedkar S.C Colony in Division No.10 under S.C.C 50.00 AE-2
Grant
Providing D.I. K7 clear water Gravity mains from Srinivasa Hall Road to
589 /
3 2018-19 Proposed E.L.S.R at Hindu Burial Ground in Ongole Municipal Corporation 25.00
(2nd call)
Providing C.C Disposal Drain from Santhi Nagar Main Road at Kumari house
590 /
4 2018-19 to Patimeedapalem Road in Pernamitta in Division No.42 under S.C.C Grant 30.00 AE-6
(3rd call)
591 / Construction of Internal Roads in Thurpu Christian Palem near Pothuraju
5 2018-19 10.00 AE-1
Canal in Division No.8 under S.C.C Grant (3rd call)
592 / Construction of Compound Wall at Vengamukkalapalem S.C Colony Burial
6 2018-19 10.00 AE-8
Ground in Division No.18 under S.C.C Grant (2nd call)
593 / Construction of Internal C.C Roads and Drains in Neelayapalem S.C Colony in
7 2018-19 Division No.6 under S.C.C Grant (4th call) 10.00 AE-1

594 / Construction of Internal C.C Drains and Culverts in Thurpu Christian Palem
8 2018-19 S.C Colony in Division No.8 under S.C.C Grant (4th call) 10.00 AE-1

595 / Construction of Internal C.C Drains in Gandhi Nagar S.C Colony in Koppolu in
9 2018-19 Division No.10 under S.C.C Grant (4th call) 15.00 AE-2

596 / Construction of Internal C.C Drains in Old S.C Colony in Division No.10 under
10 2018-19 15.00 AE-2
S.C.C Grant (4th call)

597 / Providing C.C Drains in N.T.R Colony, Old Harijanawada and Santhi Nagar S.C
11 2018-19 Colonies in Pernamitta in Division Nos.41 & 42 under S.C.C Grant (4th call) 37.00 AE-6

TOTAL 262.00
Download Start Time : 24.09.2018 5.00 P.M
Download End Time : 05.10.2018 5.00 P.M
Receipt of Bids End Time : 05.10.2018 5.15 P.M
Price Bid Opening Time : 05.10.2018 5.30 P.M

599 / Ongole Municipal Corporation - Laying of B.T Road from Chinnamaleswara SC


1 2018-19 175.00
Colony via Kesavaraju Kunta to N.H-5 in Division No.2 under S.C.C Grant

600 / Ongole Municipal Corporation - Laying of B.T Road from Pothuraju Kaluva to
2 2018-19 175.00
Chinnamaleswara S.C Colony in Division No.2 under S.C.C Grant
601 / Ongole Municipal Corporation - Laying of B.T Road from Mudigonda Vagu to
3 2018-19 56.50
Throvagunta (Chirala Road) in Division No.2 under S.C.C Grant
Ongole Municipal Corporation - Providing New Fixtures and High Mast
Lighting in S.C areas in Throvagunta, Mukthinuthalapadu, Koppolu, Indira
602 /
4 2018-19 Colony, Pulivenkata Reddy Colony, N.Agraharam, Gurram Jashuva Colony, 120.00
Arava Colony, Pragathi Colony, Vengamukka Palem, Cheruvukommu Palem
and Pernamitta in Ongole Municipal Corporation under S.C.C Grant

603 / SDRF (Summer) Grant 2017 - Transportation and Supply of Water in various
5 2018-19 47.60
places in Ongole Municipal Corporation
TOTAL 574.10
Download Start Time : 29.09.2018 5.00 P.M
Download End Time : 12.10.2018 5.00 P.M
Receipt of Bids End Time : 12.10.2018 5.15 P.M
Technical Bid Opening Time : 12.10.2018 5.30 P.M
Price Bid Opening Time : 12.10.2018 5.45 P.M
607 / Repairs and Rectification of Leaks in Various Places in A.E-3 Section in Ongole
1 2018-19 2.00 AE-8
Municipal Corporation
TOTAL 2.00
Download Start Time : 01.10.2018 5.00 P.M
Download End Time : 11.10.2018 5.00 P.M
Receipt of Bids End Time : 11.10.2018 5.15 P.M
Price Bid Opening Time : 11.10.2018 5.30 P.M
608 / Construction of Internal Roads in Thurpu Christian Palem near Pothuraju
1 2018-19 10.00 AE-1
Canal in Division No.8 under S.C.C Grant (4th call)
609 / Construction of Internal C.C Roads and Drains in Neelayapalem S.C Colony in
2 2018-19 Division No.6 under S.C.C Grant (5th call) 10.00 AE-1

Providing Abstract/Geomertical/Patterns Art/Nature Art Work on Walls with


610 /
3 2018-19 Professional Artists Anganwadi Schools at Gopal Nagar and Mahendra Nagar 4.05 AE-1
in Division No.5
611 / Construction of C.C Culvert and Approach at Kammapalem 3rd Line and near
4 2018-19 2.35 AE-1
N.T.R Statue in Division No.7
612 / Construction of C.C Drain from K.P Bus Stand upto Muslim Burial Ground in
5 2018-19 7.40 AE-1
Division No.8 (4th call)
613 / Construction of CC Road from D.J.R Strret starting to Sk . Budesha (h) in
6 2018-19 Guntur Road in Division No.3 10.00 AE-1

Construction of CC Drain & Culvert from K.Ramulu (H) to Phatan Thahera (H)
614 /
7 2018-19 and Karani Gandemma (H) to Bhurini Ramadevi (H) in Ponugupati Colony in 8.35 AE-1
Division No.3
615 / Repairs of CC Drain and Approach Road From Ramalayam Back side to
8 2018-19 10.00 AE-1
Pallapolu krishna Reddy (H) in Guthikondavari palem in Division No.9
616 / Construction of CC Road & CC Drain From A.Sithaiah (h) to Karavadi donka
9 2018-19 9.25 AE-1
Main road in Division No.8
617 / Construction of CC Drain & CC Road from Mazeed to 1st & 2nd lines in Bilal
10 2018-19 9.85 AE-1
Nagar in Division No.3
618 / Construction of CC Drain CC Road from Mazeed to 3rd lines Main Road in
11 2018-19 Bilal Nagar in Division No.3 9.85 AE-1

619 / Construction of CC Drain & CC Road from D.J.R Strret starting To Sd. Husain
12 2018-19 10.00 AE-1
(h) in Guntur Road in Division No.3
620 / Construction of Parapit wall & Supply of Eletrical Items and Road formation
13 2018-19 4.60 AE-1
of Cristain Burial ground in Division No.8

621 / Construction of CC Road & Drain from Mallavarapu Dhanalakshmi (h) to


14 2018-19 9.90 AE-1
Mediboyina Ramakrishna house (Burial Ground Back Side) in Division No.5

622 / Construction of CC Road From Karumudi Hari Babu (H) to Well in


15 2018-19 8.15 AE-1
Guthikondavari Palem in Division No.9
623 / Construction of Internal C.C Drains in Gandhi Nagar S.C Colony in Koppolu in
16 2018-19 15.00 AE-2
Division No.10 under S.C.C Grant (5th call)
624 / Construction of Internal C.C Drains in Old S.C Colony in Division No.10 under
17 2018-19 S.C.C Grant (5th call) 15.00 AE-2

625 / Laying of 150 mm dia A.C Pipe Line from S.Vijaya Bhaskar house to Cross
18 2018-19 1.20 AE-2
road of Ramanagar 7th Line in Division No.15

626 / Construction of C.C Drain and C.C Road from Chakiri Maruthi kumar house to
19 2018-19 3.20 AE-2
towards Ananda Rao Road Junction in Division No.13 (2nd call)

Construction of C.C Drain and C.C Road from Anantha Mallikarjuna house
627/
20 2018-19 towards back side of Saradha Balakutir to Ananda Rao Road in Division No.13 9.35 AE-2
(2nd call)
Providing C.C Drain from (Vijayadurga Theater) opposite Bundar Road to
628 /
21 2018-19 Anand Rao Road and C.C Drain from Jangala Sundaram house to Velchuri 9.80 AE-2
Kruparao house in Division No.13 (4th call)
629 /
22 2018-19 Providing C.C Drain at Ungarala Veedhi Road in Division No.14 (4th call) 9.00 AE-2

630 / Laying of B.T Road from Koppolu Cement Road to Hindu Burial Ground at
23 2018-19 10.00 AE-7
Guttikondavaripalem in Ongole Municipal Corporation
631 / Construction of C.C Drain From Pothineni subbarao (h) to eadra sivaiah (h)
24 2018-19 of koppolu at 10 th Div in Ongole Municipal Corporation 10.00 AE-2

632 / Providing Mural art work with High Cement Embossing Art on the beams at
25 2018-19 Koppolu fly over (on South side) of Ongole Municipal Corporation 8.75 AE-2

633 / Providing Mural art work with High Cement Embossing Art on the beams at
26 2018-19 Koppolu fly over (on North side) of Ongole Municipal Corporation 8.75 AE-2

634 / Laying of BT Patches from 13 to 15 Divisions of AE-2 Section in Ongole


27 2018-19 0.95 AE-2
Municipal Corporation
635 /
28 2018-19 Devlopment of Aiswarya Nagar Park in Division No.36 10.00 AE-3

636 / Construction of C.C Road from D.No.7/824/3 upto H.T Electrical Tower in
29 2018-19 Division No.33 3.95 AE-3

637 / Construction of C.C Road from Vaddivanikunta Road to M.P Malyadri gari
30 2018-19 9.85 AE-3
house in Division No.33
638 / Laying of 100 mm dia A.C Pipe Line from Mahalakshmi Towers to Existing
31 2018-19 3.75 AE-3
V.I.P Road in Division No.35
639 /
32 2018-19 Construction of Park Compound Wall in Subbaiah Colony in Division No.33 8.80 AE-3
640 / Construction of C.C Drain at Harihara Nagar 2nd Line both sides in Division
33 2018-19 6.40 AE-3
No.33
641 / Laying of B.T Road and Construction of Culvert at Guttikondavaripalem
34 2018-19 6.30 AE-7
Scientific Land Fill Site in Ongole Municipal Corporation
642 /
35 2018-19 Construction of Reading Room at Sivaprasad Colony in Division no -33 6.15 AE-3

Construction of C.C Road From:Manjula Srinivas Nilayam ,Venkateswrlu


643 /
36 2018-19 House Line at Opp Back Side of VedhaPatasala in Z.P. Colony in Division 5.95 AE-3
No.33
644 / Laying of 100 mm Dia A.C Pipe line at VedhapataSala (Opp line& Back Side
37 2018-19 2.15 AE-3
line) Z P Colony in Division No.33
645 /
38 2018-19 Supply and delivery of M.S Push Carts in Ongole Municipal Corporation 9.90 AE-7

646 / Providing Flooring & Site Levellng fromTanguturi Prakasam Municipal School
39 2018-19 9.65 AE-3
Godugupalem in Division No:28
647 / Development of Greenary at Kurnool Road Flyover south side 1st bit and
40 2018-19 North side 1st bit in Ongole Municipal Corporation 9.95 AE-7

648 /
41 2018-19 Repairing P.V.R Boys High School and A.F.C School in Toilet in Division No.24 9.60 AE-4

649 / Construction of C.C Drain from Nallaiah Rice Mill to Muneer Chicken Center
42 2018-19 1.05 AE-4
in Division No.23 (4th call)
650 / Providing C.C Drain From Subbarami reddy Statue To Samkyatha Nagar Road
43 2018-19 10.00 AE-4
in Division No.24
651 / Providing C.C Drain From Samkyatha Nagar Road To Uracheruvu Road in
44 2018-19 Division No.24 10.00 AE-4

652 / Providing CC Drian From Veera Anjaneya Temple To Govindha Sweets in


45 2018-19 1.40 AE-4
Division No.22
653 / Providing CC Drian From Venu Gopapala Swamy Temple To Subbarao Tiffin
46 2018-19 1.85 AE-4
Shop in Division No.22
654 / Providing C.C Road & CC Drian From Gurram Vaari Temple To Ambika Life
47 2018-19 5.67 AE-4
Style Beside in Division No.22
655 / Construction C.C Drain And Culverts at Sanjai Gandhi Colony in Division
48 2018-19 No.30 10.00 AE-4

656 / Providing Balance C.C Road & Balance R.C.C Slabs On the Drian At Vanta Pani
49 2018-19 10.00 AE-4
Vaari Colony Road in Division No.24

Providing CC Drain in centeral cafe area towards Gandhi road and polapala
657 /
50 2018-19 jalaihai house to mallisetti srinu house And centeral cafe to Tyaga raja 8.80 AE-4
Mandiram towards Gandhi road (Gandhi Road North Side) in Division no.25

658 /
51 2018-19 Providing C.C Road from Arya vaisuyla Bazar in Division No.25 2.35 AE-4

659 / Providing cc drian Gandhi Road From Potti Sri Ramulu Statue to Trunk Road
52 2018-19 South side Division No.23 7.10 AE-4

660 /
53 2018-19 Laying of H.D.P.E Pipe Line at Mamidipalem in Division No:31 2.80 AE-4
661/ Construction of C.C Culverts at Kothapeta 1st Line, 2nd Line, Hareram Bazar
54 2018-19 3.15 AE-5
and Jammichettu Veedhi in Division No.28 (4th call)
662 / Construction of C.C Road and C.C Drain from T.Nageswara Rao house to
55 2018-19 2.65 AE-5
Rambabu house in R.T.C Colony in Division No.33 (4th call)
Repair & Rectification of Leaks at Gaddalaguna Area ,Raleev Nagar
663 /
56 2018-19 Area ,Nirmal Nagar Area,Mangamoor Road and Other Areas in AE-5 section 2.55 AE-5
in Ongole Municipal Corporation
664 / Providing C.C Drains in N.T.R Colony, Old Harijanawada and Santhi Nagar S.C
57 2018-19 37.00 AE-6
Colonies in Pernamitta in Division Nos.41 & 42 under S.C.C Grant (5th call)
Providing C.C Drains both sides from M.L Narasareddy house to Madala
665 /
58 2018-19 Ramalingeswarao house in 3rd line to 9th line Cross Road in Sujatha Nagar 8.35 AE-6
3rd Line to 9th Line Cross Road in Division No.37
666 / Providing C.C Road and C.C Drain from Pragathi Nagar Main Road to Mighty
59 2018-19 8.60 AE-6
Home Road in Pragathi Nagar in Division No.39
667 / Providing C.C Drain from J.Gopal Rao house to Samatha Nagar 3rd Line in
60 2018-19 4.35 AE-6
Division No.37 (2nd call)
668 / Providing C.C Drains both sides in Sivaji Nagar 4th Line in Division No.37 (2nd
61 2018-19 call) 7.85 AE-6

669 / Approval for Providing C.C Road from 2nd line to 3rd Line Infront of Maszid
62 2018-19 1.60 AE-6
( Cross Road ) in Gandhi Nagar of Division No.37
670 / Construction of C.C Drain from Brahmaiah (H) to Kurnool Road in Division
63 2018-19 10.00 AE-6
No.38
671 / Construction of C.C Drain from Brahmaiah (H) to K.Sesharao(H) in Division
64 2018-19 4.80 AE-6
No.38
672 / Construction of C.C Road from Brahmaiah (H) to K.Sesha Rao (H) and
65 2018-19 M.Muttaiah (H) to Kurnool Road in Division No.38 8.40 AE-6

673 / Construction of C.C Drain from K.Venkateswarlu (H) to Hanumareddy(H) and


66 2018-19 6.20 AE-6
B.Hanumareddy (H) to Venkateswara Swamy Temple in Division No.38

674 / Construction of CC Road from Samatha Nagar 2nd Line and 3rd Line in
67 2018-19 9.80 AE-6
Division No:39
675 / Balance CC Road Samatha Nagar 3rd line (in Krishna Nagar Main Road) in
68 2018-19 1.75 AE-6
Division No.39
Providing Mural Art Work with High Cement Embossing Art on the beams at
676 /
69 2018-19 Kurnool Road Fly Over (on north side) of Pillar face No.41 to 48 in Ongole 8.05 AE-7
Municipal Corporation

Providing Abstract/Geometrical/Patterns Art/Nature Art Work on walls with


677 / Professional Artists at Kurnool Road Flyover Bridge Middle Portion and East
70 2018-19 8.85 AE-7
side Out side Wall from Guntur Road Junction to Bridge Strating Portion in
Ongole Municipal Corporation
678 / Providing Greenery for E-Toilets at various places in Ongole Municipal
71 2018-19 1.55 AE-7
Corporation
679 / Laying of 1000 mm R.C.C Pipe from Manduvavari Palem village junction to
72 2018-19 10.00 AE-7
Mudigondavagu Bridge in Division No.50
680 / Supply and delivery of 1100 Liters Galvanized Compactor bins to Ongole
73 2018-19 Municipal Corporation 9.70 AE-7
Construction of CC Drain at Satyanarayana Puram West side 2nd C/R,
681 /
74 2018-19 Satyanarayana Puram west side 2/1 Cross Road and 2/2 Cross Road in 9.65 AE-7
Division No.48
682 / Construction of CC Drain at Ayyannavari Veedhi from Palapati
75 2018-19 Venkateswarlu(H) to Nageswararao(H) in Division No.48 8.60 AE-7

683 / Construction of C.C Drian on west side of 60' feet Road from Pothuraju Canal
76 2018-19 9.80 AE-7
to Sk.Kasimfeera(H) in Division No.48
684 / Construction of C.C Drian on west side of 60' feet Road from Andhra Public
77 2018-19 9.80 AE-7
School to Shaik Kasimfeera (H) in Division No:48
685 / Construction of CC Drain at Chandraiah Nagar 1st C/R and Dibbala Road East
78 2018-19 side 3/1 Cross Road in Division No.48 8.35 AE-7

686 / Construction of CC Drain at Alluri Seetharamaraju Vari Veedi 1st Cross Road
79 2018-19 7.30 AE-7
in Division No:46
687 / Construction of CC Drain at Anjaiah Road from Chaitanya Hospital to Kurnool
80 2018-19 3.70 AE-7
Road flyover in Division No:46
688 / Construction of C.C Drian at Anjaiah Road from SC Hostel to Kaapu Kalyana
81 2018-19 Mandapam in Division No:46 9.80 AE-7

689 / Supply, delivery and fixing of Sewing Machines to Ongole Municipal


82 2018-19 Corporation 6.00 AE-7

690 / Construction of C.C Road at Virat Nagar 4th Line from Ravibabu(H) to Achari
83 2018-19 4.30 AE-7
Nilayam in Division No:43
691 / Construction of C.C Road at Virat Nagar 1st Line from Kande Guravaiah (H) to
84 2018-19 10.00 AE-7
4th Line in Division No:43
692 / Providing C.C Road in Uma Manovikasa Kendram Road from Srinivasa Colony
85 2018-19 Main Road to Revenue Colony Main Road in Division No:44 9.85 AE-7

693 /
86 2018-19 Construction of Community Hall in Thufan Nagar in Division No.18 9.95 AE-8

694 / Construction of Balance Compound Wall in Muslim Burial Ground in Pelluru


87 2018-19 3.45 AE-8
in Division No.17

Construction of one Side C.C Drain from M.V.R Water Plant to Mara Baavi
695 / Road in Dharavari Thota 4th Line, from Bhagya Nagar 1st Line to 4th line 2nd
88 2018-19 10.00 AE-8
Cross Road and from G.T Road to S.R.K Degree College (D.No.2-42-168 to 26-
42-161) in Bhagya Nagar 1st Line in Division No.20 (4th call)

Supply and delivery of Chlorine Gas Cylinders, Ferric Alum and Bleaching
696 /
89 2018-19 Powder for the Maintenance of Water Supply at Ongole Municipal 9.95 AE-8
Corporation
697 / Construction of Toilets at D.A Polytechnic College in Housing Board Colony in
90 2018-19 9.35 AE-8
Division No.19
698 / Laying of Balance B.T Road at Housing Office Back Side Road and
91 2018-19 5.65 AE-8
Kothamamidipalem Main Road in Division No:19

699 / Construction of C.C Drain from Guravareddy house to retired head master
92 2018-19 6.70 AE-8
Sujatha house in Bank Colony (Housing Board extension) in Division No.19

700 / Engaging of Tractors for Lifting of Highberms and debris to Ongole Municipal
93 2018-19 5.40 AE-7
Corporation.
701 /
94 2018-19 Supply and delivery of Conservancy Articles to Ongole Municipal Corporation 10.00 AE-7

702 / Providing B.T Road from N.S.P Guest House to Jayaram Theatre in Division
95 2018-19 9.30 AE-4
No.27
703 / jungle Clearing at SS Tank-1 Bund in Division no - 32 in Ongole Municipal
96 2018-19 3.39
Corporation

704 / Engaging of 110 Hydraulic Chain Mounted Machine, Excavator (JCB, TATA
97 2018-19 9.90 AE-7
HITACHI) and tractors for lifting of garbage in Ongole Municipal Corporation

705/ Removal of Silt and Jungle Clearance and Formation of Kutcha Drain from S.S
98 2018-19 Tank-I existing C.C Drain to D.R.D.A Office in Ongole Municipal Corporation 1.95 AE-8

Construction of C.C Drain From Manjula Srinivas Nilayam, Venkateswrlu


706/
99 2018-19 House Line at Opp & Back Side of VedhaPatasala in Z.P. Colony Division 6.10 AE-5
No.33
707/ Construction of C.C Road from Venkateswrlu House Line at north Side of
100
2018-19 Vedha Patasala Z.P Colony in Division No.33 10.00 AE-5

708/ Laying of 150 mm Dia A.C Pipe Line from O.K Road to Koppolu in Division
101
2018-19 No.9 4.50 AE-2

TOTAL 766.11
Download Start Time : 16.10.2018 5.00 P.M
Download End Time : 08.11.2018 5.00 P.M
Receipt of Bids End Time : 08.11.2018 5.15 P.M
Price Bid Opening Time : 08.11.2018 5.30 P.M
Ongole Municipal Corporation - Construction of Strom Water Drain from
709 /
1 2018-19 Hero Honda Show Room to Pothuraju Canal in Division No.50 under S.C.C 60.00 AE-7
Grant (2nd call)
Ongole Municipal Corporation - Construction of Medium C.C Drains and
710 /
2 2018-19 Culverts in Mamidi Palem S.C Colony in Division No.31 under S.C.C Grant 70.00 AE-4
(2nd call)
Ongole Municipal Corporation - Providing C.C Road from Gurram Jashuva
711 /
3 2018-19 Colony to Muppavarapu Gopi house in Ambedkar Nagar S.C Colony in 60.00 AE-2
Division No.10 under S.C.C Grant (2nd call)
Ongole Municipal Corporation - Construction of Strom water Drain from
712 /
4 2018-19 Arava Colony S.C area to Mondivagu in Division Nos.10 & 16 under S.C.C 70.00 AE-2
Grant (2nd call)

Developmental Activities and Infrastructure Facilities for the year 2015-16


713 / and 2016-17 - Providing Foot Paths and Construction of Drain to West Side of
5 2018-19 129.99
Road from R.D.O Office to South Byepass Road in Ongole Municipal
Corporation (2nd call)
TOTAL 389.99
Download Start Time : 12.10.2018 5.00 P.M
Download End Time : 19.10.2018 5.00 P.M
Receipt of Bids End Time : 19.10.2018 5.15 P.M
Technical Bid Opening Time : 19.10.2018 5.30 P.M
Price Bid Opening Time : 19.10.2018 5.45 P.M
Ongole Municipal Corporation - Construction of C.C Drain from Pakala
715 /
1 2018-19 Rosamma house to Patibandla Bhaskar Rao house in Vengamukkala Palem 60.00 AE-8
S.C Colony Main Road in Division No.18 under S.C.C Grant (2nd call)

Ongole Municipal Corporation - Providing Distribution Line in N.T.R Colony


716 /
2 2018-19 and Santhi Nagar S.C Colonies in Pernamitta in Division No. 41 & 42 under 50.00 AE-6
S.C.C Grant (2nd call)
Ongole Municipal Corporation - Construction of Strom Water Drain from
717 /
3 2018-19 N.Agraharam S.C Colony to Mondivagu in Division No.16 under S.C.C Grant 50.00 AE-2
(2nd call)
TOTAL 160.00
Download Start Time : 27.10.2018 5.00 P.M
Download End Time : 05.11.2018 5.00 P.M
Receipt of Bids End Time : 05.11.2018 5.15 P.M
Technical Bid Opening Time : 05.11.2018 5.30 P.M
Price Bid Opening Time : 05.11.2018 5.45 P.M
718 / Supply of Outsourcing workers in Ongole Municipal Corporation for the Year
1 2018-19 10.00 AE-5
2018-19 (Reserved for L.C.C.S)
TOTAL 10.00
Download Start Time : 27.10.2018 5.00 P.M
Download End Time : 02.11.2018 5.00 P.M
Receipt of Bids End Time : 02.11.2018 5.15 P.M
Price Bid Opening Time : 02.11.2018 5.30 P.M
719 / Construction of Internal C.C Roads at 1st, 2nd and 3rd Lines in Pragathi
1 2018-19 Colony in Division No.17 under S.C.C Grant 83.00 AE-8

720 / Laying of B.T Road from N.H-5 to Mudigonda Vagu via Mukthinuthapadu in
2 2018-19 Division No.2 under S.C.C Grant 200.00 AE-1

721 / Laying of B.T Road from Mukthinuthalapadu S.C Colony to Gudimellapadu S.C
3 2018-19 50.00 AE-1
Colony in Division No.2 under S.C.C Grant
722 / Laying of B.T Road from Arava Colony S.C Colony towards N.Agraharam S.C
4 2018-19 200.00 AE-2
Colony in Division Nos.10 & 16 under S.C.C Grant

Ongole Municipal Corporation - Providing New Fixtures and High Mast


Lighting in S.C areas in Throvagunta, Mukthinuthalapadu, Koppolu, Indira
723 /
5 2018-19 Colony, Pulivenkata Reddy Colony, N.Agraharam, Gurram Jashuva Colony, 120.00 AE-2
Arava Colony, Pragathi Colony, Vengamukka Palem, Cheruvukommu Palem
and Pernamitta in Ongole Municipal Corporation under S.C.C Grant

Ongole Municipal Corporation - Construction of Medium C.C Drains and


724 /
6 2018-19 Culverts in Mamidi Palem S.C Colony in Division No.31 under S.C.C Grant (3rd 70.00 AE-4
call)
TOTAL 723.00
Download Start Time : 30.10.2018 5.00 P.M
Download End Time : 14.11.2018 5.00 P.M
Receipt of Bids End Time : 14.11.2018 5.15 P.M
Technical Bid Opening Time : 14.11.2018 5.30 P.M
Price Bid Opening Time : 14.11.2018 5.45 P.M
726 / Construction of Anna Canteen Compound Wall at Raithu Bazar in
1 2018-19 5.50 AE-2
Kothapatnam Bus stand in Ongole Municipal Corporation
727/
2 2018-19 Construction of Compound Wall at DWAMA Office in side in Division No.31 3.55 AE-4

728 / Providing Abstract/Geometrical/patterns Art/Nature Art work on Walls with


3 2018-19 4.00 AE-4
Professional Artists at anaganwadi Schools in Ongole Municipal Corporation

729 / Construction of CC Drain Zilla Parishat office to Jayaram Theatre in Division


4 2018-19 10.00 AE-4
No.27
Providing Thermoplastic Road Marking and Supply and Fixing of raised
730 / Pavement Markers (Road Studs) from N.S.P Guest House Jayaram Hall and
5 2018-19 10.00 AE-4
Church Center to Mangamoor Road Junction in Ongole Municipal
Corporation

Providing Thermoplastic Road Marking and Supply and Fixing of raised


731 /
6 2018-19 Pavement Markers (Road Studs) with Twin Moulded Christian Burial Ground 5.10 AE-5
to End of The Bye pass in Ongole Municipal Corporation
Providing Mural art work high Cement Embosing art on the Berms at Kurnool
732 /
7 2018-19 Road Fly Over (on South Side) of Piller face No.33 to 36 in Ongole Municipal 4.45 AE-7
Corporation
733 / Repairs and Rectification of 16KLT Clarificator at (beside RR Tank) Filter bed
8 2018-19 9.85 AE-8
in Ongole Municipal Corporation
734 /
9 2018-19 Laying of BT Approaches from RIMS to Saroval Hotel in Division No.20 2.95 AE-8

735 / Repairs and Rectifications of Collectors Camp Office Premises in Ongole


10 2018-19 Municipal Corporation 4.50 AE-2

Providing Thermoplastic Road Marking and Supply and Fixing of raised


736 / Pavement Markers (Road Studs) with Twin Moulded Shanks at
11 2018-19 Kothamamidipalem Road and Church Centre to Municipal Office in Ongole 6.10 AE-8
Municipal Corporation
737 / Supply, Delivery and Fixing of sadarhalli Granite Stone Benches in Various
12 2018-19 4.50 AE-6
Place of Parks in Ongole Municipal Corporation
738 / Providing Electrical Lighting murals at South Side Fly over Circle in Ongole
13 2018-19 8.70 AE-2
Municipal Corporation.

739 / Providing Mural art work with High Cement Embossing Art on the beams at
14 2018-19 8.75 AE-7
Koppolu fly over (on south side) of Ongole Municipal Corporation

740 / Providing Mural art work with High Cement Embossing Art on the beams at
15 2018-19 8.75 AE-7
Koppolu fly over (on north side) of Ongole Municipal Corporation

741 / Providing Roofing Sheets, Fountain Equipment, Railing and Plantation in


16 2018-19 9.40 AE-6
Chennakesava Swamy Temple Layout Park in Division No.37
Providing Abstract/Geometrical/patterns Art/ Nature Art work on Walls with
742 /
17 2018-19 Professional Artists at Kurnool Road Flyover before and after bridge out side 6.45 AE-7
portion walls in Ongole Municipal Corporation
TOTAL 112.55
Download Start Time : 09.11.2018 5.00 P.M
Download End Time : 16.11.2018 5.00 P.M
Receipt of Bids End Time : 16.11.2018 5.15 P.M
Price Bid Opening Time : 16.11.2018 5.30 P.M
Ongole Municipal Corporation - Construction of C.C Drain from Mamidi
743 /
1 2018-19 Palem Burial Ground to existing Major C.C Drain north side of S.S Tank-I in 90.00 AE-4
Division No.32 under S.C.C Grant (2nd call)

Ongole Municipal Corporation - Construction of Medium C.C Drains and


744 /
2 2018-19 Culverts in Mamidi Palem S.C Colony in Division No.31 under S.C.C Grant (4th 70.00 AE-4
call)

745 / Providing C.C Drains in N.T.R Colony, Old Harijanawada and Santhi Nagar S.C
3 2018-19 37.00 AE-6
Colonies in Pernamitta in Division Nos.41 & 42 under S.C.C Grant (6th call)

746 / Construction of Internal Roads in Thurpu Christian Palem near Pothuraju


4 2018-19 Canal in Division No.8 under S.C.C Grant (5th call) 10.00 AE-1

747 / Construction of Internal C.C Roads and Drains in Neelayapalem S.C Colony in
5 2018-19 Division No.6 under S.C.C Grant (6th call) 10.00 AE-1

748 / Construction of C.C Drain from K.P Bus Stand upto Muslim Burial Ground in
6 2018-19 7.40 AE-1
Division No.8 (5th call)
Construction of CC Drain & Culvert from K.Ramulu (H) to Phatan Thahera (H)
749 /
7 2018-19 and Karani Gandemma (H) to Bhurini Ramadevi (H) in Ponugupati Colony in 8.35 AE-1
Division No.3 (2nd call)
750 / Construction of CC Drain & CC Road from Mazeed to 1st & 2nd lines in Bilal
8 2018-19 9.85 AE-1
Nagar in Division No.3 (2nd call)

751 / Construction of CC Drain CC Road from Mazeed to 3rd lines Main Road in
9 2018-19 9.85 AE-1
Bilal Nagar in Division No.3 (2nd call)

752 / Construction of Internal C.C Drains in Gandhi Nagar S.C Colony in Koppolu in
10 2018-19 15.00 AE-2
Division No.10 under S.C.C Grant (6th call)

753 / Construction of Internal C.C Drains in Old S.C Colony in Division No.10 under
11 2018-19 15.00 AE-2
S.C.C Grant (6th call)

754 / Construction of C.C Drain and C.C Road from Chakiri Maruthi kumar house to
12 2018-19 3.20 AE-2
towards Ananda Rao Road Junction in Division No.13 (3rd call)
Construction of C.C Drain and C.C Road from Anantha Mallikarjuna house
755 /
13 2018-19 towards back side of Saradha Balakutir to Ananda Rao Road in Division No.13 9.35 AE-2
(3rd call)

756 /
Providing C.C Drain from (Vijayadurga Theater) opposite Bundar Road to
14 2018-19 Anand Rao Road and C.C Drain from Jangala Sundaram house to Velchuri 9.80 AE-2
Kruparao house in Division No.13 (5th call)

757 /
15 2018-19 Providing C.C Drain at Ungarala Veedhi Road in Division No.14 (5th call) 9.00 AE-2

758 / Laying of 100 mm dia A.C Pipe Line from Mahalakshmi Towers to Existing
16 2018-19 V.I.P Road in Division No.35 (2nd call) 3.75 AE-3
Construction of C.C Road From:Manjula Srinivas Nilayam ,Venkateswrlu
759 /
17 2018-19 House Line at Opp Back Side of VedhaPatasala in Z.P. Colony in Division 5.95 AE-3
No.33 (2nd call)
760 / Providing CC Drian From Veera Anjaneya Temple To Govindha Sweets in
18 2018-19 1.40 AE-4
Division No.22 (2nd call)

761 / Providing CC Drian From Venu Gopapala Swamy Temple To Subbarao Tiffin
19 2018-19 1.85 AE-4
Shop in Division No.22 (2nd call)
762 / Providing Electrical Lighting murals at North Side Fly over Circle in Ongole
20 2018-19 Municipal Corporation. 8.70 AE-2

Providing C.C Drains both sides from M.L Narasareddy house to Madala
763 /
21 2018-19 Ramalingeswarao house in 3rd line to 9th line Cross Road in Sujatha Nagar 8.35 AE-6
3rd Line to 9th Line Cross Road in Division No.37 (2nd call)

764 / Providing C.C Drain from J.Gopal Rao house to Samatha Nagar 3rd Line in
22 2018-19 4.35 AE-6
Division No.37 (3rd call)

765 / Providing C.C Drains both sides in Sivaji Nagar 4th Line in Division No.37 (3rd
23 2018-19 7.85 AE-6
call)

766 / Balance CC Road Samatha Nagar 3rd line (in Krishna Nagar Main Road) in
24 2018-19 1.75 AE-6
Division No.39 (2nd call)
Construction of CC Drain at Satyanarayana Puram West side 2nd C/R,
767 /
25 2018-19 Satyanarayana Puram west side 2/1 Cross Road and 2/2 Cross Road in 9.65 AE-7
Division No.48 (2nd call)
768 / Construction of CC Drain at Chandraiah Nagar 1st C/R and Dibbala Road East
26 2018-19 8.35 AE-7
side 3/1 Cross Road in Division No.48 (2nd call)
769 / Construction of CC Drain at Alluri Seetharamaraju Vari Veedi 1st Cross Road
27 2018-19 7.30 AE-7
in Division No:46 (2nd call)
770 / Construction of CC Drain at Anjaiah Road from Chaitanya Hospital to Kurnool
28 2018-19 Road flyover in Division No:46 (2nd call) 3.70 AE-7

771 / Supply, delivery and fixing of Sewing Machines to Ongole Municipal


29 2018-19 Corporation (2nd call) 6.00 AE-7

772 / Laying of 150 mm Dia A.C Pipe Line from O.K Road to Koppolu in Division
30 2018-19 No.9 (2nd call) 4.50 AE-2

TOTAL 397.25
Download Start Time : 15.11.2018 5.00 P.M
Download End Time : 22.11.2018 5.00 P.M
Receipt of Bids End Time : 22.11.2018 5.15 P.M
Technical Bid Opening Time : 22.11.2018 5.30 P.M
Price Bid Opening Time : 22.11.2018 5.45 P.M
774 / Construction of CC Road from Around Dinala Bavi Chenna Reddy Koteswa
1 2018-19 Rao (H) to Byrapuneni Venkateswarlu House in Div No:8 10.00 AE-1

Construction of CC Road & CC Drain Approche from Gaddam Subba Rao


775 /
2 2018-19 House to Padma Hous and N.Venkata Rao House to siva Ramaiah 10.00 AE-1
K.Venkateswarlu House in Div No:8
776 / Construction of CC Road from Manne Narasimha Roa (H) to Muppa Bhimaiah
3 2018-19 10.00 AE-1
(H) in Koppolu in Div No:9

777 / Construction of CC Road from Singamaneni Madhava Rao (H) to N.Bhaskar


4 2018-19 10.00 AE-1
(H) and OK Road to Pelluri Srinivasa Rao (H)in Koppolu in Div No:9

778 / Construction of CC Road from OK Road to SK.Masthan (H) and S.hanumanthu


5 2018-19 9.10 AE-1
Rao (H) to G.Hanumanthu Rao (H) in Koppolu in Div No:9

Construction of CC Road from OK Road to Pasuapati Venu nadham (H) to


779 /
6 2018-19 Koppolu Hanuman (H) & Gangadi Rangaiah ( H) & S.Subbaiah (H) in Koppolu 10.00 AE-1
in Div No:9
780 / Construction of CC Road , CC Drain and Patch work from Subrahmanyam
7 2018-19 10.00 AE-1
Temple to 40" Feet Road in Gopal Nagar 1st Line in Division No:6
781 / Construction of CC Road & CC Drain from Karavadi Donka Road to Maddineni
8 2018-19 6.20 AE-1
Ramanajaneyulu (H) in Division No:7
782 / Construction of CC Road & CC Drain from Chakali Bazar in Tangella kasim
9 2018-19 8.00 AE-1
veedi in Division No:7
783 / Completion of in Completed Burning guards and Laying of CC Roads in Hindu
10 2018-19 Burial Ground at Pothuraju Canal in Div No:7 10.00 AE-1

784 / Construction of CC Road & CC Drain from Peta Venakteswarlu House to


11 2018-19 6.35 AE-1
Badithala Sudhakar (H) IN B.C Colony in Division No:1
785 / Construction of Compound Wall ( West & South Side) for Balance compound
12 2018-19 9.50 AE-1
wall & CC Drain in Division No:1
786 / Construction of Park Compound Wall at Park site in Rajeev Gruhakalpa in Div
13 2018-19 10.00 AE-1
No:9
787 / Construction of CC Drain & Patch from Enndeti Veeraiah(H) to Bapatla
14 2018-19 Nageswara Rao (H) in Gopal Nagar 1st Line in Div no:6 9.98 AE-1

788 / Construction of CC Drain & Road & C.Cculvert from SK.Madinamma (H) to 40
15 2018-19 10.00 AE-1
Feet Road in Gopal Nagar 1st Line in Div no:6
789 /
16 2018-19 Levelling of Earth Filling in Muslim Burial Ground in Div No:8 10.00 AE-1

790 / Providing CC Road from Bhavanam Bharathi House to Arya Konda Chennaiah
17 2018-19 9.80 AE-2
House at Brundavanam Venchers of Koppolu In Div No:10
791 / Providing CC Road from Brundhavanam Venchers Turning to 1st Gate bof
18 2018-19 9.65 AE-2
Koppolu in Div No:10
Providing Abstract/Geomertical/Patterns Art/Nature Art Work on Walls with
792 /
19 2018-19 Professional Artists (NOT LESS THAN BFA QUALIFICATION) at Govt Offices, 10.00 AE-2
OMC Schools, Dividers etc., in OMC
793 / Construction of CC Drain & Culvert from Temple Towers to Raithu Bazar Via
20 2018-19 10.00 AE-5
Saibaba Temple in Div No:35
794 /
21 2018-19 Providing CC Road from Viswas Nagar Road in Div No:31 10.00 AE-4

795 /
22 2018-19 Repaires to Well at Sri Rangakutam Adepallivari Veedi in Div No:26 0.70 AE-4

797 / Providing CC Drain from anajaneya Swamy Temple to SVS Kalyana


23 2018-19 8.60 AE-4
Mandapam (North Side of svs) in Div No:26 (Reserved for LCCS)
798 /
24 2018-19 Construction of CC Drain at Hari Sain Street in Div No:26 6.35 AE-4

799 / Providing CC Drain from anajaneya Swamy Temple to SVS Kalyana


25 2018-19 8.60 AE-4
Mandapam (South Side of svs) in Div No:26
800 /
26 2018-19 Providing Internal CC Road and CC Drains in Div No:26 10.00 AE-4

801 / Providing CC Road from (Muslim Bazar) Lambadi Palem at Bandlamitta Main
27 2018-19 2.71 AE-4
Road in Div No:25
802 /
28 2018-19 Repaires to well at Aryavaisulu yuvajana Sangam office in OMC 0.93 AE-4

803 / Providing Quarry Rubbish Approch Road to Solid waste Maintainance Centre
29 2018-19 10.00 AE-8
at SS Tank-2 in OMC
804 / Laying of P.V.C Pipe Line and CC Road from Indira Gandhi Statue to Subba
30 2018-19 Rao Hospital in Div No:25 9.25 AE-4

805 / Widening of C.C Road at Kurnool Road from Power office to Chimakurthi Eye
31 2018-19 Hospital in Div.No.46 of Ongole Municipal Corporation. 10.00 AE-4

806 / Arrgements of For Flex printing ,Iron Frames, Fixing Flex Printing Branding &
32 2018-19 7.00 AE-4
Fixing in Ongole Municipal Corporation
807 / Raising of CC Road From Sai Temple View to Existing Saibaba Temple Main
33 2018-19 7.90 AE-5
Road in Division No:28 in Ongole Municipal Corporation
808 / Construction of CC Drain from Varukuti Narayana (H) to D.No:1-3-1(2) at
34 2018-19 Mamidipalem in Div No:32 9.55 AE-5

809 / Development of APSEB Colony (Golla Palem) Park at Mamidipalem in Div


35 2018-19 8.25 AE-5
No:32
810 / Construction of Community Hall at Kotha Donka D No:35-066-451 Near
36 2018-19 Srimanarayana House in Div No:33 8.25 AE-5

811 /
37 2018-19 Construction of Compound Wall at R.T.C. Colony -2 in Division No: 33 9.70 AE-5

812 /
38 2018-19 Laying of BT Approaches from RIMS to Saroval Hotel in Division No.20 2.90 AE-8

813 / Formation of Quarry Spell Road fro Industrial Estate to Damacharla


39 2018-19 Anjaneyulu Colony in Div No:42 10.00 AE-6

Providing Balance CC Road from Marturu Venkata Subrahmanyam House to


814 /
40 2018-19 Topuri Bala Brahmachari House in Soniyagandhi nagar 1st and 2nd Cross 4.20 AE-6
Road in Div No:37
815 / Providing CC Road from 1st Cross Road to 7th Cros Road in Peerlamanyam
41 2018-19 10.00 AE-6
Main Road in Div No:39
816 / Providing CC Road from 8th Cross Road to 13th Cros Road in Peerlamanyam
42 2018-19 10.00 AE-6
Main Road in Div No:39 (Reserved for LCCS)
817 / Providing Roofing Sheets, Fountain Equipment, Railing and Plantation in
43 2018-19 Chennakesava Swamy Temple Layout Park in Division No.37 9.40 9.40

818 / Providing CC Road and CC Drain from Charitha Apartment to Vinyaka Temple
44 2018-19 10.00 AE-6
in Div NO:39
819 /
45 2018-19 Providing CC Road in Kotha Donka Near Peerlamanyam in Div NO:39 9.15 AE-6
820 / Providing CC Road from Existing CC Road to Managamur Road in Marrichettu
46 2018-19 10.00 AE-6
Colony (Reach-I) in Div No:39
821 / Providing CC Road from Existing CC Road to Managamur Road in Marrichettu
47 2018-19 10.00 AE-6
Colony (Reach-II) in Div No:39
822 /
48 2018-19 Providing CC Road in Revenue Colony 1st Line in Division No:37 4.15 AE-6

Providing CC Road and Drain from Abhigna Super Market to Komitineni


823 /
49 2018-19 Veera Badraiah and Divi Kantha Rao House in Revenue Colony In Div No:37 10.00 AE-6
(Reserved for LCCS)

Construction of CC Drain at Venkateswara Colony saouth side fromm K.


825 /
Chirajeevi House to T.Srinivasa Rao House North Side from B.Prasad House to
50 2018-19 P.Narasimha Roa House North Side 5th Line from T.Ganesh House to 8.60 AE-7
B.Balaraju House and North side 4th Line 1st cross Road from T.Chiranjeevi
House to K.Krishnamurthy House in Div No:50

826 / Construction of CC Drain & CC Road at Venkateswara Colony North Side 6th
51 2018-19 10.00 AE-7
Line 2nd Cross Road from Salmon House to M.Srinu House in Div No:50

Construction of CC Drain at Venkateswara Colony North Side 6th Line from


827 /
52 2018-19 G.Venkateswarlu House to Salmon House and North Side 5th Line 1st Cross 9.30 AE-7
Road from B.Kotaiah House to Obula Reddy House in Div No:50
Construction of CC Road at Venakteswara Colony North Side 6th Line from
828 /
53 2018-19 G.Venkateswarlu House to Salmon House at Rajaka Bazar 2nd Cross Road in 9.50 AE-7
Div No:50

829 / Construction of CC Road and CC Drain at Venkateswara Colony North side 4th
54 2018-19 Line ananatha Lakshmi House to P. Narasimha Rao House in Div No:50 6.50 AE-7

830 / Construction of Watchman Men Shed and Filling of Gravel at Muslim Burial
55 2018-19 Ground in Div No:43 7.15 AE-7

Construction Of CC Drain at Jayaprakash Colony Main Road South Side from


831 /
56 2018-19 Hanumanthu Rao (H) to G.Narayana (H) and Laying of Quarry Spell Road at 8.65 AE-7
Jayaprakash Colony in Div No:50 (Reserved for LCCS)
832 / Providing M.S Grill at Guntur Road fro Green Belt from pole No:DFSS666/B10
57 2018-19 7.30 AE-7
To Opp Vishnu Priya TVS Show Room in OMC
833 / Formation of Quarry Spell Road at Nethaji Colony 1st Cross Road to 6th Cross
58 2018-19 10.00 AE-7
Road in Div No:50
834 / Formation of Quarry Spell Road at Nethaji Colony 7th Cross Road to 13th
59 2018-19 Cross Road in Div No:50 10.00 AE-7

835 / Providing CC Road at Nehru Nagar Extension From E.Aseervadamma House


60 2018-19 10.00 AE-7
to V.Prasad (H) in Div No:50

Constrcution of CC Drain and CC Road at NGO Colony Main Road West side
836 / 3rd C/R from Thirupathi Rao (H) yto T.Venkateswarlu (H), West side 5th C/R
61 2018-19 from Thirupathaiah (H) to Saravaswathi Shisu Mandir (H) and East side 9th 8.10 AE-7
Cross Road from Ch.Papaiah (H) to M Subbarao ( H) in Div No:47

837 / Comnstruction of CC Drain in Ex.Counciler Mala Kondaiah Veedhi in Div


62 2018-19 5.90 AE-7
No:47
838 / Construction of CC Road from Maruthi Nagar 2nd Line to Vijetha School and
63 2018-19 7.75 AE-7
beside Sulthanamma Nilayam Road in Div No:44
839 / Construction of CC Road at Umamanovikasa Kendram Beside Road from
64 2018-19 6.20 AE-7
N.Venkateswarlu House to K.Ramanajaneyulu House in Div No:44
840 / Construction of CC Road at Maruthi Nagar M.lakshmi Narayan House to K.
65 2018-19 7.45 AE-7
Jyothi House (Police Conistable Road) in Div No:44
842 / Construction of CC Drain & Culvert From Retired M.R.O House to NH-5 at
66 2018-19 Housing Board Colony Polytechnic College Park in Div No:19 2.20 AE-8

843 / Providing CC Road & CC Drain from Puttam Setty Bala Kotaiah House to Road
67 2018-19 9.95 AE-8
End in Bhagya nagar 2nd Line 2nd Cross Road in Div No:20
844 /
68 2018-19 Providing Fensing Poles at Mother Theres aColony in Div No:18 2.05 AE-8

845 / Construction of Compound wall at Happy Home Apartmement East Side in


69 2018-19 Bhagya Nagar Donka In Div No:20 9.80 AE-8

Construction of Compound Wall & Childern Play Equipments at Meppala


846 /
70 2018-19 Subbaramaiah House Opp in Bhagya Nagar 3rd line 2nd Cross Road in Div 8.65 AE-8
No:20
847 / Providing CC Road & CC Drain from Vallepu chandra Sekhar House to
71 2018-19 7.20 AE-8
Bandaru srinu House Near Rigister Office in Div No:20
848 / Construction of CC Drain from Kuttuboyina Subba Rao House to Naga Raju
72 2018-19 7.60 AE-8
House (Via CRP Quarters ) in Bhagaya nagar in Div No : 20
849 / Construction of CC Drain from Trunk Road to andhra Bank ( Via Old R.T.O
73 2018-19 6.47 AE-8
Office in Bhagya nagar 3rd Line Main Road in Div No:20
850 / Construction of CC Drain at Pindimara to Register Office in Bhagya anagar
74 2018-19 11th Line in Div No:20 3.47 AE-8

851 / Construction of CC Drains from Existing Drain to Pindimara in Bhagya nagar


75 2018-19 2.50 AE-8
4th Line Main Road in Div No:20
853 / Providing CC Drains from D.No.26-42-49 to D.No.26-42-292 in Bhagya Nagar
76 2018-19 9.80 AE-8
Donka in Division No.20
854 / Construction of C.C Drain from Bhagya Nagar 4th Line from Bank Colony 1st
77 2018-19 2.60 AE-8
Line to 3rd Line in Division No.19
855 / Construction of C.C Drain from Bhagya Nagar 4th Line south side 1st, 2nd,
78 2018-19 3rd, 4th Cross Roads in Division No.19 9.76 AE-8

856 / Construction of C.C Drain and Culvert from LIG-137 to LIG-163 and from LIG-
79 2018-19 9.25 AE-8
81 to LIG-93 in Housing Board Colony in Division No.19
857 / Construction of C.C Drain from Bhagya Nagar 4th Line south side 5th, 6th,
80 2018-19 7th, 9th, 10th Cross roads in Division No.19 9.25 AE-8

858 / Construction of C.C Drain and Culvert from Raghavulu Apartment to N.H-5 in
81 2018-19 6.65 AE-8
Bank Colony 3rd Line in Division No.19
Construction of C.C Road from Chalapathi Rao house to Lawyer Govindaraju
859 /
82 2018-19 house and C.C Drain from Gollapudi Madavi house to Palaparthi Jitson house 8.10 AE-8
in Balaji Nagar in Division No.21
860 / Construction of C.C Road and CC Drain From Sri Srinivasa Residency to
83 2018-19 D.NO:2-1-292(A) in Division NO: 32 8.50 AE-5
Construction of C.C Drain and Culverts from Kunchala Chalapathi house to
861 /
84 2018-19 Vengamamba Cool Drink Shop at Maruthi Apartment back side in Dharavari 5.95 AE-8
Thota in Division No.21
862 / Construction of C.C Drain and Culvert from Registrar Office to Sri Chaitanya
85 2018-19 School in Bhagya Nagar 2nd Line in Division No.20 9.90 AE-8

863 / Laying of CC Road from Pelluru Main Road to Mahalakshmi Temple at Pelluru
86 2018-19 9.90 AE-8
in Div No:17
864 / Providing CC Road from Happy Home Apartment Back side at Bhagya nagar
87 2018-19 9.98 AE-8
Donbka in Div No:20
865 / Constrcution of Compound Wall Openb site at Nehru Ngar Extension (Gandhi
88 2018-19 Ngar Layout) in Div No:50 8.80 AE-7

866 / Providing Flooring & Painting of Ambedkar Bhavan RO Plant in


89 2018-19 3.78 AE-8
Vengamukkalapalem in Division No:18
TOTAL 720.68
Download Start Time : 19.11.2018 5.00 P.M
Download End Time : 05.12.2018 5.00 P.M
Receipt of Bids End Time : 05.12.2018 5.15 P.M
Price Bid Opening Time : 05.12.2018 5.30 P.M
868 /
1 2018-19 Providing Central Lighting at Kamma Palem Main Road in Division No.7 9.80 AE-2

869 /
2 2018-19 Providing Central Lighting at New Vegetable Market in Division No.24 9.80 AE-2

870 /
3 2018-19 Providing Central Lighting at Fish Market in Division No.24 9.80 AE-2

871 / Providing 12 Mtrs Galvanised High Mast Lighting System at various places in
4 2018-19 Ongole Municipal Corporation 10.00 AE-2

872 / Engaging of Galfar machine for clearnce of Toilets and Urinals of Ongole
5 2018-19 9.00 AE-4
Municipal Corporation
873 / Supply of Materials Swacha surveykshan 2019 in Ongole Municipal
6 2018-19 Corporation 5.55 AE-4

874 / Enagaging of Persons For Swacha surveykshan 2019 in Ongole Municipal


7 2018-19 5.05 AE-4
Corporation
875 / Supply of Outsourcing workers in Ongole Municipal Corporation for the Year
8 2018-19 10.00 AE-5
2018-19 (Reserved for L.C.C.S)
876 / Supply and Delivery of 80 Liters capacity litter free Bins with metal stand to
9 2018-19 10.00 AE-7
Ongole Municipal Corporation
Supply and delivery of 30 Liters Capacity Plastic Dust Bins including formation
877 /
10 2018-19 of 1 cm Hole around the bin for Home Composting to Ongole Municipal 10.00 AE-7
Corporation.

878 / Construction of Balanced C.C Drain From Arega.Venkatrao House to Existing


11 2018-19 10.00 AE-5
CC Culvert and Various places of Gaddalagunta of Division No.32

879 / Providing Mural Art work with high Cement Embosing Art on the beams at
12 2018-19 6.10 AE-7
KIMS Hospital North side in Ongole Municipal Corporation
Providing Mural Art work with high Cement Embosing Art on the beams at
880/
13 2018-19 KIMS Hospital South side and under kurnool Road Fly Over (On North Side) 9.80 AE-7
for faces No: 57 to 60 in Ongole Municipal Corporation
Providing Mural Art work with high Cement Embosing Art on the Kurnool
881/
14 2018-19 Road Fly over (on North side) of Piller face No:49 to 56 in Ongole Municipal 8.05 AE-7
Corporation
882/ Development of Greenary at Kurnool Road Fly over south side 3rd Bit in
15 2018-19 Ongole Municipal Corporation 10.00 AE-7

883/ Supply of Conocorpus Plants for Planitataion in in Ongole Municipal


16 2018-19 10.00 AE-2
Corporation
Engaging of Tractors on hire basic for digging of holes and Transporation of
884/
17 2018-19 plants to Varoius palce in Division No.1 to 50 in Ongole Municipal 6.25 AE-2
Corporation
885/ Transportataion of plants from Srikalahasthi Nursery to Ongole Municipal
18 2018-19 4.92 AE-2
Corporation
886/ Laying of R.C.C Pipes & Culvert infront of Chennakesava Swamy Temple in
19 2018-19 Pernamitta in Division No.44 3.05 AE-6

887/
20 2018-19 Development of Balanced work at Nirmal Nagar Park in Division No.33 10.00 AE-5

888/
21 2018-19 Supply of Bouganvillea Plants in Ongole Municipal Corporation 10.00 AE-2

889/
22 2018-19 Supply of Ornamental Flowering Plants to Ongole Municipal Corporation 3.24 AE-2

890/ Repairs Exsisting Drain And Consruction Balance shops in Market Road west
23 2018-19 side Division No.24 5.60 AE-4

TOTAL 186.01
Download Start Time : 28.11.2018 5.00 P.M
Download End Time : 12.12.2018 5.00 P.M
Receipt of Bids End Time : 12.12.2018 5.15 P.M
Price Bid Opening Time : 12.12.2018 5.30 P.M
891 / Arrangements for Honble Chief Ministers GNANABHERI Programme at Siri
1 2018-19 Hospital back side in Ongole Municipal Corporation 4.75 AE-8

TOTAL 4.75
Download Start Time : 04.12.2018 5.00 P.M
Download End Time : 11.12.2018 5.00 P.M
Receipt of Bids End Time : 11.12.2018 5.15 P.M
Price Bid Opening Time : 11.12.2018 5.30 P.M
893 / Construction of C.C Drain and Culvert from S.Leelavathi house to Bhemaneni Kalyan
1 2018-19 Kumar house in Kammapalem 3rd line in Division No.7 3.75 AE-1

894 / Construction of C.C Drain and C.C Road From Ankammathalli Temple to
2 3.75 AE-1
2018-19 Kothapatnam Road in Thurpu palem in Division No.7
895 / Construction of CC Road from Bharat Colony Cross Roads in Division No:3
3 9.35 AE-1
2018-19
896 / Construction of C.C Drain and C.C Road from chakire Maruthi kumar house towords
4 3.25 AE-2
2018-19 junctions of Andharao Road No.13
897 / Construction of C.C Drain and C.C road from Anantha mallikarjuna house towards
5 9.45 AE-2
2018-19 back side of Saradha balakutir to Andhrao Road in Division No.13
898 / In Complete Painting with Snowscem paint to D.R.R.M High School in Santhapeta in
6 4.10 AE-2
2018-19 Division No.14
899 / Completion of In-complete A.C Pipe Line from Cloughpet 3rd Cross road to 4th
7 1.50 AE-2
2018-19 Cross road in Cloughpet in Division No.11

900 / Provding C.C Drain and C.C Road from Battula Venkata Swami house to Auditor
8 10.00 AE-2
2018-19 Swami house in Chavalavari Veedhi 1st Cross Road in Division No.14

901 /
9 Construction of C.C Drains at Ayyanna Setty Satram in Division No.11 9.60 AE-2
2018-19
902 /
10 Construction of R.O Plant in Battulavarikunta in Division No.16 5.85 AE-2
2018-19
903 / Providing C.C Road from OK Road to Brundavanam Venchures Road turning in
11 2018-19 koppolu in Division No.10 10.00 AE-2

904 /
12 2018-19 Providing C.C Road at Ramnagar 9th Line in Division No.15 9.80 AE-2

905 /
13 Providing C.C Drain at Ramnagar 3rd Line in Division No.15 10.00 AE-2
2018-19
906 / Providing C.C Road at Ramnagar 6th Line in Division No.15
14 10.00 AE-2
2018-19

15 907 / Construction of C.C Drain and C.C Road at Ramnagar 12th Line in Division no.15 10.00 AE-2
2018-19
908 / Providing Compound Wall at PVR School in Division No.24
16 4.00 AE-4
2018-19
909 / Laying of Internal G.I Pipe Line in Division No.27
17 10.00 AE-4
2018-19

18 910/ Construction of Balance Compound wall at Dhobi Ghat opposite site in Division 3.30 AE-4
2018-19 No.24

911 / Construction of C.C Road from Pavithra collage Opp (VIP road) beside B.B Towers
19 2018-19 (Bye Pass) & Construction of C.C Drain opp Rajeev Nagar Park in Division No:34 7.40 AE-5

912 /
20 Construction of C.C Drain at Old Sujatha Nagar Cross roads in Division 34 10.00 AE-5
2018-19
913 / Construction of C.C road & C.C Drain at Old Sujatha nagar Cross Road Near Bye pass
21 2018-19 in Division 34 9.35 AE-5

914 / Providung flooring and Costruction of Balanced Compound Wall at Padamatipalem


22 2018-19 School in Division No.28 9.30 AE-5

915 / Removal of Silt and High Burms various Places in AE-5 Section in Ongole Municipal
23 3.55 AE-5
2018-19 Corporation
916 / Construction of Drain from CC Ramakrishna house to existing CC Kotha Donka Road
24 2.90 AE-5
2018-19 in Z.P Colony in Division No.33
917 / Construction of Toilets at P.V.R Girls High School in Division No.28
25 10.00 AE-5
2018-19
918/ Construction of Balance C.C Drain from Dhande Venkanna House to D.No.02-03-231
26 2018-19 and at Various Places of Gaddlagunta Area in Division No.32 7.95 AE-5

919 / Construction of Compound Wall to Open Space Near Ankammathalli Apartment in


27 6.80 AE-6
2018-19 Revenue Colony in Division No.37
920 /
28 Providing Quarry Spell Road in Christianpalem in Pernamitta in Division No.40 5.90 AE-6
2018-19

921 / Providing Quarry Spell Road from Kurnool Road to Peerlamanyam 8th Line and from
29 7.35 AE-6
2018-19 Bezawada Murali house to Krishna Nagar Main Road in Division No.39

922 /
30 Providing C.C Drain from East and West Gates to Mangamur Road in Division No:40 7.35 AE-6
2018-19
923 /
31 Providing C.C Road from West Gate to Mangamur Road in Division No:40 8.40 AE-6
2018-19
924 /
32 Providing C.C Road from East Gate to Mangamur Road in Division No:40 7.30 AE-6
2018-19
925 / Providing C.C Road from Kamineni Brahmanandam house towards West in
33 10.00 AE-6
2018-19 Ashramam North side in Division:40
Construction of C.C Road at Nehru Nagar 1st Line 1st Cross road, 2nd Line 1st Cross
926 /
34 2018-19 road and maruthi nagar 2nd line from punnarao house to towards west side in 5.25 AE-7
Division No.50
927 / Construction of C.C Drain at Venkateswara Colony north side 2nd line west side in
35 2018-19 Division No.50 10.00 AE-7

928 / Construction of C.C Road from Koteswarao house to Venkateswara Swamy Temple
36 7.15 AE-7
2018-19 in Samatha Nagar Main Road in Division No.38
929 / Constryction of C.C Road at Mahalakshamma Nagar 2nd Line, Srinivasa Colony 1st
37 8.25 AE-7
2018-19 Line and C.C Drain at Samatha Nagar in Division No.38
Laying C.C Patches from Dibbala Road to T.D.P party Office in Division No.49 and at
38 930 / Andhrakeasri Nagar 5th Cross Road in Division No.43 in Ongole Municipal 9.15 AE-7
2018-19 Corporation

931 / Construction of C.C Drain at Lakshmi Narasimha Puram in Division No.38


39 7.55 AE-7
2018-19

40 932 / Laying of Quarry Rubbish Shoulders to Sai Nagar 1st Line in Division No.38 2.75 AE-7
2018-19
933 /
41 Laying of C.C Patch at Lakshmi Narasimha Puram in Division No.38 8.80 AE-7
2018-19
Formation of Quaary Spell road at nehru nagar 7th Line 3rd Cross Road and 4th
934 /
42 2018-19 Cross Road and Balance C.C Road at Nehru Nagar 7th Line, 1st Cross Road in 10.00 AE-7
Division No.50
935 / Providing C.C Road at Nehru Nagar 7th Line from Skill Upgradation Centre to
43 2018-19 venkateswarlu house and 1st Cross Road in Division No.50 10.00 AE-7

936 /
44 2018-19 Construction of CC Road and CC Drain at Sri Ram High school in Division No:44 10.00 AE-7

Providing 150mm Dia H.D.P.E Pipe Line from North side Kotam Jyothi (H) to South
937 / Suaravarapu Peddireddy (H) at Maruthi Nagar 3rd Line and Srinivasa Colony Main
45 2018-19 Road west side 2nd Cross Road from Venkateswara Reddy (H) Yada Nilayam in 9.80 AE-7
Division No:44

938 / Construction of C.C Drain from Sangeetha Rao house to chimakurthi Narayana
46 2018-19 House at Bhagya Nagar 1st line to 2nd line 2nd Cross road in Division No.20 4.95 AE-8

939 / Providing C.C Road at Medaramettla Sathyam house to thadiparthi Sankareddy


47 2018-19 House to Bhagya nagar 2nd line 1st Cross road in Division No.20 10.00 AE-8

940 / Construction of C.C Drain at Bhagya Nagar 2nd line to 4th line 1st Cross road in
48 5.00 AE-8
2018-19 Division no.20
941 / Construction of Compound wall at Gangamma Temple Site in Pelluru in Division
49 9.75 AE-8
2018-19 No.17
942 / Construction of CC Drain from SC Hostel to Reddy Hostel at Bahagya Nagar 4th Line
50 5.00 AE-8
2018-19 in Division No.19
943 / Construction of CC drain from Burla Venkateswara Rao House to NH-5 at Housing
51 3.15 AE-8
2018-19 Board Polytechnic College Park in Division No.19
944 / Construction of C.C Drain and Culvert from Chebrolu Venkateswarlu house to
52 7.10 AE-8
2018-19 SriKrishna house in Cheruvukommu palem in Division No.18
945 / Construction of Compound Wall at Yadavas and Reddys Burial Ground in
53 9.75 AE-8
2018-19 Cheruvukommupalem in Division No.18
946 / Construction of C.C Drain and Culvert from Namdigalla Nageswara Rao House to
54 8.30 AE-8
2018-19 Z.P. Road in Cheruvukommu palem in Division No.18
947 / Construction of C.C Drain from Ramalayam to Gangamma Temple in
55 3.95 AE-8
2018-19 Cheruvukommupalem in Division No.18
948 / Construction of C.C Drain from Panchayathi Office to Ramalayam in
56 2018-19 Cheruvukommupalem in Division No.18 5.30 AE-8

949 / Construction of C.C Drain from Panchayathi Office to Gangamma Temple in


57 2018-19 Cheruvukommupalem in Division No.18 5.15 AE-8

950 / Providing C.C Road and C.C. Drain from Pendyala Subbaratnam House to Boddu
58 9.93 AE-8
2018-19 Balaji House in Cheruvukommupalem in Division No.18
951 / Providing C.C Road and C.C Drain from Pendyala peda Subbaiah House to Pendyala
59 7.10 AE-8
2018-19 chinna House in Cheruvukommupalem in Division No.18
952 / Construction of C.C Drain and Culvert from chebrolu Maheswara Rao House to
60 7.30 AE-8
2018-19 Panchayathi Office in Cheruvukommu palem in Division No.18
Providing C.C Road and C.C Drain from Jajula Brahmaiah house to Kolliboyina
953 / Prabhakar house and from Puvvada Ramaiah house to Muppa Kotilingam house in
61 9.20 AE-8
2018-19 Cheruvukommupalem in Division No.18

954 /
62 Providing C.C Drains both sides in Sivaji Nagar 4th Line in Division No.37 (4th call) 7.85 AE-6
2018-19

955 / Providing CC Drian From Veera Anjaneya Temple To Govindha Sweets in Division
63 1.40 AE-4
2018-19 No.22 (3rd call)

956 / Providing CC Drian From Venu Gopapala Swamy Temple To Subbarao Tiffin Shop in
64 1.85 AE-4
2018-19 Division No.22 (3rd call)

Construction of C.C Road from Chalapathi Rao house to Lawyer Govindaraju house
957 /
65 and C.C Drain from Gollapudi Madavi house to Palaparthi Jitson house in Balaji 8.10 AE-8
2018-19
Nagar in Division No.21 (2nd Call)

958 / Construction of C.C Drain and Culvert from Registrar Office to Sri Chaitanya School
66 9.90 AE-8
2018-19 in Bhagya Nagar 2nd Line in Division No.20 (2nd Call)
959 /
67 Supply of Bougainvillea Plants to Ongole Municipal Corporation 10.00 AE-2
2018-19
960 / Maintenance of Trees duly Constructing walls and R.C.C Collars in Ongole Municipal
68 2018-19 Corporation 9.70 AE-2

Repairs and Rectification of 650 KVA Distribution Transformer and Repairs of


961 / various pumping stations for Water Supply Pumping and Distribution Motors and
69 2018-19 Electrical Panel Board repairs General Maintaince of Water Supply in Ongole 8.45 AE-8
Municipal Corporation
962 / Engaging of 110 Hydraulic Chain Mounted Machine, Excavator (JCB/TATA HITACHI)
70 10.00 AE-7
2018-19 and Tractors for lifting of garbage in Ongole Municipal Corporation

Laying of Quarry Rubbish Road at Shramika Nagar K.Ranga Naikulu (H) to


963 /
71 Tirupataiah (H) and Ganapathi Nagar Main Road and Construction of culvert at 10.00 AE-7
2018-19
Shramika Nagar in Division No.43

Construction of C.C Drain and C.C Road at Virat Nagar 6th Line and CC Drain from
964 /
72 Garataiah (H) to Pothuraju Canal and Narasareddy (H) to Venkateswarlu(H) in 9.90 AE-7
2018-19
Division No:43
965 / Construction of C.C Road from Arega Srinivasarao house to Kolla Balaiah House in
73 10.00 AE-5
2018-19 Division No.32
966 / Construction of C.C Drain from Arega Srinivasarao House to Kolla Balaiah House in
74 9.10 AE-5
2018-19 Division No.32
967 / Completion of In-complete School Building at Park in Rajeev Gruhalu 2nd Line in
75 2018-19 Division No.9 9.90 AE-1

968 /
76 2018-19 Construction of Balance C.C Road in Indiramma Colony 9th Line in Division No.9 2.35 AE-1

TOTAL 569.38
Download Start Time : 13.12.2018 5.00 P.M
Download End Time : 28.12.2018 5.00 P.M
Receipt of Bids End Time : 28.12.2018 5.15 P.M
Price Bid Opening Time : 28.12.2018 5.30 P.M
1 970 / Construction of C.C Drain from Mamidi Palem Pump House to existing Major C.C 52.00
2018-19 Drain upto N.H-5 in Division No.19 under S.C.C Grant
971 / Construction of CC Road from B.C.Colony to N.S.P Canal in Muthinuthalapadu in
2 10.00 AE-1
2018-19 Division No.2
972 / Construction of CC Drain from BC Colony to Poleramma Temple in 10.00 AE-1
3
2018-19 Muthinuthalapadu in Division No.2
973 / Construction of Compound wall and Stage at BC Colony Common Site in
4 9.65 AE-1
2018-19 Muthinuthalapadu in Division No.2

974 / Construction of C.C Road and Drain from Dhenampudi Subbulu house to Arla
5 7.40 AE-1
2018-19 Apparao house at Z.P High School opposite in Mukthinuthalapadu in Division No.2

975 / Construction of Internal CC Drain in Gudimellapadu in Division No.2 (Reserved for


6 2018-19 L.C.C.S ) 10.00 AE-1

976 / Laying of Quarry Spell Road from KIMS Hospital to NSP Canal in Mukthinuthalapadu
7 2018-19 in Division No.2 5.00 AE-1

977 / Construction of C.C Road from Komma Pothuraju house to Sk.Narasimha house at
8 2018-19 Cross Roads in Mukthinuthalapadu B.C Colony in Division No.2 9.60 AE-1

978 / Construction of Revertment and Steps on Uracheruvu at Hanuman Statue in


9 3.65 AE-1
2018-19 Mukthinuthalapadu in Division No.2

979 / Construction of CC Road and C.C Drain from Sudanagunta Narayana house to
10 5.80 AE-1
2018-19 Dagupati Pedda Chenchaiah house in Mukthinuthalapadu in Division No.2

980 / Construction of CC Road from Taneeru Venkata Raju (H) to Taneeru Subbarao (H)
11 9.80 AE-1
2018-19 1st, 2nd and 3rd Roads (South side) in Mukthinuthalapadu in Division No.2

12 981 / Construction of Compound wall and Stage in Gudimellapadu in Division No.2 8.95 AE-1
2018-19
982 / Completion of Incomplete C.C Drain besides Karanam Balaram house in Kamasastri
13 9.87 AE-2
2018-19 Veedhi 2nd lane in Division No.14
983 / Construction of R.C Burning Platforms in Hindu Burial Ground at North Portion
14 9.82 AE-1
2018-19 (Dasarajupalli Road at Pothuraju) in Division No.7
984 / Construction of C.C Drain and Culverts in Praghathi nagar in Koppolu in Division
15 10.00 AE-2
2018-19 No.10
Providing C.C Roads and C.C Drains from Alla venkat ramaiah (H) to koduri ramaiah
985 /
16 (H) and jujjuri venkateswarlu (H) to KP Road and M.Chandra(H), 10.00 AE-2
2018-19
A.Venkataswami(H), M.Srinu(H) in Koppolu in Division No.10
986 / Providing CC Road from Gaddala veeramma house to reddy house and vistramma
17 9.05 AE-4
2018-19 house to pidi bala swamy house in Division No.31
987 / Providing C.C Road and C.C Drain from Shekar kottu to Liala peta Shesamma house
18 9.50 AE-4
2018-19 in Division No.31 (Reserved for L.C.C.S)
988 /
19 2018-19 Providing CC Road from Yagayya house to Anjaneya swami temple in Division No.31 8.80 AE-4

989 / Providing C.C Road from Bandaru venkateswarlu house to tammisetty govindamma
20 2018-19 house and reddamma house to tammisetty anjamma house in Division No.31 9.25 AE-4

990 / Supply and Delivery of Bioculum, sanitreat, Coco Peat and Biobricks for Organic
21 6.75 AE-7
2018-19 Compost Maker to Ongole Municipal Corporation
991 / Providing CC Drain Nuvvula nageswararao house to kaka Srinu house in Division
22 9.60 AE-4
2018-19 No.31
Providing C.C Road and C.C Drain Pump House Avula Brahmama House and Avula
23 992 / Brahmam House to Venkaiah House and Venkaiah House to Maseedu in Division 8.47 AE-4
2018-19 No.27

993 / Providing C.C Road and C.C Drain from Nagaboyina Venkateswarlu House to Pump 10.00 AE-4
24
2018-19 House in Division No.27

25 994 / Providing C.C Roads and C.C Drains to 6 Streets in Division No.27 10.00 AE-4
2018-19
995 / Supply of Ties, Badges, Belts, Shoes and Uniform to Municipal Schools in Ongole
26 5.15 AE-5
2018-19 Municipal Corporation
996 / Providing C.C Road and C.C drain from Cherukuri Lakshmi House to Chemgalaiah
27 10.00 AE-4
2018-19 House in Division No.27 (Reserved for L.C.C.S)
997 / Construction of Balanced C.C Drain Opp Meghana Nilayam Line (A.Ramanaiah
28 2018-19 House) and at various places in Division No.32 9.85 AE-5

Construction of C.C Drain From Thota Praveen House to Thota Ramaswamy House
998 /
29 2018-19 Eswara Nilayam Line, Dande Ashok House to Rukmini Nilayam Line(Near 10.00 AE-5
Ramalayam Junction) in Gaddalagunta area in Division No.32
999 / Filling and Site Levelling of Red Earth at Gaddalagunta Burial Ground in Division
30 5.00 AE-5
2018-19 No.32

1000 / Construction of C.C Drains from Western side of Malladi Enclve towards 10.00 AE-6
31
2018-19 Venkateswara Reddy House (Ashramam) in Mangamur Road in Division No.40

1001 / Construction of Internal Roads C.C Drains in Pardasaradhi Nagar (Ashramam) in 10.00 AE-6
32
2018-19 Mangamur Road in Division No.40
1002 / Providing C.C Roads from Madhusudhana Rao House to Siva Reddy House in Police 10.00 AE-6
33
2018-19 Colony 2nd line near Ongole Minor in Pernamitta in Division No.40
1003 / Providing C.C Drain from Indian Gas Company to R.S Apartment via Reddamma
34 7.45 AE-6
2018-19 Apartment in Chennakesava Swamy Layout in Division No.37
1004 / Providing C.C Drains both sides and Balance C.C Road at 3rd Line in Samatha Nagar
35 8.25 AE-6
2018-19 in Division No.37
1005 / Laying of C.C Road from R&B Road to Thirupa reddy Hanumareddy Byarani in
36 4.65 AE-8
2018-19 Vengamukkalapalem in Division No.18
1006 / Laying of C.C Road from Peddireddy Hanuma Redy house to Peddi Reddy Pichi
37 8.05 AE-8
2018-19 Reddy house in Vengamukkalapalem in Division No.18
1007 / Laying of C.C Road from Thippareddy Pera Reddy house to Peddi Reddy
38 3.50 AE-8
2018-19 lakshmamma house in Vengamukkalapalem in Division No.18
1008 / Providing C.C Road and C.C Drain from Palaparthi Dsrinu House to Gandla
39 7.23 AE-8
2018-19 Sambasiva Rao House at Balaji Nagar in Division No.21 (Reserved for L.C.C.S)

1009 / Construction of C.C Drain from Kuttuboyina Ravi House to Danduri Koteswara Rao
40 2018-19 House and Ponnursu Murali Hoiuse to Bheemavarapu Srinu House in Division No.21 9.90 AE-8

Construction of C.C Road from Chirala Prasad House to Durgaiah House and
1010 / Samosala Road & Durga house to Thirupathamma House and Masthanamma house
41 8.70 AE-8
2018-19 to Reddy House at Devudu Cheruvu Road in Division No.21

42 1011 / Construction of C.C Drain from Chinmaya Saradha House to Mailavarapu Kasturi 7.60 AE-8
2018-19 House beside NGO Home in Balaji Nagar in Division No.21 (Reserved for L.C.C.S)

1012 / Construction of C.C Drain From Kuttuboyina Subba Rao House to Bhagya Nagar 4th
43 7.26 AE-8
2018-19 Line via Register Office Road in Division No.20
1013 / Construction of C.C Drain at Bhagya Nagar 2nd Line to 4th Line 1st Cross Road in
44 5.00 AE-8
2018-19 Division No.20 (Reserved for L.C.C.S)
1014 / Construction of C.C Drain from Padoipoina Marrichettu to existing Gandhi Bomma
45 10.00 AE-5
2018-19 and existing Gandhi Bomma to D.No.36-71-735 in Division No.32
1015 / Construction of C.C Road from Inabathina Venkateswarlu house to existing Raja
46 7.05 AE-5
2018-19 Rajeswari ammavari Temple in Division No.32
1016 / Construction of Toilets and fixing of Iron Gate at Aarama Ksketram in Gaddalagunta
47 7.70 AE-4
2018-19 in Division No.31
1017 / Providing CC Road and C.C Drain from Velisetty Umamaheswarao house to
48 2018-19 Sivakumari house in Maratipalem in Division No.12 7.15 AE-2

1018 / Providing CC Road from Nanduri Chandra house to Miriyalapalem 1st Cross Road
49 2018-19 and Thota Govinda Rajulu Street in Division No.12 6.80 AE-2

Providing Out Fall Drain with Np3 Class R.C.C Pipes from Jawahar Navodhaya
1019 /
50 Vidhyalaya to N.H-5 along Compound Wall of Jawahar Navodhaya Vdhyalaya in 15.00 AE-8
2018-19
Division No.19
TOTAL 464.25
Download Start Time : 17.12.2018 5.00 P.M
Download End Time : 31.12.2018 5.00 P.M
Receipt of Bids End Time : 31.12.2018 5.15 P.M
Price Bid Opening Time : 31.12.2018 5.30 P.M
1020 / Providing Shamiyanas for Janma Bhoomi - Maa Vooru programme
1 2018-19 arrangements in Ongole Municipal Corporation 8.00
TOTAL 8.00
Download Start Time : 24.12.2018 5.00 P.M
Download End Time : 31.12.2018 5.00 P.M
Receipt of Bids End Time : 31.12.2018 5.15 P.M
Price Bid Opening Time : 31.12.2018 5.30 P.M
1021 / Desiltation of Drains at various places in Division Nos.22 to 27 in Ongole
1 2018-19 5.00 AE-4
Municipal Corporation
1022 / Providing 100 mm dia A.C Pipe Line from Santhapet Main Road to Saibaba
2 2018-19 2.85 AE-2
Temple and at Ram Nagar 5th Line in Division No.14
1023 / Laying of Balance C.C Road at Navodaya Vidyalayam Main Road in Division
3 2018-19 No.19 6.40 AE-8

1024 / Laying of B.T Patches at various places in Division Nos.13 to 16 in A.E-2


4 2018-19 section in Ongole Municipal Corporation 3.05 AE-2

1025 / Laying of B.T Patches at various places in Division Nos.19 and 20 in Ongole
5 2018-19 3.25 AE-8
Municipal Corporation
1026 /
6 2018-19 Formation of Temporary Roads at Siri Hospital back side in Division No.17 7.95 AE-8

Supply of Excavators, Tractors and Man Mazdoor for Clearing of High Berms
1027 /
7 2018-19 and Debris in Division Nos.30, 31 and 39 to 42 in A.E-4 section in Ongole 5.00 AE-4
Municipal Corporation
1028 / Providing J.C.B and Tractors for removal of Debris and High Berms in A.E-2
8 2018-19 section in Ongole Municipal Corporation 5.10 AE-2

1029 / Transportation and Supply of Water to Koppolu and Mukthinuthalapadu


9 2018-19 10.00 AE-2
areas in Ongole Municipal Corporation
1030 / Supply, Delivery and Fixing of LED Televisions (80 Cm) for Anganwadi Schools
10 2018-19 4.84 AE-5
in Ongole Municipal Corporation
Providing Equipment for P.V.R Boys and Girls High School, Ram Nagar High
1031 /
11 2018-19 School, Balaji Nagar Elementary School and D.R.R.M High School Smart 10.00 AE-4
Digital Class Rooms in Ongole Municipal Corporation
1032 / Supply, Delivery and Fixing of WIFI Projectors for Anganwadi Schools in
12 2018-19 Ongole Municipal Corporation 5.29 AE-5

1033 / Supply, Delivery and Fixing of ABC Learn kit Flash Cards for Anganwadi
13 2018-19 Schools in Ongole Municipal Corporation 8.17 AE-5

1034 / Laying of C.C Road at Lawyer Vasistha house in Mamidipalem S.C Hostel in
14 2018-19 4.45 AE-8
Division No.19

1035 /
Providing Thermoplastic road Marking from Ramakuri vari veedhi to South
15 2018-19 bye-pass east side road and Supply & fixing Median Markers at various places 9.44 AE-2
in Ongole Municipal Corporation
1036 / Providing Thermoplastic road Marking from Railway station to Church
16 2018-19 9.00 AE-2
Center to ramakuri vari veedhi in Ongole Municipal Corporation

1037 / Providing Thermoplastic road Marking from Church Center to Kothapatnam


17 2018-19 7.34 AE-2
Busstand Via Mastha Darga in Ongole Municipal Corporation

1038 / Development of Greenary at Kurnool Road Fly over south side 3rd Bit in
18 2018-19 Ongole Municipal Corporation (2nd call) 9.95 AE-7

1039 / Supply of Conocorpus Plants for Planitataion in in Ongole Municipal


19 2018-19 10.00 AE-2
Corporation (2nd call)
1040 /
20 2018-19 Supply of Bouganvillea Plants in Ongole Municipal Corporation (2nd call) 10.00 AE-2

1041 /
21 2018-19 Supply of Ornamental Flowering Plants to Ongole Municipal Corporation 3.24 AE-2

1042 / Transportation and Supply of Water in various places in 1 to 50 Divisions in


22 2018-19 10.00 AE-1
Ongole Municipal Corporation
TOTAL 150.32
Download Start Time : 28.12.2018 5.00 P.M
Download End Time : 11.01.2019 5.00 P.M
Receipt of Bids End Time : 11.01.2019 5.15 P.M
Price Bid Opening Time : 11.01.2019 5.30 P.M
1042(a)/ Construction of CC Culvert and RCC Pipes at Srinivasa Theatre and 1 to 9
1
2018-19 Divisions in Ongole Municipal Corporation 2.95 AE-1

1043 / Construction of CC Road from Katragadda Subhashini (H) to Gurram


2
2018-19 Janakiram (H) at Pulivenkata Reddy Colony in Division No.9 9.90 AE-1

1044 / Construction of CC Drain and Repairs to Toilets Compound Wall & Levelling
3
2018-19 of site in Thurpu Christian Palem in Division No.8 8.50 AE-1

Laying of 100 mm Dia AC Pipe line from Gaddikayalu 1st to 5th Cross Roads,
1045 /
2018-19 Gopal Nagar 1st Line Extension and Pragna School Road and Indurthi Nagar in 9.50
4 AE-1
5th, 6th and 8th Division in Ongole Municpal Corporation

1046 / Laying of AC Pipe Line from B.Koteswara Rao House to Bheemineni Badri
5
2018-19 House in Division No.8 9.10 AE-1

1047 /
2018-19 Construction of Compound Wall to Park at N.Agraharam in Division No.10 10.00
6 AE-2

1048 / Construction of Incomplete Compound Wall Community Hall of Panchayath


7
2018-19 Office Building at Agraharam in Division No.10 9.93 AE-2

1049 / Providing Quarry Spell Road from GT Road to Railway Track of Ram Nagar of
8
2018-19 14th Line in Division No.17 9.21 AE-2

1050 / Formation of Quarry Rubbish Road at Rakesh Reddy House of Karthikeya


9
2018-19 Nagar and Besides Panchayathi Office Road of Koppolu in Division No.10 5.30 AE-2

1051 / Construction of Compound Wall to Muslim Burial Ground at Koppolu in


10
2018-19 Division No.10 9.65 AE-2

1052 /
2018-19 Construction of RCC Roof Community Hall at Agraharam in Division No.10 10.00
11 AE-2

1053 /
2018-19 Supply of Mary Gold Plants and Lawn in Ongole Municipal Corporation 1.70
12 AE-2

1054 / Supply and delivery of Mateials for Maintainance of Post hole Digger and 12"
13
2018-19 Augar in Ongole Municipal Corporation 1.67 AE-2

Repaires and Rectification of Childern Play Equipments of Various Parks,


1055 /
2018-19 Repaires and Rectification of Leakage at MRO Office Road and Providing 560 3.38
14 AE-2
HD Chambers at Valve Pits at AE-2 Section in Ongole Municipal Corporation

1056 / Construction of Compound Wall at Reserved Site P & T Colony in Division


15
2018-19 No.17 9.98 AE-3
Construction of C.C Drain from Kuttuboyina Ravi House to Danduri Koteswara
1057 /
2018-19 Rao House and Ponnursu Murali Hoiuse to Bheemavarapu Srinu House in 9.90
16 AE-8
Division No.21 (2nd call)
1058 / Providing CC Road from Janda Tree to Samba Subrahmanyam House at
17
2018-19 Pelluru in Division No.17 9.99 AE-3

1059 / Formation of Quarry Spell Road from Kandula Subba Rao House to Karradi
18
2018-19 Bavi at Pelluru in Division No.17 3.46 AE-3

1060 /
2018-19 Construction of Compound Wall at Kuravadi Baavi in Pelluru in Division No.17 7.45
19 AE-3

1061 / Construction of C.C Drain at Happy Home Apartment Back Side at Bhagya
20
2018-19 Nagar Donka in Division No.20 (Reserved for L.C.C.S) 5.00 AE-3

1062 / Construction of Compound Wall at Waliball Play Ground in


21
2018-19 Vengamukkalapalem in Division No.18 (Reserved for L.C.C.S) 9.98 AE-3

1063 / Construction of Balance CC Drain from Kotha Colony Main Road existing
22
2018-19 drain to NH-5 at Pelluru in Division No.17 1.15 AE-3

1064 /
2018-19 Providing CC Drain from Srinagar Colony in Division No.45 9.95
23 AE-4

1065 / Providing CC Drain from Srinagar Colony 4th Line Kurnool Road to Thirupathi
24
2018-19 Reddy (H) in Division No.45 (Reserved for L.C.C.S) 8.90 AE-4

1066 / Providing CC Drain and CC Culvert from Sri Nagar Colony 4th Line in Division
25
2018-19 No.45 10.00 AE-4

1067 / Providing CC Road and HDPE Pipe line From Bethelu Church South side at
26
2018-19 Mamidipalem of Division no.31 9.15 AE-4

Providing CC Road and CC Drain from Nuvvula Nageswara Rao House to


1068 /
2018-19 Koteswaramm House and Devi House to Palapati Seshamma House at Vijaya 9.85
27 AE-4
Nagar Colony In Division No.31
1069 / Providing CC Road and CC Drain from Vennnukota Venkata Rao House
28
2018-19 Ramalayam Temple of Div No.31 7.55 AE-4

1070 /
2018-19 Construction of Compound Wall at Dhobi Ghat in Division No.24 9.45
29 AE-4

1071 / Providing CC Road from Bhagya Nagar 4th Line North side 11Cross Road
30
2018-19 inDivision No.31 9.96 AE-4

1072 / Providing CC Drain From (Modern Town) Bhagya Nagar 4th Line North side
31
2018-19 11th Cross Road of Division No.31 6.80 AE-4

1073 /
2018-19 Laying of PVC Pipe Line at Vijaya Nagar Colony in Division No.31 8.65
32 AE-4

Providing CC Road from Vallepu Lakshmi House to Vallepu Ratthamma House


1074 / and VenkataRao house to Bandaru Achemma House and devalla Singamma
2018-19 House to Kommu Kasayya House and Thammisetty subba Rao to Pittala 9.45
33 AE-4

Singamma House in Division No.31 (Reserved for L.C.C.S)

Providing CC Road from Thammiksetty Narayana House to Thammisetty


1075 / Shesamma House and Thammisetty Thirupathamma house to Kunchala
2018-19 Lakshmi House and Ramakuri Srinu House to Gunji Yedukondalu house at 9.85
34 AE-4

Viajaya Nagar Colony in Division No.31


1076 / Providing CC Road and CC Drain & Pipe Line from Appala vari veedhi Opp Site
35
2018-19 at Pappu Bazar of Division No.26 1.75 AE-4
1077 /
2018-19 Providing Toilets at District Library in Ongole Municipal Corporation 7.90
36 AE-4

1078 /
2018-19 Providing CC Road from Kalikadevi Temple Road of Division No.22 4.25
37 AE-4

Supply of Labour for Watch and Ward and Petrolling along NSP canal from
1079 /
2018-19 Ramatheertham Reservoir to SS Tanks and additional Pumping arrangement 6.00
38 AE-3
to SS Tank-2 in Ongole Municipal Corporation

Widening of CC Road and CC Drain from Jakraiah Hospital Marrichettu to


1080 /
2018-19 Motupalli Durgamma House and Rajasekhar House to Venkateswara Redy 10.00
39 AE-4
House and Ymala Pularaju House Prabhavathi House of Division No.27

1081 / Construction of CC Drain from Rama Mandiramma gto Ration Shop and
40
2018-19 Lagadapati Srinu House to Ration Shop of Division No.27 8.60 AE-4

1082 / Widening of CC Road and CC Drain from Pusapati Pavan House to Main Road
41
2018-19 (Down) and Nagula House to Karimulla House in Division No.27 5.25 AE-4

Providing CC Road and CC Drain From Ex Counciler Yedukondalu house to


1083 /
2018-19 Bandaru Seetha House at Vijaya Nagar Colony of Division No.31 (Reserved for 9.50
42 AE-4
L.C.C.S)
1084 / Providing Equipment for AFC Class Rooms in PVR High School 5 Numbers
43
2018-19 Smart Digital Class Rooms in Ongole Municipal Corporation 10.00 AE-4

1085 / Construction of C.C Drain (Both Side of Road) & Raising of CC Road at Back
44
2018-19 side of Gaddalagunta Park Line in Division No.32 9.30 AE-5

1086 / Providing Chain Link Mesh Fencing under Gaddalagunta Water Tank all
45
2018-19 Round in Division no.32 6.30 AE-5

1087 /
2018-19 Desiltation of Drains in AE-5 Section in Ongole Municipal Corporation 6.40
46 AE-5

1088 / Construction of CC Road at West Side of Gaddalagunta Water Tank in


47
2018-19 Division No.32 (Reserved for L.C.C.S) 9.85 AE-5

1089 / Providing Wall Pits & CC Road Repairs at Vilekarla Colony, Kotha Donka in
48
2018-19 Division No.33 3.00 AE-5

1090 / Providing C.C Drains from Subbarami Reddy Statue to Kamma Palem Main
49
2018-19 Road Via NTR Kalapraganam in Pernamitta in Division No.41 10.00 AE-6

1091 / Providing C.C Road from Pothuraju Gudi to Dagupati Nageswara Rao House
50
2018-19 of Pernamitta in Division No.41 10.00 AE-6

1092 / Providing C.C Road from Sivalayam to Hindu Burial Ground of Pernamitta
51
2018-19 (Reach-I) in Division No.41 9.95 AE-6

1093 / Providing C.C Road from Sivalayam to Hindu Burial Ground of Pernamitta
52
2018-19 (Reach-II) in Division No.41 9.95 AE-6

1094 / Constuction of Compound Wall to Brhamins and Vaisya Burial Ground near
53
2018-19 Sivalayam in Pernamitta in Division No.41 9.55 AE-6

1095 / Constuction of Compound Wall to OC'S Burial Ground near Sivalayam in


54
2018-19 Pernamitta in Division No.41 9.55 AE-6

1096 / Providing CC Road 5th Line (West side Main Road) of Pragathi Nagar in
55
2018-19 Division No.39 10.00 AE-6

1097 / Construction of Compound Wall to Naidus Burial Ground near MI Tank in


56
2018-19 Pernamitta in Division No.41 9.55 AE-6
1098 / Construction of Shelter Room to Naidus Burial Ground near MI Tank in
57
2018-19 Pernamitta in Division No.41 4.35 AE-6

1099 / Providing CC Road from Meera Colony to geetha Mandiaram of Division


58
2018-19 No.40 9.85 AE-6

1100 / Providing CC Road from Kurnool Road Main Road to Meera Colony of
59
2018-19 Division no.40 9.85 AE-6

1101 / Prroviding CC Road from Revenue Colony Main Road to towards


60
2018-19 Umamanovikasa Kedram in Division No.44 10.00 AE-7

1102 / Laying of Quarry Rubbish Road at Maruthi Nagar 3rd Line from VST Tractor
61
2018-19 Agency to N.Obulamma House in Division No.44 (Reserved for L.C.C.S) 2.90 AE-7

1103 / Formation of Quarry Spell Road at Krishna Nagar from SD.Fayaz (H) to
62
2018-19 G.Sujatha (H) in Division No.38 (Reserved for L.C.C.S) 1.20 AE-7

Construction of C.C Drain at Sunnapu Battila Bazar from Anjaneyulu (H) to


1104 /
2018-19 Srinivasa Rao (H) and CC Road from T.Ramesh (H) to B.Mattaiah (H) in 8.10
63 AE-7
Division No.38
1105 / Construction of CC Drain at Brundavan Nagar Main Road from Varma
64
2018-19 Bhiryani Point to Dacharla Apartment in Division No.46 10.00 AE-7

Construction of CC Road & CC Drain at Brudavan Nagar Main Road South side
1106 / 3rd C/R from N.Anjaiah House to V.Ramanamma House and CC Drain at
2018-19 Briundhavan Nagar Main Road North Side 3rd C/R from Ex.Depot Manager 6.40
65 AE-7

(Chittibababu (h)) to N.Subba Rao (H) in Division No.46

Construction of CC Drain at Brundavan Nagar 1st Line from Sai Super Market
1107 /
2018-19 to Anuradha (H), Anajaiah road from Touch Bhiryani Point to Ex.MLA 9.45
66 AE-7
Kasukurthi adenna (H) in Division No.46
1108 / Construction of CC Drain from SC Hostel to Reddy Hostel at Bhagya nagar 4th
67
2018-19 Line in Division No.19 8.85 AE-3

1109 / Providing CC Drain both sides and Balanced CC Road at 3rd Line in Samatha
68
2018-19 Nagar in Division No.37 (2nd Call) 8.25 AE-6

1110 / Laying of PVC Pipe Line and Construction of CC Drain at Mangla Palem Main
69
2018-19 Road in Ura cheruvu In Divison No.24 1.65 AE-4

Construction of CC Drain at Sriram Colony Main Road East side from Thoka
1111 / Veeraiah (H) B.Kondaiah (H), Virat Nagar 5th Line 1st C/R, A.Guru Brahma
2018-19 Chari (H) to Bhaskar Rao (H) and Virat Nagar 5th Line Eswaramma (H) to 8.20
70 AE-7

K.Subrahmanyam (H) in Division No.43


1112 / Construction of CC Drain at shirdi sai Baba Nagar from B.V.S Internet to Sri sai
71
2018-19 Nilayam in Division No.43 9.30 AE-7

1113 / Construction of CC Road & CC Drain at Ayush Hospital Road in Division No.43
72
2018-19 (Reserved for L.C.C.S) 8.20 AE-7

1114 /
2018-19 Construction of CC Drain at Sivalayam East Side in Pelluru in Division No.17 2.35
73 AE-3

1115 / Laying of CC Road & Drain at Ch.Venkaatanarayana House to


74
2018-19 B.Venkateswarlu house at Cheruvukommupalem in Division No.18 5.40 AE-3
1116 / Providing Childern Play Equipment in Open Space near Ankammathalli
75
2018-19 Apartment in Revenue Colony in Division No.37 9.60 AE-6

TOTAL 577.81
Download Start Time : 17.01.2019 5.00 P.M
Download End Time : 31.01.2019 5.00 P.M
Receipt of Bids End Time : 31.01.2019 5.15 P.M
Price Bid Opening Time : 31.01.2019 5.30 P.M
1
1118 / Providing Shamiyanas for 15000 Numbers Seating Capacity at Mini Stadium 10.00 AE-5
2018-19 for Pension Distribution

2
1119 / Providing Dias for Meating (Stage), Decoration, VVIP Chairs, AC'S , and Flexis 7.00 AE-5
2018-19 at Mini Stadium for Pension Distribution

3
1120 / Providing Shamiyanas, Tables and and Chairs for Meals area for Pensions 8.00 AE-5
2018-19 distribution at Mini Stadium

4
1121 / Providing PVC Chairs, Floor Mats, Sofas and Special Chairs at Mini Stadium 6.00 AE-5
2018-19 Pension Distribution

5
1122 / Providing Sound System, Lighting, Coolers and Generator sets at Mini 5.00 AE-5
2018-19 Stadium for Pension Distribution
TOTAL 36.00
Download Start Time : 27.01.2018 5.00 P.M
Download End Time : 30.01.2018 5.00 P.M
Receipt of Bids End Time : 30.01.2018 5.15 P.M
Price Bid Opening Time : 30.01.2018 5.30 P.M
1123 / Transportataion of Water through water tankers to unserved and illeserved
1 2018-19 areas in Ongoler Municipal Corporation 68.00 AE-1

1124 / Transportation and Supply of Water to Koppolu and Mukthinuthalapadu


2 2018-19 10.00 AE-2
areas in Ongole Municipal Corporation
Construction of Compound wall to Open places BC Employees housing board
1125 /
3 2018-19 Society Colony near Pothuraju palem 16th Division in Ongole Muniucipal 9.80 AE-2
Corporation
1126 / Supply of Car on hire basis to Examinar and Assistant City Planner for the
4 2018-19 8.40 AE-7
Year 2019-2020 in Ongole Municipal Corporation
1127 / Supply of Car on hire basis to Municipal Commissioner and Assistant
5 2018-19 Commissioner for the Year 2019-2020 in Ongole Municipal Corporation 8.40 AE-7

1128 / Supply of Car on hire basis to Municipal Engineer and Anganwadi Co-
6 2018-19 oradinator for the Year 2019-2020 in Ongole Municipal Corporation 8.40 AE-7

1129 / Construction of C.C Drain and Culvert from S.Leelavathi house to Bhemaneni
7 2018-19 Kalyan Kumar house in Kammapalem 3rd line in Division No.7 (2nd Call) 3.75 AE-1

1130 / Construction of C.C Drain and C.C Road from chakire Maruthi kumar house
8 2018-19 3.25 AE-2
towords junctions of Andharao Road No.13 (2nd Call)
Construction of C.C Drain and C.C road from Anantha mallikarjuna house
1131 /
9 2018-19 towards back side of Saradha balakutir to Andhrao Road in Division No.13 9.45 AE-2
(2nd Call)
1132 / Construction of C.C Drains at Ayyanna Setty Satram in Division No.11 (2nd
10 2018-19 9.60 AE-2
Call)
1133 / Construction of C.C Drain at Old Sujatha Nagar Cross roads in Division 34
11 2018-19 10.00 AE-5
(2nd Call)
1134 / Construction of C.C road & C.C Drain at Old Sujatha nagar Cross Road Near
12 2018-19 9.35 AE-5
Bye pass in Division 34 (2nd Call)
1135 / Construction of C.C Drain at Lakshmi Narasimha Puram in Division No.38
13 2018-19 7.55 AE-7
(2nd Call)
1136 / Construction of CC drain from Burla Venkateswara Rao House to NH-5 at
14 2018-19 Housing Board Polytechnic College Park in Division No.19 (2nd Call) 3.15 AE-8

1137 / Construction of C.C Drain and Culvert from Namdigalla Nageswara Rao House
15 2018-19 8.30 AE-8
to Z.P. Road in Cheruvukommu palem in Division No.18 (2nd Call)
1138 / Construction of C.C Drain from Ramalayam to Gangamma Temple in
16 2018-19 3.95 AE-8
Cheruvukommupalem in Division No.18 (2nd Call)
1139 / Construction of C.C Drain from Panchayathi Office to Ramalayam in
17 2018-19 5.30 AE-8
Cheruvukommupalem in Division No.18 (2nd Call)
1140 / Construction of C.C Drain from Panchayathi Office to Gangamma Temple in
18 2018-19 5.15 AE-8
Cheruvukommupalem in Division No.18 (2nd Call)
1141 / Providing C.C Road and C.C. Drain from Pendyala Subbaratnam House to
19 2018-19 9.93 AE-8
Boddu Balaji House in Cheruvukommupalem in Division No.18 (2nd Call)

1142 / Construction of C.C Drain and Culvert from chebrolu Maheswara Rao House
20 2018-19 to Panchayathi Office in Cheruvukommu palem in Division No.18 (2nd Call) 7.30 AE-8

Providing C.C Road and C.C Drain from Jajula Brahmaiah house to Kolliboyina
1143 /
21 2018-19 Prabhakar house and from Puvvada Ramaiah house to Muppa Kotilingam 9.20 AE-8
house in Cheruvukommupalem in Division No.18 (2nd Call)
1144 / Providing CC Drian From Venu Gopapala Swamy Temple To Subbarao Tiffin
22 2018-19 1.85 AE-4
Shop in Division No.22 (4th call)
Construction of C.C Road from Chalapathi Rao house to Lawyer Govindaraju
1145 /
23 2018-19 house and C.C Drain from Gollapudi Madavi house to Palaparthi Jitson house 8.10 AE-8
in Balaji Nagar in Division No.21 (3rd Call)
Construction of C.C Drain and C.C Road at Virat Nagar 6th Line and CC Drain
1146 /
24 2018-19 from Garataiah (H) to Pothuraju Canal and Narasareddy (H) to 9.90 AE-7
Venkateswarlu(H) in Division No:43 (2nd Call)
1147 / Construction of Revertment and Steps on Uracheruvu at Hanuman Statue in
25 2018-19 3.65 AE-1
Mukthinuthalapadu in Division No.2 (2nd Call)
Construction of CC Road and C.C Drain from Sudanagunta Narayana house to
1148 /
26 2018-19 Dagupati Pedda Chenchaiah house in Mukthinuthalapadu in Division No.2 5.80 AE-1
(2nd Call)

Construction of C.C Drain From Thota Praveen House to Thota Ramaswamy


1149 / House Eswara Nilayam Line, Dande Ashok House to Rukmini Nilayam
27 2018-19 10.00 AE-5
Line(Near Ramalayam Junction) in Gaddalagunta area in Division No.32 (2nd
Call)
1150 / Laying of C.C Road from R&B Road to Thirupa reddy Hanumareddy Byarani in
28 2018-19 4.65 AE-8
Vengamukkalapalem in Division No.18 (2nd Call)
1151 / Laying of C.C Road from Thippareddy Pera Reddy house to Peddi Reddy
29 2018-19 3.50 AE-8
lakshmamma house in Vengamukkalapalem in Division No.18 (2nd Call)
1152 / Providing Quarry Spell Road in Samatha Nagar 4th, 5th and 6th line and
30 2018-19 9.60 AE-6
Dheeraj Apartment to Abhigna Super Market in Division No.37
1153 / Construction of C.C Drain From Kuttuboyina Subba Rao House to Bhagya
31 2018-19 7.26 AE-8
Nagar 4th Line via Register Office Road in Division No.20 (2nd Call)
1154 / Construction of C.C Road from Inabathina Venkateswarlu house to existing
32 2018-19 7.05 AE-5
Raja Rajeswari ammavari Temple in Division No.32 (2nd Call)
1155 /
33 2018-19 Construction of C.C Road at Brahmins Bazar in Division No.43 2.95 AE-7

1156 / Construction of of Incompletion of C.C Road, C.C Drain and Lowering of A.C
34 2018-19 6.60 AE-7
Pipe line at Mattam Bazar in Division No.49
Supply and Delivery of Bioculum, sanitreat, Coco Peat and Biobricks for
1157 /
35 2018-19 Organic Compost maker and 30 Litres of Home Composting Bins to Ongole 5.25 AE-7
Municipal Corporation

1158 / Construction of Compound Wall of Aramakshetram at Battulavarikunta in


36 2018-19 9.90 AE-2
16th Division
1159 / Construction of CC Drain & Culvert from Kammpalem 1st Line to
37 2018-19 10.00 AE-1
Kammapalem 3rd Line (along 40" Feet Road) in Division No.7
1160 / Construction of CC Road,Drain & Culvert from Gopal Nagar 4th Line to
38 2018-19 Kammaplem 1st Line (along 40" Feet Road) in Division No.7 9.90 AE-1

1161 / Construction of CC Road,Drain & Culvert from Beside Oldage Home (West
39 2018-19 10.00 AE-1
side of Burial Ground) in Division No.7
1162 / Construction of CC Road from Kammaplem 1st Line to Mahalakshmi Temple
40 2018-19 10.00 AE-1
(Via) Tangillakasim Veedi in Division No.7
1163 / Providing 150 mm dia A.C Pipe Line at Lakshmi Narasimha Puram in Division
41 2018-19 3.15 AE-7
No.38
Supply and delivery of Chlorine Gas Cylinders, Ferric Alum and Bleaching
1164 /
42 2018-19 Powder for the Maintenance of Water Supply in Ongole Municipal 9.95 AE-8
Corporation
TOTAL 367.29
Download Start Time : 26.01.2018 5.00 P.M
Download End Time : 08.02.2018 5.00 P.M
Receipt of Bids End Time : 08.02.2018 5.15 P.M
Technical Bid Opening Time : 08.02.2018 5.30 P.M
Price Bid Opening Time : 08.02.2018 5.45 P.M
1165 / Construction of disposal drain from Throvagunta SC Colony to Mudigonda
1 2018-19 10.00 AE-7
Vagu in Division No.50 under S.C.C Grant
1166 / Construction of compound wall to SC Aramakshetram at Bathulavari Kunta in
2 2018-19 13.00 AE-2
Division No.16 under S.C.C Grant
1167 / Providing central lighting from St.Anns Church up to Pothuraju Canal in
3 2018-19 Srinivasa hall road in Division No.5 under S.C.C Grant 24.00 AE-1

Providing Balance CC Road to Arunodaya Colony and approach road to


1168 /
4 2018-19 Christian palem burial ground in Pernamitta in Divison No.42 under S.C.C 27.00 AE-6
Grant
1169 / Drilling of deep bore wells and fixing of IM-II pump sets at SC Colonies in
5 2018-19 6.00 AE-6
Ongole Municipal Corporation under S.C.C Grant (Reserved for L.C.C.S)
1170 / Construction of community hall at Samaikyatha Nagar in Division No.24
6 2018-19 20.00 AE-4
under S.C.C Grant
1171 / Construction CC Culverts and approaches in Gaddalagunta SC Colony in
7 2018-19 Division No.32 under S.C.C Grant 2.00 AE-3

1172 / Construction of Community Hall in Bathulavari Kunta SC Area in Division


8 2018-19 20.00 AE-2
No.16 under S.C.C Grant
1173 / Construction of CC road from Agraharam main road to Arava Colony main
9 2018-19 24.00 AE-2
road in Division No.16 under S.C.C Grant
1174 / Renovation of Building in Kabadi Palem SC Locality in Division No.11 under
10 2018-19 S.C.C Grant 20.00 AE-2

1175 / Construction of Balance Compound wall to Koppolu SC Burrial Ground in


11 2018-19 20.00 AE-1
Division No.9 under S.C.C Grant
TOTAL 186.00
Download Start Time : 04.02.2019 5.00 P.M
Download End Time : 18.02.2018 5.00 P.M
Receipt of Bids End Time : 18.02.2018 5.15 P.M
Price Bid Opening Time : 18.02.2018 5.30 P.M
1177 / Construction of CC Road from YSR Colony near Flyover Bridge in Division
1 2018-19 No.9 9.45 AE-1

Construction of CC Drain & Culvert From Raju (H) to SK.Shakeera (H) and
1178 /
2 2018-19 Cross Roads in Both Sides of Daddy House in Ponugupati Colony in Division 9.60 AE-1
No.3
1179 /
3 2018-19 Construction of CC Road & Drain from Gopal Nagar 4th Line in Division No.6 9.95 AE-1

1180/ Formation of Quarry Rubbish Road from Nallavagu Culvert to Peddayya


4 2018-19 5.00 AE-2
Kunta in Koppolu in Division No.10
1181 / Laying of C.C Road & Drain at Pelluru Yedukondalu House to Y.Anjaneyulu
5 2018-19 House at Cheruvukommupalem In Division No.18 3.20 AE-3

1182 / Construction of C.C Road from Bhavya Chiken Shop to Church at


6 2018-19 Dharavarithota Main Road in Division No.21 10.00 AE-3

1183 / Construction of C.C Road from Church to Banka Anjamma House at


7 2018-19 10.00 AE-3
Dharavarithota Main Road in Division No.21
1184 / Development of C.R.P Quarters Park and Supply of Children Play Equipment
8 2018-19 9.98 AE-3
in Division No.21
1185 / Developmet of Land Scaping & Tree Planitation and Childeern Play
9 2018-19 Equipment at Dcevudu Cheruvu Park in Division No.21 6.00 AE-3

1186 /
10 2018-19 Providing CC Drain at Uracheruvu of Division No.24 10.00 AE-4

1187 /
11 2018-19 Providing CC Patches in Various Places of Division No.22 5.00 AE-4

1188 / Providing CC Drain From Vemana Palem and Ankammapalem in Division


12 2018-19 9.55 AE-4
No.22
1189 /
13 2018-19 Providing First Floor for Aramakshetram at Gaddalagunta in Division No.32 10.00 AE-4
1190 / Providing CC Road and CC Drain at Mamidipalem Sharone Church in Division
14 2018-19 3.45 AE-4
No:31
1191/ Construction of Arama Kshetram Near Sharma College Burial Ground in
15 2018-19 10.00 AE-4
Division No.30
1192 /
16 2018-19 Construction of Community Hall at Magalipalem in Division No.24 10.00 AE-4

1193 /
17 2018-19 Construction of Community Hall at Yanadi Colony in Division No.27 10.00 AE-4

1194/ Transportation and Supply of Water in various places in 1 to 25 Divisions in


18 2018-19 10.00
Ongole Municipal Corporation
1195 / Construction of C.C Drain from Bharathwaj Residency to Modern Eye
19 2018-19 9.65 AE-5
Hospital and at Various Places in Division No.35
Construction of CC Drain beside Sri Achalananda Asramam Line D.No.8/95 to
1196 /
20 2018-19 existing VIP Road and D.No.36-71-99(2) to existing Mangamur Road in 10.00 AE-5
Division No.35
1197 / Construction of CC Drain at Back side of Panchamuka Anjaneyaswamy
21 2018-19 Temple Line in Division No:35 10.00 AE-5

1198 / Construction of CC Road and Drain Backside of Poleramma Temple at


22 2018-19 9.55 AE-5
Gaddalagunta in Division No.32
1199 / Providing CC Road from 7th to 13th Roads in Peerlamanyam in Division
23 2018-19 10.00 AE-6
No.39
1200 / Providing CC Road from surendra Babu House to P.Brahmaiah House Vani
24 2018-19 10.00 AE-6
Apartment in Division No.39
1201 / Construction of Community Hall Near Ambedkar Statue at Manikanta Nagar
25 2018-19 in Division No.39 10.00 AE-4

1202 /
26 2018-19 Construction of Community Hall at Arunodaya Colony in Division No.39 10.00 AE-4

1203 / Providing Foot Path and Filling of Sand under Kurnool Road flyover in Ongole
27 2018-19 5.80 AE-7
Municipal Corporation
1204 / Providing Water Supply and Electrical Work at under Kurnool Road Flyover
28 2018-19 Park in Ongole Municipal Corporation 2.60 AE-7

1205 /
29 2018-19 Repaires to Chivukalavari Veedhi Well & CC Approaches in Division No.12 1.22 AE-2

1206 / Providing C.C Drain south side from Miriyalapalem Centre to Vijayadurga Hall
30 2018-19 6.05 AE-2
in Division No.12
1207 / Providing C.C Drain North side from Miriyalapalem Centre to Vijayadurga Hall
31 2018-19 in Division No.12 8.90 AE-2

1208 / Construction of CC Drain from Bommarillu House to Indurthi Krishna Rao


32 2018-19 6.70 AE-3
House at Housing Board Colony in Division No.19
Repaires, Rectification of Electricals, Plumbing Items and Repaires to the
1209 /
33 2018-19 Damaged Compound Wall at P.V.R (G) Municipal High School in Division 5.70 AE-5
No.28
1210 / Providing Electrical Lighting Murals at Statues Circle In Ongole Municipal
34 2018-19 2.33 AE-2
Corporation
1211 / Construction of Dias & Compound Wall Kabela Site in Karuna Colony in
35 2018-19 Division No.3 6.40 AE-1
1212 / Laying of AC Pipe Line & Quarry Rubbish Road from Guntur Road to Subba
36 2018-19 4.60 AE-1
rami Reddy house in Division No.3
1213 /
37 2018-19 Laying of Air Valve Pit at sarma College Main Road in Division No.30 1.70 AE-4

1214 / Providing Balance CC Road and CC Culvert in Revenue Colony 3rd Line in
38 2018-19 Dividsion No.37 6.65 AE-6

1215 / Providing 250 mm dia A.C Pipe Line from TDP Party Office at Guntur Road to
39 2018-19 in Poornodaya Mee seva Centre in Division No.49 2.75 AE-7

1216 /
40 2018-19 Formation of Quarry spell Road Damcharla Anjaneya Colony in Division No.42 5.30 AE-6

1217 / Construction of C.C Drain & Culvert at Ganga Cheruvu Parvathamma Temple
41 2018-19 2.76 AE-4
to Water Plant in Gaddalagunta SC Colony in Division No.30
1218 / Providing CC Road from Devara Temple Poleramma Temple (Gollapalem) in
42 2018-19 Division No.31 4.38 AE-4

1219 / Transportation and Supply of Water in various places in 26 to 50 Divisions in


43 2018-19 Ongole Municipal Corporation 10.00

1220 / Construction of CC Drain at Back side of SBI Bank in Anjaiah Road in Division
44 2018-19 4.40 AE-5
No.36
1221 / Construction of Balanced CC Drain at Ayappaswamy Temple Line in Division
45 2018-19 8.70 AE-5
No.36
1222 / Construction of CC Drain from D.No.8-437 to Existing CC Culvert (Opp Padma
46 2018-19 Towers) D.No.36-72-462 byepass End in Division No.36 9.85 AE-5

1223 / Development of Park State Bank Colony East Side in Sri Ram Colony in
47 2018-19 6.35 AE-4
Division No.45
1224 / Providing CC Road from Pokuri Adinarayana House to goda velugonda reddy
48 2018-19 9.65 AE-4
House in Division No.45
1225 /
49 2018-19 Laying of 1000 mm NP-3 Pipes at Mudigonda Vagu Bridge in Division No.50 10.00 AE-7

1226 / Providing CC Road from Venkateswara Reddy Plot to Anjaneyulu House of


50 2018-19 5.30 AE-6
Division No.40
1227 / Providing CC Road from D.Thirupathaswami House to Yerukala Palem of
51 2018-19 9.80 AE-6
Division No.40
1228 / Providing CC Road from Kanduluri Koteswara Rao House to D.Thiruapthi
52 2018-19 swami house in Division No.40 9.80 AE-6

1229 / Construction of CC Drain from D.No.8-411(1) to Existing MM Road Via Sri


53 2018-19 Golden Enclave House in Division No.35 7.55 AE-5

1230 / Construction of Compound Wall and Removal of Septic Tank in Health Centre
54 2018-19 1.75 AE-1
in papa Colony in Div No.3
1231 / Laying of Quarry Rubbish Road on North side of Virat Nagr from Shaik shilar
55 2018-19 1.75 AE-7
(H) to Chennuboyina Eswarama (H) in Division No.43
1232 / Providing C.C.Drains in Sambasiva Nagar Main Road and 2nd Line and
56 2018-19 Soniyagandhi Nagar 3rd line in Division No.37 9.30 AE-6

1233 / Construction of CC Road from Western side of Malladi Enclave to Srikrishna


57 2018-19 Towers (Ashrmam) in Mangamuru Road in Division No.40 9.85 AE-6

1234 / Construction of CC Drain Reddy Bazar Katragadda Srinivasa Rao, Bathala


58 2018-19 9.15 AE-2
peraiah and Ramulavari temple in Koppolu in Division No.10
1235 / Completion of in-complete Compound wall to Park in N.Agraharam in
59 2018-19 6.82 AE-2
Division No.10
1236 / Providing Community Hall at Gaddalagunta Water Tank Compound in
60 2018-19 10.00 AE-5
Division No.32
1237 / Formation of Quarry Rubbish Road Back side of Harshini Degree College (Bye
61 2018-19 5.00 AE-5
Pass) in Division No.34
1238 /
62 2018-19 Construction of C.C Road Beside Rajeev Nagar Park in Division No.34 4.25 AE-5

1239 / Supply, Delivery and Fixing of Stitching Machines to Skill Up gradiation


63 2018-19 2.60 AE-7
Centre in Ongole Municipal Corporation
1240 / Providing Painting to Dividers from Church Centre to Rims 1st Gate in Ongole
64 2018-19 9.43 AE-2
Municipal Corporation
Providing Figurative/Abstract/Geometrical/patterns Art/ Nature art work on
1241 /
65 2018-19 walls with Professional Artists at DRRM High School & Collector office Walls 4.00 AE-2
in Ongole Municipal Corporatrion
Providing Lord Hanuman carrying Ram and Lakshman ( as a Standing position
1242 /
66 2018-19 of Hanuman) Life sculpture work with Cement (3D Effect) work at Housing 9.55 AE-3
Board Park in Division No.19
Construction of CC Drain & CC Culvert from Kathi Samudramma House (Via
1243 /
67 2018-19 Dasari Syam (h) to Kesamsetti Papa Rao (h) in Bothavari veedhi in Division 4.65 AE-1
no.8
Construction of CC Drain & CC Road from SK.Chadndu Basha (H) to
1244 /
68 2018-19 MD.Harish (H) and Transform to Devarakonda Arjun (H) in Bilal Nagar 1st 5.20 AE-1
Line in Division No.3
Laying of AC Pipe line & Quarry Rubbish Road from Gandi Ramadevi (H) to
1245 /
69 2018-19 Patnam Nageswara Rao House at main Road at Community hall Opp SC 4.70 AE-1
Colony in Division No.1
1246 / Construction of CC Road from Bochu Singaiah (h) to Bochu Deva Dasu house
70 2018-19 in Throvagunta in Division No.1 (Reserved for L.C.C.S) 6.50 AE-1

Providing Thermoplastic Road Marking and Supply and Fixing of raised


1247 /
71 2018-19 Pavement Markers (Road Studs) from Church Center to south bye Pass Road 8.90 AE-3
West side in Ongole Municipal Corporation
Providing Thermoplastic Road Marking and Supply and Fixing of raised
1248 /
72 2018-19 Pavement Markers (Road Studs) with Twin Moulded shanks from Ravi priya 3.65 AE-7
Mall to National High Way in Ongole Municipal Corporation
1249 / Construction of "Savithri Bhai Pule Bhavan" Mahila Samajam Ongole Building
73 2018-19 in Division No.22 9.85 AE-4

1250 / Supply of Out Sourcing Workers in ongole Municipal Corporation for the Year
74 2018-19 2018-19 (Reserved for L.C.C.S) 10.00 AE-5

1251 / Construction of CC Road of Fly OverOver of Iyyanna Setty Satram in Division


75 2018-19 No.11 10.00 AE-2

TOTAL 542.52
Download Start Time : 06.02.2019 5.00 P.M
Download End Time : 25.02.2019 5.00 P.M
Receipt of Bids End Time : 25.02.2019 5.15 P.M
Price Bid Opening Time : 25.02.2019 5.30 P.M
Supply of Outsourcing Workers for Sanitation Section in Package No.1 for the
1252 /
2018-19 year 2019-20 in Ongole Municipal Corporation (Reserved for Societies
1 550.00
registered under G.O.Ms.No.581 MA, Dt.6.11.96)
Supply of Outsourcing Workers for Sanitation in Package No.2 for the year
1253 /
2018-19 2019-20 in Ongole Municipal Corporation (Reserved for Societies registered
2 504.00
under G.O.Ms.No.581 MA, Dt.6.11.96)
Supply of Outsourcing Workers for Sanitation in Package No.3 for the year
1254 /
2018-19 2019-20 in Ongole Municipal Corporation (Reserved for Societies registered
3 298.00
under G.O.Ms.No.581 MA, Dt.6.11.96)
TOTAL 1352.00
Download Start Time : 13.02.2019 5.00 P.M
Download End Time : 22.02.2019 5.00 P.M
Receipt of Bids End Time : 22.02.2019 5.15 P.M
Price Bid Opening Time : 22.02.2019 5.30 P.M
1255 /
2018-19 Repairs to Internal Roads in Prakasam Bhavanam in Division No:13
1 8.25 AE-2

1256 /
2018-19 Urgent Repairs of Prakasam Bhavanam Back Side in Division No:13
2 8.28 AE-2

1257 /
2018-19 Repairs of Prakasam Bhavanam North Block in Division No:13
3 4.95 AE-2

1258 / Repairs & Rectifications of Eletrical Work in Prakasam Bhavanam in Division 8.75 AE-2
2018-19 No:13
1259 /
2018-19 Providing Internal C.C Patch Work in Prakasam Bhavam in Division No.16
9.99 AE-2

TOTAL 40.22
Download Start Time : 13.02.2019 5.00 P.M
Download End Time : 22.02.2019 5.00 P.M
Receipt of Bids End Time : 22.02.2019 5.15 P.M
Price Bid Opening Time : 22.02.2019 5.30 P.M
1261 / Transportataion of Water through water tankers to unserved and illeserved
1
2018-19 areas in Ongoler Municipal Corporation 68.00

1262 / Construction of CC Road from Gandhi Hanumanthu (H) to Both Side Roads in
2 2018-19 Throvagunta in Division No.1 7.40 AE-1

Construction of CC Road from Nalluri Suraiah (H) to Upputuri Subbayamma


1263 /
2018-19 House and Kuncha Ramanjaneyulu House (H) to Melpuri Hari Babu House in 6.75
3 AE-1
Throvagunta in Division No.1

Construction of CC Road from Ramalayam Temple to Yaramaneni Kristaiah


1264 /
4 2018-19 House and Kanaparthi Babu Rao House to Bodapati Seshamma and Kata 9.95 AE-1
Punnaiah House to Puli Srinu House in Throvagunta in Division No.1

1265 / Construction of CC Road from Park to Sai Baba Temple In Throvagunta in


5
2018-19 Division No.1 8.70 AE-1

1266 / Construction of CC Road from (Chirala Road) Chadalavada Venkateswarlu


6 2018-19 House to Mathineni Malleswari House in Throvagunta in Division No.1 7.60 AE-1
1267 / Construction of CC Road from SK.Gouse Basha (H) to High School in
7
2018-19 Throvagunta in Division No.1 8.30 AE-1

1268 / Construction of Compound Wall for Hindu Burial Ground at Ganapathi Nagar
8 2018-19 9.80 AE-7
in Division No.43
Construction of CC Road from Western side of Srikrishna Towers to
1269 /
2018-19 Venkateswara Reddy House (Ashrmam) in Mangamuru Road in Division 9.85
9 AE-6
No.40
1270 / Providing B.T Surface Road from Mangamuru Road to datta peetam (Reach-
10 2018-19 10.00 AE-6
1) in M.M Road in Division No.40
1271 / Providing B.T Surface Road from Mangamuru Road to datta peetam (Reach-
11
2018-19 2) in M.M Road in Division No.40 10.00 AE-6

1272 / Repaires and Rectification of Leaks at Gaddalagunta 3 Statue, Sai Baba


12 2018-19 2.00 AE-5
Temple and Traffic Police station in Division No.32
1273 / Repaire and Walking Track and Levelling of site at Bhagya Nagar 2nd Line
13
2018-19 Park in Division No.20 3.25 AE-3

1274 / Repaires and Rectification of Leaks KMS School, Sai Maharaj and Bhagya
14 2018-19 Nagar 4th Line in Ongole Municipal Corporation 1.90 AE-3

1275 /
2018-19 Repaires and Rectification of Leakages at Panchayathi Office in Division No.14 1.70
15 AE-2

1276 /
16 2018-19 Arrangement Toilet at Velugu Office in Ongole Municipal Corporation 1.30 AE-4

1277 / Laying of 100 mm dia A.C Pipe Line from D.No.26-42-338 to Ch.Ramesh
17
2018-19 house in Dharavari Thota in Division No.20 1.25 AE-3

1278 / Laying of C.C Culvert at P&T Colony Main Road Opp Siri Hospital in Division
18 2018-19 No.17 2.20 AE-3

Formation of Quarry Spell Road at Jayaprakash Colony Main Road Extension


1279 / Northside 1 Cross Roads from S.Obulk Reddy House to Chaithanya Colony
2018-19 Main Road & 2nd Cross Road C Jayamma House to P.Srikanth House in 5.10
19 AE-7

Division No.50
1280 / Painting to Balance Work of Arama Kshetram in Bathulavarikunta in Division
20 2018-19 3.15 AE-2
No.16
1281 / Providing Road Safety interversions to Certain Roads at AE-2 Section in
21
2018-19 Ongole Municipal Corporation 7.75 AE-2

1282 / Laying of 100mm & 150 mm Dia AC Pipe Line from New SC Colony at
22 2018-19 9.97 AE-3
Vengamukkalapalem in Division No.18
1283 / Construction of C.C Drains & Culverts from Ambedkar Nagar New SC Colony
23
2018-19 at Vengamukklapalem in Division No.18 9.98 AE-3

1284 / Construction of C.C Drains & Culverts from Harijanawada New SC Colony at
24 2018-19 9.98 AE-3
Vengamukklapalem in Division No.18
1285 /
2018-19 Laying of P.V.C Pipe Line at Vanta Pani vari Colony in Division No.24 1.85
25 AE-4

1286 / supply and Delivery of Ties, Belts, shoes and Uniforms for 17 Municipal
26 2018-19 5.16 AE-5
Elementary and Municipal High Schools in Ongole Municipal Corporation
1287 / Construction of C.C Road from Vemuri Lingaiah house to Burusu Kotamma
27
2018-19 house in Store Bazar in Division No.47 10.00 AE-7
1288 / Providing C.C Patch Work & Pipe Line Trench at Dharavarithota 6th line in
28 2018-19 2.50 AE-3
Division no.20
1289 /
2018-19 Laying of C.C Road at Velugu Office Opp In Division No.19 5.75
29 AE-3

1290 / Providing Kalankari Stencil design art work on the flyover Parapet Wall from
30 2018-19 10.00 AE-7
junction Point to towards South side in Ongole Municipal Corporation

Providing Mural art work with High Cement Embossing art on the beams at
1291 /
2018-19 Kurnool Road fly over (on North Side) of Piller face :57 to 62 in Ongole 8.85
31 AE-7
Municipal Corporation
1292 / Laying of C.C Road & Culvert from Bhadethala Sheshagiri Rao House to
32 2018-19 4.95 AE-1
Bathina Nagarjuna House Beside Park in Throvagunta in Division no.1

1293 /
Laying of C.C Road from Rayalla Subba Rao House to Kunchala Jalaiah House
2018-19 and Tanniru Punnamma House to Kunchala Mahalakshamamma house at B.C 6.00
33 AE-1
Colony in Throvagunta in Division No.1
1294 / Laying of C.C Road at Pusapati Gopal Reddy house to Open Plot at
34 2018-19 4.65 AE-3
Cheruvukommu palem in Division No.18
Providing Figurative/Non-Figurative/Geometrical/Strencils/Art work on walls
1295 /
2018-19 at P.V.R High School Road and in Throvagunta in various places in A.E-1 and 8.00
35 AE-4
A.E-4 section in Ongole Municipal Corporation
1296 / Construction of Compound Wall at Elementary School at
36 2018-19 Cheruvukommupalem in Division No.18 9.85 AE-3

1297 / Providing Wall Tails & Shead For Public Toilets in Gandhi Park in Division
37
2018-19 No.36 6.40 AE-5

1298 /
38 2018-19 Providing Public Toilets in Gandhi Park in Division No.36 10.00 AE-5

1299 / supply and Delivery of Pyrosene oil -BIS Mark and alathion technical for
39
2018-19 Sanitation in Ongole Municipla Corporation 9.55 AE-7

1300 / Construction of CC Drain at Nerhu Nagar Extension Main Road, 2nd Cross
40 2018-19 8.50 AE-7
Road and Laying of Quarry Rubbsih Road at 1st C/R in Division No.50

1301 / Completion of in-complete Community Hall in Indira Colony (SC Colony Near
41
2018-19 Ramalaya Temple 8th Line) in Division No.9 4.55 AE-1

1302 / Construction of C.C Drains to Dwaraka Nagar 3rd Line 3rd, 4th Cross Roads in
42 2018-19 10.00 AE-6
Pernamitta in Division No.40
1303 / Construction of C.C Roads from S.Stalin house to N.Venkateswara house and
43
2018-19 from N.Nagendram house to P.Bujjamma house in Division No.2 10.00 AE-1

Construction of C.C Roads from Ch.Chandra sekhar house to A.Durgaiah


1304 /
44 2018-19 house and from G.Haribabu house to M.Nagaraju house in Kesavarajukunta 10.00 AE-1
in Division No.2
Laying of 100 mm and 150 mm dia A.C Pipe Line from Kalesha house to
1305 /
2018-19 Nazeer house and from Vali house to Nazeer house in Islampeta in Division 7.20
45 AE-1
No.4
1306 / Providing C.C Road from Dhanalakshmi Enclove to Main Road in
46 2018-19 6.35 AE-6
Chennakesava Swamy Layout in Division No.37
375.99
Download Start Time : 15.02.2019 5.00 P.M
Download End Time : 01.03.2019 5.00 P.M
Receipt of Bids End Time : 01.03.2019 5.15 P.M
Technical Bid Opening Time : 01.03.2019 5.30 P.M
Price Bid Opening Time : 01.03.2019 5.45 P.M
1307 /
1 2018-19 Construction of GYM Platform at Nirmal Nagar Park in Division No.36 8.10 AE-3

1308 /
2 2018-19 Construction of GYM Platform at Natubabu Rao Park in Division No.14 8.10 AE-3

1309 /
3 2018-19 Construction of GYM Platform at Gandhi Park in Division No.36 8.10 AE-3

1310 / Construction of C.C Road from Ankalamma temple to rtd. S.I Prasad house in
4 2018-19 9.85 AE-6
Division No.41
1311 / Providing of C.C Road from Mangamur Main Road to Ajanatha Residency
5 2018-19 (Chinna Rao house) in Division No.39 9.85 AE-6

1312 / Construction of Revertment and Steps on Uracheruvu at Hanuman Statue in


6 2018-19 Mukthinuthalapadu in Division No.2 (3rd Call) 3.65 AE-1

1313 / Supply of Car on hire basis to Examinar and Assistant City Planner for the
7 2018-19 8.40 AE-7
Year 2019-2020 in Ongole Municipal Corporation (2nd call)
Providing Quarry Spell Road from ABK House to Varma House, from Achari
1314 /
8 2018-19 House to Panthulu House and from Varma House to Sri Krishna Nagar Main 10.00 AE-6
Road in Division No.39
1315 / Construction of Compound Wall and Removal of Septic Tank in Health Centre
9 2018-19 1.75 AE-1
in papa Colony in Div No.3 (2nd call)
Construction of CC Road and C.C Drain from Sudanagunta Narayana house to
1316 /
10 2018-19 Dagupati Pedda Chenchaiah house in Mukthinuthalapadu in Division No.2 5.80 AE-1
(3rd Call)
1317 / Providing CC Road and CC Drain from Mukkanti House to Ankamma House in
11 2018-19 9.40 AE-4
Division No.37
1318 / Construction of "Savithri Bhai Pule Bhavan" Mahila Samajam Ongole Building
12 2018-19 9.85 AE-4
in Division No.22 (2nd call)
TOTAL 92.85
Download Start Time : 27.02.2019 5.00 P.M
Download End Time : 05.03.2019 5.00 P.M
Receipt of Bids End Time : 05.03.2019 5.15 P.M
Price Bid Opening Time : 05.03.2019 5.30 P.M
1319 / Drilling of deep bore wells and fixing of IM-II pump sets at various places in
1 2018-19 6.00 AE-6
Ongole Municipal Corporation
Construction of CC Drain & CC Road from SK.Chadndu Basha (H) to
1320 /
2 2018-19 MD.Harish (H) and Transform to Devarakonda Arjun (H) in Bilal Nagar 1st 5.20 AE-1
Line in Division No.3 (2nd call)
TOTAL 11.20
Download Start Time : 01.03.2019 5.00 P.M
Download End Time : 11.03.2019 5.00 P.M
Receipt of Bids End Time : 11.03.2019 5.15 P.M
Price Bid Opening Time : 11.03.2019 5.30 P.M
1321 / Providing central lighting from St.Anns Church up to Pothuraju Canal in
1 2018-19 24.00 AE-1
Srinivasa hall road in Division No.5 under S.C.C Grant (2nd call)
1322 / Construction of Community Hall in Bathulavari Kunta SC Area in Division
2 2018-19 20.00 AE-2
No.16 under S.C.C Grant (2nd call)
1323 / Construction of community hall at Samaikyatha Nagar in Division No.24
3 2018-19 20.00 AE-4
under S.C.C Grant (2nd call)
1324 / Construction CC Culverts and approaches in Gaddalagunta SC Colony in
4 2018-19 Division No.32 under S.C.C Grant (2nd call) 2.00 AE-3

1325 / Construction of Balance Compound wall to Koppolu SC Burrial Ground in


5 2018-19 20.00 AE-1
Division No.9 under S.C.C Grant (2nd call)
1326 / Ongole Municipal Corporation - Laying of B.T Road from Old National
6 2018-19 101.00 AE-7
Highway to Nathaji S.C Colony in Division No.50 under S.C.C Grant
TOTAL 187.00
Download Start Time : 06.03.2019 5.00 P.M
Download End Time : 22.03.2018 5.00 P.M
Receipt of Bids End Time : 22.03.2019 5.15 P.M
Technical Bid Opening Time : 22.03.2019 5.30 P.M
Price Bid Opening Time : 22.03.2019 5.45 P.M
1331 / Providing of Ramps and Electrical Works for Polling stations in Throvagunta
1 2018-19 in Division No.1 1.20 AE-1

1332 / Providing of Ramps and Electrical Works for Polling Stations in


2 2018-19 0.95 AE-1
Gudimellapadu in Division No.2
1333 / Providing of Ramps and Eectrical Works for Polling Stations in
3 2018-19 0.95 AE-1
Mukthinuthalapadu in Division No.2
1334 / Providing of Ramps and Electrical Works for Polling Stations in Division Nos.4
4 2018-19 5.00 AE-1
to 8 in Ongole Municipal Corporation
1335 / Providing of Ramps and Electrical Works for Polling Stations in
5 2018-19 Guthikondavaripalem in Division No.9 0.45 AE-1

Construction of Ramps and New Toilet Rooms and Electrical Work for
1336 /
6 2018-19 Election Poling Stations at Various Places in A.E-3 and A.E-5 Sections in 7.35 AE-5
Ongole Municipal Corporation
Construction of Ramps at Tangutur Prakasam School, Ongole Public School
1337 /
7 2018-19 and Gaddala gunta Ramlayam for Election Polling Stations in A.E-5 Section in 0.90 AE-5
Ongole Municipal Corporation
Construction of Ramps and Flooring Repair at Thophulo School and Yadhava
1338 /
8 2018-19 School for Election Polling Stations in A.E-5 Section in Ongole Municipal 1.40 AE-5
Corporation
Construction of Ramps, Flooring repairs and Toilet Repairs at Kothamamidi
1339 /
9 2018-19 Palem for Election Poling Station in A.E-3 Section in Ongole Municipal 1.80 AE-5
Corporation
1340 / Providing Assurred Minimum Facilities in Election Polling Stations in Division
10 2018-19 2.05 AE-6
Nos.40 and 42 in Ongole Municipal Corporation

1341 / Construction of Ramps and Providing Electrical Work for Election Polling
11 2018-19 6.00 AE-7
Stations at Various Places in A.E-7 Section of Ongole Municipal Corporation
Construction of Ramps, Flooring Repairs and Electrification for Election
1342 /
12 2018-19 Polling Statins in Division Nos.10 to 16 in AE-2 Section in Ongole Municipal 9.60 AE-2
Corporation
1343 / Repairs and Mainteance of Toilets for Election Polling Stations in AE-2
13 2018-19 Section in Ongole Municipal Corporation 2.90 AE-2

TOTAL 40.55
Download Start Time : 12.03.2019 5.00 P.M
Download End Time : 19.03.2019 5.00 P.M
Receipt of Bids End Time : 19.03.2019 5.15 P.M
Price Bid Opening Time : 19.03.2019 5.30 P.M
1344 / General Elections - Providing Water sachets to Polling Stations in Ongole
1 2018-19
Municipal Corporation 3.78 AE-5

Construction of Ramps and Flooring Repair at Thophulo School and Yadhava


1345 /
2 2018-19 School for Election Polling Stations in A.E-5 Section in Ongole Municipal 1.40 AE-5
Corporation (2nd call)
Providing Ramps And Repairs to Toilets and Electrical Work for Polling
1346 /
3 2018-19 Station in Sarma College And Zilla Parishad Office in Ongole Municipal 6.05 AE-4
Corporation

1347 / Providing Ramps and Electrical Work for Polling Station in VivekanandaVidya
4
2018-19 Vihar and Govt. Girls High School in Ongole Municipal Corporation 2.42 AE-4

Providing Ramps and Electrical Work and Construction Of Toilet for Polling
1348 /
2018-19 Station in Gaddalagunta Elementary School, Peerlamanyam School and St. 2.27
5 AE-4
Xaviers High School in Ongole Municipal Corporation
TOTAL 15.92
Download Start Time : 19.03.2019 5.00 P.M
Download End Time : 25.03.2019 5.00 P.M
Receipt of Bids End Time : 25.03.2019 5.15 P.M
Price Bid Opening Time : 25.03.2019 5.30 P.M
606 /
2017-18

607 /
2017-18

K 450

866 /
2017-18
872 /
2017-18

877 /
2017-18

879 /
2017-18

899 /
2017-18

902 /
2017-18

903 /
2017-18

922 /
2017-18

925 /
2017-18

929 /
2017-18

933 /
2017-18

937 /
2017-18

942 /
2017-18

1045 /
2017-18

K 457
K 246

K 284

K 462

K 305

K 334

K 336

K 338

K 339

K 340

K 341

K 357

K 280

K 274

K 275

K 267
K 268

K 269

K 337

K 385

K 393

K 390

K 301

K 289

K 300

K 314

K 290

K 302

K 303

K 304

K 307

K 308

K 309

K 310

K 316
K 379

K 461

K 229

K 242

K 249

K 293

K 313

K 321

K 322

K 412

K 328

K 404

K 405

K 406

K 407

K 408

K 409

K 410

K 413

K 251
K 252

K 253

K 258

K 261

K 318

K 319

K 320

K 415

K 417

K 445

K 446

K 283

K 330

K 331

K 430

K 442

K 233

K 354
K 396

K 451

K 452

K 453

K 454

K 455

K 456

K 388

K 411

K 389

K 432

K 433

K 434

K 435

K 297

K 298

K 299

K 238

K 416

K 287
K 285

K 294

K 312

K 380

K 376

K 239

K 345

K 423

K 424

K 286

K 422

K 420

K 421

K 428

K 279 a

K 279 b

K 279 c

K 279 d

K 279 e
K 436

K 437

K 438

K 369 (a)

K 369 (b)

K 392

K 448 a

K 448 b

K 449 a

K 449 b

K 236

K 391

K 429

K 459

K 325

K 248

K 439

K 440

K 441
K 247

K 254

K 256

K 259

K 260

K 262

K 240

K 329

K 447

K 458

K 460
12 /
2018-19
13 /
2018-19

15 /
2018-19

17 /
2018-19

19 /
2018-19

920 /
2017-18

924 /
2017-18
44 /
2018-19

45 /
2018-19
290 /
2018-19

34 /
2018-19

35 /
2018-19

37 /
2018-19

41 /
2018-19

50 /
2018-19

57 /
2018-19

58 /
2018-19
59 /
2018-19

60 /
2018-19

61 /
2018-19

67 /
2018-19

69 /
2018-19

75 /
2018-19

87 /
2018-19

92 /
2018-19

104 /
2018-19

107 /
2018-19

109 /
2018-19

110 /
2018-19

111 /
2018-19

122 /
2018-19

125 /
2018-19

126 /
2018-19

128 /
2018-19
134 /
2018-19

135 /
2018-19

141 /
2018-19

150 /
2018-19

160 /
2018-19

161 /
2018-19

163 /
2018-19

166 /
2018-19

168 /
2018-19

169 /
2018-19

170 /
2018-19

171 /
2018-19

172 /
2018-19

173 /
2018-19

211 /
2018-19

223 /
2018-19

273 /
2018-19
274 /
2018-19

241 /
2018-19

243 /
2018-19

244 /
2018-19

245 /
2018-19

K 317

K 220
183 /
2018-19

K 470

K 471

K 472

K 484

K 503

K 466

K 476

K 486

K 497

K 500

K 502

K 504

K 505

K 475

K 478

K 479

K 480
K 489

K 490

K 482

K 483

312 /
2018-19

345 /
2018-19

K 528
K 501

K 515

K 516

K 481

K 493

377 /
2018-19

390 /
2018-19

K 494

K 508

K 509

K 517

K 529

K 530

K 531

K 532
K 533

K 534

K 535

K 467

K 468

K 469

K 498

K 511

K 512

K 513

K 524

K 525

K 463

K 485

K 487

K 488

K 492

K 495

K 526

K 527
K 464

K 491(a)

K 491(b)

K 499

K 510

K 518

K 519

K 520

K 537

K 522

K 523

K 536

306 /
2018-19

307 /
2018-19

309 /
2018-19

310 /
2018-19

316 /
2018-19

318 /
2018-19

324 /
2018-19

325 /
2018-19
326 /
2018-19

338 /
2018-19

339 /
2018-19

382 /
2018-19

344 /
2018-19

K 496
466 /
2018-19

467 /
2018-19

468 /
2018-19

472 /
2018-19
473 /
2018-19

490 /
2018-19

500 /
2018-19

503 /
2018-19

461 /
2018-19

462 /
2018-19

463 /
2018-19

465 /
2018-19

469 /
2018-19

470 /
2018-19

471 /
2018-19

477 /
2018-19

479 /
2018-19

480 /
2018-19

483 /
2018-19

484 /
2018-19

486 /
2018-19

494 /
2018-19
495 /
2018-19

498 /
2018-19

502 /
2018-19
516 /
2018-19

517 /
2018-19

519 /
2018-19

520 /
2018-19

521 /
2018-19

523 /
2018-19

K 541

K 544

K 545

K 546

K 549
K 550

K 551
558 /
2018-19

540 /
2018-19

518 /
2018-19

551 /
2018-19

556 /
2018-19

557 /
2018-19

559 /
2018-19

560 /
2018-19

562 /
2018-19
K 521
575 /
2018-19

576 /
2018-19

582 /
2018-19

583/
2018-19

400 /
2018-19
580 /
2018-19

578 /
2018-19

581 /
2018-19

710 /
2018-19
573 /
2018-19

724 /
2018-19

664 /
2018-19

608 /
2018-19

609 /
2018-19

612 /
2018-19

614 /
2018-19

617 /
2018-19

618 /
2018-19

623 /
2018-19

624 /
2018-19

626 /
2018-19

627/
2018-19

628 /
2018-19

629 /
2018-19

638 /
2018-19
643 /
2018-19

652 /
2018-19

653 /
2018-19

665 /
2018-19

667 /
2018-19

668 /
2018-19

675 /
2018-19

681 /
2018-19

685 /
2018-19

686 /
2018-19

687 /
2018-19

689 /
2018-19

708/
2018-19
741/
2018-19
765/
2018-19

760 /
2018-19

761 /
2018-19

859/
2018-19

862/
2018-19
882/
2018-19

883/
2018-19
888/
2018-19

889/
2018-19
AE-5

AE-5

AE-5

AE-5

AE-5

1029 /
2018-19

893 /
2018-19

896 /
2018-19

897 /
2018-19

901 /
2018-19
912 /
2018-19

913 /
2018-19

931 /
2018-19

943 /
2018-19

946 /
2018-19

947 /
2018-19

948 /
2018-19

949 /
2018-19

950 /
2018-19

952 /
2018-19

953 /
2018-19

956 /
2018-19

957 /
2018-19

964 /
2018-19

978 /
2018-19

979 /
2018-19

998 /
2018-19

1005 /
2018-19

1007 /
2018-19
1012 /
2018-19

1015 /
2018-19
1147 /
2018-19

1126 /
2018-19

1230 /
2018-19

1148 /
2018-19

1249 /
2018-19

1244 /
2018-19
1167 /
2018-19

1172 /
2018-19

1170 /
2018-19

1171 /
2018-19

1175 /
2018-19
1338 /
2018-19
ONGOLE MUNICIPAL CORPORATION
E-PROCUREMENT TENDER NOTICES
S. Tender
No Notice No. Name of the work Est cost

1/ Providing and Maintenance of Chalivendram (Vesavi upasaina kendrams) at


1 2019-20 Nellore Bus Stand and RIMS Hospital in Ongole Municipal Corporation 4.38 AE-2

Supply of Labour for Watch and Ward and Petrolling along N.S.P Canal from
2/ Ramatheertham Reservoir to S.S Tanks and Additional Pumping
1 2019-20 7.10 AE-3
Arrangements to S.S Tank-2 in Ongole Municipal Corporation (Reserved for
L.C.C.S)
TOTAL 4.38
Download Start Time : 12.01.2019 5.00 P.M
Download End Time : 20.04.2019 5.00 P.M
Receipt of Bids End Time : 20.04.2019 5.15 P.M
Price Bid Opening Time : 20.04.2019 5.30 P.M
4/
1 2019-20 Providing and Maintenance of Chalivendram (Vesavi Upasana kendram) at 4.39 AE-2
Corporation Office and Addanki Bus Stand in Ongole Municipal Corporation
5/ Filling Tank and Cleaning of Mukthinuthalapadu Cheruvu with (Current
2 2019-20 0.99 AE-1
Motor and Oil Motor) in Division No.2
6/ Transportation and Supply of Water in various places in 1 to 25 Divisions in
3 2019-20 10.00 AE-1
Ongole Municipal Corporation
7/ Transportation and Supply of Water in various places in 26 to 50 Divisions in
4 2019-20 10.00 AE-1
Ongole Municipal Corporation
TOTAL 25.38
Download Start Time : 15.01.2019 5.00 P.M
Download End Time : 22.04.2019 5.00 P.M
Receipt of Bids End Time : 22.04.2019 5.15 P.M
Price Bid Opening Time : 22.04.2019 5.30 P.M
8/ Transportation and Supply of Water in various places in 1 to 25 Divisions in
1 2019-20 Ongole Municipal Corporation 10.00 AE-1

9/
2 2019-20 Transportation and Supply of Water in various places in 26 to 50 Divisions in 10.00 AE-1
Ongole Municipal Corporation
TOTAL 20.00
Download Start Time : 27.04.2019 5.00 P.M
Download End Time : 04.05.2019 5.00 P.M
Receipt of Bids End Time : 04.05.2019 5.15 P.M
Price Bid Opening Time : 04.05.2019 5.30 P.M
Providing and Maintenance of Chalivendram (Vesavi Upasana Kendram) at
10 /
1 2019-20 Prakasam Bhavan, New Vegetable Market, Old Vegetable Market and K.P Bus 8.35 AE-2
Stand in Ongole Municipal Corporation
TOTAL 8.35
Download Start Time : 07.05.2019 5.00 P.M
Download End Time : 13.05.2019 5.00 P.M
Receipt of Bids End Time : 13.05.2019 5.15 P.M
Price Bid Opening Time : 13.05.2019 5.30 P.M
11 / Providing Arrangements on hire basis at Edga near Konijedu Bus Stand for
1 2019-20 1.20 AE-3
the occasion of Ramjan festival for the year 2019 in Division No.29
TOTAL 1.20
Download Start Time : 27.05.2019 5.00 P.M
Download End Time : 03.06.2019 5.00 P.M
Receipt of Bids End Time : 03.06.2019 5.15 P.M
Price Bid Opening Time : 03.06.2019 5.30 P.M
12 /
1 2019-20 Desiltation of Drains in 1 to 3 Divisions in Ongole Municipal Corporation 1.70 AE-1

13 /
2 2019-20 Desiltation of Drains in 4 to 9 Divisions in Ongole Municipal Corporation 5.90 AE-1

14 / Supply and Delivery of IM-II Hand Pump Spare Parts to Ongole Municipal
3 2019-20 6.50 AE-1
Corporation (Reserved for L.C.C.S)
15 / Desiltation of Major Drains in 43 to 44 Divisions in Ongole Municipal
4 2019-20 2.85 AE-7
Corporation
16 / Desiltation of Major Drains in 46 to 50 Divisions in Ongole Municipal
5 2019-20 Corporation 4.65 AE-7

17 / Construction of Wet Waste Shed at Guthikondavaripalem Scientific Land Fill


6 2019-20 8.75 AE-7
Site in Ongole Municipal Corporation
18 / Engaging of 110 Hydraulic Chain Mounted Machine and Tractors for lifting of
7 2019-20 9.10 AE-7
garbage in Ongole Municipal Corporation
19 / Removal of Silt at various places in 17 to 21 Divisions in Ongole Municipal
8 2019-20 Corporation 8.98 AE-3

20 / Removal of Silt at various places in 35 to 37 Divisions in Ongole Municipal


9 2019-20 9.00 AE-3
Corporation
21 / Removal of Silt at various places in 28, 29 and 34 Divisions in Ongole
10 2019-20 2.50 GEA-2
Municipal Corporation

Repairs and Rectification of 1 HP Pisten Pump Repairs in OMC office & SS-2
Up Wash 5HP Kirloskar Mono Block 4"x4" Pump & Motor Repairs & SS-2 40
22 /
11 2019-20 HP Raw Water WUPL Repairs and New Filter House 60 HP Clear Water 2.30 AE-3
Pumping Hill Clock and 60 HP Panel repair in Ongole Municipal Corporation
(Reserved for L.C.C.S)

23 / Supply and Delivery of Chlorine Gas Cylinders for maintenance of Water


12 2019-20 9.81 AE-3
Supply in Ongole Municipal Corporation
24 / Supply and Delivery of Home Need Items for Commissioners Quarters in
13 2019-20 Division No.22 5.59 AE-4

25 / Desiltation of Main Drains in Poleramma Temple to Chinthagunta burial


14 2019-20 1.20 AE-6
ground in Pernamitta in Ongole Municipal Corporation
26 / Repairs to Compound Wall and Toilet and Arranging the Sanitary Materials in
15 2019-20 8.27 AE-4
Municipal Office premises in Ongole Municipal Corporation
27 / Desiltation of Drains in 22 to 27 & 30, 31, 37, 39, 45 Divisions in Ongole
16 2019-20 Municipal Corporation 10.00 AE-4

28 / Laying of B.T Patches at various places in 22 to 27 & 30, 31, 37, 39, 45
17 2019-20 3.80 AE-4
Divisions in Ongole Municipal Corporation
29 /
18 2019-20 Desiltation of Drains in 10 to 16 Divisions in Ongole Municipal Corporation 6.90 AE-2
30 / Laying of B.T Patches at various places in 10 to 16 Divisions in Ongole
19 2019-20 1.75 AE-2
Municipal Corporation
31 / Removal of Road High Berms and Site Levelling at various places in 19 to 21
20 2019-20 1.60 AE-3
Divisions in Ongole Municipal Corporation
32 / Construction of In-complete Community Hall in Bundar Road in Division
21 2019-20 4.46 AE-2
No.12
33 / Supply of Water Tanker for watering Avenue Plants in Ongole Municipal
22 2019-20 Corporation 10.00 AE-2

34 /
23 2019-20 Repairs and Rectification of Leakage at Panchayat Raj Office in Division No.14 1.93 AE-2

TOTAL 127.54
Download Start Time : 29.05.2019 5.00 P.M
Download End Time : 06.06.2019 5.00 P.M
Receipt of Bids End Time : 06.06.2019 5.15 P.M
Price Bid Opening Time : 06.06.2019 5.30 P.M
35 / Providing Granite Flooring at Corridor to Main Hall Grievance at Prakasam
1 2019-20 Bhavan in Division No.13 9.42 AE-2

36 / Providing Flooring Tiles at the Entrance of Command Control Center at


2 2019-20 Prakasam Bhavan in Division No.13 3.65 AE-2

37 / Development of Greenery and Beautification in the premises of north side of


3 2019-20 9.99 AE-2
Prakasam Bhavan in Division No.13
38 / Drilling of Bore Well and Development of Greenery in the front side of
4 2019-20 Prakasam Bhavan in Division No.13 10.00 AE-2

TOTAL 33.06
Download Start Time : 04.06.2019 5.00 P.M
Download End Time : 11.06.2019 5.00 P.M
Receipt of Bids End Time : 11.06.2019 5.15 P.M
Price Bid Opening Time : 11.06.2019 5.30 P.M
39 / Engaging Septic Tank Cleaning Machine for cleaning all Toilets at various
1 2019-20 2.50 AE-4
Places in Ongole Municipal Corporation
Supply, Delivery and Errection of Chlorinator ranging from 0 to 5 kg per hour
40 / associated and instrumentation at Hill Station, Supply of Vapourised Chlorine
2 2019-20 3.95 AE-3
Gas Cylinder (100 kgs) and Fixing of Water Level Indicators at S.S Tank in
Ongole Municipal Corporation

Repairs and Rectification of Leaks at various plaes in Bhagya Nagar, Housing


41 /
3 2019-20 Board Colony, Cheruvukommupalem and Vengamukkapalem in Ongole 2.25 AE-3
Municipal Corporation
42 / Providing C.C Patch Work for Pipe Line Trenches in Godugu palem in Division
4 2019-20 0.84 AE-3
No.28
43 / Construction of Toilets at back side of Town Planning Room in Municipal
5 2019-20 7.80 AE-3
Office premises in Ongole Municipal Corporation

44 / Repairs and Rectification of Toilets, Plumbing Work and Painting at MEPMA


6 2019-20 2.05 AE-3
Samakya Meeting Center in C.R.C Building in Ongole Municipal Corporation

45 / Repairs and Rectification of Gandhi Nagar Offtake Sump and New Filter Bed
7 2019-20 Raw Water Well in Ongole Municipal Corporation 1.50 AE-3
46 /
8 2019-20 Construction of C.C Drain at S.S Tank-II in Division No.18 9.85 AE-3

47 /
9 2019-20 Construction of Sump at S.S Tank-II in Division No.18 8.50 AE-3

Removal of High Berms, Removal of Silt in Drain along Old Bye Pass Road
48 /
10 2019-20 from Siri Hospital to Vengamukkapalem Cross Road in Ongole Municipal 2.75 AE-3
Corporation
49 / Providing Honda Brush Cutter with Blade and Green Fortune 32F Model
11 2019-20 2.15 AE-2
Heavy Engine Hedge Trimmer to Ongole Municipal Corporation

50 / Engaging of Tractors on hire basis for digging of holes and Transportation of


12 2019-20 Plants to various places in Divisions 1 to 50 in Ongole Municipal Corporation 2.70
AE-2

51 / Drilling of Deep Bore Wells and Fixing of IM-II Hand Pumpsets at Scientific
13 2019-20 2.35 AE-7
Land Fill Site in Guthikondavaripalem in Ongole Municipal Corporation

52 / Providing Water Supply Arrangements for Army Recruitment in Ongole


14 2019-20 10.00 AE-7
Municipal Corporation
53 / Providing B.T Patches at various places in Divisions 4 to 9 in Ongole Municipal
15 2019-20 Corporation 2.10 AE-1

54 / Drilling of Deep Bore Wells and Fixing of IM-II Hand Pumpsets at various
16 2019-20 7.20 AE-1
places in Ongole Municipal Corporation
55 / Providing B.T Patches at various places in Divisions 1 to 3 in Ongole Municipal
17 2019-20 1.50 AE-1
Corporation
Providing of Electrical Work for Municipal Schools at Govt. Girls High School
56 /
18 2019-20 at Bandlamitta, Sri Vivekananda Vidya Vihar, Anganwadi Pre School, 1.76 AE-4
Vaddepalem in Ongole Municipal Corporation
57 / Construction of C.C Drain and Culvert from K.M.S School to Polytechnic
19 2019-20 9.97 AE-3
College Road at Bhagya Nagar in Division No.19
58 / Construction of Compound Wall to reserved site in P&T Colony in Division
20 2019-20 No.17 9.99 AE-3

59 / Repairs and Rectification of Clear Water Sump at New Filter Bed (P.H Office)
21 2019-20 7.70 AE-3
in Ongole Municipal Corporation
60 /
22 2019-20 Providing Fencing and Shed at S.S Tank-II back side in Division No.18 7.25 AE-3

61 / Desiltation of Main Drains in Poleramma Temple to Chinthagunta burial


23 2019-20 ground in Pernamitta in Ongole Municipal Corporation (2nd Call) 1.20 AE-6

62 / Engaging of 110 Hydraulic Chain Mounted Machine, Excavator (JCB, TATA


24 2019-20 39.00 AE-7
HITACHI) and Tractors for lifting of garbage in Ongole Municipal Corporation

TOTAL 146.86
Download Start Time : 15.06.2019 5.00 P.M
Download End Time : 28.06.2019 5.00 P.M
Receipt of Bids End Time : 28.06.2019 5.15 P.M
Price Bid Opening Time : 28.06.2019 5.30 P.M
64 / Construction of Damaged Compound Wall at west side of Gandhi Park in
1 2019-20 9.99 AE-3
Division No.36
TOTAL 9.99
Download Start Time : 21.06.2019 5.00 P.M
Download End Time : 28.06.2019 5.00 P.M
Receipt of Bids End Time : 28.06.2019 5.15 P.M
Price Bid Opening Time : 28.06.2019 5.30 P.M
65 / Providing Lighting arrangements for Army Recruitment Rally at Police Parade
1 2019-20 9.87 AE-2
Grounds in Ongole Municipal Corporation
TOTAL 9.87
Download Start Time : 28.06.2019 5.00 P.M
Download End Time : 05.07.2019 5.00 P.M
Receipt of Bids End Time : 05.07.2019 5.15 P.M
Price Bid Opening Time : 05.07.2019 5.30 P.M
67 / Filling of Quarry Spell Road at Nethaji Colony Main Road, Jayapraksh Colony
1 2019-20 4.00 AE-7
and Venkateswara Colony in Division No.50
TOTAL 4.00
Download Start Time : 19.07.2019 5.00 P.M
Download End Time : 26.07.2019 5.00 P.M
Receipt of Bids End Time : 26.07.2019 5.15 P.M
Price Bid Opening Time : 26.07.2019 5.30 P.M
Supply of Outsourcing Workers for maintenance of Water Supply Distribution
68 /
1 2019-20 and Administrative Section under Package-I for the year 2019-2020 in Ongole 146.45
Municipal Corporation (Reserved for L.C.C.S)
Supply of Outsourcing Workers for maintenance of Works in Engineering
69 /
2 2019-20 Section under Package-II for the year 2019-2020 in Ongole Municipal 133.95
Corporation (Reserved for L.C.C.S)
Supply of Outsourcing Workers for maintenance of Town Planning section
70 /
3 2019-20 under Package-III for the year 2019-2020 in Ongole Municipal Corporation 102.50
(Reserved for L.C.C.S)
TOTAL 382.90
Download Start Time : 26.07.2019 5.00 P.M
Download End Time : 09.08.2019 5.00 P.M
Receipt of Bids End Time : 09.08.2019 5.15 P.M
Price Bid Opening Time : 09.08.2019 5.30 P.M
71 / Providing Balance C.C Drain from Vadde Palem in Uracheruvu upto culvert at
1 2019-20 New Addanki Bus Stand Reservoir in Division No.24 2.75 AE-4

72 / Formation of Quarry Spell Road at Peerlamanyam Muslims area in Division


2 2019-20 9.95 AE-4
No.39
73 / Providing Barbed Wired Fencing at Ura Cheruvu east and north sides place in
3 2019-20 1.99 AE-4
Division No.24
74 / Drilling of Deep Bore Well and Fixing of I.M-II Pumpsets in Ongole Municipal
4 2019-20 9.00 AE-1
Corporation
75 / Supply, Fixing, Operation and Maintenance of Vehicle Tracking System on
5 2019-20 rental basis to the vehicles of Ongole Municipal Corporation 8.20 AE-1

76 / Providing C.I and M.S Suction Pipe Connection at Raw Water Pump House in
6 2019-20 9.98 AE-3
S.S Tank-2 in Ongole Municipal Corporation
Flushing of Bore Wells in various places and Supply, Delivery and Fixing of
77 /
7 2019-20 New Submersible Motor at Kakathiya Nagar Park in Ongole Municipal 2.65 AE-1
Corporation
78 / Laying of 100 mm dia A.C Pipe Line at S.C Colony Bethala Mandiram opposite
8 2019-20 Line in Throvagunta in Division No.1 1.00 AE-1

79 / Laying of 160 mm dia H.D.P.E Pipe Line from Ambetkar Grandhalayam to


9 2019-20 3.40 AE-3
Kathi Narasimharaju house in Ambethkar Bhavanam Road in Division No.21

80 / Laying of 160 mm dia H.D.P.E Pipe Line from Kolas Hotel to Madugula Stalin
10 2019-20 3.25 AE-3
House in Ambethkar Bhavanam Road in Division No.21
81 /
11 2019-20 Construction of Toilets for Men in Night Shelter in Division No.24 7.85 AE-4

82 /
12 2019-20 Construction of Toilets for Female in Night Shelter in Division No.24 7.85 AE-4

Repairs to 160 KVA Transformer at R.R Tank and Repairs & Rectification of
Motors at various places of Water Supply Section (Vengamukkala Palem 5 Hp
83 /
13 2019-20 Bore Well, OHSR Pumping Clear Water Mortar, New Filter Bed, SS Tank-1, SS 5.75 AE-3
Tank-2, Old Filter Bed and Pelluru Water tank) in Ongole Municipal
Corporation

84 / Repairs and Fabrication Work of DP Structure at 200 KVR DTR in Ongole


14 2019-20 1.33 AE-3
Municipal Corporation
Laying of B.T Patches in Gaddala Gunta, Laweypeta, Devudu Cheruvu, Bhagya
85 /
15 2019-20 Nagar and various locations of A.E-3 and A.E-5 sections in Ongole Municipal 3.35 AE-3
Corporation
86 /
16 2019-20 Construction of Toilet at Kothamamidi Palem School in Division No.18 1.75 AE-3

87 / Repairs and Rectification of Leaks at Rajiv Nagar, Gaddala Gunta, Lawyerpet


17 2019-20 and at various places in A.E-3 section in Ongole Municipal Corporation 3.00 AE-3

88 / Supply of 7.5 HP Submersible Motors and other repairs of Submersible


18 2019-20 4.50 GEA-1
Motors in Pernamitta in Ongole Municipal Corporation
89 / Providing 110 mm dia P.V.C Pipe Line in Samatha Nagar 8th Line Cross Roads
19 2019-20 2.70 AE-4
in Division No.37
90 / Laying of B.T Patches at various places in Division Nos.37 to 39 in Ongole
20 2019-20 Municipal Corporation 2.00 GEA-1

91 / Providing Quarry Spell Roads at various places in Division Nos.37 to 39 in


21 2019-20 Ongole Municipal Corporation 2.00 GEA-1

Supply of Labour for Watch and Ward and Petrolling along N.S.P Canal from
92 / Ramatheertham Reservoir to S.S Tanks and additional pumping
22 2019-20 10.00 AE-3
arrangements to S.S Tank-II ion Ongole Municipal Corporation (Reserved for
L.C.C.S)
93 / Repairs, Supply and Delivery of Hardware and Software Items for Office
23 2019-20 Administration purpose in Ongole Municipal Corporation 6.90 AE-3

94 / Providing Quarry Spell Roads and Filling Leak Trenches with Quarry Spell and
24 2019-20 5.20 AE-3
Dust in Division No.17 to 21 and 29 to 31 in Ongole Municipal Corporation
95 / Laying of B.T Patches at various places in Division Nos.17 to 21 and 29 to 31
25 2019-20 4.70 AE-3
in Ongole Municipal Corporation
96 / Laying of B.T Patches at various places in Division Nos.9 to 16 in Ongole
26 2019-20 5.80 AE-2
Municipal Corporation
97 / Formation of Quarry Spell Road at 5th, 6th, 7th an 8th Lines in Indiramma
27 2019-20 10.00 AE-2
Gruhalu in Division No.9
98 /
28 2019-20 Supply of Electrical Materials to Ongole Municipal Corporation 2.20 AE-2

99 /
29 2019-20 Supply of Conocorpus Plants for Plantation in Ongole Municipal Corporation 10.00 AE-2

100 / Supply and Delivery of IM-II Hand Pump 32 mm dia G.I 'B' class Pipes and
30 2019-20 10.00 GEA-1
Connecting Rods to Ongole Municipal Corporation
101 / Laying of Quarry Spell Road on south side and north side inside
31 2019-20 Guthikondavari Palem Dumping Yard in Ongole Municipal Corporation 6.70

102 / Providing Arrangements on hire basis at Edga near Konijedu Bus Stand for
32 2019-20 the occasion of Bakrid festival for the year 2019 in Division No.29 1.20 AE-3

103 /
33 2019-20 Construction of Balance C.C Drain at S.S Tank-2 in Division No.18 10.00 AE-3

104 / Providing B.T Patches at various places in Division Nos.26 to 28 and 32 to 36 Bala
34 2019-20 2.00 Kotaia
in Ongole Municipal Corporation h

105 / Providing B.T Patches at various places in Division Nos.26 to 28 and 32 in Bala
35 2019-20 Ongole Municipal Corporation 2.00 Kotaia
h

106 / Laying of Quarry Rubbish Roads at various places in Division Nos.26 to 28 and Bala
36 2019-20 2.00 Kotaia
32 to 36 in Ongole Municipal Corporation h

107 / Laying of Quarry Rubbish Roads at various places in Division Nos.26 to 28 and Bala
37 2019-20 32 Divisions in Ongole Municipal Corporation 2.00 Kotaia
h

108 / Supply and delivery of M.S Fabricated Dumper Bins with 3.00 cum capacity of
38 2019-20 9.85 Mujahi
size to Ongole Municipal Corporation ddin

109 / Laying of B.T Patches at various places in Division Nos.1 to 8 in Ongole


39 2019-20 4.20 Mujahi
Municipal Corporation ddin

110 /
40 2019-20 Providing C.C Drain at Srinagar Colony 4th Line west side in Division No.45 10.00 AE-4

111 / Removal of Silt and High Berm Cutting in Jayaprakash Colony in Division
41 2019-20 No.50 7.00 AE-4

TOTAL 216.00
Download Start Time : 31.07.2019 5.00 P.M
Download End Time : 09.08.2019 5.00 P.M
Receipt of Bids End Time : 09.08.2019 5.15 P.M
Price Bid Opening Time : 09.08.2019 5.30 P.M

112 / Filling Tank and Cleaning of Gudimellapadu Cheruvu and Mukthinuthalapadu


1 2019-20 3.60 AE-7
Cheruvu (Current Motor and Oil Engine) in Division No.2

TOTAL 3.60
Download Start Time : 12.08.2019 5.00 P.M
Download End Time : 19.08.2019 5.00 P.M
Receipt of Bids End Time : 19.08.2019 5.15 P.M
Price Bid Opening Time : 19.08.2019 5.30 P.M

Providing Painting, Garland Decoration, Supply of Butter Milk Packets and


113 / Water to Sri Babu Jagajjivanarao, Sri Dr.B.R. Ambedkar, Sri Gurram Jashuva,
1 2019-20 4.15 AE-2
Sri Prakasam Panthulu and Sri Damodara Sanjeevayya and Swami
Vivekananda Statues at various places in Ongole Municipal Corporation

TOTAL 4.15
Download Start Time : 17.08.2019 5.00 P.M
Download End Time : 22.08.2019 5.00 P.M
Receipt of Bids End Time : 22.08.2019 5.15 P.M
Price Bid Opening Time : 22.08.2019 5.30 P.M
114 / Transportation of water through Water Tankers to merged villages in Ongole
1 2019-20 12.00 AE-6
Municipal Corporation
115 / Supply and fixing of Doors and Windows and Construction of Toilets At
2 2019-20 9.83 AE-7
Rajeev Gruha Kalpa School building in Division No.9
116 / Supply and Delivery of Piduguralla Stone Powder (Lime) and Bleaching
3 2019-20 Powder to Ongole Municipal Corporation 2.15 AE-1

117 / Supply and Delivery of Pyrosene Oil - BIS Mark and Malathion Technical for
4 2019-20 9.54 AE-1
sanitation in Ongole Municipal Corporation
118 /
5 2019-20 Supply and Delivery of Conservancy Articles to Ongole Municipal Corporation 10.00 AE-1

119 / Laying of 200 mm dia A.C Pipe Line from K.P Bus Stand Junction to Karavadi
6 2019-20 Donka Junction in Division No.8 7.15 AE-7

7 50.67
Download Start Time : 24.08.2019 5.00 P.M
Download End Time : 06.09.2019 5.00 P.M
Receipt of Bids End Time : 06.09.2019 5.15 P.M
Price Bid Opening Time : 06.09.2019 5.30 P.M
121 / Repairs and Rennovation of Grama Sachivalayam Buildings in Division Nos.1
1 2019-20 9.80
to 16 in Ongole Municipal Corporation
122 / Repairs and Rennovation of Grama Sachivalayam Buildings in Division Nos.17
2 2019-20 9.80
to 33 in Ongole Municipal Corporation
123 / Repairs and Rennovation of Grama Sachivalayam Buildings in Division Nos.34
3 2019-20 to 50 in Ongole Municipal Corporation 9.80
TOTAL 29.40
Download Start Time : 06.09.2019 5.00 P.M
Download End Time : 13.09.2019 5.00 P.M
Receipt of Bids End Time : 13.09.2019 5.15 P.M
Price Bid Opening Time : 13.09.2019 5.30 P.M
124 / Construction of Compound wall and C.C Drain at west side of Gandhi Park in
1 2019-20 10.00 AE-5
Division No.36
125 / Supply, Delivery and Fixing of Children Play Equipments in D.E.E-2 section
2 2019-20 9.70 AE-3
Parks in Ongole Municipal Corporation

126 / Supply, Delivery and Fixing of Children Play Equipments in Gandhi Nagar
3 2019-20 9.70
Park, Gaddala Gunta Park in D.E.E-3 section in Ongole Municipal Corporation
127 / Laying of 110 mm dia P.V.C Pipe Line North to South from L.V Rajagopal Rao
4 2019-20 house to B.Jagan Mohan Rao house at Jammichettu Street in Division No.28 3.00 AE-5

128 / Providing 16 Mtrs Galvanized High Mast Lighting System at Addanki Bus
5 2019-20 10.00
Stand and Mangamoor road Junction in ongole Municipal Corporation
TOTAL 42.40
Download Start Time : 13.09.2019 5.00 P.M
Download End Time : 20.09.2019 5.00 P.M
Receipt of Bids End Time : 20.09.2019 5.15 P.M
Price Bid Opening Time : 20.09.2019 5.30 P.M
Construction of C.C Drain and Formation of Quarry Rubbish Road at
130 /
1 2019-20 Throvagunta from Pole No.1/42/OMC to 1/43/OMC in Division No.1 6.65 AE-1
(Reserved for L.C.C.S)
131 / Laying of C.C Road from D.No.45-124-534 to Pole No.1/51/1A/OMC in
2 2019-20 Throvagunta in Division No.1 10.00 AE-1

132 /
3 2019-20 Laying of C.C Road at Kesavaraju gunta 2nd line in Division No.2 9.85 AE-1

Laying of C.C Road at Mukthinuthalapadu BC Colony 3rd Cross Road from


133 /
4 2019-20 Pole No.2/119/OMC to 2/112/OMC and 4th Cross Road from Pole 9.90 AE-1
No.2/117/OMC to 2/110/OMC in Division No.2
134 / Laying of C.C Road from Pole No.3/191/OMC to Pole No.3/196/OMC in
5 2019-20 9.25 AE-1
Balineni Bharat Colony in Division No.3
Construction of C.C Drain at Ponugupati Colony from Pole No.3/35/OMC to
135 /
6 2019-20 3/83/OMC and Construction of Culvert at Karuna Colony 3rd Lane in Division 5.90 AE-1
No.3 (Reserved for L.C.C.S)
136 / Laying of C.C Road from Pole No.05205A120000 to existing Culvert in Gopal
7 2019-20 Nagar Extension 1st line in Division No.5 5.55 AE-1

137 / Laying of C.C Road at Gopal Nagar Extension (Store Bazar) from
8 2019-20 D.No.27/45/1691 to Existing C.C Road in Division No.5 (Reserved for L.C.C.S) 10.00
AE-1

138 / Laying of C.C Road from Pole No.05220A010000 to Pole No.HT/41/21 in


9 2019-20 8.15 AE-1
Indurthi Nagar in Division No.8
139 / Providing C.C Drain from Guttikonda Somi reddy (H) to Ramalayam in
10 2019-20 Guttikondavaripalem in Division No.9 1.55 AE-2

140 / Providing C.C Road from Pallpoli Somi Reddy (H) to Pallpoli Krishna Reddy (H)
11 2019-20 in Guttikondavaripalem in Division No.9 9.20 AE-2

141 / Formation of Quarry Rubbish Road from Burial ground to Nuna Krishna
12 2019-20 6.35 AE-2
Reddy (H) in Guttikondavaripalem in Division No.9
142 / Formation of Quarry Rubbish Road at 5th, 6th, 7th and 8th lines in Rajeev
13 2019-20 9.60 AE-2
Gruha Kalpa in Division No.9
143 / Providing C.C Road from OK Road to Cross Road of Indiramma Gruhalu 5th
14 2019-20 10.00 AE-2
line in Division No.9
144 / Providing C.C Drain from OK Road to Koppula Hanumanatha rao (H) in
15 2019-20 Division No.9 5.70 AE-2
145 / Providing C.C Road from Battu Koteswara (H) to Battu Venkatarao (H) in
16 2019-20 10.00 AE-2
Division No.9
146 / Providing C.C Road and C.C Drain from OK Road to Kosapati Venu (H) in
17 2019-20 6.95 AE-2
Division No.9
147 / Providing C.C Road and C.C Drain from OK Road to Singamaneni Subbarao (H)
18 2019-20 5.10 AE-2
in Division No.9
148 /
19 2019-20 Filling of Red Earth to Park at Rajeev gruha Kalpa 4th Line in Division No.9 7.60 AE-2

149 / Providing C.C Road from Karumudi Hari babu house to north side well in
20 2019-20 9.80 AE-2
Guthikondavari Palem in Division No.9
150 / Providing C.C Road from Sk Brammaiah (H) to Sk Sharabuddin (H) in Koppolu
21 2019-20 8.55 AE-2
in Division No.10
151 / Providing C.C Road from Nagarappamma Temple to OK Road in Koppolu in
22 2019-20 10.00 AE-2
Division No.10
152 / Construction of C.C Drains from Nallamalapu Ankireddy (H) to Ramalayam
23 2019-20 street in N.Agraharam in Division No.10 9.10 AE-2

153 / Construction of C.C Drains of North Side Cross roads in N.Agraharam in


24 2019-20 8.80 AE-2
Division No.10
154 / Providing C.C Road and C.C Drain from N.V Subbarao (H) to Anantha Indira
25 2019-20 9.25 AE-2
devi (H) in Anandarao road in Division No.13
155 / Providing C.C Road and C.C Drain from Public Toilets to Chakiri maruthi
26 2019-20 10.00 AE-2
Kumar (H) in Anandarao road in Division No.13
156 / Widening of C.C Road from Nellore Bus Stand to DRRM High School in
27 2019-20 Santhapeta in Division No.14 10.00 AE-2

157 / Providing C.C Road and C.C drain from Gutta Venkata Subbaiah Godown to
28 2019-20 8.25 AE-2
Tanguturi Gopala Krishnaiah (H) in Ramnagar 8th Line in Division No.15

158 / Providing Central Lighting from Siri Research & Rehabitation Center to South
29 2019-20 By Pass Junction (Prahathi Colony) in Ongole Municipal Corporation 9.75 AE-2

159 / Providing Central Lighting from North Bye-pass road Junction to Market yard
30 2019-20 9.95 AE-2
in Ongole Municipal Corporation
160 / Construction of CC Drain and RCC Culverts in Kota Street, South Bazar, East
31 2019-20 9.30 AE-3
Bazar and West Bazar in Pelluru in Division No.17
161 / Providing CC Road to Kotha Colony Main Road from 2nd Cross Road to Sai
32 2019-20 Revent Appartment in Pelluru in Division No.17 (Reserved for L.C.C.S) 10.00 AE-3

162 / Construction of C.C Drain to Koppolu Canal bund Road in place of damaged
33 2019-20 8.40 AE-3
drain portion in Ambedkar Colony in Division No.17
163 / Construction of C.C Drain from Merikalapalli Sambaiah (H) to Matte Srinu (H)
34 2019-20 6.40 AE-3
in Kota Veedi in Pelluru in Division No.17
Providing CC Road and CC Drain behind Anjaneya swamy Statue from
164 /
35 2019-20 BirudhuRaju Bala Kotaiah (H) to Chirumalla Mala Kondaiah (H) in Pelluru in 9.15 AE-3
Division No.17
Construction of CC Drain from Dasari Narayana (H) to Shaik Salem (H) and
165 /
36 2019-20 from Dasari Srinu (H) to Ambedkar Bhavan in Pelluru SC Colony in Division 9.50 AE-3
No.17
166 / Construction of C.C Drain from Gosula Anji Reddy (H) to R & B Road in
37 2019-20 Cheruvu Kommu Palem in Division No.18 10.00 AE-3

167 / Construction of C.C Drain and C.C Road from Kasumuri Rajamma (H) to
38 2019-20 10.00 AE-3
Davuluri Raghavaiah (H) in Cheruvukommu Palem in Division No.18

168 / Construction of C.C Drain from Thatiparthi Subbareddy (H) to Thippa Reddy
39 2019-20 10.00 AE-3
Hanuma Reddy (H) (Vagu) in Vengamukkala Palem in Division No.18

169 / Construction of C.C Drain from Vaka Venkateswarulu (H) to Anumala Suseela
40 2019-20 4.05 AE-3
(H) in Vengamukkala Palem in Division No.18
170 / Construction of CC Drain from Sutharam Srinivas (H) to Vagu in
41 2019-20 10.00 AE-3
Vengamukkala Palem in Division No.18
171 / Construction of C.C Drain from PeddiReddy Venkata Reddy (H) to Anumala
42 2019-20 4.95 AE-3
Thirumala Reddy (H) in Vengamukkala Palem in Division No.18
172 / Construction of RCC Culverts in Mangalapalem, Yanadi Colony and Reddla
43 2019-20 6.45 AE-3
Bazar in Cheruvukommu Palem in Division No.18
173 /
44 2019-20 Providing of C.C Drain in BC colony in Kothamamidi palem in Division No.18 9.40 AE-3

174 /
45 2019-20 Jungle Clearance at S.S Tank-I and S.S Tank-II in Division No.18 7.00 AE-3

175 / Construction of R.C.C Culvert at Bhagya Nagar 4th Line in Trunk Road and
46 2019-20 2.40 AE-3
Bhagya Nagar 4th line 7th Cross Road Junction in Division No.19
176 / Construction of R.C.C Culverts at Bye-Pass Road in Polytechnic College Road
47 2019-20 8.65 AE-3
and Housing Board Colony Road Junctions in Division No.19
177 /
48 2019-20 Construction of C.C Drain and R.CC. Culverts at Bank Colony in Division No.19 3.85 AE-3

178 / Extension of CC Drain to Reddy hostel road from Reddy Hostel to old bye
49 2019-20 10.00 AE-3
pass road in Division No.19
179 / Construction of C.C Drain from Mini stadium to Tobocco Board office in
50 2019-20 10.00 AE-3
Division No.19
180 / Construction C.C Drain to damaged drain portion from Bhagyanagar 4th line
51 2019-20 10.00 AE-3
to RIMS hospital in Division No.19
181 / Construction of C.C Drain to Trunk Road from Dharavari Thota Main Road to
52 2019-20 Blind School in Division No.20 9.55 AE-3

182 / Construction of C.C Drain from Dara Radhamma (H) to Gunde madugula
53 2019-20 10.00 AE-3
Devid (H) in Dharavari Thota in Division No.20
183 / Providing C.C Road and C.C Drain from Mazeed to Apparao (H) in Dharavari
54 2019-20 9.85 AE-3
Thota in Division No.20
184 / Construction of C.C Drain from Gumadi Narasimhulu (H) to Maddirala
55 2019-20 4.95 AE-3
Bhaskar Rao (H) in Dharavari Thota in Division No.20
185 / Extension of C.C Road and C.C Drain from Bhagya Nagar 2nd Line opposite to
56 2019-20 Registrar Office in Division No.20 9.85 AE-3

186 / Construction of C.C Drain in place of damaged Drain infront of New Filter Bed
57 2019-20 10.00 AE-3
in Ongole Municipal Corporation
187 / Construction of R.C.C Drain and Foot Path at Chruch Centre Opp R.D.O Office
58 2019-20 5.50 AE-3
in Division No.21

188 / Construction of C.C Road and C.C Drain from Gouse Nagendram (H) to Nella
59 2019-20 4.35 AE-3
Cheruvu Koteswra Rao (H) in Dharavari Thota 2nd Line in Division No.21

189 / Construction of C.C Road and C.C Drain in Indira Colony, near Ambetkar
60 2019-20 Statue and N.T.R Colony in Division No.21 (Reserved for L.C.C.S) 8.25 AE-3

190 / Construction of C.C Road near 1 Town Police Station and C.C Drain at C.R.P
61 2019-20 5.60 AE-3
Quarters Park south side in Division No.21
191 / Construction of C.C Road at north side of Devudu Cheruvu Park in Division
62 2019-20 No.21 6.50 AE-3

192 / Construction of C.C Road at Park back side and C.C Culvert at N.G.O Home
63 2019-20 2.45 AE-3
back side in Division No.21
193 / Construction of C.C Patch and Culvert from Sk.Subhani (H) to Nallavula
64 2019-20 2.45 AE-3
Vankata Swami in Devudu Cheruvu in Division No.21
194 / Supply and delivery of Piduguralla Stone Powder (Lime) to Ongole Municipal
65 2019-20 3.25 AE-1
Corporation
Engaging of 110 chain mounted Excavator along Koppolu Major Canal for
195 /
66 2019-20 Desiltation and Jungle Clearance from Gandhi Nagar Offtake Point to S.S 2.48 AE-3
Tank-II in Ongole Municipal Corporation
Engaging of Chain Mounted Excavators along old NH-16 for desiltation of
196 /
67 2019-20 Storm Water Drains and Jungle Clearance from S.S Tank-I to Nalla Vagu in 5.50 AE-3
Ongole Municipal Corporation
197 / Supply and Delivery of Chlorine Gas Cylinders for the maintenance of Water
68 2019-20 9.81 AE-3
Supply in Ongole Municipal Corporation
198 / Construction of C.C Drain on northern side to Gandhi Road from Trunk Road
69 2019-20 to Gandhi Statue in Division No.23 9.85 AE-4

199 / Providing Iron Grills in place of damaged RCC Jollys at PVR Boys High School
70 2019-20 1.90 AE-4
in Division No.24
200 /
71 2019-20 Arranging fencing for Zone-4 ELSR Tank in Division No.24 4.00 AE-4

201 / Providing Foot Path Slabs over existing CC Drain From Anjali Dresses to
72 2019-20 10.00 AE-4
addanki Bus Stand in Division No.24
202 / Providing Interlocking Tiles on earthern berm along the C.C Drain to Ura
73 2019-20 10.00 AE-4
Cheruvu Road in Division No.24
203 / Providing C.C Road and R.C.C Slabs on the Drain at Vanta Vaari Colony Road
74 2019-20 in Division No.24 10.00 AE-4

204 / Providing Quarry Rubbish Road from Addanki Bus Stand (ELSR) to Fish
75 2019-20 Market in Division No.24 8.30 AE-4

205 / Construction of C.C Drain in place of existing damaged drain in Poleramma


76 2019-20 9.90 AE-4
temple road in Division No.25
206 / Providing of Foot Path Slabs over existing C.C Drain in Poleramma temple
77 2019-20 8.15 AE-4
road in Division No.25
Extension of RCC Culvert and Construction of CC Drain in place of damaged
207 /
78 2019-20 drain from Sisindri play school to Parvatamma temple in Balajirao peta in 10.00 AE-4
Division No.25
208 / Construction of RCC Culvert opp. New filter beds and beside Parvathamma
79 2019-20 6.15 AE-4
Temple in Balajirao peta in Division No.25
209 / Construction of C.C Drain beside Poleramma Temple in Balajirao peta in
80 2019-20 6.15 AE-4
Division No.25
210 /
81 2019-20 Construction of C.C Drain opposite to New Filter Bed Road in Division No.25 2.16 AE-4

211 / Providing R.C.C Cover Slabs over existing drain from Sisindri play school
82 2019-20 towards Parvathamma Temple in Balaji rao Peta in Division No.25 10.00 AE-4

212 / Providing R.C.C Cover slabs over existing CC Drain beside Poleramma temple
83 2019-20 5.60 AE-4
in Balaji rao peta in Division No.25
213 / Construction of Retaining wall and Widening of C.C Road at Sanjay Gandhi
84 2019-20 Nagar Opp Gosala in Division No.27 3.10 AE-5

214 / Construction of C.C Drain and Foot Path on southern side of Rajapangala
85 2019-20 10.00 AE-5
road from C.V.N Reading room to Srigiri Road in Division No.27
215 / Providing Precast R.C.C Slabs over existing C.C Drain from Padamati Palem
86 2019-20 6.25 AE-5
Mpl. School to Ele. Pole No.SS/333/A1 in Division No.28
216 / Providing C.C Road and C.C Drain from Sai Temple Views Apartment to
87 2019-20 9.98 AE-5
Existing C.C Road in Division No.28 (Reserved for L.C.C.S)
217 / Construction of C.C Drain north to south from existing culvert to V.Narasimha
88 2019-20 rao house in Godugu Palem in Division No.28 2.60 AE-5

218 / Construction of C.C Drain from CSR Sharma College Cricket ground Opp
89 2019-20 10.00 AE-3
Culvert to Devudu Cheruvu park in Division No.30

219 / Construction of C.C Drain from Koppolu Suvarthamma (H) to Gangavarapu


90 2019-20 8.80 AE-3
Nageswara Rao (H) in Mamidipalem in Division No.31 (Reserved for L.C.C.S)

220 / Construction of C.C Drain from Koppolu Radha (H) to Badha Adham Via
91 2019-20 8.80 AE-3
Kankanala Suguna (H) at Mamidipalem in Division No.31
221 / Construction of C.C Drain from Ambedkar statue to Chintam Ratnamma (H)
92 2019-20 in Mamidipalem in Division No.31 10.00 AE-3

222 / Providing C.C Road west to east from N.Subba Reddy house to Old NH-5
93 2019-20 10.00 AE-5
Road in RTC-2 Colony in Division No.33
223 / Providing C.C Road north to south from existing C.C Road connecting to
94 2019-20 9.92 AE-5
Kotha Donka Road in RTC-2 Colony in Division No.33
224 / Construction of C.C Drain to Kothdonka Road from Koppolu Major Canal to
95 2019-20 10.00 AE-5
Existing C.C Drain in Division No.33 (Reserved for L.C.C.S)
225 / Widening of C.C Road from HDFC Bank to Friends residence apartment in
96 2019-20 Lawyer Pet Extension in Division No.34 10.00 AE-5

226 / Widening of C.C Road west to east from Elec. Pole.No. SS/1045/B2 to
97 2019-20 Ele.Pole.No.SS/1028/A3 in VIP Road in Division No.34 10.00 AE-5

227 / Construction of C.C Drain from Kola Subba Rao house to D.No.8-441 in
98 2019-20 Division No.36 2.10 AE-5

228 / Construction of C.C Drain from Kalanikethan Showroom to Ayappa Swamy


99 2019-20 8.95 AE-5
Temple Main Gate in Division No.36
229 /
2019-20 Construction of Foot Path in Gandhi Park in Division No.36 10.00
100 AE-5
230 /
2019-20 Providing C.C Drain at Opp. Chennakesava Swamy Park in Division No.37 6.70
101 AE-6

231 / Providing C.C Road from Dheeraj Apartment to Abhinga Super Market in
102
2019-20 Division No.37 9.50 AE-6

232 / Providing C.C Drain from Malleswari house to Hanumantha Rao house in
103
2019-20 Military Colony 3rd Line in Division No.37 2.20 AE-6

233 /
2019-20 Providing C.C Road at Opp. Chennakesava Swamy Park in Division No.37 9.10
104 AE-6

234 / Providing C.C Road and C.C Drain to Sujatha Nagar 6th Line Extension in
105
2019-20 Division No.37 9.60 AE-6

235 / Providing C.C Drain at Sujatha Nagar 10th Line in Division No.37 (Reserved
106
2019-20 for L.C.C.S) 3.65 AE-6

236 / Providing C.C Drain from Mangamuru Road to Revenue Colony 3rd Line via
107
2019-20 Ankammathalli Apartment in Division No.37 10.00 AE-6

237 /
2019-20 Providing C.C Drain to Gandhi Nagar 3rd Line in Division No.37 10.00
108 AE-6

238 / Providing C.C Drain from Mangamur Road to K.Narasimha rao house in
109
2019-20 Gandhi nagar 4th Line in Division No.37 10.00 AE-6

239 /
2019-20 Providing C.C Road and C.C Drain at Samatha nagar 8th line in Division No.37 9.95
110 AE-6

240 / Providing C.C Drain from Mangamur Road to Gandhi Nagar 5th Line and
111
2019-20 balance of 3rd line in Division No.37 10.00 AE-6

241 / Providing 110 mm dia P.V.C Pipe Line from Mangamur Road Junction to
112
2019-20 Sairam Junior College in Division No.37 3.80 AE-6

242 / Providing C.C Drain from Kurnool Road to Govinda Nagar 2nd Line in Division
113
2019-20 No.38 5.95 AE-6

243 / Providing C.C Drain from Kurnool Road to Lakshmi Narasimha Puram in
114
2019-20 Division No.38 5.50 AE-6

244 / Providing C.C Disposal Drain from Manikanta nagar Vinayaka temple to
115
2019-20 Samathanagar main road via Krishna Nagar in Division No.38 7.75 AE-6

245 /
2019-20 Providing C.C Drain at Sunnapubattilu Road in Division No.38 5.00
116 AE-6

246 / Providing C.C Road from Mangamur road to Delhi Public School in Division
117
2019-20 No.39 9.95 AE-6

247 /
2019-20 Providing C.C Road in Samathanagar 2nd line in Division No.39 10.00
118 AE-6

248 / Providing C.C Road and C.C Drain from MM road Marrichettu to SSR
119
2019-20 apartment in Division No.39 10.00 AE-6

249 / Providing C.C Drain from Kurnool Road to Nachareddypalem Main road in
120
2019-20 Division No.40 9.86 AE-6

250 / Providing C.C Drain from Nachareddypalem Main road to Poleramma temple
121
2019-20 Road in Division No.40 9.76 AE-6

251 / Providing C.C Drain from Nachareddypalem Main road to Opp Poleramma
122
2019-20 temple Road in Division No.40 8.10 AE-6
252 / Providing C.C Road from 2nd line Madhusudhana Rao house to Siva Reddy
123
2019-20 house in Police colony near Ongole-Pernamitta Minor in Division No.40 10.00 AE-6

253 / Providing C.C Drain from Kurnool Road to Rajiv Nagar Main Road in Division
124
2019-20 No.40 10.00 AE-6

254 / Providing C.C Drains at N.T.R Colony 3rd and 4th lines in Pernamitta in
125
2019-20 Division No.41 10.00 AE-6

255 / Providing C.C Drain in N.T.R Colony 1st and 2nd lines in Division No.41
126
2019-20 (Reserved for L.C.C.S) 9.82 AE-6

256 / Providing C.C Drain from Eswaramma house to Kumari house in Santhi Nagar
127
2019-20 in Pernamitta in Division No.42 7.65 AE-7

257 / Providing C.C Drain from Nukathoti Nukaiah house to Kila Ramesh house in
128
2019-20 Pernamitta in Division No.42 5.05 AE-7

258 / Providing C.C Road and C.C Drain from Kadiyam Veerabadra Reddy house to
129
2019-20 Ankaiah house in Division No.43 7.00 AE-7

259 / Providing C.C Road and C.C Drain from S.Lashmi Kataksham to Sai Naursing
130
2019-20 College in Andhra Kesari Nagar in Division No.43 9.25 AE-7

260 / Providing C.C Drain from Chityala Kasyamma house to Indla Anadamma
131
2019-20 house in S.T Colony in Division No.43 1.95 AE-7

261 / Providing C.C Road and C.C Drain from Virat Nagar Eswaramma house to
132
2019-20 Pesala Srinu house in Division No.43 9.80 AE-7

262 / Providing C.C Drain from Nidamanuri Venkata Rao house to Prabhavatamma
133
2019-20 house in Maruthi nagar 3rd Line in Division No.44 3.85 AE-7

263 / Providing C.C Drain from Badhri Rangareddy house to Madathala Lashmi
134
2019-20 Narayana house in Maruthi nagar 3rd Line in Division No.44 2.30 AE-7

264 / Providing C.C Drain from Sanikommu Venkateswara Redddy house to


135
2019-20 Srinivasa colony Road in Division No.44 8.78 AE-7

265 / Providing C.C Drain from Madala Hanumantharao House to Pothuraju Kalava
136
2019-20 in Division No.44 (Reserved for L.C.C.S) 9.43 AE-7

266 / Providing C.C Road and C.C Drain at Maruthi Nagar 3rd Line 3rd Cross Road in
137
2019-20 Division No.44 5.55 AE-7

267 / Providing C.C Road and C.C Drain from Revenue Colony Main Road to Suresh
138
2019-20 house in Division No.44 8.65 AE-7

268 /
2019-20 Providing C.C Drain in Sriram Colony and Virat Colony in Division No.44 9.05
139 AE-7

269 /
2019-20 Providing C.C Drain at Srinagar Colony 6th Line in Division No.45 4.32
140 AE-7

270 /
2019-20 Providing C.C Drain at Srinagar Colony 4th Line east side in Division No.45 7.52
141 AE-7

271 / Providing C.C Road and C.C Drain at Srinagar Colony 5th Line in Division
142
2019-20 No.45 7.70 AE-7

272 / Providing C.C Drain at Srinagar Colony 4th Line west side in Division No.45
143
2019-20 (Reserved for L.C.C.S) 10.00 AE-7

273 / Providing C.C Drain from Anjaiah Road west side B.S.N.L Office to Chennupati
144
2019-20 Complex in Division No.46 10.00 AE-7
274 / Providing C.C Drain at Prathibha tiruipathaiah house in Panduranga Puram in
145
2019-20 Division No.46 10.00 AE-7

275 / Providing C.C Drain from Ayyanna Bazar to Chandraiah Nagar Main Road in
146
2019-20 Division No.48 10.00 AE-7

276 / Providing C.C Drain from SK.Parveen house to Sujatha house in Division
147
2019-20 No.49 2.45 AE-7

277 /
2019-20 Providing C.C Drain at Krishna Temple Road in Division No.49 4.80
148 AE-7

278 / Providing C.C Road and C.C Drain from Simon house to Miriyala Prasad Babu
149
2019-20 house in Division No.50 9.45 AE-7

279 / Providing C.C Road and C.C Drain from Narayana house to Devi house in
150
2019-20 Division No.50 7.00 AE-7

280 / Providing C.C Road and C.C Drain from Gaddam Kasayya house To Kumar Tea
151
2019-20 Shop in Division No.50 (Reserved for L.C.C.S) 10.00 AE-7
TOTAL 1180.99
Download Start Time : 30.09.2019 5.00 P.M
Download End Time : 14.10.2019 5.00 P.M
Receipt of Bids End Time : 14.10.2019 5.15 P.M
Price Bid Opening Time : 14.10.2019 5.30 P.M
281 / Rennovation of Engineering Section Rooms in Municipal Office Building in
1 2019-20 Division No.21 5.30 AE-3

282 / Extension of C.C Road west to east from existing C.C Road to O.Venkata Rao
2 2019-20 5.95 AE-5
site in Rajeev Nagar in Division No.32
TOTAL 11.25
Download Start Time : 02.10.2019 5.00 P.M
Download End Time : 09.10.2019 5.00 P.M
Receipt of Bids End Time : 09.10.2019 5.15 P.M
Price Bid Opening Time : 09.10.2019 5.30 P.M
Preparation, Delivery and Supply of Food Items to Ward Secretary Trainees
283 /
1 2019-20 for first Batch Trainers at Social Empowerment Training Center in Ongole 9.99
Municipal Corporation
Supply and Delivery of Country Type Cotton Beds and Cotton Pillows with
284 /
2 2019-20 Bed Sheets and Pillow Covers for Ward secretaries Trainees at Social 1.70
Empowerment Training Center in Ongole Municipal Corporation
TOTAL 11.69
Download Start Time : 07.10.2019 5.00 P.M
Download End Time : 14.10.2019 5.00 P.M
Receipt of Bids End Time : 14.10.2019 5.15 P.M
Price Bid Opening Time : 14.10.2019 5.30 P.M
285 / Providing Temporary Toilet Arrangements for Muslim Ijtema Fest at Market
1 2019-20 5.05 AE-1
Yard in Ongole Municipal Corporation
TOTAL 5.05
Download Start Time : 09.10.2019 5.00 P.M
Download End Time : 21.10.2019 5.00 P.M
Receipt of Bids End Time : 21.10.2019 5.15 P.M
Price Bid Opening Time : 21.10.2019 5.30 P.M
Preparation, Delivery and Supply of Food Items to Ward Secretary Trainees
286 /
1 2019-20 for Fourth Batch Trainers at Social Empowerment Training Center in Ongole 9.99
Municipal Corporation
287 / Engaging of Galfar Machine for Cleaning Toilets and Urinals in Ongole
2 2019-20 9.42 AE-7
Municipal Corporation
TOTAL 19.41
Download Start Time : 25.10.2019 5.00 P.M
Download End Time : 01.11.2019 5.00 P.M
Receipt of Bids End Time : 01.11.2019 5.15 P.M
Price Bid Opening Time : 01.11.2019 5.30 P.M
288 / Providing Quarry Rubbish Road from N.S.P Canal to Anjaneya swamy Temple
1 2019-20 4.92 AE-1
in Mukthinuthalapadu Main Road in Division No.2
Desiltation and Clearing away Draingage Water and Sludge from
289 / Underground Drainage Pipelines for 1 year maintenance from R.K Fast Foods
2 2019-20 5.95 AE-7
to Sambasiva Nagar and open Drain from O.K Road to Pothuraju Canal in
Division No.37 in Ongole Municipal Corporation
TOTAL 10.87
Download Start Time : 04.11.2019 5.00 P.M
Download End Time : 11.11.2019 5.00 P.M
Receipt of Bids End Time : 11.11.2019 5.15 P.M
Price Bid Opening Time : 11.11.2019 5.30 P.M
Providing CC Road to Kotha Colony Main Road from 2nd Cross Road to Sai
290 /
1 2019-20 Revent Appartment in Pelluru in Division No.17 (Reserved for L.C.C.S) (2nd 10.00 AE-3
call)
291 / Providing C.C Drain from Malleswari house to Hanumantha Rao house in
2 2019-20 Military Colony 3rd Line in Division No.37 (2nd call) 2.20 AE-6

292 / Providing C.C Drain in N.T.R Colony 1st and 2nd lines in Division No.41
3 2019-20 9.82 AE-6
(Reserved for L.C.C.S) (2nd call)
293 / Providing C.C Drain from Guttikonda Somi reddy (H) to Ramalayam in
4 2019-20 1.55 AE-2
Guttikondavaripalem in Division No.9 (2nd call)
294 / Construction of C.C Drains from Nallamalapu Ankireddy (H) to Ramalayam
5 2019-20 street in N.Agraharam in Division No.10 (2nd call) 9.10 AE-2

295 / Construction of C.C Drains of North Side Cross roads in N.Agraharam in


6 2019-20 Division No.10 (2nd call) 8.80 AE-2

296 / Providing C.C Road and C.C Drain from N.V Subbarao (H) to Anantha Indira
7 2019-20 9.25 AE-2
devi (H) in Anandarao road in Division No.13 (2nd call)
297 / Providing C.C Road and C.C Drain from Public Toilets to Chakiri maruthi
8 2019-20 10.00 AE-2
Kumar (H) in Anandarao road in Division No.13 (2nd call)
298 / Construction of C.C Drain to Koppolu Canal bund Road in place of damaged
9 2019-20 drain portion in Ambedkar Colony in Division No.17 (2nd call) 8.40 AE-3

299 / Construction of C.C Drain from Merikalapalli Sambaiah (H) to Matte Srinu (H)
10 2019-20 in Kota Veedi in Pelluru in Division No.17 (2nd call) 6.40 AE-3

300 / Construction of R.C.C Drain and Foot Path at Chruch Centre Opp R.D.O Office
11 2019-20 5.50 AE-3
in Division No.21 (2nd call)
Construction of C.C Road and C.C Drain from Gouse Nagendram (H) to Nella
301 /
12 2019-20 Cheruvu Koteswra Rao (H) in Dharavari Thota 2nd Line in Division No.21 (2nd 4.35 AE-3
call)
302 / Construction of C.C Drain on northern side to Gandhi Road from Trunk Road
13 2019-20 to Gandhi Statue in Division No.23 (2nd call) 9.85 AE-4

303 / Providing Foot Path Slabs over existing CC Drain From Anjali Dresses to
14 2019-20 10.00 AE-4
addanki Bus Stand in Division No.24 (2nd call)
304 / Construction of C.C Drain in place of existing damaged drain in Poleramma
15 2019-20 9.90 AE-4
temple road in Division No.25 (2nd call)
305 / Providing of Foot Path Slabs over existing C.C Drain in Poleramma temple
16 2019-20 road in Division No.25 (2nd call) 8.15 AE-4

Extension of RCC Culvert and Construction of CC Drain in place of damaged


306 /
17 2019-20 drain from Sisindri play school to Parvatamma temple in Balajirao peta in 10.00 AE-4
Division No.25 (2nd call)
307 / Construction of RCC Culvert opp. New filter beds and beside Parvathamma
18 2019-20 Temple in Balajirao peta in Division No.25 (2nd call) 6.15 AE-4

308 / Construction of C.C Drain beside Poleramma Temple in Balajirao peta in


19 2019-20 6.15 AE-4
Division No.25 (2nd call)
309 / Construction of C.C Drain opposite to New Filter Bed Road in Division No.25
20 2019-20 (2nd call) 2.16 AE-4

310 / Providing R.C.C Cover Slabs over existing drain from Sisindri play school
21 2019-20 towards Parvathamma Temple in Balaji rao Peta in Division No.25 (2nd call) 10.00
AE-4

311 / Providing R.C.C Cover slabs over existing CC Drain beside Poleramma temple
22 2019-20 in Balaji rao peta in Division No.25 (2nd call) 5.60 AE-4

312 / Providing Precast R.C.C Slabs over existing C.C Drain from Padamati Palem
23 2019-20 Mpl. School to Ele. Pole No.SS/333/A1 in Division No.28 (2nd call) 6.25 AE-5

313 / Construction of C.C Drain north to south from existing culvert to V.Narasimha
24 2019-20 2.60 AE-5
rao house in Godugu Palem in Division No.28 (2nd call)
314 / Construction of C.C Drain from Ambedkar statue to Chintam Ratnamma (H)
25 2019-20 in Mamidipalem in Division No.31 (2nd call) 10.00 AE-3

315 / Construction of C.C Drain from Kola Subba Rao house to D.No.8-441 in
26 2019-20 2.10 AE-5
Division No.36 (2nd call)
316 / Construction of C.C Drain from Kalanikethan Showroom to Ayappa Swamy
27 2019-20 8.95 AE-5
Temple Main Gate in Division No.36 (2nd call)
317 / Providing C.C Drain at Srinagar Colony 4th Line west side in Division No.45
28 2019-20 10.00 AE-7
(Reserved for L.C.C.S) (2nd call)
318 / Providing C.C Drain from SK.Parveen house to Sujatha house in Division
29 2019-20 No.49 (2nd call) 2.45 AE-7

319 /
30 2019-20 Providing C.C Drain at Krishna Temple Road in Division No.49 (2nd call) 4.80 AE-7

320 /
31 2019-20 Construction of Approach at Bilal Nagar in Division No.2 1.10 AE-1

321 / Balance Work of 250 mm dia A.C Pipe Line from Bejawada Ramadasu house
32 2019-20 3.45 AE-2
to Panchayath Office Road in Koppolu in Division No.10
Engaging of Tractors on hire basis for digging of holes and Transportation of
322 /
33 2019-20 Plants to various places in Division Nos.1 to 50 in Ongole Municipal 5.00 AE-2
Corporation
323 /
34 2019-20 Flushing of Bore Wells at various places in Ongole Municipal Corporation 10.00 AE-6

324 / Providing C.C Drain and Levelling area at Municipal High School in
35 2019-20 2.80 AE-7
Venkateswara Colony in Division No.50
325 /
36 2019-20 Maintenance of E-Toilets in Ongole Municipal Corporation 3.64 AE-7

TOTAL 236.47
Download Start Time : 04.11.2019 5.00 P.M
Download End Time : 18.11.2019 5.00 P.M
Receipt of Bids End Time : 18.11.2019 5.15 P.M
Price Bid Opening Time : 18.11.2019 5.30 P.M
326 / Transportation and Supply of Water in various places in 1 to 25 Divisions in
1 2019-20 10.00 AE-6
Ongole Municipal Corporation
327 / Transportation and Supply of Water in various places in 26 to 50 Divisions in
2 2019-20 Ongole Municipal Corporation 10.00 AE-6

328 / Engaging of Security Guards for Anna Canteen in Ongole Municipal


3 2019-20 Corporation 1.62 AE-7

TOTAL 21.62
Download Start Time : 08.11.2019 5.00 P.M
Download End Time : 16.11.2019 5.00 P.M
Receipt of Bids End Time : 16.11.2019 5.15 P.M
Price Bid Opening Time : 16.11.2019 5.30 P.M
329 / Laying of 200 mm dia A.C Pipe Line from Ram Nagar 9th Line to Old N.H-16 in
1 2019-20 10.00 AE-3
Division No.17

330 / Balance Work of 250 mm dia A.C Pipe Line from Bejawada Ramadasu house
2 2019-20 to Panchayath Office Road in Koppolu in Division No.10 (2nd call) 3.45 AE-2

TOTAL 13.45
Download Start Time : 22.11.2019 5.00 P.M
Download End Time : 29.11.2019 5.00 P.M
Receipt of Bids End Time : 29.11.2019 5.15 P.M
Price Bid Opening Time : 29.11.2019 5.30 P.M
331 / Levelling and Raising the Ground at P.V.R Municipal Boys High School and
1 2019-20 Dhobikhana ground in Ongole Municipal Corporation 9.90 AE-4

332 / Engaging of J.C.B for cleaning of debris at beside Shadi Khana and Ura
2 2019-20 Cheruvu in Division No.24 4.80 AE-4

333 /
3 2019-20 Formation of Quarry Rubbish Road in Rajeev Gruha Kalpa in Division No.9 9.30 AE-2

334 / Formation of Quarry Rubbish Road at Komaragiri Venkaiah house in


4 2019-20 6.20 AE-2
Guthikondavaripalem in Division No.9
335 / Drilling of Deep Bore Well and Fixing of IM-II Pump Sets at various places in
5 2019-20 Ongole Municipal Corporation (Reserved for L.C.C.S) 9.60 AE-6
336 /
6 2019-20 Construction of M.S Grills to Bilal Nagar Community Hall in Division No.3 1.50 AE-1

337 / Construction of In-complete work of Flooring, Painting and Compound Wall


7 2019-20 8.15 AE-1
at Islampet Community Hall in Division No.4
338 / Construction of C.C Drain at Jawahar Navodaya Vidhyalaya Campus in
8 2019-20 10.00 AE-3
Division No.19
TOTAL 59.45
Download Start Time : 23.11.2019 5.00 P.M
Download End Time : 04.12.2019 5.00 P.M
Receipt of Bids End Time : 04.12.2019 5.15 P.M
Price Bid Opening Time : 04.12.2019 5.30 P.M
340 / Providing B.T Road in District Police Office and Police Parade Grounds in
1 2019-20 40.00 AE-6
Ongole Municipal Corporation
Supply, Delivery and Fixing of Children Play Equipments at Green Nagar
341 /
2 2019-20 Green Belt, Rajeev Gruha Kalpa Park in D.E.E-I section in Ongole Municipal 9.70
Corporation
Supply, Delivery and Fixing of Children Play Equipments at Nehru Nagar Park,
342 /
3 2019-20 Arunodaya Colony Park, Pernamitta Park D.E.E-III section in Ongole Municipal 9.70
Corporation
343 / Providing C.C Road fom Subbisetty Venkateswarlu house to Bestha Kotaiah
4 2019-20 house via Subbaiah school in Division No.42 2.70 AE-7

344 / Construction of R.C.C Culverts at N.H-5 Road Junction behind Mini Stadium in
5 2019-20 Division No.19 6.00 AE-3

TOTAL 68.10
Download Start Time : 06.12.2019 5.00 P.M
Download End Time : 20.12.2019 5.00 P.M
Receipt of Bids End Time : 20.12.2019 5.15 P.M
Price Bid Opening Time : 20.12.2019 5.30 P.M
345 / Supply, Delivery and Fixing of Motors, Panel Boards and Pipe Line Fittings at
1 2019-20 2.35 AE-3
Cheruvukommupalem existing ELSR in Division No.18
TOTAL 2.35
Download Start Time : 09.12.2019 5.00 P.M
Download End Time : 16.12.2019 5.00 P.M
Receipt of Bids End Time : 16.12.2019 5.15 P.M
Price Bid Opening Time : 16.12.2019 5.30 P.M
346 / Levelling and Raising the Ground at P.V.R Municipal Boys High School and
1 2019-20 Dhobikhana ground in Ongole Municipal Corporation (2nd call) 9.90 AE-4

347 / Engaging of J.C.B for cleaning of debris at beside Shadi Khana and Ura
2 2019-20 Cheruvu in Division No.24 (2nd call) 4.80 AE-4

TOTAL 14.70
Download Start Time : 13.12.2019 5.00 P.M
Download End Time : 21.12.2019 5.00 P.M
Receipt of Bids End Time : 21.12.2019 5.15 P.M
Price Bid Opening Time : 21.12.2019 5.30 P.M
348 / Transportation and Supply of Water in various places in 1 to 25 Divisions in
1 2019-20 10.00 AE-6
Ongole Municipal Corporation
349 / Transportation and Supply of Water in various places in 26 to 50 Divisions in
2 2019-20 10.00 AE-6
Ongole Municipal Corporation
TOTAL 20.00
Download Start Time : 18.12.2019 5.00 P.M
Download End Time : 26.12.2019 5.00 P.M
Receipt of Bids End Time : 26.12.2019 5.15 P.M
Price Bid Opening Time : 26.12.2019 5.30 P.M
350 / Providing C.C Road behind Stadium Road from Forest Office to N.H-5 in
1 2019-20 Division No.19 17.20

351 / Providing C.C Road from G.T Road to Chittithoti Tyagaraju house in Ram
2 2019-20 9.70 AE-2
Nagar 9th Line in Division No.15
352 /
3 2019-20 Providing C.C Approach at Ram Nagar 8th Line in Division No.15 1.35 AE-2

353 / Construction of New Pump House Room at S.S Tank-II Filtration Plant in
4 2019-20 Division No.18 10.00 AE-3

Engaging of J.C.B Machine, Chain Machine, Road Roller, Dozer and Tractors
354 /
5 2019-20 on hire basis for cleaning and levelling at Uggalagunta ground in Division 4.95 AE-5
No.36
355 / Arrangement of R.O Plant in A.P.S.R.T.C Bus Stand in Ongole Municipal
6 2019-20 2.99 AE-7
Corporation
TOTAL 46.19
Download Start Time : 17.12.2019 5.00 P.M
Download End Time : 30.12.2019 5.00 P.M
Receipt of Bids End Time : 30.12.2019 5.15 P.M
Price Bid Opening Time : 30.12.2019 5.30 P.M
356 / Laying of C.C Road from Pole No.1/42/OMC to 1/43/OMC in Throvagunta in
1 2019-20 4.50 AE-1
Division No.1
357 / Construction of C.C Approaches and Valve Pits in S.C Colony and B.C Colony
2 2019-20 4.30 AE-1
in Throvagunta in Division No.1
358 / Providing C.C Road from Mandava Raghava Rao house to Electric Pole
3 2019-20 No.1/51/1A/OMC in Throvagunta in Division No.1 9.99 AE-1

359 / Providing C.C Road at Poleramma Temple Road in Throvagunta in Division


4 2019-20 7.60 AE-1
No.1 (Reserved for L.C.C.S)
360 / Providing C.C Road and C.C Drain from U.Kotaiah house to Yeluri Subba rao
5 2019-20 8.72 AE-1
house near Mastan Darga in Throvagunta in Division No.1
361 / Providing C.C Road from Bandi Ramudu house to B. Kondaiah house in
6 2019-20 6.55 AE-1
Throvagunta in Division No.1
Providing C.C Road from Domari Venkateswarlu house to Chanduluri
362 /
7 2019-20 Venkaiah house in Rajakala Palem in Throvagunta in Division No.1 (Reserved 8.98 AE-1
for L.C.C.S)
363 / Construction of Compound Wall at Mandala Parishad Pradhamika Patasala in
8 2019-20 Gudimellapadu in Division No.2 6.00 AE-1

364 /
9 2019-20 Providing C.C Road at Kesavaraju Kunta 1st Line Cross Roads in Division No.2 10.00 AE-1
365 / Providing C.C Road at Kesavaraju Kunta 2nd Line Cross Roads in Division No.2
10 2019-20 10.00 AE-1
(Reserved for L.C.C.S)
366 /
11 2019-20 Providing C.C Road at Kesavaraju Kunta 3rd Line Cross Roads in Division No.2 10.00 AE-1

367 / Construction of R.C.C Drain at Pothuraju Canal and R.C.C Slab at Bilal Nagar
12 2019-20 2.60 AE-1
Community Hall in Division No.3
368 / Construction of Compound Wall and Removal of Septic Tank in Health Care
13 2019-20 Centre in Papa Colony in Division No.3 1.70 AE-1

369 / Providing C.C Drain from Sk.Mastan house to B.Bhagyamma house in Gopal
14 2019-20 4.15 AE-1
Nagar 1st Line 1st Cross Road Extension in Division No.5
370 / Providing C.C Road from Nalagarla Koteswara rao house to Sk.Rafee Royal
15 2019-20 9.98 AE-1
Biryani in Gopal Nagar 1st Line Extension in Division No.5

371 / Providing C.C Road and C.C Drain from Nagendra Swamy Putta to Alliboyina
16 2019-20 3.34 AE-1
Jalaiah house in Gopal Nagar 1st Line in Division No.6 (Reserved for L.C.C.S)

372 / Construction of Store Room and Watchman Shed at Santhapet ELSR in


17 2019-20 Ongole Municipal Corporation 9.10 AE-1

373 / Providing C.C Drain at Indiramma Gruhalu 9th Line (Cross Road to Main
18 2019-20 Road) in Division No.9 6.90 AE-2

374 / Providing C.C Road from South Side Junction to Poleramma Temple in
19 2019-20 10.00 AE-2
Guthikondavaripalem in Division No.9
375 / Providing C.C Road from Sk.Sharabuddin house to Makkena Anjaneyulu
20 2019-20 9.00 AE-2
house in Koppolu in Division No.10
376 / Providing C.C Road at Thotakura Srikanth house in N.Agraharam in Division
21 2019-20 No.10 4.70 AE-2

378 / Providing C.C Road from Primary High School to Chinna Cheruvu Road in
22 2019-20 Koppolu in Division No.10 10.00 AE-2

379 / Formation of Quarry Rubbish Road at Rakesh reddy house in Karthikeya


23 2019-20 Nagar and Besides Panchayat Office Road in Koppolu in Division No.10 5.00 AE-2

380 / Providing C.C Road from Bejawada Ramadasu house to Panchayat Office
24 2019-20 6.45 AE-2
Road in Koppolu in Division No.10
381 / Providing C.C Drain from Miriyala Palem Center to Bunder Road (North Side)
25 2019-20 10.00 AE-2
in Miriyala Palem in Division No.12
382 / Providing C.C Road and C.C Drain from Miriyala Krishna Rao house to Miriyala
26 2019-20 Palem Road in Division No.12 5.85 AE-2

Providing C.C Road and C.C Drain from Jangila Jameeba house to Pandi
383 /
27 2019-20 Lumiyan raj house in Kabadi Palem and from Nukathoti Kotamma house to 6.70 AE-2
Bank Vinod house in Division No.13
Providing C.C Road from Chittithoti Tyagaraju house to Cross Road in Ram
384 /
28 2019-20 Nagar 9th Line and from Pendyala Subba rao house to Cross Road in Ram 9.45 AE-2
Nagar 6th Line in Division No.15
385 / Providing C.C Road and C.C Drain from Ram Nagar 2nd Line to 4th Line
29 2019-20 10.00 AE-2
besides Ram Nagar High School in Division No.15
Providing C.C Drain from Kasukurthi Rama rao house to Sk.Arifa bee house in
386 /
30 2019-20 Annavarappadu 3rd to 4th Line Cross Road in Division No.15 (Reserved for 1.70 AE-2
L.C.C.S)
387 /
31 2019-20 Providing C.C Culverts in Pothurajupalem in Division No.16 1.10 AE-2

388 / Construction of Pile Foundation and Plinth Beam to Open Space in B.C
32 2019-20 10.00 AE-2
Employees Housing Board Society Colony in Division No.16
389 / Formation of Quarry Rubbish Road from Katari Ramachandra house to
33 2019-20 Municipal Park in Pothuraju Palem in Division No.16 3.50 AE-2

390 / Providing C.C Road from Chirumalla Kotaiah house to Sk.Valli house in Kotha
34 2019-20 10.00 AE-3
Colony in Division No.17 (Reserved for L.C.C.S)
391 / Providing C.C Road from Miriyam Srinu house to NCC Office in Kotha Colony
35 2019-20 10.00 AE-3
in Division No.17 (Reserved for L.C.C.S)
392 / Providing C.C Road and C.C Drain from Chappidi Sudhakar house to
36 2019-20 5.05 AE-3
Ravulapalli Narasamma house in Padamati Bazar in Division No.17
393 / Providing R.C.C Culvert for Main Disposal Drain opposite to Burial Ground in
37 2019-20 Cheruvukommupalem in Division No.18 5.75 AE-3

394 / Construction of R.C.C Culvert beside S.S Tank-I Road and N.H-5 Road Junction
38 2019-20 0.99 AE-3
in Division No.18
395 / Construction of C.C Drain near Reddy Hostel connecting to Bye-Pass Road in
39 2019-20 9.60 AE-3
Division No.19
396 /
40 2019-20 Providing C.C Road beside Reddy Hostel in Mamidi Palem in Division No.19 3.95 AE-3

397 /
41 2019-20 Providing C.C Road to Bank Colony 5th Line in Division No.19 10.00 AE-3

398 /
42 2019-20 Providing C.C Drain to Bank Colony 5th Line in Division No.19 9.40 AE-3

399 / Providing C.C Patches at Bhagya Nagar 2nd Line 1st Cross Road in Division
43 2019-20 1.88 AE-3
No.20
400 / Providing C.C Road behind DWAMA Office Road at IDSMT Layout in Division
44 2019-20 No.20 9.51 AE-3

401 /
45 2019-20 Extension of C.C Road to Velugu Office Road in Division No.20 5.55 AE-3

402 / Providing C.C Road to Bhagya Nagar 2nd Line 2nd Cross Road in Division
46 2019-20 No.21 6.20 AE-3

403 /
47 2019-20 Providing C.C Road at back side of N.S.P Quarters in Division No.29 9.85 AE-3

404 / Providing Retaining Wall and C.C Drain from Pamba Suguna house to Surali
48 2019-20 9.80 AE-3
Venkata swamy house in Srigiri (N.S.P Quarters back side) in Division No.29

405 / Providing C.C Road and Steps from Dasari Pramila house to P.Murali house in
49 2019-20 2.60 AE-3
R&B Colony in Division No.29
406 / Providing C.C Road and C.C Drain from Pulugu Srinu house to Gangamma
50 2019-20 3.00 AE-3
Temple in Mamidi Palem in Division No.30
407 / Providing C.C Drain from Kalvari Chiguru Church to Metipati Subbarao house
51 2019-20 n Gadddala Gunta in Division No.30 0.88 AE-3
Providing C.C Drain and Retaining Wall from Damavarapu Surya narayana
408 /
52 2019-20 house to Vankayalapati Satyanarayan house in Seetharamapuram (Hill 5.90 AE-3
Tower) in Division No.30
409 / Providing C.C Road and C.C Steps from Galagala Srinu house to Pedasingh
53 2019-20 Ramanaiah house at Srigiri Towers in Division No.30 3.55 AE-3

410 / Providing C.C Road and C.C Drain from Galagala Srinu house to Galagala
54 2019-20 4.00 AE-3
Chandraiah house in Srigiri Towers in Division No.30
411 / Providing C.C Road and C.C Drain from Bethelu Kristava Prardhana Mandiram
55 2019-20 9.40 AE-3
to Tella Rojamma house in Division No.30
412 / Providing C.C Road from Mamidi Palem Main Road upto Balaji Nilayam in
56 2019-20 Division No.31 3.60 AE-3

413 / Providing C.C Road, C.C Drain and 110 mm dia P.V.C Pipe Line from Bethelu
57 2019-20 Church to Jada Thimothi house in Mamidi Palem in Division No.31 8.00 AE-3

414 / Extension of C.C Drain from Agamana Veda Patasala to C.V.N Reading Room
58 2019-20 Main Gate in Division No.26 4.32 AE-5

Providing C.C Road and C.C Drain from I.Chinnammai house to Samiyelu
415 /
59 2019-20 house and from from D.No.273 to Ravi house and Vasu Sudhakar house in 9.95 AE-5
Kesavaswamy Street in Seetharamapuram in Division No.27
416 / Providing C.C Road and C.C Drain from Hanuman Nilayam to T.Venkateswarlu
60 2019-20 5.00 AE-5
house in Division No.32 (Reserved for L.C.C.S)
417 / Providing C.C Road and C.C Drain from Krishna mohan rao house to existing
61 2019-20 3.75 AE-5
C.C Road in Gaddala Gunta in Division No.32
418 / Providing C.C Road north to south from Mangamoor Donka Main Road to
62 2019-20 10.00 AE-5
Kotha Donka Road beside H.P Gas Office in Division No.33
419 / Providing C.C Drain west to east from G.Srinivasa Rao house to Thota V.S.M
63 2019-20 Guptas Enclave in Division No.34 2.80 AE-5

Providing C.C Drain from P.Rangaiah house to P.Pedda Rangaiah house and
420 /
64 2019-20 Extension of C.C Road from south side of Alluraiah Sweet Shop in Old Sujatha 2.27 AE-5
Nagar in Division No.34
421 /
65 2019-20 Providing Internal C.C Patch Works at various places in Division No.36 2.30 AE-5

422 / Providing Painting and Filling of Sand in Lawyerpet Park and Gandhi Park in
66 2019-20 2.10 AE-5
Division No.34 and 36 in Ongole Municipal Corporation
423 / Providing C.C Road to Sujatha Nagar 6th Line Extension (Reach-2) in Division
67 2019-20 No.37 9.70 AE-6

424 / Providing C.C Drain to Samatha nagar 8th line Cross Roads and Balance C.C
68 2019-20 Road of Cross Roads in Division No.37 9.80 AE-6

425 / Providing C.C Road to Samatha Nagar 3rd Line Balance Road east side in
69 2019-20 4.40 AE-6
Division No.37
426 / Providing C.C Road to Samatha Nagar 8th Line Cross Roads in Division No.37
70 2019-20 9.95 AE-6
(Reserved for L.C.C.S)
427 / Providing C.C Road and C.C Drain from G.S.R Apartment to Saisiri Homes in
71 2019-20 Chennakesava Nagar 2nd Line in Division No.37 10.00 AE-6

428 / Providing C.C Road and C.C Drain to Soniyagandhi Nagar 1st Line 1st Cross
72 2019-20 Road in Division No.37 10.00 AE-6
429 / Providing C.C Road and C.C Drain to Sujatha Nagar 2nd Line 2nd Cross Road
73 2019-20 5.40 AE-6
in Division No.37
430 / Providing C.C Road from Dhanalakshmi enclave to Park view apartment in
74 2019-20 10.00 AE-6
Chennakesava Nagar in Division No.37
431 /
75 2019-20 Providing C.C Drain at Soniya Gandhi Nagar 2nd Line in Division No.37 7.00 AE-6

432 /
76 2019-20 Providing C.C Road at Soniya Gandhi Nagar 1st Line in Division No.37 10.00 AE-6

Providing C.C Road from Kurnool Road to Peerlamanyam Main Road and C.C
433 /
77 2019-20 Approaches at various places in Division Nos.37 and 38 in Ongole Municipal 10.00 AE-6
Corporation
434 / Providing C.C Road from Muthumula Venkata Lakshmi house to Subba Rao
78 2019-20 9.00 AE-6
house in Samatha Nagar in Division No.39
435 / Providing C.C Road to Samatha Nagar west side 4th Line in Division No.39
79 2019-20 10.00 AE-6
(Reserved for L.C.C.S)
436 /
80 2019-20 Providing C.C Road to Peerlamanyam 1st Cross Road in Division No.39 9.97 AE-6

437 /
81 2019-20 Providing C.C Road to Peerlamanyam 5th Cross Road in Division No.39 10.00 AE-6

438 /
82 2019-20 Providing C.C Road to Sri Krishna Nagar 3rd Line in Division No.39 10.00 AE-6

Providing Quarry Rubbish Road in Ambethkar Colony Main Road and


439 /
83 2019-20 Providing Internal Roads in Division No.40 and Quarry Rubbish Patches in 10.00 AE-6
Division No.39 in Ongole Municipal Corporation

440 / Providing C.C Road from western side of Srikrishna Towers to Venkateswara
84 2019-20 Reddy House (Ashramam) (Reach-2) in Mangamur Road in Division No.40 9.85 AE-6

441 / Providing C.C Road from Ashramam Road K.R Homes to Maddineni Srinivas
85 2019-20 9.97 AE-6
ghouse in Mangamoor Road in Division No.40
442 / Providing C.C Road at Ayyappa Apartment in Ashramam Road in Mangamoor
86 2019-20 9.97 AE-6
Road in Division No.40
443 / Providing C.C Road at Vijaya Sai Towers in Ashramam Road in Mangamoor
87 2019-20 9.97 AE-6
Road in Division No.40
444 / Providing C.C Road and C.C Drain from O.K Road to via Koppolu Prasad house
88 2019-20 to Ramalayam in Pernamitta in Division No.42 9.88 AE-7

445 / Providing C.C Road from Kurnool Road to Ganapathi Nagar in Division No.43
89 2019-20 9.95 AE-7
(Reserved for L.C.C.S)
446 / Construction of Compound Wall to Burial Ground in Ganapathi Nagar in
90 2019-20 10.00 AE-7
Division No.43
447 /
91 2019-20 Providing C.C Road from Ganapathi Nagar to Kurnool Road in Division No.43 4.80 AE-7

Providing C.C Road and C.C Drain from Thoka Siddayya (H) to Malapati
448 /
92 2019-20 Nageswrao (H) and from Palleboyina Murthy (H) to Sk.Karimulla (H) in Sriram 8.80 AE-7
Colony in Division No.43
449 / Completion of Incomplete Compound Wall to Hindu Burial Ground in
93 2019-20 Ganapathi Nagar in Division No.43 10.00 AE-7
450 /
94 2019-20 Providing C.C Road from Kurnool Road to Ganapathi Nagar in Division No.43 10.00 AE-7

Providing C.C Drain from Nalapu Chenchu Reddy (H) to Venkata Swamy
451 / Reddy Vacant Land and from D.Venkata Rami Reddy (H) to Karanam Sarath
95 2019-20 Chandra (H) in Maruthi Nagar 2nd Line in Maruthi Nagar 3rd Line in Division 4.90 AE-7
No.44
452 / Providing C.C Road and C.C Drain from Mastan house to Revenue colony
96 2019-20 Main Road East Side 4th cross road in Division No.44 8.00 AE-7

453 / Providing C.C Road from Uma Manovikasa Kendram to Maruthi Nagar 2nd
97 2019-20 5.30 AE-7
Line in Division No.44 (Reserved for L.C.C.S)
454 / Providing C.C Drain from Kurnool Road to D.Venkatarao (ITI Correspondent)
98 2019-20 8.35 AE-7
in Division No.44
455 / Providing C.C Road and C.C Drain at Srinagar Colony 3rd Line 6th Cross Road
99 2019-20 4.26 AE-7
in Division No.45
Providing C.C Road and C.C Drain from Mathala Suman Reddy (H) to
456 /
2019-20 Nallamalapu Subbareddy (H) 1st Line East Site 2nd Cross Road in Maruthi 3.40
100 AE-7
Nagar in Division No.45

457 / Providing C.C Road from Rachamallu Lakshamma (H) to Thalluri Sujatha (H)
101
2019-20 (East Side) 4th Cross Road in Maruthi Nagar 1st Line in Division No.45 7.50 AE-7

458 / Providing C.C Drain from Dr.Venkateswar Reddy house to Vengal Reddy
102
2019-20 house in Srinagar Colony 3rd line 6th cross road (East Side) in Division No.45 5.15 AE-7

459 / Providing C.C Drain from 60 Feet Road to Pogula Venkataiah house in
103
2019-20 Chandraiah Nagar in Division No.47 8.15 AE-7

460 / Providing C.C Drain from Narayanamma house to Budagala Koteswara Rao
104
2019-20 house in Division No.47 2.50 AE-7

461 / Providing C.C Drain from Pogula Venkataiah house to 60 Feet Road in
105
2019-20 Chandraiah Nagar in Division No.47 8.15 AE-7

462 / Providing C.C Drain from Dande Venkateswarlu house to N.G.O Colony Main
106
2019-20 Road in Division No.47 6.15 AE-7

463 / Laying of 150 mm dia A.C Pipe Line at Satyanarayana Puram Yadavula Bazar
107
2019-20 and Karavadi vaari Bazar in Division No.49 5.85 AE-7

Providing C.C Drain from SK.Mahaboob Basha (H) to Peddinti Venkateswarlu


464 /
2019-20 (H) in Karavadi Bazar, Culverts at Iskan Temple opposite and from Mekapati 1.25
108 AE-7
Malyadri (H) in Sathyanarayanapuram in Division No.49

465 / Providing 160 mm dia P.V.C Pipe Line from Nehru Nagar Park to Guntur Road
109
2019-20 in Division No.50 1.85 AE-7

Providing C.C Drain from Kakarla Madhavi (H) to Konala Rama Subba Rao (H),
466 / from Vemuri Malyadri (H) to Sudhanagunta Rameswara Rao and from
2019-20 Sk.Mastan (H) to K.V Achari (H) in Venkateswara Colony in Division No.50 7.40
110 AE-7

(Reserved for L.C.C.S)

Providing C.C Road and C.C Drain from Kottakota Malleswari (H) to Pulipati
467 /
2019-20 Vanaja (H) and from Bopparaju Venkatewsarlu (H) to Rayala Seshaiah (H) in 9.85
111 AE-7
Venkateswara Colony in Division No.50
468 / Providing Quarry Rubbish Road at Nethaji Colony, Jayaprakash Colony and
112
2019-20 Chaitanya Nagar in Division No.50 9.55 AE-7

Providing C.C Road and C.C Drain from Ponnaganti Rambabu house to Veluri
469 /
2019-20 Subbareddy house and C.C Drain from ponnaganti rambabu house to 1st line 5.00
113 AE-7
in Nagendra nagar in Division No.45
470 / Fixing of Submersible Motors and Drilling of Deep Bore Well and Fixing of IM-
114
2019-20 II Pumpsets at various places in Ongole Municipal Corporation 9.55 AE-6

471 / Providing Internal C.C Drains at Jawahar Navodaya Vidhyalaya campus in


115
2019-20 Division No.19 5.00 AE-3

472 / Rectification of Pumping Main Leaks at Bhagya Nagar, Gaddala Gunta and
116
2019-20 Mamidi Palem in Ongole Municipal Corporation 3.60 AE-3

475 / Transportation and Supply of Water in various places in Ongole Municipal


117
2019-20 Corporation 40.00 AE-6
TOTAL 847.93
Download Start Time : 26.12.2019 5.00 P.M
Download End Time : 09.01.2020 5.00 P.M
Receipt of Bids End Time : 09.01.2020 5.15 P.M
Price Bid Opening Time : 09.01.2020 5.30 P.M
476 / Providing C.C Road from O.K Road to Cross Road in Indiramma Gruhalu 3rd
1 2019-20 Line in Division No.9 under SCC Grant 10.00 AE-2

477 / Providing C.C Road from Old S.C Colony to New S.C Colony in Koppolu in
2 2019-20 10.00 AE-2
Division No.10 under SCC Grant
478 / Providing C.C Road and C.C Drain from Tanga Ramana house to N.S.P Canal in
3 2019-20 7.00 AE-2
Balaji Nagar S.C Colony in Division No.16 under SCC Grant
Providing C.C Road from Jada Ramaiah (H) to Lane, from Gaddala Tirupalu (H)
479 /
4 2019-20 to Church and from Pidathala Prakasam (H) to Santhamma (H) in 10.00 AE-3
Cheruvukommu Palem in Division No.18 under SCC Grant

480 / Providing C.C Road and C.C Drain from Bochu Sangeetha rao (H) to Navuri
5 2019-20 8.00 AE-1
Achamma (H) in Throvagunta S.C Colony in Division No.3 under SCC Grant

481 / Providing C.C Road from B.Ed College to Davuluri Ragaiah house in
6 2019-20 Cheruvukommu Palem in Division No.18 under SCC Grant 10.00 AE-3

482 / Providing C.C Road from Nagalla Seshamma house to Kakumani Suresh house
7 2019-20 8.00 AE-6
in Arunodaya Colony Main Road in Division No.39 under SCC Grant
483 / Providing C.C Road from Mareti Siva house to Nagalla Seshamma house in
8 2019-20 7.00 AE-6
Arunodaya Colony Main Road in Division No.39 under SCC Grant

484 / Providing C.C Road from Kila Vimala house to Yerra Yendiyya house in Main
9 2019-20 10.00 AE-7
Road Saraladevi Nagar in Pernamitta in Division No.42 under SCC Grant

485 / Providing C.C Road and C.C Drain from Pole No.1/90/1A/3/OMC to Bochu
10 2019-20 10.00 AE-1
Sangeetharao (H) in Throvagunta S.C Colony in Division No.3 under SCC Grant

486 / Providing C.C Drain from Throvagunta West Side S.C Colony to Mudigonda
11 2019-20 10.00 AE-7
Vagu in Division No.50 under SCC Grant
TOTAL 100.00
Download Start Time : 07.01.2020 5.00 P.M
Download End Time : 20.01.2020 5.00 P.M
Receipt of Bids End Time : 20.01.2020 5.15 P.M
Price Bid Opening Time : 20.01.2020 5.30 P.M
487 / Construction of Pedestal for Statue and Landscape Work opposite to Mini
1 2019-20 9.00 AE-3
Stadium in Trunk Road in Ongole Municipal Corporation
488 /
2 2019-20 Construction of Toilets at Collector Office in Ongole Municipal Corporation 4.50 AE-2

TOTAL 13.50
Download Start Time : 20.01.2020 5.00 P.M
Download End Time : 27.01.2020 5.00 P.M
Receipt of Bids End Time : 27.01.2020 5.15 P.M
Price Bid Opening Time : 27.01.2020 5.30 P.M
489 / Laying of 110 mm dia P.V.C Pipe Line south to east from B.Venkateswarlu
1 2019-20 1.36 AE-5
house to Royal Enfield Service Point in Division No.33
490 / Construction of Toilets at Collector Office in Ongole Municipal Corporation
2 2019-20 4.50 AE-2
(2nd call)

491 / Repairs and Rectification of Leaks for Pumping Mains and Distribution Lines
3 2019-20 in Division Nos.17 to 21 and 29 to 31 in Ongole Municipal Corporation 2.26 AE-3

TOTAL 8.12
Download Start Time : 27.01.2020 5.00 P.M
Download End Time : 03.02.2020 5.00 P.M
Receipt of Bids End Time : 03.02.2020 5.15 P.M
Price Bid Opening Time : 03.02.2020 5.30 P.M
492 / Providing C.C Drain at Ponugupati Colony 3rd, 4th, 5th and 6th Cross Roads in
1 2019-20 9.80 AE-1
Division No.4
493 /
2 2019-20 Providing C.C Drain at Ponugupati Colony 7th Cross Road in Division No.4 2.20 AE-1

Preparation, Delivery and Supply of Food Items to Administrative Secretaries,


494 / Education and Data Processing Secretaries Trainers conducting Functional
3 2019-20 10.00 AE-3
Training at Social Empowerment Training Center in Ongole Municipal
Corporation

Supply and Delivery of Toilets and Rooms Cleaning Materials, Labour Wages
of Security Guards, Providing Net Facility for accommodation of
495 /
4 2019-20 Administrative Secretaries, Education and Data Processing Secretaries for 6.80 AE-3
conducting Functional Training in Social Empowerment Training Center in
Ongole Municipal Corporation

496 / Repairs and Maintenance of Toilet Block and Construction of New Septic
5 2019-20 2.75 AE-4
Tank in Fish Market in Division No.24
497 / Providing C.C Drain north to south from S.V.L Rice Store to Sree Surya
6 2019-20 Vidyaniketan School in Z.P Colony Main Road in Division No.33 9.28 AE-5

498 / Construction of Community Hall at Old Sujatha Nagar (south side of


7 2019-20 D.No.156) in Division No.35 10.00 AE-5

499 / Providing Thermoplastic Road Marking from Anjaiah Road Fly Over to P.V.R
8 2019-20 4.08 AE-7
Main Gate, Subrahmanyam Temple Road in Ongole Municipal Corporation
500 / Providing C.C Drain near Y.S.R Statue in Sri Ram Colony 1st Line in Division
9 2019-20 2.00 AE-7
No.43
501 / Construction of C.C Approaches and Valve Pits in S.C Colony and B.C Colony
10 2019-20 4.30 AE-1
in Throvagunta in Division No.1 (2nd call)
502 / Providing C.C Drain from Miriyala Palem Center to Bunder Road (North Side)
11 2019-20 10.00 AE-2
in Miriyala Palem in Division No.12 (2nd call)
Providing C.C Road and C.C Drain from Jangila Jameeba house to Pandi
503 /
12 2019-20 Lumiyan raj house in Kabadi Palem and from Nukathoti Kotamma house to 6.70 AE-2
Bank Vinod house in Division No.13 (2nd call)

504 / Providing C.C Road and C.C Drain from Chappidi Sudhakar house to
13 2019-20 Ravulapalli Narasamma house in Padamati Bazar in Division No.17 (2nd call) 5.05 AE-3

Providing Retaining Wall and C.C Drain from Pamba Suguna house to Surali
505 /
14 2019-20 Venkata swamy house in Srigiri (N.S.P Quarters back side) in Division No.29 9.80 AE-3
(2nd call)
506 / Providing C.C Road and Steps from Dasari Pramila house to P.Murali house in
15 2019-20 R&B Colony in Division No.29 (2nd call) 2.60 AE-3

507 / Providing C.C Road and C.C Drain from Pulugu Srinu house to Gangamma
16 2019-20 Temple in Mamidi Palem in Division No.30 (2nd call) 3.00 AE-3

508 / Providing C.C Drain from Kalvari Chiguru Church to Metipati Subbarao house
17 2019-20 0.88 AE-3
n Gadddala Gunta in Division No.30 (2nd call)
Providing C.C Drain and Retaining Wall from Damavarapu Surya narayana
509 /
18 2019-20 house to Vankayalapati Satyanarayan house in Seetharamapuram (Hill 5.90 AE-3
Tower) in Division No.30 (2nd call)

510 / Providing C.C Road and C.C Steps from Galagala Srinu house to Pedasingh
19 2019-20 3.55 AE-3
Ramanaiah house at Srigiri Towers in Division No.30 (2nd call)

511 / Providing C.C Road and C.C Drain from Galagala Srinu house to Galagala
20 2019-20 4.00 AE-3
Chandraiah house in Srigiri Towers in Division No.30 (2nd call)

512 / Providing C.C Road, C.C Drain and 110 mm dia P.V.C Pipe Line from Bethelu
21 2019-20 Church to Jada Thimothi house in Mamidi Palem in Division No.31 (2nd call) 8.00 AE-3

513 / Extension of C.C Drain from Agamana Veda Patasala to C.V.N Reading Room
22 2019-20 4.32 AE-5
Main Gate in Division No.26 (2nd call)
Providing C.C Road and C.C Drain from I.Chinnammai house to Samiyelu
514 /
23 2019-20 house and from from D.No.273 to Ravi house and Vasu Sudhakar house in 9.95 AE-5
Kesavaswamy Street in Seetharamapuram in Division No.27 (2nd call)
515 / Providing C.C Drain west to east from G.Srinivasa Rao house to Thota V.S.M
24 2019-20 2.80 AE-5
Guptas Enclave in Division No.34 (2nd call)
516 / Providing C.C Drain from 60 Feet Road to Pogula Venkataiah house in
25 2019-20 8.15 AE-7
Chandraiah Nagar in Division No.47 (2nd call)
517 / Providing C.C Drain from Narayanamma house to Budagala Koteswara Rao
26 2019-20 house in Division No.47 (2nd call) 2.50 AE-7

518 / Providing C.C Drain from Pogula Venkataiah house to 60 Feet Road in
27 2019-20 8.15 AE-7
Chandraiah Nagar in Division No.47 (2nd call)
519 / Providing C.C Drain from Dande Venkateswarlu house to N.G.O Colony Main
28 2019-20 6.15 AE-7
Road in Division No.47 (2nd call)

Providing C.C Drain from SK.Mahaboob Basha (H) to Peddinti Venkateswarlu


520 /
29 2019-20 (H) in Karavadi Bazar, Culverts at Iskan Temple opposite and from Mekapati 1.25 AE-7
Malyadri (H) in Sathyanarayanapuram in Division No.49 (2nd call)

Providing C.C Road and C.C Drain from Ponnaganti Rambabu house to Veluri
521 /
30 2019-20 Subbareddy house and C.C Drain from ponnaganti rambabu house to 1st line 5.00 AE-7
in Nagendra nagar in Division No.45 (2nd call)
522 / Raising the P.V.R Municipal Boys High School and Providing Compound Wall
31 2019-20 Gates opposite Rangarayudu Cheruvu in Division No.24 25.00 AE-5

523 / Providing Footpath Slabs over existing C.C Drain opposite Mini Stadium Drain
32 2019-20 10.00 AE-3
at Trunk Road in Division No.19

524 / Construction of Steps from Gademsetti Subba Rao house to Pasupuleti


33 2019-20 9.20 AE-3
Koteswara Rao house (NGO Home back side) in Balaji Nagar in Division No.21

525 / Arrangements of High Speed C.C T.V system at Vehicle shed and Dumping
34 2019-20 2.50 AE-1
Yard in Ongole Municipal Corporation
TOTAL 215.66
Download Start Time : 28.01.2020 5.00 P.M
Download End Time : 12.02.2020 5.00 P.M
Receipt of Bids End Time : 12.02.2020 5.15 P.M
Price Bid Opening Time : 12.02.2020 5.30 P.M
526 / Providing R.C.C Pipes at Ambedkar Colony and Bhagya Nagar Happy Homes
1 2019-20 1.10 AE-3
Apartment in Division No.17
527 / Providing Red Earth, Carpet Grass and Plants in C.R.P Quarters Park in
2 2019-20 9.65 AE-3
Division No.21
528 / Providing Pathway with Kurb Wall, Internal Tiles and Raising the Compound
3 2019-20 Wall in C.R.P Quarters Park in Division No.21 10.00 AE-3

529 /
4 2019-20 Providing Open Gym Platform in C.R.P Quarters Park in Division No.21 5.90 AE-3

530 / Rennovation of Accountant Room in Office Main Building in Municipal Office


5 2019-20 5.05 AE-3
Compound in Ongole Municipal Corporation
531 / Providing Electrification, Chairs and Tables to Sachivalayams in A.E-2 Section
6 2019-20 4.55 AE-2
in Ongole Municipal Corporation
Repairs of Buildings, Electrification and Paintings for Ward Secretariats at
532 /
7 2019-20 Throvagunta, Mukthinithalapadu and Gudimellapadu in Division Nos.1 and 2 5.75 AE-1
in Ongole Municipal Corporation
533 / Rennovation of Parade Ground Platform at S.P Office in Ongole Municipal
8 2019-20 Corporation 3.20 AE-6

TOTAL 45.20
Download Start Time : 05.02.2020 5.00 P.M
Download End Time : 17.02.2020 5.00 P.M
Receipt of Bids End Time : 17.02.2020 5.15 P.M
Price Bid Opening Time : 17.02.2020 5.30 P.M
534 / Providing Center Lighting from Kurnool Road Fly Over to Nacha Reddy palem
1 2019-20 196.50
in Kurnool Road in Ongole Municipal Corporation
Providing Center Lighting from on Kothapatnam Road from Koppolu Road
535 /
2 2019-20 Flyover to Koppolu Village and from Kurnool Road Flyover to Agricultural 97.00
Market on Old Bye Pass Road in Ongole Municipal Corporation
536 / Supply and Delivery of Pyrosene Oil - BIS Mark an A.C.M to Ongole Municipal
3 2019-20 Corporation 9.50 AE-1

537 / Providing C.C Drain from Bommarillu house to Mandara Nilayam house in
4 2019-20 8.60 AE-3
Housing Board Colony in Division No.19
538 / Providing C.C Drain from Sri Raghavendra Arcade to T.Annapurna Oldage
5 2019-20 Home at north side of Housing Board Park in Division No.19 6.70 AE-3

539 / Providing C.C Drain from Mandava Adilakshmi house to R.Tyagaraju house in
6 2019-20 4.80 AE-3
Housing Board Colony 1st Line in Division No.19
540 / Providing C.C Drain from Polytechnic Road Entrance to Bhagya Nagar Main
7 2019-20 6.90 AE-3
Line in Bhagya Nagar 4th Line in Division No.19
541 / Providing C.C Drain from P.Vardhan house to Manikanta Cooldrinks at east
8 2019-20 7.60 AE-3
side of Housing Board Park Line in Division No.19
542 / Providing C.C Drain from Katam Arunamma house to D.No.315 in Bhagya
9 2019-20 Nagar 4th Line 7th Cross Road in Division No.19 5.90 AE-3

543 / Laying of 80 mm dia G.I Pipe Line from Kadiam Kondaiah house to Papula
10 2019-20 5.50 AE-3
Adilakshmi house in Gaddalagunta in Division No.30
544 / Providing C.C Road from Rajarajeswari house to D.Pramila house at Hill
11 2019-20 7.15 AE-3
Tower in Division No.30
545 / Laying of 100 mm and 150 mm dia A.C Pipe Line from Mamidi Palem to
12 2019-20 9.35 AE-3
Viswas Nagar (Krishna Temple) in Division No.31

546 / Construction of Toilets for Ward Secretariat Buildings at Throvagunta and


13 2019-20 2.75 AE-1
Mukthinuthalapadu in Division No.1 and 2 in Ongole Municipal Corporation

547 / Repairs and Rennovation of Ward Sachivalayam Building and Construction of


14 2019-20 Toilet Block at Panchayat Office in Division No.17 5.75 AE-3

548 /
15 2019-20 Providing C.C Road to Bank Colony 4th Line in Division No.19 10.00 AE-3

549 / Providing C.C Drain at east and west side of Happy Home Apartment in
16 2019-20 7.95 AE-3
Division No.20
550 / Repairs and Rennovation of Ward Sachivalayam Building in old DWAMA
17 2019-20 Office Building in IDSMT Layout in Division No.31 9.00 AE-3

Construction of Toilet Blocks and Water Supply Arrangements in Ward


551 /
18 2019-20 Sachivalayam Centers at Cheruvukommu Palem, Vengamukkala Palem and 9.95 AE-3
opposite 1 Town Police Station in Ongole Municipal Corporation
552 / Repairs and Rennovation of Old Council Hall Building in Ongole Municipal
19 2019-20 9.10 AE-3
Corporation Office in Ongole Municipal Corporation
553 / Repairs and Rennovation of Asbestos Sheds in Ongole Municipal Corporation
20 2019-20 10.00 AE-3
Office in Ongole Municipal Corporation
554 / Providing C.C Road from P.Ramcharan house to P.Rangaiah house in Old
21 2019-20 2.72 AE-5
Sujatha Nagar 1st Line in Division No.34
Repairs of Buildings, Electrification and Painting to Ward Secretariat
555 /
22 2019-20 Buildings from 22 to 28 and 32 to 36 Divisions in Ongole Municipal 10.00 AE-5
Corporation
TOTAL 442.72
Download Start Time : 12.02.2020 5.00 P.M
Download End Time : 27.02.2020 5.00 P.M
Receipt of Bids End Time : 27.02.2020 5.15 P.M
Technical Bid Opening Time : 27.02.2020 5.30 P.M
Price Bid Opening Time : 27.02.2020 5.45 P.M
Ongole Municipal Corporation - Construction of C.C Drain and Footpath on
556 /
1 2019-20 western side of Trunk Road From Bhagya Nagar 1st line to South Bye Pass 100.00
Road in Division No. 19
Ongole Municipal Corporation - Construction of Shelter for Urban Homeless
557 /
2 2019-20 and One Stop Centre in RIMS Hospital Premises in Ongole Municipal 127.00
Corporation
TOTAL 227.00
Download Start Time : 29.02.2020 5.00 P.M
Download End Time : 16.03.2020 5.00 P.M
Receipt of Bids End Time : 16.03.2020 5.15 P.M
Technical Bid Opening Time : 16.03.2020 5.30 P.M
Price Bid Opening Time : 16.03.2020 5.45 P.M
558 / Arrangements of Flex Printing, Iron Frames, Fixing Flexis, Branding and Fixing
1 2019-20 6.90 AE-5
of Vinyale Stickers in Ongole Municipal Corporation

559 / Providing Thermoplastic Road Marking and Supply and Fixing of Raised
2 2019-20 2.90 AE-6
Pavement Markers (Road Studs) at Police Parade Grounds in Division No.38

Preparation, Delivery and Supply of Food Items to Administrative Secretaries,


560 / Education and Data Processing Secretaries Trainers conducting Functional
3 2019-20 10.00 AE-3
Training at Social Empowerment Training Center in Ongole Municipal
Corporation (2nd call)
TOTAL 19.80
Download Start Time : 29.02.2020 5.00 P.M
Download End Time : 07.03.2020 5.00 P.M
Receipt of Bids End Time : 07.03.2020 5.15 P.M
Price Bid Opening Time : 07.03.2020 5.30 P.M
561 / Providing C.C Road from Chirumalla Koteswara Rao house to Madduluri
1 2019-20 10.00 AE-3
Sekhar house in Kotha Colony in Pelluru in Division No.17
562 / Providing C.C Road from Happy Home Apartment to Registrar Office Main
2 2019-20 10.00 AE-3
Road in Division No.20
563 / Laying of 110 mm dia P.V.C Pipe Line east to west from Elec. Pole
3 2019-20 No.SS/94/B2 to D.No.36-72-M51 in Nirmal Nagar in Division No.36 2.65 AE-5

564 /
4 2019-20 Repairs and Painting to Natuabaurao Park in Division No.14 1.50 AE-2

565 / Construction of Septic Tank and C.C Drain in Prakasam Bhavan in Division
5 2019-20 10.00 AE-2
No.14
566 / Providing C.C Drain from Billa Kondamma house to Pilli Subbarayamma
6 2019-20 1.30 AE-2
house in Division No.16
567 / Providing C.C Drain from Koteswara rao house to Agraharam Main Road in
7 2019-20 2.90 AE-2
Division No.16

568 / Breaking of Balaji Nagar Municipal High School damaged roof slab and
8 2019-20 2.55 AE-2
Cleaning of D.R.R.M High School premises in Ongole Municipal Corporation

569 / Providing C.C Drain from Haripriya house to existing S.S Tank-I Main Road in
9 2019-20 8.10 AE-5
Division No.32
570 / Construction of Toilet Block, Water Supply Arrangements and Compound
10 2019-20 10.00 AE-5
Wall in Wad Sachivalayam Center in Siva Prasad Colony in Division No.33
571 / Laying of 110 mm dia P.V.C Pipe Line from Y.S.R Party Office beside road to
11 2019-20 A.Hanumantha rao house in Division No.33 4.70 AE-5

572 / Laying of 110 mm dia P.V.C Pipe Line from G.Seshagiri house to D.No.223 in
12 2019-20 4.10 AE-5
Division No.35
573 / Filling Tank and Cleaning of Mukthinuthalapadu Cheruvu with Current Motor
13 2019-20 1.40 AE-1
and Oil Motor in Division No.2
574 / Supply of Car on hire basis to Municipal Commissioner and Assistant
14 2019-20 Commissioner for the year 2020-21 in Ongole Municipal Corporation 9.95 AE-2

575 / Supply of Car on hire basis to Examiner and Assistant City Planner for the
15 2019-20 year 2020-21 in Ongole Municipal Corporation 9.95 AE-2

576 / Supply of Car on hire basis to Municipal Engineer for the year 2020-21 in
16 2019-20 5.00 AE-2
Ongole Municipal Corporation
577 / Providing C.C Drain at Ponugupati Colony 3rd, 4th, 5th and 6th Cross Roads in
17 2019-20 9.80 AE-1
Division No.4 (2nd call)
578 / Providing C.C Road and Steps from Dasari Pramila house to P.Murali house in
18 2019-20 R&B Colony in Division No.29 (3rd call) 2.60 AE-3

579 / Providing C.C Drain from Kalvari Chiguru Church to Metipati Subbarao house
19 2019-20 n Gadddala Gunta in Division No.30 (3rd call) 0.88 AE-3

580 / Extension of C.C Drain from Agamana Veda Patasala to C.V.N Reading Room
20 2019-20 4.32 AE-5
Main Gate in Division No.26 (3rd call)
581 / Providing C.C Drain west to east from G.Srinivasa Rao house to Thota V.S.M
21 2019-20 2.80 AE-5
Guptas Enclave in Division No.34 (3rd call)

Providing C.C Drain from SK.Mahaboob Basha (H) to Peddinti Venkateswarlu


582 /
22 2019-20 (H) in Karavadi Bazar, Culverts at Iskan Temple opposite and from Mekapati 1.25 AE-7
Malyadri (H) in Sathyanarayanapuram in Division No.49 (3rd call)

TOTAL 115.75
Download Start Time : 04.03.2020 5.00 P.M
Download End Time : 19.03.2020 5.00 P.M
Receipt of Bids End Time : 19.03.2020 5.15 P.M
Price Bid Opening Time : 19.03.2020 5.30 P.M
Ongole Municipal Corporation - Construction of Storm Water Drain from
583 /
1 2019-20 Pulivenkatareddy Colony to Koppolu Village through National Highway 190.00
Byepass Flyover in Division No.9 in Ongole Municipal Corporation
Ongole Municipal Corporation - Replacement of 600 mm and 500 mm P.S.C
584 / Pipe Line with D.I K 7 Pipe Line for Clear Water Gravity Main from Housing
2 2019-20 200.00
Board Colony to Trunk Road along Bhagya Nagar 4th Line in Ongole
Municipal Corporation
TOTAL 390.00
Download Start Time : 20.03.2020 5.00 P.M
Download End Time : 06.04.2020 5.00 P.M
Receipt of Bids End Time : 06.04.2020 5.15 P.M
Technical Bid Opening Time : 06.04.2020 5.30 P.M
Price Bid Opening Time : 06.04.2020 5.45 P.M
585 / Transportation and Supply of Water in various places in 1 to 25 divisions in
1 2019-20 Ongole Municipal Corporation 10.00

586 / Transportation and Supply of Water in various places in 26 to 50 divisions in


2 2019-20 10.00
Ongole Municipal Corporation
587 /
3 2019-20 Supply and Delivery of Bleaching Powder to Ongole Municipal Corporation 10.00
TOTAL 30.00
Download Start Time : 23.03.2020 5.00 P.M
Download End Time : 03.04.2020 5.00 P.M
Receipt of Bids End Time : 03.04.2020 5.15 P.M
Price Bid Opening Time : 03.04.2020 5.30 P.M
161 /
2019-20

232 /
2019-20

255 /
2019-20

139 /
2019-20

152 /
2019-20

153 /
2019-20

154 /
2019-20

155 /
2019-20

162 /
2019-20

163 /
2019-20

187 /
2019-20
188 /
2019-20

198 /
2019-20

201 /
2019-20

205 /
2019-20

206 /
2019-20

207 /
2019-20

208 /
2019-20

209 /
2019-20

210 /
2019-20

211 /
2019-20

212 /
2019-20

215 /
2019-20

217 /
2019-20

221 /
2019-20

227 /
2019-20

228 /
2019-20

272 /
2019-20

276 /
2019-20

277 /
2019-20
321 /
2019-20
K-94

K-128

331 /
2019-20

332 /
2019-20
K-182

K-183

K-162

K-146

K-139

K-140

K-142

K-143

K-191

K-192

K-193

K-194

K-141

K-200
K-201

K-199

K-190

K-203

K-204

K-205

K-206

K-189

K-120

K-176

P 22

K-121

K-178

K-179

K-187

K-180

K-186

K-181

K-184

K-188
K-149

K-174

K-175

K-207

K-208

K-209

K-161

K-219

K-106

K-215

K-216

K-217

K-160

K-211

K-213

K-212

K-129

K-130

K-131

K-133

K-134
K-135

K-136

K-137

K-138

K-214

K-218

K-163

K-165

K-164

K-169

K-166

K-167

K-168

K-107

K-170

P 92

P 97

K-100

P 98

K-151

K-152
K-153

K-171

K-172

K-173

K-154

K-99

K-155

K-156

K-157

K-158

K-159

P 113

K-124

K-125

K-126

K-93

K-96

K-97

K-110
K-111

K-112

K-113

K-114

K-117

K-116
K-220
K-227

488 /
2019-20

K-223

K-221

K-222

K-224

K-225

K-226

K-228

K-231

K-229
K-230

357 /
2019-20

381 /
2019-20

383 /
2019-20

392 /
2019-20

404 /
2019-20

405 /
2019-20

406 /
2019-20

407 /
2019-20

408 /
2019-20

409 /
2019-20

410 /
2019-20

413 /
2019-20

414 /
2019-20

415 /
2019-20

419 /
2019-20

459 /
2019-20

460 /
2019-20

461 /
2019-20
462 /
2019-20

464 /
2019-20

469 /
2019-20

K-233

K-240

K-241

K-242

K-246

K-247

K-248
K-232

K-234

K-235

K-236

K-237

K-238

K-239

K-243

K-244

K-245
494 /
2019-20

K-246

K-247

K-248

K-249

K-250
K-251

K-252

K-253

K-254

K-255

K-256

K-257

K-258

492 /
2019-20

506 /
2019-20

508 /
2019-20

513 /
2019-20

515 /
2019-20

520 /
2019-20
ONGOLE MUNICIPAL CORPORATION
E-PROCUREMENT TENDER NOTICES
S. Tender
No Notice No. Name of the work Est cost

588 / Supply of Masks, Sanitizers and Gloves towards arrangements against COVID-
1 2019-20 4.00
19 in Ongole Municipal Corporation
TOTAL 4.00
Download Start Time : 01.04.2020 5.00 P.M
Download End Time : 06.04.2020 5.00 P.M
Receipt of Bids End Time : 06.04.2020 5.15 P.M
Price Bid Opening Time : 06.04.2020 5.30 P.M
589 / Supply and delivery of Piduguralla Stone Powder (Lime) to Ongole Municipal
1 2019-20 3.65 AE-1
Corporation
590 / Establishment and Maintenance of Quarantine Centers at Social
2 2019-20 Empowerment Center and QIS College in Ongole Municipal Corporation 4.15 AE-3

591 / Establishment and Maintenance of Quarantine Center at IIIT College in


3 2019-20 3.95 AE-1
Ongole Municipal Corporation
Repairs and Rectification of Motor Pumpsets at various places of Water
592 /
4 2019-20 Supply Section (S.S Tank I & II, Old & New Filter Beds, R.R Tank, Zone 7) in 10.00 AE-3
Ongole Municipal Corporation
593 / Supply and Delivery of Chlorine Gas Cylinders for the maintenance of Water
5 2019-20 Supply in Ongole Municipal Corporation 9.87 AE-3

TOTAL 31.62
Download Start Time : 06.04.2020 5.00 P.M
Download End Time : 13.04.2020 5.00 P.M
Receipt of Bids End Time : 13.04.2020 5.15 P.M
Price Bid Opening Time : 13.04.2020 5.30 P.M
594 / Desiltation of Drains in 1 to 8 Divisions in A.E-1 section in Ongole Municipal
1 2019-20 9.20 AE-1
Corporation (Reserved for L.C.C.S)
595 /
2 2019-20 Desiltation of Drains in 9 to 16 Divisions in Ongole Municipal Corporation 9.50 AE-2

596 / Desiltation of existing Major and Minor Drains in 17 to 20 Divisions in Ongole


3 2019-20 9.99 AE-3
Municipal Corporation
597 / Desiltation of existing Major and Minor Drains in 21 to 24 and 29 to 31
4 2019-20 9.36 AE-3
Divisions in Ongole Municipal Corporation
598 / Desiltation of Drains in Division nos.26, 27, 28, 32 and 33 in A.E-5 section in
5 2019-20 9.95 AE-5
Ongole Municipal Corporation
599 / Desiltation of Drains in Division nos.34, 35, 36, 37 and 38 in A.E-5 section in
6 2019-20 Ongole Municipal Corporation 8.00 AE-5

600 / Desiltation of Drains from 39 to 50 Divisions in A.E-7 section in Ongole


7 2019-20 9.25 AE-7
Municipal Corporation (Reserved for L.C.C.S)
601 / Construction of Nadu Nedu Pylon at P.V.R Muncipal Boys High School in
8 2019-20 Division No.24 4.00 AE-5

602 / Supply and Delivery of Ferric Alum and Bleaching Powder for the
9 2019-20 5.20 AE-3
Maintenance of Water Supply in Ongole Municipal Corporation
603 / Construction of R.C.C Culvert at South Byepass Road Junction at FCI Godown
10 2019-20 road near Pragathi Colony in Division No.17 (Reserved for L.C.C.S) 5.90 AE-3

604 / Providing Balance C.C Road at back side of B.E.D College and
11 2019-20 Cheruvukommupalem Donka in Division No.18 7.10 AE-3

605 / Providing Balance C.C Road from Mareti Siva house to Kaki Madhava Rao
12 2019-20 7.93 AE-3
house in Arunodhaya Colony Main Road in Division No.39

Providing Quarry Rubbish Road from R.Chiranjeevi house to Gangamma


606 /
13 2019-20 Temple and from R.Brahmaiah house to Bandaru Ramesh house in 5.80 AE-1
Mukthinuthalapadu S.C Colony in Division No.2 (Reserved for L.C.C.S)

607 /
14 2019-20 Providing Quarry Rubbish Roads at Udaya Colony in Division No.4 5.15 AE-1

608 / Providing C.C Road from Gattinani Surendra kumar house to Perugupogu
15 2019-20 9.95 AE-2
Krishna house in Indiramma Gruhalu 1st Line in Division No.9

609 / Providing Quarry Rubbish Road from Middle Cross Road to North Cross Road
16 2019-20 10.00 AE-2
in Indiramma Gruhalu 2nd Line to 7th Line in Division No.9
610 / Repairs to Toilets and Providing Water Sump with Motor at Indira Colony
17 2019-20 Sachivalayam in Division No.9 1.50 AE-2

611 / Providing C.C Road from north side Service Road to Raja Victor house beside
18 2019-20 10.00 AE-2
Koppolu Fly Over in Y.S.R Colony in Division No.9

612 / Laying of 150 mm dia A.C Pipe Line from north side of Service Road to Baptist
19 2019-20 3.75 AE-2
Church besides Koppolu Fly Over in Y.S.R Colony in Division No.9

613 / Repairs and Rectification of Old Panchayat Office Building in N. Agraharam in


20 2019-20 4.20 AE-2
Division No.10
614 /
21 2019-20 Repairs to Toilets at Kabadi Palem Sachivalayam in Division No.13 2.30 AE-2

615 / Repairs and Rectification of Gravity Main Leaks at Zone 3, Zone 4, Zone 5 and
22 2019-20 5.55 AE-3
Zone 7 in Ongole Municipal Corpoation
616 / Providing C.C Road from Chavali Ramanaiah house to G.N.R Apartment in
23 2019-20 10.00 AE-3
Kotha Colony in Pelluru in Division No.17
617 / Providing C.C Road from Lakshmi Reddy house to Main Road in Ram Nagar
24 2019-20 10.00 AE-3
12th Line in Division No.17
618 / Providing C.C Drain to Ram Nagar 12th Line in Division No.17 (Reserved for
25 2019-20 L.C.C.S) 9.10 AE-3

619 / Providing C.C Road from Oosuri Srinu house to Amchala Chandra sekhar
26 2019-20 10.00 AE-3
house in Kotha Colony in Pelluru in Division No.17
620 / Providing C.C Drain from Gaddam Suresh house to Kunam Srinu house in
27 2019-20 8.50 AE-3
Cheruvukommu Palem in Division No.18
621 /
28 2019-20 Construction of Cermany Shed in Cheruvukommu Palem in Division No.18 4.70 AE-3

622 / Construction of Compound Wall at Dinala Baavi in Cheruvukommu Palem in


29 2019-20 Division No.18 (Reserved for L.C.C.S) 10.00 AE-3
623 / Providing C.C Drain from Anand Thirdulu house to Anil Thirdulu house in
30 2019-20 5.30 AE-3
Devudu Cheruvu 1st Cross Road in Division No.21
624 / Providing C.C Road and C.C Drain from Maruboyina Tulasi house to Kandepi
31 2019-20 7.90 AE-3
Hanumantharao house in Devudu Cheruvu in Division No.21
625 / Supply, Delivery and Fixing of C.C Bullet and Dome Cameras at Municipal
32 2019-20 2.14 AE-3
Office outside premises in Ongole Municipal Corporation
626 / Laying of Virtified Tiles and Fixing of M.S Grills at Siva Prasad Colony Ward
33 2019-20 Sachivalayam in Division No.33 6.20 AE-5

627 /
34 2019-20 Laying of C.C Patches at various places in Division No.26 2.00 AE-5

628 /
35 2019-20 Providing C.C Drain from D.No.25-2-14 to D.No.25-4-6 in Division No.26 6.00 AE-5

629 / Providing Toilet Block and Borewell in Santhi Nagar Sachivalayam and
36 2019-20 Christian Palem Sachivalayam in Pernamitta in Division No.42 8.15 AE-7

630 / Providing C.C Road near Morathoti Subba rao house in Venkateswara Colony
37 2019-20 in Division No.50 3.05 AE-7

631 / Providing Assured Minimum Facilities for Polling Stations of A.E-3 section in
38 2019-20 5.05 AE-3
Ongole Municipal Corporation
632 / Transportation and Supply of Water to 1 to 50 Divisions in Ongole Municipal
39 2019-20 10.00 AE-2
Corporation
Supply, Delivery and Fixing of Electrical Accessories and Plywood in Polling
633 /
40 2019-20 Stations for Local Body Elections from 26 to 28 and 32 to 38 Divisions in 5.55 AE-5
Ongole Municipal Corporation
TOTAL 277.22
Download Start Time : 23.04.2020 5.00 P.M
Download End Time : 07.05.2020 5.00 P.M
Receipt of Bids End Time : 07.05.2020 5.15 P.M
Price Bid Opening Time : 07.05.2020 5.30 P.M
1/
1 2020-21 Transportation and Supply of Water in various places in 1 to 50 Divisions in 10.00 AE-5
Ongole Municipal Corporation
TOTAL 10.00
Download Start Time : 14.05.2020 5.00 P.M
Download End Time : 21.05.2020 5.00 P.M
Receipt of Bids End Time : 21.05.2020 5.15 P.M
Price Bid Opening Time : 21.05.2020 5.30 P.M
2/ Transportation and Supply of Water in various places in Package-3 in Ongole
1 2020-21 40.00 AE-5
Municipal Corporation
3/
2 2020-21 Engaging of 110 Hydraulic Chain Mounted and Tractors for Capping at 3.50 AE-2
Dumpying yard in Ongole Municipal Corporation
4/ Supply and Delivery of Tables and Chairs for Council Hall in Ongole Municipal
3 2020-21 Corporation Office in Ongole Municipal Corporation 9.70 AE-3

5/ Providing Carrier Cassette Air Conditioners at Council Hall in Ongole


4 2020-21 6.80 AE-3
Municipal Corporation Office in Ongole Municipal Corporation
6/ Providing Wireless Conference System at Council Hall in Ongole Municipal
5 2020-21 8.30 AE-3
Corporation Office in Ongole Municipal Corporation
7/ Supply and delivery of Piduguralla Stone Powder (Lime) to Ongole Municipal
6 2020-21 3.65 AE-2
Corporation
7/
7 2020-21 Rennovation of Mayor Chamber in Ongole Municipal Corporation Office in 3.95 AE-3
Ongole Municipal Corporation
TOTAL 75.90
Download Start Time : 16.05.2020 5.00 P.M
Download End Time : 01.06.2020 5.00 P.M
Receipt of Bids End Time : 01.06.2020 5.15 P.M
Price Bid Opening Time : 01.06.2020 5.30 P.M
Supply of Outsourcing Workers for Sanitation Section in Package No.1 for the
10 /
2020-21 year 2020-21 in Ongole Municipal Corporation (Reserved for Societies
1 487.00
registered under G.O.Ms.No.581 MA, Dt.6.11.96)
Supply of Outsourcing Workers for Sanitation in Package No.2 for the year
11 /
2020-21 2020-21 in Ongole Municipal Corporation (Reserved for Societies registered
2 446.50
under G.O.Ms.No.581 MA, Dt.6.11.96)
Supply of Outsourcing Workers for Sanitation in Package No.3 for the year
12 /
2020-21 2020-21 in Ongole Municipal Corporation (Reserved for Societies registered
3 264.00
under G.O.Ms.No.581 MA, Dt.6.11.96)
TOTAL 1197.50
Download Start Time : 16.06.2020 5.00 P.M
Download End Time : 02.07.2020 5.00 P.M
Receipt of Bids End Time : 02.07.2020 5.15 P.M
Price Bid Opening Time : 02.07.2020 5.30 P.M
1
13 / Construction of L.P.G Cremetorium Building at R.T.C Bus Stand in Ongole 127.50
2020-21 Municipal Corporation
TOTAL 127.50
Download Start Time : 29.07.2020 5.00 P.M
Download End Time : 12.08.2020 5.00 P.M
Receipt of Bids End Time : 12.08.2020 5.15 P.M
Technical Bid Opening Time : 12.08.2020 5.30 P.M
Price Bid Opening Time : 12.08.2020 5.45 P.M
14/ Supply and delivery of Piduguralla Stone Powder (Lime) to Ongole Municipal
1 2020-21 7.25 AE-2
Corporation.
15/ Supply and delivery of Pyrosene oil - BIS mark and Dellfog oil for Sanitation
2 2020-21 9.50 AE-2
in Ongole Municipal Corporation.
16/ Construction of CC Road from Main Gate to Metarnary Ward in Mata Shishu
3 2020-21 5.25 AE-3
vaidhyasala In Ongole Municipal Corporation
TOTAL 22.00
Download Start Time : 01.08.2020 5.00 P.M
Download End Time : 12.08.2020 5.00 P.M
Receipt of Bids End Time : 12.08.2020 5.15 P.M
Price Bid Opening Time : 12.08.2020 5.30 P.M
17 / Transportation and Supply of Water in various places in 1 to 25 divisions in
1 2020-21 10.00
Ongole Municipal Corporation
18 / Transportation and Supply of Water in various places in 26 to 50 divisions in
2 2020-21 Ongole Municipal Corporation 10.00
TOTAL 20.00
Download Start Time : 08.08.2020 5.00 P.M
Download End Time : 17.08.2020 5.00 P.M
Receipt of Bids End Time : 17.08.2020 5.15 P.M
Price Bid Opening Time : 17.08.2020 5.30 P.M
19 / Transportation and Supply of Water in various places in 1 to 25 divisions in
1 2020-21 10.00
Ongole Municipal Corporation (2nd call)
20 / Transportation and Supply of Water in various places in 26 to 50 divisions in
2 2020-21 Ongole Municipal Corporation (2nd call) 10.00
TOTAL 20.00
Download Start Time : 18.08.2020 5.00 P.M
Download End Time : 21.08.2020 5.00 P.M
Receipt of Bids End Time : 21.08.2020 5.15 P.M
Price Bid Opening Time : 21.08.2020 5.30 P.M
21 / Engaging of 110 Hydraulic Chain Mounted Machine for lifting of garbage at
1 2020-21 Dumping Yard in Ongole Municipal Corporation 9.90

22 / Filling Tank and Cleaning of Mukthinuthalapadu Cheruvu with Current Motor


2 2020-21 1.55
and oil Motor in Division No.2
TOTAL 11.45
Download Start Time : 01.09.2020 5.00 P.M
Download End Time : 07.09.2020 5.00 P.M
Receipt of Bids End Time : 07.09.2020 5.15 P.M
Price Bid Opening Time : 07.09.2020 5.30 P.M
Supply and Delivery of Vaporized Liquid Chlorine Gas Cylinders (100 Kgs),
23 / Supply of damaged Spare Parts to Chlorination Plants and Water Level
1 2020-21 5.00 AE-3
Indicators for the Maintenance of Water Supply in Ongole Municipal
Corporation
24 / Competion of in-complete C.C Road at Primary High School behind Old
2 2020-21 2.00 AE-2
Panchayath Office in Koppolu in Division No.10
25 /
3 2020-21 Supply of Electrical Materials to Ongole Municipal Corporation 5.10 AE-2

26 /
4 2020-21 Engaging of Labour for cleaning Toilets in Pernamitta in Division No.40 1.90 AE-7

27 / Maintenance of Water Supply Scheme Submersible Motors for the year


5 2020-21 6.60 AE-7
2020-21 in Pernamitta in Division No.40
28 / Providing Security, Watch and Ward Arrangements for Old Anna Canteen
6 2020-21 5.00 AE-7
Buildings for the year 2020-21 in Ongole Municipal Corporation
Providing C.C Drain from P.V.R Boys High School New Toilet to existing Drain
29 /
7 2020-21 and C.C Drain and C.C Road from Govt. Model P.S Entrance to Existing Road 8.91 AE-3
in Ongole Municipal Corporation
30 / Providing Toilet Block and Borewell in Santhi Nagar Sachivalayam and
8 2020-21 Christian Palem Sachivalayam in Pernamitta in Division No.42 (2nd call) 8.15 AE-7

31 /
9 2020-21 Supply and Delivery of Bleaching Powder to Ongole Municipal Corporation 10.00
Supply and Errection of 110 KW/150HP CF Pumpsets each with a duty of
32 / 700M3/Hr and a total head of 45m to pump clear water from S.S Tank 2
10 2020-21 27.50
WTP Clear Water Sump to Hill Tower ELSR in Seetharampuram in Ongole
Municipal Corporation
33 / Transportation and Supply of Water in various places in Ongole Municipal
11 2020-21 40.00
Corporation
TOTAL 52.66
Download Start Time : 12.09.2020 5.00 P.M
Download End Time : 25.09.2020 5.00 P.M
Receipt of Bids End Time : 25.09.2020 5.15 P.M
Price Bid Opening Time : 25.09.2020 5.30 P.M
14th Finance Commission Grant - Providing Gravity Main from Mangamoor
34 /
1 2020-21 Road to Proposed Chenna kesava Swamy Layout ELSR in Ongole Municipal 25.00 AE-6
Corporation
14th Finance Commission Grant - Providing D.I. K7 clear water Gravity
35 /
2 2020-21 mains from Srinivasa Hall Road to Proposed E.L.S.R at Hindu Burial Ground in 25.00 AE-1
Ongole Municipal Corporation
36 /
3 2020-21 Providing C.C Drain in Pragathi Nagar 5th Line (west side) in Division No.39 7.00 AE-7

37/ Providing C.C Patches at Bhagya Nagar 2nd Line Old RTO Office to Narasa
4 2020-21 Reddy house in Division No.20 1.88 AE-3

Repairs and Rectification of Motor Pump sets at various places of Water


38 /
5 2020-21 Supply Section (SS Tank I, II, Old & New Filter Beds, RR Tank & Zone IIV) in 10.00 AE-3
Ongole Municipal Corporation
39 / Providing C.C Drain to Trunk Road from Rajamatha Towers towards Srikanya
6 2020-21 10.00 AE-3
Lodge in Division No.20
40 / Providing C.C Drain and R.C.C Culvert east to north from D.No.116 to
7 2020-21 2.35
Endowment Office Building in Division No.25
41 / Laying of 150 mm dia A.C Pipe Line from Chaithanya School to (D.NO.223)
8 2020-21 existing M.M Road in Division No.35 2.35

42 / Providing balance Flooring, Electrification and Sanitary Work in Pelluru


9 2020-21 Sachivalayam in Division No.17 2.40 AE-3

43 / Rennovation of District Resource Centre in D.D Agriculture Office Compound


10 2020-21 in Ongole Municipal Corporation 2.97 AE-3

44 / Rennovation of Office Building in D.D Agriculture Office Compound in Ongole


11 2020-21 6.48 AE-3
Municipal Corporation
45 / Supply, Delivery and Fixing of C.C Bullet and Dome Cameras at Municipal
12 2020-21 Office outside premises in Ongole Municipal Corporation (2nd call) 2.14 AE-3

46 / Repairs and Rennovation of Sheds balance work in Ongole Municipal


13 2020-21 3.50
Corporation Office in Ongole Municipal Corporation
47 / Construction of incomplete Columns to open space in B.C Employees
14 2020-21 1.70
Housing Board Society in Division No.16
T0TAL 102.77
Download Start Time : 23.09.2020 5.00 P.M
Download End Time : 07.10.2020 5.00 P.M
Receipt of Bids End Time : 07.10.2020 5.15 P.M
Price Bid Opening Time : 07.10.2020 5.30 P.M
49 / Providing Quarry Rubbish Road from Middle Cross Road to North Cross Road
1 2020-21 10.00 AE-2
in Indiramma Gruhalu in Division No.9
50 / Transportation and Supply of Water to various places in in Ongole Municipal
2 2020-21 10.00
Corporation
T0TAL 20.00
Download Start Time : 12.10.2020 5.00 P.M
Download End Time : 16.10.2020 5.00 P.M
Receipt of Bids End Time : 16.10.2020 5.15 P.M
Price Bid Opening Time : 16.10.2020 5.30 P.M
51 / Transportation and Supply of Water in various places in Ongole Municipal
1 2020-21 Corporation (2nd all) 40.00

Laying of 100 mm dia and 150 mm dia G.I Pipe Line at Vengamukkalapalem,
52 / Cheruvukommu Palem and Pelluru and Supply of 3 Phase, 3 HP Speed
2 2020-21 6.60 AE-3
Vaccum Pump and Vacuum, Pressure Gauges in S.S Tank-II Filtration Plant in
Ongole Municipal Corporation
53 / Laying of 150 mm dia P.V.C Pipe Line from Veternary Hospital to
3 2020-21 5.00 AE-7
Dimpudukallam in Old Harizana Wada in Pernamitta in Division No.41
Painting, Garland decoration, Supply of Buttermilk Packets and Providing
54 / Water to Sri babu Jagajievana rao, Sri Dr.B.R. Ambedkar, Sri Gurram Jashuva,
4 2020-21 Sri Prakasam Panthulu and Damodara Sanjeevayya and Swami Vivekananda 4.15 AE-2
Statues at various places in Ongole Municipal Corporation
55 / Engaging of Labour for cleaning Toilets in Pernamitta in Division No.40 (2nd
5 2020-21 call) 1.90 AE-7

56 / Providing 45 HP (33.57 KW) Sub Mersuble Motor V.T for fixing at Hill Tower
6 2020-21 5.10 AE-3
in Ongole Municipal Corporation
57 / Supply and Delivery of 1100 Liters Galvanized Compactor bins to Ongole
7 2020-21 10.00 AE-2
Municipal Corporation
Laying of 200 mm dia A.C Pipe Line and C.C Road and C.C Drain from Vamke
58 /
8 2020-21 Subba rao house to Mattebam Venkataraju house in Pelluru East Bazar in 8.45 AE-3
Division No.17
59 / Laying of B.T Patches in various locations in Division Nos.22 to 25 and 29 to
9 2020-21 5.00 AE-3
31 in A.E-3 section in Ongole Municipal Corporation
60 / Laying of B.T Patches in various locations in Division Nos.17 to 21 in A.E-3
10 2020-21 section in Ongole Municipal Corporation 6.00 AE-3

61 / Providing Quarry Rubbish Roads in Division Nos.17 to 25 and 29 to 31 in A.E-


11 2020-21 6.50 AE-3
3 section in Ongole Municipal Corporation
62 / Laying of B.T Patches and C.C Road Patches at various places in A.E-2 Section
12 2020-21 5.00 AE-2
in Ongole Municipal Corporation
63 / Laying of B.T Patches and C.C patches at various places in Division Nos.39 to
13 2020-21 4.00 AE-7
50 in A.E-7 section in Ongole Municipal Corporation
64 / Laying of B.T Patches at various places in Division Nos.26 to 28 and 32 to 38
14 2020-21 in A.E-5 section in Ongole Municipal Corporation 5.00 AE-5
65 / Providing C.C Drain from D.No.7-824/4-1 to D.No.7-824(7) and from Krishna
15 2020-21 4.65 AE-5
reddy house to G.Kondaiah house in Z.P Colony in Division No.33
Providing C.C Drain from Ch.Chandra Sekhar house to existing C.C Culvert in
66 / Gaddala Gunta and Laying of Pipe Line Patches near Ex-councillor Jwalapathi
16 2020-21 5.35 AE-5
house and Jammichettu Street in Division Nos.28 and 32 in Ongole Municipal
Corporation
67 / Providing C.C Drain from Mahalakshmi Temple back side to Padamati Bazar
17 2020-21 4.50 AE-3
in Pelluru in Division No.17
68 / Providing C.C Road from S.V Ramanamma house to Jaya Rao Paster (church)
18 2020-21 house in Vijaya Nagar Colony in Division No.31 9.90 AE-3

69 / Providing C.C Road from Bandaru Adi Lakshmi house to S.V Ramanamma
19 2020-21 9.90 AE-3
house in Vijaya Nagar Colony 7th Cross Road in Division No.31
70 / Providing C.C Drain from D.No.25-2-14 to D.No.25-4-6 in Division No.26 (2nd
20 2020-21 6.00 AE-5
call)
T0TAL 153.00
Download Start Time : 12.10.2020 5.00 P.M
Download End Time : 26.10.2020 5.00 P.M
Receipt of Bids End Time : 26.10.2020 5.15 P.M
Price Bid Opening Time : 26.10.2020 5.30 P.M
71 / Transportation and Supply of Water in various places in Division Nos.1 to 25
1 2020-21 10.00 AE-5
in Ongole Municipal Corporation
T0TAL 10.00
Download Start Time : 04.11.2020 5.00 P.M
Download End Time : 09.11.2020 5.00 P.M
Receipt of Bids End Time : 09.11.2020 5.15 P.M
Price Bid Opening Time : 09.11.2020 5.30 P.M
72 / Providing C.C Drain from Srikanya Lodge towards Ambekar Bhavan Road in
1 2020-21 Trunk Road on Western side in Division No.20 40.00 AE-3

73 / Providing Balance C.C Road in Ram Nagar 12th Line in Division No.17
2 2020-21 8.15 AE-3
(Reserved for L.C.C.S)
74 / Providing Balance C.C Road from Davuluri Ragaiah house to Kavuri
3 2020-21 Mariyamma house in Cheruvukommupalem in Division No.18 7.30 AE-3

75 / Providing C.C Drain from Gaddalagunta Park opposite to existing C.C Culvert
4 2020-21 3.15 AE-3
at Arama Kshetram in Division No.32
76 / Construction of Balance Pelluru Burial Ground Room at Pelluru in Division
5 2020-21 2.05 AE-3
No.17
Laying of 150 mm dia A.C Pipe Line from Traffic Police Station opposite
77 /
6 2020-21 culvert to Vedasri School and from R.P Road 10th Cross Road to 13th Cross 7.45 AE-3
Road in Division No.29
78 / Repairs, Rectification and Shifting of 15 HP Motor and 20 HP Motor at New
7 2020-21 3.91 AE-3
Filter Bed Compound in Ongole Municipal Corporation
Providing Toilet Room and Alluminium Partition at Assistant City Planner
79 /
8 2020-21 Chamber in Town Planning Section in Ongole Municipal Corporation office in 1.68 AE-3
Ongole Municipal Corporation
80 / Providing Balance C.C Road from Kaki Madhava Rao house to Mareti Siva
9 2020-21 8.16 AE-7
house in Arunodaya Colony Main Road in Division No.39
T0TAL 81.85
Download Start Time : 30.11.2020 5.00 P.M
Download End Time : 11.12.2020 5.00 P.M
Receipt of Bids End Time : 11.12.2020 5.15 P.M
Price Bid Opening Time : 11.12.2020 5.30 P.M
82 / Engaging of 110 Hydraulic Chain Mounted Machine for lifting of Garbage at
1 2020-21 Dumping Yard in Ongole Municipal Corporation 10.00 AE-3

T0TAL 10.00
Download Start Time : 22.12.2020 5.00 P.M
Download End Time : 29.12.2020 5.00 P.M
Receipt of Bids End Time : 29.12.2020 5.15 P.M
Price Bid Opening Time : 29.12.2020 5.30 P.M
Providing C.C Drain from Gaddal Israel (H) to Church Compound Wall,
83 / Ravinuthala Sundhar Rao (H) to Gaddala Ramesh (H) and Panditi Veeraswami
1 2020-21 4.95 AE-3
(H) to Panditi Mohan Rao (H) in Gandhi Nagar S.C Colony in Koppolu in
Division No.10

Providing C.C Road and C.C Drain from Kokkiligadda Gourisankar house to
84 /
2 2020-21 Payvula Srinivasarao house and C.C Drain from G.Nirmala house to 9.60 AE-3
Ch.Ruzveld house in C.R.P Quarters in Division No.31
85 /
3 2020-21 Providing C.C Drain in Mahalakshmamma Nagar 1st Line in Division No.38 7.30 AE-7

86 /
4 2020-21 Providing C.C Drain in Mahalakshmamma Nagar 2nd Line in Division No.38 7.15 AE-7

87 /
5 2020-21 Providing C.C Drain in Mahalakshmamma Nagar 3rd Line in Division No.38 3.40 AE-7

88 / Providing C.C Road and C.C Drain at Srinivasa Brundavanam Apartmet to


6 2020-21 10.00 AE-7
Main Road in Pragathi Nagar 4th Line in Division No.39
89 / Providing C.C Road from Lakshmi Nilayam Apartment to Main Road in
7 2020-21 4.75 AE-7
Pragathi Nagar 4th Line in Division No.39
90 / Laying of 110 mm dia P.V.C Pipe Line at Andhra Kesari Nagar 2nd Line in
8 2020-21 Division No.43 0.60 AE-7

91 / Drilling of Deep Bore Wells and Fixing of IM-II Pump Sets and Repairs of
9 2020-21 Submersible Motors at various places in Ongole Municipal Corporation 10.00 AE-7

92 / Transportation and Supply of Water in various places in 1 to 50 Divisions in


10 2020-21 Ongole Municipal Corporation 10.00 AE-3

93 /
11 2020-21 Supply and Delivery of Bleaching Powder to Ongole Municipal Corporation 3.51 AE-3

T0TAL 71.26
Download Start Time : 24.12.2020 5.00 P.M
Download End Time : 07.01.2021 5.00 P.M
Receipt of Bids End Time : 07.01.2021 5.15 P.M
Price Bid Opening Time : 07.01.2021 5.30 P.M
94 / Providing C.C Drain and C.C Culvert from TPC Prakash Rao house to north
1 2020-21 3.10 AE-3
side of Park in Housing Board Colony in Division No.19
95 /
2 2020-21 Providing C.C Drains in Indiramma Gruhalu in Division No.9 40.00 AE-3

96 / Laying of 100 mm dia P.V.C Pipe Line at SVS Public School Road in Pernamitta
3 2020-21 in Division No.42 1.10 AE-4

Supply and Delivery of Chlorine Gas Cylinder of 900 kg for maintenance of


97 /
4 2020-21 New Filter Beds WTP and S.S Tank-2 WTP in water supply section in Ongole 9.90 AE-3
Municipal Corporation
98 / Providing 600 mm dia D.I. K 9 Pipe Line at Old National Highway cross culvert
5 2020-21 10.00 AE-3
near Vengamukkalapalem Circle in Division No.19

99 / Supply and Delivery of Chlorine Gas Cylinder of 100 kg for maintenance of


6 2020-21 10.00 AE-3
Old Filter Beds WTP in water supply section in Ongole Municipal Corporation

100 / Repairs and Rennovation of UPHC Building at Papa Colony Sachivalayam area
7 2020-21 10.00
in Division No.3
101 / Repairs and Rennovation of UPHC Building at Pothurajupalem Sachivalayam
8 2020-21 10.00
area in Division No.45
102 / Repairs and Rennovation of UPHC Building at Nirmal Nagar (M.M Donka)
9 2020-21 Sachivalayam area in Division No.35 10.00

103 / Repairs and Rennovation of UPHC Building at Venkateswara Colony


10 2020-21 10.00
Sachivalayam area in Division No.50
Providing C.C Drain from Gaddal Israel (H) to Church Compound Wall,
104 / Ravinuthala Sundhar Rao (H) to Gaddala Ramesh (H) and Panditi Veeraswami
11 2020-21 (H) to Panditi Mohan Rao (H) in Gandhi Nagar S.C Colony in Koppolu in 4.95 AE-3
Division No.10 (2nd call)
Providing C.C Road and C.C Drain from Kokkiligadda Gourisankar house to
105 /
12 2020-21 Payvula Srinivasarao house and C.C Drain from G.Nirmala house to 9.60 AE-3
Ch.Ruzveld house in C.R.P Quarters in Division No.31 (2nd call)
106 / Laying of 110 mm dia P.V.C Pipe Line at Andhra Kesari Nagar 2nd Line in
13 2020-21 Division No.43 (2nd call) 0.60 AE-7

T0TAL 129.25
Download Start Time : 08.01.2021 5.00 P.M
Download End Time : 22.01.2021 5.00 P.M
Receipt of Bids End Time : 22.01.2021 5.15 P.M
Price Bid Opening Time : 22.01.2021 5.30 P.M
Construction of Dr.YSR Urban Health Clinic (Urban Primary Health Center) at
107 /
1 2020-21 Rajiv Gruha Kalpa ward secretariat in Division No.9 in Ongole Municipal 80.00
Corporation
Construction of Dr.YSR Urban Health Clinic (Urban Primary Health Center) at
108 /
2 2020-21 Vengamukkalapalem ward secretariat in Division No.39 in Ongole Municipal 80.00
Corporation
Construction of Dr.YSR Urban Health Clinic (Urban Primary Health Center) at
109 /
3 2020-21 Peerlamanyam ward secretariat in Division No.39 in Ongole Municipal 80.00
Corporation
110 / Construction of Dr.YSR Urban Health Clinic (Urban Primary Health Center) at
4 2020-21 80.00
Gaddalagunta ward secretariat in Ongole Municipal Corporation
111 / Construction of Dr.YSR Urban Health Clinic (Urban Primary Health Center) at
5 2020-21 80.00
Gudimellapadu ward secretariat in Ongole Municipal Corporation
T0TAL 400.00
Download Start Time : 19.01.2021 5.00 P.M
Download End Time : 03.02.2021 5.00 P.M
Receipt of Bids End Time : 03.02.2021 5.15 P.M
Technical Bid Opening Time : 03.02.2021 5.30 P.M
Price Bid Opening Time : 03.02.2021 5.45 P.M
Providing C.C Drain from P.Krishna Murthi house to Kondamitta Road in
112 /
1 2020-21 Sitharamapuram and Providing Balance C.C Road at Talluri Ramesh house at 10.00 AE-3
Setharamapuram Entrance in Division No.30
113 / Providing Quarry Rubbish Road from Sunkara Koti Reddy house to
2 2020-21 Brahmamgari Temple in Agraharam in Division No.10 4.65 AE-3

114 / Providing C.C Drain at infront of PVR Girls Municipal High School in Division
3 2020-21 1.90 AE-5
No.28
115 / Providing C.C Drain from D.No.36-64-40 to D.No.34-64-001 (west side) in
4 2020-21 9.80 AE-5
Sujatha Nagar 9th Line in Division No.37
116 / Repairs to Community Hall Building in Thurpu Christian palem in Division
5 2020-21 No.8 8.15 AE-5

117 / Supply and Delivery of Pyrosene oil - BIS mark and Dellfog Oil for Sanitation
6 2020-21 9.90 AE-5
in Ongole Municipal Corporation
118 / Transportation and Supply of Water in various places in 1 to 50 Divisions in
7 2020-21 10.00 AE-5
Ongole Municipal Corporation
119 / Supply and Delivery of Conservancy Articles for the year 2020-21 in Ongole
8 2020-21 Municipal Corporation 9.90 AE-5

120 / Flex printing, Iron Frames, Fixing Flexs, Branding and Fixing of Stickers for SS
9 2020-21 5.65 AE-5
2021 in Ongole Municipal Corporation
121 / Providing C.C Drain and C.C Culvert from TPC Prakash Rao house to north
10 2020-21 side of Park in Housing Board Colony in Division No.19 (2nd call) 3.10 AE-3

122 /
11 2020-21 Providing R.O Plant System in Guthikondavari Palem in Division No.9 7.00 AE-3

T0TAL 80.05
Download Start Time : 27.01.2021 5.00 P.M
Download End Time : 10.02.2021 5.00 P.M
Receipt of Bids End Time : 10.02.2021 5.15 P.M
Price Bid Opening Time : 10.02.2021 5.30 P.M

124 / Laying of 160 mm dia P.V.C Pipe Line from Ungarala Polaiah (H) to Varadha
1 2020-21 Pedda Babu (H) in Santhapeta 1st Line 4th Cross Road in Division No.14 4.80 AE-3

TOTAL 4.80
Download Start Time : 10.02.2021 5.00 P.M
Download End Time : 15.02.2021 5.00 P.M
Receipt of Bids End Time : 15.02.2021 5.15 P.M
Price Bid Opening Time : 15.02.2021 5.30 P.M
125 / Providing First Floor Slab over New Office Building in Municipal Corporation
1 2020-21 40.00
office in Ongole Municipal Corporation
126 / Construction of Culverts near Pernamitta G.P Office and 60 feet Road
2 2020-21 1.75 AE-7
junction in Division No.42
127 / Providing Quarry Rubbish Road from Kurnool Road to Peerlamanyam Muslim
3 2020-21 Burial Ground in Division No.42 10.00 AE-7

128 / Maintenance of Water Supply Scheme Submersible Motors for the year
4 2020-21 2020-21 in Pernamitta in Division No.40 6.60 AE-7

Providing C.C Drain and Culvert from D.No.36-72-446 to existing Bye Pass
129 / Road in Nirmal Nagar 4th Cross Road and existing MM Road to D.No.36-72-
5 2020-21 10.00 AE-5
305 via D.No.36-72-293 and Dama house opposite line in Tower Line in
Division No.35 and 36 in Ongole Municipal Corporation

Providing C.C Road and C.C Drain from Vallapu Venkata Ratnam (H) to
130 /
6 2020-21 Kunchala Koteswaramma (H) and C.C Drain from G.Nayamanu (H) to I 9.90 AE-3
Sulochana (H) in Vijaya Nagar Colony in Division No.31
131 / Providing C.C Road from Sai Mamidi Castle to M.Anji reddy house in
7 2020-21 9.90 AE-3
Ramnagar 6th Line in Division No. 15
132 / Providing C.C Road from Maruthi Enclave to Manasarovar Apartment in
8 2020-21 Model Town 11th Cross Road in Division No.31 10.00 AE-3

133 /
9 2020-21 Providing Meeting Hall at Farmers Training Center at Ongole 7.80 AE-3

134 / Construction of Water Sump and Septic Tank to Farmers Training Center at
10 2020-21 Ongole 6.75 AE-3

135 / Providing C.C Drain at infront of PVR Girls Municipal High School in Division
11 2020-21 1.90 AE-5
No.28 (2nd call)

136 /
Providing C.C Road and C.C Drain from Kokkiligadda Gourisankar house to
12 2020-21 Payvula Srinivasarao house and C.C Drain from G.Nirmala house to 9.60 AE-3
Ch.Ruzveld house in C.R.P Quarters in Division No.31 (3rd call)
TOTAL 124.20
Download Start Time : 10.02.2021 5.00 P.M
Download End Time : 24.02.2021 5.00 P.M
Receipt of Bids End Time : 24.02.2021 5.15 P.M
Price Bid Opening Time : 24.02.2021 5.30 P.M
137 / Transportation and Supply of Water in various places in 1 to 50 Divisions in
1 2020-21 Ongole Municipal Corporation 10.00 AE-5

TOTAL 10.00
Download Start Time : 18.03.2021 5.00 P.M
Download End Time : 24.03.2021 5.00 P.M
Receipt of Bids End Time : 24.03.2021 5.15 P.M
Price Bid Opening Time : 24.03.2021 5.30 P.M

138 / Laying and Interconnection of 600 mm dia D.I K9 Pipe Line across the Old
1 2020-21 National High Way at Vengamukkapalem in Ongole Municipal Corporation 5.10 AE-3

139 / Repairs and Rectification of Leaks at Bhagya Nagar, Ram Nagar and
2 2020-21 Annavarappadu in Ongole Municipal Corporation 1.53 AE-3
140 / Rennovation of Balance Council Hall and Commissioner Quarters in Ongole
3 2020-21 7.85 AE-3
Municipal Corporation
141 / Engaging of 110 Hydraulic Chain Mounted Machine for lifting of Garbage at
4 2020-21 10.00 AE-5
Dumping Yard in Ongole Municipal Corporation
TOTAL 24.48
Download Start Time : 23.03.2021 5.00 P.M
Download End Time : 06.04.2021 5.00 P.M
Receipt of Bids End Time : 06.04.2021 5.15 P.M
Price Bid Opening Time : 06.04.2021 5.30 P.M
142 / Transportation and Supply of Water in various places in 1 to 50 Divisions in
1 2020-21 Ongole Municipal Corporation 10.00 AE-5

TOTAL 10.00
Download Start Time : 31.03.2021 5.00 P.M
Download End Time : 15.04.2021 5.00 P.M
Receipt of Bids End Time : 15.04.2021 5.15 P.M
Price Bid Opening Time : 15.04.2021 5.30 P.M
K-279

K-280
K-259

K-281

K-270

K-271

K-282

K-283

K-284

K-285

K-286

K-260

K-261

K-262

K-263

K-264

K-265

K-266

K-267
K-268

K-269

K-278

K-272

K-273

K-274

K-276

K-277
K-290

K-287

K-292

K-299

K-300

K-301

K-305

K-276
K-288

K-303

K-304

K-278
K-306

33 /
2020-21

K-289

K-302

K-308

26 /
2020-21
K-293

K-295

K-296

628 /
2019-20

K-309

K-310

K-311

K-312

K-316

K-322

K-323

K-324
K-325
83 /
2020-21

84 /
2020-21

90 /
2020-21
94 /
2020-21
114 /
2020-21

105 /
2020-21
ONGOLE MUNICIPAL CORPORATION
E-PROCUREMENT TENDER NOTICES
S. Tender
No Notice No. Name of the work Est cost

1/ Construction of Pedestal and Beautification of the Area for Gurram Jashuva


1 2021-22 Gari Statue at Prakasam Bhavan in Ongole Municipal Corporation 10.00 AE-5

Rennovation of Toilet, Laying of Vitrified Tiles and Fixing Gyp Board Grid
False Ceiling in Mayor Chamber and Providing Alluminium Partition to
2/
2 2021-22 Examiner Section and Providing Painting, Rennovation of Plumping and 10.00 AE-3
Laying of Tiles to Stair Case Repairs in Main Block in Ongole Municipal
Corporation Office

3/
3 2021-22 Repairs to M.S Push Carts in Division Nos.1 to 3 in Ongole Municipal 7.10 AE-5
Corporation
4/ Repairs to M.S Push Carts in Division Nos.4 and 5 in Ongole Municipal
4 2021-22 Corporation 5.40 AE-5

5/ Engaging of Excavator (J.C.B) and Tractors for Removal of Debris and


5 2021-22 3.95 AE-5
Demolition for Town Planning section in Ongole Municipal Corporation
6/
6 2021-22 Transportation and Supply of Water in various places in 1 to 50 Divisions in 10.00 AE-5
Ongole Municipal Corporation
7/ Engaging of 110 Hydraulic Chain Mounted Machine for lifting of Garbage at 141 /
7 2021-22 Dumping Yard in Ongole Municipal Corporation (2nd call) 10.00 AE-5 2020-
21

TOTAL 56.45
Download Start Time : 06.04.2021 5.00 P.M
Download End Time : 17.04.2021 5.00 P.M
Receipt of Bids End Time : 17.04.2021 5.15 P.M
Price Bid Opening Time : 17.04.2021 5.30 P.M
8/ Supply and Delivery of Spare Parts and Repair Works of Skid Steer Loader
1 2021-22 (AP27BS 9270, 9271, 9272 and 9273) to Ongole Municipal Corporation 4.22 AE-5

9/ Construction of Public Toilets at Prakasam Bhavan, Ongole in Ongole


2 2021-22 Municipal Corporation 13.00 AE-3

10 / Supply of Car on hire basis to Mayor for the year 2021-22 in Ongole
3 2021-22 5.00 AE-5
Municipal Corporation
11 / Supply of Car on hire basis to Municipal Commissioner and Assistant
4 2021-22 9.95 AE-5
Commissioner for the year 2021-22 in Ongole Municipal Corporation
12 / Supply of Car on hire basis to Municipal Engineer and Examiner of Accounts
5 2021-22 9.95 AE-5
for the year 2021-22 in Ongole Municipal Corporation
13 / Supply of Car on hire basis to Assistant City Planner-1 and 2 for the year
6 2021-22 2021-22 in Ongole Municipal Corporation 9.95 AE-5

TOTAL 52.07
Download Start Time : 12.04.2021 5.00 P.M
Download End Time : 26.04.2021 5.00 P.M
Receipt of Bids End Time : 26.04.2021 5.15 P.M
Price Bid Opening Time : 26.04.2021 5.30 P.M
Repairs and Rectification of various Motors and Pumpsets at various places
15 /
1 2021-22 of Water Supply section (S.S Tank I & II, Old & New Filter Beds, R.R Tank, 4.96 AE-3
Police Quarters and Pelluru) in Ongole Municipal Corporation
16 /
2 2021-22 Desiltation of Drains in 9 to 16 Divisions in Ongole Municipal Corporation 9.80 AE-3

17 / Desiltation of existing Major and Minor Drains in 17 to 20 Divisions in Ongole


3 2021-22 9.80 AE-3
Municipal Corporation
18 / Desiltation of existing Major and Minor Drains in 21 to 24 and 29 to 31
4 2021-22 9.65 AE-3
Divisions in Ongole Municipal Corporation
19 /
5 2021-22 Desiltation of Drains in 1 to 8 Divisions in Ongole Municipal Corporation 7.70 AE-5

20 / Desiltation of Drains in 26 to 28 and 32 to 38 Divisions in Ongole Municipal


6 2021-22 Corporation 9.80 AE-5

21 /
7 2021-22 Desiltation of Drains in 39 to 50 Divisions in Ongole Municipal Corporation 10.00 AE-7

22 / Supply and Delivery of Sodium Hypo Chlorite for spraying at various places
8 2021-22 6.45 AE-5
under precautionary measure for COVID-19 in Ongole Municipal Corporation

23 / Transportation and Supply of Water in various places in Ongole Municipal


9 2021-22 40.00 AE-5
Corporation
TOTAL 108.16
Download Start Time : 23.04.2021 5.00 P.M
Download End Time : 04.05.2021 5.00 P.M
Receipt of Bids End Time : 04.05.2021 5.15 P.M
Price Bid Opening Time : 04.05.2021 5.30 P.M
24 / Construction of Public Toilets at Prakasam Bhavan, Ongole in Ongole 9/
1 2021-22 13.00 AE-3 2021-
Municipal Corporation (2nd call) 22

25 / Supply of Car on hire basis to Mayor for the year 2021-22 in Ongole 10 /
2 2021-22 Municipal Corporation (2nd call) 5.00 AE-5 2021-
22

Supply of Car on hire basis to Municipal Commissioner and Assistant


26 / 11 /
3 2021-22 Commissioner for the year 2021-22 in Ongole Municipal Corporation (2nd 9.95 AE-5 2021-
22
call)
27 / Supply of Car on hire basis to Municipal Engineer and Examiner of Accounts 12 /
4 2021-22 for the year 2021-22 in Ongole Municipal Corporation (2nd call) 9.95 AE-5 2021-
22

28 / Supply of Car on hire basis to Assistant City Planner-1 and 2 for the year 13 /
5 2021-22 9.95 AE-5 2021-
2021-22 in Ongole Municipal Corporation (2nd call) 22

TOTAL 47.85
Download Start Time : 26.04.2021 6.00 P.M
Download End Time : 03.05.2021 5.00 P.M
Receipt of Bids End Time : 03.05.2021 5.15 P.M
Price Bid Opening Time : 03.05.2021 5.30 P.M
29 / Laying of 110 mm dia P.V.C Pipe Line from A.Prasad Rao house to yanamala
1 2021-22 1.20 AE-3
Nagaraju house in Dharavari Thota in Division No.21
30 / Laying of 110 mm dia P.V.C Pipe Line from Tanniru Venkayamma house to
2 2021-22 1.15 AE-3
Matte Raghava house in Dharavari Thota in Division No.21
31 / Filling of Red Earth at Koppolu Road Divider from Flyover Ending Point to
3 2021-22 10.00 AE-5
Chithala in Ongole Municipal Corporation
32 / Manufacture, Supply and Delivery of IM-II Hand Pump Spare Parts to Ongole
4 2021-22 10.00 AE-7
Municipal Corporation
33 / Drilling of Deep Borewells and Fixing of IM-I Pump Sets and Flushing of
5 2021-22 10.00 AE-7
Borewells at various places in Ongole Municipal Corporation
34 /
6 2021-22 Supply and Delivery of Bleaching Powder to Ongole Municipal Corporation 7.05 AE-5

35 / Supply and Delivery of Piduguralla Stone Powder (Lime) to Ongole Municipal


7 2021-22 8.01 AE-5
Corporation
TOTAL 47.41
Download Start Time : 01.05.2021 6.00 P.M
Download End Time : 10.05.2021 5.00 P.M
Receipt of Bids End Time : 10.05.2021 5.15 P.M
Price Bid Opening Time : 10.05.2021 5.30 P.M
37 / Providing balance C.C Road opposite Thalluri Ramesh house in Sarma College
1 2021-22 Road in Division No.30 1.95 AE-3

38 / Laying of 110 mm dia P.V.C Pipe Line from A.Prasad Rao house to yanamala 29 /
2 2021-22 1.20 AE-3 2021-
Nagaraju house in Dharavari Thota in Division No.21 (2nd call) 22

39 / Laying of 110 mm dia P.V.C Pipe Line from Tanniru Venkayamma house to 30 /
3 2021-22 1.15 AE-3 2021-
Matte Raghava house in Dharavari Thota in Division No.21 (2nd call) 22

40 / Drilling of Deep Borewells and Fixing of IM-I Pump Sets and Flushing of 33 /
4 2021-22 Borewells at various places in Ongole Municipal Corporation (2nd call) 10.00 AE-7 2021-
22

41 / Desiltation of Drains in 9 to 16 Divisions in Ongole Municipal Corporation 16 /


5 2021-22 9.80 AE-3 2021-
(recall) 22

42 / Desiltation of existing Major and Minor Drains in 17 to 20 Divisions in Ongole 17 /


6 2021-22 9.80 AE-3 2021-
Municipal Corporation (recall) 22

43 / Desiltation of existing Major and Minor Drains in 21 to 24 and 29 to 31 18 /


7 2021-22 9.65 AE-3 2021-
Divisions in Ongole Municipal Corporation (recall) 22

44 / Desiltation of Drains in 1 to 8 Divisions in Ongole Municipal Corporation 19 /


8 2021-22 7.70 AE-5 2021-
(recall) 22

45 / Desiltation of Drains in 26 to 28 and 32 to 38 Divisions in Ongole Municipal 20 /


9 2021-22 9.80 AE-5 2021-
Corporation (recall) 22

46 / Desiltation of Drains in 39 to 50 Divisions in Ongole Municipal Corporation 21 /


10 2021-22 10.00 AE-7 2021-
(recall) 22

TOTAL 71.05
Download Start Time : 13.05.2021 6.00 P.M
Download End Time : 25.05.2021 5.00 P.M
Receipt of Bids End Time : 25.05.2021 5.15 P.M
Price Bid Opening Time : 25.05.2021 5.30 P.M
Engaging of Tractor Mounted Sprayers for Spraying of Sodium Hypo Chlorite
47 / in Sanitary Division No.1 to 4 and hire basis on 18 KVA Generator for BHEL
1 2021-22 6.65 AE-5
MISTER Sprayer in COVID-19 precautionary measures in Ongole Municipal
Corporation
TOTAL 6.65
Download Start Time : 15.05.2021 6.00 P.M
Download End Time : 28.05.2021 5.00 P.M
Receipt of Bids End Time : 28.05.2021 5.15 P.M
Price Bid Opening Time : 28.05.2021 5.30 P.M
48 / Providing Balance C.C Road in Ram Nagar 12th Line in Division No.17 73 /
1 2021-22 8.15 AE-3 2020-
(Reserved for L.C.C.S) (recall) 21

49 / Providing Balance C.C Road from Puttamsetty Residency to V Beauty Parlour


2 2021-22 3.05 AE-3
in Bhagya Nagar 2nd Line 2nd Cross Road in Division No.20
50 / Drilling of Deep Borewells and Fixing of IM-I Pump Sets and Flushing of 40 /
3 2021-22 10.00 AE-7 2021-
Borewells at various places in Ongole Municipal Corporation (recall) 22

TOTAL 21.20
Download Start Time : 31.05.2021 6.00 P.M
Download End Time : 14.06.2021 5.00 P.M
Receipt of Bids End Time : 14.06.2021 5.15 P.M
Price Bid Opening Time : 14.06.2021 5.30 P.M
51 / Construction of Garbage Transfer Station in Mukthinuthalapadu Donka Road
1 2021-22 in Ongole Municipal Corporation under 15th Finance Commission Grant 80.00

52 / Construction of Garbage Transfer Station in Pernamitta in Ongole Municipal


2 2021-22 Corporation under 15th Finance Commission Grant 70.00
T0TAL 150.00
Download Start Time : 14.06.2021 5.00 P.M
Download End Time : 28.06.2021 5.00 P.M
Receipt of Bids End Time : 28.06.2021 5.15 P.M
Technical Bid Opening Time : 28.06.2021 5.30 P.M
Price Bid Opening Time : 28.06.2021 5.45 P.M
53 / Drilling of Deep Borewells and Fixing of IM-I Pump Sets and Flushing of 50 /
1 2021-22 10.00 AE-7 2021-
Borewells at various places in Ongole Municipal Corporation (3rd call) 22

TOTAL 10.00
Download Start Time : 15.06.2021 5.00 P.M
Download End Time : 22.06.2021 5.00 P.M
Receipt of Bids End Time : 22.06.2021 5.15 P.M
Price Bid Opening Time : 22.06.2021 5.30 P.M
Construction of Garbage Transfer Station in Mukthinuthalapadu Donka Road
54 /
1 2021-22 in Ongole Municipal Corporation under 15th Finance Commission Grant (2nd 80.00
call)
T0TAL 80.00
Download Start Time : 29.06.2021 5.00 P.M
Download End Time : 06.07.2021 5.00 P.M
Receipt of Bids End Time : 06.07.2021 5.15 P.M
Technical Bid Opening Time : 06.07.2021 5.30 P.M
Price Bid Opening Time : 06.07.2021 5.45 P.M
55 / Filling of Mukthinuthalapadu Tank with Current Motor and Oil Motor and
1 2021-22 1.70 AE-5
Repairs to 15HP Motor in Division No.2
Download Start Time : 05.07.2021 6.00 P.M
Download End Time : 12.07.2021 5.00 P.M
Receipt of Bids End Time : 12.07.2021 5.15 P.M
Price Bid Opening Time : 12.07.2021 5.30 P.M
56 / Supply, Delivery and Fixing of Burning Platform in Hindu Burial Ground in
1 2021-22 3.72 AE-5
Division No.7
57 / Supply, Delivery and Fixing of Burning Platform in Lawyerpet Hindu Burial
2 2021-22 4.20 AE-5
Ground in Division No.34
58 / Supply and Delivery of Plastic Dust Bins (Round Shape) 12 Liters capacity to
3 2021-22 Ongole Municipal Corporation 9.98 AE-5

59 / Engaging of 110 Hydraulic Chain Mounted Machine for lifting of garbage at


4 2021-22 10.00 AE-5
Dumping Yard in Ongole Municipal Corporation
Supply, Delivery and Errection of Chlorine Plants, Emergenncy Life Breathin
60 / Device, Chlorine Escape BA Set and Sensor for safe handling of Chlorine at
5 2021-22 9.85 AE-3
back side of R&B Guest House, New Filter Bed and S.S Tank Filter Bed in
Ongole Municipal Corporation

Laying of 110 mm dia P.V.C Pipe Line and C.C Patch Restoration from P.V.R
61 /
6 2021-22 Girls High School Main Road to Parvathamma Temple via Hazrat Mahaboob 4.10 AE-3
Subhani vari Dargah in Jamedar Street in Division No.25
Supply and Delivery of Chlorine Gas Cylinder of 900 kg for maintenance of
62 /
7 2021-22 New Filter Beds WTP and S.S Tank-2 WTP in Water Supply Section in Ongole 9.90 AE-3
Municipal Corporation
63 / Transportation and Supply of Water in various places in 1 to 50 Divisions in
8 2021-22 10.00 AE-5
Ongole Municipal Corporation
TOTAL 61.75
Download Start Time : 06.07.2021 6.00 P.M
Download End Time : 17.07.2021 5.00 P.M
Receipt of Bids End Time : 17.07.2021 5.15 P.M
Price Bid Opening Time : 17.07.2021 5.30 P.M
Provding CC Road from Mandal Parishad School to Chirala Main Road,
64 / Providing CC Drains from Ramisetty Lakshmi Srinivasarao (H) to Killa
1 2021-22 20.00 AE-5
Koteswara Rao (H) and from Gandhi Bomma to Ele Pole No.1/35/6/5 in
Division No.1

Providing CC Road from Mariyamma (H) to Sk.Masthan (H) in Kesavaraju


65 /
2 2021-22 Kunta 2nd Cross Road and Providing CC Road from Sivalayam Temple to 20.00 AE-5
Ankammathalli Temple in Division No.2
66 /
3 2021-22 Providing Internal CC Roads in Balineni Bharath Colony in Division No.3 20.00 AE-5

Providing CC Drains from Mubarak Biriyani Point to GopiKrishna Hall end


67 / (north side), from Guntur Road to Islampet Masjid Road, from Srinivasa Hall
4 2021-22 Road to Islampet Masjid Road (north side), from Sk.Rafi (H) to Srinivasa (H) 20.00 AE-5
and Providing CC Patches from Rehman (H) to Frakruddin (H) in Division No.4

Providing CC Road at Auxilium School back side, Providing CC Drains at


68 / Gaddikayyalu Masjid Line, Gopal Nagar 1st Line Last Cross Road
5 2021-22 (Neelayapalem) and from Gopal Nagar-2 Sachivalayam to Bhupathi 20.00 AE-5
Nageswara rao (H) and Patch Works in Mahendra Nagar in Division No.5
Providing CC Drain at Nimmakayalavari Street, Provinding RCC Culvert at opp
Masjid Road at Thangella Kasim Veedhi, Raising of CC Road & Providing CC
Drains at Neelampalem from Velchuri Srinivasa rao (H) to Kaskurthi
69 / Mariyadas (H), west to east from Gopal Nagar 3rd Line 2nd Cross Road, at
6 2021-22 Gopal Nagar 4th Line west side from Sannamuri Saraswathi (H) to 39-16-10 20.00 AE-5

west side, at Gopal Nagar 4th Line east and west sides and Providing RCC
Culverts opp Narayana Rao Mpl. School in KP Road & at Gopal Nagar 4th Line
and in Division No.6

Providing CC Drain, Reconstruction of CC Drain at Thangella Khasim Veedi in


Rajakala Street, Providing CC Road & CC Drain at Kammapalem 3rd Line
extension in 40 Feet Road to Karavadi Donka 7th Line, Providing CC Drain
70 /
7 2021-22 from Karavadi Donka 'Y' Junction to Kalikamatha Temple, Providing CC Road 20.00 AE-5
& CC Drain from back side of Hindu Burial Ground Old Age Home west side in
Karavadi Donka and Providing CC Drain from 1st Cross Road to 2nd Cross
Road in Kammapalem 3rd Line east side of CC Road in Division No.7

Providing CC Road, CC Drain & Patch Work from Katari Sankar (H) to Dasari
Suneetha (H) and from Aluri Lakshmi (H) to Polineni Aruna (H), Providing CC
71 / Roads from Dasari Suneetha (H) to Lingisetty Purnachandra rao (H) & from
8 2021-22 20.00 AE-5
Kaja Mahamuddin (H) to Edara Srinivasa Rao (H) and Providing CC Drain from
Chenchu Lakshmi (H) to Bonthavari veedhi 1st & 2nd Lines and in Division
No.8

Providing CC Roads from Saridi Durga Prasad (H) 3rd Line Cross Road at
72 / Indiramma Gruhalu Bhaskar (H) Yarradla Anji Reddy (H) at Indiramma
9 2021-22 20.00 AE-3
Gruhalu 4th Line and Dasari Narasimha Rao (H) to Sk.Savual Ahammad (H) at
Indiramma Gruhalu 8th Line in Division No.9

Providing CC Drains from Ambetkar Statue to Menda Vijaya Raju (H) at Old
SC Colony 1st Line, Kasukurthi Lakshmaiah (H) to Burri Venkateswarlu (H) at
73 /
10 2021-22 Old SC Colony 2nd Line, Kasukurthi Venkateswarlu (H) to Kasukurthi Shekar 20.00 AE-3
(H) at Old SC Colony 3rd Line and Providing CC Road from BVR School to
Yalagala Sanjivarao (H) in Koppolu in Division No.10

Providing CC Road & CC Culvert from Sharon Provisions Shop to Guduru


Prabhakar Rao (H) at Cloughpet 3rd Line 1st Cross Road, Providing Precast
74 / Slabs from Yerrajarla Koteswara Rao (H) to Edventist Church (H) beside
11 2021-22 20.00 AE-3
Kothapatnam Bus Stand Fly Over, Providing CC Culvert at RailPet 2nd Line
Main Road and Widening of CC Road from D.No.19-28-261 to Thanikonda
Nageswara Rao (H) Railpet 2nd line last beside Fly Over in Division No.11
Raising of CC Road & CC Drain from Challa Srirama (H) to Chavala Kumari (H),
Chavala Kumari (H) to Bapatla Gopi (H) and Kotari Narendra (H) to Kale
Venkateswarlu (H) at Maratipalem, Raising of CC Road & CC Drain from
75 / Kamineni Sivakumar (H) Vemula Prasad (H) and Prasanthi Nilayam (H) to
12 2021-22 20.00 AE-3
Valisetty Umamaheswararao (H) at Chikulavari veedhi, Repairs to Openwells
at Chivukulavari Street, Ramalayam Temple & Pakeer Palem and Providing
CC Drain from Karamcheti Krishna (H) to Rehaman Store & Karamcheti
Krishna (H) to Opp Kuppam Prasad (H) in Ranguthota in Division No.12

Providing CC Road & CC Drain from Anganawadi Center to M.Varalakshmi


(H), Providing CC Roads from Tasty Bread Omlet Shop to Ravipriya (H) at
76 /
13 2021-22 Govinda Raju Road, P.RajaSekhar (H) of Kotha Bazar, from P.Santhi (H) to 20.00 AE-3
Rajesh (H) and Opp ABM Degree College to K.Sagar (H) via Pentsoch Chruch
in Kabadi Palem in Division No.13

Providing CC Drains from Ungarala Polaiah (H) to Anjaneya Swami Nilayam,


Lakkaraju Residency Apartment to Tinny Bells School, Chaithanya Plaza north
77 /
14 2021-22 side to Tinny Bells School, Sri Ram School to Anjaneya Swami Temple, 20.00 AE-3
Providing CC Patches from P.Kumari (H) to Y.Buchamma (H) at Anjaneya
Swami Temple Road in Santhapeta in Division No.14

Providing CC Drains from Raghavendra Swami Temple to Railway Gate &


various sections at Annavarapadu, Providing CC Road & Culvert at
Annavarapadu 3rd line, CC Roads from behind Raghavendra Swami Temple,
78 /
15 2021-22 Gandham Haribabu (H) to Bezawada Prasad (H), RamNagar 4th & 5th Cross 20.00 AE-3
Road, Ramnagar 6th Line (from Pendyala Subbarao (H) to 4 Way Junction)
and Perabathina Kotaiah (H) to Tanguturi Gopala Krishna (H) in Ramnagar 8th
Line in Division No.15

Providing CC Drains from Ungarala Koteswaramma (H) to Katukuri Nagamma


(H) & Manikya Vardha Nilayam (H) to Jamandlamudi Samrajyam (H) at Balaji
79 / Nagar & Providing Quarry Rubbish Road at dattatereya Colony & Providing
16 2021-22 20.00 AE-3
Precast Slabs from Koppolu Mastanayya (H) to Edara Kumari (H) in Arava
Colony Main Road near Mechanic Shop and Providing RCC Pipes at
Pothurajupalem in Division No.16

80 / Construction of Compound Wall at Gangamma Temple in Pelluru in Division


17 2021-22 20.00 AE-3
No.17

Construction of Compound Wall near Power Station Burial Ground at


Cheruvukommupalem, Providing CC Road & CC Drain from Thippareddy
81 / Perireddy (H) to Peddireddy Suryanarayana Reddy (H), Providing Quarry
18 2021-22 20.00 AE-3
Rubbish Road from Dhammala Nagaiah (H) to Pasumarthi Narasimha (H) and
Laying of 100 mm dia AC Pipe Line from Thirumala Reddy (H) to R&B Road in
Vengamukkapalem in Division No.18
Providing CC Drain 1st Cross Road entrance to Ch.Naga Prasanna (H) in
Bhagya Nagar 4th Line, on south side from Ch.Chandra Mouli (H) to Bank
82 /
19 2021-22 Colony 3rd Line entrance in Housing Board Colony, Mandava Adilakshmi (H) 20.00 AE-3
to R.Tyagaraju (H) at Kendriya Vidyalaya Housing Board Colony and D.No.97
to Ramakrishna Reddy (H) in Housing Board Colony in Division No.19

Providing CC Drain from Bathula Jalamm (H) to Bhagya Nagar Park at Bhagya
Nagar 2nd Line Main Road, R.Kameswaramma (H) to Chandra Sekar Reddy
83 /
20 2021-22 (H) at Bhagya Nagar Donka, GS Purna Chandra Rao (H) & ELSR to Saymala (H) 20.00 AE-3
at Bhagya Nagar 3rd line ELSR and SRK Degree College to Rambabu CSC
Center at Bhagya Nagar 1st Line 2nd Cross Road in Division No.20

Providing CC Drain from Kumari Kotaiah (H) to Bochu Venkateswararao (H) at


84 /
21 2021-22 Indira Colony 3rd line, Providing damaged CC Road at Dharavari thota 2nd 20.00 AE-3
line in Division No.21

Construction of Arama Kshetram at Ankamma Palem (opp 1 Town Police


Station), Providing CC Drain & Culverts on west side from Venkateswara
85 /
22 2021-22 Swamy Temple to Anand Babu (H) at Mangalapalem, Srimannarayana (H) to 20.00 AE-3
Madhavi Latha (H) at TVP Street and Providing CC Patch work at various
places in Division No.22

Laying of 110 mm & 160 mm dia PVC Pipe Line from Ongole Dairy Milk
Parlour to Venkateswara (H) at Ganuga Palem, Basha Glass Work to Notice
86 /
23 2021-22 Shop, Moulali (H) to Sathyam Handlooms & Srinivasa Footwear to Srinu (H) at 20.00 AE-3
Kotavari Veedhi, Providing CC Road & CC Drain beside Kotavari Veedhi School
east side in Division No.23

Providing CC Drains & CC Roads from Vanttavani Colony 4th & 7th Lines,
87 /
24 2021-22 Ekalavya Nagar Burial Ground opp Roads, Vaddepalem, MangalaPalem 20.00 AE-3
beside YSRCP Party Office, TB Road and Samaikyatha Nagar in Division No.24

Providing CC Drain & CC Road from Parvathamma Temple to Addanki


Srinivasa Rao (H) at Balajiraopet 1st Line, Laying of 100 mm dia AC Pipe Line
88 / & Providing CC Road from Chenchu Ramarao (H) to Nallamalli Dhanalakshmi
25 2021-22 (H) at Balajiraopet 2nd Line 1st Cross Road, Providing Precast Slabs & Wall 20.00 AE-3

Raising at NRI College opp Parvathamma Temple and Jandachettu back side
in Division No.25

Laying of Damaged CC Road from U.Venkateswarlu (H) to D.No.12-20-643,


89 /
26 2021-22 Providing CC Drain and Providing RCC Culverts at various places in Division 20.00 AE-5
No.26
90 /
27 2021-22 Providing CC Road, CC Drain and CC Retaining Wall in Division No.27 20.00 AE-5

91 / Providing CC Drain and RCC Culvert at Kothapeta Streets and Jammichettu


28 2021-22 Streets in Division No.28 20.00 AE-5

Providing CC Drains from M.Eswaramma (H) to P.Koeswaramma (H) and


92 /
29 2021-22 Providing CC Drain and Flooring with chequrred terrazzo tiles for Steps at 20.00 AE-3
Kondamitta Rajapanagala 11th Cross Road in Division No.29
Providing CC Drain from Puram Somaiah (H) to Muvva Venkateswarlu (H) at
JC Banglaw Back Side NSP Colony, Mogili Anadharao Plot to Nagendra Swami
Temple at Seetharampuram, Boddu Vijaya Lakshmi (H) to Sonu Supply Shop
93 /
30 2021-22 at Gaddalagunta and Laying of 100 mm dia AC Pipe Line from Vadde Naleeni 20.00 AE-3
Jayanthi (H) to Karavadhi Seshaiah (H) at Seetharampuram, Burial Ground to
Kondaiah (H) and from Pasumarthi Ankaiah (H) to Punuri Lakshmi Narayana
(H) in Division No.30

Providing CC Road & CC Drain From Murikipudi Saymala (H) to Yarrlagundla


Meeri (H) at VijayNagar Colony, Providing CC Drains & Quarry Rubbish Road
from Pittala Suguna (H) to P.Srinivasa Rao (H) at Gayathri Nagar near Hill,
94 /
31 2021-22 Hindu Burial Ground Road, Venkaiah Master (H) to Krishna Manidiram Road 20.00 AE-3
and Opp Ramalayam Street at Mamidipalem and Providing CC Drain and
Filling Quarry Rubbish from P.Sagar (H) to P.Suguna (H) in VijayNagar Colony
in Division No.31

Providing CC Road & CC Drain from Chillara Chandrasekhar (H) Line in


Gaddalagunta, Providing CC Road from I.Rangaiah (H) to existing CC Road
95 / (backside of Ramalayam Temple), Providing CC Road from D.No.152 to 362
32 2021-22 20.00 AE-5
(beside Public Toilets) in Gaddala Gunta, Laying of 110 mm dia PVC Pipe Line
from Gillalu Church to Rajeswari Ammavari Temple and Laying of 160 mm dia
PVC Pipe Line from D.No.152 to 13 beside Public Toilets in Division No.32

96 / Providing CC Road from Military Colony 1st Line 1st Cross Road and Providing
33 2021-22 20.00 AE-5
CC Drain at Military Colony East and West Side Cross Roads in Division No.33

Providing CC Drains from Old Sujatha Nagar 3rd, 4th Line and D.No.5-1-50(6)
97 /
34 2021-22 to 3-5-M65 (Ramalayam Temple - Konijeti Bustand) and both sides of VIP 20.00 AE-5
Road (south side) at 3rd, 4th & 5th Cross Roads in Division No.34

Providing CC Drain & RCC Culvert from Hanuman Temple to SR Residency &
D.NO.119 to Rama Sai Residency, Laying of 110 mm dia PVC Pipe Line west
98 /
35 2021-22 side of Influence Showroom street, Providing CC Drains east side of Sri 20.00 AE-5
Achalananda Trust and from D.No.36-72-197 to existing MM Road (via
Harithavanam) in Division No.35

Providing CC Drain in Nirmal Nagar 2nd Cross Road, Raising of CC Road from
99 / Chitithoti (H) (south side) to existing Byepass Road and Providing CC Drain
36 2021-22 20.00 AE-5
from Subbareddy Towers to SBI ATM (Anjaiah Road), Brundavanam
Residency to kiran (H) in Division No.36

Providing CC Roads in Samathanagar 6th Line from D.No.34-64-119 to


100 /
37 2021-22 Mother Palace House and in Samathanagar 5th Line from D.No.34-64-1066 20.00 AE-5
to 7-816-9 in Division No.37

Providing CC Road & CC Drain from Sai Krishna Nagar 3rd Cross Road opp
101 / Gayathri School Road, Providing CC Road & CC Drain from Rajeswari (H) to
38 2021-22 20.00 AE-5
existing Samatha Nagar Main Road and Providing CC Drain at Sri Lakshmi
Narasimhapuram Street in Division No.38
102 / Providing CC Drains in Santhi Nagar 1st Line 1st Cross Road east side and
39 2021-22 Quarry Rubbish Roads in Krisnha Nagar in Division No.39 20.00 AE-7
Providing CC Road from V.Venkateswara Reddy (H) to Chittemreddy Seshi
103 /
40 2021-22 Reddy (H) in Nachareddy Palem and CC Road & CC Drain in ELSR East Side 20.00 AE-7
Road in Division No.40
104 / Providing CC Drain from Ambedkar Statue to chintagunta Burial Ground and
41 2021-22 CC Road infront of Ramalinga Reddy (H) in Division No.41 20.00 AE-7

Providing CC Drains from Rayapudi Kondaiah (H) to Main Road south to north
at Santhi Nagar Pernamitta and from Kaila Masaiah (H) culvert to Nukathoti
105 /
42 2021-22 Koteswarao (H) at Santhi Nagar Pernamita and CC Road from Suram 20.00 AE-7
Sudhakar Reddy (H) to Suram Chandu (H) in Kurnool Road in Pernamitta in
Division No.42

106 / Providing CC Road and CC Drain from Kurnool Road to Ganapathi Nagar
43 2021-22 20.00 AE-7
Temple and CC Road in Virat Nagar 4th Line in Division No.43
107 /
44 2021-22 Providing CC Roads and CC Drains in Srinivasa Colony in Division No.44 20.00 AE-7

108 / Providing CC Roads and CC Drains in 2nd and 4th Cross Roads in Srinagar
45 2021-22 Colony in Division No.45 20.00 AE-7

109 / Providing CC Drains from Sai Janadrhan Office to Flyover in Pandaripuram in


46 2021-22 20.00 AE-7
Division No.46
Providing CC Drains from Bhavani Prasad (H) to Gundu Suvarthamma (H),
110 /
47 2021-22 Pothuraju Canal to Phani (H) and G.Kotataiah (H) to Sirigiri Sambhaiah (H) in 20.00 AE-7
NGO Colony 7th Line in Division No.47
111 / Providing CC Drains both sides in Ayyannavari Veedhi and Cross Roads and
48 2021-22 20.00 AE-7
Amrutha Hosptial Road in Division No.48
112 / Providing CC Road and CC Drain in Krishna Mandir backside and CC Road in
49 2021-22 Balakrishna Puram in Division No.49 20.00 AE-7

Providing CC Road Mosque north side in Venkateswara Colony and Providing


113 / Quarry Rubbish Road from Sunnam Ravi Chandra (H) to Vijay Kumar (H) in
50 2021-22 20.00 AE-7
Chaitanya Colony and Sd.Kasimbe (H) to Sivalyalam in Jayaprakash Colony
south side 1st Cross Road in Nehru Nagar in Division No.50

TOTAL 1000.00
Download Start Time : 13.07.2021 6.00 P.M
Download End Time : 28.07.2021 5.00 P.M
Receipt of Bids End Time : 28.07.2021 5.15 P.M
Price Bid Opening Time : 28.07.2021 5.30 P.M
Ongole Municipal Corporation – Clean Andhra Pradesh (CLAP) Program –
114 /
1 2021-22 Procurement of 3 Coloured household Bins under 15th Finance commission 144.00
Grant
T0TAL 144.00
Download Start Time : 24.07.2021 5.00 P.M
Download End Time : 09.08.2021 5.00 P.M
Receipt of Bids End Time : 09.08.2021 5.15 P.M
Technical Bid Opening Time : 09.08.2021 5.30 P.M
Price Bid Opening Time : 09.08.2021 5.45 P.M
115 / Supply and Delivery of Flowering and Avenue Plants to Ongole Municipal
1 2021-22 10.00 AE-5
Corporation
116 / Laying of 160 mm dia P.V.C Pipe Line and C.C Patch Restoration from Ram
2 2021-22 Nagar 2nd Line Main Road to Municipal High School in Division No.15 5.55 AE-3

TOTAL 15.55
Download Start Time : 30.07.2021 6.00 P.M
Download End Time : 06.08.2021 5.00 P.M
Receipt of Bids End Time : 06.08.2021 5.15 P.M
Price Bid Opening Time : 06.08.2021 5.30 P.M
117 / Providing CC Road and CC Drain from Kurnool Road to Ganapathi Nagar
1 2021-22 20.00 AE-7
Temple and CC Road in Virat Nagar 4th Line in Division No.43
118 /
2 2021-22 Providing CC Roads and CC Drains in Srinivasa Colony in Division No.44 20.00 AE-7

119 / Providing CC Roads and CC Drains in 2nd and 4th Cross Roads in Srinagar
3 2021-22 20.00 AE-7
Colony in Division No.45
120 / Providing CC Drains from Sai Janadrhan Office to Flyover in Pandaripuram in
4 2021-22 20.00 AE-7
Division No.46
Providing CC Drains from Bhavani Prasad (H) to Gundu Suvarthamma (H),
121 /
5 2021-22 Pothuraju Canal to Phani (H) and G.Kotataiah (H) to Sirigiri Sambhaiah (H) in 20.00 AE-7
NGO Colony 7th Line in Division No.47
122 / Providing CC Drains both sides in Ayyannavari Veedhi and Cross Roads and
6 2021-22 Amrutha Hosptial Road in Division No.48 20.00 AE-7

123 / Providing CC Road and CC Drain in Krishna Mandir backside and CC Road in
7 2021-22 Balakrishna Puram in Division No.49 20.00 AE-7

Providing CC Road Mosque north side in Venkateswara Colony and Providing


124 / Quarry Rubbish Road from Sunnam Ravi Chandra (H) to Vijay Kumar (H) in
8 2021-22 Chaitanya Colony and Sd.Kasimbe (H) to Sivalyalam in Jayaprakash Colony 20.00 AE-7
south side 1st Cross Road in Nehru Nagar in Division No.50

Provding CC Road from Mandal Parishad School to Chirala Main Road,


125 / Providing CC Drains from Ramisetty Lakshmi Srinivasarao (H) to Killa 64 /
9 2021-22 Koteswara Rao (H) and from Gandhi Bomma to Ele Pole No.1/35/6/5 in 20.00 AE-5 2021-
22
Division No.1 (2nd call)

Providing CC Drains from Mubarak Biriyani Point to GopiKrishna Hall end


126 /
(north side), from Guntur Road to Islampet Masjid Road, from Srinivasa Hall 67 /
10 2021-22 Road to Islampet Masjid Road (north side), from Sk.Rafi (H) to Srinivasa (H) 20.00 AE-5 2021-
22
and Providing CC Patches from Rehman (H) to Frakruddin (H) in Division No.4
(2nd call)

Providing CC Drain, Reconstruction of CC Drain at Thangella Khasim Veedi in


Rajakala Street, Providing CC Road & CC Drain at Kammapalem 3rd Line
extension in 40 Feet Road to Karavadi Donka 7th Line, Providing CC Drain
127 / 70 /
11 2021-22 from Karavadi Donka 'Y' Junction to Kalikamatha Temple, Providing CC Road 20.00 AE-5 2021-
22
& CC Drain from back side of Hindu Burial Ground Old Age Home west side in
Karavadi Donka and Providing CC Drain from 1st Cross Road to 2nd Cross
Road in Kammapalem 3rd Line east side of CC Road in Division No.7 (2nd call)
Providing CC Road, CC Drain & Patch Work from Katari Sankar (H) to Dasari
Suneetha (H) and from Aluri Lakshmi (H) to Polineni Aruna (H), Providing CC
128 / Roads from Dasari Suneetha (H) to Lingisetty Purnachandra rao (H) & from 71 /
12 2021-22 20.00 AE-5 2021-
Kaja Mahamuddin (H) to Edara Srinivasa Rao (H) and Providing CC Drain from 22
Chenchu Lakshmi (H) to Bonthavari veedhi 1st & 2nd Lines and in Division
No.8 (2nd call)

Providing CC Roads from Saridi Durga Prasad (H) 3rd Line Cross Road at
129 / Indiramma Gruhalu Bhaskar (H) Yarradla Anji Reddy (H) at Indiramma 72 /
13 2021-22 20.00 AE-3 2021-
Gruhalu 4th Line and Dasari Narasimha Rao (H) to Sk.Savual Ahammad (H) at 22
Indiramma Gruhalu 8th Line in Division No.9 (2nd call)

Providing CC Drains from Ambetkar Statue to Menda Vijaya Raju (H) at Old
SC Colony 1st Line, Kasukurthi Lakshmaiah (H) to Burri Venkateswarlu (H) at
130 / 73 /
14 2021-22 Old SC Colony 2nd Line, Kasukurthi Venkateswarlu (H) to Kasukurthi Shekar 20.00 AE-3 2021-
22
(H) at Old SC Colony 3rd Line and Providing CC Road from BVR School to
Yalagala Sanjivarao (H) in Koppolu in Division No.10 (2nd call)

Providing CC Road & CC Culvert from Sharon Provisions Shop to Guduru


Prabhakar Rao (H) at Cloughpet 3rd Line 1st Cross Road, Providing Precast
Slabs from Yerrajarla Koteswara Rao (H) to Edventist Church (H) beside
131 / 74 /
15 2021-22 Kothapatnam Bus Stand Fly Over, Providing CC Culvert at RailPet 2nd Line 20.00 AE-3 2021-
22
Main Road and Widening of CC Road from D.No.19-28-261 to Thanikonda
Nageswara Rao (H) Railpet 2nd line last beside Fly Over in Division No.11
(2nd call)

Raising of CC Road & CC Drain from Challa Srirama (H) to Chavala Kumari (H),
Chavala Kumari (H) to Bapatla Gopi (H) and Kotari Narendra (H) to Kale
Venkateswarlu (H) at Maratipalem, Raising of CC Road & CC Drain from
Kamineni Sivakumar (H) Vemula Prasad (H) and Prasanthi Nilayam (H) to
132 / 75 /
16 2021-22 Valisetty Umamaheswararao (H) at Chikulavari veedhi, Repairs to Openwells 20.00 AE-3 2021-
22
at Chivukulavari Street, Ramalayam Temple & Pakeer Palem and Providing
CC Drain from Karamcheti Krishna (H) to Rehaman Store & Karamcheti
Krishna (H) to Opp Kuppam Prasad (H) in Ranguthota in Division No.12 (2nd
call)

Providing CC Road & CC Drain from Anganawadi Center to M.Varalakshmi


(H), Providing CC Roads from Tasty Bread Omlet Shop to Ravipriya (H) at
133 / 76 /
17 2021-22 Govinda Raju Road, P.RajaSekhar (H) of Kotha Bazar, from P.Santhi (H) to 20.00 AE-3 2021-
22
Rajesh (H) and Opp ABM Degree College to K.Sagar (H) via Pentsoch Chruch
in Kabadi Palem in Division No.13 (2nd call)

Providing CC Drains from Raghavendra Swami Temple to Railway Gate &


various sections at Annavarapadu, Providing CC Road & Culvert at
Annavarapadu 3rd line, CC Roads from behind Raghavendra Swami Temple,
134 / 78 /
18 2021-22 Gandham Haribabu (H) to Bezawada Prasad (H), RamNagar 4th & 5th Cross 20.00 AE-3 2021-
22
Road, Ramnagar 6th Line (from Pendyala Subbarao (H) to 4 Way Junction)
and Perabathina Kotaiah (H) to Tanguturi Gopala Krishna (H) in Ramnagar 8th
Line in Division No.15 (2nd call)
135 / Construction of Compound Wall at Gangamma Temple in Pelluru in Division 80 /
19 2021-22 20.00 AE-3 2021-
No.17 (2nd call) 22

Construction of Compound Wall near Power Station Burial Ground at


Cheruvukommupalem, Providing CC Road & CC Drain from Thippareddy
136 / Perireddy (H) to Peddireddy Suryanarayana Reddy (H), Providing Quarry 81 /
20 2021-22 Rubbish Road from Dhammala Nagaiah (H) to Pasumarthi Narasimha (H) and 20.00 AE-3 2021-
22
Laying of 100 mm dia AC Pipe Line from Thirumala Reddy (H) to R&B Road in
Vengamukkapalem in Division No.18 (2nd call)

Providing CC Drain 1st Cross Road entrance to Ch.Naga Prasanna (H) in


Bhagya Nagar 4th Line, on south side from Ch.Chandra Mouli (H) to Bank
137 / Colony 3rd Line entrance in Housing Board Colony, Mandava Adilakshmi (H) 82 /
21 2021-22 20.00 AE-3 2021-
to R.Tyagaraju (H) at Kendriya Vidyalaya Housing Board Colony and D.No.97 22
to Ramakrishna Reddy (H) in Housing Board Colony in Division No.19 (2nd
call)

Providing CC Drain from Bathula Jalamm (H) to Bhagya Nagar Park at Bhagya
138 /
Nagar 2nd Line Main Road, R.Kameswaramma (H) to Chandra Sekar Reddy 83 /
22 2021-22 (H) at Bhagya Nagar Donka, GS Purna Chandra Rao (H) & ELSR to Saymala (H) 20.00 AE-3 2021-
22
at Bhagya Nagar 3rd line ELSR and SRK Degree College to Rambabu CSC
Center at Bhagya Nagar 1st Line 2nd Cross Road in Division No.20 (2nd call)

Construction of Arama Kshetram at Ankamma Palem (opp 1 Town Police


Station), Providing CC Drain & Culverts on west side from Venkateswara
139 / 85 /
23 2021-22 Swamy Temple to Anand Babu (H) at Mangalapalem, Srimannarayana (H) to 20.00 AE-3 2021-
22
Madhavi Latha (H) at TVP Street and Providing CC Patch work at various
places in Division No.22 (2nd call)

Laying of 110 mm & 160 mm dia PVC Pipe Line from Ongole Dairy Milk
Parlour to Venkateswara (H) at Ganuga Palem, Basha Glass Work to Notice
140 / 86 /
24 2021-22 Shop, Moulali (H) to Sathyam Handlooms & Srinivasa Footwear to Srinu (H) at 20.00 AE-3 2021-
22
Kotavari Veedhi, Providing CC Road & CC Drain beside Kotavari Veedhi School
east side in Division No.23 (2nd call)

Providing CC Drains & CC Roads from Vanttavani Colony 4th & 7th Lines,
141 / Ekalavya Nagar Burial Ground opp Roads, Vaddepalem, MangalaPalem 87 /
25 2021-22 beside YSRCP Party Office, TB Road and Samaikyatha Nagar in Division No.24 20.00 AE-3 2021-
22
(2nd call)

Laying of Damaged CC Road from U.Venkateswarlu (H) to D.No.12-20-643,


142 / 89 /
26 2021-22 Providing CC Drain and Providing RCC Culverts at various places in Division 20.00 AE-5 2021-
22
No.26 (2nd call)
143 / Providing CC Road, CC Drain and CC Retaining Wall in Division No.27 (2nd 90 /
27 2021-22 20.00 AE-5 2021-
call) 22

144 / Providing CC Drain and RCC Culvert at Kothapeta Streets and Jammichettu 91 /
28 2021-22 20.00 AE-5 2021-
Streets in Division No.28 (2nd call) 22
Providing CC Drains from M.Eswaramma (H) to P.Koeswaramma (H) and
145 / 92 /
29 2021-22 Providing CC Drain and Flooring with chequrred terrazzo tiles for Steps at 20.00 AE-3 2021-
22
Kondamitta Rajapanagala 11th Cross Road in Division No.29 (2nd call)

Providing CC Drain from Puram Somaiah (H) to Muvva Venkateswarlu (H) at


JC Banglaw Back Side NSP Colony, Mogili Anadharao Plot to Nagendra Swami
146 /
Temple at Seetharampuram, Boddu Vijaya Lakshmi (H) to Sonu Supply Shop 93 /
30 2021-22 at Gaddalagunta and Laying of 100 mm dia AC Pipe Line from Vadde Naleeni 20.00 AE-3 2021-
22
Jayanthi (H) to Karavadhi Seshaiah (H) at Seetharampuram, Burial Ground to
Kondaiah (H) and from Pasumarthi Ankaiah (H) to Punuri Lakshmi Narayana
(H) in Division No.30 (2nd call)

Providing CC Road & CC Drain from Chillara Chandrasekhar (H) Line in


Gaddalagunta, Providing CC Road from I.Rangaiah (H) to existing CC Road
(backside of Ramalayam Temple), Providing CC Road from D.No.152 to 362
147 / 95 /
31 2021-22 (beside Public Toilets) in Gaddala Gunta, Laying of 110 mm dia PVC Pipe Line 20.00 AE-5 2021-
22
from Gillalu Church to Rajeswari Ammavari Temple and Laying of 160 mm dia
PVC Pipe Line from D.No.152 to 13 beside Public Toilets in Division No.32
(2nd call)

Providing CC Drain & RCC Culvert from Hanuman Temple to SR Residency &
D.NO.119 to Rama Sai Residency, Laying of 110 mm dia PVC Pipe Line west
148 / 98 /
32 2021-22 side of Influence Showroom street, Providing CC Drains east side of Sri 20.00 AE-5 2021-
22
Achalananda Trust and from D.No.36-72-197 to existing MM Road (via
Harithavanam) in Division No.35 (2nd call)

Providing CC Drain in Nirmal Nagar 2nd Cross Road, Raising of CC Road from
149 / Chitithoti (H) (south side) to existing Byepass Road and Providing CC Drain 99 /
33 2021-22 20.00 AE-5 2021-
from Subbareddy Towers to SBI ATM (Anjaiah Road), Brundavanam 22
Residency to kiran (H) in Division No.36 (2nd call)

Providing CC Road & CC Drain from Sai Krishna Nagar 3rd Cross Road opp
150 / Gayathri School Road, Providing CC Road & CC Drain from Rajeswari (H) to 101 /
34 2021-22 20.00 AE-5 2021-
existing Samatha Nagar Main Road and Providing CC Drain at Sri Lakshmi 22
Narasimhapuram Street in Division No.38 (2nd call)

Providing CC Road from V.Venkateswara Reddy (H) to Chittemreddy Seshi


151 / 103 /
35 2021-22 Reddy (H) in Nachareddy Palem and CC Road & CC Drain in ELSR East Side 20.00 AE-7 2021-
22
Road in Division No.40 (2nd call)

152 / Providing CC Drain from Ambedkar Statue to chintagunta Burial Ground and 104 /
36 2021-22 20.00 AE-7 2021-
CC Road infront of Ramalinga Reddy (H) in Division No.41 (2nd call) 22

Providing CC Drains from Rayapudi Kondaiah (H) to Main Road south to north
at Santhi Nagar Pernamitta and from Kaila Masaiah (H) culvert to Nukathoti
153 / 105 /
37 2021-22 Koteswarao (H) at Santhi Nagar Pernamita and CC Road from Suram 20.00 AE-7 2021-
22
Sudhakar Reddy (H) to Suram Chandu (H) in Kurnool Road in Pernamitta in
Division No.42 (2nd call)
154 / Supply, Delivery and Fixing of Burning Platform in Hindu Burial Ground in 56 /
38 2021-22 3.72 AE-5 2021-
Division No.7 (2nd call) 22

155 / Supply, Delivery and Fixing of Burning Platform in Lawyerpet Hindu Burial 57 /
39 2021-22 4.20 AE-5 2021-
Ground in Division No.34 (2nd call) 22

TOTAL 747.92
Download Start Time : 30.07.2021 6.00 P.M
Download End Time : 25.08.2021 5.00 P.M
Receipt of Bids End Time : 25.08.2021 5.15 P.M
Price Bid Opening Time : 25.08.2021 5.30 P.M
156 / Transportation and Supply of Water in various places in 1 to 50 Divisions for 63 /
1 2021-22 10.00 AE-5 2021-
the month of August in Ongole Municipal Corporation 22

157 / Providing Quarry Rubbish Road in Dumping Yard at Guthikondavari Palem in


2 2021-22 10.00
Ongole Municipal Corporation
TOTAL 20.00
Download Start Time : 31.07.2021 6.00 P.M
Download End Time : 06.08.2021 5.00 P.M
Receipt of Bids End Time : 06.08.2021 5.15 P.M
Price Bid Opening Time : 06.08.2021 5.30 P.M
Providing Painting, Garland Decoration, Shamiyana and Chairs for Statues
158 /
1 2021-22 Maintenance at various Places in the limits of Ongole Municipal Corporation 5.30 AE-5
(Reserved for L.C.C.S)
TOTAL 5.30
Download Start Time : 17.08.2021 6.00 P.M
Download End Time : 23.08.2021 5.00 P.M
Receipt of Bids End Time : 23.08.2021 5.15 P.M
Price Bid Opening Time : 23.08.2021 5.30 P.M
Transportation and Supply of Water in various places in 1 to 50 Divisions
159 / 63 /
1 2021-22 from 25th August, 2021 to 11th September, 2021 in Ongole Municipal 10.00 AE-5 2021-
22
Corporation
TOTAL 10.00
Download Start Time : 18.08.2021 6.00 P.M
Download End Time : 25.08.2021 5.00 P.M
Receipt of Bids End Time : 25.08.2021 5.15 P.M
Price Bid Opening Time : 25.08.2021 5.30 P.M
160 / Transportation and Supply of Water in various places in 1 to 50 Divisions in
1 2021-22 40.00 AE-5
Ongole Municipal Corporation
161 / Supply and Delivery of Pyrosene Oil - BIS Mark and Mud Oil for Sanitation in
2 2021-22 Ongole Municipal Corporation 1.63 AE-5

162 / Supply and Delivery of Bleaching Powder for Sanitaion to Ongole Municipal
3 2021-22 3.51 AE-5
Corporation
163 / Filling of Quarry Rubbish Road at Guthikondavari Palem Dumping Yard in
4 2021-22 10.00 AE-5
Ongole Municipal Corporation
164 / Rennovation of Assistant Commissioner Chamber in Ongole Municipal
5 2021-22 3.20 AE-3
Corporation Office in Ongole Municipal Corporation
165 / Filling of Quarry Rubbish and Providing Cover Slabs in Muslim Burial Ground
6 2021-22 1.97 AE-5
at Kothaptnam Flyover in Division No.8
166 / Laying of 100 mm dia A.C Pipe Line from Apex School to Sardhar house in
7 2021-22 5.17 AE-5
Division No.4
167 / Laying of 110 mm dia H.D.P.E Pipe Line from Throvagunta Auto Nagar to
8 2021-22 7.75 AE-5
Community Hall in Division No.1
Laying of 110 mm dia P.V.C Pipe Line west to east from Gopal Nagar 3rd and
168 /
9 2021-22 2nd Cross Roads and from south to north in Thangella Khasim Veedhi Opp. 1.52 AE-5
Masid Road in Division No.6
169 / Construction of Compound Wall for Open Site in Pothurajupalem in Division
10 2021-22 No.16 8.25 AE-3

170 / Providing CC Roads and CC Drains in 2nd and 4th Cross Roads in Srinagar 119 /
11 2021-22 20.00 AE-7 2021-
Colony in Division No.45 (2nd call) 22

171 / Providing CC Drains from Sai Janadrhan Office to Flyover in Pandaripuram in 120 /
12 2021-22 20.00 AE-7 2021-
Division No.46 (2nd call) 22

172 /
Providing CC Drains from Bhavani Prasad (H) to Gundu Suvarthamma (H), 121 /
13 2021-22 Pothuraju Canal to Phani (H) and G.Kotataiah (H) to Sirigiri Sambhaiah (H) in 20.00 AE-7 2021-
22
NGO Colony 7th Line in Division No.47 (2nd call)
173 / Providing CC Drains both sides in Ayyannavari Veedhi and Cross Roads and 122 /
14 2021-22 Amrutha Hosptial Road in Division No.48 (2nd call) 20.00 AE-7 2021-
22

174 / Providing CC Road and CC Drain in Krishna Mandir backside and CC Road in 123 /
15 2021-22 Balakrishna Puram in Division No.49 (2nd call) 20.00 AE-7 2021-
22

Provding CC Road from Mandal Parishad School to Chirala Main Road,


175 / Providing CC Drains from Ramisetty Lakshmi Srinivasarao (H) to Killa 125 /
16 2021-22 20.00 AE-5 2021-
Koteswara Rao (H) and from Gandhi Bomma to Ele Pole No.1/35/6/5 in 22
Division No.1 (3rd call)

Providing CC Drains from Mubarak Biriyani Point to GopiKrishna Hall end


(north side), from Guntur Road to Islampet Masjid Road, from Srinivasa Hall
176 / 126 /
17 2021-22 Road to Islampet Masjid Road (north side), from Sk.Rafi (H) to Srinivasa (H) 20.00 AE-5 2021-
22
and Providing CC Patches from Rehman (H) to Frakruddin (H) in Division No.4
(3rd call)

Providing CC Drain, Reconstruction of CC Drain at Thangella Khasim Veedi in


Rajakala Street, Providing CC Road & CC Drain at Kammapalem 3rd Line
extension in 40 Feet Road to Karavadi Donka 7th Line, Providing CC Drain
177 / 127 /
18 2021-22 from Karavadi Donka 'Y' Junction to Kalikamatha Temple, Providing CC Road 20.00 AE-5 2021-
22
& CC Drain from back side of Hindu Burial Ground Old Age Home west side in
Karavadi Donka and Providing CC Drain from 1st Cross Road to 2nd Cross
Road in Kammapalem 3rd Line east side of CC Road in Division No.7 (3rd call)

Providing CC Road, CC Drain & Patch Work from Katari Sankar (H) to Dasari
Suneetha (H) and from Aluri Lakshmi (H) to Polineni Aruna (H), Providing CC
178 / Roads from Dasari Suneetha (H) to Lingisetty Purnachandra rao (H) & from 128 /
19 2021-22 Kaja Mahamuddin (H) to Edara Srinivasa Rao (H) and Providing CC Drain from 20.00 AE-5 2021-
22
Chenchu Lakshmi (H) to Bonthavari veedhi 1st & 2nd Lines and in Division
No.8 (3rd call)
Providing CC Drains from Ambetkar Statue to Menda Vijaya Raju (H) at Old
SC Colony 1st Line, Kasukurthi Lakshmaiah (H) to Burri Venkateswarlu (H) at
179 / 130 /
20 2021-22 Old SC Colony 2nd Line, Kasukurthi Venkateswarlu (H) to Kasukurthi Shekar 20.00 AE-3 2021-
22
(H) at Old SC Colony 3rd Line and Providing CC Road from BVR School to
Yalagala Sanjivarao (H) in Koppolu in Division No.10 (3rd call)

Providing CC Road & CC Culvert from Sharon Provisions Shop to Guduru


Prabhakar Rao (H) at Cloughpet 3rd Line 1st Cross Road, Providing Precast
Slabs from Yerrajarla Koteswara Rao (H) to Edventist Church (H) beside
180 / 131 /
21 2021-22 Kothapatnam Bus Stand Fly Over, Providing CC Culvert at RailPet 2nd Line 20.00 AE-3 2021-
22
Main Road and Widening of CC Road from D.No.19-28-261 to Thanikonda
Nageswara Rao (H) Railpet 2nd line last beside Fly Over in Division No.11 (3rd
call)

Raising of CC Road & CC Drain from Challa Srirama (H) to Chavala Kumari (H),
Chavala Kumari (H) to Bapatla Gopi (H) and Kotari Narendra (H) to Kale
Venkateswarlu (H) at Maratipalem, Raising of CC Road & CC Drain from
Kamineni Sivakumar (H) Vemula Prasad (H) and Prasanthi Nilayam (H) to
181 / 132 /
22 2021-22 Valisetty Umamaheswararao (H) at Chikulavari veedhi, Repairs to Openwells 20.00 AE-3 2021-
22
at Chivukulavari Street, Ramalayam Temple & Pakeer Palem and Providing
CC Drain from Karamcheti Krishna (H) to Rehaman Store & Karamcheti
Krishna (H) to Opp Kuppam Prasad (H) in Ranguthota in Division No.12 (3rd
call)

Providing CC Road & CC Drain from Anganawadi Center to M.Varalakshmi


(H), Providing CC Roads from Tasty Bread Omlet Shop to Ravipriya (H) at
182 / 133 /
23 2021-22 Govinda Raju Road, P.RajaSekhar (H) of Kotha Bazar, from P.Santhi (H) to 20.00 AE-3 2021-
22
Rajesh (H) and Opp ABM Degree College to K.Sagar (H) via Pentsoch Chruch
in Kabadi Palem in Division No.13 (3rd call)

Construction of Compound Wall near Power Station Burial Ground at


Cheruvukommupalem, Providing CC Road & CC Drain from Thippareddy
183 / Perireddy (H) to Peddireddy Suryanarayana Reddy (H), Providing Quarry 136 /
24 2021-22 20.00 AE-3 2021-
Rubbish Road from Dhammala Nagaiah (H) to Pasumarthi Narasimha (H) and 22
Laying of 100 mm dia AC Pipe Line from Thirumala Reddy (H) to R&B Road in
Vengamukkapalem in Division No.18 (3rd call)

Providing CC Drain 1st Cross Road entrance to Ch.Naga Prasanna (H) in


Bhagya Nagar 4th Line, on south side from Ch.Chandra Mouli (H) to Bank
184 / Colony 3rd Line entrance in Housing Board Colony, Mandava Adilakshmi (H) 137 /
25 2021-22 to R.Tyagaraju (H) at Kendriya Vidyalaya Housing Board Colony and D.No.97 20.00 AE-3 2021-
22
to Ramakrishna Reddy (H) in Housing Board Colony in Division No.19 (3rd
call)

Providing CC Drain from Bathula Jalamm (H) to Bhagya Nagar Park at Bhagya
Nagar 2nd Line Main Road, R.Kameswaramma (H) to Chandra Sekar Reddy
185 / 138 /
26 2021-22 (H) at Bhagya Nagar Donka, GS Purna Chandra Rao (H) & ELSR to Saymala (H) 20.00 AE-3 2021-
22
at Bhagya Nagar 3rd line ELSR and SRK Degree College to Rambabu CSC
Center at Bhagya Nagar 1st Line 2nd Cross Road in Division No.20 (3rd call)
Construction of Arama Kshetram at Ankamma Palem (opp 1 Town Police
186 /
Station), Providing CC Drain & Culverts on west side from Venkateswara 139 /
27 2021-22 Swamy Temple to Anand Babu (H) at Mangalapalem, Srimannarayana (H) to 20.00 AE-3 2021-
22
Madhavi Latha (H) at TVP Street and Providing CC Patch work at various
places in Division No.22 (3rd call)

Laying of 110 mm & 160 mm dia PVC Pipe Line from Ongole Dairy Milk
Parlour to Venkateswara (H) at Ganuga Palem, Basha Glass Work to Notice
187 / 140 /
28 2021-22 Shop, Moulali (H) to Sathyam Handlooms & Srinivasa Footwear to Srinu (H) at 20.00 AE-3 2021-
22
Kotavari Veedhi, Providing CC Road & CC Drain beside Kotavari Veedhi School
east side in Division No.23 (3rd call)

Providing CC Drains & CC Roads from Vanttavani Colony 4th & 7th Lines,
188 / Ekalavya Nagar Burial Ground opp Roads, Vaddepalem, MangalaPalem 141 /
29 2021-22 beside YSRCP Party Office, TB Road and Samaikyatha Nagar in Division No.24 20.00 AE-3 2021-
22
(3rd call)

Laying of Damaged CC Road from U.Venkateswarlu (H) to D.No.12-20-643,


189 / 142 /
30 2021-22 Providing CC Drain and Providing RCC Culverts at various places in Division 20.00 AE-5 2021-
22
No.26 (3rd call)
190 / 143 /
31 2021-22 Providing CC Road, CC Drain and CC Retaining Wall in Division No.27 (3rd call) 20.00 AE-5 2021-
22

191 / Providing CC Drain and RCC Culvert at Kothapeta Streets and Jammichettu 144 /
32 2021-22 20.00 AE-5 2021-
Streets in Division No.28 (3rd call) 22

Providing CC Drains from M.Eswaramma (H) to P.Koeswaramma (H) and


192 / 145 /
33 2021-22 Providing CC Drain and Flooring with chequrred terrazzo tiles for Steps at 20.00 AE-3 2021-
22
Kondamitta Rajapanagala 11th Cross Road in Division No.29 (3rd call)

Providing CC Drain from Puram Somaiah (H) to Muvva Venkateswarlu (H) at


JC Banglaw Back Side NSP Colony, Mogili Anadharao Plot to Nagendra Swami
Temple at Seetharampuram, Boddu Vijaya Lakshmi (H) to Sonu Supply Shop
193 / 146 /
34 2021-22 at Gaddalagunta and Laying of 100 mm dia AC Pipe Line from Vadde Naleeni 20.00 AE-3 2021-
22
Jayanthi (H) to Karavadhi Seshaiah (H) at Seetharampuram, Burial Ground to
Kondaiah (H) and from Pasumarthi Ankaiah (H) to Punuri Lakshmi Narayana
(H) in Division No.30 (3rd call)

Providing CC Road & CC Drain from Chillara Chandrasekhar (H) Line in


Gaddalagunta, Providing CC Road from I.Rangaiah (H) to existing CC Road
(backside of Ramalayam Temple), Providing CC Road from D.No.152 to 362
194 / 147 /
35 2021-22 (beside Public Toilets) in Gaddala Gunta, Laying of 110 mm dia PVC Pipe Line 20.00 AE-5 2021-
22
from Gillalu Church to Rajeswari Ammavari Temple and Laying of 160 mm dia
PVC Pipe Line from D.No.152 to 13 beside Public Toilets in Division No.32
(3rd call)

Providing CC Drain & RCC Culvert from Hanuman Temple to SR Residency &
D.NO.119 to Rama Sai Residency, Laying of 110 mm dia PVC Pipe Line west
195 / 148 /
36 2021-22 side of Influence Showroom street, Providing CC Drains east side of Sri 20.00 AE-5 2021-
22
Achalananda Trust and from D.No.36-72-197 to existing MM Road (via
Harithavanam) in Division No.35 (3rd call)
Providing CC Drain in Nirmal Nagar 2nd Cross Road, Raising of CC Road from
196 / Chitithoti (H) (south side) to existing Byepass Road and Providing CC Drain 149 /
37 2021-22 20.00 AE-5 2021-
from Subbareddy Towers to SBI ATM (Anjaiah Road), Brundavanam 22
Residency to kiran (H) in Division No.36 (3rd call)

Providing CC Road & CC Drain from Sai Krishna Nagar 3rd Cross Road opp
197 / Gayathri School Road, Providing CC Road & CC Drain from Rajeswari (H) to 150 /
38 2021-22 existing Samatha Nagar Main Road and Providing CC Drain at Sri Lakshmi 20.00 AE-5 2021-
22
Narasimhapuram Street in Division No.38 (3rd call)

Providing CC Road from V.Venkateswara Reddy (H) to Chittemreddy Seshi


198 / 151 /
39 2021-22 Reddy (H) in Nachareddy Palem and CC Road & CC Drain in ELSR East Side 20.00 AE-7 2021-
22
Road in Division No.40 (3rd call)
199 / Providing CC Drain from Ambedkar Statue to chintagunta Burial Ground and 152 /
40 2021-22 CC Road infront of Ramalinga Reddy (H) in Division No.41 (3rd call) 20.00 AE-7 2021-
22

Providing CC Drains from Rayapudi Kondaiah (H) to Main Road south to north
200 /
at Santhi Nagar Pernamitta and from Kaila Masaiah (H) culvert to Nukathoti 153 /
41 2021-22 Koteswarao (H) at Santhi Nagar Pernamita and CC Road from Suram 20.00 AE-7 2021-
22
Sudhakar Reddy (H) to Suram Chandu (H) in Kurnool Road in Pernamitta in
Division No.42 (3rd call)

201 / Supply, Delivery and Fixing of Burning Platform in Lawyerpet Hindu Burial 155 /
42 2021-22 Ground in Division No.34 (3rd call) 4.20 AE-5 2021-
22

TOTAL 707.20
Download Start Time : 27.08.2021 6.00 P.M
Download End Time : 08.09.2021 5.00 P.M
Receipt of Bids End Time : 08.09.2021 5.15 P.M
Price Bid Opening Time : 08.09.2021 5.30 P.M

203 / Providing Vitrified Tiles Flooring and Electrification for Ground Floor to Jeeva
1 2021-22 7.00 AE-3
Niyantrana Prayogasala (BCL) Compound in Ongole Municipal Corporation

204 / Providing Extension of Meeting Hall with GI Roofing back side Jeeva
2 2021-22 5.30 AE-3
Niyanathara Prayogasala (BCL) Compound in Ongole Municipal Corporation

205 / Providing Painting to Jeeva Niyantrana Prayogasala (BCL) Compound in


3 2021-22 5.00 AE-3
Ongole Municipal Corporation

206 /
Providing Damp Proof Course, Stair Case to Terrace with Railing, Dadooing of
4 2021-22 walls, Gate repair and GI Roofing for Stair Case and Cycle Stand in Jeeva 4.25 AE-3
Niyantrana Prayogasal (BCL) Compound in Ongole Municipal Corporation

207 / Repairs and Rectification of Leakages from Division No.9 to 25 and 29 to 31


5 2021-22 2.99 AE-3
in Ongole Municipal Corporation
208 / Laying of Granular Sub Base for Open Area at Whole Sale Vegetable Market
6 2021-22 1.99 AE-3
in New Vegetable Market in Division No.24
209 /
7 2021-22 Laying of B.T Patches to Cheruvukommupalem Main Road in Division No.18 3.99 AE-3

210 / Laying of 150 mm dia P.V.C Pipe Line at Samatha Nagar 10th Line in Division
8 2021-22 No.37 1.45 AE-7
211 / Construction of Balance C.C Drains in Venkateswara Colony Main road in
9 2021-22 7.00 AE-7
Division No.50
212 / Supply and Delivery of Pyrosene Oil - BIS Mark and Mud Oil for Sanitation in 161 /
10 2021-22 Ongole Municipal Corporation (2nd call) 1.63 AE-5 2021-
22

213 / Filling of Quarry Rubbish and Providing Cover Slabs in Muslim Burial Ground 165 /
11 2021-22 1.97 AE-5 2021-
at Kothaptnam Flyover in Division No.8 (2nd call) 22

214 / Laying of 100 mm dia A.C Pipe Line from Apex School to Sardhar house in 166 /
12 2021-22 5.17 AE-5 2021-
Division No.4 (2nd call) 22

Laying of 110 mm dia P.V.C Pipe Line west to east from Gopal Nagar 3rd and
215 / 168 /
13 2021-22 2nd Cross Roads and from south to north in Thangella Khasim Veedhi Opp. 1.52 AE-5 2021-
22
Masid Road in Division No.6 (2nd call)
TOTAL 49.26
Download Start Time : 11.09.2021 6.00 P.M
Download End Time : 21.09.2021 5.00 P.M
Receipt of Bids End Time : 21.09.2021 5.15 P.M
Price Bid Opening Time : 21.09.2021 5.30 P.M
Providing White Washing to Old Fish Matket Shops and levelling with Quarry
216 /
1 2021-22 Rubbish infront of Shops for Auction purpose in Ongole Municipal 1.88 AE-3
Corporation
217 / Renovation of Existing Stage and Filling of Well near Water Pond at SC Colony
2 2021-22 1.99 AE-3
in Vengamukkalapalem in Division No.18
TOTAL 3.87
Download Start Time : 29.09.2021 5.00 P.M
Download End Time : 04.10.2021 5.00 P.M
Receipt of Bids End Time : 04.10.2021 5.15 P.M
Price Bid Opening Time : 04.10.2021 5.30 P.M
Providing C.C Drain from Swamireddy (H) to Kodhanda Rama Swamy Temple
218 / & Bed Corrcetion for Existing Drain from Pallpolu krishna reddy (H) to
2021-22 Ramalayam Temple and Providing Entrance gate to Pond at Guthikondavari 5.00
1 AE-3

palem in Division No.9


219 / Repairs and Replacement of Accessories in LED Video Screen in Gandhi Park
2
2021-22 in Division No.36 1.10 AE-1

220 / Providing Quarry Rubbish Road from Mangamoor Main Road to existing CC
3
2021-22 road in Military Colony in Division No.33 1.22

221 / Construction of Compound wall and Filling of Quarry Rubbish at Mangamur


4
2021-22 Donka Urban Health Center in Division No.33 10.00

222 / Providing Walking Track at Collector Camp Office in Ongole Municipal


5
2021-22 Corporation 1.99

Providing Quarry Rubbish Road West to East from B.Yohana House to


223 / B.Venkata Narayana House,North to South from B.Venkata Narayana House
2021-22 to SK.Kalesha House and West to East from Anjaneya Swamy Temple to 2.08
6
Bypass Road at Netaji Nagar in Division No.50

224 / Drilling of Deep Borewells and Fixing of IM-I Pump Sets and Flushing of 53/21-
7
2021-22 Borewells at various places in Ongole Municipal Corporation (4th call) 10.00 22
225 / Formation of Quarry Rubbish Road at Udhaya Colony 1,2,&3 Cross roads in
8
2021-22 Division No.3 3.27

226 / Providing C.C Road from Annapureddy Hanumanth (H) to Bandela Geetha at
9
2021-22 Kesavarajukunta 4th line 1st cross road in Division No.2 1.65

227 / Laying of B.T & C.C Patches in various places of A.E - 3 Section in Ongole
10
2021-22 Municipal Corporation. 6.00

228 / Providing CC Drain back side of Happy Home Apartment in Bagyanagar


11
2021-22 Donka in Division No.20 2.55

229 / Supply and Delivery of 3/4 " dia & 1 1/2 " dia Size G.I Brackets and fixing of
12
2021-22 LED Street Light sets at various places in Ongole Municipal Corporation 10.00

230 / Construction of CC Drain beside Sai Residency at Bhagya nagar 3rd line 3rd
13
2021-22 cross road in Division No. 20 0.60

231 / Construction of Balance CC Drains in Venkateswara colony Main road in 210 /


14
2021-22 Division No.50 (2nd Call) 7.00 AE-3 2021-
22

232 / Laying of 150 mm dia P.V.C Pipe Line At Samatha Nagar 10th line in Division 211 /
15
2021-22 No.37 (2nd Call) 1.45 AE-3 2021-
22

233 / Supply and Delivery of Pyrosene Oil - BIS Mark and Mud Oil for Sanitation in 212 /
16
2021-22 Ongole Municipal Corporation (3rd call) 1.63 AE-5 2021-
22

234 / Filling of Quarry Rubbish and Providing Cover Slabs in Muslim Burial Ground 213 /
17
2021-22 at Kothaptnam Flyover in Division No.8 (3rd call) 1.97 AE-5 2021-
22

235 / Laying of 100 mm dia A.C Pipe Line from Apex School to Sardhar house in 214 /
18
2021-22 Division No.4 (3rd call) 5.17 AE-5 2021-
22

Laying of 110 mm dia P.V.C Pipe Line west to east from Gopal Nagar 3rd and
236 / 215 /
2021-22 2nd Cross Roads and from south to north in Thangella Khasim Veedhi Opp. 1.52
19 AE-5 2021-
22
Masid Road in Division No.6 (3rd call)
TOTAL 74.20
Download Start Time : 19.10.2021 5.00 P.M
Download End Time : 03.11.2021 5.00 P.M
Receipt of Bids End Time : 03.11.2021 5.15 P.M
Price Bid Opening Time : 03.11.2021 5.30 P.M
Laying of 110 mm dia P.V.C Pipe Line and C.C Patch Restoration beside IPC
237 /
1 2021-22 Church Road, Kabadi Palem from J.Swarupa (H) to S.Rohini Devi (H) in 2.50 AE-3
Division No.13
TOTAL 2.50
Download Start Time : 30.10.2021 6.00 P.M
Download End Time : 06.11.2021 5.00 P.M
Receipt of Bids End Time : 06.11.2021 5.15 P.M
Price Bid Opening Time : 06.11.2021 5.30 P.M
238 / Transportation and Supply of Water in various places in 1 to 50 Divisions in
1 2021-22 10.00 AE-5
Ongole Municipal Corporation
TOTAL 10.00
Download Start Time : 04.11.2021 5.00 P.M
Download End Time : 11.11.2021 5.00 P.M
Receipt of Bids End Time : 11.11.2021 5.15 P.M
Price Bid Opening Time : 11.11.2021 5.30 P.M
239 / Providing Quarry Rubbish Road from existing Main Road to Baptist Church in
1
2021-22 Y.S.R Colony in Division No.10 3.87 AE-3

240 / Transportation and Supply of Water for Tree Plantation at various places in
2
2021-22 Ongole Municipal Corporation 5.00 AE-5

241 / Providing C.C Drain south to north from Bandaru venkata Subbaiah house to
3
2021-22 Elec.Pole No:11/811/202 in Sonia Gandhi Nagar 2nd Line in Division No.37 3.35 AE-5

242 / Repairs to 15HP Motor and 10HP Motor at Mukthinuthalapadu Cheruvu in


4
2021-22 Division No.2 0.73 AE-5

243 / Providing CC Road and Steps from Dasari Premila (H) to P.Murali (H) in
5
2021-22 Sitharamapuram in Division No.30 5.30 AE-3

Construction of Toilet, Providing Painting, Flooring to Vantavari Colony


244 / Secretariat, Providing Impervious Coat to Kesavaraju Peta Secretariat,
2021-22 Repairs to Compound Wall to Sarada Balakuteer Secretariat and Painting to 9.75
6 AE-3

Santhapeta Secretariat in Ongole Municipal Corporation


245 / Engaging of 110 Hydraulic Chain Mounted Machine for lifting of garbage at
7
2021-22 Dumping Yard in Ongole Municipal Corporation 10.00 AE-3

Supply and delivery of Chlorine Gas Cyinder of 900 kg for Maintenance of


246 /
2021-22 Water Treatment Plants in Water Supply Section in Ongole Municipal 9.90
8 AE-3
Corporation
Construction of GYM Platform and Supply, delivery, installation and
247 /
2021-22 Commissioning of Outdoor Fitness Equipment at R.R Tank Bund in Division 10.00
9 AE-5
No.36
248 / Rennovation of Panchayath Office for Sachivalayam at Cheruvukommupalem
10
2021-22 in Division No.18 2.52 AE-3

249 / Providing C.C Road south to north from D.No.142 to Bilal Nagar 1st Line Cross
11
2021-22 Road in Bilal Nagar in Division No.2 1.60 AE-5

Providing Non-Figurative Painting with Exterior Emulsion Paint with


250 / Professional Artists (not less than BFA qualification) to both side Dividers
2021-22 from Taluka Police Station to R.K Fast Foods Center, M.M Road Junction in 7.82
12 AE-3

Ongole Municipal Corporation

Providing C.C Drain from Swamireddy (H) to Kodhanda Rama Swamy Temple
251 / & Bed Corrcetion for Existing Drain from Pallpolu krishna reddy (H) to 218 /
2021-22 Ramalayam Temple and Providing Entrance gate to Pond at Guthikondavari 5.00
13 2021
-22
palem in Division No.9 (2nd call)
252 / Construction of CC Drain beside Sai Residency at Bhagya nagar 3rd line 3rd 230 /
14
2021-22 cross road in Division No. 20 (2nd call) 0.60 2021-
22

253 / Construction of Balance CC Drains in Venkateswara colony Main road in 231 /


15
2021-22 Division No.50 (3rd Call) 7.00 2021-
22

254 / Laying of 150 mm dia P.V.C Pipe Line At Samatha Nagar 10th line in Division 232 /
16
2021-22 No.37 (3rd Call) 1.45 2021-
22

TOTAL 83.89
Download Start Time : 10.11.2021 5.00 P.M
Download End Time : 24.11.2021 5.00 P.M
Receipt of Bids End Time : 24.11.2021 5.15 P.M
Price Bid Opening Time : 24.11.2021 5.30 P.M
255 / Transportation and Supply of Water at various places in 1 to 50 Divisions in
1 2021-22 10.00 AE-5
Ongole Municipal Corporation

Formation of Kutcha Drains, Laying of R.C.C Pipes for Road Crossings and
256 /
2021-22 Formation of Quarry Rubbish Roads to Journalist Colony, Rajeev Gruha Kalpa, 9.85
2 AE-3
Pulivenkatareddy Colony and Indira Colony in Division No.9

257 / Laying of B.T and C.C Patches at various locations in A.E-2 section in Ongole
3 2021-22 5.90 AE-3
Municipal Corporation
258 / Laying of B.T Patches at various places in A.E-5 Section in Ongole Municipal
4
2021-22 Corporation 10.00 AE-5

259 / Laying of B.T Patches west to east from Dr.Ambedkar Statue to NTR Statue in
5 2021-22 Throvagunta in Division No.1 10.00 AE-5

260 / Formation of Quarry Rubbish Road south to north from Mukthinuthalapadu


6
2021-22 Tunnel to Anjaneya Swamy temple in Division No.2 1.00 AE-5

261 / Providing Quarry Rubbish Patch work from Samatha Nagar to Mangamoor
7 2021-22 3.00 AE-7
Road in Ongole Municipal Corporation
TOTAL 49.75
Download Start Time : 29.11.2021 5.00 P.M
Download End Time : 08.12.2021 5.00 P.M
Receipt of Bids End Time : 08.12.2021 5.15 P.M
Price Bid Opening Time : 08.12.2021 5.30 P.M
262 / Construction of Compound Wall for Open Site in Samaikyatha Nagar in
1
2021-22 Division No.24 10.00 AE-3

263 / Providing C.C Road and C.C Drain for IDSMT Layout Model Town 5th Cross
2
2021-22 Road in Mamidipalem in Division No.31 10.00 AE-3

Repairs & Rectification of 75HP, 40HP Motors and Pumpsets at SS-2 WTP,
264 / 60HP Motors & Pumpsets at RR Tank Pump House, 30HP Motor at Police
2021-22 Quarters Pump House, 40HP Motor and Pumpset at NFB WTP and Pelluru 4.91
3 AE-3

Bore Motor in Water Supply Section in Ongole Municipal Corporation

265 / Filling with Quarry Rubbish and Supply of 450 mm dia R.C.C Pipe at
4
2021-22 Gangamma Temple Road in Cheruvukommupalem in Division No.18 0.99 AE-3

266 /
2021-22 Repairs to Community Hall Building in Bilal Nagar in Division No.3 7.10
5 AE-5

267 / Providing Quarry Rubbish Road west to east from D.No.22-31-1326 to


6
2021-22 D.No.22-31-1340 at Kakatiya Nagar 1st Line in Division No.8 0.85 AE-5

268 / Providing Quarry Rubbish Road from Ganapathi Nagar to Sriram Colony via
7
2021-22 Sramika Nagar Road in Division No.43 9.88 AE-7

269 / Formation of Quarry Rubbish Roads at various places in Nachareddy palem in


8
2021-22 Division No.40 1.83 AE-7

270 / Providing C.C Road and C.C Drain at Rajeev Gruha Kalpa 6th Line in Division
9
2021-22 No.9 40.00 AE-3

271 / Transportation and Supply of Water at various places in 1 to 50 Divisions in


10
2021-22 Ongole Municipal Corporation 40.00 AE-5
272 / Transportation and Supply of Water for Tree Plantation at various places in 240 /
11
2021-22 Ongole Municipal Corporation (2nd call) 5.00 AE-5 2021-
22

Providing C.C Drain south to north from Bandaru venkata Subbaiah house to
273 / 241 /
2021-22 Elec.Pole No:11/811/202 in Sonia Gandhi Nagar 2nd Line in Division No.37 3.35
12 AE-5 2021-
22
(2nd call)
274 / Repairs to 15HP Motor and 10HP Motor at Mukthinuthalapadu Cheruvu in 242 /
13
2021-22 Division No.2 (2nd call) 0.73 AE-5 2021-
22

275 / Providing CC Road and Steps from Dasari Premila (H) to P.Murali (H) in 243 /
14
2021-22 Sitharamapuram in Division No.30 (2nd call) 5.30 AE-3 2021-
22

Construction of GYM Platform and Supply, delivery, installation and


276 / 247 /
2021-22 Commissioning of Outdoor Fitness Equipment at R.R Tank Bund in Division 10.00
15 AE-5 2021-
22
No.36 (2nd call)
277 / Providing C.C Road south to north from D.No.142 to Bilal Nagar 1st Line Cross 249 /
16
2021-22 Road in Bilal Nagar in Division No.2 (2nd call) 1.60 AE-5 2021-
22

Providing C.C Drain from Swamireddy (H) to Kodhanda Rama Swamy Temple
278 / & Bed Corrcetion for Existing Drain from Pallpolu krishna reddy (H) to 218 / 251 /
2021-22 Ramalayam Temple and Providing Entrance gate to Pond at Guthikondavari 5.00
17 2021 2021-
-22 22
palem in Division No.9 (3rd call)
TOTAL 156.54
Download Start Time : 01.12.2021 5.00 P.M
Download End Time : 15.12.2021 5.00 P.M
Receipt of Bids End Time : 15.12.2021 5.15 P.M
Price Bid Opening Time : 15.12.2021 5.30 P.M
279 / Providing C.C Drain from Abhi Sarees & Dress Materials to NGO Home in CRP
1 2021-22 Quarters in Division No.21 10.00 AE-3

280 / Providing C.C Road from Virat Nagar 1st Cross Road Junction (Kande
2 2021-22 4.99 AE-7
Ramanaiah Yadav house) to 3rd Cross Road Junction in Division No.43
Engaging of JCB Machine on hire basis for Debris Removal and
281 /
3 2021-22 Transportation of Garbage at various places in 1 to 50 Divisions in Ongole 4.20 AE-5
Municipal Corporation
282 / Supply of Car on hire basis to Mayor from January, 2022 to December, 2022
4 2021-22 6.40 AE-5
in Ongole Municipal Corporation
283 / Providing Quarry Rubbish Road from Pachikayalapati Madhava (H) to Sekhar
5 2021-22 0.96 AE-3
(H) via Vadiyala Meramma (H) in Vaddepalem in Division No.31
284 / Providing C.C Road at Brahmin Old Age Home 1st Line 1st Cross Road in
6 2021-22 Division No.34 0.99 AE-5

285 /
7 2021-22 Provideing C.C Drain in Rajeev Nagar Extension in Division No.34 0.53 AE-5

286 / Supply and Delivery of 3/4" dioa and 1 1/2" dia G.I Brackets and Fixing of
8 2021-22 10.00 AE-3
LED Street Light Sets at various places in Ongole Municipal Corporation

287 / Providing Quarry Rubbish Patch work from Samatha Nagar to Mangamoor 261 /
9 2021-22 3.00 AE-7 2021-
Road in Ongole Municipal Corporation (recall) 22

288 / Construction of Compound Wall for Open Site in Samaikyatha Nagar in 262 /
10 2021-22 10.00 AE-3 2021-
Division No.24 (2nd call) 22
289 / Providing C.C Road and C.C Drain at Rajeev Gruha Kalpa 6th Line in Division 270 /
11 2021-22 40.00 AE-3 2021-
No.9 (2nd call) 22

290 / Transportation and Supply of Water for Tree Plantation at various places in 272 /
12 2021-22 5.00 AE-5 2021-
Ongole Municipal Corporation (3rd call) 22

Providing C.C Drain south to north from Bandaru venkata Subbaiah house to
291 / 273 /
13 2021-22 Elec.Pole No:11/811/202 in Sonia Gandhi Nagar 2nd Line in Division No.37 3.35 AE-5 2021-
22
(3rd call)
292 / Repairs to 15HP Motor and 10HP Motor at Mukthinuthalapadu Cheruvu in 274 /
14 2021-22 Division No.2 (3rd call) 0.73 AE-5 2021-
22

Construction of GYM Platform and Supply, delivery, installation and


293 / 276 /
15 2021-22 Commissioning of Outdoor Fitness Equipment at R.R Tank Bund in Division 10.00 AE-5 2021-
22
No.36 (3rd call)
294 / Providing C.C Road south to north from D.No.142 to Bilal Nagar 1st Line Cross 277 /
16 2021-22 Road in Bilal Nagar in Division No.2 (3rd call) 1.60 AE-5 2021-
22

TOTAL 111.75
Download Start Time : 21.12.2021 5.00 P.M
Download End Time : 04.01.2022 5.00 P.M
Receipt of Bids End Time : 04.01.2022 5.15 P.M
Price Bid Opening Time : 04.01.2022 5.30 P.M
Laying of D.I K7 Pipelines along Kothapatnam Road at Koppolu in Division
295 / No.9 and H.D.P.E Drinking Water Pipelines in SC Colony and other Residential
1 2021-22 131.84 AE-3
Areas in Ongole Municipal Corporation under 15th Finance Commission
Grant

296 / Construction of Storm Water Drain from Pothuraju Canal to Bapuji Complex
2 2021-22 100.00 AE-5
in Ongole Municipal Corporation under 15th Finance Commission Grant

Laying of 150 mm dia H.D.P.E / D.I K7 Drinking Water Pipelines in


297 /
3 2021-22 Kothamamidi Palem and Suraksha Layout in Ongole Municipal Corporation 70.00 AE-3
under 15th Finance Commission Grant

298 /
Construction of C.C Storm Water Drain from Mangamuru Road Junction to SS
4 2021-22 Tank beside Old Bye-Pass Road in Ongole Municipal Corporation under 15th 60.00 AE-5
Finance Commission Grant
Construction of C.C Disposal Drain from Ram Nagar 16th Line back side to
299 /
5 2021-22 Nalla Kaluva side in Ongole Municipal Corporation under 15th Finance 60.00 AE-3
Commission Grant
300 / Providing Trunk Main from Ram Nagar ELSR to N. Agraharam in Ongole
6 2021-22 135.81
Municipal Corporation under 14th Finance Commission Grant
301 / Providing Avenue Plantation along with Tree Guards to Ongole Municipal
7 2021-22 Corporation under 15th Finance Commission Grant 47.00

Laying of 160 mm dia H.D.P.E and 200 mm dia D.I K7 Drinking Water
302 /
8 2021-22 Distribution Pipelines in Cheruvukommupalem in Division No.18 in Ongole 40.00 AE-3
Municipal Corporation under 15th Finance Commission Grant
Construction of Storm Water Drain from Gaddalagunta Community Toilets to
303 /
9 2021-22 Summer Storage Tank Disposal Drain in Ongole Municipal Corporation under 25.00 AE-5
15th Finance Commission Grant
304 / Construction of C.C Disposal Drain in Pothurajupalem, Arava Colony in
10 2021-22 23.84 AE-3
Ongole Municipal Corporation under 15th Finance Commission Grant
Provding CC Road from Mandal Parishad School to Chirala Main Road,
305 / Providing CC Drains from Ramisetty Lakshmi Srinivasarao (H) to Killa
11 2021-22 Koteswara Rao (H) and from Gandhi Bomma to Ele Pole No.1/35/6/5 in 20.00 AE-5
Division No.1

Providing CC Drains from Mubarak Biriyani Point to GopiKrishna Hall end


306 / (north side), from Guntur Road to Islampet Masjid Road, from Srinivasa Hall
12 2021-22 20.00 AE-5
Road to Islampet Masjid Road (north side), from Sk.Rafi (H) to Srinivasa (H)
and Providing CC Patches from Rehman (H) to Frakruddin (H) in Division No.4

Providing CC Drain, Reconstruction of CC Drain at Thangella Khasim Veedi in


Rajakala Street, Providing CC Road & CC Drain at Kammapalem 3rd Line
307 /
extension in 40 Feet Road to Karavadi Donka 7th Line, Providing CC Drain
13 2021-22 from Karavadi Donka 'Y' Junction to Kalikamatha Temple, Providing CC Road 20.00 AE-5
& CC Drain from back side of Hindu Burial Ground Old Age Home west side in
Karavadi Donka and Providing CC Drain from 1st Cross Road to 2nd Cross
Road in Kammapalem 3rd Line east side of CC Road in Division No.7

Providing CC Road, CC Drain & Patch Work from Katari Sankar (H) to Dasari
Suneetha (H) and from Aluri Lakshmi (H) to Polineni Aruna (H), Providing CC
308 / Roads from Dasari Suneetha (H) to Lingisetty Purnachandra rao (H) & from
14 2021-22 20.00 AE-5
Kaja Mahamuddin (H) to Edara Srinivasa Rao (H) and Providing CC Drain from
Chenchu Lakshmi (H) to Bonthavari veedhi 1st & 2nd Lines and in Division
No.8

Providing CC Drains from Ambetkar Statue to Menda Vijaya Raju (H) at Old
SC Colony 1st Line, Kasukurthi Lakshmaiah (H) to Burri Venkateswarlu (H) at
309 /
15 2021-22 Old SC Colony 2nd Line, Kasukurthi Venkateswarlu (H) to Kasukurthi Shekar 20.00 AE-3
(H) at Old SC Colony 3rd Line and Providing CC Road from BVR School to
Yalagala Sanjivarao (H) in Koppolu in Division No.10

Providing CC Road & CC Culvert from Sharon Provisions Shop to Guduru


Prabhakar Rao (H) at Cloughpet 3rd Line 1st Cross Road, Providing Precast
310 / Slabs from Yerrajarla Koteswara Rao (H) to Edventist Church (H) beside
16 2021-22 20.00 AE-3
Kothapatnam Bus Stand Fly Over, Providing CC Culvert at RailPet 2nd Line
Main Road and Widening of CC Road from D.No.19-28-261 to Thanikonda
Nageswara Rao (H) Railpet 2nd line last beside Fly Over in Division No.11
Raising of CC Road & CC Drain from Challa Srirama (H) to Chavala Kumari (H),
Chavala Kumari (H) to Bapatla Gopi (H) and Kotari Narendra (H) to Kale
Venkateswarlu (H) at Maratipalem, Raising of CC Road & CC Drain from
311 / Kamineni Sivakumar (H) Vemula Prasad (H) and Prasanthi Nilayam (H) to
17 2021-22 20.00 AE-3
Valisetty Umamaheswararao (H) at Chikulavari veedhi, Repairs to Openwells
at Chivukulavari Street, Ramalayam Temple & Pakeer Palem and Providing
CC Drain from Karamcheti Krishna (H) to Rehaman Store & Karamcheti
Krishna (H) to Opp Kuppam Prasad (H) in Ranguthota in Division No.12

Providing CC Road & CC Drain from Anganawadi Center to M.Varalakshmi


(H), Providing CC Roads from Tasty Bread Omlet Shop to Ravipriya (H) at
312 /
18 2021-22 Govinda Raju Road, P.RajaSekhar (H) of Kotha Bazar, from P.Santhi (H) to 20.00 AE-3
Rajesh (H) and Opp ABM Degree College to K.Sagar (H) via Pentsoch Chruch
in Kabadi Palem in Division No.13

Construction of Compound Wall near Power Station Burial Ground at


Cheruvukommupalem, Providing CC Road & CC Drain from Thippareddy
313 / Perireddy (H) to Peddireddy Suryanarayana Reddy (H), Providing Quarry
19 2021-22 20.00 AE-3
Rubbish Road from Dhammala Nagaiah (H) to Pasumarthi Narasimha (H) and
Laying of 100 mm dia AC Pipe Line from Thirumala Reddy (H) to R&B Road in
Vengamukkapalem in Division No.18

Providing CC Drain 1st Cross Road entrance to Ch.Naga Prasanna (H) in


Bhagya Nagar 4th Line, on south side from Ch.Chandra Mouli (H) to Bank
314 /
20 2021-22 Colony 3rd Line entrance in Housing Board Colony, Mandava Adilakshmi (H) 20.00 AE-3
to R.Tyagaraju (H) at Kendriya Vidyalaya Housing Board Colony and D.No.97
to Ramakrishna Reddy (H) in Housing Board Colony in Division No.19

Providing CC Drain from Bathula Jalamm (H) to Bhagya Nagar Park at Bhagya
Nagar 2nd Line Main Road, R.Kameswaramma (H) to Chandra Sekar Reddy
315 /
21 2021-22 (H) at Bhagya Nagar Donka, GS Purna Chandra Rao (H) & ELSR to Saymala (H) 20.00 AE-3
at Bhagya Nagar 3rd line ELSR and SRK Degree College to Rambabu CSC
Center at Bhagya Nagar 1st Line 2nd Cross Road in Division No.20

Construction of Arama Kshetram at Ankamma Palem (opp 1 Town Police


Station), Providing CC Drain & Culverts on west side from Venkateswara
316 /
22 2021-22 Swamy Temple to Anand Babu (H) at Mangalapalem, Srimannarayana (H) to 20.00 AE-3
Madhavi Latha (H) at TVP Street and Providing CC Patch work at various
places in Division No.22

Laying of 110 mm & 160 mm dia PVC Pipe Line from Ongole Dairy Milk
Parlour to Venkateswara (H) at Ganuga Palem, Basha Glass Work to Notice
317 /
23 2021-22 Shop, Moulali (H) to Sathyam Handlooms & Srinivasa Footwear to Srinu (H) at 20.00 AE-3
Kotavari Veedhi, Providing CC Road & CC Drain beside Kotavari Veedhi School
east side in Division No.23

Providing CC Drains & CC Roads from Vanttavani Colony 4th & 7th Lines,
318 /
24 2021-22 Ekalavya Nagar Burial Ground opp Roads, Vaddepalem, MangalaPalem 20.00 AE-3
beside YSRCP Party Office, TB Road and Samaikyatha Nagar in Division No.24
Laying of Damaged CC Road from U.Venkateswarlu (H) to D.No.12-20-643,
319 /
25 2021-22 Providing CC Drain and Providing RCC Culverts at various places in Division 20.00 AE-5
No.26
320 /
26 2021-22 Providing CC Road, CC Drain and CC Retaining Wall in Division No.27 20.00 AE-5

321 / Providing CC Drain and RCC Culvert at Kothapeta Streets and Jammichettu
27 2021-22 20.00 AE-5
Streets in Division No.28
Providing CC Drains from M.Eswaramma (H) to P.Koeswaramma (H) and
322 /
28 2021-22 Providing CC Drain and Flooring with chequrred terrazzo tiles for Steps at 20.00 AE-3
Kondamitta Rajapanagala 11th Cross Road in Division No.29

Providing CC Drain from Puram Somaiah (H) to Muvva Venkateswarlu (H) at


JC Banglaw Back Side NSP Colony, Mogili Anadharao Plot to Nagendra Swami
Temple at Seetharampuram, Boddu Vijaya Lakshmi (H) to Sonu Supply Shop
323 /
29 2021-22 at Gaddalagunta and Laying of 100 mm dia AC Pipe Line from Vadde Naleeni 20.00 AE-3
Jayanthi (H) to Karavadhi Seshaiah (H) at Seetharampuram, Burial Ground to
Kondaiah (H) and from Pasumarthi Ankaiah (H) to Punuri Lakshmi Narayana
(H) in Division No.30

Providing CC Road & CC Drain from Chillara Chandrasekhar (H) Line in


Gaddalagunta, Providing CC Road from I.Rangaiah (H) to existing CC Road
324 / (backside of Ramalayam Temple), Providing CC Road from D.No.152 to 362
30 2021-22 (beside Public Toilets) in Gaddala Gunta, Laying of 110 mm dia PVC Pipe Line 20.00 AE-5

from Gillalu Church to Rajeswari Ammavari Temple and Laying of 160 mm dia
PVC Pipe Line from D.No.152 to 13 beside Public Toilets in Division No.32

Providing CC Drain & RCC Culvert from Hanuman Temple to SR Residency &
D.NO.119 to Rama Sai Residency, Laying of 110 mm dia PVC Pipe Line west
325 /
31 2021-22 side of Influence Showroom street, Providing CC Drains east side of Sri 20.00 AE-5
Achalananda Trust and from D.No.36-72-197 to existing MM Road (via
Harithavanam) in Division No.35

Providing CC Drain in Nirmal Nagar 2nd Cross Road, Raising of CC Road from
326 / Chitithoti (H) (south side) to existing Byepass Road and Providing CC Drain
32 2021-22 from Subbareddy Towers to SBI ATM (Anjaiah Road), Brundavanam 20.00 AE-5
Residency to kiran (H) in Division No.36

Providing CC Road & CC Drain from Sai Krishna Nagar 3rd Cross Road opp
327 / Gayathri School Road, Providing CC Road & CC Drain from Rajeswari (H) to
33 2021-22 existing Samatha Nagar Main Road and Providing CC Drain at Sri Lakshmi 20.00 AE-5
Narasimhapuram Street in Division No.38

Providing CC Road from V.Venkateswara Reddy (H) to Chittemreddy Seshi


328 /
34 2021-22 Reddy (H) in Nachareddy Palem and CC Road & CC Drain in ELSR East Side 20.00 AE-7
Road in Division No.40
329 / Providing CC Drain from Ambedkar Statue to chintagunta Burial Ground and
35 2021-22 20.00 AE-7
CC Road infront of Ramalinga Reddy (H) in Division No.41
Providing CC Drains from Rayapudi Kondaiah (H) to Main Road south to north
330 /
at Santhi Nagar Pernamitta and from Kaila Masaiah (H) culvert to Nukathoti
36 2021-22 Koteswarao (H) at Santhi Nagar Pernamita and CC Road from Suram 20.00 AE-7
Sudhakar Reddy (H) to Suram Chandu (H) in Kurnool Road in Pernamitta in
Division No.42

331 / Providing CC Roads and CC Drains in 2nd and 4th Cross Roads in Srinagar
37 2021-22 20.00 AE-7
Colony in Division No.45
332 / Providing CC Drains from Sai Janadrhan Office to Flyover in Pandaripuram in
38 2021-22 20.00 AE-7
Division No.46
Providing CC Drains from Bhavani Prasad (H) to Gundu Suvarthamma (H),
333 /
39 2021-22 Pothuraju Canal to Phani (H) and G.Kotataiah (H) to Sirigiri Sambhaiah (H) in 20.00 AE-7
NGO Colony 7th Line in Division No.47
334 / Providing CC Drains both sides in Ayyannavari Veedhi and Cross Roads and
40 2021-22 20.00 AE-7
Amrutha Hosptial Road in Division No.48
335 / Providing CC Road and CC Drain in Krishna Mandir backside and CC Road in
41 2021-22 Balakrishna Puram in Division No.49 20.00 AE-7

TOTAL 1313.49
Download Start Time : 27.12.2021 5.00 P.M
Download End Time : 10.01.2022 5.00 P.M
Receipt of Bids End Time : 10.01.2022 5.15 P.M
Technical Bid Opening Time : 10.01.2022 5.30 P.M
Price Bid Opening Time : 10.01.2022 5.45 P.M
337 / Providing Balance C.C Road from Gorantla Multiplex to Gopala Krishna
1 2021-22 30.00 AE-5
Function Hall in Gopal Nagar Main Road in Division No.5
338 / Engaging of 110 Hydraulic Chain Mounted Machine for lifting of garbage at
2 2021-22 37.70 AE-5
Dumping Yard in Ongole Municipal Corporation
339 /
3 2021-22 Construction of Sachivalayam Building in Throvagunta in Division No.1 40.00 AE-5

340 / Providing C.C Approach and Valve pit at Rajeev Nagar Main Road in Division
4 2021-22 0.79 AE-5
No.34
341 / Construction of Damaged Compound Wall at north side of Hindu Burial
5 2021-22 Ground in Karavadi Donka in Division No.7 3.50 AE-5

342 / Providing R.C.C Culvert and CC Patches at Adapa.Anka Babu House at Rajeev
6 2021-22 1.00 AE-5
Nagar in Division No.34
343 / Providing C.C Approach Roads and Repairs to Pot holes at various places in
7 2021-22 4.00 AE-7
S.B.I Colony and Srinagar Colony in Division No.45
Providing Quarry Rubbish Road west to east from Srinivasa Hall Main Road to
344 /
8 2021-22 Elec. Pole No.SS/1125/A3 in Gaddikayyalu (Hindu Burial Ground ELSR) in 3.00 AE-5
Division No.5
345 / Formation of Quarry Rubbish at various places in Kamma Palem in Division
9 2021-22 No.7 2.00 AE-5

346 / Supply and Delivery of spare aparts and Repairing of Town Planning Tractor
10 2021-22 2.65 AE-5
Engine (AP27X 0254) & Trolley in Ongole Municipal Corporation
347 / Construction of Compound Wall for Open Site in Samaikyatha Nagar in 288 /
11 2021-22 10.00 AE-3 2021-
Division No.24 (3rd call) 22
348 / Providing C.C Road and C.C Drain at Rajeev Gruha Kalpa 6th Line in Division 289 /
12 2021-22 40.00 AE-3 2021-
No.9 (3rd call) 22

TOTAL 174.64
Download Start Time : 04.01.2022 5.00 P.M
Download End Time : 18.01.2022 5.00 P.M
Receipt of Bids End Time : 18.01.2022 5.15 P.M
Price Bid Opening Time : 18.01.2022 5.30 P.M
Laying of D.I K7 Pipelines along Kothapatnam Road at Koppolu in Division
349 / No.9 and H.D.P.E Drinking Water Pipelines in SC Colony and other Residential 295 /
1 2021-22 Areas in Ongole Municipal Corporation under 15th Finance Commission 131.84 AE-3 2021-
22
Grant (2nd call)

Construction of Storm Water Drain from Pothuraju Canal to Bapuji Complex


350 / 296 /
2 2021-22 in Ongole Municipal Corporation under 15th Finance Commission Grant (2nd 100.00 AE-5 2021-
22
call)
Laying of 150 mm dia H.D.P.E / D.I K7 Drinking Water Pipelines in
351 / 297 /
3 2021-22 Kothamamidi Palem and Suraksha Layout in Ongole Municipal Corporation 70.00 AE-3 2021-
22
under 15th Finance Commission Grant (2nd call)
Construction of C.C Storm Water Drain from Mangamuru Road Junction to SS
352 / 298 /
4 2021-22 Tank beside Old Bye-Pass Road in Ongole Municipal Corporation under 15th 60.00 AE-5 2021-
22
Finance Commission Grant (2nd call)
Construction of C.C Disposal Drain from Ram Nagar 16th Line back side to
353 / 299 /
5 2021-22 Nalla Kaluva side in Ongole Municipal Corporation under 15th Finance 60.00 AE-3 2021-
22
Commission Grant (2nd call)
354 / Providing Trunk Main from Ram Nagar ELSR to N. Agraharam in Ongole 300 /
6 2021-22 135.81 2021-
Municipal Corporation under 14th Finance Commission Grant (2nd call) 22

355 / Providing Avenue Plantation along with Tree Guards to Ongole Municipal 301 /
7 2021-22 Corporation under 15th Finance Commission Grant (2nd call) 47.00 2021-
22

Laying of 160 mm dia H.D.P.E and 200 mm dia D.I K7 Drinking Water
356 / 302 /
8 2021-22 Distribution Pipelines in Cheruvukommupalem in Division No.18 in Ongole 40.00 AE-3 2021-
22
Municipal Corporation under 15th Finance Commission Grant (2nd call)

357 /
Construction of Storm Water Drain from Gaddalagunta Community Toilets to 303 /
9 2021-22 Summer Storage Tank Disposal Drain in Ongole Municipal Corporation under 25.00 AE-5 2021-
22
15th Finance Commission Grant (2nd call)
Construction of C.C Disposal Drain in Pothurajupalem, Arava Colony in
358 / 304 /
10 2021-22 Ongole Municipal Corporation under 15th Finance Commission Grant (2nd 23.84 AE-3 2021-
22
call)

Provding CC Road from Mandal Parishad School to Chirala Main Road,


359 / Providing CC Drains from Ramisetty Lakshmi Srinivasarao (H) to Killa 305 /
11 2021-22 20.00 AE-5 2021-
Koteswara Rao (H) and from Gandhi Bomma to Ele Pole No.1/35/6/5 in 22
Division No.1 (2nd call)
Providing CC Drains from Mubarak Biriyani Point to GopiKrishna Hall end
360 /
(north side), from Guntur Road to Islampet Masjid Road, from Srinivasa Hall 306 /
12 2021-22 Road to Islampet Masjid Road (north side), from Sk.Rafi (H) to Srinivasa (H) 20.00 AE-5 2021-
22
and Providing CC Patches from Rehman (H) to Frakruddin (H) in Division No.4
(2nd call)

Providing CC Drain, Reconstruction of CC Drain at Thangella Khasim Veedi in


Rajakala Street, Providing CC Road & CC Drain at Kammapalem 3rd Line
extension in 40 Feet Road to Karavadi Donka 7th Line, Providing CC Drain
361 / 307 /
13 2021-22 from Karavadi Donka 'Y' Junction to Kalikamatha Temple, Providing CC Road 20.00 AE-5 2021-
22
& CC Drain from back side of Hindu Burial Ground Old Age Home west side in
Karavadi Donka and Providing CC Drain from 1st Cross Road to 2nd Cross
Road in Kammapalem 3rd Line east side of CC Road in Division No.7 (2nd call)

Providing CC Road, CC Drain & Patch Work from Katari Sankar (H) to Dasari
Suneetha (H) and from Aluri Lakshmi (H) to Polineni Aruna (H), Providing CC
362 / Roads from Dasari Suneetha (H) to Lingisetty Purnachandra rao (H) & from 308 /
14 2021-22 20.00 AE-5 2021-
Kaja Mahamuddin (H) to Edara Srinivasa Rao (H) and Providing CC Drain from 22
Chenchu Lakshmi (H) to Bonthavari veedhi 1st & 2nd Lines and in Division
No.8 (2nd call)

Providing CC Drains from Ambetkar Statue to Menda Vijaya Raju (H) at Old
SC Colony 1st Line, Kasukurthi Lakshmaiah (H) to Burri Venkateswarlu (H) at
363 / 309 /
15 2021-22 Old SC Colony 2nd Line, Kasukurthi Venkateswarlu (H) to Kasukurthi Shekar 20.00 AE-3 2021-
22
(H) at Old SC Colony 3rd Line and Providing CC Road from BVR School to
Yalagala Sanjivarao (H) in Koppolu in Division No.10 (2nd call)

Providing CC Road & CC Culvert from Sharon Provisions Shop to Guduru


Prabhakar Rao (H) at Cloughpet 3rd Line 1st Cross Road, Providing Precast
Slabs from Yerrajarla Koteswara Rao (H) to Edventist Church (H) beside
364 / 310 /
16 2021-22 Kothapatnam Bus Stand Fly Over, Providing CC Culvert at RailPet 2nd Line 20.00 AE-3 2021-
22
Main Road and Widening of CC Road from D.No.19-28-261 to Thanikonda
Nageswara Rao (H) Railpet 2nd line last beside Fly Over in Division No.11
(2nd call)

Raising of CC Road & CC Drain from Challa Srirama (H) to Chavala Kumari (H),
Chavala Kumari (H) to Bapatla Gopi (H) and Kotari Narendra (H) to Kale
Venkateswarlu (H) at Maratipalem, Raising of CC Road & CC Drain from
Kamineni Sivakumar (H) Vemula Prasad (H) and Prasanthi Nilayam (H) to
365 / 311 /
17 2021-22 Valisetty Umamaheswararao (H) at Chikulavari veedhi, Repairs to Openwells 20.00 AE-3 2021-
22
at Chivukulavari Street, Ramalayam Temple & Pakeer Palem and Providing
CC Drain from Karamcheti Krishna (H) to Rehaman Store & Karamcheti
Krishna (H) to Opp Kuppam Prasad (H) in Ranguthota in Division No.12 (2nd
call)
Providing CC Road & CC Drain from Anganawadi Center to M.Varalakshmi
(H), Providing CC Roads from Tasty Bread Omlet Shop to Ravipriya (H) at
366 / 312 /
18 2021-22 Govinda Raju Road, P.RajaSekhar (H) of Kotha Bazar, from P.Santhi (H) to 20.00 AE-3 2021-
22
Rajesh (H) and Opp ABM Degree College to K.Sagar (H) via Pentsoch Chruch
in Kabadi Palem in Division No.13 (2nd call)

Construction of Compound Wall near Power Station Burial Ground at


Cheruvukommupalem, Providing CC Road & CC Drain from Thippareddy
367 / Perireddy (H) to Peddireddy Suryanarayana Reddy (H), Providing Quarry 313 /
19 2021-22 20.00 AE-3 2021-
Rubbish Road from Dhammala Nagaiah (H) to Pasumarthi Narasimha (H) and 22
Laying of 100 mm dia AC Pipe Line from Thirumala Reddy (H) to R&B Road in
Vengamukkapalem in Division No.18 (2nd call)

Providing CC Drain 1st Cross Road entrance to Ch.Naga Prasanna (H) in


Bhagya Nagar 4th Line, on south side from Ch.Chandra Mouli (H) to Bank
368 / Colony 3rd Line entrance in Housing Board Colony, Mandava Adilakshmi (H) 314 /
20 2021-22 to R.Tyagaraju (H) at Kendriya Vidyalaya Housing Board Colony and D.No.97 20.00 AE-3 2021-
22
to Ramakrishna Reddy (H) in Housing Board Colony in Division No.19 (2nd
call)

Providing CC Drain from Bathula Jalamm (H) to Bhagya Nagar Park at Bhagya
Nagar 2nd Line Main Road, R.Kameswaramma (H) to Chandra Sekar Reddy
369 / 315 /
21 2021-22 (H) at Bhagya Nagar Donka, GS Purna Chandra Rao (H) & ELSR to Saymala (H) 20.00 AE-3 2021-
22
at Bhagya Nagar 3rd line ELSR and SRK Degree College to Rambabu CSC
Center at Bhagya Nagar 1st Line 2nd Cross Road in Division No.20 (2nd call)

Construction of Arama Kshetram at Ankamma Palem (opp 1 Town Police


Station), Providing CC Drain & Culverts on west side from Venkateswara
370 / 316 /
22 2021-22 Swamy Temple to Anand Babu (H) at Mangalapalem, Srimannarayana (H) to 20.00 AE-3 2021-
22
Madhavi Latha (H) at TVP Street and Providing CC Patch work at various
places in Division No.22 (2nd call)

Laying of 110 mm & 160 mm dia PVC Pipe Line from Ongole Dairy Milk
Parlour to Venkateswara (H) at Ganuga Palem, Basha Glass Work to Notice
371 / 317 /
23 2021-22 Shop, Moulali (H) to Sathyam Handlooms & Srinivasa Footwear to Srinu (H) at 20.00 AE-3 2021-
22
Kotavari Veedhi, Providing CC Road & CC Drain beside Kotavari Veedhi School
east side in Division No.23 (2nd call)

Providing CC Drains & CC Roads from Vanttavani Colony 4th & 7th Lines,
372 / Ekalavya Nagar Burial Ground opp Roads, Vaddepalem, MangalaPalem 318 /
24 2021-22 20.00 AE-3 2021-
beside YSRCP Party Office, TB Road and Samaikyatha Nagar in Division No.24 22
(2nd call)

Laying of Damaged CC Road from U.Venkateswarlu (H) to D.No.12-20-643,


373 / 319 /
25 2021-22 Providing CC Drain and Providing RCC Culverts at various places in Division 20.00 AE-5 2021-
22
No.26 (2nd call)
374 / Providing CC Road, CC Drain and CC Retaining Wall in Division No.27 (2nd 320 /
26 2021-22 call) 20.00 AE-5 2021-
22

375 / Providing CC Drain and RCC Culvert at Kothapeta Streets and Jammichettu 321 /
27 2021-22 20.00 AE-5 2021-
Streets in Division No.28 (2nd call) 22
Providing CC Drains from M.Eswaramma (H) to P.Koeswaramma (H) and
376 / 322 /
28 2021-22 Providing CC Drain and Flooring with chequrred terrazzo tiles for Steps at 20.00 AE-3 2021-
22
Kondamitta Rajapanagala 11th Cross Road in Division No.29 (2nd call)

Providing CC Drain from Puram Somaiah (H) to Muvva Venkateswarlu (H) at


JC Banglaw Back Side NSP Colony, Mogili Anadharao Plot to Nagendra Swami
Temple at Seetharampuram, Boddu Vijaya Lakshmi (H) to Sonu Supply Shop
377 / 323 /
29 2021-22 at Gaddalagunta and Laying of 100 mm dia AC Pipe Line from Vadde Naleeni 20.00 AE-3 2021-
22
Jayanthi (H) to Karavadhi Seshaiah (H) at Seetharampuram, Burial Ground to
Kondaiah (H) and from Pasumarthi Ankaiah (H) to Punuri Lakshmi Narayana
(H) in Division No.30 (2nd call)

Providing CC Road & CC Drain from Chillara Chandrasekhar (H) Line in


Gaddalagunta, Providing CC Road from I.Rangaiah (H) to existing CC Road
(backside of Ramalayam Temple), Providing CC Road from D.No.152 to 362
378 / 324 /
30 2021-22 (beside Public Toilets) in Gaddala Gunta, Laying of 110 mm dia PVC Pipe Line 20.00 AE-5 2021-
22
from Gillalu Church to Rajeswari Ammavari Temple and Laying of 160 mm dia
PVC Pipe Line from D.No.152 to 13 beside Public Toilets in Division No.32
(2nd call)

Providing CC Drain & RCC Culvert from Hanuman Temple to SR Residency &
D.NO.119 to Rama Sai Residency, Laying of 110 mm dia PVC Pipe Line west
379 / 325 /
31 2021-22 side of Influence Showroom street, Providing CC Drains east side of Sri 20.00 AE-5 2021-
22
Achalananda Trust and from D.No.36-72-197 to existing MM Road (via
Harithavanam) in Division No.35 (2nd call)

Providing CC Drain in Nirmal Nagar 2nd Cross Road, Raising of CC Road from
380 / Chitithoti (H) (south side) to existing Byepass Road and Providing CC Drain 326 /
32 2021-22 from Subbareddy Towers to SBI ATM (Anjaiah Road), Brundavanam 20.00 AE-5 2021-
22
Residency to kiran (H) in Division No.36 (2nd call)

Providing CC Road & CC Drain from Sai Krishna Nagar 3rd Cross Road opp
381 / Gayathri School Road, Providing CC Road & CC Drain from Rajeswari (H) to 327 /
33 2021-22 existing Samatha Nagar Main Road and Providing CC Drain at Sri Lakshmi 20.00 AE-5 2021-
22
Narasimhapuram Street in Division No.38 (2nd call)

Providing CC Road from V.Venkateswara Reddy (H) to Chittemreddy Seshi


382 / 328 /
34 2021-22 Reddy (H) in Nachareddy Palem and CC Road & CC Drain in ELSR East Side 20.00 AE-7 2021-
22
Road in Division No.40 (2nd call)
383 / Providing CC Drain from Ambedkar Statue to chintagunta Burial Ground and 329 /
35 2021-22 20.00 AE-7 2021-
CC Road infront of Ramalinga Reddy (H) in Division No.41 (2nd call) 22

Providing CC Drains from Rayapudi Kondaiah (H) to Main Road south to north
at Santhi Nagar Pernamitta and from Kaila Masaiah (H) culvert to Nukathoti
384 / 330 /
36 2021-22 Koteswarao (H) at Santhi Nagar Pernamita and CC Road from Suram 20.00 AE-7 2021-
22
Sudhakar Reddy (H) to Suram Chandu (H) in Kurnool Road in Pernamitta in
Division No.42 (2nd call)

385 / Providing CC Drains from Sai Janadrhan Office to Flyover in Pandaripuram in 332 /
37 2021-22 Division No.46 (2nd call) 20.00 AE-7 2021-
22

Providing CC Drains from Bhavani Prasad (H) to Gundu Suvarthamma (H),


386 / 333 /
38 2021-22 Pothuraju Canal to Phani (H) and G.Kotataiah (H) to Sirigiri Sambhaiah (H) in 20.00 AE-7 2021-
22
NGO Colony 7th Line in Division No.47 (2nd call)
387 / Providing CC Drains both sides in Ayyannavari Veedhi and Cross Roads and 334 /
39 2021-22 20.00 AE-7 2021-
Amrutha Hosptial Road in Division No.48 (2nd call) 22

388 / Providing CC Road and CC Drain in Krishna Mandir backside and CC Road in 335 /
40 2021-22 20.00 AE-7 2021-
Balakrishna Puram in Division No.49 (2nd call) 22

TOTAL 1293.49
Download Start Time : 11.01.2022 5.00 P.M
Download End Time : 27.01.2022 5.00 P.M
Receipt of Bids End Time : 27.01.2022 5.15 P.M
Technical Bid Opening Time : 27.01.2022 5.30 P.M
Price Bid Opening Time : 27.01.2022 5.45 P.M
Construction of Chimney Foundation and Sump at RTC Bus Stand at Hindu
389 /
1 2021-22 Burial Ground in Ongole Municipal Corporation under 14th Finance 5.76097 AE-3
Commission Grant
Providing Sanitary, Plumbing Work and M.S Grills to the Cremetorium
390 /
2 2021-22 Building at RTC Bus Stand Hindu Burial Ground in Ongole Municipal 6.38332 AE-3
Corporation under 14th Finance Commission Grant
Providing Electrical Items and Rolling Shutter to the Cremetorium Building at
391 /
3 2021-22 RTC Bus Stand Hindu Burial Ground in Ongole Municipal Corporation under 9.11903 AE-3
14th Finance Commission Grant
TOTAL 21.26332
Download Start Time : 11.01.2022 5.00 P.M
Download End Time : 18.01.2022 5.00 P.M
Receipt of Bids End Time : 18.01.2022 5.15 P.M
Price Bid Opening Time : 18.01.2022 5.30 P.M
Laying of 110 mm and 160 mm dia P.V.C Pipe Line from K.G.N Cool Drinks
392 /
1 2021-22 Shop to Bachu Veeranjaneyulu (H) in Indira Colony 3rd Cross Road in Division 2.80 AE-3
No.21
393 / Providing Quarry Rubbish Road at Srikrishna Nagar Internal Roads in Division
2 2021-22 No.39 10.00 AE-5

394 / Development of Landscape and Hardscape Work at Central Median in New


3 2021-22 2.35 AE-5
fish Market in Divison No.24
395 / Repairs and Replacement of Water Fountain Accessories in Chennakesava
4 2021-22 Park in Division No.37 1.00 AE-5

396 /
5 2021-22 Providing Footpath at infront of Gandhi Park in Division No.36 3.27 AE-5

397 / Providing C.C Patches at various places in Division Nos.32 & 34 in Ongole
6 2021-22 0.70 AE-5
Municipal Corporation
398 / Providing Quarry Rubbish Road south to north from Kurnool Road Main Road
7 2021-22 4.10 AE-5
to Garbage Transfer Station-I in Ongole Municipal Corporation
399 / Providing C.C Drain from PRP office to SS Fresh Chicken Shop in Division
8 2021-22 No.45 10.00 AE-7

400 /
9 2021-22 Providing C.C Patch (Rennovation) Work at Srinivasa Colony in Division No.43 2.80 AE-7
Providing C.C Drain from Balarami reddy house to Sulthanamma house and
401 /
10 2021-22 opp. Manovikasa Kendram in Maruthi Nagar 2nd Line and 3rd Line in Division 4.00 AE-7
No.44
402 / Providing Quarry Rubbish Road at around Gandhi (Nehru) Nagar Park in
11 2021-22 2.57 AE-7
Division No.50
403 / Providing Quarry Rubbish Road in Venkateswara Nagar and Jayaprakash
12 2021-22 6.65 AE-7
Colony in Division No.50
404 / Providing Balance C.C Road from Gorantla Multiplex to Gopala Krishna 337 /
13 2021-22 30.00 AE-5 2021-
Function Hall in Gopal Nagar Main Road in Division No.5 (2nd call) 22

405 / Construction of Sachivalayam Building in Throvagunta in Division No.1 (2nd 339 /


14 2021-22 40.00 AE-5 2021-
call) 22

406 / Supply and Delivery of spare aparts and Repairing of Town Planning Tractor 346 /
15 2021-22 Engine (AP27X 0254) & Trolley in Ongole Municipal Corporation (2nd call) 2.65 AE-5 2021-
22

TOTAL 122.89
Download Start Time : 20.01.2022 5.00 P.M
Download End Time : 03.02.2022 5.00 P.M
Receipt of Bids End Time : 03.02.2022 5.15 P.M
Price Bid Opening Time : 03.02.2022 5.30 P.M
Engaging of Tractor Mounted Sprayers for Spraying of Sodium Hypo Chlorite
407 / in Sanitary Division No.1 to 5 and hire basis on 18 KVA Generator for BHEL
1 2021-22 5.72 AE-5
Mister Sprayer in Covid-19 precautionary measures in Ongole Municipal
Corporation

408 / Supply and Delivery of Sodium Hypo Chlorite for Spraying at various places
2 2021-22 5.05 AE-5
under precautionary measure for Covid-19 in Ongole Municipal Corporation

Laying of D.I K7 Pipelines along Kothapatnam Road at Koppolu in Division


409 / No.9 and H.D.P.E Drinking Water Pipelines in SC Colony and other Residential 349 /
3 2021-22 131.84 AE-3 2021-
Areas in Ongole Municipal Corporation under 15th Finance Commission 22
Grant (3rd call)

Construction of Storm Water Drain from Pothuraju Canal to Bapuji Complex


410 / 350 /
4 2021-22 in Ongole Municipal Corporation under 15th Finance Commission Grant (3rd 100.00 AE-5 2021-
22
call)
Laying of 150 mm dia H.D.P.E / D.I K7 Drinking Water Pipelines in
411 / 351 /
5 2021-22 Kothamamidi Palem and Suraksha Layout in Ongole Municipal Corporation 70.00 AE-3 2021-
22
under 15th Finance Commission Grant (3rd call)
Construction of C.C Storm Water Drain from Mangamuru Road Junction to SS
412 / 352 /
6 2021-22 Tank beside Old Bye-Pass Road in Ongole Municipal Corporation under 15th 60.00 AE-5 2021-
22
Finance Commission Grant (3rd call)
Construction of C.C Disposal Drain from Ram Nagar 16th Line back side to
413 / 353 /
7 2021-22 Nalla Kaluva side in Ongole Municipal Corporation under 15th Finance 60.00 AE-3 2021-
22
Commission Grant (3rd call)
414 / Providing Trunk Main from Ram Nagar ELSR to N. Agraharam in Ongole 354 /
8 2021-22 135.81 2021-
Municipal Corporation under 14th Finance Commission (3rd call) 22
415 / Providing Avenue Plantation along with Tree Guards to Ongole Municipal 355 /
9 2021-22 47.00 2021-
Corporation under 15th Finance Commission Grant (3rd call) 22

Laying of 160 mm dia H.D.P.E and 200 mm dia D.I K7 Drinking Water
416 / 356 /
10 2021-22 Distribution Pipelines in Cheruvukommupalem in Division No.18 in Ongole 40.00 AE-3 2021-
22
Municipal Corporation under 15th Finance Commission Grant (3rd call)

Construction of Storm Water Drain from Gaddalagunta Community Toilets to


417 / 357 /
11 2021-22 Summer Storage Tank Disposal Drain in Ongole Municipal Corporation under 25.00 AE-5 2021-
22
15th Finance Commission Grant (3rd call)
Construction of C.C Disposal Drain in Pothurajupalem, Arava Colony in
418 / 358 /
12 2021-22 Ongole Municipal Corporation under 15th Finance Commission Grant (3rd 23.84 AE-3 2021-
22
call)

Provding CC Road from Mandal Parishad School to Chirala Main Road,


419 / Providing CC Drains from Ramisetty Lakshmi Srinivasarao (H) to Killa 359 /
13 2021-22 20.00 AE-5 2021-
Koteswara Rao (H) and from Gandhi Bomma to Ele Pole No.1/35/6/5 in 22
Division No.1 (3rd call)

Providing CC Drains from Mubarak Biriyani Point to GopiKrishna Hall end


(north side), from Guntur Road to Islampet Masjid Road, from Srinivasa Hall
420 / 360 /
14 2021-22 Road to Islampet Masjid Road (north side), from Sk.Rafi (H) to Srinivasa (H) 20.00 AE-5 2021-
22
and Providing CC Patches from Rehman (H) to Frakruddin (H) in Division No.4
(3rd call)

Providing CC Drain, Reconstruction of CC Drain at Thangella Khasim Veedi in


Rajakala Street, Providing CC Road & CC Drain at Kammapalem 3rd Line
extension in 40 Feet Road to Karavadi Donka 7th Line, Providing CC Drain
421 / 361 /
15 2021-22 from Karavadi Donka 'Y' Junction to Kalikamatha Temple, Providing CC Road 20.00 AE-5 2021-
22
& CC Drain from back side of Hindu Burial Ground Old Age Home west side in
Karavadi Donka and Providing CC Drain from 1st Cross Road to 2nd Cross
Road in Kammapalem 3rd Line east side of CC Road in Division No.7 (3rd call)

Providing CC Road, CC Drain & Patch Work from Katari Sankar (H) to Dasari
Suneetha (H) and from Aluri Lakshmi (H) to Polineni Aruna (H), Providing CC
422 / Roads from Dasari Suneetha (H) to Lingisetty Purnachandra rao (H) & from 362 /
16 2021-22 Kaja Mahamuddin (H) to Edara Srinivasa Rao (H) and Providing CC Drain from 20.00 AE-5 2021-
22
Chenchu Lakshmi (H) to Bonthavari veedhi 1st & 2nd Lines and in Division
No.8 (3rd call)

Providing CC Drains from Ambetkar Statue to Menda Vijaya Raju (H) at Old
SC Colony 1st Line, Kasukurthi Lakshmaiah (H) to Burri Venkateswarlu (H) at
423 / 363 /
17 2021-22 Old SC Colony 2nd Line, Kasukurthi Venkateswarlu (H) to Kasukurthi Shekar 20.00 AE-3 2021-
22
(H) at Old SC Colony 3rd Line and Providing CC Road from BVR School to
Yalagala Sanjivarao (H) in Koppolu in Division No.10 (3rd call)
Providing CC Road & CC Culvert from Sharon Provisions Shop to Guduru
Prabhakar Rao (H) at Cloughpet 3rd Line 1st Cross Road, Providing Precast
Slabs from Yerrajarla Koteswara Rao (H) to Edventist Church (H) beside
424 / 364 /
18 2021-22 Kothapatnam Bus Stand Fly Over, Providing CC Culvert at RailPet 2nd Line 20.00 AE-3 2021-
22
Main Road and Widening of CC Road from D.No.19-28-261 to Thanikonda
Nageswara Rao (H) Railpet 2nd line last beside Fly Over in Division No.11 (3rd
call)

Raising of CC Road & CC Drain from Challa Srirama (H) to Chavala Kumari (H),
Chavala Kumari (H) to Bapatla Gopi (H) and Kotari Narendra (H) to Kale
Venkateswarlu (H) at Maratipalem, Raising of CC Road & CC Drain from
Kamineni Sivakumar (H) Vemula Prasad (H) and Prasanthi Nilayam (H) to
425 / 365 /
19 2021-22 Valisetty Umamaheswararao (H) at Chikulavari veedhi, Repairs to Openwells 20.00 AE-3 2021-
22
at Chivukulavari Street, Ramalayam Temple & Pakeer Palem and Providing
CC Drain from Karamcheti Krishna (H) to Rehaman Store & Karamcheti
Krishna (H) to Opp Kuppam Prasad (H) in Ranguthota in Division No.12 (3rd
call)

Providing CC Road & CC Drain from Anganawadi Center to M.Varalakshmi


(H), Providing CC Roads from Tasty Bread Omlet Shop to Ravipriya (H) at
426 / 366 /
20 2021-22 Govinda Raju Road, P.RajaSekhar (H) of Kotha Bazar, from P.Santhi (H) to 20.00 AE-3 2021-
22
Rajesh (H) and Opp ABM Degree College to K.Sagar (H) via Pentsoch Chruch
in Kabadi Palem in Division No.13 (3rd call)

Providing CC Drain 1st Cross Road entrance to Ch.Naga Prasanna (H) in


Bhagya Nagar 4th Line, on south side from Ch.Chandra Mouli (H) to Bank
427 / Colony 3rd Line entrance in Housing Board Colony, Mandava Adilakshmi (H) 368 /
21 2021-22 20.00 AE-3 2021-
to R.Tyagaraju (H) at Kendriya Vidyalaya Housing Board Colony and D.No.97 22
to Ramakrishna Reddy (H) in Housing Board Colony in Division No.19 (3rd
call)

Providing CC Drain from Bathula Jalamm (H) to Bhagya Nagar Park at Bhagya
Nagar 2nd Line Main Road, R.Kameswaramma (H) to Chandra Sekar Reddy
428 / 369 /
22 2021-22 (H) at Bhagya Nagar Donka, GS Purna Chandra Rao (H) & ELSR to Saymala (H) 20.00 AE-3 2021-
22
at Bhagya Nagar 3rd line ELSR and SRK Degree College to Rambabu CSC
Center at Bhagya Nagar 1st Line 2nd Cross Road in Division No.20 (3rd call)

Construction of Arama Kshetram at Ankamma Palem (opp 1 Town Police


Station), Providing CC Drain & Culverts on west side from Venkateswara
429 / 370 /
23 2021-22 Swamy Temple to Anand Babu (H) at Mangalapalem, Srimannarayana (H) to 20.00 AE-3 2021-
22
Madhavi Latha (H) at TVP Street and Providing CC Patch work at various
places in Division No.22 (3rd call)
Laying of 110 mm & 160 mm dia PVC Pipe Line from Ongole Dairy Milk
Parlour to Venkateswara (H) at Ganuga Palem, Basha Glass Work to Notice
430 / 371 /
24 2021-22 Shop, Moulali (H) to Sathyam Handlooms & Srinivasa Footwear to Srinu (H) at 20.00 AE-3 2021-
22
Kotavari Veedhi, Providing CC Road & CC Drain beside Kotavari Veedhi School
east side in Division No.23 (3rd call)
Providing CC Drains & CC Roads from Vanttavani Colony 4th & 7th Lines,
431 / Ekalavya Nagar Burial Ground opp Roads, Vaddepalem, MangalaPalem 372 /
25 2021-22 20.00 AE-3 2021-
beside YSRCP Party Office, TB Road and Samaikyatha Nagar in Division No.24 22
(3rd call)
Laying of Damaged CC Road from U.Venkateswarlu (H) to D.No.12-20-643,
432 / 373 /
26 2021-22 Providing CC Drain and Providing RCC Culverts at various places in Division 20.00 AE-5 2021-
22
No.26 (3rd call)
433 / 374 /
27 2021-22 Providing CC Road, CC Drain and CC Retaining Wall in Division No.27 (3rd call) 20.00 AE-5 2021-
22

434 / Providing CC Drain and RCC Culvert at Kothapeta Streets and Jammichettu 375 /
28 2021-22 20.00 AE-5 2021-
Streets in Division No.28 (3rd call) 22

Providing CC Drains from M.Eswaramma (H) to P.Koeswaramma (H) and


435 / 376 /
29 2021-22 Providing CC Drain and Flooring with chequrred terrazzo tiles for Steps at 20.00 AE-3 2021-
22
Kondamitta Rajapanagala 11th Cross Road in Division No.29 (3rd call)

Providing CC Drain from Puram Somaiah (H) to Muvva Venkateswarlu (H) at


JC Banglaw Back Side NSP Colony, Mogili Anadharao Plot to Nagendra Swami
Temple at Seetharampuram, Boddu Vijaya Lakshmi (H) to Sonu Supply Shop
436 / 377 /
30 2021-22 at Gaddalagunta and Laying of 100 mm dia AC Pipe Line from Vadde Naleeni 20.00 AE-3 2021-
22
Jayanthi (H) to Karavadhi Seshaiah (H) at Seetharampuram, Burial Ground to
Kondaiah (H) and from Pasumarthi Ankaiah (H) to Punuri Lakshmi Narayana
(H) in Division No.30 (3rd call)

Providing CC Road & CC Drain from Chillara Chandrasekhar (H) Line in


Gaddalagunta, Providing CC Road from I.Rangaiah (H) to existing CC Road
(backside of Ramalayam Temple), Providing CC Road from D.No.152 to 362
437 / 378 /
31 2021-22 (beside Public Toilets) in Gaddala Gunta, Laying of 110 mm dia PVC Pipe Line 20.00 AE-5 2021-
22
from Gillalu Church to Rajeswari Ammavari Temple and Laying of 160 mm dia
PVC Pipe Line from D.No.152 to 13 beside Public Toilets in Division No.32
(3rd call)

Providing CC Drain & RCC Culvert from Hanuman Temple to SR Residency &
438 /
D.NO.119 to Rama Sai Residency, Laying of 110 mm dia PVC Pipe Line west 379 /
32 2021-22 side of Influence Showroom street, Providing CC Drains east side of Sri 20.00 AE-5 2021-
22
Achalananda Trust and from D.No.36-72-197 to existing MM Road (via
Harithavanam) in Division No.35 (3rd call)

Providing CC Drain in Nirmal Nagar 2nd Cross Road, Raising of CC Road from
439 / Chitithoti (H) (south side) to existing Byepass Road and Providing CC Drain 380 /
33 2021-22 from Subbareddy Towers to SBI ATM (Anjaiah Road), Brundavanam 20.00 AE-5 2021-
22
Residency to kiran (H) in Division No.36 (3rd call)

440 / Providing CC Drain from Ambedkar Statue to chintagunta Burial Ground and 383 /
34 2021-22 20.00 AE-7 2021-
CC Road infront of Ramalinga Reddy (H) in Division No.41 (3rd call) 22

441 / Providing CC Drains from Sai Janadrhan Office to Flyover in Pandaripuram in 385 /
35 2021-22 20.00 AE-7 2021-
Division No.46 (3rd call) 22

Providing CC Drains from Bhavani Prasad (H) to Gundu Suvarthamma (H),


442 / 386 /
36 2021-22 Pothuraju Canal to Phani (H) and G.Kotataiah (H) to Sirigiri Sambhaiah (H) in 20.00 AE-7 2021-
22
NGO Colony 7th Line in Division No.47 (3rd call)

443 / Providing CC Drains both sides in Ayyannavari Veedhi and Cross Roads and 387 /
37 2021-22 Amrutha Hosptial Road in Division No.48 (3rd call) 20.00 AE-7 2021-
22

444 / Providing CC Road and CC Drain in Krishna Mandir backside and CC Road in 388 /
38 2021-22 20.00 AE-7 2021-
Balakrishna Puram in Division No.49 (3rd call) 22

TOTAL 1224.26
Download Start Time : 28.01.2022 5.00 P.M
Download End Time : 11.02.2022 5.00 P.M
Receipt of Bids End Time : 11.02.2022 5.15 P.M
Technical Bid Opening Time : 11.02.2022 5.30 P.M
Price Bid Opening Time : 11.02.2022 5.45 P.M
445 / Transporation and Suppsly of Water in various places in 1 to 50 Divisions in
1 2021-22 40.00 AE-5
Ongole Municipal Corporation
446 / Preventive Maintenance and Repairs of Sanitary and Engineering vehicles in
2 2021-22 Ongole Municipal Corporation 10.00 AE-5

Laying of D.I K7 Pipelines along Kothapatnam Road at Koppolu in Division


447 / No.9 and H.D.P.E Drinking Water Pipelines in SC Colony and other Residential 409 /
3 2021-22 Areas in Ongole Municipal Corporation under 15th Finance Commission 131.84 AE-3 2021-
22
Grant (4th call)

Construction of Storm Water Drain from Pothuraju Canal to Bapuji Complex


448 / 410 /
4 2021-22 in Ongole Municipal Corporation under 15th Finance Commission Grant (4th 100.00 AE-5 2021-
22
call)
Laying of 150 mm dia H.D.P.E / D.I K7 Drinking Water Pipelines in
449 / 411 /
5 2021-22 Kothamamidi Palem and Suraksha Layout in Ongole Municipal Corporation 70.00 AE-3 2021-
22
under 15th Finance Commission Grant (4th call)
Construction of C.C Storm Water Drain from Mangamuru Road Junction to SS
450 / 412 /
6 2021-22 Tank beside Old Bye-Pass Road in Ongole Municipal Corporation under 15th 60.00 AE-5 2021-
22
Finance Commission Grant (4th call)
Construction of C.C Disposal Drain from Ram Nagar 16th Line back side to
451 / 413 /
7 2021-22 Nalla Kaluva side in Ongole Municipal Corporation under 15th Finance 60.00 AE-3 2021-
22
Commission Grant (4th call)
452 / Providing Avenue Plantation along with Tree Guards to Ongole Municipal 415 /
8 2021-22 47.00 2021-
Corporation under 15th Finance Commission Grant (4th call) 22

Laying of 160 mm dia H.D.P.E and 200 mm dia D.I K7 Drinking Water
453 / 416 /
9 2021-22 Distribution Pipelines in Cheruvukommupalem in Division No.18 in Ongole 40.00 AE-3 2021-
22
Municipal Corporation under 15th Finance Commission Grant (4th call)

Construction of Storm Water Drain from Gaddalagunta Community Toilets to


454 / 417 /
10 2021-22 Summer Storage Tank Disposal Drain in Ongole Municipal Corporation under 25.00 AE-5 2021-
22
15th Finance Commission Grant (4th call)
Construction of C.C Disposal Drain in Pothurajupalem, Arava Colony in
455 / 418 /
11 2021-22 Ongole Municipal Corporation under 15th Finance Commission Grant (4th 23.84 AE-3 2021-
22
call)

Provding CC Road from Mandal Parishad School to Chirala Main Road,


456 / Providing CC Drains from Ramisetty Lakshmi Srinivasarao (H) to Killa 419 /
12 2021-22 Koteswara Rao (H) and from Gandhi Bomma to Ele Pole No.1/35/6/5 in 20.00 AE-5 2021-
22
Division No.1 (4th call)
Providing CC Drains from Mubarak Biriyani Point to GopiKrishna Hall end
(north side), from Guntur Road to Islampet Masjid Road, from Srinivasa Hall
457 / 420 /
13 2021-22 Road to Islampet Masjid Road (north side), from Sk.Rafi (H) to Srinivasa (H) 20.00 AE-5 2021-
22
and Providing CC Patches from Rehman (H) to Frakruddin (H) in Division No.4
(4th call)
Providing CC Drain, Reconstruction of CC Drain at Thangella Khasim Veedi in
Rajakala Street, Providing CC Road & CC Drain at Kammapalem 3rd Line
extension in 40 Feet Road to Karavadi Donka 7th Line, Providing CC Drain
458 / 421 /
14 2021-22 from Karavadi Donka 'Y' Junction to Kalikamatha Temple, Providing CC Road 20.00 AE-5 2021-
22
& CC Drain from back side of Hindu Burial Ground Old Age Home west side in
Karavadi Donka and Providing CC Drain from 1st Cross Road to 2nd Cross
Road in Kammapalem 3rd Line east side of CC Road in Division No.7 (4th call)

Providing CC Road, CC Drain & Patch Work from Katari Sankar (H) to Dasari
Suneetha (H) and from Aluri Lakshmi (H) to Polineni Aruna (H), Providing CC
459 / Roads from Dasari Suneetha (H) to Lingisetty Purnachandra rao (H) & from 422 /
15 2021-22 20.00 AE-5 2021-
Kaja Mahamuddin (H) to Edara Srinivasa Rao (H) and Providing CC Drain from 22
Chenchu Lakshmi (H) to Bonthavari veedhi 1st & 2nd Lines and in Division
No.8 (4th call)

Providing CC Drains from Ambetkar Statue to Menda Vijaya Raju (H) at Old
460 /
SC Colony 1st Line, Kasukurthi Lakshmaiah (H) to Burri Venkateswarlu (H) at 423 /
16 2021-22 Old SC Colony 2nd Line, Kasukurthi Venkateswarlu (H) to Kasukurthi Shekar 20.00 AE-3 2021-
22
(H) at Old SC Colony 3rd Line and Providing CC Road from BVR School to
Yalagala Sanjivarao (H) in Koppolu in Division No.10 (4th call)

Providing CC Road & CC Culvert from Sharon Provisions Shop to Guduru


Prabhakar Rao (H) at Cloughpet 3rd Line 1st Cross Road, Providing Precast
Slabs from Yerrajarla Koteswara Rao (H) to Edventist Church (H) beside
461 / 424 /
17 2021-22 Kothapatnam Bus Stand Fly Over, Providing CC Culvert at RailPet 2nd Line 20.00 AE-3 2021-
22
Main Road and Widening of CC Road from D.No.19-28-261 to Thanikonda
Nageswara Rao (H) Railpet 2nd line last beside Fly Over in Division No.11 (4th
call)

Raising of CC Road & CC Drain from Challa Srirama (H) to Chavala Kumari (H),
Chavala Kumari (H) to Bapatla Gopi (H) and Kotari Narendra (H) to Kale
Venkateswarlu (H) at Maratipalem, Raising of CC Road & CC Drain from
Kamineni Sivakumar (H) Vemula Prasad (H) and Prasanthi Nilayam (H) to
462 / 425 /
18 2021-22 Valisetty Umamaheswararao (H) at Chikulavari veedhi, Repairs to Openwells 20.00 AE-3 2021-
22
at Chivukulavari Street, Ramalayam Temple & Pakeer Palem and Providing
CC Drain from Karamcheti Krishna (H) to Rehaman Store & Karamcheti
Krishna (H) to Opp Kuppam Prasad (H) in Ranguthota in Division No.12 (4th
call)

Providing CC Road & CC Drain from Anganawadi Center to M.Varalakshmi


(H), Providing CC Roads from Tasty Bread Omlet Shop to Ravipriya (H) at
463 / 426 /
19 2021-22 Govinda Raju Road, P.RajaSekhar (H) of Kotha Bazar, from P.Santhi (H) to 20.00 AE-3 2021-
22
Rajesh (H) and Opp ABM Degree College to K.Sagar (H) via Pentsoch Chruch
in Kabadi Palem in Division No.13 (4th call)

Providing CC Drain 1st Cross Road entrance to Ch.Naga Prasanna (H) in


Bhagya Nagar 4th Line, on south side from Ch.Chandra Mouli (H) to Bank
464 / Colony 3rd Line entrance in Housing Board Colony, Mandava Adilakshmi (H) 427 /
20 2021-22 to R.Tyagaraju (H) at Kendriya Vidyalaya Housing Board Colony and D.No.97 20.00 AE-3 2021-
22
to Ramakrishna Reddy (H) in Housing Board Colony in Division No.19 (4th
call)
Laying of 110 mm & 160 mm dia PVC Pipe Line from Ongole Dairy Milk
465 /
Parlour to Venkateswara (H) at Ganuga Palem, Basha Glass Work to Notice 430 /
21 2021-22 Shop, Moulali (H) to Sathyam Handlooms & Srinivasa Footwear to Srinu (H) at 20.00 AE-3 2021-
22
Kotavari Veedhi, Providing CC Road & CC Drain beside Kotavari Veedhi School
east side in Division No.23 (4th call)

Providing CC Drains & CC Roads from Vanttavani Colony 4th & 7th Lines,
466 / Ekalavya Nagar Burial Ground opp Roads, Vaddepalem, MangalaPalem 431 /
22 2021-22 beside YSRCP Party Office, TB Road and Samaikyatha Nagar in Division No.24 20.00
AE-3 2021-
22
(4th call)

Laying of Damaged CC Road from U.Venkateswarlu (H) to D.No.12-20-643,


467 / 432 /
23 2021-22 Providing CC Drain and Providing RCC Culverts at various places in Division 20.00 AE-5 2021-
22
No.26 (4th call)
468 / 433 /
24 2021-22 Providing CC Road, CC Drain and CC Retaining Wall in Division No.27 (4th call) 20.00 AE-5 2021-
22

469 / Providing CC Drain and RCC Culvert at Kothapeta Streets and Jammichettu 434 /
25 2021-22 Streets in Division No.28 (4th call) 20.00 AE-5 2021-
22

Providing CC Drains from M.Eswaramma (H) to P.Koeswaramma (H) and


470 / 435 /
26 2021-22 Providing CC Drain and Flooring with chequrred terrazzo tiles for Steps at 20.00 AE-3 2021-
22
Kondamitta Rajapanagala 11th Cross Road in Division No.29 (4th call)

Providing CC Drain from Puram Somaiah (H) to Muvva Venkateswarlu (H) at


JC Banglaw Back Side NSP Colony, Mogili Anadharao Plot to Nagendra Swami
Temple at Seetharampuram, Boddu Vijaya Lakshmi (H) to Sonu Supply Shop
471 / 436 /
27 2021-22 at Gaddalagunta and Laying of 100 mm dia AC Pipe Line from Vadde Naleeni 20.00 AE-3 2021-
22
Jayanthi (H) to Karavadhi Seshaiah (H) at Seetharampuram, Burial Ground to
Kondaiah (H) and from Pasumarthi Ankaiah (H) to Punuri Lakshmi Narayana
(H) in Division No.30 (4th call)

Providing CC Road & CC Drain from Chillara Chandrasekhar (H) Line in


Gaddalagunta, Providing CC Road from I.Rangaiah (H) to existing CC Road
(backside of Ramalayam Temple), Providing CC Road from D.No.152 to 362
472 / 437 /
28 2021-22 (beside Public Toilets) in Gaddala Gunta, Laying of 110 mm dia PVC Pipe Line 20.00 AE-5 2021-
22
from Gillalu Church to Rajeswari Ammavari Temple and Laying of 160 mm dia
PVC Pipe Line from D.No.152 to 13 beside Public Toilets in Division No.32
(4th call)

Providing CC Drain & RCC Culvert from Hanuman Temple to SR Residency &
D.NO.119 to Rama Sai Residency, Laying of 110 mm dia PVC Pipe Line west
473 / 438 /
29 2021-22 side of Influence Showroom street, Providing CC Drains east side of Sri 20.00 AE-5 2021-
22
Achalananda Trust and from D.No.36-72-197 to existing MM Road (via
Harithavanam) in Division No.35 (4th call)

Providing CC Drain in Nirmal Nagar 2nd Cross Road, Raising of CC Road from
474 / Chitithoti (H) (south side) to existing Byepass Road and Providing CC Drain 439 /
30 2021-22 20.00 AE-5 2021-
from Subbareddy Towers to SBI ATM (Anjaiah Road), Brundavanam 22
Residency to kiran (H) in Division No.36 (4th call)
475 / Providing CC Drain from Ambedkar Statue to chintagunta Burial Ground and 440 /
31 2021-22 20.00 AE-7 2021-
CC Road infront of Ramalinga Reddy (H) in Division No.41 (4th call) 22

476 / Providing CC Drains from Sai Janadrhan Office to Flyover in Pandaripuram in 441 /
32 2021-22 Division No.46 (4th call) 20.00 AE-7 2021-
22
Providing CC Drains from Bhavani Prasad (H) to Gundu Suvarthamma (H),
477 / 442 /
33 2021-22 Pothuraju Canal to Phani (H) and G.Kotataiah (H) to Sirigiri Sambhaiah (H) in 20.00 AE-7 2021-
22
NGO Colony 7th Line in Division No.47 (4th call)

478 / Providing CC Drains both sides in Ayyannavari Veedhi and Cross Roads and 443 /
34 2021-22 20.00 AE-7 2021-
Amrutha Hosptial Road in Division No.48 (4th call) 22

479 / Providing CC Road and CC Drain in Krishna Mandir backside and CC Road in 444 /
35 2021-22 20.00 AE-7 2021-
Balakrishna Puram in Division No.49 (4th call) 22

TOTAL 1087.68
Download Start Time : 12.02.2022 5.00 P.M
Download End Time : 24.02.2022 5.00 P.M
Receipt of Bids End Time : 24.02.2022 5.15 P.M
Technical Bid Opening Time : 24.02.2022 5.30 P.M
Price Bid Opening Time : 24.02.2022 5.45 P.M
Laying of D.I K7 Pipelines along Kothapatnam Road at Koppolu in Division
480 / No.9 and H.D.P.E Drinking Water Pipelines in SC Colony and other Residential 447 /
1 2021-22 Areas in Ongole Municipal Corporation under 15th Finance Commission 131.84 AE-3 2021-
22
Grant (5th call)

Construction of Storm Water Drain from Pothuraju Canal to Bapuji Complex


481 / 448 /
2 2021-22 in Ongole Municipal Corporation under 15th Finance Commission Grant (5th 100.00 AE-5 2021-
22
call)
Laying of 150 mm dia H.D.P.E / D.I K7 Drinking Water Pipelines in
482 / 449 /
3 2021-22 Kothamamidi Palem and Suraksha Layout in Ongole Municipal Corporation 70.00 AE-3 2021-
22
under 15th Finance Commission Grant (5th call)
Construction of C.C Storm Water Drain from Mangamuru Road Junction to SS
483 / 450 /
4 2021-22 Tank beside Old Bye-Pass Road in Ongole Municipal Corporation under 15th 60.00 AE-5 2021-
22
Finance Commission Grant (5th call)
Construction of C.C Disposal Drain from Ram Nagar 16th Line back side to
484 / 451 /
5 2021-22 Nalla Kaluva side in Ongole Municipal Corporation under 15th Finance 60.00 AE-3 2021-
22
Commission Grant (5th call)
485 / Providing Avenue Plantation along with Tree Guards to Ongole Municipal 452 /
6 2021-22 Corporation under 15th Finance Commission Grant (5th call) 47.00 2021-
22

Construction of Storm Water Drain from Gaddalagunta Community Toilets to


486 / 454 /
7 2021-22 Summer Storage Tank Disposal Drain in Ongole Municipal Corporation under 25.00 AE-5 2021-
22
15th Finance Commission Grant (5th call)
Construction of C.C Disposal Drain in Pothurajupalem, Arava Colony in
487 / 455 /
8 2021-22 Ongole Municipal Corporation under 15th Finance Commission Grant (5th 23.84 AE-3 2021-
22
call)

Provding CC Road from Mandal Parishad School to Chirala Main Road,


488 / Providing CC Drains from Ramisetty Lakshmi Srinivasarao (H) to Killa 456 /
9 2021-22 20.00 AE-5 2021-
Koteswara Rao (H) and from Gandhi Bomma to Ele Pole No.1/35/6/5 in 22
Division No.1 (5th call)
Providing CC Drains from Mubarak Biriyani Point to GopiKrishna Hall end
489 /
(north side), from Guntur Road to Islampet Masjid Road, from Srinivasa Hall 457 /
10 2021-22 Road to Islampet Masjid Road (north side), from Sk.Rafi (H) to Srinivasa (H) 20.00 AE-5 2021-
22
and Providing CC Patches from Rehman (H) to Frakruddin (H) in Division No.4
(5th call)

Providing CC Drain, Reconstruction of CC Drain at Thangella Khasim Veedi in


Rajakala Street, Providing CC Road & CC Drain at Kammapalem 3rd Line
extension in 40 Feet Road to Karavadi Donka 7th Line, Providing CC Drain
490 / 458 /
11 2021-22 from Karavadi Donka 'Y' Junction to Kalikamatha Temple, Providing CC Road 20.00 AE-5 2021-
22
& CC Drain from back side of Hindu Burial Ground Old Age Home west side in
Karavadi Donka and Providing CC Drain from 1st Cross Road to 2nd Cross
Road in Kammapalem 3rd Line east side of CC Road in Division No.7 (5th call)

Providing CC Road, CC Drain & Patch Work from Katari Sankar (H) to Dasari
Suneetha (H) and from Aluri Lakshmi (H) to Polineni Aruna (H), Providing CC
491 / Roads from Dasari Suneetha (H) to Lingisetty Purnachandra rao (H) & from 459 /
12 2021-22 20.00 AE-5 2021-
Kaja Mahamuddin (H) to Edara Srinivasa Rao (H) and Providing CC Drain from 22
Chenchu Lakshmi (H) to Bonthavari veedhi 1st & 2nd Lines and in Division
No.8 (5th call)

Providing CC Drains from Ambetkar Statue to Menda Vijaya Raju (H) at Old
SC Colony 1st Line, Kasukurthi Lakshmaiah (H) to Burri Venkateswarlu (H) at
492 / 460 /
13 2021-22 Old SC Colony 2nd Line, Kasukurthi Venkateswarlu (H) to Kasukurthi Shekar 20.00 AE-3 2021-
22
(H) at Old SC Colony 3rd Line and Providing CC Road from BVR School to
Yalagala Sanjivarao (H) in Koppolu in Division No.10 (5th call)

Providing CC Road & CC Culvert from Sharon Provisions Shop to Guduru


Prabhakar Rao (H) at Cloughpet 3rd Line 1st Cross Road, Providing Precast
Slabs from Yerrajarla Koteswara Rao (H) to Edventist Church (H) beside
493 / 461 /
14 2021-22 Kothapatnam Bus Stand Fly Over, Providing CC Culvert at RailPet 2nd Line 20.00 AE-3 2021-
22
Main Road and Widening of CC Road from D.No.19-28-261 to Thanikonda
Nageswara Rao (H) Railpet 2nd line last beside Fly Over in Division No.11 (5th
call)

Raising of CC Road & CC Drain from Challa Srirama (H) to Chavala Kumari (H),
Chavala Kumari (H) to Bapatla Gopi (H) and Kotari Narendra (H) to Kale
Venkateswarlu (H) at Maratipalem, Raising of CC Road & CC Drain from
Kamineni Sivakumar (H) Vemula Prasad (H) and Prasanthi Nilayam (H) to
494 / 462 /
15 2021-22 Valisetty Umamaheswararao (H) at Chikulavari veedhi, Repairs to Openwells 20.00 AE-3 2021-
22
at Chivukulavari Street, Ramalayam Temple & Pakeer Palem and Providing
CC Drain from Karamcheti Krishna (H) to Rehaman Store & Karamcheti
Krishna (H) to Opp Kuppam Prasad (H) in Ranguthota in Division No.12 (5th
call)

Providing CC Road & CC Drain from Anganawadi Center to M.Varalakshmi


(H), Providing CC Roads from Tasty Bread Omlet Shop to Ravipriya (H) at
495 / 463 /
16 2021-22 Govinda Raju Road, P.RajaSekhar (H) of Kotha Bazar, from P.Santhi (H) to 20.00 AE-3 2021-
22
Rajesh (H) and Opp ABM Degree College to K.Sagar (H) via Pentsoch Chruch
in Kabadi Palem in Division No.13 (5th call)
Providing CC Drain 1st Cross Road entrance to Ch.Naga Prasanna (H) in
Bhagya Nagar 4th Line, on south side from Ch.Chandra Mouli (H) to Bank
496 / Colony 3rd Line entrance in Housing Board Colony, Mandava Adilakshmi (H) 464 /
17 2021-22 20.00 AE-3 2021-
to R.Tyagaraju (H) at Kendriya Vidyalaya Housing Board Colony and D.No.97 22
to Ramakrishna Reddy (H) in Housing Board Colony in Division No.19 (5th
call)

Laying of 110 mm & 160 mm dia PVC Pipe Line from Ongole Dairy Milk
Parlour to Venkateswara (H) at Ganuga Palem, Basha Glass Work to Notice
497 / 465 /
18 2021-22 Shop, Moulali (H) to Sathyam Handlooms & Srinivasa Footwear to Srinu (H) at 20.00 AE-3 2021-
22
Kotavari Veedhi, Providing CC Road & CC Drain beside Kotavari Veedhi School
east side in Division No.23 (5th call)

Providing CC Drains & CC Roads from Vanttavani Colony 4th & 7th Lines,
498 / Ekalavya Nagar Burial Ground opp Roads, Vaddepalem, MangalaPalem 466 /
19 2021-22 20.00 AE-3 2021-
beside YSRCP Party Office, TB Road and Samaikyatha Nagar in Division No.24 22
(5th call)

Laying of Damaged CC Road from U.Venkateswarlu (H) to D.No.12-20-643,


499 / 467 /
20 2021-22 Providing CC Drain and Providing RCC Culverts at various places in Division 20.00 AE-5 2021-
22
No.26 (5th call)
500 / 468 /
21 2021-22 Providing CC Road, CC Drain and CC Retaining Wall in Division No.27 (5th call) 20.00 AE-5 2021-
22

501 / Providing CC Drain and RCC Culvert at Kothapeta Streets and Jammichettu 469 /
22 2021-22 20.00 AE-5 2021-
Streets in Division No.28 (5th call) 22

Providing CC Drains from M.Eswaramma (H) to P.Koeswaramma (H) and


502 / 470 /
23 2021-22 Providing CC Drain and Flooring with chequrred terrazzo tiles for Steps at 20.00 AE-3 2021-
22
Kondamitta Rajapanagala 11th Cross Road in Division No.29 (5th call)

Providing CC Drain from Puram Somaiah (H) to Muvva Venkateswarlu (H) at


JC Banglaw Back Side NSP Colony, Mogili Anadharao Plot to Nagendra Swami
Temple at Seetharampuram, Boddu Vijaya Lakshmi (H) to Sonu Supply Shop
503 / 471 /
24 2021-22 at Gaddalagunta and Laying of 100 mm dia AC Pipe Line from Vadde Naleeni 20.00 AE-3 2021-
22
Jayanthi (H) to Karavadhi Seshaiah (H) at Seetharampuram, Burial Ground to
Kondaiah (H) and from Pasumarthi Ankaiah (H) to Punuri Lakshmi Narayana
(H) in Division No.30 (5th call)

Providing CC Road & CC Drain from Chillara Chandrasekhar (H) Line in


Gaddalagunta, Providing CC Road from I.Rangaiah (H) to existing CC Road
(backside of Ramalayam Temple), Providing CC Road from D.No.152 to 362
504 / 472 /
25 2021-22 (beside Public Toilets) in Gaddala Gunta, Laying of 110 mm dia PVC Pipe Line 20.00 AE-5 2021-
22
from Gillalu Church to Rajeswari Ammavari Temple and Laying of 160 mm dia
PVC Pipe Line from D.No.152 to 13 beside Public Toilets in Division No.32
(5th call)

Providing CC Drain & RCC Culvert from Hanuman Temple to SR Residency &
D.NO.119 to Rama Sai Residency, Laying of 110 mm dia PVC Pipe Line west
505 / 473 /
26 2021-22 side of Influence Showroom street, Providing CC Drains east side of Sri 20.00 AE-5 2021-
22
Achalananda Trust and from D.No.36-72-197 to existing MM Road (via
Harithavanam) in Division No.35 (5th call)
Providing CC Drain in Nirmal Nagar 2nd Cross Road, Raising of CC Road from
506 / Chitithoti (H) (south side) to existing Byepass Road and Providing CC Drain 474 /
27 2021-22 20.00 AE-5 2021-
from Subbareddy Towers to SBI ATM (Anjaiah Road), Brundavanam 22
Residency to kiran (H) in Division No.36 (5th call)

507 / Providing CC Drains from Sai Janadrhan Office to Flyover in Pandaripuram in 476 /
28 2021-22 20.00 AE-7 2021-
Division No.46 (5th call) 22

Providing CC Drains from Bhavani Prasad (H) to Gundu Suvarthamma (H),


508 / 477 /
29 2021-22 Pothuraju Canal to Phani (H) and G.Kotataiah (H) to Sirigiri Sambhaiah (H) in 20.00 AE-7 2021-
22
NGO Colony 7th Line in Division No.47 (5th call)
509 / Providing CC Drains both sides in Ayyannavari Veedhi and Cross Roads and 478 /
30 2021-22 Amrutha Hosptial Road in Division No.48 (5th call) 20.00 AE-7 2021-
22

510 / Providing CC Road and CC Drain in Krishna Mandir backside and CC Road in 479 /
31 2021-22 Balakrishna Puram in Division No.49 (5th call) 20.00 AE-7 2021-
22

TOTAL 977.68
Download Start Time : 25.02.2022 5.00 P.M
Download End Time : 08.03.2022 5.00 P.M
Receipt of Bids End Time : 08.03.2022 5.15 P.M
Technical Bid Opening Time : 08.03.2022 5.30 P.M
Price Bid Opening Time : 08.03.2022 5.45 P.M
511 / Filling of Mukthinuthalapadu Tank with Current Motor and Oil Motor in
1 2021-22 0.90 AE-5
Division No.2
512 / Providing C.C Road and C.C Drain from Kandukuri Baburao house to Kattineni
2 2021-22 6.40 AE-5
Ramalinga reddy house in Pernamitta in Division No.41
Providing C.C Road west to east from Sai Balaji Residency to B.K.R Residency
513 /
3 2021-22 and existing C.C Road to D.No.8-164(6) at Rajeev Nagar Extension in Division 7.93 AE-5
No.34
Providing balance C.C Road from beside Gorantla Multiplex from existing C.C
514 /
4 2021-22 Road to Main Road (Srinivasa Hall Road) at Gopal Nagar Main Road in 10.00 AE-5
Division No.6
515 / Providing C.C Road from P.Ramesh Reddy house to existing Culvert in Z.P
5 2021-22 10.00 AE-5
Colony 4th Cross Road in Division No.33
516 / Providing C.C Drain and R.C.C Culvert north to south from D.No.7/259 to
6 2021-22 1.15 AE-5
Narasa Reddy house in Sujatha Nagar 3rd Line in Division No.37
517 / Providing balance C.C Road and C.C Drains in Srinagar Colony 4th Line
7 2021-22 Extension in Division No.45 9.95 AE-5

518 / Construction of Retaining Wall and Providing C.C Drain opposite to G.Ramesh
8 2021-22 10.00 AE-3
house at NSP Quarters in Division No.30
519 / Filling With Quarry Rubbish to reserved site in Housing Board Park play area
9 2021-22 in Division No.19 10.00 AE-3

520 / Providing Culvert to D.A Polytechnic College Road approach to State Highway
10 2021-22 9.75 AE-3
in Housing Board Colony in Division No.19
521 / Providing C.C Road and C.C Drain from Bethula Church to Tella Subbarao
11 2021-22 7.90 AE-3
house in MamidiPalem in Division No.31
522 / Raising of C.C Road at Bhagya Nagar 3rd Line 1st Cross Road back side of
12 2021-22 9.35 AE-3
Green Trends in Division No.20
Providing C.C Culvert at Rajapanagal Road 15th Line and Providing C.C Road
523 /
13 2021-22 and C.C Drain from Pulugu Srinivasulu (H) to Yerramothu Venkatarao (H) near 4.45 AE-3
Gangamma Devi Ammavari Temple in Mamidipalem in Division No.30
524 / Providing C.C Drain from Yadavapalem to Vagu near Gangamma Temple in
14 2021-22 1.03 AE-3
Cheruvukommupalem in Division No.18
525 / Providing Balance Work to Arama Kshetram in Mamidi Palem in Division
15 2021-22 No.30 10.00 AE-3

526 / Supply and Delivery of Electrical Items to Lighting Section and Office
16 2021-22 8.64 AE-3
Maintenance in Ongole Municipal Corporation
527 / Supply and Delivery of Water Supply Materials in 34 to 38 Divisions in Ongole
17 2021-22 0.99 AE-5
Municipal Corporation
528 / Providing C.C Road from D.No.136 to D.No.2-1-174/1 in Gaddala Gunta in
18 2021-22 10.00 AE-5
Division No.32
529 / Repairs and Rectification of Pumpsets and Motors at S.S Tank-2 Water
19 2021-22 Treatment Plant in Water Supply Section in Ongole Municipal Corporation 4.50 AE-3

530 / Providing Central Lighting at Agriculture Market Yard in Ongole Municipal


20 2021-22 corporation 9.91 AE-3

531 / Providing Quarry Rubbish Roads and Kutcha Drains to Mother Theresa
21 2021-22 10.00 AE-3
Colony in Division No.18
532 / Providing Granite Flooring to Crematorium Building varandah and Pinda
22 2021-22 10.00 AE-3
Pradanam Hall in Hindu Burial Ground near R.T.C Bus Stand in Division No.24
533 / Providing R.C.C Pipe Culvert on N.S.P Minor-1 Canal at Sy.No.100/3 in
23 2021-22 1.62 AE-3
Division No.16
534 / Providing C.C Drain and Culvert from Delhi Public School to Devudu Cheruvu
24 2021-22 10.00 AE-3
Four Junction Roads in Division No.21
535 / Providing Toilets to First Floor for Council Hall and Corporators Waiting Hall
25 2021-22 in Corporation Office in Ongole Municipal Corporation 9.75 AE-3

Providing Sump, Septic Tank and Stair Case to Urban Health Center and
536 /
26 2021-22 Providing Quarry rubbish Approach Road from Main Road to Urban Health 7.55 AE-3
Center in Postal Colony in Ongole Municipal Corporation
537 / Laying of Balance B.T Patches to Cheruvukommupalem Road from Sangam
27 2021-22 2.55 AE-3
Dairy to Sub Station in Division No.18
538 / Repairs and Rectification of Pump Sets and Motors at New Filter Beds Water
28 2021-22 Treatment Plant in Water Supply Section in Ongole Municipal Corporation 4.60 AE-3

Providing C.C Drain and Culvert from Nalluri Nursing Home to


539 /
29 2021-22 Anjaneyaswami Temple and Sankarasetti Suryanarayana (H) to Sunnisetti 8.35 AE-3
Venkateswarlu Rice Store in Division No.12
540 / Providing C.C Road from Mastanvali Darga to T.Apparao (H) and Providing CC
30 2021-22 Drain to East side at Baghyanagar Donka in Division No.20 10.00 AE-3

TOTAL 217.27
Download Start Time : 17.03.2022 5.00 P.M
Download End Time : 30.03.2022 5.00 P.M
Receipt of Bids End Time : 30.03.2022 5.15 P.M
Price Bid Opening Time : 30.03.2022 5.30 P.M
541 / Laying of B.T Patches south to north from Elec.Pole No.SS/1061/A9 to NH-16
1 2021-22 10.00 AE-5
Service Road in Kesavarajukunta Main Road in Division No.2
542 / Providing C.C Drain west to east from D.No.251 to Ephphatha Church in
2 2021-22 9.07 AE-5
Balineni Bharath Colony in Division No.3
543 / Providing Internal C.C Roads in Balineni Bharath Colony Main Road in Division
3 2021-22 10.00 AE-5
No.3
544 / Providing C.C Drain from Registrar Office Road to existing Culvert towards
4 2021-22 10.00 AE-3
Dharavari Thota south side in Division No.20
545 / Providing C.C Drain north to south from Satya Residency to S.S Tank-I Road in
5 2021-22 Rajeev Nagar Extension in Division No.34 10.00 AE-5

Providing C.C Drain and Raising of C.C Road south to north from
546 /
6 2021-22 Elec.Pole.No.SS8/B4/1A to SS8/B4/4A at back side of Ramalayam Temple in 8.10 AE-5
Division No.34
547 / Supply, Delivery and Fixing of Burning Platform at Lawyerpet Hindu Burial
7 2021-22 6.00 AE-5
Ground in Division No.34
548 / Construction of First Floor at Aramakshetram near Gaddalagunta Park in
8 2021-22 10.00 AE-5
Division No.34
549 / Completion of Incomplete Compound Wall to Hindu Burial Ground in
9 2021-22 Ganapathi Nagar in Division No.43 9.90 AE-5

550 / Providing C.C Road from Somu Madhava Reddy (H) to Nagarjuna (H) in
10 2021-22 Maruthi Nagar 3rd Line in Division No.44 9.99 AE-5

551 /
11 2021-22 Providing C.C Drain in Maruthi Nagar Extension in Division No.44 9.98 AE-5

TOTAL 103.04
Download Start Time : 23.03.2022 5.00 P.M
Download End Time : 06.04.2022 5.00 P.M
Receipt of Bids End Time : 06.04.2022 5.15 P.M
Price Bid Opening Time : 06.04.2022 5.30 P.M
552 / Providing Quarry Rubbish Road at around Gandhi (Nehru) Nagar Park in 402 /
1 2021-22 Division No.50 (recall) 2.57 AE-7 2021-
22

553 / Providing Quarry Rubbish Road in Venkateswara Nagar and Jayaprakash 403 /
2 2021-22 6.65 AE-7 2021-
Colony in Division No.50 (recall) 22

TOTAL 9.22
Download Start Time : 25.03.2022 5.00 P.M
Download End Time : 01.04.2022 5.00 P.M
Receipt of Bids End Time : 01.04.2022 5.15 P.M
Price Bid Opening Time : 01.04.2022 5.30 P.M
Supply and Delivery of JK Tyres, Tubes and Flaps to Big Compactors, Mini
555 /
1 2021-22 Compactors, Skid Steer Loaders, JCB and Tractors to Ongole Municipal 7.55 AE-5
Corporation
556 / Supply and Delivery of Pyrosene Oil and MLO for sanitation to Ongole
2 2021-22 9.85 AE-5
Municipal Corporation
557 / Providing Pre-cast Slabs to C.C Drain beside Kothapatnam Fly Over Bridge on
3 2021-22 0.99 AE-3
Railpet Road in Division No.11
558 / Providing Mini High Mast Lighting arrangements at various places in Ongole
4 2021-22 9.15 AE-3
Municipal Corporation
559 / Providing LED Rope Lighting to Mini High Mast Lighting Poles at various
5 2021-22 places in Ongole Municipal Corporation 2.50 AE-3
Laying of D.I K7 Pipelines along Kothapatnam Road at Koppolu in Division
560 / No.9 and H.D.P.E Drinking Water Pipelines in SC Colony and other Residential 480 /
6 2021-22 131.84 AE-3 2021-
Areas in Ongole Municipal Corporation under 15th Finance Commission 22
Grant (recall)

Construction of Storm Water Drain from Pothuraju Canal to Bapuji Complex


561 / 481 /
7 2021-22 in Ongole Municipal Corporation under 15th Finance Commission Grant 100.00 AE-5 2021-
22
(recall)
Laying of 150 mm dia H.D.P.E / D.I K7 Drinking Water Pipelines in
562 / 482 /
8 2021-22 Kothamamidi Palem and Suraksha Layout in Ongole Municipal Corporation 70.00 AE-3 2021-
22
under 15th Finance Commission Grant (recall)
Construction of C.C Storm Water Drain from Mangamuru Road Junction to SS
563 / 483 /
9 2021-22 Tank beside Old Bye-Pass Road in Ongole Municipal Corporation under 15th 60.00 AE-5 2021-
22
Finance Commission Grant (recall)

564 /
Construction of C.C Disposal Drain from Ram Nagar 16th Line back side to 484 /
10 2021-22 Nalla Kaluva side in Ongole Municipal Corporation under 15th Finance 60.00 AE-3 2021-
22
Commission Grant (recall)
565 / Providing Avenue Plantation along with Tree Guards to Ongole Municipal 485 /
11 2021-22 Corporation under 15th Finance Commission Grant (6th call) 47.00 2021-
22
Construction of C.C Disposal Drain in Pothurajupalem, Arava Colony in
566 / 487 /
12 2021-22 Ongole Municipal Corporation under 15th Finance Commission Grant (6th 23.84 AE-3 2021-
22
call)
TOTAL 522.72
Download Start Time : 28.03.2022 5.00 P.M
Download End Time : 11.04.2022 5.00 P.M
Receipt of Bids End Time : 11.04.2022 5.15 P.M
Technical Bid Opening Time : 11.04.2022 5.30 P.M
Price Bid Opening Time : 11.04.2022 5.45 P.M
567 / Providing C.C Road and C.C Drain from Nagendra Swamy Putta to existing C.C
1 2021-22 9.85 AE-5
Road in Gopal Nagar 1st Line in Division No.6
568 / Providing C.C Drain and C.C Patches west to east from Subhodayam Tea Stall
2 2021-22 10.00 AE-5
to Sree Nilayam house at Jammichettu Street in Division No.28
569 / Laying of 110 mm dia P.V.C Pipe Line from D.No.03-005-149 to
3 2021-22 2.00 AE-5
J.Subramanyam house at Ayyappa Swamy Temple in Division No.28
570 / Providing C.C Drain from Achalananda Ashramam to Mangamur Donka Main
4 2021-22 Road in Sivaji Nagar 2nd Line in Division No.37 8.00 AE-5

571 / Filling of Red Earth for Central Medians at various places in Ongole Municipal
5 2021-22 7.00 AE-5
Corporation
Engaging of Tractors on hire basis for Debris Removal and Transportation of
572 /
6 2021-22 Garbage for Town Planning section in 1 to 50 Divisions in Ongole Municipal 4.10 AE-5
Corporation

Providing CC Drain, Reconstruction of CC Drain at Thangella Khasim Veedi in


Rajakala Street, Providing CC Road & CC Drain at Kammapalem 3rd Line extension in
573 / 40 Feet Road to Karavadi Donka 7th Line, Providing CC Drain from Karavadi Donka 490 /
7 2021-22 'Y' Junction to Kalikamatha Temple, Providing CC Road & CC Drain from back side of 20.00 AE-5 2021-
Hindu Burial Ground Old Age Home west side in Karavadi Donka and Providing CC 22
Drain from 1st Cross Road to 2nd Cross Road in Kammapalem 3rd Line east side of
CC Road in Division No.7 (6th call)
Providing CC Road & CC Culvert from Sharon Provisions Shop to Guduru Prabhakar
Rao (H) at Cloughpet 3rd Line 1st Cross Road, Providing Precast Slabs from
574 / Yerrajarla Koteswara Rao (H) to Edventist Church (H) beside Kothapatnam Bus 493 /
8 2021-22 Stand Fly Over, Providing CC Culvert at RailPet 2nd Line Main Road and Widening of 20.00 AE-3 2021-
22
CC Road from D.No.19-28-261 to Thanikonda Nageswara Rao (H) Railpet 2nd line
last beside Fly Over in Division No.11 (6th call)

575 / Providing CC Road and CC Drain in Krishna Mandir backside and CC Road in 510 /
9 2021-22 20.00 AE-7 2021-
Balakrishna Puram in Division No.49 (6th call) 22

576 / Construction of Retaining Wall and Providing C.C Drain opposite to G.Ramesh 518 /
10 2021-22 10.00 AE-3 2021-
house at NSP Quarters in Division No.30 (2nd call) 22

Providing C.C Culvert at Rajapanagal Road 15th Line and Providing C.C Road
577 / and C.C Drain from Pulugu Srinivasulu (H) to Yerramothu Venkatarao (H) near 523 /
11 2021-22 Gangamma Devi Ammavari Temple in Mamidipalem in Division No.30 (2nd 4.45 AE-3 2021-
22
call)

578 / Providing C.C Road and C.C Drain from Bethula Church to Tella Subbarao 521 /
12 2021-22 7.90 AE-3 2021-
house in MamidiPalem in Division No.31 (2nd call) 22

579 / Providing C.C Drain and R.C.C Culvert north to south from D.No.7/259 to 516 /
13 2021-22 1.15 AE-5 2021-
Narasa Reddy house in Sujatha Nagar 3rd Line in Division No.37 (2nd call) 22

580 / Providing C.C Road and C.C Drain from Kandukuri Baburao house to Kattineni 512 /
14 2021-22 6.40 AE-5 2021-
Ramalinga reddy house in Pernamitta in Division No.41 (2nd call) 22

581 / Supply and Delivery of Water Supply Materials in 34 to 38 Divisions in Ongole 527 /
15 2021-22 0.99 AE-5 2021-
Municipal Corporation (2nd call) 22

Providing C.C Drain and Culvert from Nalluri Nursing Home to


582 / 539 /
16 2021-22 Anjaneyaswami Temple and Sankarasetti Suryanarayana (H) to Sunnisetti 8.35 AE-3 2021-
22
Venkateswarlu Rice Store in Division No.12 (2nd call)
583 / Providing C.C Drain and Culvert from Delhi Public School to Devudu Cheruvu 534 /
17 2021-22 Four Junction Roads in Division No.21 (2nd call) 10.00 AE-3 2021-
22
Repairs and Rectification of Pumpsets and Motors at S.S Tank-2 Water
584 / 529 /
18 2021-22 Treatment Plant in Water Supply Section in Ongole Municipal Corporation 4.50 AE-3 2021-
22
(2nd call)
Repairs and Rectification of Pump Sets and Motors at New Filter Beds Water
585 / 538 /
19 2021-22 Treatment Plant in Water Supply Section in Ongole Municipal Corporation 4.60 AE-3 2021-
22
(2nd call)
TOTAL 159.29
Download Start Time : 31.03.2022 5.00 P.M
Download End Time : 12.04.2022 5.00 P.M
Receipt of Bids End Time : 12.04.2022 5.15 P.M
Price Bid Opening Time : 12.04.2022 5.30 P.M
586 / Transportation and Supply of Water in various places in 1 to 50 Divisions in
1 2021-22 40.00 AE-5
Ongole Municipal Corporation
TOTAL 40.00
Download Start Time : 31.03.2022 5.00 P.M
Download End Time : 12.04.2022 5.00 P.M
Receipt of Bids End Time : 12.04.2022 5.15 P.M
Price Bid Opening Time : 12.04.2022 5.30 P.M
ONGOLE MUNICIPAL CORPORATION
E-PROCUREMENT TENDER NOTICES
S. Tender
No Notice No. Name of the work Est cost

Laying of 110 mm Dia P.V.C Pipe Line from Bhagya Nagar 4th Line 11th Cross
1/
1 2022-23 Road to Social Welfare Girls Hostel in Sakkubayamma Degree College 4.20 AE-3
Compound Entrance Gate via Padmanjali Towers in Division No.19
2/
2 2022-23 Laying of 110 mm dia P.V.C Pipe Line to Kabadipalem Thota area main road 0.99 AE-3
back side of HCM Compound in Division No.13
TOTAL 5.19
Download Start Time : 19.04.2022 5.00 P.M
Download End Time : 25.04.2022 5.00 P.M
Receipt of Bids End Time : 25.04.2022 5.15 P.M
Price Bid Opening Time : 25.04.2022 5.30 P.M
Providing C.C Drain and Raising of C.C Road west to east from Sri Shirdi Sai
3/
1 2022-23 Nilayam to Elec.Pole.No.SS/15/A3 at Amrutha Mineral Water Plant Line Road 16.60 AE-5
in Division No.8
4/ Providing C.C Disposal Drain from Pothuraju Kaluva towards Rajeev Gruha
2 2022-23 40.00 AE-3
Kalpa Colony in Division No.9
5/ Construction of Compound Wall to Koppolu Burial Ground and
3 2022-23 Guttikondavari Palem Road in Division No.9 40.00 AE-3

6/
4 2022-23 Providing C.C Road and Culvert to Gurram Jashuva Colony in Division No.10 40.00 AE-3

7/
5 2022-23 Construction of Compound Wall to Reserve Site in Ram Nagar 10th Line in 17.70 AE-3
Division No.15
8/ Providing C.C Road and C.C Drain to west side of Bank Colony 4th Line in
6 2022-23 Division No.19 28.00 AE-3

9/ Construction of Compound Wall to Reserve Site in Bhagya Nagar 3rd Line in


7 2022-23 Division No.20 19.70 AE-3

10 / Widening of C.C Road from Devudu Cheruvu Press Club, Poleramma Temple
8 2022-23 40.00 AE-3
to Ambedkar Bhavan via Devudu Cheruvu Park in Division No.21
11 / Providing C.C Road and C.C Drain to Model Town 11th Line, IDSMT Layout in
9 2022-23 20.40 AE-3
Division No.31
Providing C.C Drain south to north from P.Venkateswarlu house to Church in
12 /
10 2022-23 Vaddevani Kunta 1st Line, Providing C.C Road and C.C Drain south to north 20.00 AE-5
from D.No.483 to D.No.7-796 in Vaddevani Kunta 3rd Line in Division No.33
Providing C.C Drain and R.C.C Culvert from Hanuman Temple to SR Residency
13 /
11 2022-23 & D.No.36-72-292 to D.No.130 at Tower Line (old Andhra Bank line) in 20.00 AE-5
Division No.35
Providing C.C Road at Jayaprakash Colony Main Road, Venkateswara Colony
14 /
12 2022-23 7th Line and Nehru Nagar and Providing C.C Drains in Nehru Nagar in Division 40.00 AE-5
No.50
15 /
13 2022-23 Providing C.C Road around Nehru Nagar Park in Division No.50 20.00 AE-5

16 / Construction of Balance Dr.YSR Urban Health Clinic (Urban Primary Health


14 2022-23 30.00
Center) at Rajiv Gruha Kalpa ward secretariat in Division No.9
17 / Construction of Balance Dr.YSR Urban Health Clinic (Urban Primary Health
15 2022-23 30.00
Center) at Vengamukkalapalem ward secretariat in Division No.39
18 / Filling of Quarry Rubbish at Urban Health Center premises and at various
16 2022-23 10.00 AE-5
places in Throvagunta in Division No.1
19 / Laying of B.T Patches at Mukunda Nagar in Kesavaraju Kunta Main Road in
17 2022-23 10.00 AE-5
Division No.2
20 / Providing C.C Drain at Gopal Nagar Extension in Gaddikayyalu 2, 3 and 4 Lines
18 2022-23 at Division No.5 9.45 AE-5

21 / Providing Internal Quarry Rubbish Roads in Gaddikayyalu 6, 7, 8 and 9 Lines


19 2022-23 in Division No.5 5.60 AE-5

22 / Providing Painting and Construction of Waiting Room in Muslim Burial


20 2022-23 7.00 AE-5
Ground in Division No.8
23 / Providing balance Compound Wall to Koppolu Sachivalayam Building
21 2022-23 7.70 AE-3
Compound in Division No.10
24 / Raising of C.C Road from Alagari Nagaraju (H) to Banka Srinu (H) in Dharavari
22 2022-23 Thota Main Road in Division No.21 10.00 AE-3

25 / Providing Quarry Rubbish Road west to east from D.No.7-816-9 to 34-64-


23 2022-23 1066 in Samatha Nagar 5th Line in Division No.37 4.37 AE-5

26 / Desiltation and Clearing away drainage water and Sludge from Mangamoor
24 2022-23 6.00 AE-5
Road both sides from Signals to Sivaji Nagar 3rd Line in Division No.37
27 /
25 2022-23 Providing C.C Drain in Teachers Colony 1st Line in Division No.39 9.98 AE-5

28 / Providing C.C Drain at Srinivasa Colony Cross Roads and S.T Colony Main
26 2022-23 Road in Division No.43 8.75 AE-5

29 / Providing C.C Road from M.Lakshmi Narayanamma house to G.Ramesh Babu


27 2022-23 8.50 AE-5
house in Maruthi Nagar 3rd Line in Division No.44
30 /
28 2022-23 Providing C.C Road in State Bank Colony Extension in Division No.45 10.00 AE-5

Providing C.C Drain from Poilce Training College Gate to Kurnool Road
31 /
29 2022-23 (Sunnapu Battilu Road) Srinagar Colony 1st Line (beside St. Xavior School) in 9.99 AE-5
Division No.45
32 / Providing C.C Drain from Kurnool Road to Store Subbrao house and from
30 2022-23 10.00 AE-5
Kamala Tea Stall to Police Quarters Compound Wall in Division No.45
33 / Providing Pathway back side of Prakasam Bhavan in Ongole Municipal
31 2022-23 Corporation 1.71 AE-3

34 / Drilling of Deep Bore Wells and Fixing of IM-II Pumpsets at various places in
32 2022-23 9.99 AE-5
Ongole Municipal Corporation
Supply and Delivery of Chlorine Gas Cylinder of 900 kg for maintenance of
35 /
33 2022-23 Water Treatment Plants in Water Supply Section in Ongole Municipal 9.90 AE-3
Corporation
36 / Providing Pre-cast Slabs to C.C Drain beside Kothapatnam Fly Over Bridge on 557 /
34 2022-23 0.99 AE-3 2021-
Railpet Road in Division No.11 (2nd call) 22

37 / Providing C.C Road and C.C Drain from Nagendra Swamy Putta to existing C.C 567 /
35 2022-23 9.85 AE-5 2021-
Road in Gopal Nagar 1st Line in Division No.6 (2nd call) 22

38 / Providing C.C Drain from Achalananda Ashramam to Mangamur Donka Main 570 /
36 2022-23 Road in Sivaji Nagar 2nd Line in Division No.37 (2nd call) 8.00 AE-5 2021-
22
39 / Construction of Retaining Wall and Providing C.C Drain opposite to G.Ramesh 576 /
37 2022-23 10.00 AE-3 2021-
house at NSP Quarters in Division No.30 (3rd call) 22

Providing C.C Culvert at Rajapanagal Road 15th Line and Providing C.C Road
40 / and C.C Drain from Pulugu Srinivasulu (H) to Yerramothu Venkatarao (H) near 577 /
38 2022-23 4.45 AE-3 2021-
Gangamma Devi Ammavari Temple in Mamidipalem in Division No.30 (3rd 22
call)

41 / Providing C.C Road and C.C Drain from Bethula Church to Tella Subbarao 578 /
39 2022-23 house in MamidiPalem in Division No.31 (3rd call) 7.90 AE-3 2021-
22

42 / Providing C.C Drain and R.C.C Culvert north to south from D.No.7/259 to 579 /
40 2022-23 Narasa Reddy house in Sujatha Nagar 3rd Line in Division No.37 (3rd call) 1.15 AE-5 2021-
22

43 / Providing C.C Road and C.C Drain from Kandukuri Baburao house to Kattineni 580 /
41 2022-23 6.40 AE-5 2021-
Ramalinga reddy house in Pernamitta in Division No.41 (3rd call) 22

Providing C.C Drain and Culvert from Nalluri Nursing Home to


44 / 582 /
42 2022-23 Anjaneyaswami Temple and Sankarasetti Suryanarayana (H) to Sunnisetti 8.35 AE-3 2021-
22
Venkateswarlu Rice Store in Division No.12 (3rd call)
45 / Providing C.C Drain and Culvert from Delhi Public School to Devudu Cheruvu 583 /
43 2022-23 10.00 AE-3 2021-
Four Junction Roads in Division No.21 (3rd call) 22

Providing CC Drain, Reconstruction of CC Drain at Thangella Khasim Veedi in


Rajakala Street, Providing CC Road & CC Drain at Kammapalem 3rd Line
extension in 40 Feet Road to Karavadi Donka 7th Line, Providing CC Drain
46 / 573 /
44 2022-23 from Karavadi Donka 'Y' Junction to Kalikamatha Temple, Providing CC Road 20.00 AE-5 2021-
22
& CC Drain from back side of Hindu Burial Ground Old Age Home west side in
Karavadi Donka and Providing CC Drain from 1st Cross Road to 2nd Cross
Road in Kammapalem 3rd Line east side of CC Road in Division No.7 (7th call)

Laying of D.I K7 Pipelines along Kothapatnam Road at Koppolu in Division


47 / No.9 and H.D.P.E Drinking Water Pipelines in SC Colony and other Residential 560 /
45 2022-23 Areas in Ongole Municipal Corporation under 15th Finance Commission 131.84 AE-3 2021-
22
Grant (recall)

Construction of Storm Water Drain from Pothuraju Canal to Bapuji Complex


48 / 561 /
46 2022-23 in Ongole Municipal Corporation under 15th Finance Commission Grant 100.00 AE-5 2021-
22
(recall)
Construction of C.C Disposal Drain from Ram Nagar 16th Line back side to
49 / 564 /
47 2022-23 Nalla Kaluva side in Ongole Municipal Corporation under 15th Finance 60.00 AE-3 2021-
22
Commission Grant (recall)
Construction of C.C Disposal Drain in Pothurajupalem, Arava Colony in
50 / 566 /
48 2022-23 Ongole Municipal Corporation under 15th Finance Commission Grant (7th 23.84 AE-3 2021-
22
call)

Providing CC Drain & RCC Culvert from Hanuman Temple to SR Residency &
D.NO.119 to Rama Sai Residency, Laying of 110 mm dia PVC Pipe Line west
51 / 505 /
49 2022-23 side of Influence Showroom street, Providing CC Drains east side of Sri 20.00 AE-5 2021-
22
Achalananda Trust and from D.No.36-72-197 to existing MM Road (via
Harithavanam) in Division No.35 (6th call)
TOTAL 994.11
Download Start Time : 23.04.2022 5.00 P.M
Download End Time : 09.05.2022 5.00 P.M
Receipt of Bids End Time : 09.05.2022 5.15 P.M
Technical Bid Opening Time : 09.05.2022 5.30 P.M
Price Bid Opening Time : 09.05.2022 5.45 P.M
52 / Laying of 110 mm dia P.V.C Pipe Line to Kabadipalem Thota area main road 2/
1 2022-23 0.99 AE-3
back side of HCM Compound in Division No.13 (2nd call) 2022-23

TOTAL 0.99
Download Start Time : 27.04.2022 5.00 P.M
Download End Time : 04.05.2022 5.00 P.M
Receipt of Bids End Time : 04.05.2022 5.15 P.M
Price Bid Opening Time : 04.05.2022 5.30 P.M
54 / Transportation and Supply of Water in various places in 1 to 50 Divisions in
1 2022-23 40.00 AE-5
Ongole Municipal Corporation
55 / Construction of Balance Dr.YSR Urban Health Clinic (Urban Primary Health
2 2022-23 30.00 AE-5
Center) at Gudimellapadu ward secretariat in Division No.2
56 / Construction of Compound Wall for Aramakshetram in Balaji Nagar in
3 2022-23 Division No.16 16.50 AE-3

57 / Providing C.C Road north to south from G.Thirupathi Rao house to existing
4 2022-23 16.50 AE-5
C.C Road in Soniya Gandhi Nagar 1st Line in Division No.37
58 / Providing C.C Drain at west side of Maruthi Nagar End Street and S.B.I Colony
5 2022-23 28.00 AE-5
in Division No.44
59 / Providing C.C Drain at east side of Maruthi Nagar 2nd Street, S.B.I Colony and
6 2022-23 Providing C.C Road at S.B.I Colony 4th Cross Road in Division No.45 39.85 AE-5

Providing Balance Work to Urban Homeless and One Stop Center Building at
60 /
7 2022-23 Government General Hospital, Ongole Compound (RIMS Hospital) in Ongole 22.00 AE-3
Municipal Corporation
Laying of 160 mm dia P.V.C Pipe Line from Gudimellapdu Ward Secretariat to
61 /
8 2022-23 Sivalayam, M.Kumari (H) to Elec Pole No.2/481/OMC and Errabbai (H) to 10.00 AE-5
P.Muthyala (H) in Division No.2
62 / Providing Quarry Rubbish Road to Rajeev Gruha Kalpa 1st, 2nd and 3rd Line
9 2022-23 10.00 AE-3
Cross Roads in Division No.9
Providing C.C Road and C.C Drain from Sundarasetty Koteswararao (H) to
63 / Ravella Prasad (H), Pasupuleti Kotesewararao (H) to Sundarasetty Sundara
10 2022-23 rao (H) and Pasupuleti Venkaiah (H) to Sundasetty Mahesh Babu (H) in 10.00 AE-3
Pelluru in Division No.17
64 / Providing C.C Road from Chirumalla Balakoteswara rao (H) to Pragathi Vidhya
11 2022-23 Nikethan School in Kotha Colony in Pelluru in Division No.17 9.00 AE-3

65 / Raising of C.C Road and C.C Drain from Tadella Srinu (H) to MV Subbarao (H)
12 2022-23 6.40 AE-3
in Dharavarithota in Division No.21
66 / Providing B.T Road from existing Mangamoor Main Road to D.No.190 in
13 2022-23 10.00 AE-5
Military Colony in Division No.33
Providing Quarry Rubbish Road from north to south from Venkata Rami
67 /
14 2022-23 Reddy house to Thanneeru Sanjeeva Rao house in Military Colony 3rd Line in 3.74 AE-5
Division No.33
68 / Construction of Compound wall at Yadava Municipal Primary School in
15 2022-23 Division No.33 3.50 AE-5

69 / Supply and Delivery of Acid, Phenyle and Maintenance Equipments in tree


16 2022-23 0.90 AE-5
plantation and Parks in Ongole Municipal Corporation
TOTAL 256.39
Download Start Time : 28.04.2022 5.00 P.M
Download End Time : 12.05.2022 5.00 P.M
Receipt of Bids End Time : 12.05.2022 5.15 P.M
Price Bid Opening Time : 12.05.2022 5.30 P.M
70 / Construction of R.C.C Culverts from Gorantla Multiplex to Gopal Nagar 4th
1 2022-23 6.50 AE-5
Lane in Gopal Nagar Main Road in Division No.5
73 / Providing Pre-cast Slabs to Disposal Drain at back side of Poleramma Temple
2 2022-23 in Division No.25 10.00 AE-3

74 / Providing C.C Road and C.C Drain from Erragundla Meri (H) to Sekhar Shop in
3 2022-23 Vijaya Colony in Division No.31 10.00 AE-3

75 / Providing Quarry Rubbish Road beside Coffee Shop in Kotha Donka Extension
4 2022-23 3.61 AE-5
in Division No.33
76 /
5 2022-23 Providing Quarry Rubbish Roads in Saraladevi Nagar in Division No.41 9.99 AE-5

77 / Desiltation of Drains in 1 to 8, 26 to 28 and 32 Divisions in Ongole Municipal


6 2022-23 Corporation 10.00 AE-5

78 / Desiltation of existing Major and Minor Drains in 19 to 25, 29 to 31 Divisions


7 2022-23 10.00 AE-3
in Ongole Municipal Corporation
79 /
8 2022-23 Desiltation of Drains in 33 to 38 Divisions in Ongole Municipal Corporation 5.00 AE-5

80 /
9 2022-23 Desiltation of Drains from 39 to 50 Divisions in Ongole Municipal Corporation 9.99 AE-5

Supply and Delivery of 75 HP UP 150/38B Pumpset with 1440 rpm, GM


81 /
10 2022-23 Impellar, Head of 40 mts and 200/150 mm to Clear Water Pump House at SS 3.05 AE-3
Tank-II WTP in Ongole Municipal Corporation
82 / Providing Main Gates and Name Plate to DD Agriculture office and BCL & STL
11 2022-23 office in Ongole Municipal Corporation 1.75 AE-3

83 / Clearing thin jungle growth on bunds of S.S Tank-I and along the Old National
12 2022-23 2.80 AE-3
High Way in Ongole Municipal Corporation
Providing C.C Drain and Raising of C.C Road west to east from Sri Shirdi Sai
84 / 3/
13 2022-23 Nilayam to Elec.Pole.No.SS/15/A3 at Amrutha Mineral Water Plant Line Road 16.60 AE-5 2022-
23
in Division No.8 (2nd call)
85 / Providing C.C Disposal Drain from Pothuraju Kaluva towards Rajeev Gruha 4/
14 2022-23 40.00 AE-3 2022-
Kalpa Colony in Division No.9 (2nd call) 23

86 / Construction of Compound Wall to Koppolu Burial Ground and 5/


15 2022-23 40.00 AE-3 2022-
Guttikondavari Palem Road in Division No.9 (2nd call) 23

87 / Construction of Compound Wall to Reserve Site in Ram Nagar 10th Line in 7/


16 2022-23 17.70 AE-3 2022-
Division No.15 (2nd call) 23

88 / Construction of Compound Wall to Reserve Site in Bhagya Nagar 3rd Line in 9/


17 2022-23 19.70 AE-3 2022-
Division No.20 (2nd call) 23

89 / Providing C.C Road and C.C Drain to Model Town 11th Line, IDSMT Layout in 11 /
18 2022-23 20.40 AE-3 2022-
Division No.31 (2nd call) 23
Providing C.C Drain south to north from P.Venkateswarlu house to Church in
90 / Vaddevani Kunta 1st Line, Providing C.C Road and C.C Drain south to north 12 /
19 2022-23 20.00 AE-5 2022-
from D.No.483 to D.No.7-796 in Vaddevani Kunta 3rd Line in Division No.33 23
(2nd call)

Providing C.C Drain and R.C.C Culvert from Hanuman Temple to SR Residency
91 / 13 /
20 2022-23 & D.No.36-72-292 to D.No.130 at Tower Line (old Andhra Bank line) in 20.00 AE-5 2022-
23
Division No.35 (2nd call)
Providing C.C Road at Jayaprakash Colony Main Road, Venkateswara Colony
92 / 14 /
21 2022-23 7th Line and Nehru Nagar and Providing C.C Drains in Nehru Nagar in Division 40.00 AE-5 2022-
23
No.50 (2nd call)
93 / 15 /
22 2022-23 Providing C.C Road around Nehru Nagar Park in Division No.50 (2nd call) 20.00 AE-5 2022-
23

94 / Providing C.C Drain at Gopal Nagar Extension in Gaddikayyalu 2, 3 and 4 Lines 20 /


23 2022-23 9.45 AE-5 2022-
at Division No.5 (2nd call) 23

95 / Providing balance Compound Wall to Koppolu Sachivalayam Building 23 /


24 2022-23 7.70 AE-3 2022-
Compound in Division No.10 (2nd call) 23

Desiltation and Clearing away drainage water and Sludge from Mangamoor
96 / 26 /
25 2022-23 Road both sides from Signals to Sivaji Nagar 3rd Line in Division No.37 (2nd 6.00 AE-5 2022-
23
call)
97 / Providing C.C Drain at Srinivasa Colony Cross Roads and S.T Colony Main 28 /
26 2022-23 8.75 AE-5 2022-
Road in Division No.43 (2nd call) 23

Providing C.C Drain from Poilce Training College Gate to Kurnool Road
98 / 31 /
27 2022-23 (Sunnapu Battilu Road) Srinagar Colony 1st Line (beside St. Xavior School) in 9.99 AE-5 2022-
23
Division No.45 (2nd call)
Providing C.C Drain from Kurnool Road to Store Subbrao house and from
99 / 32 /
28 2022-23 Kamala Tea Stall to Police Quarters Compound Wall in Division No.45 (2nd 10.00 AE-5 2022-
23
call)
100 / Providing C.C Road and C.C Drain from Nagendra Swamy Putta to existing C.C 37 /
29 2022-23 9.85 AE-5 2022-
Road in Gopal Nagar 1st Line in Division No.6 (3rd call) 23

101 / Construction of Retaining Wall and Providing C.C Drain opposite to G.Ramesh 39 /
30 2022-23 house at NSP Quarters in Division No.30 (4th call) 10.00 AE-3 2022-
23

Providing C.C Culvert at Rajapanagal Road 15th Line and Providing C.C Road
102 / and C.C Drain from Pulugu Srinivasulu (H) to Yerramothu Venkatarao (H) near 40 /
31 2022-23 4.45 AE-3 2022-
Gangamma Devi Ammavari Temple in Mamidipalem in Division No.30 (4th 23
call)

103 / Providing C.C Road and C.C Drain from Bethula Church to Tella Subbarao 41 /
32 2022-23 house in MamidiPalem in Division No.31 (4th call) 7.90 AE-3 2022-
23

104 / Providing C.C Drain and R.C.C Culvert north to south from D.No.7/259 to 42 /
33 2022-23 Narasa Reddy house in Sujatha Nagar 3rd Line in Division No.37 (4th call) 1.15 AE-5 2022-
23

Providing C.C Drain and Culvert from Nalluri Nursing Home to


106 / 44 /
34 2022-23 Anjaneyaswami Temple and Sankarasetti Suryanarayana (H) to Sunnisetti 8.35 AE-3 2022-
23
Venkateswarlu Rice Store in Division No.12 (4th call)
107 / Providing C.C Drain and Culvert from Delhi Public School to Devudu Cheruvu 45 /
35 2022-23 Four Junction Roads in Division No.21 (4th call) 10.00 AE-3 2022-
23
Laying of D.I K7 Pipelines along Kothapatnam Road at Koppolu in Division
108 / No.9 and H.D.P.E Drinking Water Pipelines in SC Colony and other Residential 47 /
36 2022-23 131.84 AE-3 2022-
Areas in Ongole Municipal Corporation under 15th Finance Commission 23
Grant (recall)
Construction of Storm Water Drain from Pothuraju Canal to Bapuji Complex
109 / 48 /
37 2022-23 in Ongole Municipal Corporation under 15th Finance Commission Grant 100.00 AE-5 2022-
23
(recall)

Providing CC Drain, Reconstruction of CC Drain at Thangella Khasim Veedi in


Rajakala Street, Providing CC Road & CC Drain at Kammapalem 3rd Line extension in
110 / 40 Feet Road to Karavadi Donka 7th Line, Providing CC Drain from Karavadi Donka 46 /
38 2022-23 'Y' Junction to Kalikamatha Temple, Providing CC Road & CC Drain from back side of 20.00 AE-5 2022-
Hindu Burial Ground Old Age Home west side in Karavadi Donka and Providing CC 23
Drain from 1st Cross Road to 2nd Cross Road in Kammapalem 3rd Line east side of
CC Road in Division No.7 (8th call)

Providing CC Drain & RCC Culvert from Hanuman Temple to SR Residency &
111 / D.NO.119 to Rama Sai Residency, Laying of 110 mm dia PVC Pipe Line west side of 51 /
39 2022-23 Influence Showroom street, Providing CC Drains east side of Sri Achalananda Trust 20.00 AE-5 2022-
and from D.No.36-72-197 to existing MM Road (via Harithavanam) in Division No.35 23
(7th call)

TOTAL 712.52
Download Start Time : 10.05.2022 5.00 P.M
Download End Time : 25.05.2022 5.00 P.M
Receipt of Bids End Time : 25.05.2022 5.15 P.M
Technical Bid Opening Time : 25.05.2022 5.30 P.M
Price Bid Opening Time : 25.05.2022 5.45 P.M
112 /
1 2022-23 Construction of First Floor in Community Hall in Islampet in Division No.4 24.25 AE-5

113 / Providing Internal C.C Roads in Christian Burial Ground in Karavadi Donka in
2 2022-23 23.50 AE-5
Division No.8
Providing C.C Road from D.No.157 to N.Anji Reddy house, D.No.440 to
114 /
3 2022-23 N.Subba Reddy house and D.No.145 to Well in Guthikondavari Palem in 24.95 AE-5
Division No.9
115 / Providing Balance C.C Road near Rice Mill and Balance C.C Road near B.V.R
4 2022-23 20.00 AE-3
High School in Koppolu in Division No.10
116 / Construction of Compound Wall at Muslim Burial Ground in Koppolu in
5 2022-23 Division No.10 17.50 AE-3

Providing C.C Road, C.C Drain and 110 mm dia P.V.C Pipe Line from Emani
117 / Anjaneyulu (H) to Mandhabayata Kunta and Providing C.C Road and C.C Drain
6 2022-23 from Mattebam Venkata raju (H) to Nakka Krishna (H) in Kummari Colony in 11.80 AE-3

Pelluru in Division No.17

Raising of C.C Road and Providing C.C Drain from Jangala Sangeetha Rao
118 /
7 2022-23 house to SRK Degree College Road in Bhagya Nagar 1st Line near Ward 40.00 AE-3
Sachivalayam in Division No.20
119 / Providing C.C Disposal Drain from H.P Petrol Bunk to Hotel Kumar Residency
8 2022-23 40.00 AE-3
along Trunk Road in Division No.21
Construction of New Toilet Block and Balance Work Kitchen Building and
120 /
9 2022-23 Providing Electrification to entire building of Shadikhana Building near New 40.00 AE-3
Vegetable Market in Division No.24
121 / Providing C.C Drain from Rythu Bazar to Alluraiah Sweets Shop (VIP Road
10 2022-23 north side) via Temple Towers Apartment in Division No.35 40.00 AE-5

122 /
11 2022-23 Providing Shoulders at Kesavarajukunta Main Road in Division No.2 6.35 AE-5

123 / Rennovation of Dias around the tree near Ramalayam Temple in


12 2022-23 Chivukulavari Street in Division No.12 1.23 AE-3

124 / Diversion of Intersection Chamber at Pothurajupalem N.Agraharam Railway


13 2022-23 7.00 AE-3
Gate in Division No.16
125 / Construction of Compound Wall upto plinth beam in Teachers Colony 3rd
14 2022-23 10.00 AE-5
Line L.P.No.134/81 reserved site in Division No.39
126 / Providing 100 mm dia P.V.C Pipe Line at Jaya Prakash Colony and
15 2022-23 7.65 AE-5
Venkateswara Colony in Division No.50
127 / Rennovation and Refixing of Old 9 Mts damaged MS Poles to Bus Stand Road
16 2022-23 and Collector Office Road in Ongole Municipal Corporation 10.00 AE-3

128 /
17 2022-23 Desiltation of Drains in 9 to 18 Divisions in Ongole Municipal Corporation 10.00 AE-3

Removal of Silt and Jungle Clearence and Formation of Kutcha Drain from
129 /
18 2022-23 Pothurajupalem to Pothuraju Canal via Gurram Jashuva Colony and 3.30 AE-3
Pulivenkatareddy Colony in Ongole Municipal Corporation
130 / Repairs and Rectification of Pumping Main and Gravity Main leakages in A.E-
19 2022-23 3.00 AE-3
2 Section in Ongole Municipal Corporation
Providing Non-Figurative Painting with Exterior Emulsion Paint to both side
131 /
20 2022-23 Dividers from Church Center to MSR Statue via Collector Camp Office Road in 5.45 AE-3
Ongole Municipal Corporation

Supply and Laying of Bituminous Hot Sealing Compound (Grade 'A' ISI) and
132 / Sealing the Joints to C.C Roads from Railway Station Junction to PVR Boys
21 2022-23 High School Ground via Church Center, Jayaram Theater and Dheeraj 5.75 AE-3

Hospital Road & Debris Lifting in Ongole Municipal Corporation

134 / Engaging of Labour for removal of Silt to Special Sanitation Drive at various
22 2022-23 1.00 AE-3
Places in A.E-2 section in Ongole Municipal Corporation
135 / Lifting of Debris and Cleaning of the Premises of Kothapatnam ELSR
23 2022-23 Compound in Ongole Municipal Corporation 0.79 AE-3

136 / Providing Interconnection to Dakshana Murthy Bazar, Santhapeta and


24 2022-23 Clowpeta near Community Hall in Ongole Municipla Corporation 0.78 AE-3

137 / Construction of Compound Wall for Aramakshetram in Balaji Nagar in 56 /


25 2022-23 Division No.16 (2nd call) 16.50 AE-3 2022-
23

138 / Providing C.C Drain at west side of Maruthi Nagar End Street and S.B.I Colony 58 /
26 2022-23 in Division No.44 (2nd call) 28.00 AE-5 2022-
23

139 / Providing C.C Drain at east side of Maruthi Nagar 2nd Street, S.B.I Colony and 59 /
27 2022-23 39.85 AE-5 2022-
Providing C.C Road at S.B.I Colony 4th Cross Road in Division No.45 (2nd call) 23
Providing C.C Road and C.C Drain from Sundarasetty Koteswararao (H) to
140 / Ravella Prasad (H), Pasupuleti Kotesewararao (H) to Sundarasetty Sundara 63 /
28 2022-23 10.00 AE-3 2022-
rao (H) and Pasupuleti Venkaiah (H) to Sundasetty Mahesh Babu (H) in 23
Pelluru in Division No.17 (2nd call)

Providing Quarry Rubbish Road from north to south from Venkata Rami
141 / 67 /
29 2022-23 Reddy house to Thanneeru Sanjeeva Rao house in Military Colony 3rd Line in 3.74 AE-5 2022-
23
Division No.33 (2nd call)
142 / Construction of Compound wall at Yadava Municipal Primary School in 68 /
30 2022-23 Division No.33 (2nd call) 3.50 AE-5 2022-
23

TOTAL 455.89
Download Start Time : 19.05.2022 5.00 P.M
Download End Time : 02.06.2022 5.00 P.M
Receipt of Bids End Time : 02.06.2022 5.15 P.M
Price Bid Opening Time : 02.06.2022 5.30 P.M
Supply and Delivery of 75 HP UP 150/38B Pumpset with 1440 rpm, GM
143 / 81 /
2 2022-23 Impellar, Head of 40 mts and 200/150 mm to Clear Water Pump House at SS 3.05 2022
-23
Tank-II WTP in Ongole Municipal Corporation (2nd call)
144 / Clearing thin jungle growth on bunds of S.S Tank-I and along the Old National 83 /
3 2022-23 High Way in Ongole Municipal Corporation (2nd call) 2.80 2022
-23

TOTAL 5.85
Download Start Time : 27.05.2022 5.00 P.M
Download End Time : 31.05.2022 5.00 P.M
Receipt of Bids End Time : 31.05.2022 5.15 P.M
Price Bid Opening Time : 31.05.2022 5.30 P.M
145 / Providing Chain Link Mesh Fencing and M.S Gate to Rangarayudu Cheruvu in
1 2022-23 10.00 AE-5
Division No.36
146 / Providing Filling of Red Earth, Quarry Rubbish at Rangarayudu Cheruvu in
2 2022-23 Division No.36 9.90 AE-5

147 / Providing Painting of Wall Arts to the Wall Arts to the Wall at Rangarayudu
3 2022-23 1.62 AE-5
Cheruvu in Division No.36
TOTAL 21.52
Download Start Time : 03.06.2022 5.00 P.M
Download End Time : 13.06.2022 5.00 P.M
Receipt of Bids End Time : 13.06.2022 5.15 P.M
Price Bid Opening Time : 13.06.2022 5.30 P.M
148 / Providing Quarry Rubbish Roads opposite to R.T.O Office in Mother Theresa
1 2022-23 Colony in Division No.18 10.00 AE-3

149 / Filling with Quarry Rubbish back side of Fire Ghat in Hindu Burial Ground in
2 2022-23 10.00 AE-3
R.T.C Bus Stand in Ongole Municipal Corporation
TOTAL 20.00
Download Start Time : 06.06.2022 5.00 P.M
Download End Time : 13.06.2022 5.00 P.M
Receipt of Bids End Time : 13.06.2022 5.15 P.M
Price Bid Opening Time : 13.06.2022 5.30 P.M
150 / Construction of First Floor in Community Hall in Islampet in Division No.4 112 /
1 2022-23 24.25 AE-5 2022-
(2nd call) 23

151 / Providing Internal C.C Roads in Christian Burial Ground in Karavadi Donka in 113 /
2 2022-23 23.50 AE-5 2022-
Division No.8 (2nd call) 23

152 / Providing Balance C.C Road near Rice Mill and Balance C.C Road near B.V.R 115 /
3 2022-23 20.00 AE-3 2022-
High School in Koppolu in Division No.10 (2nd call) 23

153 / Construction of Compound Wall at Muslim Burial Ground in Koppolu in 116 /


4 2022-23 17.50 AE-3 2022-
Division No.10 (2nd call) 23

Providing C.C Road, C.C Drain and 110 mm dia P.V.C Pipe Line from Emani
154 / Anjaneyulu (H) to Mandhabayata Kunta and Providing C.C Road and C.C Drain 117 /
5 2022-23 11.80 AE-3 2022-
from Mattebam Venkata raju (H) to Nakka Krishna (H) in Kummari Colony in 23
Pelluru in Division No.17 (2nd call)

Raising of C.C Road and Providing C.C Drain from Jangala Sangeetha Rao
155 / 118 /
6 2022-23 house to SRK Degree College Road in Bhagya Nagar 1st Line near Ward 40.00 AE-3 2022-
23
Sachivalayam in Division No.20 (2nd call)
156 / Rennovation of Dias around the tree near Ramalayam Temple in 123 /
7 2022-23 1.23 AE-3 2022-
Chivukulavari Street in Division No.12 (2nd call) 23

157 / Providing 100 mm dia P.V.C Pipe Line at Jaya Prakash Colony and 126 /
8 2022-23 Venkateswara Colony in Division No.50 (2nd call) 7.65 AE-5 2022-
23

158 / Providing Pre-cast Slabs to Disposal Drain at back side of Poleramma Temple 73 /
9 2022-23 10.00 AE-3 2022-
in Division No.25 (2nd call) 23

159 / Providing C.C Road and C.C Drain from Erragundla Meri (H) to Sekhar Shop in 74 /
10 2022-23 10.00 AE-3 2022-
Vijaya Colony in Division No.31 (2nd call) 23

160 / Construction of Compound Wall for Aramakshetram in Balaji Nagar in 137 /


11 2022-23 16.50 AE-3 2022-
Division No.16 (3rd call) 23

161 / Providing C.C Drain at east side of Maruthi Nagar 2nd Street, S.B.I Colony and 139 /
12 2022-23 Providing C.C Road at S.B.I Colony 4th Cross Road in Division No.45 (3rd call) 39.85
AE-5 2022-
23

Providing C.C Road and C.C Drain from Sundarasetty Koteswararao (H) to
162 / Ravella Prasad (H), Pasupuleti Kotesewararao (H) to Sundarasetty Sundara 140 /
13 2022-23 10.00 AE-3 2022-
rao (H) and Pasupuleti Venkaiah (H) to Sundasetty Mahesh Babu (H) in 23
Pelluru in Division No.17 (3rd call)

163 / Construction of Compound Wall to Koppolu Burial Ground and 86 /


14 2022-23 40.00 AE-3 2022-
Guttikondavari Palem Road in Division No.9 (3rd call) 23

Providing C.C Drain and R.C.C Culvert from Hanuman Temple to SR Residency
164 / 91 /
15 2022-23 & D.No.36-72-292 to D.No.130 at Tower Line (old Andhra Bank line) in 20.00 AE-5 2022-
23
Division No.35 (3rd call)
165 / Providing balance Compound Wall to Koppolu Sachivalayam Building 95 /
16 2022-23 Compound in Division No.10 (3rd call) 7.70 AE-3 2022-
23

166 / Providing C.C Road and C.C Drain from Nagendra Swamy Putta to existing C.C 100 /
17 2022-23 9.85 AE-5 2022-
Road in Gopal Nagar 1st Line in Division No.6 (4th call) 23

167 / Construction of Retaining Wall and Providing C.C Drain opposite to G.Ramesh 101 /
18 2022-23 10.00 AE-3 2022-
house at NSP Quarters in Division No.30 (5th call) 23
Providing C.C Culvert at Rajapanagal Road 15th Line and Providing C.C Road
168 / and C.C Drain from Pulugu Srinivasulu (H) to Yerramothu Venkatarao (H) near 102 /
19 2022-23 4.45 AE-3 2022-
Gangamma Devi Ammavari Temple in Mamidipalem in Division No.30 (5th 23
call)

169 / Providing C.C Road and C.C Drain from Bethula Church to Tella Subbarao 103 /
20 2022-23 house in MamidiPalem in Division No.31 (5th call) 7.90 AE-3 2022-
23

Providing C.C Drain and Culvert from Nalluri Nursing Home to


170 / 106 /
21 2022-23 Anjaneyaswami Temple and Sankarasetti Suryanarayana (H) to Sunnisetti 8.35 AE-3 2022-
23
Venkateswarlu Rice Store in Division No.12 (5th call)
171 / Providing C.C Drain and Culvert from Delhi Public School to Devudu Cheruvu 107 /
22 2022-23 10.00 AE-3 2022-
Four Junction Roads in Division No.21 (5th call) 23

TOTAL 350.53
Download Start Time : 09.06.2022 5.00 P.M
Download End Time : 23.06.2022 5.00 P.M
Receipt of Bids End Time : 23.06.2022 5.15 P.M
Price Bid Opening Time : 23.06.2022 5.30 P.M
172 / Providing Chain Link Mesh Fencing and M.S Gate to Rangarayudu Cheruvu in 145 /
1 2022-23 10.00 AE-5
Division No.36 (2nd call) 2022-23

173 / Providing Painting of Wall Arts to the Wall Arts to the Wall at Rangarayudu 147 /
2 2022-23 1.62 AE-5
Cheruvu in Division No.36 (2nd call) 2022-23

TOTAL 11.62
Download Start Time : 14.06.2022 5.00 P.M
Download End Time : 20.06.2022 5.00 P.M
Receipt of Bids End Time : 20.06.2022 5.15 P.M
Price Bid Opening Time : 20.06.2022 5.30 P.M
176 / Providing Painting of Wall Arts to the Wall at Gnadhi Park and Rangarayudu
1 2022-23 Cheruvu in Division No.36 6.73 AE-5

TOTAL 6.73
Download Start Time : 18.06.2022 5.00 P.M
Download End Time : 29.06.2022 5.00 P.M
Receipt of Bids End Time : 29.06.2022 5.15 P.M
Price Bid Opening Time : 29.06.2022 5.30 P.M
179 / Transportation and Supply of Water in various places in 1 to 50 Divisions in
1 2022-23 40.00 AE-5
Ongole Municipal Corporation
180 / Construction of Balance Garbage Transfer Station-I in Pernamitta in Ongole
2 2022-23 40.00 AE-5
Municipal Corporation
181 / Construction of Balance Dr.YSR Urban Health Clinic (Urban Primary Health
3 2022-23 36.00 AE-5
Center) at Peerlamanyam ward secretariat in Division No.39
182 / Construction of Balance Dr.YSR Urban Health Clinic (Urban Primary Health
4 2022-23 Center) at Gaddalagunta ward secretariat in Division No.30 30.00 AE-3

Providing Granite Flooring and Electrical and Sanitary Work at Crematorium,


183 / Painting Work and Filling with Gravel to low level area to the Crematorium
5 2022-23 Building at R.T.C Bus Stand Hindu Burial Ground in Ongole Municipal 34.20 AE-3
Corporation
184 / Providing C.C Drain and Culvert from Sk.Karimulla house to Gopi Tea Stall in
6 2022-23 11.60 AE-3
Railpet 1st Line in Division No.11
185 / Laying of B.T Road from Chainage 344 to 460 m in Kesavaraju Kunta towards
7 2022-23 8.20 AE-5
to Flyover in Division No.2
186 / Providing C.C Approaches and Repairs to Toilets at Bilal Nagar Community
8 2022-23 7.45 AE-5
Hall in Division No.2
187 / Formation of Gravel Road to Rajeev Gruha Kalpa 5th Line beside Reserve Site
9 2022-23 in Division No.9 2.24 AE-3

188 / Filling with Gravel to Park Reserve Site in Rajeev Gruha Kalpa 4th Line in
10 2022-23 10.00 AE-3
Division No.9
189 / Filling with Gravel to Park Reserve Site in Rajeev Gruha Kalpa 5th Line in
11 2022-23 10.00 AE-3
Division No.9
190 / Engaging of J.C.B and Tractor for Removing of Jungle, Formation of Kutcha
12 2022-23 0.90 AE-3
Drain and Lifting of Debris in Division No.9
191 / Providing Painting and Name Boards to Santhapet Secretariat Building in
13 2022-23 3.15 AE-3
Division No.14
192 / Providing C.C Road from existing road to Bharath School of Nursing in
14 2022-23 Ramnagar 8th Line in Division No.15 8.35 AE-3

193 / Providing C.C Drain and Culverts beside Dr.B.R Ambedkar Statue in Pelluru
15 2022-23 S.C Colony in Division No.17 6.15 AE-3

194 / Providing Non-Figurative Painting with Exterior Emulsion Paint to C.R.P


16 2022-23 1.60 AE-3
Quarters Park in Division No.21
195 /
17 2022-23 Engaging of 130 Chain Mounted Machine at Uracheruvu in Division No.24 7.26 AE-3

Laying of 110 mm dia P.V.C Pipe Line from Bandaru Atchamma (H) to
196 / Tammisetty vasantha (H), Valithoti Amaravathi (H) to Kommuri Suseela (H),
18 2022-23 Sekhar kottu to Lalapet Seshamma (H) and Erragundla Mary (H) to 9.60 AE-3
Nageswara Rao Kottu in Division No.31
197 /
19 2022-23 Providing Central Lighting to 60 Feet Road in Ongole Municipal Corporation 9.91 AE-3

198 / Laying of B.T Patches at various places in Division Nos.9 to 25 and 29 to 31 in


20 2022-23 8.84 AE-3
Ongole Municipal Corporation

199 / Construction of Compound Wall to Narayana Rao School near Mastan Durga
21 2022-23 6.32 AE-3
and Vaddepalem School near DWMA Office in Ongole Municipal Corporation

200 / Replacement of M.S 300 mm x 10 mm Suction Pipes to Raw Water Pump


22 2022-23 5.10 AE-3
House at S.S Tank-II Water Treatment Plant in Ongole Municipal Corporation
Repairs and Rectification of 30 HP Motor at Police Quarters, 100 HP Raw
201 / Water Pump and 75 HP Panel Board at WTP at S.S Tank-II WTP, 45 HP
23 2022-23 2.40 AE-3
Submersible Motor at Hillock Balancing Reservoir in Water Supply section in
Ongole Municipal Corporation
202 / Removal of Jungle and Jammu from S.S Tank-II to Gandhi Nagar Off Take
24 2022-23 1.12 AE-3
Point in Koppolu Major Canal in Ongole Municipal Corporation
203 / Providing Internal C.C Roads in Christian Burial Ground in Karavadi Donka in
25 2022-23 Division No.8 (3rd call) 23.50 AE-5
204 / Construction of Compound Wall at Muslim Burial Ground in Koppolu in
26 2022-23 17.50 AE-3
Division No.10 (3rd call)
205 / Construction of Compound Wall for Aramakshetram in Balaji Nagar in
27 2022-23 16.50 AE-3
Division No.16 (4th call)
Providing C.C Road, C.C Drain and 110 mm dia P.V.C Pipe Line from Emani
206 / Anjaneyulu (H) to Mandhabayata Kunta and Providing C.C Road and C.C Drain
28 2022-23 11.80 AE-3
from Mattebam Venkata raju (H) to Nakka Krishna (H) in Kummari Colony in
Pelluru in Division No.17 (3rd call)
207 / Providing C.C Road and C.C Drain from Nagendra Swamy Putta to existing C.C
29 2022-23 9.85 AE-5
Road in Gopal Nagar 1st Line in Division No.6 (5th call)
208 / Providing balance Compound Wall to Koppolu Sachivalayam Building
30 2022-23 7.70 AE-3
Compound in Division No.10 (4th call)
Providing C.C Drain and Culvert from Nalluri Nursing Home to
209 /
31 2022-23 Anjaneyaswami Temple and Sankarasetti Suryanarayana (H) to Sunnisetti 8.35 AE-3
Venkateswarlu Rice Store in Division No.12 (6th call)

Providing C.C Road and C.C Drain from Sundarasetty Koteswararao (H) to
210 / Ravella Prasad (H), Pasupuleti Kotesewararao (H) to Sundarasetty Sundara
32 2022-23 10.00 AE-3
rao (H) and Pasupuleti Venkaiah (H) to Sundasetty Mahesh Babu (H) in
Pelluru in Division No.17 (4th call)
211 / Providing Pre-cast Slabs to Disposal Drain at back side of Poleramma Temple
33 2022-23 10.00 AE-3
in Division No.25 (3rd call)
212 / Construction of Retaining Wall and Providing C.C Drain opposite to G.Ramesh
34 2022-23 10.00 AE-3
house at NSP Quarters in Division No.30 (6th call)
Providing C.C Culvert at Rajapanagal Road 15th Line and Providing C.C Road
213 / and C.C Drain from Pulugu Srinivasulu (H) to Yerramothu Venkatarao (H) near
35 2022-23 4.45 AE-3
Gangamma Devi Ammavari Temple in Mamidipalem in Division No.30 (6th
call)
TOTAL 430.04
Download Start Time : 28.06.2022 5.00 P.M
Download End Time : 12.07.2022 5.00 P.M
Receipt of Bids End Time : 12.07.2022 5.15 P.M
Price Bid Opening Time : 12.07.2022 5.30 P.M
214 / Laying of B.T Patches from N.H-16 Service Road to N.S.P Canal in
1 2022-23 7.75 AE-5
Mukthinuthalapdu in Division No.2
215 / Providing C.C Drain from South Side 4th Line Extension to Tirupathamma
2 2022-23 6.00 AE-5
Temple at Gopal Nagar Extension 60 Feet Road in Division No.5
Providing C.C Drain from Pedababu (H) to Anjaneyaswami Temple Road and
216 /
3 2022-23 CC Patch from P Kumari (H) to Y Buchamma (H) at Santhapeta in Division 6.00 AE-3
No.14

Providing C.C Drains from Ungarala Venkata Subbaiah (H) to Road End,
Ungarala Rajagopal ( H) to Road End at Ungaralavari veedhi, Prakasam
217 /
4 2022-23 Towers west side to Gurram Rambabu(H), Ramali Building east side to V.V 6.20 AE-3
Srihari (H) and Magunbta Subba Rami Reddy Statue to Ilavala Sudhakar
Reddy (H) in Kamasastrivari Street in Santhapeta in Division No.14

218 / Providing C.C Drain from D.No.36-71-431 to D.No.8-125(2) in V.I.P Road 5th
5 2022-23 10.00 AE-5
Cross Road in Division No.34
219 / Raising of C.C Road from Sai Srinivasa Towers to Sri Venkateswara Residency
6 2022-23 5.73 AE-5
in Rajeev Nagar Extension in Division No.34
220 /
7 2022-23 Repairs and Cleaning of Open Well in Gaddalagunta in Division No.34 1.00 AE-5

221 / Providing C.C Road from east to west at VVR Degree College back side at
8 2022-23 Chennakesvaswamy Manyam in Division No.37 3.47 AE-5

Supply, Delivery and Fixing of R.C.C Drainage Pipe Line and Filling of Quarry
222 /
9 2022-23 Rubbish near Durgah Street (10th Cross Road) in Peerlamanyam in Division 9.73 AE-5
No.39
223 / Construction of Compound Wall upto plinth beam for Open Site at L.P
10 2022-23 10.00 AE-5
No.118/1 in Pernamitta in Division No.38
224 / Laying of 110 mm and 160 mm dia P.V.C Pipe Line in Sri Krishna Nagar in
11 2022-23 4.69 AE-5
Division No.39
225 / Providing C.C Drain from D.No.46-140-389 to Venkatadri Residency in
12 2022-23 2.99 AE-5
Pragathi Nagar in Division No.39
226 / Laying of 110 mm dia P.V.C Pipe Line in Chandraiah Nagar 8th Line and 9th
13 2022-23 Line in Division No.48 5.30 AE-5

227 / Drilling of Deep Bore Wells and Fixing of I.M-II Pump Sets at various places in
14 2022-23 10.00 AE-5
Ongole Municipal Corporation
Engaging of JCB for Removal of Junle Clearance and Debris in
228 /
15 2022-23 Mukthinuthalapadu, Kesavarajukunta, Pernamitta, Old Byepass and 2.50 AE-5
Mangamoor Donka in Ongole Municipal Corporation
TOTAL 91.36
Download Start Time : 30.06.2022 5.00 P.M
Download End Time : 14.07.2022 5.00 P.M
Receipt of Bids End Time : 14.07.2022 5.15 P.M
Price Bid Opening Time : 14.07.2022 5.30 P.M
229 / Providing C.C Patches at various places in A.E-1 section in Ongole Municipal
1 2022-23 Corporation 10.00 AE-1

230 / Providing C.C Patches and B.T Patches at various places in A.E-2 section in
2 2022-23 10.00 AE-2
Ongole Municipal Corporation
TOTAL 20.00
Download Start Time : 06.07.2022 5.00 P.M
Download End Time : 11.07.2022 5.00 P.M
Receipt of Bids End Time : 11.07.2022 5.15 P.M
Price Bid Opening Time : 11.07.2022 5.30 P.M

Repairs & Rectification of Transformer, Raw Water 40 Hp WUPL Pump, Raw


Water 40 Hp & 100 Hp Vacuum Connection, Repumping 40 Hp Pump, Clear
Water 150 Hp & 75 Hp Bypass GI Fitting, 5 Hp Upwash motor Repair, 35 Hp
231 /
1 2022-23 Motor Starter Repair at SS Tank-II&I and R.R Tank 60 Hp Motor & 60 Hp 8.00 AE-3
pump Section Pipes repairs, New Filter House Zone-4 Pump Repair, Zone-6
40 Hp Pump and 60 Hp Pump No.2 Hill Lock Pumping in Ongole Municipal
Corporation

232 / Supply of C.I.D Joints & Non Return Valves for Leaks Purpose at Various
2 2022-23 10.00 AE-3
Places in 1 to 50 Divisions of Ongole Municipal Corporation
TOTAL 18.00
Download Start Time : 13.07.2022 5.00 P.M
Download End Time : 20.07.2022 5.00 P.M
Receipt of Bids End Time : 20.07.2022 5.15 P.M
Price Bid Opening Time : 20.07.2022 5.30 P.M
233 / Clearing thin jungle growth on bunds of SS Tank-2 and along the pump house
1 2022-23 3.00 AE-3
premises in Ongole Municipal Corporation
234 / Providing Compound Wall and Drilling of Deep Bore Well at Arunodaya
2 2022-23 10.00 AE-3
Colony UPHC Building in Division No.39
235 / Supply and Delivery of IM-II Hand Pump Spare Parts to Ongole Municipal
3 2022-23 10.00 AE-2
Corporation
Providing LED Rope Lighting from Church Center to Kasu Brahmananda
236 /
4 2022-23 Reddy statue, Collector Camp Office Road and Cloughpet in Ongole 10.00 AE-2
Municipal Corporation
237 / Formation of Quarry Rubbish Road at Peerlamanyam to UPHC Center of
5 2022-23 10.00 AE-3
Arunodaya Colony in Division No.39
239 / Preventive Maintenance and Repairs of Sanitary and Engineering Vehicles in
7 2022-23 10.00
Ongole Municipal Corporation
Repairs and Rectification of 30 HP Motor at Police Quarters, 100 HP Raw
240 / Water Pump and 75 HP Panel Board at WTP at S.S Tank-II WTP, 45 HP 201 /
8 2022-23 Submersible Motor at Hillock Balancing Reservoir in Water Supply section in 2.40 AE-3 2022-
23
Ongole Municipal Corporation (2nd call)

241 / Construction of Balance CC Drains in Venkateswara colony Main road in 253 /


9 2022-23 7.00 2021-
Division No.50 (4th Call) 22

TOTAL 62.40
Download Start Time : 16.07.2022 5.00 P.M
Download End Time : 21.07.2022 5.00 P.M
Receipt of Bids End Time : 21.07.2022 5.15 P.M
Price Bid Opening Time : 21.07.2022 5.30 P.M

Repairs & Rectification of Transformer, Raw Water 40 Hp WUPL Pump, Raw


Water 40 Hp & 100 Hp Vacuum Connection, Repumping 40 Hp Pump, Clear
Water 150 Hp & 75 Hp Bypass GI Fitting, 5 Hp Upwash motor Repair, 35 Hp
242 / 231 /
1 2022-23 Motor Starter Repair at SS Tank-II&I and R.R Tank 60 Hp Motor & 60 Hp 8.00 AE-3 2022-
23
pump Section Pipes repairs, New Filter House Zone-4 Pump Repair, Zone-6
40 Hp Pump and 60 Hp Pump No.2 Hill Lock Pumping in Ongole Municipal
Corporation (2nd call)

TOTAL 8.00
Download Start Time : 21.07.2022 10.00 A.M
Download End Time : 25.07.2022 5.00 P.M
Receipt of Bids End Time : 25.07.2022 5.15 P.M
Price Bid Opening Time : 25.07.2022 5.30 P.M
Providing LED Rope Lighting from Church Center to Kasu Brahmananda
243 / 236 /
1 2022-23 Reddy statue, Collector Camp Office Road and Cloughpet in Ongole 10.00 AE-2 2022-
23
Municipal Corporation (2nd call)
TOTAL 10.00
Download Start Time : 22.07.2022 5.00 P.M
Download End Time : 26.07.2022 5.00 P.M
Receipt of Bids End Time : 26.07.2022 5.15 P.M
Price Bid Opening Time : 26.07.2022 5.30 P.M
244 /
1 2022-23 Providing Footpath at infront of C.R.P Quarters Park in Division No.21 5.95 AE-2

Laying of 110 mm Dia PVC Pipe Line from Ongole Dairy Milk Parlour to
245 /
2 2022-23 Venkateswara (H) at Ganugapalem and Srinivasa Foot Ware to Srinu (H) at 10.00 AE-3
Kota Vari Veedhi in Division No.23

Laying of 110 mm and 160mm Dia PVC Pipe Line from Basha Glass Work to
246 / Notice Shop, Moulali (H) to Sathyam Handlooms at Kotavari Veedhi and
3 2022-23 10.00 AE-3
Construction of CC Road & CC drain Beside Kotavari veedhi school East side
in Division No.23

Providing C.C Road and C.C Drain from SK.Mastan (h) to Guraka Kumari (h) in
247 /
4 2022-23 Sundaraiah Colony 5th Line and B.Balaswami (h) to Kankanala Srinu (h) near 9.98 AE-3
Krishna Sai School in Pernamitta in Division No.42
Providing C.C Drain from Upputuri Srinu (h) to P.Srinu (h) in Sundaraiah
248 /
5 2022-23 Colony 2nd Line and SK.Meerbhi (h) to I.Chiranjeevi (h) in Sundaraiah Colony 10.00 AE-3
6th Line in Pernamitta in Division No.42
Construction of Ladies Bathroom, Toilet and Laying of Borewells and
249 /
6 2022-23 Completion of Compound Wall with Gate in Hindu Burial Ground in 9.90 AE-3
Ganapathi Nagar in Division No.43
250 / Supply and Delivery of Computers, Printers and Scanners and Providing
7 2022-23 Painting to Commissioner Building in Ongole Municipal Corporation 10.00 AE-3

251 / Supply and Delivery of Office Tables, Boss Chairs, Computer Chairs, Office
8 2022-23 5.00 AE-3
Chairs, Conference Tables to Ongole Municipal Corporation
252 / Construction of Balance CC Drains in Venkateswara colony Main road in 241 /
9 2022-23 7.00 2022-
Division No.50 (5th Call) 23

TOTAL 77.83
Download Start Time : 22.07.2022 5.00 P.M
Download End Time : 05.08.2022 5.00 P.M
Receipt of Bids End Time : 05.08.2022 5.15 P.M
Price Bid Opening Time : 05.08.2022 5.30 P.M
254 / Supply and Delivery of Coconut Brooms and Bamboo Sticks for Sanitation in
1 2022-23 1.60 AE-3
Ongole Municipal Corporation
255 / Engaging of Announcement Autos for awareness of Single Use Plastic in
2 2022-23 Ongole Municipal Corporation 1.00 AE-3

256 / Printing of A4 Pamplelts for Single Use Plastic Ban and for User Charges in
3 2022-23 0.99 AE-3
Ongole Municipal Corporation
257 / Providing Drinking Water Facility for Spandana Meeting at Spandana Hall in
4 2022-23 0.48 AE-2
Collector Office in Ongole Municipal Corporation
258 / Removal of Jungle Clearance and Levelling the Bund at Cheruvukommu
5 2022-23 0.99 AE-2
Palem Tank in Division No.18
259 / Supply, Delivery and Fixing of C.C Bullet and Drone Cameras at Municipal
6 2022-23 Office out side premises in Ongole Municipal Corporation 0.43 AE-2

TOTAL 5.49
Download Start Time : 29.07.2022 5.00 P.M
Download End Time : 02.08.2022 5.00 P.M
Receipt of Bids End Time : 02.08.2022 5.15 P.M
Price Bid Opening Time : 02.08.2022 5.30 P.M
Laying of 200 mm dia P.V.C Pipe Line from Santhapet 1st Line to Magunta
260 /
1 2022-23 Subba Rami Reddy Statue and 160 mm dia P.V.C Pipe Line from Chaitanya 9.60 AE-1
Plaza Apartment to Anjaneyaswamy Temple in Division No.14

Laying of 200 mm dia P.V.C Pipe Line from Government Girls Hostel-I to
261 /
2 2022-23 Venkata Subbaiah house and Veterinary Hospital Road and from Santhapet 9.90 AE-1
1st Line to Natu Babu Rao Park in Division No.14
Supply and Laying of Bituminous Hot Sealing Compound (Grade 'A' ISI) and
262 /
3 2022-23 Sealing the Joints to C.C Roads in Divisions 33 to 50 in Ongole Municipal 10.00 AE-3
Corporation

Supply and Laying of Bituminous Hot Sealing Compound (Grade 'A' ISI) and
263 / Sealing the Joints to C.C Roads from Guntur Road, Gorantla Multiplex Road,
4 2022-23 5.00 AE-1
Bapuji Market Complex Road, Collector Office Road (Trunk Road), Santhapeta
Main Road and Ramnagar Main Road in Ongole Municipal Corporation

264 / Repairs to M.S Push Carts in Sanitary Divisions 1 to 3 in Ongole Municipal


5 2022-23 10.00 AE-3
Corporation
265 / Repairs to M.S Push Carts in Sanitary Divisions 4 to 5 in Ongole Municipal
6 2022-23 Corporation 9.95 AE-3

Providing Painting, Garland Decoration, Shamiyana and Chairs for Statues


266 /
7 2022-23 Maintenance at various places for the year 2022-23 in Ongole Municipal 5.30 AE-2
Corporation
TOTAL 59.75
Download Start Time : 29.07.2022 5.00 P.M
Download End Time : 11.08.2022 5.00 P.M
Receipt of Bids End Time : 11.08.2022 5.15 P.M
Price Bid Opening Time : 11.08.2022 5.30 P.M
267 / Repairs, Supply and Delivery of Hardware and Software Items for Municipal
1 2022-23 5.81 AE-3
Office administrative purpose in Ongole Municipal Corporation
268 / Providing Refreshments for various programmes at various places at
2 2022-23 3.30 AE-3
Municipal Office premises in Ongole Municipal Corporation
269 / Arrangements for 75th Independence Day and 73rd Republic Day
3 2022-23 Celebrations at Municipal Office premises in Ongole Municipal Corporation 1.76 AE-3

270 / Repairs to Air Conditioners at Municipal Corporation Office in Ongole


4 2022-23 Municipal Corporation 0.92 AE-3

271 / Providing Drinking Water Facilities for various meetings at various places in
5 2022-23 0.99 AE-3
Ongole Municipal Corporation
272 /
6 2022-23 Providing Compound Wall to A.B.M College Helipad Area in Division No.12 1.05 AE-1

Providing Arrangements for Activities to be taken up for "Azadi ka Amrut


273 /
7 2022-23 Mahotsav" Programme from 01.08.2022 to 15.08.2022 in Ongole Municipal 10.00 AE-3
Corporation
Providing Abstract/Geometrical/Patterns Art/Nature Art Work on walls with
274 / Professional Artists (not less than BFA Qualification) at KIMS Hospistal,
8 2022-23 10.00 AE-3
Koppolu Junction, near Guntur Route & Nellore Route Pillars in Ongole
Municipal Corporation
TOTAL 33.83
Download Start Time : 02.08.2022 5.00 P.M
Download End Time : 06.08.2022 5.00 P.M
Receipt of Bids End Time : 06.08.2022 5.15 P.M
Price Bid Opening Time : 06.08.2022 5.30 P.M
275 / Laying of 160 mm dia P.V.C Pipe Line from Maruthi Nagar 1st Line Ending to
1 2022-23 Chennuboyina Vijaya house in Division No.44 2.60 AE-3

276 / Desiltation of Storm Water Drains with Gang Work in 1 to 50 Divisions in


2 2022-23 10.00 AE-3
Ongole Municipal Corporation
Desiltation of existing Storm Water Drains from Old Udipi Hote to P.R.P
277 /
3 2022-23 Office in Kurnool Road in Division Nos.44 and 45 in Ongole Municipal 3.80 AE-3
Corporation
278 / Laying of 110 mm dia P.V.C Pipe Line from south to north at Varma Grand
4 2022-23 2.00 AE-2
Hotel beside Road in Division No.38
279 / Repairs and Rectification of Leaks in 1 to 50 Divisions in Ongole Municipal
5 2022-23 Corporation 9.99 AE-3

280 / Removal of Jungle Clearance and Levelling the Bund at Cheruvukommu 258 /
6 2022-23 Palem Tank in Division No.18 (2nd call) 0.99 AE-2 2022-
23

281 / Supply and Delivery of R.C.C Np3 Pipes and Formation of Roads in Rajiv
7 2022-23 Gruha Kalpa in Division No.9 10.00 AE-1

TOTAL 39.38
Download Start Time : 04.08.2022 5.00 P.M
Download End Time : 11.08.2022 5.00 P.M
Receipt of Bids End Time : 11.08.2022 5.15 P.M
Price Bid Opening Time : 11.08.2022 5.30 P.M
282 / Construction of Storm Water Drain from Pothuraju Canal to Bapuji Complex
1 2022-23 100.00 AE-1
in Ongole Municipal Corporation under 15th Finance Commission Grant
283 / Construction of Balance Dr.YSR Urban Health Clinic (Urban Primary Health
2 2022-23 36.00 AE-1
Center) in Gudimellapadu in Division No.2
Providing C.C Roads from D.No.157 to Elec. Pole No.SS/16/A6/2, from
284 /
3 2022-23 D.No.210 to Elec. Pole No.SS/A3/1/2 and from Elec. Pole No.BN1/A2/6 to 10.00 AE-1
D.No.278 in Bilal Nagar in Division No.2
285 / Providing Internal C.C Roads in Balineni Bharath Colony 8th, 9th, 10th, 11th
4 2022-23 and 14th Cross Roads in Division No.3 10.00 AE-1

286 / Providing Balance C.C Road from existing C.C Road to Dasarajupalli Road
5 2022-23 10.00 AE-1
D.No.592 to D.No.665 in Balineni Bharath Colony Main Road in Division No.3
Providing C.C Road from V.Venkateswarlu house to B.Narasimha Rao house
287 /
6 2022-23 in Balineni Bharath Colony and C.C Drain from D.No.240 to Sd.Karimulla 10.00 AE-1
house in Balaram Colony in Division No.3
288 / Providing C.C Road and C.C Drain in Chakalivari Veedhi in Mukthinuthalapadu
7 2022-23 in Division No.2 9.70 AE-1
289 / Widening of C.C Road beside Auxillium School to 4th Line at Gopal Nagar
8 2022-23 38.50 AE-1
Extension 60' Feet Road in Division No.5
290 / Construction of Dr.B.R Ambedkar Auditorium in Division in New Ambedkar
9 2022-23 40.00 AE-1
Nagar in Koppolu in Division No.10
291 / Construction of Balance Compound Wall to S.C Burial Ground west side in
10 2022-23 20.50 AE-1
Koppolu in Division No.10
292 / Providing C.C Drain and Culvert to Dreams Nagar 1st Line towards north side
11 2022-23 from Kothapatnam Road in Division No.10 15.60 AE-1

293 / Construction of C.C Storm Water Drain in MDB Road in Division No.14 under
12 2022-23 40.00 AE-1
15th Finance Commission Grant
Construction of C.C Storm Water Drain from Sai Baba Temple to existing
294 /
13 2022-23 Culvert at Agraharam Railway Track Gate in Division No.15 under 15th 25.00 AE-1
Finance Commission Grant
295 / Construction of balance Dr.YSR Urban Health Clinic (Urban Primary Health
14 2022-23 Center) at Vengamukkalapalem ward secretariat in Division No.18 36.00 AE-2

296 / Construction of balance work of Watchman Room and Roofing G.I Sheet at
15 2022-23 Garbage Transfer Station-I at Kothamamidi Palem in Division No.18 40.00 AE-2

297 / Providing New Toilet at Panchayat Office and Painting to Auditorium Building
16 2022-23 and Veterinary Hospital in Division No.18 5.20 AE-2

298 / Providing C.C Drain on from Poleramma Temple in APSEB Colony to Old
17 2022-23 27.00 AE-2
Byepass Road in Division No.19 under 15th Finance Commission Grant
299 / Providing B.T Road from Sai Baba Temple to Old Bye Pass Road via V.R
18 2022-23 35.60 AE-2
Residency in Housing Board Colony in Division No.19
300 / Providing R.C.C Culvert Walls from D.A Polytechnic College Road approach to
19 2022-23 9.30 AE-2
Old Bye Pass in Housing Board Colony in Division No.19
301 / Providing C.C Road and C.C Drain from Gokul Residency to Bhagya Nagar 4th
20 2022-23 38.50 AE-2
Line and from E.L.S.R to Bhagya Nagar 4th Line in Division No.20
302 / Providing C.C Drain from Srikanya Lodge to Maruthi Apartment north side in
21 2022-23 20.90 AE-2
Division No.21
303 /
22 2022-23 Repairs to Compound Wall at Devudu Cheruvu Park in Division No.21 10.00 AE-2

304 / Providing C.C Drain at west to east from Shiva Parvathy Nilayam to Ele.Pole
23 2022-23 9.42 AE-2
No.025/10B/0101/000 at Yenugu Chettu Bazar in Division No.22
305 / Providing C.C Road from Bandlamitta to New Vegetable Market Towards
24 2022-23 29.93 AE-2
Samaikyatha Nagar in Division No.24 under 15th Finance Commission Grant
306 / Providing C.C Road from Anjaiah Road entrance to New Vegetable Market
25 2022-23 23.24 AE-2
Road (beside P.V.R Boys High School) in Division No.24
307 / Providing C.C Road from Addanki Bus Stand ELSR to Samaikyatha Nagar Road
26 2022-23 19.90 AE-2
entrance in Division No.24
308 / Construction of C.C Drain and Widening of C.C Road from Leuman Coffee
27 2022-23 29.00 AE-2
Shop to Dena Bank in Rajapanagal Main Road in Division No.28
309 / Construction of Retaining Wall, Steps and C.C Road opposite to G.Ramesh
28 2022-23 house in N.S.P Quarters in Division No.30 20.00 AE-2

310 / Construction of Compound Wall to Park in Gaddalagunta Extension in


29 2022-23 40.00 AE-2
Division No.32
311 / Providing C.C Drain from Mangamoor Road N.S.P Canal to Sai Towers in Z.P
30 2022-23 32.65 AE-3
colony in Division No.33
Providing C.C Drain from Padmalaya Bakery to existing Bye Pass Road (V.I.P
312 /
31 2022-23 Road south side drain) in Division No.34 under 15th Finance Commission 30.00 AE-3
Grant
313 / Providing C.C Road and C.C Drain from D.No.36-71-941 to existing C.C Road
32 2022-23 21.50 AE-3
(D.No.36-71-923) in Rajeev Nagar Extension in Division No.34
Providing C.C Road at V.I.P Road HDFC Bank Line from K.Koteswara Rao
314 / house to V.Srinu house (Kitchen Hall) and C.C Road at ELSR Gaddalagunta to
33 2022-23 10.00 AE-3
Well opposite to ELSR and from Ramalakshmamma house to T.Lakshmi
house opp. Nehru Statue in Division No.34
315 / Construction of Sachivalayam Building at Survey No.292 in Uma Maheswara
34 2022-23 40.00 AE-3
Nagar in M.M Road in Division No.35
316 / Widening of C.C Road from Raavi Chettu to Rythu Bazar in Mangamoor Road
35 2022-23 9.00 AE-3
in Division No.35
317 / Laying of 110 mm dia P.V.C Pipe Line from Uma Maheswara College to
36 2022-23 Mangamoor Road via Shakir house in Lawyerpet in Division No.35 1.65 AE-3

318 /
37 2022-23 Providing Gravel Filling to R.R Tank (Ranga Rayudu Cheruvu) in Division No.36 2.90 AE-3

319 / Providing C.C Road from Sri Sai Nilayam to Sarada Residency in
38 2022-23 26.50 AE-3
Chennakesava Swamy Layout in Division No.37
320 / Providing C.C Road from Achalanda Ashramam to existing Mangamoor Road
39 2022-23 9.90 AE-3
in Sivaji Nagar 2nd Line in Division No.37
321 / Providing C.C Drain and C.C Road in Survey No.256/6 in Gandhi Nagar 6th
40 2022-23 Line in Division No.37 8.70 AE-3

322 / Repairs to Compound Wall and Walking Track in Chennakesava Swamy


41 2022-23 Layout Park in Division No.37 6.00 AE-3

Providing C.C Drain from Bathina Yenkayya house (D.No.46-139/409) to


323 /
42 2022-23 Pratap Ramakotamma house (D.No.46-139/378) near R&B Road in 10.00 AE-3
Mahalakshmi Nagar 2nd Line in Division No.38
324 / Supply and Delivery of Reverse Osmosis Water Treatment Plant (R.O Plant)
43 2022-23 1.47 AE-3
Material near Ambedkar Statue in Pernamitta in Division No.40

Providing C.C Drain from Perugu Thirupathamma (h) to Gonasani Sai (h) via
Kilari Srinivas (h) and from Sriram Colony 2nd Line 1st Cross Road
325 /
44 2022-23 Venkateswarlu (h) to Brahmin Bazar & Sriram Colony 2nd Line 2nd Cross 40.00 AE-3
Road Murthy (h) to Brahmin Bazar and Srinivasa Colony Extension Road in
Division No.43

Providing C.C Road from Pasam Kondaiah house to N.Guravaiah house in


326 /
45 2022-23 Sriram Colony 2nd Main Road from 2nd Cross Road to 4th Cross Road in 10.00 AE-3
Division No.43
Providing C.C Road from Ch. Pullaiah house to Pasam Kondaiah house in
327 /
46 2022-23 Sriram Colony 2nd Main Road from 2nd Cross Road to 4th Cross Road in 10.00 AE-3
Division No.43
Providing C.C Road from Nali Balarajamma house to Ch.Pullaiah house in
328 /
47 2022-23 Sriram Colony 2nd Main Road from 2nd Cross Road to 4th Cross Road in 10.00 AE-3
Division No.43
329 / Providing C.C Drain from Maruthi Nagar 1st Line ending to west side of
48 2022-23 9.98 AE-3
Chennuboyina Vijaya house beside Pothuraju Canal in Division No.44
330 / Providing C.C Road and C.C Drain at Maruthi Nagar 2nd Line opposite to Uma
49 2022-23 8.95 AE-3
Manovikasa Kendram in Division No.44
Formation of Quarry Rubbish in Maruthi Nagar 1st Line ending to west side
331 /
50 2022-23 of Chennuboyina Vijaya house and Maruthi Nagar 3rd Line beside Petrol 5.15 AE-3
Bunk to Naraiah house in Division No.44
Providing C.C Drains at Nagendra Nagar 1st Line, 2nd Line, 2nd Cross Road,
332 /
51 2022-23 5th Cross Road and Sri Nagar Colony 6th Cross Road, 7th Cross Road in 22.00 AE-3
Division No.45
333 / Providing C.C Roads at Srinagar Colony 6th and 7th Cross Roads in Division
52 2022-23 15.00 AE-3
No.45
334 / Engaging Private J.C.B for cleaning of Jungle and Solid Waste near Pothuraju
53 2022-23 2.86 AE-3
Canal in Division No.44 and 45 in Ongole Municipal Corporation
335 / Providing C.C Drain at 60 Feet Road from Krishna Lodge (D.No.31-53-M1) to
54 2022-23 36.50 AE-3
Darla Bujjamma house (D.No.31-53-175) in Division No.48
Providing C.C Drain from Golla Rosaiah house (D.No. 32-54.421) to Godipaga
336 /
55 2022-23 Vijayamma house (D.No.31-53-179) in Chandraiah Nagar Main Road in 28.25 AE-3
Division No.48
337 / Providing C.C Drain from Timber Depot in Wood Complex to Pothuraju Canal
56 2022-23 32.00 AE-3
in Division No.50 under 15th Finance Commission Grant
338 / Laying of B.T Road from Old Bypass to Dal Mill for approaches to Netaji
57 2022-23 40.00 AE-3
Colony in Division No.50
339 / Providing Quarry Rubbish Roads at Netaji Colony Internal Roads in Division
58 2022-23 25.00 AE-3
No.50
340 /
59 2022-23 Providing C.C.Road at Venkateswara Colony Main Road in Division No.50 13.50 AE-3

Supply and Laying of Bituminous Hot Sealing Compound (Grade 'A' ISI) and
341 /
60 2022-23 Sealing the Joints to C.C Roads in D.E.E-2 section in Ongole Municipal 6.70 AE-2
Corporation

Laying of 110 mm Dia PVC Pipe Line from Ongole Dairy Milk Parlour to
342 / 245 /
61 2022-23 Venkateswara (H) at Ganugapalem and Srinivasa Foot Ware to Srinu (H) at 10.00 AE-3 2022-
23
Kota Vari Veedhi in Division No.23 (2nd call)

Laying of 110 mm and 160mm Dia PVC Pipe Line from Basha Glass Work to
343 / Notice Shop, Moulali (H) to Sathyam Handlooms at Kotavari Veedhi and 246 /
62 2022-23 10.00 AE-3 2022-
Construction of CC Road & CC drain Beside Kotavari veedhi school East side 23
in Division No.23 (2nd call)

344 / Supply, Delivery and Fixing of C.C Bullet and Drone Cameras at Municipal 259 /
63 2022-23 0.43 AE-2 2022-
Office out side premises in Ongole Municipal Corporation (2nd call) 23

TOTAL 1305.88
Download Start Time : 18.08.2022 5.00 P.M
Download End Time : 05.09.2022 5.00 P.M
Receipt of Bids End Time : 05.09.2022 5.15 P.M
Technical Bid Opening Time : 05.09.2022 5.30 P.M
Price Bid Opening Time : 05.09.2022 5.45 P.M
345 / Construction of Pedestal and Beautification of the Traffic Island opp. Bapuji
1 2022-23 10.00 AE-3
Complex in Ongole Municipal Corporation
TOTAL 10.00
Download Start Time : 22.08.2022 5.00 P.M
Download End Time : 29.08.2022 5.00 P.M
Receipt of Bids End Time : 29.08.2022 5.15 P.M
Price Bid Opening Time : 29.08.2022 5.30 P.M
346 / Construction of Ward Sachivalayam Building in Gaddalagunta in Division
1 2022-23 No.32 40.00 AE-2

347 /
2 2022-23 Providing C.C Road at Samatha Nagar 9th line in Division No.37 9.85 AE-3

Providing C.C Drain from Sri Priya Apartment to Chigurupati Nilayam and C.C
348 /
3 2022-23 Road from Nainala Balakotaiah house (33-055-601) to Vaddela Ranga house 10.00 AE-3
(33-055-606) in Sri Nagar Colony 1st Line in Division No.45

349 / Providing C.C Road at back side of Bala Krishna Puram 3rd Line in Division
4 2022-23 No.49 2.25 AE-3

350 /
5 2022-23 Providing C.C Drain at Bala Krishna Puram Main Road in Division No.49 8.00 AE-3

351 / Providing C.C Drain, C.C Road and 110 mm dia P.V.C Pipe Line at Iscon
6 2022-23 Temple back side in Division No.49 6.35 AE-3

352 / Providing C.C Road from Mota Anjamma house to D.No.33-57-096 in


7 2022-23 9.50 AE-3
Jayaprakash Colony Extension Line in Division No.50
353 /
8 2022-23 Providing C.C Road at Nehru Nagar Park south side in Division No.50 7.00 AE-3

354 / Repairs, Supply and Delivery of Hardware and Software Items for office
9 2022-23 administration purpose in Ongole Municipal Corporation 3.85 AE-3

355 / Providing Drinking Water Facility for other Government Programmes at


10 2022-23 various places in Ongole Municipal Corporation 1.50 AE-3

TOTAL 98.30
Download Start Time : 22.08.2022 5.00 P.M
Download End Time : 06.09.2022 5.00 P.M
Receipt of Bids End Time : 06.09.2022 5.15 P.M
Price Bid Opening Time : 06.09.2022 5.30 P.M
357 / Providing C.C Drain at Akkireddy house opposite to Sub Station in
1 2022-23 1.90 AE-1
Annavarappadu 3rd Line in Division No.15
358 / Laying of 150mm Dia AC Pipe line from Devudu Cheruvu Park to Bhagiradha
2 2022-23 Statue in Division No.21 7.00 AE-2

Providing Thermoplastic Road Marking and Supply and fixing of Raised


359 /
3 2022-23 Pavement Markers (Road Stunds) from Hotel Kolas to C.R.P Quarters 2.00 AE-2
Junction in Division No.21
TOTAL 10.90
Download Start Time : 26.08.2022 5.00 P.M
Download End Time : 08.09.2022 5.00 P.M
Receipt of Bids End Time : 08.09.2022 5.15 P.M
Price Bid Opening Time : 08.09.2022 5.30 P.M
360 / Supply and Delivery of Bronze Statue of "Mahakavi Gurram Jashuva" to
1 2022-23 6.75 AE-3
Ongole Municipal Corporation
TOTAL 6.75
Download Start Time : 30.08.2022 5.00 P.M
Download End Time : 06.09.2022 5.00 P.M
Receipt of Bids End Time : 06.09.2022 5.15 P.M
Price Bid Opening Time : 06.09.2022 5.30 P.M
Providing C.C Road from Dasari Tirupathi Swamy (H) to Purre Venkateswarlu
361 /
1 2022-23 (H) and C.C Drain from Parre Rosaiah (H) to Ratikinda Prabhudasu (H) in 10.00 AE-2
Vengamukkapalem S.C Colony in Division No.18
362 / Providing C.C Road from Dasari Tirupathi Swamy (H) to Purre Venkateswarlu
2 2022-23 (H) in Vengamukkapalem S.C Colony in Division No.18 7.00 AE-2

Providing C.C Drain from beside Vinayaka Temple to Burusu Lakshmi (H) in
363 /
3 2022-23 Domalapalem and Allahuddin Jewellery to Lakshmi Sravanthi Cut Pieces in 8.65 AE-2
Bheemaraju Veedhi in Division No.25
364 / Dismantling of Dilapidated Toilet at Rajapanagal Road 12th Cross Road in
4 2022-23 0.42 AE-2
Division No.29
365 / Providing C.C Road from Brahmam Shop to Subba Rao house in Lingareddy
5 2022-23 10.00 AE-3
Colony in Pernamitta in Division No.40
366 / Providing C.C Road from Sri Hanuman Granites to Kanupuram Subbarao
6 2022-23 house in Chaitanya Colony in Pernamitta in Division No.40 9.99 AE-3

367 / Providing C.C Drain from Sriram Purna house to Ravuri Guravareddy house in
7 2022-23 9.99 AE-3
Pernamitta in Division No.40
TOTAL 56.05
Download Start Time : 30.08.2022 5.00 P.M
Download End Time : 13.09.2022 5.00 P.M
Receipt of Bids End Time : 13.09.2022 5.15 P.M
Price Bid Opening Time : 13.09.2022 5.30 P.M
368 / Transportation and Supply of Water in various places in 1 to 50 Divisions in
1 2022-23 10.00 AE-2
Ongole Municipal Corporation
TOTAL 10.00
Download Start Time : 01.09.2022 5.00 P.M
Download End Time : 08.09.2022 5.00 P.M
Receipt of Bids End Time : 08.09.2022 5.15 P.M
Price Bid Opening Time : 08.09.2022 5.30 P.M
369 /
1 2022-23 Providing C.C Patches at various places in Division No.5 0.87 AE-1

370 / Providing C.C Culvert at K.P Road back side of Mahalakshmi ammavari
2 2022-23 2.90 AE-1
Temple in Division No.6
371 /
3 2022-23 Providing C.C Drains in Vengamukkapalem S.C Colony in Division No.18 10.00 AE-2

372 / Raising of C.C Road from Government LIC Office to Pitchi reddy (H) in Bhagya
4 2022-23 7.40 AE-2
Nagar 3rd Line in Division No.20
373 / Raising of C.C Road from D.Jeevaratnam (H) to Sk.Aashabi (H) in Bhagya
5 2022-23 5.60 AE-2
Nagar Donka in Division No.20
Filling with Quarry Rubbish to C.R.P Quarters Road down beside Mastanvali
374 /
6 2022-23 Darga and D.Jeevaratnam (H) to Sk.Mastanbi (H) in Bhagya Nagar Donka in 4.80 AE-2
Division No.20
375 / Construction of Compound Wall for Well at Bhagya Nagar 2nd Line in
7 2022-23 Division No.20 4.00 AE-2

376 / Providing C.C Drain from D.Jeevaratnam (H) to Sk.Aashabhi (H) in Bhagya
8 2022-23 2.70 AE-2
Nagar Donka in Division No.20
Providing C.C Road from Water Tank Compound Wall to M.Venkateswarlu
377 /
9 2022-23 (H) and G.Ramanaiah (H) to E.Venkata Ramanamma (H) in N.S.P Quarters 9.30 AE-2
Srigiri Hill area in Division No.30
378 / Providing C.C Drain from E.Venkata ranamanna (H) to M.Venkateswarlu (H)
10 2022-23 in N.S.P Quarters Srigiri Hill area in Division No.30 3.00 AE-2

379 / Supply and Fixing of Electrical Items and Water Bubbles for Sachivalayams
11 2022-23 2.56 AE-2
from 55 to 63 and 64 to 70 in Ongole Municipal Corporation

TOTAL 53.13
Download Start Time : 02.09.2022 5.00 P.M
Download End Time : 16.09.2022 5.00 P.M
Receipt of Bids End Time : 16.09.2022 5.15 P.M
Price Bid Opening Time : 16.09.2022 5.30 P.M

381 / Construction of Pedestal and Beautification of the Area for Gurram Jashuva
1 2022-23 10.00 AE-3
Gari Statue at Prakasam Bhavan in Ongole Municipal Corporation

TOTAL 10.00
Download Start Time : 16.09.2022 5.00 P.M
Download End Time : 19.09.2022 5.00 P.M
Receipt of Bids End Time : 19.09.2022 5.15 P.M
Price Bid Opening Time : 19.09.2022 5.30 P.M
Construction of Storm Water Drain from Pothuraju Canal to Bapuji Complex
382 / 282 /
1 2022-23 in Ongole Municipal Corporation under 15th Finance Commission Grant (2nd 100.00 AE-1 2022-23
call)
Construction of C.C Storm Water Drain from Kesavaraju Kunta to Pothuraju
383 /
2 2022-23 Canal in Division No.2 in Ongole Municipal Corporation under 15th Finance 86.50 AE-1
Commission Grant
384 /
3 2022-23 Laying of C.C Patches at Islampet Extension Road in Division No.4 1.60 AE-1 K-65

385 / Providing C.C Drain from South Side 4th Line Extension to Tirupathamma Rev K-
4 2022-23 6.00 AE-1
Temple at Gopal Nagar Extension 60 Feet Road in Division No.5 67

386 / Providing C.C Road and C.C Drain from Nagendra Swamy Putta to existing C.C Rev K-
5 2022-23 Road in Gopal Nagar 1st Line in Division No.6 9.85 AE-1
66

387 / Laying of 110 mm dia P.V.C Pipe Line opposite to Dinala Bavi in Kakathiya
6 2022-23 2.30 AE-1 K-76
Nagar inn Division No.8
388 / Construction of Dr.B.R Ambedkar Auditorium in Division in New Ambedkar 290 /
7 2022-23 40.00 AE-1
Nagar in Koppolu in Division No.10 (2nd call) 2022-23

389 / Construction of Balance Compound Wall to S.C Burial Ground west side in 291 /
8 2022-23 20.50 AE-1
Koppolu in Division No.10 (2nd call) 2022-23
390 / Providing Balance C.C Road near Rice Mill and Balance C.C Road near B.V.R 152 /
9 2022-23 20.00 AE-3
High School in Koppolu in Division No.10 (3rd call) 2022-23

391 / Construction of C.C Storm Water Drain in MDB Road in Division No.14 under 293 /
10 2022-23 40.00 AE-1
15th Finance Commission Grant (2nd call) 2022-23

Providing C.C Drains from Ungarala Venkata Subbaiah (H) to Road End,
Ungarala Rajagopal (H) to Road End at Ungaralavari veedhi, Prakasam Towers
392 / Rev K-
11 2022-23 west side to Gurram Rambabu (H), Ramali Building east side to V.V Srihari (H) 6.20 AE-1
68
and Magunbta Subba Rami Reddy Statue to Ilavala Sudhakar Reddy (H) in
Kamasastrivari Street in Santhapeta in Division No.14

Providing C.C Drain from Pedababu (H) to Anjaneyaswami Temple Road and
393 / Rev K-
12 2022-23 C.C Patch from P Kumari (H) to Y Buchamma (H) in Santhapeta in Division 6.00 AE-1
69
No.14
394 / Providing C.C Drain at Akkireddy house opposite to Sub Station in 357 /
13 2022-23 1.90 AE-1
Annavarappadu 3rd Line in Division No.15 (2nd call) 2022-23

Providing Interconnection at Kamma Palem, Pipe Line shifting at Pulivenkata


395 /
14 2022-23 Reddy Colony & Repairs and Rectification of Leaks at Ram Nagar 1st Line opp. 1.60 AE-1 K-64
Mythri Vanam Apartment in Division No.15
Providing Quarry Rubbish Roads at opp. Arava Colony 1st Line Road,
396 /
15 2022-23 Ramulavari Temple back side road, B.C Employees Road and Arava Colony 9.10 AE-1 K-84
Extension Ashok Nagar beside Road in Division No.16

397 / Providing C.C Road and C.C Culvert from Ashok Nagar upto Pole
16 2022-23 No.296/A4/5A in Arava Colony and C.C Road in B.C Colony in Division No.16 8.65 AE-1 K-83

Providing C.C Road from Dasari Tirupathi Swamy (H) to Purre Venkateswarlu
398 / 361 /
17 2022-23 (H) and C.C Drain from Parre Rosaiah (H) to Ratikinda Prabhudasu (H) in 10.00 AE-2 2022-23
Vengamukkapalem S.C Colony in Division No.18 (2nd call)

399 / Providing C.C Road from Dasari Tirupathi Swamy (H) to Purre Venkateswarlu 362 /
18 2022-23 7.00 AE-2
(H) in Vengamukkapalem S.C Colony in Division No.18 (2nd call) 2022-23

400 / Providing C.C Drain from Srikanya Lodge to Maruthi Apartment north side in 302 /
19 2022-23 Division No.21 (2nd call) 20.90 AE-2 2022-23

401 / Supply, Delivery, Installation and Commissioning of Outdoor Fitness


20 2022-23 Equipments and Providing Lawn at Devudu Cheruvu Park in Division No.21 10.00 AE-2 K-79

402 /
21 2022-23 Construction of Gym Platform at Devudu Cheruvu Park in Division No.21 9.50 AE-2 K-80

403 / Laying of 150mm Dia AC Pipe line from Devudu Cheruvu Park to Bhagiradha 358 /
22 2022-23 7.00 AE-2
Statue in Division No.21 (2nd call) 2022-23

404 / Providing C.C Drain at west to east from Shiva Parvathy Nilayam to Ele.Pole 304 /
23 2022-23 9.42 AE-2
No.025/10B/0101/000 at Yenugu Chettu Bazar in Division No.22 (2nd call) 2022-23
Laying of 110 mm Dia PVC Pipe Line from Ongole Dairy Milk Parlour to
405 / 342 /
24 2022-23 Venkateswara (H) at Ganugapalem and Srinivasa Foot Ware to Srinu (H) at 10.00 AE-3 2022-23
Kota Vari Veedhi in Division No.23 (3rd call)

Laying of 110 mm and 160mm Dia PVC Pipe Line from Basha Glass Work to
406 / Notice Shop, Moulali (H) to Sathyam Handlooms at Kotavari Veedhi and 343 /
25 2022-23 Construction of CC Road & CC drain Beside Kotavari veedhi school East side 10.00 AE-3 2022-23

in Division No.23 (3rd call)

Providing C.C Drain from beside Vinayaka Temple to Burusu Lakshmi (H) in
407 / 363 /
26 2022-23 Domalapalem and Allahuddin Jewellery to Lakshmi Sravanthi Cut Pieces in 8.65 AE-2 2022-23
Bheemaraju Veedhi in Division No.25 (2nd call)
Providing C.C Roads from beside BA & KR College to near Dheeraj Hospital
408 /
27 2022-23 and Allaudding Jewellers to Lakshmi Sravanthi Cut Pieces in Bheemaraju 8.40 AE-2 K-77
Veedhi in Division No.25
409 / Construction of Retaining Wall, Steps and C.C Road opposite to G.Ramesh 309 /
28 2022-23 20.00 AE-2
house in N.S.P Quarters in Division No.30 (2nd call) 2022-23

410 /
Providing C.C Drain from IP Venkateswarlu (H) to Ramulamma (H) and
29 2022-23 Samson (H) to Satyam (H) near Nagendra Swamy Temple in Hill Tower area in 9.98 AE-2 K-81
Division No.30
411 / Construction of Steps from Dasari Pramila house to Hill in Seetharama Puram
30 2022-23 2.00 AE-2 K-82
in Division No.30
412 / Construction of Ward Sachivalayam Building in Gaddalagunta in Division 346 /
31 2022-23 No.32 (2nd call) 40.00 AE-2 2022-23

413 / Providing C.C Drain from Mangamoor Road N.S.P Canal to Sai Towers in Z.P 311 /
32 2022-23 32.65 AE-3
colony in Division No.33 (2nd call) 2022-23

414 / Providing C.C Road at west side of Power Office in Z.P Colony 3rd Line in
33 2022-23 5.35 AE-3 K-61
Division No.33
Providing C.C Drain from Padmalaya Bakery to existing Bye Pass Road (V.I.P
415 / 312 /
34 2022-23 Road south side drain) in Division No.34 under 15th Finance Commission 30.00 AE-3 2022-23
Grant (2nd call)
416 / Providing Major and Minor Repairs to Arama Kshetram Building near
35 2022-23 Gaddalagunta Park in Division No.34 10.00 AE-3 K-85

417 / Providing C.C Road at north side of Priya Darshini Towers beside Harshini
36 2022-23 Degree College in Division No.34 7.55 AE-3 K-86

418 / Raising of C.C Road from Hari Villu Residency to Mallikarjuna reddy house in
37 2022-23 7.35 AE-3 K-87
Rajeev Nagar Extension in Division No.34
419 / Providing C.C Drain from Sai Nilayam to Elec. Pole No.SS 262/A6 in V.I.P Road
38 2022-23 6.85 AE-3 K-88
6th Cross Road east side in Division No.34
420 / Formation of Quarry Rubbish Road from D.No.36-71-943 to existing S.S Tank-
39 2022-23 I Main Road in Division No.34 5.20 AE-3 K-89

421 / Construction of Wall Chamber at Traffic Police Station opposite for 150 mm
40 2022-23 and 300 mm dia Valves in Division No.34 2.10 AE-3 K-70

422 /
41 2022-23 Providing C.C Road at Samatha Nagar 8th Line in Division No.38 9.50 AE-3 K-60

423 / Providing Internal Quarry Rubbish Roads in Damacharla colony 1st, 2nd, 3rd
42 2022-23 9.95 AE-3 K-58
and 4th Lines in Division No.42
Providing C.C Drain from Perugu Thirupathamma (h) to Gonasani Sai (h) via
Kilari Srinivas (h) and from Sriram Colony 2nd Line 1st Cross Road
424 / 325 /
43 2022-23 Venkateswarlu (h) to Brahmin Bazar & Sriram Colony 2nd Line 2nd Cross 40.00 AE-3 2022-23
Road Murthy (h) to Brahmin Bazar and Srinivasa Colony Extension Road in
Division No.43 (2nd call)

Providing C.C Drains at Nagendra Nagar 1st Line, 2nd Line, 2nd Cross Road,
425 / 332 /
44 2022-23 5th Cross Road and Sri Nagar Colony 6th Cross Road, 7th Cross Road in 22.00 AE-3 2022-23
Division No.45 (2nd call)
426 / Providing C.C Roads at Srinagar Colony 6th and 7th Cross Roads in Division 333 /
45 2022-23 15.00 AE-3
No.45 (2nd call) 2022-23

427 / Providing C.C Drain from Danduri Venkateswarlu (H) to DEO Office Swamulu
46 2022-23 (H) in Chandraiah Nagar in Division No.48 1.70 AE-3 K-59

428 /
47 2022-23 Providing C.C Road and C.C Drain at Indira Nagar 1st Line in Division No.49 4.60 AE-3 K-62

429 / Providing C.C Road and C.C Drain at Balakrishna Puram 1st Line and 2nd Lines
48 2022-23 3.60 AE-3 K-63
in Division No.49
430 / Providing C.C Road at back side of Bala Krishna Puram 3rd Line in Division 349 /
49 2022-23 2.25 AE-3
No.49 (2nd call) 2022-23

431 / Providing C.C Drain from Timber Depot in Wood Complex to Pothuraju Canal 337 /
50 2022-23 in Division No.50 under 15th Finance Commission Grant (2nd call) 32.00 AE-3 2022-23

432 / Providing Quarry Rubbish Approach Road at Ministries Church in Jayaprakash


51 2022-23 10.00 AE-3 K-71
Colony in Division No.50

433 / Providing Quarry Rubbish Road at Venkateswara Colony 1st, 2nd Cross Roads
52 2022-23 9.98 AE-3 K-72
and Church Road in Venkateswara Colony Extension in Division No.50

434 / Supply of 2 Nos of Tractor Dozers for Solid Waste Management in Ongole 15 th
53 2022-23 25.00 AE-3
Municipal Corporation under 15th Finance Commission Grant 11

Supply of 4000 Litre Water Tanker Tractor Trailer for Dumping Yard at
435 / 15 th
54 2022-23 Guthikondavari Palem in Ongole Municipal Corporation under 15th Finance 2.50 AE-3 12
Commission Grant
Supply 5 Ton 2 Wheel Tractor Trailer for Solid Waste Management at
436 / 15 th
55 2022-23 Garbage Transfer Stations in Ongole Municipal Corporation under 15th 5.00 AE-3 13
Finance Commission Grant
437 / Providing LED Rope Lighting at Kurnool Road in Ongole Municipal
56 2022-23 10.00 AE-2 K-57
Corporation

438 / Supply and Delivery of 1" dia and 1 1/2 " dia size G.I Brackets and Fixing of
57 2022-23 LED Street Light Sets at various places in Ongole Municipal Corporation 9.00 AE-2 K-78

TOTAL 862.18
Download Start Time : 16.09.2022 5.00 P.M
Download End Time : 30.09.2022 5.00 P.M
Receipt of Bids End Time : 30.09.2022 5.15 P.M
Technical Bid Opening Time : 30.09.2022 5.30 P.M
Price Bid Opening Time : 30.09.2022 5.45 P.M
Development of Central Medians, Green Belt Development, Traffic Island
439 /
1 2022-23 Development and Road Side Plantation in Ongole Municipal Corporation 40.00
under 15th Finance Commission Grant
TOTAL 40.00
Download Start Time : 21.09.2022 5.00 P.M
Download End Time : 28.09.2022 5.00 P.M
Receipt of Bids End Time : 28.09.2022 5.15 P.M
Price Bid Opening Time : 28.09.2022 5.30 P.M
440 / Transportation and Supply of Water in various places in 1 to 50 Divisions in
1 2022-23 10.00 AE-2
Ongole Municipal Corporation
TOTAL 10.00
Download Start Time : 22.09.2022 5.00 P.M
Download End Time : 29.09.2022 5.00 P.M
Receipt of Bids End Time : 29.09.2022 5.15 P.M
Price Bid Opening Time : 29.09.2022 5.30 P.M
Providing C.C Drain from Rajiv Colony 1st Line 1st Cross Road Flat No.40
441 / (Sk.Shabira (H)) to Rajiv Colony 6th Line 1st Cross Road (Pullaiah (H)) and
1 2022-23 20.00 AE-1 K-92
from Rajiv Colony 4th Line Flat No.324 (Jakara Ramanamma (H)) to Rajiv
Colony 4th Line Flat No.341 (Kavali Suresh (H)) in Division No.9

Providing C.C Road from Dibbala Road Main Road to Velidhi Munnaiah house
442 /
2 2022-23 (D.No.31-053-388) via Jada Devanamma house (D.No.31-053-399) in Division 15.00 AE-3 K-100
No.48

443 /
Providing C.C Drain from Velidhi Munnaiah house (D.No.31-053-388) to
3 2022-23 Dibbala Road Main Road via Jada Devanamma house (D.No.31-053-399) in 5.00 AE-3 K-101
Division No.48
444 / Repairs to Air Conditioners at Municipal Corporation Office in Ongole
4 2022-23 Municipal Corporation 1.92 AE-3 K-102

445 / Providing Arrangements for Tree Plantation Programme at various places in


5 2022-23 Ongole Municipal Corporation 0.93 AE-1 K-103

TOTAL 42.85
Download Start Time : 22.09.2022 5.00 P.M
Download End Time : 06.10.2022 5.00 P.M
Receipt of Bids End Time : 06.10.2022 5.15 P.M
Price Bid Opening Time : 06.10.2022 5.30 P.M
446 / Transportation and Supply of Water in various places in 1 to 50 Divisions in
1 2022-23 40.00 AE-5
Ongole Municipal Corporation
Supply of Cars on hire basis to Mayor, Municipal Commissioner, Municipal
447 /
2 2022-23 Engineer, Assistant Commissioner, Assistant City Planner & Examiner in 31.20 AE-3
Ongole Municipal Corporation
TOTAL 71.20
Download Start Time : 07.10.2022 5.00 P.M
Download End Time : 14.10.2022 5.00 P.M
Receipt of Bids End Time : 14.10.2022 5.15 P.M
Price Bid Opening Time : 14.10.2022 5.30 P.M
448 / Construction of Open Kitchen, Service Room and Parking Tiles to Shadikhana
1 2022-23 40.00 AE-2 K-124
in Division No.24
449 / Formation of Approach Road to New 15 MLD Sewage Treatment Plant in
2 2022-23 Guthikondavari Palem in Division No.9 5.00 AE-1 K-94

450 / Providing C.C Drain at Akkireddy house opposite to Sub Station in 394 /
3 2022-23 1.90 AE-1
Annavarappadu 3rd Line in Division No.15 (3rd call) 2022-23

TOTAL 46.90
Download Start Time : 11.10.2022 5.00 P.M
Download End Time : 18.10.2022 5.00 P.M
Receipt of Bids End Time : 18.10.2022 5.15 P.M
Price Bid Opening Time : 18.10.2022 5.30 P.M
451 / Construction of Balance Dr.YSR Urban Health Clinic (Urban Primary Health
1 2022-23 Center) in Rajiv Gruha Kalpa 2nd Line in Division No.9 37.80 AE-1 K-122

452 / Fixing of R.O Plant, Drilling of Bore Well and Fixing of Motor at Sub-Treasury
2 2022-23 6.40 AE-1 K-119
Office in Division No.14
453 / Supply and Installation of R.O 1000 LPH at S.C Womens Hostel in Bhagya
3 2022-23 Nagar 4th Line 11th Cross Road in Division No.19 5.35 AE-2 K-145

454 / Construction of Compound Wall to Urban Health Center in Gaddala Gunta in


4 2022-23 18.00 AE-2 K-126
Division No.30

455 / Construction of balance work of Roofing G.I Sheet and Flooring at Garbage
5 2022-23 Transfer Station-II in Pernamitta in Ongole Municipal Corporation 40.00 AE-3 K-132

Supply and Delivery of 75HP Pump set for SS Tank-II Clear Water pump house
456 /
6 2022-23 and 60 HP Pump set for RR Tank pump house in Ongole Municipal 10.00 AE-3 K-143
Corporation
Supply and Delivery of 30HP Pump set for Police Quarters Pump House and
457 /
7 2022-23 40 HP Pump set for S.S Tank-II Raw Water Pump House in Ongole Municipal 9.15 AE-3 K-144
Corporation
458 /
8 2022-23 Supply and Delivery of C.I D/F Sluice Valves to Ongole Municipal Corporation 9.95 AE-3 K-151

459 /
Removal of Obstructions and Diversions of Storm Water during rainy season
9 2022-23 in order to avoid inundation of low lying areas at various places in 1 to 50 0.98 AE-3 K-152
Divisions in Ongole Municipal Corporation
460 / Construction of Cement Concrete Pavement Platform for Windrows at
10 2022-23 Dumping Yard in Guthikondavari Palem in Ongole Municipal Corporation 10.00 AE-3 K-153

Removal of Silt from Pothuraju Canal from 60 Feet Road Ending Bridge to
461 /
11 2022-23 Chandraiah nagar in order to avoid inundation of low lying areas in Divisions 3.00 AE-3 K-154
48, 49 & 50 in Ongole Municipal Corporation
462 / Repairs to Air Conditioners at Municipal Corporation Office in Ongole 444 /
12 2022-23 Municipal Corporation (2nd call) 1.92 AE-3 2022-23

TOTAL 152.55
Download Start Time : 14.10.2022 5.00 P.M
Download End Time : 25.10.2022 5.00 P.M
Receipt of Bids End Time : 25.10.2022 5.15 P.M
Price Bid Opening Time : 25.10.2022 5.30 P.M
Laying of D.I K7 Pipelines along Kothapatnam Road at Koppolu in Division
463 / No.9 and H.D.P.E Drinking Water Pipelines in SC Colony and other Residential
1 2022-23 131.84
Areas in Ongole Municipal Corporation under 15th Finance Commission
Grant

Providing D.I Water Pipe Line from Flyover to Sriram Colony along Kurnool
464 /
2 2022-23 Road in Division No.43, 44 & 45 in Ongole Municipal Corporation under 15th 94.00
Finance Commission Grant
Providing B.T Road from Mangamuru Road to Samatha Nagar 5th Line in
465 /
3 2022-23 Division No.37 & 39 in Ongole Municipal Corporation under 15th Finance 80.00
Commission Grant
466 / Repairs to Motors, Removal of Shrub Jungle, Moss, Cleaning and Filling
4 2022-23 3.50 AE-2 K-105
Mukthinuthalapadu Tank with Current Motors in Division No.2
467 /
5 2022-23 Construction of Compound Wall to Islampet E.L.S.R in Division No.4 25.00 AE-1 K-106

Providing CC Drains from Mubarak Biriyani Point to GopiKrishna Hall end


468 / (north side), from Guntur Road to Islampet Masjid Road, from Srinivasa Hall
6 2022-23 22.00 AE-1 489 /
Road to Islampet Masjid Road (north side), from Sk.Rafi (H) to Srinivasa (H) 2021-22

and Providing CC Patches from Rehman (H) to Frakruddin (H) in Division No.4

469 / Providing C.C Road back side of 'V' Grand Restaurant to Krishna Theatre Road
7 2022-23 14.40 AE-1 K-107
in Ramannapet 1st Line in Division No.4
470 / Providing C.C Drain back side of 'V' Grand Restaurant to Krishna Theatre
8 2022-23 5.50 AE-1 K-108
Road in Ramannapet 1st Line in Division No.4
471 / Providing C.C Drain from Gaddikayyalu Main Road north side existing culvert
9 2022-23 to Gorantla Multiplex Road in Division No.5 9.96 AE-1 K-90

472 / Providing C.C Drain from Gaddikayyalu Main Road south side existing culvert
10 2022-23 9.96 AE-1 K-91
to Gorantla Multiplex Road in Division No.5
473 / Laying of 110 mm dia P.V.C Pipe Line from Jockey Show Room to Gorripati
11 2022-23 1.45 AE-1 K-118
Srinivasulu house at Old Market in Division No.6
474 / Providing C.C Drain and Culvert from Jockey Show Room to existing Drain at
12 2022-23 2.60 AE-1 K-147
opposite Old Market in Division No.6
475 / Providing C.C Road and C.C Drain from Nagendra Swamy Putta to existing C.C 386 /
13 2022-23 Road in Gopal Nagar 1st Line in Division No.6 (2nd call) 9.85 AE-1 2022-23

Providing CC Drain, Reconstruction of CC Drain at Thangella Khasim Veedi in


Rajakala Street, Providing CC Road & CC Drain at Kammapalem 3rd Line extension in
476 / 40 Feet Road to Karavadi Donka 7th Line, Providing CC Drain from Karavadi Donka
14 2022-23 'Y' Junction to Kalikamatha Temple, Providing CC Road & CC Drain from back side of 22.00 AE-1 110 /
2022-23
Hindu Burial Ground Old Age Home west side in Karavadi Donka and Providing CC
Drain from 1st Cross Road to 2nd Cross Road in Kammapalem 3rd Line east side of
CC Road in Division No.7

Providing CC Road, CC Drain & Patch Work from Katari Sankar (H) to Dasari
Suneetha (H) and from Aluri Lakshmi (H) to Polineni Aruna (H), Providing CC
477 / Roads from Dasari Suneetha (H) to Lingisetty Purnachandra rao (H) & from
15 2022-23 Kaja Mahamuddin (H) to Edara Srinivasa Rao (H) and Providing CC Drain from 22.00 AE-1 491 /
2021-22

Chenchu Lakshmi (H) to Bonthavari veedhi 1st & 2nd Lines and in Division
No.8
Construction of New Toilet Block, Septic Tank, Providing Water Supply,
478 /
16 2022-23 Electrification for Municipal Primary School in Rajiv Gruha Kalpa 2nd Line in 8.25 AE-1 K-93
Division No.9

GGMP - Providing C.C Drain from Rajiv Colony 1st Line 1st Cross Road Flat
479 / No.40 (Sk.Shabira (H)) to Rajiv Colony 6th Line 1st Cross Road (Pullaiah (H)) 441 /
17 2022-23 20.00 AE-1
and from Rajiv Colony 4th Line Flat No.324 (Jakara Ramanamma (H)) to Rajiv 2022-23

Colony 4th Line Flat No.341 (Kavali Suresh (H)) in Division No.9 (2nd call)

480 / Providing C.C Drain from Pedda Cheruvu Road to Old S.C Colony in Division
18 2022-23 40.00 AE-1 K-109
No.10

Providing CC Drains from Ambetkar Statue to Menda Vijaya Raju (H) at Old
SC Colony 1st Line, Kasukurthi Lakshmaiah (H) to Burri Venkateswarlu (H) at
481 /
19 2022-23 Old SC Colony 2nd Line, Kasukurthi Venkateswarlu (H) to Kasukurthi Shekar 22.00 AE-1 492 /
2021-22
(H) at Old SC Colony 3rd Line and Providing CC Road from BVR School to
Yalagala Sanjivarao (H) in Koppolu in Division No.10

482 / Construction of Compound Wall to Open Place at Dr.B.R Ambedkar Statue in


20 2022-23 16.10 AE-1 K-110
Koppolu in Division No.10
483 / Providing C.C Drain from K.P Road Petrol Bunk to Eschole Church in Division
21 2022-23 20.00 AE-1 K-111
No.11
484 / Widening of C.C Road from St. Mary School to Modukuri Sambaiah house in
22 2022-23 17.30 AE-1 K-112
Railway Station Road in Division No.11
485 / Providing C.C Drain and Culvert from Sk.Karimulla house to Gopi Tea Stall in AE-1 Rev K
23 2022-23 Railpet 1st Line in Division No.11 17.30 113

Raising of CC Road & CC Drain from Challa Srirama (H) to Chavala Kumari (H),
Chavala Kumari (H) to Bapatla Gopi (H) and Kotari Narendra (H) to Kale
Venkateswarlu (H) at Maratipalem, Raising of CC Road & CC Drain from
486 / Kamineni Sivakumar (H) Vemula Prasad (H) and Prasanthi Nilayam (H) to
24 2022-23 Valisetty Umamaheswararao (H) at Chikulavari veedhi, Repairs to Openwells 22.00 AE-1 494 /
2021-22

at Chivukulavari Street, Ramalayam Temple & Pakeer Palem and Providing


CC Drain from Karamcheti Krishna (H) to Rehaman Store & Karamcheti
Krishna (H) to Opp Kuppam Prasad (H) in Ranguthota in Division No.12

Providing C.C Drain and Culvert from Nalluri Nursing Home to


487 / AE-1 Rev K
25 2022-23 Anjaneyaswami Temple and Sankarasetti Suryanarayana (H) to Sunnisetti 8.35 95
Venkateswarlu Rice Store in Division No.12
Providing CC Road & CC Drain from Anganawadi Center to M.Varalakshmi
(H), Providing CC Roads from Tasty Bread Omlet Shop to Ravipriya (H) at
488 /
26 2022-23 Govinda Raju Road, P.RajaSekhar (H) of Kotha Bazar, from P.Santhi (H) to 22.00 AE-1 495 /
2021-22
Rajesh (H) and Opp ABM Degree College to K.Sagar (H) via Pentsoch Chruch
in Kabadi Palem in Division No.13
489 / Laying of 160 mm dia P.V.C Pipe Line at Chundivari Street and Ungarala
27 2022-23 Veedhi in Division No.14 4.30 AE-1 K-114
Providing C.C Drains from Ungarala Venkata Subbaiah (H) to Road End,
Ungarala Rajagopal (H) to Road End at Ungaralavari veedhi, Prakasam Towers
490 / 392 /
28 2022-23 west side to Gurram Rambabu (H), Ramali Building east side to V.V Srihari (H) 6.20 AE-1 2022-23
and Magunbta Subba Rami Reddy Statue to Ilavala Sudhakar Reddy (H) in
Kamasastrivari Street in Santhapeta in Division No.14 (2nd call)

Providing C.C Drain from Pedababu (H) to Anjaneyaswami Temple Road and
491 / 393 /
29 2022-23 C.C Patch from P Kumari (H) to Y Buchamma (H) in Santhapeta in Division 6.00 AE-1 2022-23
No.14 (2nd call)
492 /
30 2022-23 Providing C.C Drain from Railway Line to Balaji Nagar in Division No.16 40.00 AE-1 K-115

493 / Cleaning of existing Pond and Providing alround Walking Track for
31 2022-23 32.65 AE-1 K-116
Bathulavari Kunta Cheruvu in Division No.16
494 / Construction of Compound Wall for Aramakshetram in Balaji Nagar in Rev K
32 2022-23 19.50 AE-1
Division No.16 117

495 / Providing C.C Road from Ch.Anand house to Pole No.274/C6/4 in Pothuraju
33 2022-23 Palem in Division No.16 9.65 AE-1 K-120

496 / Construction of Incomplete Compound Wall to Open Site at Gangamma


34 2022-23 40.00 AE-2 K-29
Temple in Pelluru in Division No.17
497 /
35 2022-23 Construction of Community Hall in Vengamukkala Palem in Division No.18 40.00 AE-2 K-135

498 /
36 2022-23 Providing Quarry Rubbish Roads in Mother Theresa Colony in Division No.18 10.00 AE-2 K-121

499 / Providing C.C Drains in Vengamukkapalem S.C Colony in Division No.18 (3rd 371 /
37 2022-23 call) 10.00 AE-2 2022-23

Providing C.C Road from Dasari Tirupathi Swamy (H) to Purre Venkateswarlu
500 / 398 /
38 2022-23 (H) and C.C Drain from Parre Rosaiah (H) to Ratikinda Prabhudasu (H) in 10.00 AE-2 2022-23
Vengamukkapalem S.C Colony in Division No.18 (3rd call)

501 / Providing C.C Road from Dasari Tirupathi Swamy (H) to Purre Venkateswarlu 399 /
39 2022-23 7.00 AE-2
(H) in Vengamukkapalem S.C Colony in Division No.18 (3rd call) 2022-23

502 / Providing Compound Wall, Grills, Electrification and Painting to Housing


40 2022-23 Board Park in Division No.19 40.00 AE-2 K-134

503 / Widening of C.C Road from Devudu Cheruvu Park to Kanaka Durgamma
41 2022-23 Temple in Division No.21 40.00 AE-2 K-123

504 / Providing C.C Disposal Drain from H.P Petrol Bunk to Hotel Kumar Residency AE-2 Rev K
42 2022-23 40.00
along Trunk Road in Division No.21 146

505 / Providing C.C Drain at west to east from Shiva Parvathy Nilayam to Ele.Pole 404 /
43 2022-23 9.42 AE-2
No.025/10B/0101/000 at Yenugu Chettu Bazar in Division No.22 (3rd call) 2022-23

Laying of 110 mm & 160 mm dia PVC Pipe Line from Ongole Dairy Milk
Parlour to Venkateswara (H) at Ganuga Palem, Basha Glass Work to Notice
506 /
44 2022-23 Shop, Moulali (H) to Sathyam Handlooms & Srinivasa Footwear to Srinu (H) at 22.00 AE-2 497 /
2021-22
Kotavari Veedhi, Providing CC Road & CC Drain beside Kotavari Veedhi School
east side in Division No.23
Laying of 110 mm Dia PVC Pipe Line from Ongole Dairy Milk Parlour to
507 / 405 /
45 2022-23 Venkateswara (H) at Ganugapalem and Srinivasa Foot Ware to Srinu (H) at 10.00 AE-3 2022-23
Kota Vari Veedhi in Division No.23 (4th call)

Laying of 110 mm and 160mm Dia PVC Pipe Line from Basha Glass Work to
508 / Notice Shop, Moulali (H) to Sathyam Handlooms at Kotavari Veedhi and 406 /
46 2022-23 Construction of CC Road & CC drain Beside Kotavari veedhi school East side 10.00 AE-3 2022-23

in Division No.23 (4th call)


509 / Providing C.C Platform, C.C Drain and Rennovation for Fish Market in Division
47 2022-23 40.00 AE-3 K-133
No.24
510 / Rennovation of existing Slaughter House at New Fish Market area in Division
48 2022-23 26.90 AE-2 K-125
No.24

Providing CC Drains & CC Roads from Vanttavani Colony 4th & 7th Lines,
511 /
49 2022-23 Ekalavya Nagar Burial Ground opp Roads, Vaddepalem, MangalaPalem 22.00 AE-2 498 /
2021-22
beside YSRCP Party Office, TB Road and Samaikyatha Nagar in Division No.24

Providing C.C Drain from beside Vinayaka Temple to Burusu Lakshmi (H) in
512 / 407 /
50 2022-23 Domalapalem and Allahuddin Jewellery to Lakshmi Sravanthi Cut Pieces in 8.65 AE-2 2022-23
Bheemaraju Veedhi in Division No.25 (3rd call)

Providing C.C Roads from beside BA & KR College to near Dheeraj Hospital
513 / 408 /
51 2022-23 and Allaudding Jewellers to Lakshmi Sravanthi Cut Pieces in Bheemaraju 8.40 AE-2 2022-23
Veedhi in Division No.25 (2nd call)
514 /
52 2022-23 Providing CC Road, CC Drain and CC Retaining Wall in Division No.27 22.00 AE-2 500 /
2021-22

515 / Providing CC Drain and RCC Culvert at Kothapeta Streets and Jammichettu
53 2022-23 Streets in Division No.28 22.00 AE-2 501 /
2021-22

Providing CC Drains from M.Eswaramma (H) to P.Koeswaramma (H) and


516 /
54 2022-23 Providing CC Drain and Flooring with chequrred terrazzo tiles for Steps at 22.00 AE-2 502 /
2021-22
Kondamitta Rajapanagala 11th Cross Road in Division No.29
Providing CC Drain from Puram Somaiah (H) to Muvva Venkateswarlu (H) at
JC Banglaw Back Side NSP Colony, Mogili Anadharao Plot to Nagendra Swami
Temple at Seetharampuram, Boddu Vijaya Lakshmi (H) to Sonu Supply Shop
517 /
55 2022-23 at Gaddalagunta and Laying of 100 mm dia AC Pipe Line from Vadde Naleeni 22.00 AE-2 503 /
2021-22
Jayanthi (H) to Karavadhi Seshaiah (H) at Seetharampuram, Burial Ground to
Kondaiah (H) and from Pasumarthi Ankaiah (H) to Punuri Lakshmi Narayana
(H) in Division No.30
Providing C.C Drain from IP Venkateswarlu (H) to Ramulamma (H) and
518 / 410 /
56 2022-23 Samson (H) to Satyam (H) near Nagendra Swamy Temple in Hill Tower area in 9.98 AE-2 2022-23
Division No.30 (2nd call)
519 / Construction of Steps from Dasari Pramila house to Hill in Seetharama Puram 411 /
57 2022-23 in Division No.30 (2nd call) 2.00 AE-2 2022-23

520 / Construction of Ward Sachivalayam Building in Gaddalagunta in Division 412 /


58 2022-23 40.00 AE-2
No.32 (3rd call) 2022-23

521 / Providing C.C Drain from Mangamoor Road N.S.P Canal to Sai Towers in Z.P 413 /
59 2022-23 32.65 AE-3
colony in Division No.33 (3rd call) 2022-23

522 / Providing C.C Road at west side of Power Office in Z.P Colony 3rd Line in 414 /
60 2022-23 Division No.33 (2nd call) 5.35 AE-3 2022-23
523 / Providing CC Road from Edara Ramu house to Byepass Road at power office
61 2022-23 10.00 AE-3 K-142
beside Road in Division No.33
524 / Providing C.C Drain from Sai Nilayam to Elec. Pole No.SS 262/A6 in V.I.P Road 419 /
62 2022-23 6.85 AE-3
6th Cross Road east side in Division No.34 (2nd call) 2022-23

525 /
63 2022-23 Construction of Community Hall in V.I.P Road in Division No.35 40.00 AE-3 K-130

Providing CC Drain in Nirmal Nagar 2nd Cross Road, Raising of CC Road from
526 / Chitithoti (H) (south side) to existing Byepass Road and Providing CC Drain
64 2022-23 22.00 AE-3 506 /
from Subbareddy Towers to SBI ATM (Anjaiah Road), Brundavanam 2021-22

Residency to kiran (H) in Division No.36


527 / Providing Major and Minor Repairs and Construction of Compound Wall to
65 2022-23 10.00 AE-3 K-138
the Gandhi Nagar Sachivalayam in Division No.37
Providing C.C Drain from Atluri Srinivasa Rao house to Guptas Apartment
528 /
66 2022-23 near Kurnool Road R&B Road in Mahalakshmi Nagar 3rd Line in Division 10.00 AE-3 K-148
No.38
529 / Providing C.C Road from Pasupuleti Srinivasulu house to Sannapa reddy
67 2022-23 30.00 AE-3 K-127
chandra sekhar house in Samatha nagar 7th Line in Division No.39
530 / Providing C.C Road from Parsam Venkata swamy house to Alla Rangaiah
68 2022-23 house in Samatha Nagar 4th Line in Division No.39 30.00 AE-3 K-129

531 / Providing C.C Road from Vinjamuri Krishna kumari house to Vastavayi Kumar
69 2022-23 19.00 AE-3 K-128
raj house in Rajula Colony in Division No.39
532 / Construction of Ward Secretariat Building to Secretariat No.57 in Survey
70 2022-23 40.00 AE-3 K-131
No.212 in Linga Reddy Colony in Pernamitta in Division No.40
533 / Providing C.C Road from Ayyappa Tower-2 Apartment to Ashramam Main
71 2022-23 10.00 AE-3 K-96
Road Culvert in Indira Nagar in Division No.40

534 / Providing C.C Road from Pallam Ramana reddy house (No.497) to K.Lakshmi
72 2022-23 9.00 AE-3 K-97
house (No.465) in Dwaraka Nagar in Indira Nagar in Division No.40

535 / Providing C.C Road from N.Narasimha rao house (No.497) to V.Srinivasulu
73 2022-23 9.00 AE-3 K-98
house (No.465) in Dwaraka Nagar in Indira Nagar in Division No.40

Providing C.C Road from Kakarla Subba rao house (No.339) to Kakarla
536 /
74 2022-23 Yalamanda house (No.46-137-52) in Dwaraka Nagar in Indira Nagar in 9.00 AE-3 K-99
Division No.40
537 / Providing CC Drains from Sai Janardhan Office to Flyover in Pandaripuram in
75 2022-23 22.00 AE-3 507 /
Division No.46 2021-22

Providing CC Drains from Bhavani Prasad (H) to Gundu Suvarthamma (H),


538 /
76 2022-23 Pothuraju Canal to Phani (H) and G.Kotataiah (H) to Sirigiri Sambhaiah (H) in 22.00 AE-3 508 /
2021-22
NGO Colony 7th Line in Division No.47
539 / Providing C.C Drains both sides in Ayyannavari Veedhi, Cross Roads and
77 2022-23 Amrutha Hospital Road in Division No.48 22.00 AE-3 509 /
2021-22

540 / Providing C.C Road repairs and Approaches at various places in Division
78 2022-23 2.50 AE-3 K-139
No.48

541 /
GGMP - Providing C.C Road from Dibbala Road Main Road to Velidhi
442 /
79 2022-23 Munnaiah house (D.No.31-053-388) via Jada Devanamma house (D.No.31- 15.00 AE-3 2022-23
053-399) in Division No.48 (2nd call)
GGMP - Providing C.C Drain from Velidhi Munnaiah house (D.No.31-053-388)
542 / 443 /
80 2022-23 to Dibbala Road Main Road via Jada Devanamma house (D.No.31-053-399) in 5.00 AE-3 2022-23
Division No.48 (2nd call)
543 / Providing C.C Road repairs and C.C Approaches at various places in Division
81 2022-23 No.49 2.30 AE-3 K-140

544 / Providing C.C Road and C.C Drain at Indira Nagar 1st Line in Division No.49 428 /
82 2022-23 (2nd call) 4.60 AE-3 2022-23

545 / Providing C.C Road and C.C Drain at Balakrishna Puram 1st Line and 2nd Lines 429 /
83 2022-23 3.60 AE-3
in Division No.49 (2nd call) 2022-23

546 / Providing C.C Road at back side of Bala Krishna Puram 3rd Line in Division 430 /
84 2022-23 No.49 (3rd call) 2.25 AE-3 2022-23

547 /
85 2022-23 Providing C.C Road at Netaji Colony Main Road in Division No.50 39.00 AE-3 K-136

548 / Providing C.C Drains to Main Road in Venkateswara Colony Hospital Road
86 2022-23 and 1st Cross Road in Venkateswara Colony in Division No.50 39.00 AE-3 K-137

549 / Providing C.C Drain from Timber Depot in Wood Complex to Pothuraju Canal 15th K
87 2022-23 32.00 AE-3
in Division No.50 under 15th Finance Commission Grant 149

550 / Providing Quarry Rubbish Roads at Netaji Colony Internal Roads in Division 339 /
88 2022-23 25.00 AE-3 2022-
No.50 (recall) 23

Development of Central Medians, Green Belt Development, Traffic Island


551 / 439 /
89 2022-23 Development and Road Side Plantation in Ongole Municipal Corporation 40.00 2022-
23
under 15th Finance Commission Grant (2nd call)
552 / Supply of 2 Nos of Tractor Dozers for Solid Waste Management in Ongole AE-3 1511th
90 2022-23 25.00
Municipal Corporation under 15th Finance Commission Grant
553 / Removing of High Berms on road sides and Clearing of Heavy Jungle on road
91 2022-23 6.00 AE-3 K-104
side in Division No.33 to 50 in Ongole Municipal Corporation
Replacement of MS 300x10 mm Suction Pipes to Raw Water Pump House at
554 /
92 2022-23 RR Tank and Replacement of MS 150x10 mm Suction Pipes to Old Filter Beds 4.45 AE-3 K-141
in Ongole Municipal Corporation
555 / Construction of Valve Chambers at various places in 33 to 50 Divisions in
93 2022-23 Ongole Municipal Corporation 10.00 AE-3 K-150

556 / Maintenance of Toilets in Ongole Municipal Corporation Office in Ongole


94 2022-23 2.01 AE-1 K-155
Municipal Corporation
Supply of 4000 Litre Water Tanker Tractor Trailer for Dumping Yard at
557 / 435 /
95 2022-23 Guthikondavari Palem in Ongole Municipal Corporation under 15th Finance 2.50 AE-3 2022-23
Commission Grant (2nd call)
Supply 5 Ton 2 Wheel Tractor Trailer for Solid Waste Management at
558 / 436 /
96 2022-23 Garbage Transfer Stations in Ongole Municipal Corporation under 15th 5.00 AE-3 2022-23
Finance Commission Grant (2nd call)
TOTAL 1944.07
Download Start Time : 14.10.2022 5.00 P.M
Download End Time : 31.10.2022 5.00 P.M
Receipt of Bids End Time : 31.10.2022 5.15 P.M
Technical Bid Opening Time : 31.10.2022 5.30 P.M
Price Bid Opening Time : 31.10.2022 5.45 P.M
559 / GGMP - Providing C.C Drain from Sreshta Children Hospital to Ismail Biryani
1 2022-23 Point and Halal Biryani to opposite Iskon Temple in Division No.49 20.00 AE-3 K-156

560 / Transportation and Supply of Water in various places in 1 to 50 Divisions in


2 2022-23 Ongole Municipal Corporation 10.00 AE-2 K-157

561 / Repairs and Rectification of Pumping Main and Gravity Main Leakages in 17
3 2022-23 to 32 Divisions in Ongole Municipal Corporation 5.00 AE-2 K-158

562 / Removal of Debris and Silt in Drains and Removal of High Berms in 1 to 16
4 2022-23 5.00 AE-1 K-159
Divisions in Ongole Municipal Corporation
563 / Desiltation of existing Major and Minor Drains in 17 to 32 Divisions in Ongole
5 2022-23 Municipal Corporation 5.00 AE-2 K-160

Desiltation of Storm Water Drains in 33 to 50 Divisions with Gang Work in


564 /
6 2022-23 order to avoid inundation of Low Lying Areas in Ongole Municipal 5.00 AE-3 K-161
Corporation
Engaging of J.C.B and Tractor from Removing of Jungle, Formation of Kutcha
565 /
7 2022-23 Drain and Lifting of Debris in 1 to 16 Divisions in Ongole Municipal 2.00 AE-1 K-162
Corporation
566 / Providing C.C Culvert at Ayyappa Swamy Temple front road in Godugu Palem
8 2022-23 in Division No.28 1.20 AE-2 K-163

TOTAL 53.20
Download Start Time : 15.10.2022 5.00 P.M
Download End Time : 25.10.2022 5.00 P.M
Receipt of Bids End Time : 25.10.2022 5.15 P.M
Price Bid Opening Time : 25.10.2022 5.30 P.M
GGMP - Providing C.C Drain from Old Satyam Tiffin Shop to existing V.I.P
567 / Road, M.Chalalpathi Rao house to M.M Road, from D.No.130 to M.M Road
1 2022-23 12.20
(Main) and from D.No.8-94 to existing M.M Road (west side Influence) in
Division No.35
568 / GGMP - Laying of 110 mm dia P.V.C Pipe Line from B.M.R to Nirmala School
2 2022-23 4.00
and west side Influence to existing V.I.P Road in Division No.35
569 / GGMP - Providing C.C Road from Vigneswara Apartment to existing V.I.P
3 2022-23 Road in Division No.35 3.80

570 / Providing C.C Drain at Akkireddy house opposite to Sub Station in 450 /
4 2022-23 Annavarappadu 3rd Line in Division No.15 (4th call) 1.90 AE-1 2022-23

TOTAL 21.90
Download Start Time : 20.10.2022 5.00 P.M
Download End Time : 27.10.2022 5.00 P.M
Receipt of Bids End Time : 27.10.2022 5.15 P.M
Price Bid Opening Time : 27.10.2022 5.30 P.M
571 / GGMP - Providing C.C Road at Ranguthota 1st Line 1st Cross Road and Pakeer
1
2022-23 Palem in Division No.12 5.75 AE-1

GGMP - Providing C.C Drain from Bombay Cloth store to Swathi Selections,
572/ Anjaneya Swami Temple back side to Karamsetty Krishna house, Karamsetty
2022-23 Krishna house to Kasim Shaiab Buildings in Ranguthota and Pedda Masjid 14.25
2 AE-1

Center in Division No.12


GGMP - Providing C.C Drain from Krishna Residency Apartment to Sri
573 / Mahalakshmi Nilayam, Shrihari Nivas to Swathi house, Chakiri Kotaiah
2022-23 Nilayam near Ramalayam Temple, Miriyala Palem Center to Vijayadurga Hall 20.00
3 AE-1

Junction in Chilukurivari Street and Miriyalapalem in Division No.12


574 / Supply and Delivery of SFRC Man Hole Covers with Angular Frames in 1 to 50
4
2022-23 Divisions in Ongole Municipal Corporation 3.30 AE-2

575 / Engineering SWM - Removal of Garbage, Site Levelling and Clearance of Site
5
2022-23 for Bio-Mining Process at Dumping Yard in Ongole Municipal Corporation 2.80 AE-3

576 / National Air Cleaning Programme - Development of Plantation near SWM


6
2022-23 Land Fill Site in Ongole Municipal Corporation 4.00 AE-3

National Air Cleaning Programme - Risking of Existing Divider and Plantation


577 /
2022-23 along both sides of Bye-Pass Road at Mangamoor Road Junction (1 Km From 20.00
7 AE-3
Junction to North & south side) in Ongole Municipal Corporation

578 / National Air Cleaning Programme - Laying End Pavement of Cement Concrete
8
2022-23 Road at Vegetable Market Road in Ongole Municipal Corporation 40.00 AE-3

TOTAL 110.10
Download Start Time : 26.10.2022 5.00 P.M
Download End Time : 02.11.2022 5.00 P.M
Receipt of Bids End Time : 02.11.2022 5.15 P.M
Price Bid Opening Time : 02.11.2022 5.30 P.M

579 / GGMP - Providing C.C Drain from Sreshta Children Hospital to Ismail Biryani 559 /
1 2022-23 Point and Halal Biryani to opposite Iskon Temple in Division No.49 (2nd call) 20.00
AE-3 2022-
23

TOTAL 20.00
Download Start Time : 26.10.2022 5.00 P.M
Download End Time : 31.10.2022 5.00 P.M
Receipt of Bids End Time : 31.10.2022 5.15 P.M
Price Bid Opening Time : 31.10.2022 5.30 P.M
GGMP - Providing C.C Drain from Old Satyam Tiffin Shop to existing V.I.P
580 / Road, M.Chalalpathi Rao house to M.M Road, from D.No.130 to M.M Road 567 /
1 2022-23 12.20 2022-
(Main) and from D.No.8-94 to existing M.M Road (west side Influence) in 23
Division No.35 (2nd call)
581 / GGMP - Providing C.C Road from Vigneswara Apartment to existing V.I.P 569 /
2 2022-23 3.80 2022-
Road in Division No.35 (2nd call) 23

582 / Providing C.C Drain at Akkireddy house opposite to Sub Station in 570 /
3 2022-23 1.90 AE-1
Annavarappadu 3rd Line in Division No.15 (5th call) 2022-23

TOTAL 17.90
Download Start Time : 28.10.2022 5.00 P.M
Download End Time : 31.10.2022 5.00 P.M
Receipt of Bids End Time : 31.10.2022 5.15 P.M
Price Bid Opening Time : 31.10.2022 5.30 P.M
583 / Providing C.C Culvert at opposite to Auxilium School in Islampet Extension in
1 2022-23 1.55 AE-1
Division No.4
584 / Providing C.C Road at opposite to Auxilium School in Islampet Extension in
2 2022-23 1.60 AE-1
Division No.4
585 / Construction of Compound Wall to Muslim Burial Ground in Koppolu in
3 2022-23 19.95 AE-1
Division No.10
586 /
4 2022-23 Formation of Road at Dreams Nagar in Division No.10 6.55 AE-1

587 /
5 2022-23 Providing C.C Approaches at various places in Division No.11 5.10 AE-1

588 /
6 2022-23 Providing Fencing for CRPF Quarters Park in Division No.21 2.00 AE-2

589 / Construction of Compound Wall to Urban Health Center in Gaddala Gunta in 454 /
7 2022-23 18.00 AE-2
Division No.30 (2nd call) 2022-23

590 / Supply and Delivery of Mini High mast Lighting and Cable at MM Road
8 2022-23 Chennakesava Swamy Park in Division No.37 3.15 AE-2

591 / Providing Quarry Rubbish Road from Linga Reddy Apartment to Kurnool Road
9 2022-23 9.20 AE-3
in Division No.40

592 / Providing Quarry Rubbish Road from Ananth Lakshmi Provision Shop to
10 2022-23 10.00 AE-3
Nuthalapati Srinivasulu Shop near Amaravathi Nagar Road in Division No.40

593 /
Construction of Ladies Bathroom Toilet, Laying of Bore Well and Construction
11 2022-23 of compound Wall at west side at Chinthagunta Burial ground in Division 10.00 AE-3
No.42
Provididng D.I Water Pipe Line in Maruthi Nagar 2nd Line and SBI Colony
594 /
12 2022-23 from Kurnool Road in Division No.44 & 45 in Ongole Municipal Corporation 40.00 AE-3
under 15th Finance Commission Grant

595 / N-CAP - Supply and Delivery of 2 nos. of Tanker Mounted Tractors for
13 2022-23 24.00 AE-3
watering and maintenance of Green Belt in Ongole Municipal Corporation

SWM - Supply and Delivery of Rapid Fog Machine (Thermal Fog type)
596 /
14 2022-23 Stainless Steel Machine (SS30-4), Portable and Vehicle mounted to Ongole 9.50 AE-3
Municipal Corporation
597 / SWM - Supply and Delivery of Bleaching Powder to Ongole Municipal
15 2022-23 4.15 AE-3
Corporation
598 / SWM - Construction of Cement Concrete Pavement Platform-2 for Windows
16 2022-23 at Dumping Yard in Ongole Municipal Corporation 9.70 AE-3

599 /
17 2022-23 Repairs to existing Urinals at various Places in Ongole Municipal Corporation 3.50 AE-1

600 / Fixing and Painting of Boundary Stones for the boundaries of ULB in view of
18 2022-23 4.50 H
Samagra Bhu Survey Programme in Ongole Municipal Corporation
Printing of Maps and Other Daily Reports of all sizes AO, A1, A2, A3, A4, Legal
601 /
19 2022-23 Colour & B/W in view of Samagra Bhu Survey Program and other daily office 10.00 H
needs in Ongole Municipal Corporation
602 / Providing Refreshments and other Material for Council Meetings and Review
20 2022-23 5.50 AE-3
Meetings at Municipal Office in Ongole Municipal Corporation
Removal of Obstructions and Diversions of Storm Water during rainy season
603 / 459 /
21 2022-23 in order to avoid inundation of low lying areas at various places in 1 to 50 0.98 AE-3 2022-23
Divisions in Ongole Municipal Corporation (2nd call)
TOTAL 198.93
Download Start Time : 28.10.2022 5.00 P.M
Download End Time : 11.11.2022 5.00 P.M
Receipt of Bids End Time : 11.11.2022 5.15 P.M
Price Bid Opening Time : 11.11.2022 5.30 P.M
604 / Supply, Delivery and Plantation of Avenue Plants from National Highway to
1 2022-23 6.00 AE-2
QIS College in Division No.18
TOTAL 6.00
Download Start Time : 01.11.2022 5.00 P.M
Download End Time : 04.11.2022 5.00 P.M
Receipt of Bids End Time : 04.11.2022 5.15 P.M
Price Bid Opening Time : 04.11.2022 5.30 P.M
605 / SWM - Providing Major and Minor Repairs to Compactor Vehicles in Ongole
1 2022-23 9.90 AE-3
Municipal Corporation
SWM - Supply, Delivery and Installation of PTZ C.C Cameras at Dumping Yard
606 /
2 2022-23 Vermi Compost Plant, CND Waste Plant Mamidipalem near S.S Tank-I and 7.50 AE-3
other localities in Ongole Municipal Corporation
607 / Construction of Compound Wall for Urban Health Center at Vengamukka
3 2022-23 6.70 AE-2
Palem in Division No.18
608 / Supply and Fixing of ABS Speed Breakers at various places in Ongole
4 2022-23 Municipal Corporation 5.80 AE-2

609 / Providing Drinking Water Facility for various sections at Municipal Office in
5 2022-23 2.00 AE-3
Ongole Municipal Corporation
TOTAL 31.90
Download Start Time : 04.11.2022 5.00 P.M
Download End Time : 08.11.2022 5.00 P.M
Receipt of Bids End Time : 08.11.2022 5.15 P.M
Price Bid Opening Time : 08.11.2022 5.30 P.M
National Clean Air Programme - Development of Island around Sri Kasu
611 /
1 2022-23 Brahmananda Reddy house near Sanghamithra Hospital in Ongole Municipal 10.00 AE-3
Corporation
Water Supply - Providing Electrical Repairs and Supply and Delivery of
612 /
2 2022-23 Electrical Materials to all Pump Houses and Filter Beds in Ongole Municipal 3.00 AE-3
Corporation
613 / Providing Mini High Mast Lighting Arrangements and M.S Grills to Central
3 2022-23 6.40 AE-2
Divider at Sanghamithra Hospital in Division No.17

Providing Zebra Crossing Lines and Solar Blinkers to Church Center Junction,
614 /
4 2022-23 Collector Office In-Gate & Out-Gate, Bye-pass Junction at Sanghamithra 10.00 AE-2
Hospital, M.M Road Junction in Ongole Municipal Corporation

615 / Providing Repairs, Supply and Delivery of Hardware and Software Items for
5 2022-23 2.50 AE-3
Video Screen in Gandhi Park in Division No.36
TOTAL 31.90
Download Start Time : 10.11.2022 5.00 P.M
Download End Time : 17.11.2022 5.00 P.M
Receipt of Bids End Time : 17.11.2022 5.15 P.M
Price Bid Opening Time : 17.11.2022 5.30 P.M
Development of Park by Providing Greenery, Children Playing Equipment,
616 / Internal Drains, Toilets, Water Supply, Electricity, Sitting Benches etc., at
1 2022-23 Housing Board Colony in Division No.19 in Ongole Municipal Corporation 75.00 AE-2
under 15th Finance Commission Grant

Laying of D.I K7 Pipelines along Kothapatnam Road at Koppolu in Division


617 / No.9 and H.D.P.E Drinking Water Pipelines in SC Colony and other Residential 463 /
2 2022-23 Areas in Ongole Municipal Corporation under 15th Finance Commission 131.84 2022-
23
Grant (2nd Call)

Providing D.I Water Pipe Line from Flyover to Sriram Colony along Kurnool
618 / 464 /
3 2022-23 Road in Division No.43, 44 & 45 in Ongole Municipal Corporation under 15th 94.00 2022-
23
Finance Commission Grant (2nd Call)
Providing C.C Drain from Veeramuchu Vajram house to Arumulla Yakobu
619 /
4 2022-23 house in 3rd Line and Community Hall to Eluri Koteswara Rao in 8th Line in 10.00 AE-4
Throvagunta S.C Colony in Division No.1

Providing C.C Drain from Pasumurthy Srinu house to Kavuri Dayamma house,
620 /
5 2022-23 Bodeddula Sujatha house and Kotapuri Anjaiah house to Vijaya Lakshmi 10.00 AE-4
house in 5th, 7th & 9th Lines in Throvagunta S.C Colony in Division No.1

621 / Providing C.C Drain from Ramisetti Srinivasa Rao house to Killa Bhaskar Rao
6 2022-23 9.50 AE-4
house inn Throvagunta Putta Bazar in Division No.1

622 / Providing C.C Drain from Main Road to B.Manikyam house and from Main
7 2022-23 Road to K.Prabhakar house in Throvagunta S.C Colony in Division No.1 7.50 AE-4

623 / Providing C.C Drain from Ethamukkala Hemanth house to Bodeddula Anil
8 2022-23 6.70 AE-4
Kumar house 1st Line in Throvagunta S.C Colony in Division No.1
Providing C.C Road from 1st Cross Road from Kanakamma house to Road end
624 /
9 2022-23 and K.Devasahayam house to K.Prabhakar house in S.C Colony in 9.50 AE-4
Throvagunta in Division No.1
Providing CC Drains from M.Eswaramma (H) to P.Koeswaramma (H) and
625 /
10 2022-23 Providing CC Drain and Flooring with chequered terrazzo tiles for Steps at 22.00 AE-2 516 /
2022-23
Kondamitta Rajapanagal 11th Cross Road in Division No.29 (2nd call)
SWM - Providing Granular Sub Base by using Quarry Rubbish to Open Site
626 /
11 2022-23 near Shadikhana and Vehicle Shed near Santhapet ELSR for Solid Waste 7.00 AE-3
Management purpose in Ongole Municipal Corporation
627 / Drilling of Deep Bore Wells and Fixing of IM-II Pump Sets at various places in
12 2022-23 9.95 AE-2
Ongole Municipal Corporation
628 / Providing 16 Mts High Mast Flag and Pylon at Rangarayudu Cheruvu in
13 2022-23 Division No.36 6.70 AE-2

629 / Providing Inter-connection at Vicky Tailors Road and Replacement of Iron


14 2022-23 0.78 AE-2
Manhole at Gandhi Statue in Gandhi Road in Division No.22
630 / Providing Inter-connection to Bhagya Nagar 4th Line 11th Cross Road to
15 2022-23 1.90 AE-2
DRDA Office Road in Division No.19
631 / Repairs and Cleaning of Septic Tank of Toilets at Narayana Rao School in
16 2022-23 1.59 AE-1
Division No.12
632 / Providing R.C.C Pipe Culvert for Cross Roads, Removal of High Berms and
17 2022-23 1.60 AE-2
Jungle Clearance at Mother Theresa Colony in Division No.18
633 / Rennovation of Dias around the tree near Ramalayam Temple in
18 2022-23 Chivukulavari Street in Division No.12 4.50 AE-1

634 / Providing C.C Road from Sai Sree Residency to Achalanda Ashramam in Sivaji
19 2022-23 9.95 AE-3
Nagar 2nd Line in Division No.37
635 / Providing Mini High Mast Lighting Arrangements near Park in Bhagya Nagar
20 2022-23 1.90 AE-2
3rd Line in Division No.20
636 /
21 2022-23 Rennovation of Arch at Bhagya Nagar 2nd Line Entrance in Division No.20 2.21 AE-2

Development of Central Medians, Green Belt Development, Traffic Island


637 / 551 /
439 /
22 2022-23 Development and Road Side Plantation in Ongole Municipal Corporation 40.00 2022-
23 2022-23
under 15th Finance Commission Grant (3rd call)
638 / Construction of Valve Chambers at various places in 33 to 50 Divisions in 555 /
23 2022-23 Ongole Municipal Corporation (2nd call) 10.00 AE-3 2022-23

Supply of 4000 Litre Water Tanker Tractor Trailer for Dumping Yard at
639 / 557 /
24 2022-23 Guthikondavari Palem in Ongole Municipal Corporation under 15th Finance 2.50 AE-3 2022-23
Commission Grant (3rd call)
TOTAL 476.62
Download Start Time : 10.11.2022 5.00 P.M
Download End Time : 25.11.2022 5.00 P.M
Receipt of Bids End Time : 25.11.2022 5.15 P.M
Technical Bid Opening Time : 25.11.2022 5.30 P.M
Price Bid Opening Time : 25.11.2022 5.45 P.M
640 / Rennovation of "Moulana Abdul Kalam Ajad Statue" in land Old Market 5.30
1 2022-23 AE-4
Junction in Division No.4
641 / Providing Quarry Rubbish Roads at various places in Koppolu in Division
2 2022-23 No.10 6.00 AE-6

642 / Providing R.O Plant System at near Sachivalayam in Bathulavari Kunta in


3 2022-23 11.20 AE-6
Division No.16
643 / Providing C.C Drain from Edara Ramu house to Bye-pass Road at Power
4 2022-23 9.80 AE-3
Office beside Road in Division No.33
644 / Providing C.C Drains and C.C Culverts at Old Sujatha Nagar 1st, 2nd, 3rd Lines
5 2022-23 10.00 AE-3
in Division No.34
645 /
6 2022-23 Providing C.C Road from Challa Enclave to existing C.C Road in Division No.34 9.50 AE-3

646 / Providing C.C Drain from Sk.Karimulla house to Vuruma Ravichandra house in
7 2022-23 Pragathi Nagar 3rd Line right side 3rd cross road in Division No.39 6.00 AE-3

Providing C.C Drain from Karnati Siva house (D.No.33-055-1097) to Pilli


647 /
8 2022-23 Lakshma Reddy house (D.No.33-055-522) near Pothuraju Canal in Division 8.00 AE-3
No.45
648 / Providing Quarry Rubbish Road from G.Krishna Reddy house upto N.C Colony
9 2022-23 9.96 AE-3 K-73
in Division No.50
649 / Providing Quarry Rubbish Road from Jayaprakash Colony Extension to
10 2022-23 9.96 AE-3 K-74
Hevens Church Road in Division No.50
650 / Providing Quarry Rubbish Road at Jayaprakash Colony 2nd Line in Division
11 2022-23 9.80 AE-3 K-75
No.50

Providing CC Drains from Mubarak Biriyani Point to GopiKrishna Hall end


(north side), from Guntur Road to Islampet Masjid Road, from Srinivasa Hall
651 / 468 /
12 2022-23 Road to Islampet Masjid Road (north side), from Sk.Rafi (H) to Srinivasa (H) 22.00 AE-1 2022-23
and Providing CC Patches from Rehman (H) to Frakruddin (H) in Division No.4
(2nd call)

652 / Providing C.C Drain back side of 'V' Grand Restaurant to Krishna Theatre 470 /
13 2022-23 Road in Ramannapet 1st Line in Division No.4 (2nd call) 5.50 AE-1 2022-23

653 / Providing C.C Culvert at opposite to Auxilium School in Islampet Extension in 583 /
14 2022-23 1.55 AE-1
Division No.4 (2nd call) 2022-23

654 / Providing C.C Road at opposite to Auxilium School in Islampet Extension in 584 /
15 2022-23 1.60 AE-1
Division No.4 (2nd call) 2022-23

655 / Laying of 110 mm dia P.V.C Pipe Line from Jockey Show Room to Gorripati 473 /
16 2022-23 Srinivasulu house at Old Market in Division No.6 (2nd call) 1.45 AE-1 2022-23

656 / Providing C.C Drain and Culvert from Jockey Show Room to existing Drain at 474 /
17 2022-23 2.60 AE-1
opposite Old Market in Division No.6 (2nd call) 2022-23

Providing CC Drain, Reconstruction of CC Drain at Thangella Khasim Veedi in


Rajakala Street, Providing CC Road & CC Drain at Kammapalem 3rd Line extension in
657 / 40 Feet Road to Karavadi Donka 7th Line, Providing CC Drain from Karavadi Donka
476 /
18 2022-23 'Y' Junction to Kalikamatha Temple, Providing CC Road & CC Drain from back side of 22.00 AE-1 2022-23
Hindu Burial Ground Old Age Home west side in Karavadi Donka and Providing CC
Drain from 1st Cross Road to 2nd Cross Road in Kammapalem 3rd Line east side of
CC Road in Division No.7 (2nd call)

Providing CC Road, CC Drain & Patch Work from Katari Sankar (H) to Dasari
Suneetha (H) and from Aluri Lakshmi (H) to Polineni Aruna (H), Providing CC
658 / Roads from Dasari Suneetha (H) to Lingisetty Purnachandra rao (H) & from 477 /
19 2022-23 22.00 AE-1
Kaja Mahamuddin (H) to Edara Srinivasa Rao (H) and Providing CC Drain from 2022-23

Chenchu Lakshmi (H) to Bonthavari veedhi 1st & 2nd Lines and in Division
No.8 (2nd call)

Construction of New Toilet Block, Septic Tank, Providing Water Supply,


659 / 478 /
20 2022-23 Electrification for Municipal Primary School in Rajiv Gruha Kalpa 2nd Line in 8.25 AE-1 2022-23
Division No.9 (2nd call)
660 / Providing C.C Drain from Pedda Cheruvu Road to Old S.C Colony in Division 480 /
21 2022-23 40.00 AE-1
No.10 (2nd call) 2022-23

Providing CC Drains from Ambetkar Statue to Menda Vijaya Raju (H) at Old
SC Colony 1st Line, Kasukurthi Lakshmaiah (H) to Burri Venkateswarlu (H) at
661 / 481 /
22 2022-23 Old SC Colony 2nd Line, Kasukurthi Venkateswarlu (H) to Kasukurthi Shekar 22.00 AE-1 2022-23
(H) at Old SC Colony 3rd Line and Providing CC Road from BVR School to
Yalagala Sanjivarao (H) in Koppolu in Division No.10 (2nd call)
662 / Construction of Compound Wall to Muslim Burial Ground in Koppolu in 585 /
23 2022-23 19.95 AE-1
Division No.10 (2nd call) 2022-23

Raising of CC Road & CC Drain from Challa Srirama (H) to Chavala Kumari (H),
Chavala Kumari (H) to Bapatla Gopi (H) and Kotari Narendra (H) to Kale
Venkateswarlu (H) at Maratipalem, Raising of CC Road & CC Drain from
Kamineni Sivakumar (H) Vemula Prasad (H) and Prasanthi Nilayam (H) to
663 / 486 /
24 2022-23 Valisetty Umamaheswararao (H) at Chikulavari veedhi, Repairs to Openwells 22.00 AE-1 2022-23
at Chivukulavari Street, Ramalayam Temple & Pakeer Palem and Providing
CC Drain from Karamcheti Krishna (H) to Rehaman Store & Karamcheti
Krishna (H) to Opp Kuppam Prasad (H) in Ranguthota in Division No.12 (2nd
call)

Providing C.C Drain and Culvert from Nalluri Nursing Home to


664 / 487 /
25 2022-23 Anjaneyaswami Temple and Sankarasetti Suryanarayana (H) to Sunnisetti 8.35 AE-1 2022-23
Venkateswarlu Rice Store in Division No.12 (2nd call)
665 / Providing C.C Drain from Railway Line to Balaji Nagar in Division No.16 (2nd 492 /
26 2022-23 call) 40.00 AE-1 2022-23

666 / Providing C.C Drain at west to east from Shiva Parvathy Nilayam to Ele.Pole 505 /
27 2022-23 9.42 AE-2
No.025/10B/0101/000 at Yenugu Chettu Bazar in Division No.22 (4th call) 2022-23

Laying of 110 mm & 160 mm dia PVC Pipe Line from Ongole Dairy Milk
Parlour to Venkateswara (H) at Ganuga Palem, Basha Glass Work to Notice
667 / 506 /
28 2022-23 Shop, Moulali (H) to Sathyam Handlooms & Srinivasa Footwear to Srinu (H) at 22.00 AE-2 2022-23
Kotavari Veedhi, Providing CC Road & CC Drain beside Kotavari Veedhi School
east side in Division No.23 (2nd call)

Laying of 110 mm Dia PVC Pipe Line from Ongole Dairy Milk Parlour to
668 / 507 /
29 2022-23 Venkateswara (H) at Ganugapalem and Srinivasa Foot Ware to Srinu (H) at 10.00 AE-3 2022-23
Kota Vari Veedhi in Division No.23 (5th call)

Laying of 110 mm and 160mm Dia PVC Pipe Line from Basha Glass Work to
669 / Notice Shop, Moulali (H) to Sathyam Handlooms at Kotavari Veedhi and 508 /
30 2022-23 10.00 AE-3
Construction of CC Road & CC drain Beside Kotavari veedhi school East side 2022-23

in Division No.23 (5th call)


Providing CC Drains & CC Roads from Vanttavani Colony 4th & 7th Lines,
670 / Ekalavya Nagar Burial Ground opp Roads, Vaddepalem, MangalaPalem 511 /
31 2022-23 beside YSRCP Party Office, TB Road and Samaikyatha Nagar in Division No.24 22.00 AE-2 2022-23

(2nd call)
Providing C.C Drain from beside Vinayaka Temple to Burusu Lakshmi (H) in
671 / 512 /
32 2022-23 Domalapalem and Allahuddin Jewellery to Lakshmi Sravanthi Cut Pieces in 8.65 AE-2 2022-23
Bheemaraju Veedhi in Division No.25 (4th call)
Providing C.C Roads from beside BA & KR College to near Dheeraj Hospital
672 / 513 /
33 2022-23 and Allaudding Jewellers to Lakshmi Sravanthi Cut Pieces in Bheemaraju 8.40 AE-2 2022-23
Veedhi in Division No.25 (3rd call)
673 / Providing CC Road, CC Drain and CC Retaining Wall in Division No.27 (2nd 514 /
34 2022-23 22.00 AE-2
call) 2022-23

674 / Providing CC Drain and RCC Culvert at Kothapeta Streets and Jammichettu 515 /
35 2022-23 22.00 AE-2
Streets in Division No.28 (2nd call) 2022-23
Providing CC Drain from Puram Somaiah (H) to Muvva Venkateswarlu (H) at
JC Banglaw Back Side NSP Colony, Mogili Anadharao Plot to Nagendra Swami
Temple at Seetharampuram, Boddu Vijaya Lakshmi (H) to Sonu Supply Shop
675 / 517 /
36 2022-23 at Gaddalagunta and Laying of 100 mm dia AC Pipe Line from Vadde Naleeni 22.00 AE-2 2022-23
Jayanthi (H) to Karavadhi Seshaiah (H) at Seetharampuram, Burial Ground to
Kondaiah (H) and from Pasumarthi Ankaiah (H) to Punuri Lakshmi Narayana
(H) in Division No.30 (2nd call)

676 / Construction of Steps from Dasari Pramila house to Hill in Seetharama Puram 519 /
37 2022-23 2.00 AE-2 2022-23
in Division No.30 (3rd call)
677 / Construction of Compound Wall to Urban Health Center in Gaddala Gunta in 589 /
38 2022-23 18.00 AE-2
Division No.30 (3rd call) 2022-23

678 / Construction of Ward Sachivalayam Building in Gaddalagunta in Division 520 /


39 2022-23 No.32 (4th call) 40.00 AE-2 2022-23

Providing CC Drain in Nirmal Nagar 2nd Cross Road, Raising of CC Road from
679 / Chitithoti (H) (south side) to existing Byepass Road and Providing CC Drain 526 /
40 2022-23 from Subbareddy Towers to SBI ATM (Anjaiah Road), Brundavanam 22.00 AE-3 2022-23

Residency to kiran (H) in Division No.36 (2nd call)

Construction of Ladies Bathroom Toilet, Laying of Bore Well and Construction


680 / 593 /
41 2022-23 of compound Wall at west side at Chinthagunta Burial ground in Division 10.00 AE-3 2022-23
No.42 (2nd call)
681 / Providing CC Drains from Sai Janardhan Office to Flyover in Pandaripuram in 537 /
42 2022-23 22.00 AE-3
Division No.46 (2nd call) 2022-23

Providing CC Drains from Bhavani Prasad (H) to Gundu Suvarthamma (H),


682 / 538 /
43 2022-23 Pothuraju Canal to Phani (H) and G.Kotataiah (H) to Sirigiri Sambhaiah (H) in 22.00 AE-3 2022-23
NGO Colony 7th Line in Division No.47 (2nd call)
683 / Providing C.C Drains both sides in Ayyannavari Veedhi, Cross Roads and 539 /
44 2022-23 Amrutha Hospital Road in Division No.48 (2nd call) 22.00 AE-3 2022-23

684 / Providing C.C Road and C.C Drain at Indira Nagar 1st Line in Division No.49 544 /
45 2022-23 4.60 AE-3
(3rd call) 2022-23

685 / Providing C.C Road at back side of Bala Krishna Puram 3rd Line in Division 546 /
46 2022-23 2.25 AE-3
No.49 (4th call) 2022-23

686 / 547 /
47 2022-23 Providing C.C Road at Netaji Colony Main Road in Division No.50 (2nd call) 39.00 AE-3 2022-23

687 / Providing C.C Drains to Main Road in Venkateswara Colony Hospital Road 548 /
48 2022-23 39.00 AE-3
and 1st Cross Road in Venkateswara Colony in Division No.50 (2nd call) 2022-23

TOTAL 734.09
Download Start Time : 17.11.2022 5.00 P.M
Download End Time : 01.12.2022 5.00 P.M
Receipt of Bids End Time : 01.12.2022 5.15 P.M
Price Bid Opening Time : 01.12.2022 5.30 P.M
688 / Transportation and Supply of Water in various places in 1 to 50 Divisions in
1 2022-23 Ongole Municipal Corporation 40.00 AE-2

689 / Engaging of J.C.B, Dozer and Tractors on hire basis for removal of C&D Waste
2 2022-23 10.00 AE-2
at various places in Ongole Municipal Corporation
690 / Maintenance of Road for C&D Waste Dump Site and Removal of Debris at
3 2022-23 10.00 AE-3
various places in Ongole Municipal Corporation
National Clean Air Programme - Development of Island around Sri Kasu
691 / 611 /
4 2022-23 Brahmananda Reddy Staute near Sanghamithra Hospital in Ongole Municipal 10.00 AE-3 2022-23
Corporation (2nd call)
TOTAL 70.00
Download Start Time : 19.11.2022 4.00 P.M
Download End Time : 28.11.2022 4.00 P.M
Receipt of Bids End Time : 28.11.2022 4.15 P.M
Price Bid Opening Time : 28.11.2022 4.30 P.M
692 / Repairs to Motors, Removal of Shrub Jungle, Moss, Cleaning and Filling 466 /
1 2022-23 3.50 2022-
Mukthinuthalapadu Tank with Current Motors in Division No.2 (recall) 23

693 / Providing C.C Road repairs and C.C Approaches at various places in Division 543 /
2 2022-23 2.30 2022-
No.49 (recall) 23

694 / Transportation and Supply of Water in various places in 1 to 50 Divisions in 560 /


3 2022-23 Ongole Municipal Corporation (recall) 10.00 2022-
23

695 / Repairs and Rectification of Pumping Main and Gravity Main Leakages in 17 561 /
4 2022-23 5.00 2022-
to 32 Divisions in Ongole Municipal Corporation (recall) 23

696 / Desiltation of existing Major and Minor Drains in 17 to 32 Divisions in Ongole 563 /
5 2022-23 5.00 2022-
Municipal Corporation (recall) 23

697 / SWM - Construction of Cement Concrete Pavement Platform-2 for Windows 598 /
6 2022-23 at Dumping Yard in Ongole Municipal Corporation (recall) 9.70 2022-
23

TOTAL 35.50
Download Start Time : 22.11.2022 4.00 P.M
Download End Time : 29.11.2022 4.00 P.M
Receipt of Bids End Time : 29.11.2022 4.15 P.M
Price Bid Opening Time : 29.11.2022 4.30 P.M
GGMP - Providing C.C Drains in Military Colony 1st Line from Sattar house to
698 / Venkateswarlu house, Ponugupati Nagar 2nd Line Subba Rao house to Rajpal
1 2022-23 20.00 AE-1
house, 5th Line Mastan house to Anjali house, 6th Line Koteswara rao house
to Koteswaramma house in Division No.3

699 / Supply and Delivery of Piduguralla Stone Powder (Lime) to Ongole Municipal
2 2022-23 5.00 AE-3 K-172
Corporation
TOTAL 25.00
Download Start Time : 02.12.2022 4.00 P.M
Download End Time : 09.12.2022 4.00 P.M
Receipt of Bids End Time : 09.12.2022 4.15 P.M
Price Bid Opening Time : 09.12.2022 4.30 P.M
GGMP - Construction of C.C Drains from Prakasam Colony 2nd Line from
700 /
1 2022-23 Sabbeer house to Habeebulla house and Papa Colony 4, 5 & 6th Streets in 12.00
Division No.3
701 / GGMP - Construction of C.C Disposal Drains from Guntur Road Karimulla
2 2022-23 8.00
Tea Shop to Rankers school in Division No.3
702 / GGMP - Formation of C.C Road from Enuguchettu Center (D.No.34-1-44(1))
3 2022-23 20.00
to Ambedkar Statue in Division No.22
GGMP - Construction of C.C Drain from Thatha Building (New Diamond Tea
703 /
4 2022-23 Center) to Enugu Chettu (A.Kotaiah house) in Kesavaraju Peta Sachivalayam 11.60
in Division No.22
704 / GGMP - Providing C.C Drain from Anjaneya swamy Temple to Ayyappa Swami
5 2022-23 Temple in Kesavarajupeta Sachivalayam in Division No.22 8.40

705 / GGMP - Laying of 100mm dia P.V.C Pipe Line back side of KK Computers and
6 2022-23 10.50
Pappu Bazar in Division No.26
GGMP - Construction of Drain back side of KK Computers from Emani Madhu
706 /
7 2022-23 (H) to Matta Subbarattamma (H) and C.C Road at Godugu Sanjeevi Veedhi in 9.50
Division No.26
TOTAL 80.00
Download Start Time : 06.12.2022 4.00 P.M
Download End Time : 13.12.2022 4.00 P.M
Receipt of Bids End Time : 13.12.2022 4.15 P.M
Price Bid Opening Time : 13.12.2022 4.30 P.M
707 / Providing balance C.C Road at Venkateswara Colony Main Road along with
1 2022-23 25.00 AE-3 K-185
two cross roads in Division No.50
708 / Laying of 160 mm dia P.V.C Pipe Line from Thedepalli Nagalakshmi house to
2 2022-23 2.70 AE-3 K-170
Sk.Johny basha house near Pragathi Layout in Division No.50
Solid Waste Management - Providing Major and Minor Repairs to Municipal
709 /
3 2022-23 Vermi Composting Plant near Kothamamdi Palem in Ongole Municipal 10.00 AE-3 K-171
Corporation
710 / Maintenance of Water Supply Distribution System and Pumping mains at
4 2022-23 10.00 AE-3 K-178
various locations in Ongole Municipal Corporation
Supply and Delivery of 5 HP & 3 HP Vacuum Motors for various Pump House
711 /
5 2022-23 & 7.50 HP Sub-mersible Motor for Pernamitta Water Supply Scheme in 5.80 AE-3 K-179
Ongole Municipal Corporation
712 / Providing Drinking Water Facility for Spandana Meeting at Spandana Hall in
6 2022-23 1.95 AE-3 K-193
Collector Office for the year 2023 in Ongole Municipal Corporation

713 / Supply, Delivery and Fixing of M.S Name Plates at Dumping Yard, C&D Waste,
7 2022-23 MRF Center and Vermi Compost Plant in Ongole Municipal Corporation 0.99 AE-3 K-194

Repairs and Rectification of various Motors and Pump Sets at various places
714 /
8 2022-23 of Water Supply section (S.S Tank I, II, Old & New Filter Beds, Police 9.90 AE-3 K-195
Quarters) in Ongole Municipal Corporation

715 / Providing Refreshments and other Material for Council Meetings and Review 602 /
9 2022-23 5.50 AE-3
Meetings at Municipal Office in Ongole Municipal Corporation (recall) 2022-23

Providing C.C Drain from Veeramuchu Vajram house to Arumulla Yakobu


716 / 619 /
11 2022-23 house in 3rd Line and Community Hall to Eluri Koteswara Rao in 8th Line in 10.00 AE-4 2022-23
Throvagunta S.C Colony in Division No.1 (2nd call)

Providing C.C Drain from Pasumurthy Srinu house to Kavuri Dayamma house,
717 / Bodeddula Sujatha house and Kotapuri Anjaiah house to Vijaya Lakshmi 620 /
12 2022-23 10.00 AE-4
house in 5th, 7th & 9th Lines in Throvagunta S.C Colony in Division No.1 (2nd 2022-23

call)
718 / Providing C.C Drain from Ramisetti Srinivasa Rao house to Killa Bhaskar Rao 621 /
13 2022-23 9.50 AE-4
house inn Throvagunta Putta Bazar in Division No.1 (2nd call) 2022-23

Providing C.C Drain from Main Road to B.Manikyam house and from Main
719 / 622 /
14 2022-23 Road to K.Prabhakar house in Throvagunta S.C Colony in Division No.1 (2nd 7.50 AE-4 2022-23
call)

720 / Providing C.C Drain from Ethamukkala Hemanth house to Bodeddula Anil 623 /
15 2022-23 6.70 AE-4
Kumar house 1st Line in Throvagunta S.C Colony in Division No.1 (2nd call) 2022-23

Providing C.C Road from 1st Cross Road from Kanakamma house to Road end
721 / 624 /
16 2022-23 and K.Devasahayam house to K.Prabhakar house in S.C Colony in 9.50 AE-4 2022-23
Throvagunta in Division No.1 (2nd call)
722 / Rennovation of "Moulana Abdul Kalam Ajad Statue" in land Old Market 640 /
10 2022-23 5.30 AE-4
Junction in Division No.4 (2nd call) 2022-23

723 / Providing R.O Plant System at near Sachivalayam in Bathulavari Kunta in 642 /
17 2022-23 11.20 AE-6
Division No.16 (2nd call) 2022-23

Sucking of Sludge and Water from Underground Drainage Pipelines from R.K
724 /
18 2022-23 Fast Foods to Sambasiva Nagar and Open Drain from Kurnool Road to 7.25 AE-3 K-181
Pothuraju Canal in Division No.37 & 45 in Ongole Municipal Corporation
TOTAL 148.79
Download Start Time : 08.12.2022 4.00 P.M
Download End Time : 16.12.2022 4.00 P.M
Receipt of Bids End Time : 16.12.2022 4.15 P.M
Price Bid Opening Time : 16.12.2022 4.30 P.M

Rejuvenation of Water Bodies at Rangarayudu Cheruvu for strengthening of


725 /
1 2022-23 Tank Bund and Providing of Walking Track and Plantation in Division No.36 in 100.00
Ongole Municipal Corporation under 15th Finance Commission Grant

National Clean Air Programme - Laying End to End Pavement of Cement


726 /
2 2022-23 Concrete Road from RDO Office to Ramya Hotel along the west side of Trunk 60.00
Road in Ongole Municipal Corporation
727 / Providing Interconnection of Pipe Line at Kesavaraju Kunta Main Road and
3 2022-23 1.97 AE-1 K-164
Internal Roads of 5th and 6th Cross Roads in Division No.2
728 / Painting of the Bridge along Pothuraju Canal at Papa Colony (Prakasam
4 2022-23 Colony) in Division No.3 0.30 AE-4 K-184

730 / Engaging of J.C.B for removing of Jungle, Formation of Kutcha Drain and
5 2022-23 0.96 AE-1 K-165
Lifting of Debris in Division No.9
732 /
6 2022-23 Formation of Road from Koppolu Road to Brundavan Nagar in Division No.10 2.00 K-180

733 /
7 2022-23 Providing C.C Roads in Dharavari Thota in Division No.21 9.80 AE-2 K-173

734 / Providing Interconnections to Water Supply Lines in Bhimarajuvari Street and


8 2022-23 2.90 AE-2 K-174
Balajirao Pet in Division No.24 and 25 in Ongole Municipal Corporation

Laying of 110 mm dia H.D.P.E Pipe Line from west to east from D.No.34-64-
735 /
9 2022-23 1406 to N.Venkata subbaiah house in Samatha Nagar 3rd Line in Division 2.61 AE-3 K-166
No.37
736 / Providing C.C Drain both sides from P.Veeranjaneyulu Plot to existing
10 2022-23 compound wall in Sunnapubattilu Road in Sri Nagar Colony in Division No.38 3.50
AE-3 K-167

737 / Providing C.C Road from Sk.Karimulla house to Vuruma Ravichandra house in
11 2022-23 Pragathi Nagar 3rd Line right side 3rd cross road in Division No.39 9.15 AE-3 K-168

738 / Providing C.C Road from G.Raghavaiah house to Hanuman Granites in


12 2022-23 Kurnool Road Main Road in Chaitanya Colony in Division No.40 8.00 AE-3 K-175

739 / Providing C.C Drain from G.Raghavaiah house to Hanuman Granites in


13 2022-23 6.25 AE-3 K-176
Kurnool Road Main Road in Chaitanya Colony in Division No.40
Providing C.C Road from Tanniru Subba rao house to Bandaru Subba rao
740 /
14 2022-23 house in Pernamitta Vadde Palem and T.Siddamma house to B.Ramesh 9.95 AE-3 K-186
house in Pernamitta in Division No.40
741 / Providing C.C Road from Kontha Sivamma house to Chittemreddy
15 2022-23 Ramalingareddy house in Reddy Palem in Division No.40 9.15 AE-3 K-187

Providing C.C Road from Kalicheti Subbarao house to Ankoji Pavan house and
742 /
16 2022-23 Sriramulu nageswarararao house to Maram Venkareddy house in Linga 6.70 AE-3 K-188
Reddy Colony in Division No.40
743 / Providing C.C Road from Koduru Raghavaiah house to Ramisetty Srinivasa rao
17 2022-23 house in Chaitanya Colony in Division No.40 6.65 AE-3 K-189

744 / Providing C.C Road from Padma house to Venkateswara reddy house in
18 2022-23 6.00 AE-3 K-190
Dwaraka Nagar in Division No.40
Providing C.C Drain from Tanniru Subba rao house to Bandaru Subba rao
745 /
19 2022-23 house in Pernamitta Vadde Palem and from T.Siddamma house to B.Ramesh 8.90 AE-3 K-191
house in Pernamitta in Division No.40
746 / Laying of 160 mm dia P.V.C Pipe Line from Transformer Road in Vadde Palem
20 2022-23 9.50 AE-3 K-192
to Sarayi Factory in Division No.40
747 /
21 2022-23 Construction of Community Hall in Pernamitta S.C Colony in Division No.41 10.00 AE-3 K-177

748 / Providing C.C Road from Goda Ravanamma house to M.Sudha jayakumar
22 2022-23 4.00 AE-3 K-169
house in State Bank Colony Extension in Division No.45
749 / Providing C.C Drain from Edara Ramu house to Bye-pass Road at Power 643 /
23 2022-23 Office beside Road in Division No.33 (recall) 9.80 AE-3 2022-23

750 / Providing C.C Culvert at opposite to Auxilium School in Islampet Extension in 653 /
24 2022-23 1.55 AE-1
Division No.4 (3rd call) 2022-23

751 / Providing C.C Road at opposite to Auxilium School in Islampet Extension in 654 /
25 2022-23 1.60 AE-1
Division No.4 (3rd call) 2022-23

752 / Laying of 110 mm dia P.V.C Pipe Line from Jockey Show Room to Gorripati 655 /
26 2022-23 1.45 AE-1
Srinivasulu house at Old Market in Division No.6 (3rd call) 2022-23

753 / Providing C.C Drain and Culvert from Jockey Show Room to existing Drain at 656 /
27 2022-23 opposite Old Market in Division No.6 (3rd call) 2.60 AE-1 2022-23

TOTAL 295.29
Download Start Time : 08.12.2022 4.00 P.M
Download End Time : 23.12.2022 4.00 P.M
Receipt of Bids End Time : 23.12.2022 4.15 P.M
Technical Bid Opening Time : 23.12.2022 4.30 P.M
Price Bid Opening Time : 23.12.2022 4.45 P.M
754 / Providing C.C Patches at various places in 1 to 6 Divisions in Ongole
1 2022-23 9.25 AE-4
Municipal Corporation
755 / Providing C.C Patches at various places in 7 and 8 Divisions in Ongole
2 2022-23 Municipal Corporation 5.21 AE-4

756 / Providing C.C Patches at various places in 9 to 13 and 16 Divisions in Ongole


3 2022-23 4.00 AE-6
Municipal Corporation
757 / Providing C.C Patches at various places in 14 and 15 Divisions in Ongole
4 2022-23 9.60 AE-6
Municipal Corporation
TOTAL 28.06
Download Start Time : 08.12.2022 4.00 P.M
Download End Time : 15.12.2022 4.00 P.M
Receipt of Bids End Time : 15.12.2022 4.15 P.M
Price Bid Opening Time : 15.12.2022 4.30 P.M
758 / Construction of First Floor Slab at Shadikhana Building in Division No.24 in
1 2022-23 68.00
Ongole Municipal Corporation
TOTAL 68.00
Download Start Time : 09.12.2022 4.00 P.M
Download End Time : 23.12.2022 4.00 P.M
Receipt of Bids End Time : 23.12.2022 4.15 P.M
Price Bid Opening Time : 23.12.2022 4.30 P.M
GGMP - Construction of C.C Drain from Thatha Building (New Diamond Tea
759 / 703 /
1 2022-23 Center) to Enugu Chettu (A.Kotaiah house) in Kesavaraju Peta Sachivalayam 11.60 2022-
23
in Division No.22 (2nd call)
GGMP - Construction of Drain back side of KK Computers from Emani Madhu
760 / 706 /
2 2022-23 (H) to Matta Subbarattamma (H) and C.C Road at Godugu Sanjeevi Veedhi in 9.50 2022-
23
Division No.26 (2nd call)
761 / GGMP - Formation of C.C Road from Enuguchettu Center (D.No.34-1-44(1)) 702 /
3 2022-23 20.00 2022-
to Ambedkar Statue in Division No.22 (2nd call) 23

762 / GGMP - Providing C.C Drain from Anjaneya swamy Temple to Ayyappa Swami 704 /
4 2022-23 8.40 2022-
Temple in Kesavarajupeta Sachivalayam in Division No.22 (2nd call) 23

Providing CC Drains from M.Eswaramma (H) to P.Koeswaramma (H) and


763 / 625 /
5 2022-23 Providing CC Drain and Flooring with chequered terrazzo tiles for Steps at 22.00 AE-2 2022-23
Kondamitta Rajapanagal 11th Cross Road in Division No.29 (3rd call)
764 / Construction of Steps from Dasari Pramila house to Hill in Seetharama Puram 676 /
6 2022-23 2.00 AE-2 2022-23
in Division No.30 (4th call)
TOTAL 73.50
Download Start Time : 13.12.2022 5.00 P.M
Download End Time : 19.12.2022 5.00 P.M
Receipt of Bids End Time : 19.12.2022 5.15 P.M
Price Bid Opening Time : 19.12.2022 5.30 P.M
Providing Quarry Rubbish Road from Anjaneya Swamy Temple to NSP Canal
765 /
1 2022-23 in Mukthinuthalapadu and Mukthinuthalapadu Road to Gudimellapadu Road 2.70 AE-4 K-196
in Division No.2
766 / Providing R.C.C Culvert and Drain near Papa Rice Mill at Guntur Road in
2 2022-23 5.80 AE-4 K-228
Division No.2
767 / Providing C.C Road from Generators Repairs Shop at Guntur Road to Ershadh
3 2022-23 9.82 AE-4 K-229
Steels Shop in Division No.2
768 / Widening of C.C Road from Gopal Nagar 4th Line to Kamma Palem 3rd Line in
4 2022-23 26.75 K-183
Gopal Nagar Mini Byepass Road in Division No.5
769 / Providing C.C Road from Venkata reddy house to Watchman Room in
5 2022-23 Brundavan Colony in Division No.10 40.00 K-182

770 / Construction of Foot Path from Railpet 2nd Line to Escole Church Center
6 2022-23 23.65 AE-6 K-197
along ABM Degree College Compound Wall in Division No.11
771 / Providing Platform for GTS and C.C Road from Kothamamidi Palem B.T Road
7 2022-23 37.50 AE-2 K-198
to GTS Office Room at Kothamamidi Palem in Division No.18
Providing C.C Road from Lawyer Vasishta (H) to Penaka Madhusudhan reddy
772 /
8 2022-23 (H) in Bank Colony 8th Line and from Ice Factory Line Entrance to Jacob (H) in 40.00 AE-2 K-199
Housing Board Colony in Division No.19
Construction of C.C Culvert and Approaches at Old Bye-pass Road (beside
773 /
9 2022-23 Polytechnic College Road) at Housing Board Colony south side in Division 22.30 AE-2 K-200
No.19
774 / Construction of C.C Drain, RCC Sump and High Mast Lighting arrangements
10 2022-23 19.50 AE-2 K-201
for Sports Authority at Mini Stadium in Division No.19
775 / Widening of C.C Road from Guptas Apartment to Srikanya Lodge in
11 2022-23 28.60 AE-2 K-202
Dharavarithota in Division No.21
776 / Construction of Steps, Compound Wall Painting work, Flooring Repair works
12 2022-23 1.50 AE-5 K-225
and Plantation at MRF Center in Division No.24
777 / Providing C.C Drain at Balajiraopet 1st Line and Jenda Chettu backside Drain
13 2022-23 Wall, Precast Slabs in Division No.25 27.50 AE-5 K-203

Providing C.C Drain from Sikakolli Narayana (H) to Kalavukuru Subba


778 /
14 2022-23 Rathamma (H) in Seetharamapuram and from Pujari Ruthu (H) to Ponnam Sai 10.00 AE-2 K-204
priya (H) in Kesavaswamypet near Ram Mandir in Division No.27

Providing C.C Road from Tanniru Venkayamma (H) to Danduri Venkata


779 /
15 2022-23 ramanjaneyulu (H) in Kesavaswamypet near Meeseva and Zakaraiah Nagar 6.50 AE-2 K-205
beside Emmanuelll Baptist Church 2nd Cross 1st Left in Division NO.27

Laying of 110 mm dia P.V.C Pipe Line at Zakaraiah Nagar beside Emmanuel
780 /
16 2022-23 Baptist Church 2nd Cross 1st Left and at Sanjay Gandhi Nagar near Masjid in 5.00 AE-2 K-206
Division No.27
781 / Providing C.C Road from Shivam Foundation to Power Office Compound Wall
17 2022-23 in Z.P Colony 5th Line in Division No.33 25.00 AE-3 K-207

Providing C.C Drain from Mandapati Anjamma house (12-120-1a) to


782 /
18 2022-23 Devarakonda Mangamma house (46-137-2272a) in Indira Nagar in Division 27.00 AE-3 K-208
No.40
783 / Providing C.C Drain from Gaddam Yesudaya house to NSP Canal in Linga
19 2022-23 13.00 AE-3 K-209
Reddy Apartments in Division No.40
784 / Providing C.C Road from K.R Homes to Anuradha Nilayam at Sri Rama
20 2022-23 9.99 AE-3 K-223
Chandra Mission Asramam locality in Division No.40
785 / Providing C.C Drain from Chintakayala Sai house to Penut Godown and Ravuri
21 2022-23 9.90 AE-3 K-210
Jyothi house in Sundaraiah Colony in Division No.42
786 / Providing C.C Drain from Kilari Venkateswaralu Shop to Chintakayala Sai
22 2022-23 house in Sundaraiah Colony in Division No.42 9.90 AE-3 K-211

Providing C.C Drain from Uppalapati Subbulu house to Thota Vijay babu
787 /
23 2022-23 house and Eluri Polamma house to Rathikinda Anandarao house in Division 9.60 AE-3 K-212
No.42
788 / Providing C.C Road from G.Srinivasa Reddy house to Ponnani Chinna house in
24 2022-23 Y.S.R Colony in Division No.42 7.55 AE-3 K-213

789 / Providing C.C Road from N.Madhava reddy house to D.Krishna reddy house
25 2022-23 7.55 AE-3 K-214
in Y.S.R Colony in Division No.42
Providing C.C Drain from G.Srinivasa reddy house to Ponnani Chinna house
790 /
26 2022-23 and N.Madhavareddy house to D.Krishna reddy house in Y.S.R Colony in 5.00 AE-3 K-215
Division No.42

791 /
Providing C.C Road from Ganapathi Nagar Anjaneyaswamy Temple to Burial
27 2022-23 Ground near Pothuraju Canal Bridge (via) Kakarla Yalamanda house in 40.00 AE-3 K-216
Division No.43
792 / Providing C.C Drain from Honey Fancy Shop to Masjid at Poleramma Temple
28 2022-23 20.00 AE-3 K-217
Line near N.G.O Colony in Division No.45
793 / Providing C.C Drain from Chilakala Venkatarao house (D.No.33-055-678) to
29 2022-23 17.00 AE-3 K-218
Koutilya Super Market in Srinagar Colony 2nd Line in Division No.45
794 / Providing C.C Roads in Nehru Nagar and Nehru Nagar Extension in Division
30 2022-23 40.00 AE-3 K-219
No.50
795 / Providing C.C Drains in Nehru Nagar and Nehru Nagar Extension in Division
31 2022-23 40.00 AE-3 K-220
No.50

796 / Providing Infrastructure Developmental Works to Throvagunta Harizanawada


32 2022-23 39.00 AE-3 K-221
Burial Ground near Chennai Kolkata Highway in Division No.50

Providing Infrastructure Developmental Works to Throvagunta


797 /
33 2022-23 Christianpalem Burial Ground near Chennai Kolkata Highway in Division 39.00 AE-3 K-222
No.50
798 / Providing C.C Patches at various places in 25 to 28 Divisions in Ongole
34 2022-23 7.50 AE-5 K-227
Municipal Corporation
799 / Providing C.C Patches at various places in 29 to 32 Divisions in Ongole
35 2022-23 Municipal Corporation 7.20 AE-5 K-224

800 /
36 2022-23 Supply and Delivery of Electrical Materials to Ongole Municipal Corporation 9.95 AE-5 K-226

Providing C.C Drain from Karnati Siva house (D.No.33-055-1097) to Pilli


801 / 647 /
37 2022-23 Lakshma Reddy house (D.No.33-055-522) near Pothuraju Canal in Division 8.00 AE-3 2022-23
No.45 (2nd call)
802 / Providing C.C Patches at various places in 1 to 6 Divisions in Ongole 754 /
38 2022-23 9.25 AE-4
Municipal Corporation (2nd call) 2022-23

803 / Providing C.C Patches at various places in 7 and 8 Divisions in Ongole 755 /
39 2022-23 Municipal Corporation (2nd call) 5.21 AE-4 2022-23

804 / Providing C.C Patches at various places in 9 to 13 and 16 Divisions in Ongole 756 /
40 2022-23 4.00 AE-6
Municipal Corporation (2nd call) 2022-23
805 / Rennovation of "Moulana Abdul Kalam Ajad Statue" in land Old Market 722 /
41 2022-23 5.30 AE-4
Junction in Division No.4 (3rd call) 2022-23

806 / Providing R.O Plant System at near Sachivalayam in Bathulavari Kunta in 723 /
42 2022-23 11.20 AE-6
Division No.16 (3rd call) 2022-23

Providing CC Drains from Mubarak Biriyani Point to GopiKrishna Hall end


807 /
(north side), from Guntur Road to Islampet Masjid Road, from Srinivasa Hall
651 /
43 2022-23 Road to Islampet Masjid Road (north side), from Sk.Rafi (H) to Srinivasa (H) 22.00 AE-1 2022-23
and Providing CC Patches from Rehman (H) to Frakruddin (H) in Division No.4
(3rd call)

Providing CC Drain, Reconstruction of CC Drain at Thangella Khasim Veedi in


Rajakala Street, Providing CC Road & CC Drain at Kammapalem 3rd Line extension in
808 / 40 Feet Road to Karavadi Donka 7th Line, Providing CC Drain from Karavadi Donka
657 /
44 2022-23 'Y' Junction to Kalikamatha Temple, Providing CC Road & CC Drain from back side of 22.00 AE-1 2022-23
Hindu Burial Ground Old Age Home west side in Karavadi Donka and Providing CC
Drain from 1st Cross Road to 2nd Cross Road in Kammapalem 3rd Line east side of
CC Road in Division No.7 (3rd call)

Providing CC Road, CC Drain & Patch Work from Katari Sankar (H) to Dasari
Suneetha (H) and from Aluri Lakshmi (H) to Polineni Aruna (H), Providing CC
809 / Roads from Dasari Suneetha (H) to Lingisetty Purnachandra rao (H) & from 658 /
45 2022-23 22.00 AE-1
Kaja Mahamuddin (H) to Edara Srinivasa Rao (H) and Providing CC Drain from 2022-23

Chenchu Lakshmi (H) to Bonthavari veedhi 1st & 2nd Lines and in Division
No.8 (3rd call)

Raising of CC Road & CC Drain from Challa Srirama (H) to Chavala Kumari (H),
Chavala Kumari (H) to Bapatla Gopi (H) and Kotari Narendra (H) to Kale
Venkateswarlu (H) at Maratipalem, Raising of CC Road & CC Drain from
Kamineni Sivakumar (H) Vemula Prasad (H) and Prasanthi Nilayam (H) to
810 / 663 /
46 2022-23 Valisetty Umamaheswararao (H) at Chikulavari veedhi, Repairs to Openwells 22.00 AE-1 2022-23
at Chivukulavari Street, Ramalayam Temple & Pakeer Palem and Providing
CC Drain from Karamcheti Krishna (H) to Rehaman Store & Karamcheti
Krishna (H) to Opp Kuppam Prasad (H) in Ranguthota in Division No.12 (3rd
call)

811 / Providing C.C Drain from Railway Line to Balaji Nagar in Division No.16 (3rd 665 /
47 2022-23 call) 40.00 AE-1 2022-23

Laying of 110 mm & 160 mm dia PVC Pipe Line from Ongole Dairy Milk
812 /
Parlour to Venkateswara (H) at Ganuga Palem, Basha Glass Work to Notice
667 /
48 2022-23 Shop, Moulali (H) to Sathyam Handlooms & Srinivasa Footwear to Srinu (H) at 22.00 AE-2 2022-23
Kotavari Veedhi, Providing CC Road & CC Drain beside Kotavari Veedhi School
east side in Division No.23 (3rd call)

Providing CC Drains & CC Roads from Vanttavani Colony 4th & 7th Lines,
813 / Ekalavya Nagar Burial Ground opp Roads, Vaddepalem, MangalaPalem 670 /
49 2022-23 beside YSRCP Party Office, TB Road and Samaikyatha Nagar in Division No.24 22.00 AE-2 2022-23

(3nd call)
814 / 673 /
50 2022-23 Providing CC Road, CC Drain and CC Retaining Wall in Division No.27 (3rd call) 22.00 AE-2 2022-23

815 / Providing CC Drain and RCC Culvert at Kothapeta Streets and Jammichettu 674 /
51 2022-23 Streets in Division No.28 (3rd call) 22.00 AE-2 2022-23
Providing CC Drains from M.Eswaramma (H) to P.Koeswaramma (H) and
816 / 763 /
52 2022-23 Providing CC Drain and Flooring with chequered terrazzo tiles for Steps at 22.00 AE-2 2022-23
Kondamitta Rajapanagal 11th Cross Road in Division No.29 (4th call)
817 / Construction of Steps from Dasari Pramila house to Hill in Seetharama Puram 764 /
53 2022-23 in Division No.30 (5th call) 2.00 AE-2 2022-23

Providing CC Drain from Puram Somaiah (H) to Muvva Venkateswarlu (H) at


JC Banglaw Back Side NSP Colony, Mogili Anadharao Plot to Nagendra Swami
Temple at Seetharampuram, Boddu Vijaya Lakshmi (H) to Sonu Supply Shop
818 / 675 /
54 2022-23 at Gaddalagunta and Laying of 100 mm dia AC Pipe Line from Vadde Naleeni 22.00 AE-2 2022-23
Jayanthi (H) to Karavadhi Seshaiah (H) at Seetharampuram, Burial Ground to
Kondaiah (H) and from Pasumarthi Ankaiah (H) to Punuri Lakshmi Narayana
(H) in Division No.30 (3rd call)

819 / Construction of Ward Sachivalayam Building in Gaddalagunta in Division 678 /


55 2022-23 40.00 AE-2
No.32 (5th call) 2022-23

Providing CC Drain in Nirmal Nagar 2nd Cross Road, Raising of CC Road from
820 / Chitithoti (H) (south side) to existing Byepass Road and Providing CC Drain 679 /
56 2022-23 from Subbareddy Towers to SBI ATM (Anjaiah Road), Brundavanam 22.00
AE-3 2022-23

Residency to kiran (H) in Division No.36 (3rd call)


821 / Providing CC Drains from Sai Janardhan Office to Flyover in Pandaripuram in 681 /
57 2022-23 Division No.46 (3rd call) 22.00 AE-3 2022-23

Providing CC Drains from Bhavani Prasad (H) to Gundu Suvarthamma (H),


822 / 682 /
58 2022-23 Pothuraju Canal to Phani (H) and G.Kotataiah (H) to Sirigiri Sambhaiah (H) in 22.00 AE-3 2022-23
NGO Colony 7th Line in Division No.47 (3rd call)
TOTAL 1102.22
Download Start Time : 22.12.2022 4.00 P.M
Download End Time : 05.01.2023 4.00 P.M
Receipt of Bids End Time : 05.01.2023 4.15 P.M
Price Bid Opening Time : 05.01.2023 4.30 P.M
823 / Laying of 110 mm dia P.V.C Pipe Line from Siva Stone Arts to Khaja
1 2022-23 Ramanaiah house in Division No.49 0.99 AE-3

824 / Providing Side Berms for C.C Road from Khaja Ramanaiah house to Siva Stone
2 2022-23 Arts and Cleaning of Jungle near Pothuraju Canal in Division No.49 0.99 AE-3

825 / Supply and Delivery of M.S Mesh for Open Well at Santhi Nagar in
3 2022-23 0.99 AE-3
Pernamitta in Division No.42
826 / Dismantling of Dilapidated Public Toilet at Padamati Palem near Kondaiah
4 2022-23 0.42 AE-2
Bunk in Division No.28
TOTAL 3.39
Download Start Time : 23.12.2022 4.00 P.M
Download End Time : 30.12.2022 4.00 P.M
Receipt of Bids End Time : 30.12.2022 4.15 P.M
Price Bid Opening Time : 30.12.2022 4.30 P.M
Replacement of 600 mm and 500 mm P.S.C Pipe Line with D.I K 7 Pipe Line
827 /
1 2022-23 for Clear Water Gravity Main from Housing Board Colony to Trunk Road 200.00
along Bhagya Nagar 4th Line in Ongole Municipal Corporation
Laying of D.I K7 Pipelines along Kothapatnam Road at Koppolu in Division
828 / No.9 and H.D.P.E Drinking Water Pipelines in SC Colony and other Residential
2 2022-23 131.84
Areas in Ongole Municipal Corporation under 15th Finance Commission
Grant

Providing D.I Water Pipe Line from Flyover to Sriram Colony along Kurnool
829 /
3 2022-23 Road in Division No.43, 44 & 45 in Ongole Municipal Corporation under 15th 94.00
Finance Commission Grant
830 / Providing B.T Road from Gangamma Temple to Obul Reddy Bridge in
4 2022-23 3.80 AE-2
Cheruvukommu Palem in Division No.18
831/ Laying of 110 mm dia P.V.C Pipe Line from opp. Gayatri High School to
5 2022-23 Venkata Reddy house in Samatha Nagar in Division No.38 5.90 AE-3

832 / Providing C.C Patches at various places in 17 to 20 Divisions in Ongole


6 2022-23 8.00 AE-2
Municipal Corporation
833 / Providing C.C Patches at various places in 21 to 24 Divisions in Ongole
7 2022-23 7.50 AE-2
Municipal Corporation
TOTAL 451.04
Download Start Time : 24.12.2022 4.00 P.M
Download End Time : 09.01.2023 4.00 P.M
Receipt of Bids End Time : 09.01.2023 4.15 P.M
Technical Bid Opening Time : 09.01.2023 4.30 P.M
Price Bid Opening Time : 09.01.2023 4.45 P.M
834 / Construction of First Floor Slab at Shadikhana Building in Division No.24 in 758 /
1 2022-23 Ongole Municipal Corporation (2nd call) 68.00 2022-23

835 / Providing C.C Culvert at opposite to Auxilium School in Islampet Extension in 750 /
2 2022-23 1.55 AE-1
Division No.4 (4rd call) 2022-23

836 / Providing C.C Road at opposite to Auxilium School in Islampet Extension in 751 /
3 2022-23 1.60 AE-1
Division No.4 (4th call) 2022-23

837 / Laying of 110 mm dia P.V.C Pipe Line from Jockey Show Room to Gorripati 752 /
4 2022-23 Srinivasulu house at Old Market in Division No.6 (4th call) 1.45 AE-1 2022-23

838 / Providing C.C Drain and Culvert from Jockey Show Room to existing Drain at 753 /
5 2022-23 opposite Old Market in Division No.6 (4th call) 2.60 AE-1 2022-23

TOTAL 75.20
Download Start Time : 24.12.2022 4.00 P.M
Download End Time : 02.01.2023 4.00 P.M
Receipt of Bids End Time : 02.01.2023 4.15 P.M
Price Bid Opening Time : 02.01.2023 4.30 P.M
Rejuvenation of Water Bodies at Rangarayudu Cheruvu for strengthening of
839 / Tank Bund and Providing of Walking Track and Plantation in Division No.36 in 725 /
1 2022-23 100.00 2022-
Ongole Municipal Corporation under 15th Finance Commission Grant (2nd 23
call)
840 / 733 /
2 2022-23 Providing C.C Roads in Dharavari Thota in Division No.21 (2nd call) 9.80 AE-2 2022-23

Providing C.C Road from Tanniru Subba rao house to Bandaru Subba rao
841 / 740 /
3 2022-23 house in Pernamitta Vadde Palem and T.Siddamma house to B.Ramesh 9.95 AE-3 2022-23
house in Pernamitta in Division No.40 (2nd call)
Providing C.C Drain from Tanniru Subba rao house to Bandaru Subba rao
842 / 745 /
4 2022-23 house in Pernamitta Vadde Palem and from T.Siddamma house to B.Ramesh 8.90 AE-3 2022-23
house in Pernamitta in Division No.40 (2nd call)
843 / Laying of 160 mm dia P.V.C Pipe Line from Transformer Road in Vadde Palem 746 /
5 2022-23 to Sarayi Factory in Division No.40 (2nd call) 9.50 AE-3 2022-23

844 / Construction of Community Hall in Pernamitta S.C Colony in Division No.41 747 /
6 2022-23 10.00 AE-3
(2nd call) 2022-23

845 / Providing C.C Drain from Edara Ramu house to Bye-pass Road at Power 749 /
7 2022-23 9.80 AE-3
Office beside Road in Division No.33 (3rd call) 2022-23

TOTAL 157.95
Download Start Time : 24.12.2022 4.00 P.M
Download End Time : 09.01.2023 4.00 P.M
Receipt of Bids End Time : 09.01.2023 4.15 P.M
Technical Bid Opening Time : 09.01.2023 4.30 P.M
Price Bid Opening Time : 09.01.2023 4.45 P.M
GGMP – Providing C.C Road from Addanki Srinivasa Rao house to
846 /
1 2022-23 N.Thirupathi house in Balajiraopet 1st Line Lambadi veedhi Sachivalayam in 13.40
Division No.25
847 / GGMP – Providing C.C Road from Sai Janani Apartment to existing S.S Tank-I
2 2022-23 (Mamidipalem) Main Road in Division No.34 20.00 AE-1

848 / Providing R.C.C Pipe Culvert for Cross Roads, Removal of High Berms and 632 /
3 2022-23 Jungle Clearance at Mother Theresa Colony in Division No.18 (2nd call) 1.60 AE-2 2022-23

TOTAL 35.00
Download Start Time : 26.12.2022 4.00 P.M
Download End Time : 02.01.2023 4.00 P.M
Receipt of Bids End Time : 02.01.2023 4.15 P.M
Price Bid Opening Time : 02.01.2023 4.30 P.M
849 / Providing C.C Drain from Rythu Bazar to Alluraiah Sweets Shop (VIP Road 121 /
1 2022-23 north side) via Temple Towers Apartment in Division No.35 40.00 AE-5 2022-23

850 / Providing Internal Quarry Rubbish Roads at various places in Sundaraiah


2 2022-23 9.90 AE-3
Colony in Division No.42
TOTAL 49.90
Download Start Time : 29.12.2022 4.00 P.M
Download End Time : 05.01.2023 4.00 P.M
Receipt of Bids End Time : 05.01.2023 4.15 P.M
Price Bid Opening Time : 05.01.2023 4.30 P.M
Construction of C.C Drain from Indiramma Colony 1st Street Plot No.53 (Vijay
851 / Mohan house) to existing Culvert at Guthikondavari Palem Road turning
1 2022-23 100.00
along Koppolu Road in Division No.9 in Ongole Municipal Corporation under
15th Finance Commission Grant

Construction of C.C Drain from Angalakutti Akkamma house (Housing ID


852 / No.08227801) to Amudalapalli Anjaiah house (D.No.25-038-311) in Balaji
2 2022-23 45.80
Nagar in Division No.16 in Ongole Municipal Corporation under 15th Finance
Commission Grant
TOTAL 145.80
Download Start Time : 30.12.2022 4.00 P.M
Download End Time : 16.01.2023 4.00 P.M
Receipt of Bids End Time : 16.01.2023 4.15 P.M
Technical Bid Opening Time : 16.01.2023 4.30 P.M
Price Bid Opening Time : 16.01.2023 4.45 P.M
853 /
1 2022-23 Cleaning and Formation of Muslim Burial Ground at K.P Road in Division No.8 5.00 AE-4

Providing Interconnection to Pipe Line at Anjayaswamy Temple in Indiramma


854 /
2 2022-23 Colony and at Animal Husbandary Office opposite in Santhapet in Division 0.98 AE-4
No.14
855 / Rennovation of C.C Drain and Providing C.C Culvert at Hosanna Mandir Line
3 2022-23 in Balaji Nagar in Division No.16 5.30 AE-6

856 / Maintenance of Urinals and Toilets at Gandhi Park in Ongole Municipal


4 2022-23 3.85 AE-4
Corporation
857 / Supply and Delivery of Ornamental Foilage Plants for Maintenance of
5 2022-23 0.99 AE-4
Gardens and Parks in Ongole Municipal Corporation
858 / Supply and Delivery of Tools and Fertilizers for Maintenane of Gardens and
6 2022-23 6.10 AE-4
Parks in Ongole Municipal Corporation
859 / Engaging of J.C.B for removing of Jungle clearance and lifting of Debris in 1 to
7 2022-23 16 Divisions in Ongole Municipal Corporation 2.00 AE-6

Engaging of J.C.B and Tractor for removing of Jungle, Formation of Kutcha


860 /
8 2022-23 Drain and Lifting of Debris in 17 to 32 Divisions in Ongole Municipal 5.00 AE-2
Corporation
861 / Repairs to Old M.S Push Carts in Sanitary Division No.5 in Ongole Municipal
9 2022-23 3.50 AE-3
Corporation

862 / SWM - Engaging of Shovel 0.85 cum (110 HP) Machine for Lifting of Garbage
10 2022-23 10.00 AE-3
at Dumping Yard in Guthikondavari Palem in Ongole Municipal Corporation

Repairs and Rectification of 1200 mm dia P.S.C Gravity Main Leaks at various
863 /
11 2022-23 places from Ethamukkala Head Regulator to S.S Tank-II Inlet in Ongole 9.99 AE-3
Municipal Corporation
GGMP – Providing C.C Road from Addanki Srinivasa Rao house to
864 / 846 /
12 2022-23 N.Thirupathi house in Balajiraopet 1st Line Lambadi veedhi Sachivalayam in 13.40 2022-
23
Division No.25 (2nd call)
TOTAL 66.11
Download Start Time : 03.01.2023 4.00 P.M
Download End Time : 10.01.2023 4.00 P.M
Receipt of Bids End Time : 10.01.2023 4.15 P.M
Price Bid Opening Time : 10.01.2023 4.30 P.M
865 / Transportation and Supply of Water in various places in 1 to 50 Divisions in 688 /
1 2022-23 40.00
Ongole Municipal Corporation 2022-23

866 /
2 2022-23 Repairs and Rectification of Public Toilet at Pappu Bazar in Division No.25 1.70 AE-5 K-243

867 / Providing LED Rope Lighting at Collector Camp Office in Ongole Municipal
3 2022-23 Corporation 0.50 AE-2 K-248
868 / Supply and Fixing of ABS Speed Breakers at various places in Ongole
4 2022-23 6.00 AE-2 K-249
Municipal Corporation
Providing Non-Veg Meals and Veg Meals for VIPs, Corporators and other
869 /
5 2022-23 Staff for Council Meetings and Other Meeting at Council Hall of Ongole 6.60 AE-3 K-251
Municipal Corporation

Providing Hire Charges on Shamiyanas, Pendulums, VIP Chairs, Soft Sets,


870 / Plastic Chairs, Tables, Mike Sets, DJ sets and Supply of Water Cans, Paper
6 2022-23 Glasses and Plastic Glasses in any programmes in Ongole Municipal 8.05
AE-3 K-252
Corporation
871 / Providing C.C Patches at various places in 1 to 6 Divisions in Ongole 802 /
7 2022-23 Municipal Corporation (3rd call) 9.25 AE-4 2022-23

872 / Providing C.C Patches at various places in 7 and 8 Divisions in Ongole 803 /
8 2022-23 5.21 AE-4
Municipal Corporation (3rd call) 2022-23

873 / Providing C.C Patches at various places in 9 to 13 and 16 Divisions in Ongole 804 /
9 2022-23 4.00 AE-6
Municipal Corporation (3rd call) 2022-23

874 / Providing C.C Patches at various places in 17 to 20 Divisions in Ongole 832 /


10 2022-23 Municipal Corporation (2nd call) 8.00 AE-2 2022-23

875 / Providing C.C Patches at various places in 21 to 24 Divisions in Ongole 833 /


11 2022-23 Municipal Corporation (2nd call) 7.50 AE-2 2022-23

876 / Providing C.C Patches at various places in 25 to 28 Divisions in Ongole 798 /


12 2022-23 7.50 AE-5
Municipal Corporation (2nd call) 2022-23

877 / Providing C.C Patches at various places in 29 to 32 Divisions in Ongole 799 /


13 2022-23 7.20 AE-5
Municipal Corporation (2nd call) 2022-23

878 / Providing C.C Road Repairs and C.C Approaches at various places in 33 to 50
14 2022-23 Divisions in Ongole Municipal Corporation 7.00 AE-3 K-245

879 / Providing C.C Drain from Rythu Bazar to Alluraiah Sweets Shop (VIP Road 849 /
15 2022-23 40.00 AE-5
north side) via Temple Towers Apartment in Division No.35 (2nd call) 2022-23

880 / Providing C.C Culvert at opposite to Auxilium School in Islampet Extension in 835 /
16 2022-23 1.55 AE-1
Division No.4 (5rd call) 2022-23

881 / Providing C.C Road at opposite to Auxilium School in Islampet Extension in 836 /
17 2022-23 Division No.4 (5th call) 1.60 AE-1 2022-23

882 / Laying of 110 mm dia P.V.C Pipe Line from Jockey Show Room to Gorripati 837 /
18 2022-23 1.45 AE-1
Srinivasulu house at Old Market in Division No.6 (5th call) 2022-23

883 / Providing C.C Drain and Culvert from Jockey Show Room to existing Drain at 838 /
19 2022-23 2.60 AE-1
opposite Old Market in Division No.6 (5th call) 2022-23

884 / Rennovation of C.C Drain and Providing C.C Culvert at Hosanna Mandir Line 855 /
20 2022-23 5.30 AE-6
in Balaji Nagar in Division No.16 (2nd call) 2022-23

Engaging of J.C.B and Tractor for removing of Jungle, Formation of Kutcha


885 / 860 /
21 2022-23 Drain and Lifting of Debris in 17 to 32 Divisions in Ongole Municipal 5.00 AE-2 2022-23
Corporation (2nd call)
GGMP – Providing C.C Road from Addanki Srinivasa Rao house to
886 / 864 /
22 2022-23 N.Thirupathi house in Balajiraopet 1st Line Lambadi veedhi Sachivalayam in 13.40 2022-23
Division No.25 (3rd call)
TOTAL 189.41
Download Start Time : 12.01.2023 4.00 P.M
Download End Time : 19.01.2023 4.00 P.M
Receipt of Bids End Time : 19.01.2023 4.15 P.M
Price Bid Opening Time : 19.01.2023 4.30 P.M
887 / Providing C.C Culvert and C.C Drain beside Throvagunta Main Road in
1 2022-23 6.70 AE-4 K-230
Division No.1
888 / Formation of Road from Sk.Bikari house to P.Ramulamma house in Bilal
2 2022-23 2.65 AE-4 K-231
Nagar 5th Line in Division No.2
889 / Providing C.C Drain both sides from Gaddikayyalu Store Bazar Extension to
3 2022-23 Purini Suresh house in Division No.5 9.80 AE-4 K-232

890 /
4 2022-23 Providing C.C Road from Achari house to Store Bazar Line in Division No.5 9.80 AE-4 K-233

891 / Providing C.C Road from Saadam Pushpalatha house to Senikalavari Devara
5 2022-23 9.80 AE-4 K-234
house in Division No.5
892 /
6 2022-23 Development of Walking Track at DRRM High School in Division No.14 10.00 AE-6 K-235

893 /
7 2022-23 Providing C.C Road at Ungaralavari Veedhi in Division No.14 4.50 AE-6 K-236

894 / Providing C.C Road from Sannaboyina Koteswara Rao house to Nagam
8 2022-23 4.40 AE-2 K-237
Sivaiah house near Nagaramma Temple in Pelluru in Division No.17
895 / Providing C.C Drain from K.Hanumantha Rao house to H.P Petrol Bunk at
9 2022-23 10.00 AE-2 K-238
Bhagya Nagar in Divisio No.20
896 / Providing C.C Drain from Ramadevi Chicken Center to Bhagya Nagar 3rd Line
10 2022-23 9.00 AE-2 K-239
in Division No.20
897 / Providing C.C Road from Registrar Office Road to Happy Home Apartment in
11 2022-23 Bhagya Nagar 2nd Line in Division No.20 8.10 AE-2 K-240

898 / Providing C.C Drain from Registrar Office Road to Happy Home Apartment in
12 2022-23 6.00 AE-2 K-241
Bhagya Nagar 2nd Line in Division No.20
899 /
13 2022-23 Proposed New Arch for Ekalavya Nagar Entrance in Division No.24 4.60 AE-2 K-242

900 / Providing C.C Road from Sri Abhaya Anjaneya Swamy Temple basck side
14 2022-23 20.00 AE-3 K-244
(Marrichettu) to SSR Towers in Mangamoor Road in Division No.39
Providing C.C Road from Lawyer Vasishta (H) to Penaka Madhusudhan reddy
901 / 772 /
15 2022-23 (H) in Bank Colony 8th Line and from Ice Factory Line Entrance to Jacob (H) in 40.00 AE-2 2022-23
Housing Board Colony in Division No.19 (2nd call)
Construction of C.C Culvert and Approaches at Old Bye-pass Road (beside
902 / 773 /
16 2022-23 Polytechnic College Road) at Housing Board Colony south side in Division 22.30 AE-2 2022-23
No.19 (2nd call)

903 / Construction of C.C Drain, RCC Sump and High Mast Lighting arrangements 774 /
17 2022-23 19.50 AE-2
for Sports Authority at Mini Stadium in Division No.19 (2nd call) 2022-23

904 / Widening of C.C Road from Guptas Apartment to Srikanya Lodge in 775 /
18 2022-23 28.60 AE-2
Dharavarithota in Division No.21 (2nd call) 2022-23

905 / Providing C.C Drain at Balajiraopet 1st Line and Jenda Chettu backside Drain 777 /
19 2022-23 27.50 AE-5
Wall, Precast Slabs in Division No.25 (2nd call) 2022-23
Providing C.C Drain from Sikakolli Narayana (H) to Kalavukuru Subba
906 / 778 /
20 2022-23 Rathamma (H) in Seetharamapuram and from Pujari Ruthu (H) to Ponnam Sai 10.00 AE-2 2022-23
priya (H) in Kesavaswamypet near Ram Mandir in Division No.27 (2nd call)

Providing C.C Road from Tanniru Venkayamma (H) to Danduri Venkata


907 / ramanjaneyulu (H) in Kesavaswamypet near Meeseva and Zakaraiah Nagar 779 /
21 2022-23 6.50 AE-2
beside Emmanuelll Baptist Church 2nd Cross 1st Left in Division NO.27 (2nd 2022-23

call)

Laying of 110 mm dia P.V.C Pipe Line at Zakaraiah Nagar beside Emmanuel
908 / 780 /
22 2022-23 Baptist Church 2nd Cross 1st Left and at Sanjay Gandhi Nagar near Masjid in 5.00 AE-2 2022-23
Division No.27 (2nd call)
909 / Providing C.C Road from Shivam Foundation to Power Office Compound Wall 781 /
23 2022-23 25.00 AE-3
in Z.P Colony 5th Line in Division No.33 (2nd call) 2022-23

Providing C.C Drain from Mandapati Anjamma house (12-120-1a) to


910 / 782 /
24 2022-23 Devarakonda Mangamma house (46-137-2272a) in Indira Nagar in Division 27.00 AE-3 2022-23
No.40 (2nd call)
911 / Providing C.C Drain from Gaddam Yesudaya house to NSP Canal in Linga 783 /
25 2022-23 13.00 AE-3
Reddy Apartments in Division No.40 (2nd call) 2022-23

912 / Providing C.C Drain from Honey Fancy Shop to Masjid at Poleramma Temple 792 /
26 2022-23 Line near N.G.O Colony in Division No.45 (2nd call) 20.00 AE-3 2022-23

913 / Providing C.C Drain from Chilakala Venkatarao house (D.No.33-055-678) to 793 /
27 2022-23 Koutilya Super Market in Srinagar Colony 2nd Line in Division No.45 (2nd call) 17.00
AE-3 2022-23

914 / Providing C.C Roads in Nehru Nagar and Nehru Nagar Extension in Division 794 /
28 2022-23 No.50 (2nd call) 40.00 AE-3 2022-23

915 / Providing C.C Drains in Nehru Nagar and Nehru Nagar Extension in Division 795 /
29 2022-23 40.00 AE-3
No.50 (2nd call) 2022-23

916 / Providing Infrastructure Developmental Works to Throvagunta Harizanawada 796 /


30 2022-23 39.00 AE-3
Burial Ground near Chennai Kolkata Highway in Division No.50 (2nd call) 2022-23

Providing Infrastructure Developmental Works to Throvagunta


917 / 797 /
31 2022-23 Christianpalem Burial Ground near Chennai Kolkata Highway in Division 39.00 AE-3 2022-23
No.50 (2nd call)

918 /
Providing C.C Drain from Karnati Siva house (D.No.33-055-1097) to Pilli
801 /
32 2022-23 Lakshma Reddy house (D.No.33-055-522) near Pothuraju Canal in Division 8.00 AE-3 2022-23
No.45 (3rd call)
919 / Providing R.O Plant System at near Sachivalayam in Bathulavari Kunta in 806 /
33 2022-23 11.20 AE-6
Division No.16 (4th call) 2022-23

TOTAL 553.95
Download Start Time : 17.01.2023 4.00 P.M
Download End Time : 31.01.2023 4.00 P.M
Receipt of Bids End Time : 31.01.2023 4.15 P.M
Price Bid Opening Time : 31.01.2023 4.30 P.M
921 / Transportation and Supply of Water in various places in 1 to 50 Divisions in 865 / 688 /
1 2022-23 40.00 2022-
Ongole Municipal Corporation (2nd call) 23
2022-23
GGMP – Providing C.C Road from Addanki Srinivasa Rao house to
922 / 886 /
864 /
2 2022-23 N.Thirupathi house in Balajiraopet 1st Line Lambadi veedhi Sachivalayam in 13.40 2022-
23 2022-23
Division No.25 (4th call)

923 / Providing C.C Drain from Sk.Karimulla house to Vuruma Ravichandra house in 646 /
3 2022-23 Pragathi Nagar 3rd Line right side 3rd cross road in Division No.39 (recall) 6.00 AE-3 2022-23

924 / Providing C.C Patches at various places in 1 to 6 Divisions in Ongole 871 /


4 2022-23 Municipal Corporation (4th call) 9.25 AE-4 2022-23

925 / Providing C.C Patches at various places in 7 and 8 Divisions in Ongole 872 /
5 2022-23 5.21 AE-4
Municipal Corporation (4th call) 2022-23

926 / Providing C.C Patches at various places in 9 to 13 and 16 Divisions in Ongole 873 /
6 2022-23 4.00 AE-6
Municipal Corporation (4th call) 2022-23

927 / Providing C.C Patches at various places in 17 to 20 Divisions in Ongole 874 /


7 2022-23 8.00 AE-2
Municipal Corporation (3rd call) 2022-23

928 / Providing C.C Patches at various places in 25 to 28 Divisions in Ongole 876 /


8 2022-23 Municipal Corporation (3rd call) 7.50 AE-5 2022-23

TOTAL 93.36
Download Start Time : 21.01.2023 4.00 P.M
Download End Time : 27.01.2023 4.00 P.M
Receipt of Bids End Time : 27.01.2023 4.15 P.M
Price Bid Opening Time : 27.01.2023 4.30 P.M
GGMP - Providing C.C Disposal Drain from Garuda Bakery to Sangavarapu
929 /
1 2022-23 Pavan Kumar (H) of Kondaiah Bunk Road at Rajapanagal Road-1 Sachivalayam 20.00 AE-5
in Division No.28
930 / GGMP - Providing R.C.C Culvert opposite to New Filter Bed at Lambadi Street
2 2022-23 6.60 AE-5
Lambadi Veedhi Sachivalayam in Division No.25
931 / Providing C.C Road from NCCSAI (National Council for the Church at Action
3 2022-23 18.00 AE-3 K-263
India) to R&B Road in Division No.33
932 / SWM - Supply and Delivery of H.D.P.E 60 Ltr capacity Bins to Ongole
4 2022-23 9.50 AE-3 K-264
Municipal Corporation
TOTAL 54.10
Download Start Time : 25.01.2023 4.00 P.M
Download End Time : 01.02.2023 4.00 P.M
Receipt of Bids End Time : 01.02.2023 4.15 P.M
Price Bid Opening Time : 01.02.2023 4.30 P.M
Construction of C.C Drain from Indiramma Colony 1st Street Plot No.53 (Vijay
933 / Mohan house) to existing Culvert at Guthikondavari Palem Road turning 851 /
1 2022-23 100.00 2022-
along Koppolu Road in Division No.9 in Ongole Municipal Corporation under 23
15th Finance Commission Grant (2nd call)

Construction of C.C Drain from Angalakutti Akkamma house (Housing ID


934 / No.08227801) to Amudalapalli Anjaiah house (D.No.25-038-311) in Balaji 852 /
2 2022-23 45.80 2022-
Nagar in Division No.16 in Ongole Municipal Corporation under 15th Finance 23
Commission Grant (2nd call)
935 / Formation of Internal Roads to 5th, 6th Main Lines, 3rd, 4th, 5th Internal
3 2022-23 Cross Roads and Sivalayam Road in Kesavarajukunta in Division No.2 10.00 AE-4 K-265
936 /
4 2022-23 Formation of Road at Government I.T.I College in Division No.2 7.15 AE-4 K-266

937 / Formation of Internal Roads to 1st, 2nd, 3rd, 4th Main Line and 1st, 2nd, 3rd,
5 2022-23 4th, 5th Internal Cross Roads in Kesavaravarjukunta in Division No.2 10.00 AE-4 K-267

938 / Widening of C.C Road at Balaji Nagar S.T Colony Main Road (S.T habitation) in
6 2022-23 Division No.16 10.00 AE-6 K-253

939 / Providing C.C Drain at Balaji Nagar 4th Line and Cross Roads (S.T habitation)
7 2022-23 10.00 AE-6 K-254
in Division No.16
940 / Providing C.C Road at Ramalayam back side in Pothuraju Palem in Division
8 2022-23 9.80 AE-6 K-255
No.16
941 / Providing C.C Drain at Balaji Nagar Yanadi Sangham and Cross Roads (S.T
9 2022-23 8.30 AE-6 K-256
habitation) in Division No.16
942 / Filling of Pipe Line Trenches with Quarry Rubbish beside of N.C.C Office in
10 2022-23 Pelluru in Division No.17 3.90 AE-2 K-257

943 / Laying of 110 mm dia P.V.C Pipe Line at Bank Colony 7th Line and 8th Line in
11 2022-23 8.50 AE-2 K-258
Housing Board Colony in Division No.19
944 / Providing C.C Road at Bandlamitta Model Primary School front road at
12 2022-23 5.60 AE-5 K-268
Pathivari Veedhi in Division No.25
945 / Laying of 110 mm dia P.V.C Pipe Line from Balajiraopet 2nd Line Cross Road
13 2022-23 3.40 AE-5 K-269
to Sisindri School in Division No.25
Providing C.C Drains at Bandlamitta Model Primary School front road,
946 /
14 2022-23 Kotaiah Sweet Shop in Bheemarajuvari Veedhi and Balaji Steel Shop opposite 8.20 AE-5 K-270
road in Gandhi Road in Division No.25
Providing C.C Roads at Balajiraopet 2nd Line Cross Road, Tyagaraju
947 /
15 2022-23 Mandiram Side Road in Gantapalem and Balaji Steels Shop opposite road in 9.70 AE-5 K-271
Division No.25
948 / Providing C.C Culvert and Approaches at Gaddalagunta Urban Health Center
16 2022-23 1.90 AE-5 K-259
in Division No.30
949 / Providing 12 Mtrs High Mast Lighting System at Krishna Mandiram Junction
17 2022-23 4.00 AE-5 K-260
in Mamidi Palem in Division No.31
950 / Providing C.C Drain from Sanki Rajesh (H) to Sunkara Venkata Rangaiah (H) in
18 2022-23 APSEB Colony in Mamidi Palem in Division No.31 3.00 AE-5 K-261

951 / Providing C.C Road from Thathineni Padma (H) to Payyavula Srinivasulu (H) in
19 2022-23 7.60 AE-5 K-272
Vijay Nagar Colony in Division No.31
952 / Providing C.C Road from Sanki Rajesh (H) to Sunkara Venkat Rangaiah (H) in
20 2022-23 APSEB Colony Layout in Mamidi Palem in Division No.31 6.00 AE-5 K-273

953 / Providing C.C Drain from Valluri Nagarjuna house to Thuraka Surendra house
21 2022-23 3.40 AE-5 K-274
in Vijay Nagar Colony in Division No.31
954 / Providing C.C Drain from Kommalapati Sridevi (H) to D.Singamma (H) in Vijay
22 2022-23 6.40 AE-5 K-275
Nagar Colony in Division No.31
955 / Providing C.C Drain from Thathineni Padma (H) to Payyavula Srinivasa Rao
23 2022-23 6.20 AE-5 K-276
(H) in Gayatri Nagar in Division No.31
956 / Providing C.C Drain from Vallepu Mohan (H) to Bhagya Nagar 4th Line in
24 2022-23 Vaddepalem in Division No.31 7.50 AE-5 K-277

957 / Providing C.C Road from Rathikonda Venkateswarlu (H) to Paleti Prasad (H) in
25 2022-23 6.30 AE-5 K-278
Viswas Nagar in Division No.31
958 / Laying of 110 mm dia P.V.C Pipe Line at back side of Gandhi Statue in
26 2022-23 8.25 AE-5 K-262
Gaddalagunta S.C Colony in Division No.32
959 / 840 /
27 2022-23 Providing C.C Roads in Dharavari Thota in Division No.21 (3rd call) 9.80 AE-2 2022-23

Providing C.C Road from Tanniru Subba rao house to Bandaru Subba rao
960 / 841 /
28 2022-23 house in Pernamitta Vadde Palem and T.Siddamma house to B.Ramesh 9.95 AE-3 2022-23
house in Pernamitta in Division No.40 (3rd call)
Providing C.C Drain from Tanniru Subba rao house to Bandaru Subba rao
961 / 842 /
29 2022-23 house in Pernamitta Vadde Palem and from T.Siddamma house to B.Ramesh 8.90 AE-3 2022-23
house in Pernamitta in Division No.40 (3rd call)
962 / Laying of 160 mm dia P.V.C Pipe Line from Transformer Road in Vadde Palem 843 /
30 2022-23 9.50 AE-3
to Sarayi Factory in Division No.40 (3rd call) 2022-23

963 / Construction of Community Hall in Pernamitta S.C Colony in Division No.41 844 /
31 2022-23 (3rd call) 10.00 AE-3 2022-23

964 / Providing C.C Road at opposite to Auxilium School in Islampet Extension in 881 /
32 2022-23 1.60 AE-1
Division No.4 (6th call) 2022-23

965 / Providing C.C Culvert at opposite to Auxilium School in Islampet Extension in 880 /
33 2022-23 1.55 AE-1
Division No.4 (6th call) 2022-23

966 / Laying of 110 mm dia P.V.C Pipe Line from Jockey Show Room to Gorripati 882 /
34 2022-23 Srinivasulu house at Old Market in Division No.6 (6th call) 1.45 AE-1 2022-23

967 / Providing C.C Drain and Culvert from Jockey Show Room to existing Drain at 883 /
35 2022-23 2.60 AE-1
opposite Old Market in Division No.6 (6th call) 2022-23

TOTAL 366.25
Download Start Time : 25.01.2023 4.00 P.M
Download End Time : 09.02.2023 4.00 P.M
Receipt of Bids End Time : 09.02.2023 4.15 P.M
Technical Bid Opening Time : 09.02.2023 4.30 P.M
Price Bid Opening Time : 09.02.2023 4.45 P.M
Arrangement for Total Station Survey (600 Ac Land) for Jagananna Layout i.e.,
968 /
1 2022-23 Malliswara Puram, N. Agraharam and Vengamukka Palem in Ongole 7.70 AE-6
Municipal Corporation
TOTAL 7.70
Download Start Time : 25.01.2023 3.00 P.M
Download End Time : 30.01.2023 10.30 A.M
Receipt of Bids End Time : 30.01.2023 10.45 A.M
Price Bid Opening Time : 30.01.2023 11.00 A.M
969 / Supply and Delivery of Furniture and necessary arrangements for Deputy
1 2022-23 0.85 AE-3
Mayor Chamber-1 in Ongole Municipal Corporation
970 / Supply and Delivery of Furniture and necessary arrangements for Deputy
2 2022-23 0.85 AE-3
Mayor Chamber-2 in Ongole Municipal Corporation
Supply, Delivery, Fixing and Replacement of 600 mm dia M.S Pipe and 90
971 /
3 2022-23 degrees M.S Bend at Bhagya Nagar 4th Line near back side of DWAMA Office 2.71 AE-2
in Division No.19
TOTAL 4.41
Download Start Time : 30.01.2023 4.00 P.M
Download End Time : 06.02.2023 4.00 P.M
Receipt of Bids End Time : 06.02.2023 4.15 P.M
Price Bid Opening Time : 06.02.2023 4.30 P.M
972 / Providing C.C Drain from Ambedkar Statue to Kasukurthi Durga Rao house in
1 2022-23 9.70 AE-2
Pelluru in Division No.17
973 / Drilling of 10 nos. of Dee Bore Wells and Fixing of IM-II Pump Sets at various
2 2022-23 9.95 AE-2
places in Ongole Municipal Corporation
974 / SWM - Supply and Delivery of Gear Oil and Hydraulic Oils for Sanitary
3 2022-23 Vehicles in Ongole Municipal Corporation 0.99 AE-3 K-250

975 / Providing C.C Patches at various places in 7 and 8 Divisions in Ongole 925 /
4 2022-23 5.21 AE-4
Municipal Corporation (5th call) 2022-23

976 / Providing C.C Patches at various places in 9 to 13 and 16 Divisions in Ongole 926 /
5 2022-23 4.00 AE-6
Municipal Corporation (5th call) 2022-23

977 / Rennovation of C.C Drain and Providing C.C Culvert at Hosanna Mandir Line 884 /
6 2022-23 5.30 AE-6
in Balaji Nagar in Division No.16 (3rd call) 2022-23

978 / Providing R.O Plant System at near Sachivalayam in Bathulavari Kunta in 919 /
7 2022-23 Division No.16 (5th call) 11.20 AE-6 2022-23

979 / Supply and Delivery of Tools and Fertilizers for Maintenance of Gardens and 858 /
8 2022-23 6.10 AE-4
Parks in Ongole Municipal Corporation (recall) 2022-23

980 / Providing C.C Drain from Sk.Karimulla house to Vuruma Ravichandra house in 923 /
9 2022-23 6.00 AE-3
Pragathi Nagar 3rd Line right side 3rd cross road in Division No.39 (3rd call) 2022-23

TOTAL 58.45
Download Start Time : 01.02.2023 4.00 P.M
Download End Time : 08.02.2023 4.00 P.M
Receipt of Bids End Time : 08.02.2023 4.15 P.M
Price Bid Opening Time : 08.02.2023 4.30 P.M
GGMP - Providing C.C Disposal Drain from Garuda Bakery to Sangavarapu
981 / 929 /
1 2022-23 Pavan Kumar (H) of Kondaiah Bunk Road at Rajapanagal Road-1 Sachivalayam 20.00 AE-5 2022-23
in Division No.28 (2nd call)
982 / GGMP - Providing R.C.C Culvert opposite to New Filter Bed at Lambadi Street 930 /
2 2022-23 Lambadi Veedhi Sachivalayam in Division No.25 (2nd call) 6.60 AE-5 2022-23

983 / Providing C.C Road from NCCSAI (National Council for the Church at Action 931 /
3 2022-23 India) to R&B Road in Division No.33 (2nd call) 18.00 AE-3 2022-23

984 /
4 2022-23 Rennovation of Toilet and at Gandhi Park in Ongole Municipal Corporation 4.00 AE-4

985 / Providing C.C Drain from Kamineni Saraswathi house to Kota Vijaya Lakshmi
5 2022-23 house in Division No.8 0.50 AE-4

TOTAL 49.10
Download Start Time : 01.02.2023 5.00 P.M
Download End Time : 08.02.2023 5.00 P.M
Receipt of Bids End Time : 08.02.2023 5.15 P.M
Price Bid Opening Time : 08.02.2023 5.30 P.M

You might also like