You are on page 1of 3

No.

of Total Financial
Sl.No. Name of the Project Block/Taluk District Unit (In km)
Villages Outlay (TFO)

(1) (2) (3) (4) (5) (6) (7)


Rural Roads
Construction of link road from Mughal road
Point Chakki-Gah to Bagh via Govt. Middle
1 3 Bufliaz Poonch 4.00 721.82
School Kala Hari Village Chandimarh – B
Buffliaz Tehsil Surankote District Poonch.

Construction of road from RS Pura (Bagoona)


2 to Devi Pindi (Ancient Temple) including link 7 Vijaypur Samba 5.30 405.78
road from Udh Mandi
Construction of Link Road from Noshi
3 7 Ramban Ramban 3.00 828.70
Anzwati to Horrandhar Dhar
Construction of Road from Kavana to
4 6 Ramsoo Ramban 4.10 997.43
Waggalwass Sarachi Link Road Pgase-I
Const. of road from Sakhi Maidan Kalai road
5 5 Lassana Poonch 3.00 502.35
Km 31st to 33rd block Lassana.
Construction of Road from TV Tower Gugwal
6 5 Ramban Ramban 4.60 518.77
Kumari via Primary School Kharal Phase-I.
Contt. Of link road from Gadi Nallah to Gotha
7 Tehsil Bhagwah District Doda Phase -I 6 Bhagwah Doda 6.00 1420.00
L=6.00km
Const. of link road from Sangiote K 3rd to
8 Chetti Batti Sangiote block Balakote Tehsil 3 Mendhar Poonch 1.50 248.02
Mendhar District Poonch (Length=1.50 Kms.)
Construction of link road from Barnoti-
Budhi road via Canal (Ravi Tawi) to Khurd
9 5 Barnoti Kathua 2.25 355.88
Shamshanghat upto Budhi –Thanoon link L-
2.25 kms
Constt.of link road to join Bani Dhaman road
10 to Hansa Bhullari road at Duggan from Power 7 Duggan Kathua 1.25 263.98
House to Ghan bridge at Duggan
Construction of approach road including
retaining walls, parking facilities , baricading
11 4 Tangdar Kupwara 2.00 244.43
and other allied works at Sharda Temple
Teetwal.
Construction of road from Purmandal road to
12 5 Puramandal Samba 5.00 607.45
Kathar via Upper Sangar
Construction of Road from Hangipora to
13 3 Berinag Anantnag 4.00 800.78
Saskhoudans Nowgam Nard
Construction of road from Jankher to
14 4 Basholi Kathua 3.00 532.19
Bhagoin/Papral (Phase-1st) under NABARD

15 Construction of Monbal to Sarwanwali road 2 Handwara Kupwara 2.50 421.32


Const of 50Mtr Span Steel Girder Pahribal-
16 Takanwari Bridge over Nallah Sindh at 15 Ganderbal Ganderbal 1.70 1487.37
Ganderbal.
Design and Construction of 70 Mtr Span
(2x35) Single Lane (4.25 Mtr Carriageway)
17 Steel Trussed Motorable Bridge with 1.2m 3 Rajouri Rajouri 1.00 550.85
wide foot path on either side over Thanna
Mandi Nallah at Aitti Rajouri
Const. of road from Upper Meer to Draman
18 10 Pancheri Udhampur 2.00 729.82
Phase I
Construction of road from Loyel Bela to
19 Naganari via Ban, Tehsil Mandi, District 7 Mandi Poonch 3.50 892.58
Poonch (Part-I),Length 3.50 Kms
Constt.of road from Banhore to Raipur via
20 7 Mahanpur Kathua 2.00 499.48
Bari Pathak
Improvement / Up-Gradation of road from
21 National Highway to Mohaya Mata Mandir at 5 Jib Udhampur 5.00 738.80
Garnai
Improvement/ Upgradation of Road from
22 Dharamkot Malti Road to Govt. Nursing 5 Billawar Kathua 3.00 461.38
College Surara via Chreeda (L=3.00 KMs)
Construction on of link road Lunka Paani to
23 7 Ramgarh Samba 5.50 741.21
Lian village ((5.50 km)
Improvement/upgradation of road from Tuta
24 4 Nagrota Gujroo Kathua 3.50 620.37
Dunga to Siya Mata Via Ambuled (L=3.50 km)

Construction/Upgradation of road Potlaban to


25 6 Chadoora Budgam 2.85 669.27
Wudder Mohalla at Watakaloo

Upgradation of road from Kambay Mohalla to


26 4 Ganderbal Ganderbal 3.00 264.09
Hatbura including Primary School
Upgradation/macdamization of inner link of
27 3 Karnah Kupwara 3.50 306.04
Kandi Nutnussa
Construction/Upgradation of road from
28 Zafferkhani to Sarmarg via Zafferkhani Check 15 Ramhal Kupwara 3.50 279.64
and Punjabi Mohalla
Upgradation of road from Chamber to
29 4 Tangdar Kupwara 2.50 425.02
Bandriyan via Yariban
Construction/Upgradation of road from Rakhi
30 3 Kakapora Pulwama 3.00 459.79
Narwah to Kunjipora under NABARD

31 Construction of road Hallan to Chiranbal 4 D.H. Pora Kulgam 5.00 888.05


Construction/upgradation of Soaf Shali
Ziyarat Shief Road including Gurvan Mohalla
32 3 Breng Anantnag 3.10 574.48
and Soaf Gratwalipora link road under
NABARD
Construction of Road from Logripora Wajoora
33 5 Pahalgam Anantnag 2.50 606.14
to Syeed Pathri Reshkul Bal
Construction of road to PMGSY road to
34 8 Srinagar Srinagar 1.58 202.02
Paragliding point at Astanmarg
Upgradation of Shah Mohalla Mominabad
35 2 Khonmoh Srinagar 3.26 429.39
Khyber Colony main road Khonmoh
Construction/Upgradation of road from
36 Bonyar to Sursyar via Malwari including 5 Chrarisharief Budgam 1.70 210.80
Zarimohalla
Upgradation of Aripanthan inner links and
37 6 Beerwah Budgam 8.00 844.57
Warihama inner links
38 Construction of Magam Bypass Road 2 Beerwah Budgam 1.00 211.07

Up-Gradation of road from Firing link road to


39 Mohan Singh Mohalla via Radha Krishna 3 Panjgrain Rajouri 2.50 378.71
Mandir Muradpur Length = 2.50 KMs

Up-gradation of road from main road (NH-


40 3 Rajouri Rajouri 2.00 285.80
144 A) Dalogra to Shiv Shah Mohalla

Upgradation of Road from Lowhar Mohalla to


41 Narram wala Kala Via Mohra Kallah, Bulabad, 3 Manjakote Rajouri 2.00 255.03
Hajam Mohalla, onward to upper Saroola
Strengthening/Upgradation of Khanpora
42 1 Achabal Anantnag 2.60 224.94
Utrsoo Road at Khanpora
Construction of Kral Khainey Hayan road at
43 3 Kangan Ganderbal 2.50 334.90
Kangan
Construction/Upgradation of Langate Bagath
44 5 Handwara Kupwara 3.50 369.24
Colony Road including Takiya
Upgradation/Improvement of Rakh
45 Padshahnard to Kuthanmarg road including 4 Keller Shopian 2.75 402.76
Bakerwal Mohallah link (2.75Km)
Construction of road from Palai to Nanetar
46 Mohra Barwal from Samba Sumb Road (L- 4 Sumb Samba 1.50 237.87
1.50 kms)
Construction of road from Ramgarh road
47 (Gudwal) to Youth Convention Centre 5 Vijaypur Samba 1.60 185.55
Vijaypur
Upgradation of Sitharan Toasamaidan Road
48 6 Khag Budgam 13.00 1402.73
at Khag
Upgradation of Patalbagh road to
49 Bejbagh(Musair Qabar) via International 5 Pampore Pulwama 5.00 925.60
School Patalbagh I/C all allied Links

Improvement/upgradation of Road from


50 Bongam to Hergam incl. at Kenihama and 2 Chadoora Budgam 6.25 399.02
Checkpora Kalan at Rambagh Chadoora

Upgradation of Kandizal road from Pampore


51 3 Kakapora Pulwama 3.00 438.21
Shopian road km 2nd towards Kandizal IR
Strengthening/ Upgradation of Gujjar Basti
52 4 Tral Pulwama 3.75 613.67
Gulshanpora road
Upgradation of Panzath Shampora Drein
Road including Panzath Nagbal link, Wanpora
53 to Shankerpora road, National Highway to 5 Qazigund Anantnag 7.00 722.52
Levdora link and Gagerdanji New Colony link
( agg. Length: 7.00 Kms)

Strengthening/Upgradation of Tilgam A and


54 4 Pattan Baramulla 5.00 622.29
Tilgam B inner links

Construction of 1x20 Mtr Span Plate Girder


RCC decked Bridge over Maloori Nallah along
55 4 Harwan Srinagar 2.00 462.42
with link road to Mawas Canal at Syedpora
Bala Harwan
Improvement/upgradation of road from
56 4 Basholi Kathua 2.00 319.42
Mann Badial to Sanki (Gujjar Mohalla)
Up-gradation of road from Main road to
57 Ziarat Bani Sharief Dharana, Tehsil Mendhar 2 Mendhar Poonch 1.00 187.35
length=1.00 kms
Construction/upgradation of Gulabwan
58 Abhama to Kalis mohalla incl. Chuthal to 4 Achgoze Pulwama 6.50 739.85
Bajard Mohalla and Gilla Mohalla Sangerwani

Upgradation of Safanagri Lamine Darbagh


59 4 Shopian Shopian 4.50 672.98
Wachi Road (Aggregate Length = 4.50 Kms)
Improvement/ Upgradation of Birindara Road
60 0 Kangan Ganderbal 1.50 216.39
at Chattergull Kangan

You might also like