Environmental Summary
Inspect by: Nadrah Syaqirin binti Ramlan Date & Time: 3/5/2023 @ 10:30 a.m
Project: Package 4D Kota Seri Langat Location: Tank No.1 & Tank No.2
Implemented?
Inspection Items Action Taken / Recommendation Remarks
Good Fair Poor N/A
1 WASTE MANAGEMENT
Is the site office, storage area and working kept clean
1.1 /
and tidy?
Are waste bins and containers are neat and
1.2 /
appropriate?
1.3 Are waste bin lids are closed? /
1.5 Are all wastes removed off site regularly? / Biweekly basis
2 CHEMICAL STORAGE
2.1 Are chemicals stored and labelled properly? /
Are hazardous chemicals provided with MSDS,
2.2 / Office record
warning signage?
4 AIR QUALITY
No major earthwork
4.4 Is there any water browser deployment at site? / ongoing and no dust
dispersion seen
4.5 Cleanliness of public access road complied? /
5 WATER QUALITY
7 SITE HOUSEKEEPING
Inspected by Reviewed by
Signature: Nadrah Signature: Amin
Name: Nadrah Syaqirin Name: Amin Firdaus
Designation: Environmental Officer Designation: Project Engineer
Construction, Completion And Handing Over Of Proposed 2 Nos 4.53 Million Litre Elevated Water Tank (Site 1 & Site 2) And
Its Associated Works (Package 4D) For Cadangan Pembangunan Di Bandar Kota Seri Langat, Mukim Tanjong Dua Belas,
Daerah Kuala Langat, Selangor Darul Ehsan Untuk Tetuan Seriemas Development Sdn. Bhd
Inspect by: Nadrah Syaqirin binti Ramlan Date & Time: 10/5/2023 @ 10:30 am
Project: Package 4D Kota Seri Langat Location: Tank No.1 & Tank No.2
Implemented?
Inspection Items Action Taken / Recommendation Remarks
Good Fair Poor N/A
1 WASTE MANAGEMENT
Is the site office, storage area and working kept clean
1.1 /
and tidy?
Are waste bins and containers are neat and
1.2 /
appropriate?
1.3 Are waste bin lids are closed? /
1.5 Are all wastes removed off site regularly? / Biweekly basis
2 CHEMICAL STORAGE
2.1 Are chemicals stored and labelled properly? /
4 AIR QUALITY
No major earthwork
4.4 Is there any water browser deployment at site? / ongoing and no dust
dispersion seen
4.5 Cleanliness of public access road complied? /
5 WATER QUALITY
Are surface water and effluent discharges are properly
5.1 /
managed and controlled to protect environment?
7 SITE HOUSEKEEPING
7.1 Site area is kept clean and free of debris/rubbish? /
Inspected by Reviewed by
Signature: Nadrah Signature: Amin
Name: Nadrah Syaqirin Name: Amin Firdaus
Designation: Environmental Officer Designation: Project Engineer
Construction, Completion And Handling Over Of Proposed 2 Nos, 4.53 Million Litre Elevated Water Tank (Site 1 & Site 2) And Its Associated Works (Package 4D) For Cadangan Pembangunan
Di Bandar Kota Seri Langat. Mukim Tanjong Dua Belas, Daerah Kuala Langat, Selangor Darul Ehsan
Untuk Tetuan Seriemas Development Bhd.
APRIL 2023
1 0.0
2 0.0
3 0.0
4 0.0
5 0.0
6 0.0
7 10.0
8 0.0
9 0.0
10 0.0
11 0.0
12 0.0
13 0.0
14 0.0
15 0.0
16 0.0
17 4.0
18 0.0
19 0.0
20 0.0
21 0.0
22 0.0
23 0.0
24 8.0
25 5.0
26 7.0
27 6.0
28 11.0
29 9.0
30 5.5
Legend:
Rain Sunny N/A
MAY 2023
1 5.0
2 4.0
3 6.0
4 0.0
5 0.0
6 7.0
7 11.0
8 0.0
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOTAL RAINFALL IN MONTH (MM) 33.0
Legend:
Rain Sunny N/A