S.No
Work ↓ (Type A) (Type B) (Type C) (Type D)
Rate → Rs.1800/Sq.ft (Rs.1900 / Sq.ft) (Rs.2100/ Sq.ft) (Rs.2400/Sq.ft)
5 Tie Beam 9inch x 6 inch 9Inch x 2inch 9 inch x 4 inch 9 inch x 4 inch
Flyash Bricks /
6 Type of Bricks Flyash Bricks Flyash Bricks Wire Cut Bricks
Chamber Bricks
Cement
Brickwork &
7 Vijay Gold JSW PSC Sankar/ Chettinad Ultra Tech
Plastering
Steel (ISI only) Ogun / ARS ARS / Equivalent JSW / Equivalent Tata
8
15 Bathroom Doors PVC Doors PVC Doors PVC Doors Fibre Doors
Throughout the
Throughout the Throughout the Throughout the
16 Sill Concrete length of walls at
length of walls length of walls length of walls
3ft
9inch x 6 inch
Cut Lintel on Window Cut Lintel on Window Throughout the
17 Lintel Beam Throughout the
and Door Openings and Door Openings length of walls
Length of wall
19 Roof Slab Thickness 5" Thick As per Design As per Design As per Design
3'3"Height using Fly 3'3"Height using Fly 3'3"Height using Fly 3'3"Height using Fly
20 Parapet Wall
Ash Bricks Ash Bricks Ash Bricks Ash Bricks
21 Weathering Course Gyps Flooring Gyps Flooring 9" x 9" Clay Tile Cooling Tile
Portico Elevation
26 Rs.40/Sq.ft Rs.45/Sq.ft Rs.45/Sq.ft Rs.80/Sq.ft
Tile
Description Of NEST RESIDENCY GRANDE EDIFICE
S.No
Work ↓ (Type A) (Type B) (Type C) (Type D)
PVC for External PVC for External PVC for External
27 UPVC for External
Line Line Line
Plumbing
UPVC &CPVC for UPVC &CPVC for UPVC &CPVC for UPVC &CPVC for
Concealed Line Concealed Line Concealed Line Concealed Line
28 Sanitary Fittings Parry Ware Basic Parry Ware Basic Parry ware/ Cera Jaguar Fitttings
2Coat Wall/ Ceiling 2 Coat Wall 2 Coat Wall+ Ceiling 2 Coat Wall+ Ceiling
Painting
Putty Putty/Ceiling Putty Putty Putty
2 Coat Wall Putty for 2 Coat Wall Putty for 2 Coat Wall Putty for 2 Coat Wall Putty for
Elevation Elevation Elevation Elevation
Exterior
1 Coat Exterior 1 Coat Exterior
1 Coat Exterior Primer 2 Coat Primer
Primer Primer
2 Coat Asian Ace 2 Coat Asian Ace 2 Coat Asian Apex 2 Coat Asian Ultima
Emulsion Emulsion Emulsion Emulsion
S.No Exclusions
1 Plan Approval
2 Temporary EB Connections/ Charges
3 Borewell Expense @ Site
4 Quality Water For Constructions
5 Compound Wall
6 Floor Sump
7 Septic Tank
8 Overhead Tank www.youtube.com/kgsbuilders
Any Deviation of work/ material price from
9
that mentioned in Aggrement Click On Link To View our Completed Projected
10 3D Elevation Drawing 1) Duplex 4BHK East Facing House
11 Special Elevation Features https://youtu.be/KVS9_wmmGU8
12 Electrical Appliances 2) Completed House Playlist On YouTube
13 Additional Basement Height https://youtube.com/playlist?list=PLN1iKcNghVGeBhFa
14 Additional Roof Height vdxAPqZefwI5LkH0p
15 Soil Testing